HomeMy WebLinkAboutContract 44066 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT
§ Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Quadrant North Tarrant Partners, Ltd.
Address, State,Zip Code: 14801 Quorum Drive, Suite 1601 Dallas, TX 75254
Phone, E-Mail: (972)980-8806 1 ruphoff@margauxrealty.com or dsilvermangmgpartners.com
Authorized Signatory/Title: Donald L. Silverman, Principal
Project Name: Quadrant Park Vista Addition
Project Location: SWC N. Tarrant Pkwy. & Park Vista Blvd.
Plat Case No.: FS-412-066 Plat Name: Quadrant Park Vista
Council District:4 City Project No: 01946
CFA: 2012-050 DOE: 6882
To be complet d b to _
Received by: e:
IFFICIAL pEc®RID
1Ty SIECRE 'A Y
TXs
NOW, THEREFORE,KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein the Ci ty and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort North and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section I1, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub-contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X ,
Sewer (A-1) Paving (B) .�.,. Storm Drain (B-1) _, Street Lights &
Signs (
2
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
3
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre-Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City-issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
1. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
4
J. Developer hereby releases and agrees to 'Indemnify, defend and hold the
Y City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to property
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub--contractors,
officers, agents or employees, whether art such `injuries,._.death or
damazes are caused,in why,or in part, bv he alle zed negligence of
the City of Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or da„akes are caused, in whole or in party the
alle ed neielizence of the Ci OL Fort Wortht its o fficers servants or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
5
defects, in conformance with the Policy, and in accordance with all p lans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within -the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
6
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize -the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER of PAGE INTENTIONALLY LEFT BLANK)
7
Cost Summary Sheet
Project Name: Quadrant Park Vista Add'n
CFA No.: 2012-050 DOE No.: 6882
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 28,404.00
2.Sewer Construction $ 151780.00
Wafer and Sewer Construction Total $ 44,184.00
B. TPW Construction
1.Street $
2.Storm Drain $ ..
3.Street Lights Installed by Developer $ ..
TPW Construction Cost Total $
Total Construction Cost(excluding the fees): $ 44,184.00
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 883.68
D. Water/Sewer Material Testing Fee(2%) $ 883.68
Sub-Total for Water Construction Fees $ 1,767.36
E. TPW Inspection Fee(4%) $ -
F. TPW Material Testing(2%) $ -
G. Street Light Inspsection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ -
Total Construction Fees. $ 1,767.36
Choice
Financial Guarantee Options,choose one Amount ck one
Bond=100% $ 44,184.00
Completion Agreement= 100%/Holds Plat $ 44,184.00
Cash Escrow Water/Sanity Sewer= 125% $ 55,230.00
Cash Escrow Paving/Storm Drain=125% $ -
Letter of Credit=125%w/2yr expiration period $ 55,230.00
8
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has exec d t is
instrument in uadruplicate,at Fort Worth, Texas this `' day of "-.1JJ1
20
CITY OF FORT WORTH-Recommended by:
Water Department Transportation & Public"Works Department
w
jp/ YJ
Wendy Cy- abu.lal, EMBA,P.E. Douglas W. Wiersig, P.E.
Development Engineering Manager Director
Approved as to Form&Legality: Approved by City Manager's Office
Douglas W. BIack Fernando Costa
Assistant City Attorney Assistant City Manager
r
M&C No. N
Date:
d CV 0000% i
ATTEST: �' 4 �� �
O
Q
ary J. Kays r ' Ohl
City Secreta '
r, ix
'0:Zzq0
ATTEST: Quadrant North Tarrant Partners,Ltd.
By its general partner
MDC Fort Worth, LLC
Signature Signature
(Print)Name: Print Name:Donald L. Silverman
Tine:Manager of MDC Fort Worth,LLC
OFFICIAL RECORD
9 CITY SECRETARY
FTs WORTH] TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
❑ Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
i
M
t
{
PROJECT
LOCATION
N.
74 R/Ry
�
4R qN T
�i
r—
z
Li
m
� a
� m
o-
BASSWOOD BLVD.
LOCATION MAP
' CITY DISTRICT 4
MAPSCO # 36--C
Winkelmann VICINITY MAP
r
& Associates, Inc, QUADRANT PARK VISTA ADDITION
CONSULTING CIVIL ENGINEERS ■ SURVEYORS FORT WORTH, TEXAS
ST PLAZA DRIVE,SUITE 325 (972)490-7090
DAL ELI SHIVER SURVEY, ABSTRACT N 0. 1455
DALLASS,,TEXAS 75230 (972)490-7099 FAX
CITY OF FORT WORTH SHEET
TARRANT COUNTY, TEXAS
Scale Date QUADRANT NORTH TARRANT PARTNERS, LTD.
Dwg. Fife 14900 LANDMARK BLVD., STE. # 610 OF
Pro ect No. DALLAS, TX 75254
S
i�
r
r
4
PN�
N �
r (V
/ \FT /TY
$SS
#
S
/g 5 /
15'Et(.SANITARY SE%"EASEMENT
CAW WT A.SLUE 10737
\p�\ LOT 4R,BLOCK A I t
0.848 ACRES
(36,921 SO FT.) }
\ Y
LOT 5R,BLOCK A
1.690 ACRES n a
(73.601 SO,FT.)
RETAIL
9,100 SF v +
FFE=667.00 3R,BLOCK A
1 \ `
1.771 ACRES
(77,142 SQ.FT.) � J
T`V EASEMENT
\
CABINET A.SLIDE 16737
15'SANITARY
EASEMENT
# 1 W
BY THIS PLAT
f
3�
M
rn
LOT 6R,BLDCit A LOT 7,8LOCK A
1.547 ACRES 0.592 ACRES
(67,408 SO FT.) (25,768 SO FT) (''�
I l
7 ~
fn c
5�
SCALE: i
ry a. Wv
13'WATER EASEMENT
TO BE ABANEI%" I
BY THIS KAT
15'U TILITY EASEMENT WOOD FENCE �- N.PROP S W T R
CABINET A,SLIDE 10737 TP
Winkelmann
EXHIBIT A WATER
& Associates, Inc. QUADRANT PARK VISTA ADDITION
FORT WORTH, TEXAS
CONSULTING CIVIL ENGINEERS w SURVEYORS
6750 DALLAS,S,TEXAS PLAZA DRIVE,SUITE 325 (972)490--7090 ELI SHOVER SURVEY ABSTRACT N 0. 1455
DALLAS,TEXAS 75230 (972)490-7099 FAX r
CITY OF FORT WORTH SHEET
TARRANT COUNTY, TEXAS
Scale Date QUADRANT NORTH TARRANT PARTNERS, LTD. V
Dwg, File 14900 LANDMARK BLVD., STE. # 610
OF
Pro'ect No.
DALLAS, TX 75254
i
p P�
�P
NX. S„ 5.5.
400p 4 3
cv
� I
- - i
TS'EK.SANITARY SEWER EASEMENT 4 !
CABWHT A.SLIDE 10737
\ �\
LOT 4R,BLOCK A I c
\ 0.948 ACRES
y� V` (36,921 S4.FT.)
\ LOT 5R,BLOCK A I Y
ti
1.890 ACRES ^
R TAIL (73,801 SO FT.)
E \ `
9,100 SF
FFE=66 7.00 1 3R,BLOCK A
1,771 ACRES \
(77,142 54.FT.) '/O[1 �
15' EASEMENT
CABINET T A A,,SLIDE LIDE X0737
ir
c c
ur
15'SANITARY `
SURER
EASEMENT
BY THIS PLATay r'
/ z
a
I �
3 y
ry
rrn
CN
N Lv z
LOT 5R,BLOCK A I LOT 7,BLOCK A
1.547 ACRES 0.592 ACRES j
(67,408 SO FT.) (25,768 SQ FT.) z
m Q
N
5°
� z F
SCALE:
m
I a wv
1"=80, 15'WATER eASaENr _—
TO BE ABANDONED
BY THIS PLAT
r 15'UTILITY EASEMENT w000 FENCE '
OLUMNS
CABINET A,SLIDE 10737 fP
AMP
4
Winkelmann EXHIBIT A-1 WASTEWATER
UA RANT PARK VISTA Associates, Inc. O ADDITION
D D
CONSULTING CIVIL ENGINEERS . SURVEYORS FORT WORTH, TEXAS
.T EST PLAZA DRIVE,SUITE 325 (972)490-7090
DALLAS.TEXAS 75230 (972)490-7099 FAX ELI SHIVER SURVEY, ABSTRACT NO. 1455
CITY OF FORT WORTH SHEET
TARRANT COUNTY, TEXAS '
Scale Date QUADRANT NORTH TARRANT PARTNERS, LTD.
OF
Dwg. File 14900 LANDMARK BLVD., STE. # 610
a
Pro'ect No. DALLAS, TX 75254
`
s
}
COMMUNITY FACILITIES AGREEMENT
for
QUADRANT PARK VISTA ADDITION
LOTS 7&6R,5R BLOCK A
December 10,2012
Exhibit"A"-Water
Engineers
Description Unit Public Qty. Unit Cost Total Public Cost
A Connect to exist.12"water EA 1 $1,200.00 $1,200.00
B Street Open cut for 8"pipe SF 75 $8.00 $600.00
C 8"Gate Valve&Box EA 3 $950.00 $2,850.00
D Fire hydrant w16"lead&Gate Valve EA 1 $2,500.00 $2,500.00
E Fittings TN 0.26 $500.00 $130.00
F 12"x8"Tapping Sleeve&Valve EA 1 $3,000.00 $3,000.00
G 8"waterline PVC C900 DR 18 LF 272 $28.00 $7,616.00
H Testing LS 1 $4,500.00 $4,500.00
1 Trench Safety LF 272 $0.50 $136.00
J Sodding SY 513 $4.00 $2,052.00
K Concrete Replacement SY 33 $40.00 $1,320.00
L Traffic Control LS 1 $2,500.00 $2,500.00
$28,404.00
Exhibit"A-1"-Sanitary Sewer
Engineers
Description Unit Public Qty. Unit Cost Total Public Cost
A 8"Sanitary sewer pipe-SD R 26 LF 136 $45.00 $6,120.00
B 6"Sanitary Sewer Pi e-SDR 35 LF 16 $30.00 $480.00
C Manholes 4'dia EA 1 $2,800.00 $2,800.00
D Manhole-std 4'Dia.Added Depth over 6' VF 1 $148.00 $148.00
E Manholes 4'dia drop connection EA 1 $3,500.00 $3,500.00
F Manhole-Std 4'Dia.-Added Depth over 6' VF 7 $160.00 $1,120.00
G Concrete Collar EA 2 $40.00 $80.00
H Clay Dam EA 1 $200.00 $200.00
1 TV inspection LF 136 $1.00 $136.00
J Trench safety LF 136 $1.00 $136.00
K Sodding SY 240 $4.00 $960.00
L lVacuum test on MH EA 2 $50.00 $100.00
$15,780.00
TOTALS
Exhibit"A"-Water $28,404.00
Exhibit"A-1"-Sanitary Sewer $15,780.00