HomeMy WebLinkAboutContract 56320 CSC No. 56320
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES
This AGREEMENT is between the City of Fort Worth,a Texas home-rule municipality
("CITY"), and Arredondo, Zepeda & Brunz, LLC, authorized to do business in Texas,
("ENGINEER"), for a PROJECT generally described as: Sanitary Sewer Rehabilitation,
Contract 118.
Article I
Scope of Services
The Scope of Services is set forth in Attachment A. Negotiated changes to this
Agreement, if any, are included in Attachment C.
Article II
Compensation
The ENGINEER's compensation shall be in the amount up to $302,590.50 as set
forth in Attachment B. Payment shall be considered full compensation for all labor
(including all benefits, overhead and markups), materials, supplies, and equipment
necessary to complete the Services.
Engineer shall provide monthly invoices to City. The Engineer shall provide the City
sufficient documentation, including but not limited to meeting the requirements set forth in
Attachment D to this AGREEMENT, to reasonably substantiate the invoices.
Payments for services rendered shall be made in accordance with the Texas
Prompt Payment Act (Texas Government Code Ch. 2251).
Acceptance by Engineer of said payment shall release City from all claims or
liabilities under this Agreement for anything related to, performed, or furnished in
connection with the Services for which payment is made, including any act or omission of
City in connection with such Services.
Article III
Term
Time is of the essence. Unless otherwise terminated pursuant to Article VI. D.
herein, this Agreement shall be for a term beginning upon the effective date, as described
below, and shall continue until the expiration of the funds or completion of the subject
matter contemplated herein pursuant to the schedule, whichever occurs first. Unless
specifically otherwise amended, the original term shall not exceed five years from the
original effective date:
OFFICIAL RECORD
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services CITY SECRETARY
Revised Date:May 7,2021
Pagel of 14
FT. WORTH, TX
Article IV
Obligations of the Engineer
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing under the same or similar circumstances and
professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that could
affect the total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 2 of 14
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the contract documents and any health or safety precautions
required by such construction work. The ENGINEER and its personnel have
no authority to exercise any control over any construction contractor or other
entity or their employees in connection with their work or any health or safety
precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that
the PROJECT, when completed, will be in accordance with the contract
documents, nor shall anything in the contract documents or this
AGREEMENT between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on-site inspections to discover
latent defects in the work or otherwise check the quality or quantity of the work
on the PROJECT. If the ENGINEER makes on-site observation(s) of a
deviation from the contract documents the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the contract documents.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 3 of 14
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that
the CITY's actual PROJECT costs, financial aspects, economic
feasibility, or schedules will not vary from the ENGINEER's opinions,
analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the contract
documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are no other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished b others, and may not always represent
p Y Y Y p
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 4 of 14
I. Business Equity Participation
City has goals for the full and equitable participation of minority business
and/or women business enterprises in City contracts greater than
$100,000. In accordance with the City's Business Equity Ordinance
(Ordinance No. 24535-11-2020 as codified in Chapter 20, Article X of the
City's Code of Ordinances, as amended, and any relevant policy or guidance
documents), the City has goals for the full and equitable participation of
minority business and/or women business enterprises in City contracts
greater than $100,000. Engineer acknowledges the MBE and WBE goals
established for this contract and its execution of this Agreement is Engineer's
written commitment to meet the prescribed MBE and WBE participation
goals. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may result
in the termination of this Agreement and debarment from participating in City
contracts for a period of time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
(3) ENGINEER and subconsultant agree to reproduce such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of hard copies at the rate published in the Texas Administrative Code in
effect as of the time copying is performed.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 5 of 14
K. INSURANCE
Engineer shall not commence work under this Agreement until it has
obtained all insurance required under Attachment F and City has approved
such insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY. The doctrine
of respondent superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required,
at its own cost and expense. However, if design changes are required due to
the changes in the permitting authorities' published design criteria and/or
practice standards criteria which are published after the date of this
Agreement which the ENGINEER could not have been reasonably aware of,
the ENGINEER shall notify the CITY of such changes and an adjustment in
compensation will be made through an amendment to this AGREEMENT.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 6 of 14
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
A. City-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights-of-way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 7 of 14
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of such
materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at the construction site,
and provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third-Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering services
performed. Only the CITY will be the beneficiary of any
undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third-party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third-party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 8 of 14
I. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
J. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
CITY and ENGINEER shall exercise their best efforts to meet their
respective duties and obligations as set forth in this Agreement, but shall
not be held liable for any delay or omission in performance due to force
majeure or other causes beyond their reasonable control, including, but not
limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters,
epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 9 of 14
D. Termination
(1) This AGREEMENT may be terminated
a.) by the City for its convenience upon 30 days' written notice to
ENGINEER.
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days' written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Reasonable cost of reproduction or electronic storage of partial or
complete studies, plans, specifications or other forms of ENGINEER'S
work product;
b.) The reasonable time requirements for the ENGINEER'S personnel to
document the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all projected termination
expenses. The CITY'S approval shall be obtained in writing prior to
proceeding with termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
The ENGINEER shall indemnify or hold harmless the CITY against
liability for any damage committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control to the extent that the damage is caused by
or resulting from an act of negligence, intentional tort, intellectual
property infringement, or failure to pay a subcontractor or supplier. CITY
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 10 of 14
is entitled to recover its reasonable attorney's fees in proportion to the
ENGINEER's liability.
G. Assignment
ENGINEER shall not assign all or any part of this AGREEMENT without the
prior written consent of CITY.
H. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
I. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
J. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or
may be enacted later by governing bodies having jurisdiction or authority for
such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless
CITY and all of its officers, agents and employees from and against all
claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
K. Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel,
have reviewed and revised Agreement and that the normal rule of contract
construction, to the effect that any ambiguities are to be resolved against
the drafting party, must not be employed in the interpretation of Agreement
or any amendments or exhibits hereto. The failure of CITY or ENGINEER
to insist upon the performance of any term or provision of this Agreement
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 11 of 14
or to exercise any right granted herein shall not constitute a waiver of CITY's
or ENGINEER's respective right to insist upon appropriate performance or
to assert any such right on any future occasion.
L. Immigration Nationality Act
ENGINEER shall verify the identity and employment eligibility of its
employees who perform work under this Agreement, including completing
the Employment Eligibility Verification Form (1-9). Upon request by CITY,
ENGINEER shall provide CITY with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this
Agreement. ENGINEER shall adhere to all Federal and State laws as well
as establish appropriate procedures and controls so that no services will be
performed by any ENGINEER employee who is not legally eligible to
perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD
CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES
DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER,
ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. CITY, upon written notice to ENGINEER, shall have the right
to immediately terminate this Agreement for violations of this provision by
ENGINEER.
M. Prohibition On Contracts With Companies Boycotting Israel
ENGINEER acknowledges that in accordance with Chapter 2271 of the
Texas Government Code, CITY is prohibited from entering into a contract
with a company for goods or services unless the contract contains a written
verification from the company that it: (1) does not boycott Israel; and (2) will
not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract,
ENGINEER certifies that ENGINEER'S signature provides written
verification to the CITY that ENGINEER: (1) does not boycott Israel;
and (2) will not boycott Israel during the term of the contract.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 12 of 14
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This AGREEMENT may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
same instrument. The following attachments and schedules are hereby made a part of this
AGREEMENT:
Attachment A - Scope of Services
Attachment B - Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
Attachment F — Insurance Requirements
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:May 7,2021
Page 13 of 14
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY: BY:
CITY OF FORT WORTH ENGINEER
✓nwaLAULwe Arredondo, Zepeda & Brunz, LLC
Dana Burghdoff(SeTll,202 0 :17 CDT)
Dana Burghdoff
Assistant City Manager Wfonso Gar a� , P.E.
Date: Sep 11,2021 President
Date: August 5, 2021
APPROVAL RECOMMENDED:
C By:
.pher�arder(Aug N26.,a20221171e4�:26 CDT)
Chris Harder, P,E.
Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
awry vc��io�
Suby Varughese, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY
sea-zi
gyBB[ack,5ep 10,202116:34 CDn
Doug Black
Senior Assistant City Attorney
�44�n�
ATTEST: poi°FORr��aa Form 1295 No. 2021-747044
° �0
gi
° o�P M&C No.:_21-0538
Ronald Gonzales pvo g=�
Acting City Secretary ���,�o *� M&C Date: August 3, 2021
��4�
°O00000 OCP° O
nEXAsoAp
City of Fort worth,Texas OFFICIAL RECORD
Standard Agreement for Englneering Related Design Services
Revised Dale:May 7.2021 CITY SECRETARY
Page 14 of 14
FT. WORTH, TX
Prohibition on Boycotting Energy Companies
Contractor acknowledges that in accordance with Chapter 2274 of the Texas Government Code
(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from entering into a contract
for goods or services that has a value of$100,000 or more, which will be paid wholly or partly from public
funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a
written verification from the company that it: (1) does not boycott energy companies; and (2) will not
boycott energy companies during the term of the contract. The terms "boycott energy company" and
"company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code
(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government
Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's
signature provides written verification to the City that Contractor: (1)does not boycott energy companies;
and (2) will not boycott energy companies during the term of this Agreement.
Prohibition on Discrimination Against Firearm and Ammunition Industries
Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code(as added by Acts 2021,87th Leg., R.S.,S.B. 19,§ 1),the City is prohibited from entering
into a contract for goods or services that has a value of$100,000 or more which will be paid wholly or
partly from public funds of the City, with a company (with 10 or more full-time employees) unless the
contract contains a written verification from the company that it: (1) does not have a practice, policy,
guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2)will
not discriminate during the term of the contract against a firearm entity or firearm trade association. The
terms"discriminate," "firearm entity"and "firearm trade association" have the meaning ascribed to those
terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, §
1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing
this Agreement, Contractor certifies that Contractor's signature provides written verification to the City
that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a
firearm entity or firearm trade association; and (2)will not discriminate against a firearm entity or firearm
trade association during the term of this Agreement.
BY:
CONSULTANT
Arredondo,Zepeda& Brunz, LLC.
Aymlo •
Ifonso Garz , P.E.
President
Date: 9-9-21
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
ATTACHMENT A
Scope for Engineering Design Related Services for Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
<SANITARY SEWER AND WATER REHABILITATION CONTRACT 118>
CITY PROJECT NO.: 102789
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
Council
Water Length Water Station Station Lateral/ Sanitary Proposed
Street Proposed Water Main Sewer GIS ID Sanitary
District Comments From To
size Main(LF) Number Length(LF) Size
2301 Stanley Ave 9 O L-2448 6+60E 13+79 660 78355 8„
77572
2417 Stan l eV Ave 9 0 M-79 13+79 3+56.81 294 103612 10"
2524 Sandage Ave 9 O L-2080 2+57.04 33+80.00 270 85823 8"
2700 McCart Ave 9 O L-4885 2+78.5E 84130 43+32 200 89081130
8„
130
2700 McCart Ave 9 O M-75 04+57 48+38.00 455 90559 8„
90349
2700 McCart Ave 9 0 L-4814 01+57 0+00 157 190303 8"
2700 McCart Ave 9 O L-4963 4+12 0+00 550 84099 8"
2944 Forest Park Blvd 9 O 1-2424 7+90.SE 55+97.70 826 108021 8„
112326
1228 E Leuda St 8 O L-167 08+61 4+96.77 365 77184 8"
Unknown
3501 Baldwin st 9 8" 620 (1928),C.I. 0
Unknown
Unknown 100+36.6
3500 S Henderson St 9 8" 595 (1928),C.I. L-1454 4+08.00 2 417 78977 8"
Unknown
78954
3201 Ryan Ave 9 O L-1309 15+56.80 57+62.00 1555 101831 8"
82570
99081
Devitt st 9 O M-82 O-r00 60+87 652 82709 8"
3113 Benbrook Blvd O L-2270 3+94 0+00 394 29476
3113 Benbrook Blvd 0 L-2271 01+05 0+00 105 64217
3113 Benbrook Blvd L-2269 04+98 0+00 105 88135
2012 Wark Pkwy 11179 6 67596+00 0+00 600 6796
2300 Stanley Ave L-2063 05+40 0+00 540 65740
3261 Stadium Dr I M-64R 141+14.0 1 137+17.8 393 91882
91951
L-1457 04+08 O+0O 408 78912
Totals 1215 8946
Water LF 1215
Sewer LF 8946
Total LF 1 10161
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 1 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
WORK TO BE PERFORMED
Task 1. Design Management
Task 2. Conceptual Design
Task 3. Preliminary Design
Task 4. Final Design
Task 5. Bid Phase Services
Task 6. Construction Phase Services
Task 7. ROW/Easement Services
Task 8. Survey Services
Task 9. Plan Submittal Checklists
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
■ communicate effectively,
■ coordinate internally and externally as needed, and
■ proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting
• Attend a pre-design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
• Conduct review meetings with the CITY at the end of each design phase
• Prepare invoices and submit monthly in the format requested by the CITY.
• Prepare and submit monthly progress reports in the format provided by the Water
Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 2 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub-consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• 12 MWBE/SBE reports will be prepared
• 4 meetings with city staff
• 12 monthly water department progress reports will be prepared
• 12 monthly project schedule updates will be prepared
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E. Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly MWWBE Report Form and Final Summary Payment Report Form
G. Plan Submittal Checklists (See Task 9)
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to
■ Study the project,
■ Identify and develop alternatives that enhance the system,
■ Present (through the defined deliverables) these alternatives to the CITY
■ Recommend the alternatives that successfully addresses the design problem, and
■ Obtain the CITY's endorsement of this concept.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 3 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
ENGINEER will develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
• In addition to data obtained from the CITY, ENGINEER will research proposed
improvements in conjunction with any other planned future improvements that
may influence the project.
• The ENGINEER will also identify and seek to obtain data for existing conditions
that may impact the project including but not limited to; utilities, agencies (TxDOT
and railroads), City Master Plans, and property ownership as available from the
Tax Assessor's office.
• The data collection efforts will also include conducting special coordination
meetings with affected property owners and businesses as necessary to develop
sewer re-routing plans.
• The ENGINEER shall visit the project site and obtain the meter numbers and sizes
on all existing meters to be replaced on the project and shall identify existing
sample stations and fire line locations.
2.4. The Conceptual Design Package shall include the following:
• Cover Sheet
• Graphic exhibits and written summary of alternative design concepts considered,
strengths and weaknesses of each, and the rationale for selecting the
recommended design concept.
• Proposed phasing of any water and sanitary sewer work that is included in this
project documented in both the project schedule and narrative form.
• Documentation of key design decisions.
• Estimates of probable construction cost.
ASSUMPTIONS
re expected for this project.
0 Geotechnical borings a p p �
• 2_copies of the conceptual design package (30% design) will be delivered..
Report shall be letter sized and comb- bound with a clear plastic cover.
Drawings will be_11"x17" size fold outs bound in the report
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw
• ENGINEER shall prepare the meeting minutes of the Concept Review meeting
and revise the report, if needed.
• ENGINEER shall not proceed with Preliminary Design activities without obtaining
written approval by the CITY of the Conceptual Design Package.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 4 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
DELIVERABLES
A. Conceptual Design Package
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development of Preliminary Design Drawings and Specifications shall include the
following:
• Cover Sheet
• A Proiect Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall
be indicated for each Control Point: Identified (existing City Monument#8901, PK
Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base. Z coordinate on City Datum only; descriptive location
(i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North Side Drive and North Main
Street).
• Overall project easement layout sheet(s) with property owner information.
• Overall project water and/or sanitary sewer layout sheets. The water layout sheet
shall identify the proposed water main improvement/existing water mains in the
vicinity and all water appurtenances along with pressure plane boundaries, water
tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall
identify the proposed sewer main improvement/existing sewer mains and all
sewer appurtenances in the vicinity.
• Overall water and/or sanitary sewer abandonment sheet.
• Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc.,
in the same coordinate system as the Control Points.
• Bench marks per 1,000 ft of plan/profile sheet—two or more.
• Bearings given on all proposed centerlines, or baselines.
• Station equations relating utilities to paving, when appropriate.
• Plan and profile sheets which show the following: proposed water and/or sanitary
sewer plan/profile and recommended pipe size, fire hydrants, water service lines
and meter boxes, gate valves, isolation valves, manholes, existing meter
numbers and sizes that are to be replaced, existing sample locations, existing fire
line locations, existing utilities and utility easements, and all pertinent information
needed to construct the project. Legal description (Lot Nos., Block Nos., and
Addition Names) along with property ownership shall be provided on the plan
view.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 5 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 110
CITY PROJECT NO.:102789
• The ENGINEER shall make provisions for reconnecting all identifiable water and/or
wastewater service lines which connect directly to any main being replaced,
including replacement of existing service lines within City right-of-way or utility
easement. When the existing alignment of a water and sanitary sewer main or
lateral is changed, provisions will be made in the final plans and/or specifications
by the ENGINEER to relocate all service lines which are connected to the existing
main and connect said service lines to the relocated main.
• The following shall be applicable at all locations where it is necessary to relocate or
reroute the existing private sanitary sewer service line due to the abandonment or
realignment of the existing public sanitary sewer lateral or main: The CITY shall
furnish the ENGINEER with a sample format of how the sewer service line
reroute/relocation should be designed and submitted for construction. During
design survey, if a rod can be inserted through the cleanout to the bottom of the
service line, the ENGINEER will obtain the flow line elevation and design the
service line prior to advertising the project for bid. If the service flow line
information cannot be obtained during design survey, the ENGINEER shall delay
the design of the sewer service line until after a Quality Level A Subsurface Utility
Engineering (SUE investigation has been performed). The Level A SUE will be
performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY
prior to bidding if the CITY determines that it is needed for satisfactory completion
of the design; or (3) by the Contractor after the project has been bid, by means of a
bid item to that effect. In all options, the ENGINEER shall propose appropriate de-
hole locations in the project and collect flow line elevation and other applicable
information of the sewer service line. The ENGINEER shall use this information to
provide the design for the sanitary sewer service line to be rerouted or relocated.
• Provide map showing location of new manhole construction at the end of existing
sewer segments, 90 degree bends, or tee connections. Site survey or specific
design plans for manhole construction is not included as part of the scope. The
contract documents shall specify that it is the Contractor's responsibility to
coordinate utility location, etc. manhole construction.
• The ENGINEER will prepare standard and special detail sheets for water line
installation and sewer rehabilitation or replacement that are not already included in
the D-section of the CITY's specifications. These may include connection details
between various parts of the project, tunneling details, boring and jacking details,
waterline relocations, details unique to the construction of the project, trenchless
details, and special service lateral reconnections.
3.3. Constructability Review
• Prior to the 60 percent review meeting with the CITY, the ENGINEER shall
schedule and attend a project site visit with the CITY Project Manager and
Construction personnel to walk the project. The ENGINEER shall summarize the
CITY's comments from the field visit and submit this information to the CITY in
writing.
3.4. Utility Clearance
• The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities,
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 6 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
private utilities, private utilities and government agencies to determine the
approximate location of above and underground utilities, and other facilities
(current and future) that have an impact or influence on the project. ENGINEER
will design CITY facilities to avoid or minimize conflicts with existing utilities, and
where known and possible consider potential future utilities in designs.
• The ENGINEER shall upload individual DWF files for each plan sheet of the
approved preliminary plan set to the designated project folder in Buzzsaw for
forwarding to all utility companies which have facilities within the limits of the
project. The DWF files should be created directly from the CAD files as opposed
to PDF files.
3.5. Traffic Control Plan
• Develop a traffic control plan utilizing standard traffic reroute configurations
posted as "Typicals" on the CITY's Buzzsaw website. The typicals need not be
sealed individually, if included in the sealed contract documents.
• Develop supplemental traffic control drawings as needed for review and approval
by the Traffic Division of the Transportation and Public Works Department.
These drawings shall be sealed by a professional engineer registered in the
State of Texas.
ASSUMPTIONS
• _1_ public meeting(s) will be conducted or attended during the preliminary
design phase.
• _0_borings at an average bore depth of feet each will be provided.
• Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an
additional_0_project specific traffic control sheets will be developed for
• _2_sets of_11"x17" size plans will be delivered for the
Constructability Review.
• _2_sets of_11"x 17" size plans will be delivered for the Preliminary
Design (60% design).
• _2_sets of specifications will be delivered for the Preliminary Design (60%
design).
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw.
• The CITY's front end and technical specifications will be used. The ENGINEER
shall supplement the technical specifications if needed.
• _2_sets of 11"x17" size drawings will be delivered for Utility
Clearance.
• ENGINEER shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 7 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
DELIVERABLES
A. Preliminary Design drawings and specifications
B. Utility Clearance drawings
C. Traffic Control Plan
D. Storm Water Pollution Prevention Plan
E. Estimates of probable construction cost
F. Data Base listing names and addresses of residents and businesses affected by
the project.
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
• For projects that disturb an area greater than one (1) acre, the Contractor will be
responsible for preparing and submitting the Storm Water Pollution Prevention Plan
(SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM
Construction Plan according to the current CITY iSWM Criteria Manual for Site
Development and Construction which will be incorporated into the SWPPP by the
contractor.
• Draft Final plans (90%) and specifications shall be submitted to CITY per the approved
Project Schedule.
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Construction Documents (100%) to the CITY per the approved Project Schedule.
Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in
State of Texas.
• The ENGINEER shall submit a final design estimate of probable construction cost with
both the 90% and 100% design packages. This estimate shall use ONLY standard CITY
bid items.
ASSUMPTIONS
• _2_sets of_11"x17" size drawings and _1_sets of_22"x34"
size drawings and_3 specifications will be delivered for the 90% Design package.
• A DWF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw.
• 2 sets of_22"x#34" size drawings and _1_specifications will be
delivered for the 100% Design package.
• A DWF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 8 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
• [Engineer to provide estimated final sheet list (cover/index, general notes, control point
location, easement layout, SUE plan sheets, no. of plan/profiles, special detail sheets,
etc.)]
DELIVERABLES
A. 90% construction plans and specifications.
B. 100% construction plans and specifications.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
D. Original cover mylar for the signatures of authorized CITY officials.
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto Buzzsaw for
access to potential bidders.
• Contract documents shall be uploaded in a .xIs file.
• Unit Price Proposal documents are to be created utilizing CFW Bidtools only
and combined in a specified spreadsheet workbook, Bid Proposal Worksheet
Template, and will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and .dwf files.
The .pdf will consist of one file of the entire plan set. The AM will consist of
individual files, one for each plan sheet, and will be numbered and named in
a manner similar to that of the plan set index.
• The ENGINEER shall sell contract documents and maintain a plan holders list on
Buzzsaw from documents sold and from Contractor's uploaded Plan Holder
Registrations in Buzzsaw.
• The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's Buzzsaw folder titled Request for Information. The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
City of Fort Worth,Texas
Attachment A
PMO Release Dale:08.1.2014
Page 9 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and
mail addenda to all plan holders.
• Attend the prebid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only
are to be uploaded into the project's Bid Results folder on Buzzsaw.
• Incorporate all addenda into the contract documents and issue conformed sets.
5.2 Final Design Drawings
1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall be created from the original
CAD drawing files and shall contain all associated sheets of the particular plan
set. Singular PDF and DWF files for each sheet of a plan set will not be
accepted. PDF and DWF files shall conform to naming conventions as follows:
I. TPW file name example — "W-1956—org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320—org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number
of sheets in this file.
Example: X-12755_org18.pdf
Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in
Buzzsaw.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 10 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet
as an individual DWG file with all reference files integrated into the sheet. If the
plans were prepared in DGN format, they shall be converted to DWG prior to
uploading. The naming convention to be used for the DWG files shall be as
follows:
I. TPW files shall use the W number as for PDF and DWF files, but shall
include the sheet number in the name — "W-1956_SHT01.dwg", "W-
1956_SHT02.dwg", etc.
II. Water and Sewer file names shall use the X number as for PDF and
DWF files, but shall include the sheet number in the name — "X-
12155_SHT01.dwg", "X-12755_SHT02.dwg", etc.
For information on the proper manner to submit files and to obtain a file number for
the project, contact the Department of Transportation and Public Works Vault at
telephone number(817) 392-8426. File numbers will not be issued to a project
unless the appropriate project numbers and fund codes have been assigned and
are in the Department of Transportation and Public Works database.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• _5_sets of construction documents will be sold to and made available on
Buzzsaw for plan holders and/or given to plan viewing rooms.
• _3_sets of—11"17" size and _2 sets of_22"04" size
drawings plans and _4 specifications (conformed, if applicable) will be
delivered to the CITY.
• PDF, DWF and DWG files will be uploaded to Buzzsaw.
DELIVERABLES
A. Addenda
B. Bid tabulations
C. CFW Data Spreadsheet
D. Recommendation of award
E. Construction documents (conformed, if applicable)
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 11 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
• The ENGINEER shall attend the preconstruction conference.
• After the pre-construction conference, the ENGINEER shall provide project
exhibits and attend public meeting to help explain the proposed project to
residents. The CITY shall select a suitable location and mail the invitation letters
to the affected customers.
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress. (Not to exceed 14 hours total)
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work.
The ENGINEER shall attend the "Final' project walk through and assist with preparation of
final punch list
6.2 Record Drawings
• The ENGINEER shall prepare Record Drawings from information provided by
the CITY depicting any changes made to the Final Drawings during construction.
The following information shall be provided by the CITY:
o As-Built Survey
o Red-Line Markups from Contractor
o Red-Line Markups from City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
• The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
o These Record Drawings were prepared using information provided by
others and represent the as constructed conditions to the extent that
documented changes were provided for recording. The ENGINEER
assumes no liability for undocumented changes and certifies only that the
documented changes are accurately depicted on these drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, on mylar for record storage. The ENGINEER may
keep copies of the information provided by the CITY for their files, but all original
red-lined drawings shall be returned to the CITY with the mylars.
2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 12 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets
of the particular plan set. Singular PDF and DWF files for each sheet of a
plan set will not be accepted. PDF and DWF files shall conform to naming
conventions as follows:
I. TPW file name example — "W-1956—rec47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_rec" designating the file is
of a record drawing plan set, "47" shall be the total number of sheets in this
file.
Example: W-0053_rec3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_rec36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_rec"
designating the file is of a record drawing plan set, "36" shall be the total
number of sheets in this file.
Example: X-12755—rec18.pdf
Both PDF and DWF files shall be uploaded to the project's Record Drawings folder
in Buzzsaw.
ASSUMPTIONS
• 3 RFI's are assumed.
• _0_Change Orders are assumed
• One copy of full size (22"x34") mylars will be delivered to the CITY.
DELIVERABLES
A. Public meeting exhibits
B. Response to Contractor's Request for Information
C. Review of Change Orders
D. Review of shop drawings
E. Final Punch List items
F. Record Drawings on Mylar
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 13 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
7.1. Right-of-Way Research
• The ENGINEER shall determine rights-of-way, easements needs for construction of the
project. Required temporary and permanent easements will be identified based on available
information and recommendations will be made for approval by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM
for real property acquisition
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Buzzsaw site.
7.3. Temporary Right of Entry Preparation and Submittal
• Prior to surveying, the ENGINEER shall prepare and submit Temporary Right of Entry
documents for landowners to CITY PM for real property acquisition. It is assumed that letters
will only be required for land owners adjacent to temporary construction easements or who
are directly affected by the project and no easement is required to enter their property.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Buzzsaw site.
ASSUMPTIONS
• _32_Easements or right-of-way documents will be necessary.
• 115 Temporary right-of-entry documents will be necessary.
• Right-of-Way research and mapping includes review of property/right-of-way records
based on current internet based Tarrant Appraisal District (TAD) information available at the
start of the project and available on-ground property information (i.e. iron rods, fences,
stakes, etc.). It does not include effort for chain of title research, parent track research,
additional research for easements not included in the TAD, right-of-way takings, easement
vacations and abandonments, right-of-way vacations, and street closures.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
TASK 8. SURVEY SERVICES.
ENGINEER will provide survey support as follows.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 14 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
8.1. Design Survey
• ENGINEER will perform field surveys to collect horizontal and vertical elevations and
other information needed by ENGINEER in design and preparation of plans for the project.
Information gathered during the survey shall include topographic data, elevations of all
sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities,
structures, trees (measure caliper, identify overall canopy, and have qualified arborist
identify species of trees), and other features relevant to the final plan sheets. Existing
drainage at intersections will be verified by field surveys. Spot elevations will be shown on
intersection layouts with cross slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the following:
A Project Control Sheet, showing ALL Control Points, used or set while gathering data.
Generally on a scale of not less than 1:400:
— The following information about each Control Point;
a. Identified (Existing. CITY Monument#8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing
base. Z coordinate on CITY Datum only.
C. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of
North Side Drive at the East end of radius at the Southeast corner of North Side Drive and
North Main Street).
— Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate
system, as the Control.
— No less than two horizontal bench marks, per line or location.
— Bearings given on all proposed centerlines, or baselines.
— Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of
Entry for landowners to CITY PM.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Buzzsaw site.
ASSUMPTIONS
• Topographic survey at intersection will include no more than 100 ft. in each direction.
DELIVERABLES
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 15 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 110
CITY PROJECT NO.:102789
A. Copies of field survey data and notes signed and sealed by a licensed surveyor.
B. Drawing of the project layout with dimensions and coordinate list.
TASK 9. PLAN SUBMITTAL CHECKLISTS
Engineer shall complete and submit Plan Submittal Checklists in accordance with the
following table:
PLAN SUBMITTAL CHECKLIST REQUIREMENTS
Traffic Traffic Traffic
Traffic
Street Water Traffic Control Control Control Storm Storm Lights /Sewer
Attachment"A" Signal Engineering 30% 60% 90%
Water Water (Submit (Submit
Type (Submit All (Submit All
30% 60% All @ All @
@ 30
° 60%
/o) 30% 60%) �° Required for all work in City
ROW
Street X X X X X. X X X X
Storm Water X X X X X
Water/Sewer X X X X
*If included in street project
ASSUMPTIONS
DELIVERABLES
A.
B.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 16 of 17
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER AND WATER REHABILITATION CONTRACT 118
CITY PROJECT NO.:102789
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition including temporary right-of-
entries.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre-qualification, bid protests, bid rejection and
re-bidding of the contract for construction.
Construction management and inspection services
• Periodic site visits during construction phase
Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of
God.
Services related to warranty claims, enforcement and inspection after final
completion.
Services related to submitting for permits (ie.TxDOT, railroad, etc...)
Services related to Subsurface Utility Engineering Levels A, B, C or D
Services related to Survey Construction Staking
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
Construction Shop drawing review, samples and other submittals submitted by the
contractor.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
Services related to geotechnical investigation
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 17 of 17
ATTACHMENT B
COMPENSATION
Design Services for
Sanitary Sewer and Water Rehabilitation Contract 118
City Project No. 102789
Lump Sum Project
I. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $302,590.50 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV—Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall and submit to the designated representative of the
prepare
Water Department monthly progress reports and schedules in the format
required by the City.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:B.09.2012
Page 1 of 3
B-1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount
Prime Consultant
Arredondo, Zepeda, Project Management and $194,740.50 64.36%
and Brunz, LLC Design
Proposed MBE/SBE Sub-Consultants
Spooner and Surveying $107,850.00 35.64%
Associates
Non-MBE/SBE Consultants
TOTAL $302,590.50 100%
Project Number & Name Total Fee MBE/SBE Fee MBE/SBE
City Project No. 102789, Sanitary Sewer $302,590.50 $107,850.00 35.64%
and Water Rehabilitation Contract 118
City MBE/SBE Goal = 10% Consultant Committed Goal = 35.64 %
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 2 of 3
B-2
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
�I
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 3 of 3
B-3
Professional Services Invoice Project Manager: Subyvamghese,P.E. Summary
Project: Sanitar Sewer and Water Rehabilitation Contract 118
city Project#: 102789
City Sec Number I supplier Instructions:
FIII In green cells Including Invoice Number,From and To Dates and the Included worksheets.
Company Name: When your Invoice Is complete,save and close,start Bunsaw and Add your Invoice to the
Consultant folder within Project's folder.
Supplier's PM: Alex Martinez,P.E. email: amam ez amen m
Supplier Invoice#: Office Address:11355 McCrea Road,Dallas,Tx 75238
Payment Request#: Telephone: 214-341-9900
Service Date:From Fax: 214-341-9925
Service Date:To
Invoice Date: Remit Address:11355 McCrea Road Dallas,TX75238
Agreement LTD
Agreement Amendment Amountto Completed Percent (S)Invoiced Current Remaining
Sheet FID and Work Type Description Amount Amount Date Amount Spent Previously Invoice Balance
Work Type t ItWater $36,182.21 $36,182.21 $36,162.21
Work Type 2 Sewer $266,408.29 $266,408.29 $266,408.29
WorkT e3
WorkT e4
Work Type6
Work Type 6
Totals This Invoice S302590.50 5302590.50 S302590.50
Overall Percentage Spent:
Professional Services Invoice P rolecl Manager: 8uby Wrugheee,P.E.
Project: Sanitary Sewer and Water Rehabilitation Contrac
City Project N: 102789
Work Type Desc: I Suppller Instructions:
FID:
City Set Number: Fill In green cells Including Percent complete and Invoked Previously Dunlnes
Pumhase Older: I Man your Invoke Is complete,save and close,start euzuaw and Add your Invoke to the
Consultant folder within Prelecrs folder.
Company Name:
Supplier's PM: Alex Wrtl—,P.E. email: mawwz@azb<�re.com
Supplier Invoice q: Office Address:11355 Mscree Road,Dallas.T 75238
Payment Request#: Telephone: 214J41 g
Service Date:From Fax: 214341-9925
Service Date-.To
Invoice Date: Remit 11355 Me— Dallas,TX 75239
Pay Items Agreement LTD
Agreement Amendment Amendment Amountto Completed Percent (S)Invoiced Current Remaining
Pre
Description Amount Number Amount Date Amount Sent vtousl Invoice Balance
]e-�eslgn Wales $36.18221 538,18221 $38.1B221
Totals This Unit: SM.182.21 sm.182.21 06.132.21
Overall Percentage Spent:
Professional Services Invoice Pro)ecl Manager: Suby Varughess,P.E.
Project: Sanitary Sewer and Water Rehabilitation Contra,
City Project tt: 102789
Work Type Desc: I supplier lnstrucuons:
FID:
City Sec Number: Fill In green cells Including Percent Complete and Invoiced Previously Duanities
Purchase Order: I W hen your Invoice Is complete,we and close,start Bumm and Add your Inyolce to the
consultant told,,wahln Project'.told,,.
Company Name:
Supplier's PM: Alex Martinez,P.E. email: math
0azb—grs.com
Supplier Invoice M Office Address:11355 McCrea Road,Dallas,Tx 752M
Payment Request M Telephone: 214341-9"
Service Date:Froin Fax: 214-341-9925
Service Dat.:To
Invoice Date: Remit 11356 McCrea Road,Dallas,TX 7623E
Pay Items Agreement LTD
Agreement Amendment Amendment Amountto Completed Percent IS)Invoiced Current Remaining
Description Amount Number Amount Date Amount Sent Previously Invoice Balance
30-Design Smer $266,408.29 1 $266,408.29 $266,408.29
Totals This Unit: $266408.29IMAGE].29 3266.406.29
Overall Percentage Spent:
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Water Department Design Services for
Sanitary Sewer and Water Rehabilitation Contract 118
City Project No.1D2789
tabor nears saxon•an.nt Es.nse
Ts4 No. Tasty D•scrlPlbn Principal PTo}cl ProJecl 6R CAOD RPLS 9urvry eervey AdMast TeW labor Cert SubconsManl TeWC Pense Tsl9u5 Tohl %Cemphte fta-..q
bYn • En In••r Tacn Dsew ralMe Repretluabn es nutlgel
1200 $1. $1. $118 $114 11T6 /11c $188 lea MNBE R.-Ar
iA Pro bhn emenl 0 62 ]Ba 0 0 I 1B 10Aa am 0A0 GAO .Aa i 1aAa
M Team
1.1.2 OalpC 24 46BO.M OAO 4680.00
1.2 CwT•rvn¢a[uz aN Pa 0.
121 Pse CwrOretan A�eet ores i meean 4 4 t 4d0.00 400 1410.00
1.22 Das 6amnal Rerary Mez' urcs4rree 16 18 5T60.00 OAO STfi0A0
-4 Re ess Pe M asartea l2 rrorau 8 11]0.00 0.A 11T0.00
1.26 Re 110E_5SERe eMsrtes l2 moMn 4a0.00 OAD �'�
12J41 CoariratOnWNIXf[+ 4 fiWAO am fia0A0
1.2.14 CarmOabCwsMSIwl Mee sszes l2 eree 12 12 4]A.00 am k-.
2A Conn IW Das n 3--a M TB as 0 0 0 0 OB ilAa 0A0 am Am" -AO 13am
21 Daq CaBectwl aasure510161 LF To 2 2 0 1fiT200 0.A 1b2C0
24 Cerce rel Des Pac arcs 10,1611Etow 2 to b 60 A ]A300.00 2c0.00 200.aD 600.
23 DPCC 4 a 8 }L54W 0.00 }=00W.
iA PseBMna 0 n 60 Percen 4 41 1M BB B6 0 0 0 0 45 um - am 200A0 mm 4Y m
3.1 Prclntilx cesbn Ora 16 ep N 4c 2364T.00 2C X 20 M
40.e0
25840.01
42 Combuch5e'Re.'ww 4 18 B 6 O.Iq 524D.00
39 Meet a 8 BBO.W 0.00 -M
3.4 lkdi Ckvane 2 a 26fi200 0.00 66200
35 Tsnnc coarcl Pbn 2 A A 58TO.ra a.00 5970.00
3a OPCC 2 8 8 5 32s- 0.00 3A200
4A FlnalDnl n a a 77 TB All0 0 0 a 31 . OAa apa 61BA0 cs1A0 'I.-]
42 Faasl aan 90%CorsNct'm Pbro Tratux 2 40 40 40 163f000 am 16310.00
43 F•sa 1A%RvaaNs e[atm 2 24 }o 30 it}40.00 598.D0 580.00 119]8.00
44 Coran -EstaTales 9051 xtl 100% 2 8 B B 3.Al- 0.00 3-YA aN P.- a ] 11 22 11 0 0 0 1 TAa am aAa 1 Aa 1 Wx a 9TA0
5A POs
5.1.1 U tlatl9el Cortrxl Wsraseris utl Mavien�nikHeM list 8 ss2o0 14c0.00 1000" 1952W
5.1.2 bsue Ad4�esaurcs3 fi 6 3 046.00 OAA 046..
5.1.J ArrN Re-OACorfaterte 2 2 TN.00 am 720A0
S.tA AIkN Sa 0 0.00 0.00 D00
5.15 TebJnle BW ad RawmmeN Awed 1 4 855.00 O110 a5500
5.1.fi hstp CONonz'etlfaNrxlnocut[Hs 4 B a 252400 fAOW 60000 3,02400
BA ConslsucRonPNsa]ervkea 0 1 ]t a 1B 0 0 a B103A0 - 2. am OAO B1DIA0
6.1 ComOicinn5 M1 000 O.W -
P
AixNPrewn0�tleD Cer2eserce 2 2 -00 0.00 moo
2 2 TARO a.. TARO2 12 2]TOAO am 3T013AA0 0.00 1320.00
3 495A0 am 495A0Remtlnra' 4 Is 24 M DA0 4B40a
ft0V0Eas•m•nlBervkea 0 a so 0 0 42 0 6026 11 SaAO OAa 44 .Oa amP20 A 5,600.00 0.00 Sa00A0
a u e a a5T5400 000 5]60.00a 0 0 0 0 0 0 0 on OAa BB 50A0 - b2AxaAa OAO Op0 OAo Is,000Ao
Tohls 146 405 2]2 2b 0 42 0 b.26 ibAsaAa a.W l0T AO 49BA0 110ANAO 2R,1B.M OX s0
Wax aMsener Ozspn&enMdann 16umm•
F %poet Dd Fee We4r 6enta hexer Tani Cosl % Ne Remx a TOW IMes 113J
Water 1216 12%3 as Fw % 3 LF % 3 Taal Lahr 1B6 B50.00
Serer fl94fi BB%B AB ro9 Cd4acttta sONNI bgV,01 WNpI MDIVNI pWVNI 0% pDNA11 Tahl Es /10]-0d.N
TofaI 10161 100°/.Y 581 TOTAL bDNA11 A1liVNl OMJNI tldVel l9NAl 0% pDN,W MBFJSEESWtt4nNar1 D00
IbnMBEJSSE Suhu0ulve 10]650.00
5% S�0 Nar4 5}8250
MBE3eE Pa - tOn
TOW Pse a0os1 1i0;6905a
C1,1FM1-Tean
PMoa
M40taresa S-Lnei a EnoM1 6�4T hw Retnse Da<.k.2012
ten
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Sanitary Sewer and Water Rehabilitation Contract 118
City Project No. 102789
Article IV
Obligations of the Engineer
Add sentence to clause I.
I. Business Equity Participation
This project will satisfy the Business Equity Participation with a minimum 10 %
SBE participation.
Article VI
General Legal Provisions
Add word (legal) in clauses F, first sentence, and J, last sentence.
F. Indemnification
The ENGINEER shall indemnify or hold harmless the CITY
against legal liability for any damage committed by...........
J. Observe and Comply
..........ENGINEER agrees to defend, indemnify and hold
harmless CITY and all of its officers, agents and employees from
and against all legal claims or liability arising out of the violation
of any such order, law, ordinance, or regulation, whether it be by
itself or its employees.
City of Fort Worth,Texas
Attachment C
PMO Release Date:05.19.2010
Page I of 1
FORT WORTH
ATTACHMENT "D"
PROJECT SCHEDULE
A. ENGINEER Project Schedule Development
ENGINEER shall prepare a project schedule for the services to be provided in fulfilling
the requirements of the Agreement and encompassing the Scope of Work defined in
Attachment A to the Agreement.
ENGINEER shall prepare and maintain project schedule throughout the life of the project
as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled
Engineer Project Schedule.
ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for
planned sequencing of the work activity and timing of the work.
B. Schedule "Tier" Selection
City has identified three "Tier" levels for project schedules as defined in City's
Specification 00 31 15, to align with the size and complexity of the project as a basis for
schedule development. City's Project Manager will determine the "Tier" level for the
ENGINEER's project schedule as part of the negotiation of the Agreement.
C. Project Baseline Schedule
ENGINEER will produce an initial project schedule and submit as a "baseline" for review
and acceptance by City's Project Manager as defined in City's Specification 00 31 15
which will be referred to as the Project Baseline Schedule. Updates to the baseline
schedule follow the requirements of City's Specification 00 31 15.
D. Project Progress Schedule
ENGINEER will provide to the City, monthly updates to their project schedule indicating
progress of the Work in compliance with the requirements of City's Specification 00 31
15 and said schedule will be referred to as the Project Progress Schedule.
E. Master Project Schedule
City will develop and maintain a master project schedule for the overall project.
ENGINEER's project baseline and progress schedule submittals will be an integral part
of the development and updating process of City's Master Project Schedule.
City of Fort Worth,Texas
Attachment D
Revision Date:07.20.2018
Page 1 of 1
oilq }\}
0 \ �(
27e : / co =
( -
E ■.m
} ■m ] \ E )7;¥f( [
� _ 7fe � > e E
\([« ! I« #
2
o §
/ $ [ ,
+ iu )2_=----
177K w � ,�2ZF3 5 ;
2 } \\\
2 §;$
a v\\
\ {2�n
4
/
m
# \
I /
ATTACHMENT E
N --- --- ENCO TER .
cl
---,
1
PARKhHILL DRY" -- — �"
w I'' PARK,'HILL DRY - -- I -
P1
j t
l )�sI _
MCPHERSON AVE_
% I W I
-,�
'W CANTEY,STL� — +
- = -W LOW EN ST - q r—1
tr,
I .
i
Q -- AL
FORTWORTHr =-
BOWIE ST h
ATTACHMENT E
Fdl 1
T - `1W DEVITT ST - -�� --
IVU 1
-- Z -
. h-I ITITIT .
17-,
V SHAW ST
Ir IT
ITT
`} - BEWICIK STD
BEWICK ST - - I L l_1_I-L_ W
iA
LO
I LTTTTTT=E:F-I
W BIDDISON ST W BIDDISON ST
7-
LO - - -1 --- -
IPY ST W RIPY�ST
Z
O -
-
L� vi
FoRTWORTH _ - _ __ _= IXI
_
ATTACHMENT E
-- -- E,LEUDA STr
1
E TERRELL AVE
- i u-• '� '
r `
ROSEDgL'E'S ----- -- --
FoRTWoRTH -
ATTACHMENT E
ILLJ
r
�. yj. r
Ar
J ,� f a! 1 r 1 �§ i -- •,
W 1 ,
Vltl
w
uj
tj
BENBROOK B VD
fr r ';1 4 .s __ W
10
ilk
' 'ram r •i.l
ff
A r /
4r 7� 1e r ,T
7 f
r`
:
FORT WORTH,
hime
JI
ATTACHMENT "F"
CERTIFICATE OF INSURANCE
Design Services for
Sanitary Sewer Rehabilitation, Contract 118
City Project No. 102789
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, August 3, 2021 REFERENCE NO.: **M&C 21-0538
LOG NAME: 60SSRC118-AZB
SUBJECT:
(CD 9) Authorize Execution of an Engineering Agreement with Arredondo, Zepeda & Brunz, LLC, in the
Amount of$302,590.50 for the Sanitary Sewer Rehabilitation, Contract 118 Project and Adopt
Attached Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of an engineering agreement with Arredondo, Zepeda & Brunz, LLC, in the
amount of$302,590.50, for Sanitary Sewer Rehabilitation, Contract 118 project; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of$537,405.00, transferred from available
funds within the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer
Rehabilitation, Contract 118 project(City Project No. 102789).
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize execution of an engineering agreement
with Arredondo, Zepeda & Brunz, LLC, in the amount of$302,590.50, for Sanitary Sewer Rehabilitation,
Contract 118 project for the preparation of plans and specifications for sanitary sewer and water main
replacements on the following streets, alleys and easements:
Scope
Street From To of
Work
Easement East of 150 feet East of the Stanley 660 feet
Stanley Avenue Avenue/Glenco Terrace South Sewer
intersection
Easement South 150 feet East and 660 feet
South of the Stanley 290 feet
of Stanley Avenue/Glenco Terrace West Sewer
Avenue intersection
Easement
between Warner Glenco Terrace 540 feet Sewer
Road and Stanley South
Avenue
Easement West Glenco Terrace 600 feet Sewer
of Warner Road ISouth
350 feet South and 300
Easement North feet West of the Ward 450 feet Sewer
of Park Hill Drive Parkway/Warner Road West
intersection
300 feet South and 280 50 feet North Sewer
Easement South feet West of the Ward
of Ward Parkway Parkway/Warner Road
intersection u
Alley between
Leuda Street and Tennessee Avenue 430 feet East Sewer
Terrell Avenue
100 feet East of the 6th 350 feet
Devitt Street Avenue/Devitt Street West Sewer
intersection
Alley between 800 feet
Willing Avenue Devitt Street South Sewer
and Ryan Avenue
Easement
between 5th 410 feet
Avenue and Biddison Street South Sewer
Baldwin Street
Easement
between Baldwin Biddison Street 420 feet Sewer
Street and South
Henderson Street
Baldwin Street Biddison Street Ripy Street Water
Henderson Street Biddison Street Ripy Street Water
200 feet West of the 340 feet
Benbrook Odessa Avenue/Benbrook West then Sewer
Boulevard Boulevard intersection North 130
feet
Easement East of Lamesa Place Benbrook Sewer
Odessa Avenue Boulevard
Easement
Lamesa Place Odessa Avenue 500 feet East Sewer
and Benbrook
Boulevard
Easement South Sandage Avenue Forest Drive Sewer
of Park Hill Drive
McPherson Forest Street/McPherson �[l00 feet Sewer
Avenue Street intersection jWest
Alley between
McCart Avenue McPheson Avenue 140 feet Sewer
and Sandage South
Avenue
Alley between 900 feet
Forest Park Bowie Street North then Sewer
Boulevard and 150 feet
McCart Avenue West
Alley between
McCart Avenue Cantley Street 150 feet Sewer
and Sandage North
Avenue
Easement North McCart Avenue 550 feet Sewer
of Cantley Street West
In addition to the contract amount, $234,814.50 (Water: $42,500.79; Sewer: $192,313.71) is required for
project management, real property acquisition, utility coordination, and material testing. This project will
have no impact on the Water Department's operating budget when completed. The sewer component of
the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program.
Appropriations for Sanitary Sewer Replacement, Contract 118, are as depicted below:
Fund Existing Additional Project
Appropriations Appropriations Total*
W&S Capital
Projects - Fund $0.00 $537,405.00 $537,405.00
56002
Project Total $0.00 1 $537,405.00 $537,405.00
*Numbers rounded for presentation purposes.
Business Equity: Arredondo, Zepeda & Brunz, LLC is in compliance with the City's BDE Ordinance by
committing to 36\% SBE participation on this project. The City's SBE goal on this project is 10\%..
The project is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Water& Sewer Fund, and upon
approval of the above recommendation and adoption of the attached appropriation ordinance, funds will
be available in the W&S Capital Projects Fund for the SS Rehab, Contract 118 project to support the
approval of the above recommendations and execution of the engineering agreement. Prior to any
expenditure being incurred, the Water Department has the responsibility of verifying the availability of
funds.
FUND IDENTIFIERS (FIDs):
TO
Fund Department Accoun Project Program ctivity Budget Reference # moun
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project ProgramActivity Budget Reference # 'Amount
ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by: Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Suby Varughese (7803)
ATTACHMENTS
1. 60SSRC118-AZB Compliance.pdf (CFW Internal)
2. 60SSRC118-AZB FID Table (WCF 06.10.21).xlsx (CFW Internal)
3. 60SSRC118-AZB Form 1295.pdf (CFW Internal)
4. 60SSRC118-AZB funds availability.docx (CFW Internal)
5. 60SSRC118-AZB 56002 A021(r2)r.docx (Public)
6. AZB SAM.pdf (CFW Internal)
7. M & C MAP (1).pdf (Public)
8. M & C MAP (2).pdf (Public)
9. M & C MAP (3).pdf (Public)
10. M & C MAP (4).Ddf (Public)
O
(7
ul Ul w Ul V1 UI Ul Ul W Ul Ul Ul Ul Ul w In UI Ul Ul Ul Ul Ul Ul Ul Ul
al m al al al al al al T al a al a l l al al al M Ol m al al al al al al
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o N
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 O CD 0 0 o by
N N N N Ni
d
d
O O O O O O CD CD O O O CD O O CD CD O O O CD O O O Q
J V J J J J J 0 J V J Ol
al 0 al al J J O Ol J J mO O CD CD CD O O CD CD 0 CDO CD0 O O O O O O O O O
O O O CD O CD CD CD CD O CD CD O CD CD CDlD O lD O O C. CDA A A A A A A A A A A A A A A A A A C. A O A A A A
W W W W W W W W W W W W W W W W W W N W N W W wW
CD O O O ID O O Cl O O O O O O O O O O O O O O O O
Ul Ul W W Ul w Ul Ul Ul Ul A In UI w Ul Ul A A V1 A Ul A A
W W W V W F� J W Ul F, l0 W W W W F� lD lD w lD lD lD lD
N W " A W N F, W A F, In 1--' W F, W F- Ul Ul Ul <n (n Ul Ul
O O O O O (D CD CD O O al O O O O O m Ol al M M al a1
W In WC) In I-H O In F� " O W Ul W Ul F" 0 O O O O O CD
Vl O In N O O F" O O O O Ul CD Ul 00 0 O O O O O O
O O O O O N O O F� O O O O F�
O O O O O O O O O O O O CD CD O O O O O O O
N N N N N N N N N N N N N N N N N N N N N N N
J J J J J J J J J J J J J J J J V J J J J J J
W Wm W W W W W W W W W W W W W W W W W W W W
l0 l0 lD lD lD l0 lD l0 lD W w wlD w w wlD W wlD WlD lD
O O O O O O O O O CD O O O O O O (DO O
O O O O O O O O O O O O O O O O O O O
V J J V V J V J J J J J V J V J J J J
W W J A A A A W W W W W W J W W W W W
A A O O O O O O O O O A A O O O O O O
lD lD lD lD lD lD lD lD lD l0 lD lD lD lD lO lD lD lD lD N N N N
W W lD lD W lD W W W lD W lD W lD lD lD W lD lD O O O O
lD lD lD lD l0 lD lD lD lD W lD l0 lD lD lD lD lD (D lD N N N N
lD W lD W W lD W W W W W l0 lD lD lO l0 W lD lD N F�
t/1 t/) {/T N i� A '(n t/t tR in A {/F t/t• A A i 4 V1
{/T 1--� i!t• i/T t/D N J O> t/? al In {/? N W F-� V Ul A V V Ul Ul V
al W W In In O O al A Ul 00 , Ul Ql N 0o O] 00 00 00 00 00 00
In F- O O O O O A O m V N N Ul F, m m J Q1 Ol V V Ql Ol
m N O O O O O O O N N O 0 0 W O W N J W W N N W W
W Ul O O O O O W O Vl N O O O N O W N N W W N N W W
O O O O O O O N O V O 0 O O N J O O O O O O O O
0 0 0 0 0 0 0 lO O O O O l<<D O O O O 0 0 O O
N In C m m m m p -0 O O h 0 G
O_ O_ _ a) N 0) a) O c d
nri Ori 33 3 3 v n - lu m ,< �; `-1°
6 6 (D (D (D (D n O In E a- (l n N
r-F -: w- I-+ rr
,D O O — h - a On d
N Q n n n n cu n � N Q n
<n c 3 .n .nn .ten n n O (n c 3' O
+ c c c c s n + h a v
lu pF rt —
rr 0 O O O O rt 0
7 7 7 7