Loading...
HomeMy WebLinkAboutContract 55573-AR2 CSC No.55573-AR2 FORT WoR r m City of Fort Worth Construction Allowance Request Project Name Water and Sanitary Sewer Replacemins Contract 2019,WSM-E City Sec No. 1 55573 Project No.(s)l 56002-060043010700430-102301.001780 M&C: 21 0127 City Proj,No.F 10230 1 Project Descrlptiom The replacement of water(including lead services)and sewer mains on several streets. Contractor:[ Woody Contractors,Inc. Allowance No: J= Dale: 8/2712021 City Project Mgr.[ Brenda Oropeza City Inspector: I Pedro Hernandez Phone Number:[ 817-392-8271 Phone Number: 817-992 3991 Dept. Water Sewer Paving Totals Contract Time (Calender days) Original Contract Amount $1,263,052.00 $1,739,313.80 $771,157.65 3,773,623.45 510 Previous Allowances Allocated $0.00 $9,700,00 $0.00 $0.00 0 Amount of Proposed Allocation $0.00 28,465.00 $0.00 $28,465.00 0 Original Allowance Available for Allocation $100,000.00 $140,000.00 $80,000.00 $320,000.00 Remaining Funds Available for Ilits Allocation L $100,000.00 1 $130,300.00 $80,000.00 $310,300.00 Revised Contract Time 510 JUSTIFICATION;(REASONS)FOR AL OWANCE Allowance No. 2 will provide for the reroute of two sewer services that are currently connected to an existing sanitary sewer lateral(to be abandoned)located on private property.The two service reroutes include cutting/replacing concrete driveway and hand tunneling to connect a service line located underneath a residence.The allowance also provides for the replacement of a wood fence with a concrete footer that was in conflict with both service reroutes. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment In full for all costs arising out of,or incidental to,the above Construction Allowance Request, Contractor's�Com an Name Contractor Name Contracjqr Signature Date Woody Contractors,Inc. Troy Woody Ins ctor Date Prop M na er 7 Dale Director Water De t Date onstructlon rvisor TPW NO Date T. Aug 31,20214 % s ant City Attorney Date Assistant nily Ma'nage-r Dale k(Sep 3 20211214 D7 Sep 3,2021 as s ,luJ.21 g pr Sep 7,2021 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX F(Dla-' WO R-rI-3t City of fort Worth Construction Allowance Request Project Name Water and Sanitary Seaver Replacemins Contract 2019,WSM-E City Sec No. 55573 Project No,(s) 56002-060043010700430.102301-001780 M&C: 21-0127 City Proj.No. 102301 Project The replacement of water(including lead services)and Seaver mains on several streets. Description Contractor Woody Contractors,Inc. Allowance No: 0 Dale: 8/27/2021 City Project Mgr, Brenda Oropeza City Inspector FPedro Hernandez GONSTKUGIION ALLOWANCE ITEMS 10 BE ADDED PTION DEPT QIY Unit Unit Cost Total 53 6'Wood Fence w112'Wide one.Fooler Sewer 60 EA $125.00 $7,500.00 54 6"Conc.Driveway Seaver 790 SF $6.00 $4,740.00 55 Mobilization for Tunnel Sub Sewer 1 EA $3,850.00 $3,850.00 56 Hand Tunnel to Connet Service Located Beneath Residence Sewer 1 LS $8,250.00 $8,250.00 57 Add.Tunnel(If needed) Sewer 5 ILF $825.00 $4,125.00 Water Sewer $28,465.00 Paving Page 2 of 4 Additions Sub Total $28,465.00 City of Fort Worth = = Construction Allowance RegUest Project Name Water and Sanitary Sewer Repiacemins Contract 2019,WSM•E City Sec No. 55573 Project No.(s) 56002-060043010700430.102301-001780 M&C: 21-0127 City Proj.No. F 102301 Project Description The replacement of wafer(including lead services)and sewer mains on several streets. Contractor Woody Contractors,Inc. Allowance No: M Date 8/27/2021 City Project Mgr, Brenda Oropeza City Inspector Pedro Hernandez CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED _ ITEM DESCRIPTION DEPT Li Unit Unit Cost Total i I i l Water Sewer Paving Page 3 of 4 Deletions Sub Total MIWBE Breakdown for this Change Order .:Y�'-r,Yi 4,�.,V;,5f (�•+� ..ems'+}i$�`%f iv iX;','�'s`t�-i`y�,:-�pn•.;���o::�:}�. �+p��i'.:--a:4n, ^C.'k.a�'�i..f•':v' h.Ttiih�� SEu{'.C,}} .'uuY,^'tiy�5t�{i,1 `u?f� .�e7•Y,{,h!� �c? h•Ei..F GI^,:j:/1'•li:i:,l't'. ��-4...:•T�� :;l:i`::. ��a-J t Total ��r= isnrtL: '�e')tt�nQ'U.� , ?L.tl: :N Previous Change Orders ..n1i..{ ,sti !F-r 1=: 'l.T" t�Y'•�,,g•;•• z3.�- ;•�+i=4 '�z, a�?eS:u"sia ry kYi,^�; .(.. ,'y i `h,,{CQ; :+ •' E E��.'„13w,f `tei�' rty.'�Ieit`.#�.2.':Fly.7 t�-�.a,FS`L ,�j.�'"�q::.�-�LS'�it�� � �;t=,`'t�',�.r.��!;�'3.:ti�t5'�,r����..sk I Total43.,#l,Crt4.'.f -1-��:•,:�Ls.o...:�..�'.fi�'+2t3. i'eS..e is I I, i Page 4 of 4 t Contract Compliance Manager By signing l aalmowladgo that l am the person responsible for the monitoring attd administration of this contraot,inoluding ensmring all performance and roportingrequirements, 4-p-It (h-v"- - Signaturo Namc of Employee �.o✓ e Title ATTEST; on �- lveOF*0 �0°°°°°° ly0�� Ronald Gonzales �A °Acting Clty Secretary Onoo0voo° 004 �d 0Ici j, °000000 /,/ `(�11 SEX Asa•�p OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX