Loading...
HomeMy WebLinkAboutContract 42414-A2 CITY SECRETARY AMENDMENT No. 2 CONTRACT NO TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Half£ Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 42414 , (CONTRACT) which was authorized by M&C C-25001 on the 12th day of July, 2011 in the amount of $174,972; and WHEREAS, the contract was subsequently revised by: Amendment Number 1 in the amount of $140, 605 . 00 authorized by the City Council on the 1st day of March, 2012 ; and WHEREAS, the CONTRACT involves engineering services for the following project: SANITARY SEWER REHABILITATION CONTRACT 80 (LXXX) ; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated November 12 , 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $12, 684 .00 . 2 . Article II of the CONTRACT is amended to provide for an increase in ee to be paid to Engineer for all work and OFFICIA6 RECORD CITY SECRETARY Page -1- FT.WORTHS TX services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $328,261 . 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECLrED and EPFECTTVU as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort /Worth Half£ Associates, Inc. t.dNi Fernando Costa J. ussell Killen, P.E. , CFM Assistant City Manager Vice President DATE: / DATE: (Z APPROVAL RECOMMENDED : S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND M&C: N/A MG IT : Date: Douglas W. Black oad°°nhn Assistant City Attorney cr'OQ�®RT�aa� �Ao o.1d ATTE o° d Mary J. Ka � °oOOOOOO°°°° a City Secretary 34x11 � OFFICIAL RECORD Page -2- CITY SECRETARY T.WORTH,TX son ME HALFF November 13, 2012 28248 Mr. Roberto Sauceda City of Fort Worth Water Department 1000 T'hrockmorton Street Fort Worth, Texas 76102-6311 RE: Amendment No. 2—Sanitary Sewer Rehabilitation Contract LXYX (80) City Project No. 01499 Dear Mr. Sauceda: Halff Associates presents this Amendment No. 2 for additional services to City Project No. 01499. Amendment No. 2 shall include the effort necessary to separate Contract 80 into two bid packages, Part 1 and Part 2. • TASK 3. PRELIMINARY DESIGN (60 PERCENT). ASSUMPTIONS — Develop an additional 10 sheets and edit original sheets to create two separate plan sets, Part 1 and Part 2. • TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). ASSUMPTIONS — Develop separate estimates of probable construction cost and construction specifications for Parts 1 and 2. • TASK 5. BID PHASE SERVICES. ASSUMPTIONS — Provide bid phase services for both bid packages, Part 1 and Part 2. • TASK 6. CONSTRUCTION PHASE SERVICES. ASSUMPTIONS — Provide construction phase services for both construction packages, Part I and Part 2. • TASK 7. ROW/EASEMENT SERVICES. ASSUMPTIONS — Update TROE forms and exhibits to reflect division into Parts 1 and 2. • REPRODUCTION. ASSUMPTIONS —Provide an additional 10 Mylar sheets and provide additional plan sets to TWDB for SRF approval. A summary of the proposed budget for this revised amendment is as follows: Preliminary Design $1,660 Final Design $2,305 Bid Phase $4,665 Construction Phase Services $3,365 ROW/Easement Services $539 Reproduction $150 TOTAL PROPOSED AMENDMENT NO, 2 $,12,684 NALFF ASSOCIATES,:NC 00�000 HALFF" "``s`° Clty oFfort VPorch VVem<Uepnamem own N.v bc,13,2DQ Page 2 None of the effort in Amendment 2 is associated with an M/WBE subcontractor. The current M/WBE amount is $106,000 from the original contract and Amendment 1. This is 33.6% of the current contract total_ Amendment 2 will bring the total contract amount to $328,261 with 32.3% being M/WBE effort. This is well above the 23%M/WBE goal set for the original project. Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal for the referenced project. Following is project fee summary: Original Contract $174,972 Amendment No. 1 $140,605 Amen dmen t No. 2 $12,684 REVISED CONTRACT AMOUNT $328,261 Sincerely, HALFF ASSOCIATES, INC. Dennis W. Haar Project Manager C: Tony Sholola, P.E. - - - - - - - - - - - - - - - - $ $ R 221 R$- $$»R»$» $$$9. AR as .°. $9$ » RR$$ 9 i' aXXga g fr� x $ x x s s s $ e a $ $ s $ $ $ r.Gg 8$ e ry $ ry _ Is_ 4M _� amxx AI q _ a om» s v - a3 Q I i OymV� ° P w`y.n os mJCd'$ Pi4P w I AU mQ `U$y ih p y� H FF L &�pn AaM a AL & °a n fi S N w W € E€ rE�ga'=F°eaR¢s€o FP ;"sea z�iws 6& LLmAtte$°sA p $ % ;g^m i�Rzz �pID $ w ?mID6v a= of ss- �v Bb .m� �E6 r.a