Loading...
HomeMy WebLinkAboutContract 53959-A2 CSC No. 53959-A2 AMENDMENT No.2 TO CITY SECRETARY CONTRACT No. 53959 WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 53959, (the CONTRACT) which was authorized by M&C No. 20-0386 on the 16 day of June, 2020 in the amount of $ 144, 000 . 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $80, 000 . 00 which as administratively authorized on the 8 day of October, 2020; and WHEREAS, the CONTRACT involves engineering services for the following project : Sycamore Park Phase I; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $48,100. 00. (See Attached Funding Breakdown Sheet, Page -4-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $272,100. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. City of Fort worth, Texas OFFICIAL RECORD Prof Services Agreement Amendment Template Revision Date: August 23, 2021 Page 1 of 4 CITY SECRETARY FT. WORTH, TX APPROVED: City of Fort Worth ENGINEER Teague Nall and Perkins, Inc. Valerie Washington(Sep 21,202115:41 CDT) Valerie Washington Willian H . Smith, ASLA Assistant City Manager Director of Landscape Architecture DATE: Sep 21, 2021 DATE: Sep. 16, 2021 APPROVAL RECOMMENDED: �GZG� Richard Zavala(Sep 16 116:38 CDT) Richard Zavala Director, Park & Recreation Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . `N'f� Jing Yang Project Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas bycamore ar ase Prof Services Agreement Amendment Template 102014 Revision Date: August 23, 2021 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: M&C: 21-0694 88&*V7 Date : Sep 21, 2021 lack(Sep 21,2021 15:18 CDT) Douglas W. Black Assistant City Attorney ATTEST: a oo�°FORr4 a 100000.° d Ronald P. Gonzales �v$ 00 S=d 0 0 Acting City Secretary �� o o�c�d ° °°° 11 0 °O00000 d *XASoAp OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Sycamore Park Phase I Prof Services Agreement Amendment Template 102014 Revision Date: August 23, 2021 Page 3 of 4 FUNDING BREAKDOWN SHEET City Secretary No. 53959 Amendment No . 2 Department Fund-Account-Center Amount 0800450 34018-5330500-102014-003730 48, 100 . 00 Total : 48, 100 . 00 City of Fort Worth, Texas Sycamore Park Phase I Prof Services Agreement Amendment Template 102014 Revision Date: August 23, 2021 Page 4 of 4 Attachment A t n www.fipinc.com July 30, 2021 engineers surveyors landscape architects Mrs. Jing Yang TEXAS FORT City of Fort Worth DENTONORTH Parks & Recreation Department ALLEN 311 W Tenth Street HEATH CYPRESS Fort Worth, Texas 76102 SUGAR LAND GEORGIA BLAIRSVILLE Re: Fee Proposal for Contract Amendment No. 2 — Sycamore Park Improvements, Phase 1 City of Fort Worth Project No. 102014 (TNP Project No. FTW 20157) Dear Mrs. Yang: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services to be provided on this project: I. North Loop Drive and Parking Per the Sycamore Park master plan, the City has identified available funds for the design and partial construction of the North Loop Drive improvements and adjacent parking. The Loop Drive improvements will consist of an 18 ft. wide concrete pavement section with adjacent angled parking spaces with curb landscape islands, roadway alignment revisions to match the master plan layout, relocation of the west drive connection to Vickery Blvd., and a storm drain system. TNP will provide additional surveying, and engineering services for the additional design, and will utilize a sub consultant for the geotechnical investigation and report. Landscape design services will not be provided for the north loop road and parking, so only sod will be provided in the islands. The Subsurface Utility Engineering (SUE) sub consultant will not be provided in this scope. II. Fee Proposal for Contract Amendment No. 2: $ 48,100 TNP proposes a total fee of $48,100 to accomplish the scope of services. A breakdown of the fee is included in Attachment B-2. Summary of Contract Fee: Original Contract Amount: $ 144,000 Amendment No. 1 $ 80,000 Amendment No. 2 $ 48,100 Revised Contract Amount $ 272,100 III. Project Schedule The anticipated duration of the additional design services is 5 months. See Attachment D-2 Project Schedule. TNP Firm A Registrations Texas Board of Professional Engineers and Land Surveyors I Engineering Firm No.F-230 I Surveying Firm No. 1001 1 600 101 94381 1 1001 1601 Georgia Board of Professional Engineers Firm No.PEF007431 I Texas Board of Architectural Examiners Firm No.BR 2673 IV. M/WBE Utilization: This amendment includes work effort for our certified SBE subconsultant partners. With this amendment, the overall M/SBE participation will be 7.89% which is a little below the City's M/SBE goal of 8%, due to the request that SUE services not be provided with this amendment, which was one of the M/SBE subconsultants. Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call us. Sincerely, TEAGUE NALL AND PERKINS, INC. Bill Smith, RLA Director of Landscape Architecture Services, Associate Scott A. Gibson, P.E. Team Leader, Associate Attachments: 1) Attachment B-2 Compensation 2) Attachment D-2 Project Schedule 9/15/2021 M&C Review Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORTWORTII REFERENCE**M&C 21- LOG 80SYCAMORE PARK PHASE I DATE: 9/14/2021 NO.: 0694 NAME: ENGINEERING AGREEMENT AMENDMENT NO.2 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 8) Authorize Execution of Amendment No. 2 to the Engineering Agreement with Teague Nall and Perkins, Inc., to Provide Additional Engineering Design Services for Sycamore Park Phase I Improvements in an Amount Not to Exceed $48,100.00, for a Total Contract Value of$272,100.00 (2018 Bond Program) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 2 to City Secretary Contract No. 53959, an engineering agreement with Teague Nall and Perkins, Inc., to provide additional engineering design services for Sycamore Park Phase I Improvements in an amount not to exceed $48,100.00, for a revised contract value of$272,100.00 (City Project No. 102014). DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the execution of Amendment No. 2 with Teague Nall and Perkins, Inc. (TNP) to provide additional engineering design services for the replacement of the north loop road at Sycamore Park (City Secretary Contract No. 53959), in an amount not to exceed $48,100.00, for revised contract value of$272,100.00. TNP has been under contract (M&C 20-0386 and City Secretary Contract No. 53959) since June 16, 2020, providing engineering design services for Phase I road and parking lot repaving. The amount in the original engineering contract is $144,000.00. To date, Amendment No. 1, in the amount of $80,000.00, was administratively approved for additional scope including pedestrian trail reconfiguration and playground replacement. rDesign Contract & Amendment No. I Amount Design Contract No. 53959 F $144,000.00 Fmendment No. 1 F$80,000.00 Fmendment No. 2 $48,100.00 Total r $272,100.00 This project is included in the 2018 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 23209-05-2018) and subsequent actions taken by the Mayor and Council. Since the contract amount of Amendment No. 2 is less than $100,000.00, no MWBE participation is required. Sycamore Park is located in COUNCIL DISTRICT 8. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the 2018 Bond Program Fund for the 2018GO Sycamore Park St Rehab project to support the approval of this recommendation and execution of the contract. Prior to an expenditure being incurred, the Park& Recreation Department has the responsibility of verifying the availability of funds. apps.cfwnet.org/counciI_packet/mc_review.asp?ID=29242&counciIdate=9/14/2021 1/2 9/15/2021 M&C Review TO Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year Chartfield 2 FROM Fund Departmenn Account Project Program Activity Budget Reference # Amount ID ID Year I (Chartfield 2) Submitted for City Manager's Office by_ Valerie Washington (6192) Originating Department Head: Richard Zavala (5704) Additional Information Contact: David Creek (5744) ATTACHMENTS Project Map.pdf apps.cfwnet.org/counciI_packet/mc_review.asp?ID=29242&counciIdate=9/14/2021 2/2