HomeMy WebLinkAboutContract 54024-A1 CSC No. 54024-Al
AMENDMENT No.1
TO CITY SECRETARY CONTRACT No. 54024
WHEREAS, the City of Fort Worth (CITY) and Dunaway Associates, L.P,
(ENGINEER) made and entered into City Secretary Contract No. 54024, (the
CONTRACT) which was administratively authorized on the 17th day of June,
2020 in the amount of $ 25, 110 . 00; and
WHEREAS, the CONTRACT involves engineering services for the
following project :
Storm Drain Improvements to Support Water & Sanitary Sewer
Replacement Contract 2019, WSM-K and 2018 CIP Year 1 Contracts 17
and 18; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $12, 070. 00. (See Attached Funding
Breakdown Sheet, Page -4-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $37, 180. 00.
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect .
EXECUTED and EFFECTIVE as of the date subscribed by the City' s
designated Assistant City Manager.
City of Fort Worth, Texas 102641
Prof Services Agreement Amendment Template Storm Drain Improvements to Support Water &
Sanitary Sewer Replacement Contract 2019, WSM-K and 2018 CIP
Year 1 Contracts 17 and 18
Revision Date: August 23, 2021
Page 1 of 4 OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
APPROVED:
City of Fort Worth ENGINEER
Dunaway Associates, L.L. C.
Dana Burghdol�c --Vi/I/�
Dana Burghdoff Daniel T mper, PE
Assistant City Manager Engagement Manager, Principal
DATE: Sep 11, 2021 DATE:
A'PPROVAL RECOMMENDED:
Wj(SepWj(Sep 10D.,
William Johnson
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
7A410.4 i3a44 z-
Mike Bennett
Project Manager
City of Fort Worth, Texas 102641
Prof Services Agreement Amendment Template Storm Drain Improvements to Support Water &
Sanitary Sewer Replacement Contract 2019, WSM-K and 2018 CIP
Year 1 Contracts 17 and 18
Revision Date: August 23, 2021
Page 2 of 4 OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
APPROVED AS TO FORM AND LEGALITY: M&C: NA
989OV7 Date :
Douglas W. Black
Assistant City Attorney
ATTEST:
470 FOR 0
C V �° 00
Ronald P. Gonzales ��,g o';¢
Acting City Secretary �v o o=�
o 040
° d
° °0
A °O°°°°o ,cY
�4 ICY
City of Fort Worth, Texas 102641
Prof Services Agreement Amendment Template Storm n,- i n Tmnrnvamants to Support Water &
Sanitary Sewer Replacement OFFICIAL RECORD WSM-K and 2018 CIP
L Contracts 17 and 18
Revision Date: August 23, 2021 CITY SECRETARY
Page 3 of 4 FT.WORTH,TX
FUNDING BREAKDOWN SHEET
City Secretary No. 54024
Amendment No. 1
Department Fund-Account-Center Amount
TPW 52002-0200431-5330500-102641-CAPEXP 12 , 070 . 00
Total : 12 , 070 . 00
City of Fort Worth, Texas 102641
Prof Services Agreement Amendment Template Storm Drain Improvements to Support Water &
Sanitary Sewer Replacement Contract 2019, WSM-K and 2018 CIP
Year 1 Contracts 17 and 18
Revision Date: August 23, 2021
Page 4 of 4
DUNAWAY
DA No. 0004465.002
September 9, 2021
Mike Bennett, P.E., PMP
Project Manager
Capital Delivery Division
Transportation/Public Works Department
City of Fort Worth
Office: 817.392.7891
Email: mike.bennett(o-)-fortworthtexas.gov
Reference: Amendment No. 1 —Storm Drain Construction Phase Re-Design
Storm Drain Improvements to Support Water& Sanitary Sewer Replacement
Contract 2019, WSM-K and 2018 CIP Year 1 Contracts 17 and 18
City. Project No. 102641
Contract ID: 10651
Dear Mr. Bennett:
Dunaway Associates, L.L.C. is pleased to present this Amendment No. 1 for the work performed
related to field conditions that did not match records for the segment of storm drain that was proposed
for Gordon Street and Shaw Streets and included for construction in 2018 CIP Year 2, Contract 18.
The efforts for this project were to field identify and coordinate efforts to complete the discovery of in-
ground conditions, and then to follow up with the re-design and provide quantities for the new storm
drain system. This entailed several meetings and on-site visits. As this effort happened during
construction and required an immediate response, this effort was not scoped prior to the work as
construction would have been delayed.
Level of effort,which has been provided in a prior email:
Hours Rate Total:
PM(Bryan Sherrieb) 26.25 $ 180.00 $ 4,725.00
Design Engineer 54.00 $ 130.00 $ 7,020.00
Admin: $ 325.00
Total: $ 12,070.00
Contract Summary
Contract Description Fee
Original Contract $ 25,110.00
Gordon/Shaw Re-design $ 12,070.00
TOTAL PROJECT $ 37,180.00
Please review the enclosed information and do not hesitate to call me if you have any questions or
require additional information regarding this proposal.
Amendment No. 1
September 9, 2021
Page 2
Sincerely,
DUNAWAY ASSOCIATES, L.L.C.
-V/
Daniel jTrper, P.E.
Engagement Manager, Principal
4465 Storm Drain amendment 2-21-0908.docx