Loading...
HomeMy WebLinkAboutContract 52902-CO1 CSC No.52902-COI FORT WORTH City of Fort Worth ��_ Change Order Request Project Name:[_Churchill Road Water and Sanitary Sewer Improvements City Sec No.: 52902 Project No.(s):l 56017-0600430/0700430-001780 1 DOE No. N/A City Proj.No.: 100888 Installation of Water and Sanitary Sewer Improvements on Churchill Rd between White Settlement Rd and River Oaks Project Description: Blvd. Contractor: Flow-Line Construction, Inc. Change Order# 0 Date: 8/23/2021 City Project Mgr.1 Lawrence Hamilton City Inspector: I Carmen Drake Phone Number: 817-392-2626 Phone Number: 817-392-8347 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $6,522,745.00 $1,614,210.00 $8,136,955.00 720 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $6,522,745.00 $1,614,210.00 $8,136,955.00 720 Amount of Proposed Change Order $0.00 $22,705.70 $22,705.70 047 Revised Contract Amount $6,522,745.00 $1,636,915.70 $8,159,660.70 767 Original Funds Available for Change Orders $130,455.00 $48,426.00 $178,881.00 Remaining Funds Available for this CO $130,455.00 $48,426.00 $178,881.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.28% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $10,171,193.75 JUSTIFICATION(REASONS)FOR CHANGE ORDER Change Order No. 1 provides for the following: • The installation of special levee backfill material as required by the USACOE at a levee crossing on the project. • 6-inch sewer pipe for the reroute of sewer mains away from the levee crossing. • The relocation of a sewer manhole from the levee crossing as required by the USACOE. • Additional storm water pollution prevention. • The reroute of a 4-inch service at 800 Churchill Road from two lots. Staff recommends the addition of 47 calendar days for the change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor Name = 11 conA Signature Dat Flow-Line Construction, Inc. Eduardo Hernandez Q Z Ins eot r, Date Project Manager Date Nrector Water D4tr, Date Construction supervisor Water Dept) Date Aug31,2021 „� i�,�vio�i.�nto,L -77,9 Chnso herH r DT Assistant City Attorney Date Assistant City Manager Date Sep 3,2021 a s 9 �f Sep 3 2021 Council Action If Required M&C Number NIA M&C Date Approved FNTA OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Ft>n r Wt>wr H City of Fort Worth Change Order Additions Project Name Churchill Road Water and Sanitary Sewer Improvements City Sec No.: 1 52902 Project No.(s): 56017-0600430/0700430-001780 DOE No. N/A City Proj.No.: 100888 Project Installation of Water and Sanitary Sewer Improvements on Churchill Rd between White Settlement Rd and River Oaks Description Blvd. Contractor Flow-Line Construction,Inc. Change Order:= Date: 8/23/2021 City Project Mgr. Lawrence Hamilton City Inspector Carmen Drake ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 2 8"Sewer Pipe PVC(SDR 26) Sewer 23.00 LF $65.00 $1,495.00 5 Construction Staking Sewer 0.08690 LS $40,000.00 $3,476.00 9 Remove 4'Sewer Manhole Sewer 1.00 EA $1,000.00 $1,000.00 11 SWPPP>=1 ACRE Sewer 0.06 LS $50,000.00 $3,050.00 22 Trench Safety Sewer 23.00 LF $2.00 $46.00 28 4'Extra Depth Manhole Sewer 2.00 VF $215.00 $430.00 39 6"Sewer Pipe PVC(SDR 26)w/fittings and connections to existing Sewer 77.00 LF $117.83 $9,072.91 40 6"Sanitary Sewer Two-Way Cleanout Sewer 2.00 EA $3,173.67 $6,347.34 41 4'Drop Manhole Relocation(out of levee) Sewer 1.00 EA $8,000.00 $8,000.00 42 Grout/Abandon Existing 6"PVC Sewer pipe(in levee) Sewer 5.00 CY J$300.00 $1,500.00 43 Import and Install Special Levee Backfill,Haul of Surplus Dirt(289 CY) Sewer 289.00 CY J$142.63 $41,220.07 44 Re-Route of 4"Sewer Service at 800 Churchill Rd. Sewer 1.00 LS $3,118.38 $3,118.38 Water Sewer $78,705.70 Page 1 of i Additions Sub Total $78,705.70 FOR-T WORTH City of Fort Worth Change Order Deletions Project Name Churchill Road Water and Sanitary Sewer Improvements City Sec No.: 52902 Project No.(s): 56017-0600430/0700430-001780 DOE No. ERKI City Proj.No.: 100888 Project Description Installation of Water and Sanitary Sewer Improvements on Churchill Rd between White Settlement Rd and River Oaks Blvd, Contractor Flow-Line Construction, Inc. Change Order: M Date 8/23/2021 City Project Mgr. Lawrence Hamilton City Inspector: Carmen Drake DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 33 Sewer Construction Allowance Sewer 0.80 LS $70,000.00 $56,000.00 Water Sewer $56,000.00 Page 1 of 1 IDeletions Sub Total 1$56,000.00 MIWBE Breakdown for this Change Order Total Previous Change Orders Co MOM . , ._ AMOAT Total = = $Q 00 Page 1 of 1 Contract Compliance Manager By signing I acknowledge that I am the poison responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. J /V of y-fi 1�?�_{'� j 011u t,c L _ Signature �G 0 cam( {�11J Name of Employee 1'WAtSIONdI by,41Nf(r Title ATTEST: I�F°F°0000.0 � ° ° = dvg°°°°°°°°°°° od Ronald Gonzales P� b Acting City Secretary aa�nEXAso4p OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX