Project Name: FY18-CD9 Street Repair and Recon Program City Sec No.: I 55163
Project No.(s):[ 56002.060043010700430.200431-0017601CO2160 DOE No. N/A City Proj.No.: CO24451 CO2389
Project Description: Combined Water,Sewer Replacement and Pavement Rehabilitation Improvements in the Near Southside Medical
District
Contractor: Reyes Group,Ltd._ Change Order# Date: 919/2021
City Project Mgr. John Kasavich City Inspector: Donald Watson i
Phone Number: 817-392-8480 Phone Number: 817-205-8911
Dept. Water Unit 1 Sewer Unit 2 TPW Unit III Totals Contract Time
I (Calender days)
Original Contract Amount $1,928,794.00 $559,058A0 $1,843,259.50 $4,331,111.50 365
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,928,794.00 $559,058.00 $1,843,259.50 $4,331,111.50 365
Amount of Proposed Change Order $0.00 $0.00 $0.00 $0.00 021
Revised Contract Amount $1,928,794.00 $559,058.00 $1,843,259.50 $4,331,111.50 386
Original Funds Available for Change Orders $57,864.00 $27,953.00 $184,326.00 $270,143.00
Remaining Funds Available for this CO $57,864.00 $27,953.00 $184 326,00 1 $270,143.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%Of ORIGINAL CONTRACT 1 0.00%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 1$5,413,889.38
JUSTIFICATION(REASONS FOR CHANGE ORDER
Change Order No.1 will provide for the following:
• The replacement of an existing 2-inch water line that was encountered less than 6-inches from the surface
and in direct conflict during sidewalk replacement on Miller Avenue(Arbor Street to Brookline Avenue).
• Restocking fee for 12-inch PVC water pipe that no longer need on the project.
• The deletion of pay item quantities that are no longer need on the project
Staff recommends the addition of 21 calendar days for the change order. j
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature =Dats
Reyes Group,Ltd. Jaison Cherian
I hector Date Pro'eot Manager Date
Director(Water Dept) Date Co struct'on Sup isor(Water Dept) Dale
5 , Sep 15,2021 5V /
eAssistant City Attorney Date Assistant City Manager Date
w�l Sep 15,2021 Sep 15,2021
Council Action(If Required)
M&C Number NA M&C Date Approved NA
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Fc�R-r ` bR-']tom City of Fort Worth
Change Order Additions
Project Name FY18-CD9 Street Repair and Recon Program City Sec No.: 55163
Project No.(s): 56002-0600430/0700430-80 and 200431 DOE No. N/A City Proj.No.: CO24451 CO
Project Combined Water,Sewer Replacement and Pavement Rehabilitation Improvements in the Near Southside Medical
Description District
Contractor Reyes Group,Ltd. Change Order:0 Date: 9l9I20 21
City Project Mgr. John Kasavich City Inspector F Donald Watson
ADDITIONS
TlfillDI=St-WRTFOY DEPT Qt Unit Unit Cost Total
15 8"PVC Water Pipe Water Unit 1 502.00 EA $86.00 $43,172.00
1 14 4"-12"Pressure Plug Water Unit 1 1.00 EA $3,058.00 $3,058.00
1 19 Salvage 3/4 Water Meter Water Unit 1 6.00 EA $681.50 $4,089.00
1 39 Temporary Water Services for Miller Water Unit 1 0.05 LS $219,275.50 $10,963.78
149 Ductile Iron Fittingsw/Restraint Water Unit 1 0.06 TN $5,988.00 $359.28
1 54 1"Water Service,Meter Reconnection Water Unit 1 6.00 EA $394.50 $2,367.00
1 55 1"Water Service Water Unit 1 6.00 EA $1,722.00 $10,332.00
1 65 8"Gate Valve Water Unit 1 2.00 EA $2,960.50 $5,921.00
1 78 Mobilization for Miller Rd Water Unit 1 1.00 LS $5,500.00 $5,500.00
1 79 Excavate and Hual off exislion CSML at Enderly Water Unit 1 60.00 CY $32.00 $1,920.00
1 80 Restocking Fee for 12"PVC Pipe Water Unit 1 235.00 LF $13.00 $3,055.00
Water Unit 1 $90,737.06
Sewer Unit 2
TPW Unit III
Page i of i Additions Sub Total $90,737.06
City of Fort Worth
Change Order Deletions
Project Name FY18-CD9 Street Repair and Recon Program City Sec No.: 1 55163
Project No.(s): 56002-0600430/0700430-80 and 200431 DOE No, N/A City Proj.No.: I CO2445/CO
Project Description Combined Water,Sewer Replacement and Pavement Rehabilitation Improvements in the Near SOUthside Medical
District
Contractor Reyes Group,Ltd. Change Order; = Date 9/9/2021
City Project Mgr. John I<asavich City Inspector: FDonald Watson
DELETIONS
ITEM I DESCRIPTION DEP I Qty Unit Unit Cost Total
1-4 12"PVC Water Pipe Water Unit 1 235.000 LF $94.00 $22,090.00
1-12 Water Line Grounting Water Unit 1 4.00 CY $484.00 $1,936.00
1-49 DUCllle Iron Water Fittings w/Restraint Water Unit 1 0.04 TN $5,988.00 $239.52
1-51 Connection to Existing 4"-12"Water Main Water Unit 1 1.00 EA $2,773.00 $2,773.00
1-54 1"Water Service Meter Reconnection Water Unit 1 2.00 EA $394.50 $789.00
1-55 1"Water Service Water Unit 1 2.00 EA $1,722.00 $3,444.00
1-74 Construction Allowance Water Unit 1 0.5946554 LS $100,000.00 $59,465.54
Water Unit 1 $90,737.06
Sewer Unit 2
TPW Unit III
Page 1 of 1 Deletions Sub Total J$90,737.06
IVIMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 1 of 1
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
--7—
Name of Employee
Title
ATTEST:
a �
�oo�° 00000.FORp�L d�
0 00
Ronald Gonzales p�a 0. a�
��0 °*i�
Acting City Secretary �
0 °_�
o o oc
d
° °0 Fy
471
-Q nEX4 54�A,
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX