HomeMy WebLinkAboutContract 54223-CO2 CSC No.54223-CO2 FO RT W"a-r H City of Fort Worth Change Order Request Project Name:1 Lake Arlington Lift Station City Sec No.: 54223 Project No.(s): 56019/07004301001480 NTP N/A City Proj.No.: 100995 Project Description: Construction of a new Sanitary Sewer Lift Station for the Lake Ariingten Force Main Project Contractor: Bar Constructors Inc. Change Order# 0 Date: 1 8/27/2021 City Project Mgr.1 Pratima Poudyal City Inspector: I Nathan Gray Phone Number: 817-392-6149 Phone Number: 817-392A961 Dept, Unit I Lift Station Unit II Water Alternate A-2 Totals Contract Time (Calender days) Original Contract Amount $9,422,126.00 $72,565.00 $583,002.00 $10,077,693.00 487 Extras to Date • 19,830.96 $0.00 $0.00 -$19,830.96 92 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $9,402,295.04 $72,565.00 $583,002.00 $10,057,862.04 579 Amount of Proposed Change Order •$11,978.95 $0.00 $0.00 411,978,95 0 Revised Contract Amount $9,390,316.09 $72,565.00 $583,002.00 $10,045,883.09 579 Original Funds Available for Change Orders $201,554.00 $0.00 $0.00 $201,554.00 Remaining Funds Available for this CO $221,384.96 $0.00 $0.00 $221,384,96 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -0.32% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $12,597,116.25 JUSTIFICATION(REASONS)FOR CHANGE ORD City of Fort Worth Water Depertment Plant Operations conducted two separate Radio Frequency PATH studies and each confirmed that the designed tower height of 60 ft.above ground level was well in excess of the proper radio link needs at the Lake Arlington Lift Station location. The PATH study determined that a much shorter tower of only 20 ft.above ground level would be required.Change Order No.2 provides for the following to accomodate the design change from the tower to the antenna: .Removal of 60 ft.lattice style tower,the tower foundation and all appurtenances. .Addition of 20 ft.pole style antenna to be mounted on the electrical building and all required appurtenances. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an c,ccord and_at sfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's company Name Contractor Name r;ontcaor 5 nature Darr: Bar Constructors Inc. Mike Ayers Inspector Date Prokct Mavaget. Date 9/15/21 0 zC1 1202 Director(Water Deptf Date Construction r Da T. S• Sep 21,2021Mai Date Assistant City Manaw Date- Sep 24,2021Ha 5 Sep 27,2021 Council Action if Required) M&C Number r NIA M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth Change Order Additions Project Name Lake Arlington Lift Station City Sec No.: 54223 Project No.(s): 56019/0700430/001480 DOE No. N/A City Proj. No.: 100995 Project Construction of a new Sanitary Sewer Lift Station for the Lake Arlington Force Main Project Description Contractor Bar Constructors Inc. Change Order: 0 Date: 8/27/2021 City Project Mgr. Pratima Poudyal City Inspector r Nathan Gray ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 43 20'Pole Antenna&Appurtenances Unit I Lift Station 1.00 EA $1,763.13 $1,763.13 Unit I Lift Station $1,763.13 Unit II Water Alternate A-2 Page 1 of 3 Additions Sub Total $1,763.13 FORT WORTH City of Fort Worth Change Order Deletions Project Name Lake Arlington Lift Station City Sec No.: 54223 Project No.(s): 56019/0700430/001480 DOE No. N/A City Proj. No.: 100995 Project Description Construction of a new Sanitary Sewer Lift Station for the Lake Arlington Force Main Project Contractor Bar Constructors Inc. Change Order: � Date 8/27/2021 City Project Mgr. I Pratima Poudyal City Inspector: EEEray DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 9999,0017 Instrumentation,SCADA",Antenna Tower(Deduct 60' Unit I Lift Station 0.054 EA $256,000.00 $13,742.08 33 lattice style tower,the tower foundation and all appurtenances) Unit I Lift Station $13,742.08 Unit II Water Alternate A-2 Page 2 of 3 Deletions Sub Total 1$13,742.08 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Page 3 of 3 Contract Co►nnliame Manager By signing I acknowledge that I am the person responsible for the monitoring and administration ofthis contract,including ensuring all performance andrep orting requirements. Signature Pratinia Poudyal, P.E. Name of Employee Project Manager Title ATTEST: �� 000000000.4_ � Ronald Gonzales ��0 °op�� Acting City Secretary �o ° 0vo °=d °oo o°4�� Y� 000000000 oo a SEX Asap OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX