HomeMy WebLinkAboutOrdinance 25128-09-2021ORDINANCE NO. 25128-09-2021
AN ORDINANCE ADJUSTING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE WATER AND SEWER BOND 2020A FUND IN THE
AMOUNT OF $155,323.00, BY DECREASING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE UNSPECIFIED PROJECT (CITY PROJECT NO.
UNSPEC), AND INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS
IN THE CFA BUCKET PROGRAMMABLE PROJECT (CITY PROJECT NO.
P00001) BY THE SAME AMOUNT, FOR THE PURPOSE OF FUNDING THE
COMMUNITY FACILITIES AGREEMENT—WAYFARE MULTIFAMILY
PROJECT (CITY PROJECT NO. 103516); PROVIDING FOR A SEVERABILITY
CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR
ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH;
AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS:
SECTION 1.
That in addition to those amounts allocated to the various City departments for Fiscal Year 2020-2021 in the
Budget of the City Manager, there shall also be adjusted estimated receipts and appropriations in the Water
and Sewer Bond 2020A Fund in the amount of $155,323.00, by decreasing estimated receipts and
appropriations in the Unspecified project (City Project No. UNSPEC), and increasing estimated receipts and
appropriations in the CFA Bucket programmable project (City Project No. P00001) by the same amount, for
the purpose of funding the Community Facilities Agreement-Wayfare Multifamily project (City Project No.
103516).
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair
the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall
be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance 24446-09-2020 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance are in
direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of
said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
APPROVED AS TO FORM AND LEGALITY: CITY SECRETARY
9-1.,,,,----- P-61 ‘--1\4..3,4t)
Assistant City Attorney Ronald P. Gonzales
Acting City Secretary
ADOPTED AND EFFECTIVE: September 28, 2021
R./DPP/ARE 'WV, OF TEAAS LAC
AND GRBY EDGEWOOD LW
5 ;ma Rawl
Water Small. Tawe
(orationER Water smgmE
TOM Sample tested (PCOnaecvtke Pxafoul
Number
f Quantity Smofes1
FAtEar a[i'I
®EAff(4 e)
1.
52
local Estimated Coat faa water smnd1m(53,5,/Eac SLSEOW
_> 7,A FABFY0E58
OR TC/T
EXHIBIT:
CITY COST -PARTICIPATION
B12712021
LONE STAR GAS
TTy 1
VOL D/77 PG
AEMAINCEP OF TRACT 1
:ABANDONED BA
CRAWL '
STANDARDSNOTES
1 THE CITY OF FORT WORTH DESIGN AND APPLY WHETHER INDICATED ON THESE
HESE
PLANS OR NO1
2 CONTRACTOR SHALL FIE. VERIFY DEPTH OF ALL TING UTILITIES PRIOR TON
CONSTRUCTION
d ALL /WE CONNECTIONS AND BENDS SHALL BE
MANUFAC,PE
FITTINGS
F ALL nLaesranwTaE oEsicucaKrERIAND VERTICAL FITTINGS rovEs
AND FoaVBE AND MAXIM 6ANGLE OF PI�PEJONTSWILLSERESTRICEo DEFLECTION
RERB RnWMENDATION AFTER WHICH
NOTE THE CONTRACTOR SHALL CONTACT E FOLLOWING
AT LEAST s HOURS PRIOR TO EXCAVATING (N THIS AR.
TXU ELECTRIC DELIVERY 1-600.711-9,
CITY OF FORT WORTH B17-292-1234
CI RDEPr t
VEF5TICALLY AND HORIZONTALLY PRIOR TO CONSTRUCTION
LEGEND
PROPERTY LINE
EASEMENT LINE
EXISTING WATERLINE
SEWEREXISTING LINE
EXISTING STORM DRAIN LNE
PROPOSED WATERLINE
clT c FORT WORTH Y
CAPWNLE Ny :sW SS,— PROPOSED SEWER LINE
'AWE, WIDTH
PROPOSED STORM DRAIN LINE
GOL rrAnATERIALS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH
.L \ HEBEPLANSANDGitt BTANDBARDfSECCi ))CATIONS EXCEPT AS
2 THE CONTRACTOR SHALL COORDINATE ALL PHASES OF INSPECTION
OF UTILITIES WTH THE ON ON AN,OR
INSTALLATION ALL PIPES AND PPE FIOTENGS SHALL) BEI SPECTED BY
PRIORTHE CI, TO COVERING AMOIOR BACKFILLING OF UTILITY
TRENCHES
EAPPLVErVN FOR SERVICES OBTNN
RGES FEES SLID CONNECTIOv rosTS
FOR EACH UNLIW SERGCE
4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
S TO THE
R OF RECORD SHOWING ALL
UTILITY INSTALLATION EATION VARMSCESFRO/l THE FINAL CONSTR.TION
SHALLDOCUMENTS FIELD CHANGES LOR PROPERTY LINES THE s-BUILT
P,NS BY DISTANCE TO THE T LINES
5 UNLESS OTHERWSE NOTED ALL CONCRETE USED IN ILI
INSTALLATION SHALL BE CLASS .71/ MOO
6 ALL TER MAINS SHALL BE a MINIMUM OF PVC C900 DR8
)
CLASS
170
7 WATER AND SANITARY SEWER SEP,CES SHALL MEET ,LRADING
CODE REQUIREMENTS
8 ALL WATER MAWS LINI EAS OTHERWISE NOTED SHALL HAVE A
MINIMUM COVER OF BD BELOW F/NISHED GRADE
9 WHEN WATER MAINS AND SAWA,' SEWERS ARE INSTALLED THEY
BOXESSHALL BE INSTALLED NO CLOSER 10 EACH OTHER THAN NINE FEET
HORIZONTALLY IN ALL DIRECTIONS AND PARALLEL LINES MUST BE
INSTALLED IN SEPARATE TRENCHES
10 ALL METER SHALL BE LOCATED
11 TRENCH CKFILLMATERIAL I SHALL BEMECHANCALLY COMPACTED
IN 61 LIFTS TO THE TOP OF SUBGRADE TO MINIMUM OF °DA
STANDARD PROCTOR DENSITY UNLESS OTHERWISE SHOWN ON
THESE PLANS OR STATED IN THE CITY SECIFICATIONS
17 ECTION
WITCTION SHALL HOLES SHALL BE
LINES THE METHOD D H N ds HOURS OFI HE INSTALLATION OF UTILItt
OIL
DENSITY ON THAT
aE REOUIREO AS VERIFi IRE
EBYAN APPROVED
TESTING RESULTING DUE LABORATORY
a DISPLACEMENT EXCESS OR
TUT LINES AND CONDUITS
SHAL BE DISPOSED F IN A MANNER ACCEPTABLE TO THE CD,
BENCHMARKS
T WATER AND
PRIVATE STORM CROSSINGS INCLUDED IN
ENCROACH
WATER, SEWER STUDY BASSI RECORD NO WSS 2021-1008
WAYFARE MULTIFAMILY
ICIBOLO HILLS PARKWAY)
OVERALL WATER PLAN
vMU BE FORT WORTH, TARRANT COUNTY, TEXAS
Boll PE LOTON
I''�I LAND SQLUT7QNS
DRAWN TCG
DESIGNED RS
DATE PROJECT SHEET
GUST IS0BB, s
ao
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 09/28/21 M&C FILE NUMBER: M&C 21-0769
LOG NAME: 60WAYFARE CIBOLO WATERLINE OVERSIZING
SUBJECT
(CD 7) Authorize Execution of a Community Facilities Agreement with Wayfare Development Group-Cibolo Hills, LLC with City Participation in an
Amount Not to Exceed $135,626.80 for Oversizing a 12-Inch Water Main to a 16-Inch Water Main and Construction of an 8-Inch Water Main in the
Vicinity West of Saginaw Boulevard and South of Cibolo Hills Parkway to Serve Wayfare Multifamily and Anticipated Future Growth in North Fort
Worth and Adopt Attached Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of a community facilities agreement with Wayfare Development Group-Cibolo Hills, LLC, with City participation in an
amount not to exceed $135,626.80 for oversizing a 12-inch water main to a 16-inch water main and construction of an 8-inch water main in
the vicinity west of Saginaw Blvd and south of Cibolo Hills Pwky to serve Wayfare Multifamily and anticipated future growth in north Fort
Worth; and
2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water and Sewer Bond 2020A Fund, in
the amount of $155,323.00, by decreasing estimated receipts and appropriations in the Unspecified project (City Project No. UNSPEC) and
increasing estimated receipts and appropriations in the Community Facilities Agreement Bucket programmable project (City Project
No.P00001) by the same amount, for the purpose of funding the Community Facilities Agreement — Wayfare Multifamily (City Project
No.103516).
DISCUSSION:
Wayfare Development Group Cibolo Hills, LLC (Developer) is constructing Wayfare Multifamily Development (Development) west of Saginaw Blvd
and south of Cibolo Hills Pkwy. The Water Department would like to cost participate to oversize approximately 2,800 linear feet of 12-inch water
main to a 16-inch water main. Additionally, the Water Department would like to cost participate 100% to construct an 8-inch water main for
approximately 870 linear feet to connect to an existing 8-inch water main. The Wayfare Multifamily project is assigned City Project No. 103516 and
Accela System Record IPRC21-0090.
In accordance with Chapter 212, Subchapter C of the Texas Local Government Code, the City of Fort Worth's (City) participation in the contract is
exempt from competitive bidding requirements because the contract is for oversizing public improvements being constructed by the Developer
and limited to 30 percent of the total amount of the contract for the eight inch water main, the Developer will execute a performance bond to cover
the total project cost, including all of the City's cost participation, and the City's cost participation will be determined in accordance with the City's
community facilities agreement (CFA) unit price ordinance. The City's cost participation in the construction and oversizing of the water mains are
estimated to be in an amount not to exceed $135,626.80, as shown in the table below. Payments to the Developer are estimated to be
$131,306.67 for construction costs and $2,626.13 for material testing. The remaining City participation in the estimated amount of $1,694.00 will
cover the City's portion of inspection fees, administrative material testing fees, and water lab testing fees.
A. Public Improvements
1. Water- 16"
2. Sewer
Water Contingency 15%
3. Drainage
4. Paving/Earthwork
5. Street Lighting
6. Traffic Signal
B. Inspections & Testing
1. Construction Inspection
2. Admin Material Testing
3. Material Testing Cost
4. Water Lab Fee
Total Project Cost
Fee
Fee
Developer City Cost Total Cost
Cost
$123,114.95$131,306.67 $254,421.621
$124,734.01 $0.00 $124,734.011
$0.00 $19,696.00 $19,696.00I
$556,343.96 $0.00 $556,343.961
$975,370.00 $0.00 $975,370.00I
$98,990.00 $0.00 $98,990.00
$1,300.00 $0.00 $1,300.00
I
$36,250.00I $1,250.00 $37,500.00
$7,448.00I $294.00 $7,742.00
$0.00 $2,626.13 $2,626.13
$1,890.00 $150.00 $2,040.00
$1,925,440.92I$155,322.80 $2,080,763.72
*Numbers will be rounded up for accounting purposes.
The reimbursement of the participation, excluding inspection and material testing fees, is not a lump -sum amount and may be less than the stated
amount depending upon the actual quantities and unit prices from the notice of final completion package, commonly referred to as the green sheet
package. Funding for the Community Facility Agreement (CFA) — Wayfare Multifamily project as depicted in the table below:
Fund
Water & Sewer Bond
2020A-Fund 56017
Project Total
Existing Additional
Appropriations Appropriations
Project Total*
$0.00
$$155,323.00
$0.00 $$155,323.00
$$155,323.00
$$155,323.00'
*Numbers rounded for presentation purposes.
Business Equity Division: Opportunity for business equity is negligible as determined by DVIN.
This development is located in Council District 7.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspecified - All Funds project within the Water & Sewer Bond 2020A
Fund and upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds will be available in the Water
& Sewer Bond 2020A Fund for the CFA Bucket programmable project to support the approval of the above recommendation and execution of the
agreement. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds.
Submitted for City Manaaer's Office bv: Dana Burghdoff 8018
Oriainatina Business Unit Head:
Additional Information Contact:
Chris Harder 5020
Soon Wong 8369