ProjeciNarnel Water and Sanitary Sewer Replacements Contract 2019,WSM-E City Sec No, 55573
Project No.(s) 56002.0600430/0700430-102301-001780 M&C: 21-0927 City Proj.No. 102301
Project Description: The replacement of water(including lead services)and sewer mains on several streets.
Contractor: Woody Contractors,Inc. Allowance No: ® Date: 9/24/2021
City Project Mgr.I Brenda Oropeza City Inspector: I Pedro Hernandez
Phone Number: 817-392-8271 Phone Number: 817-992-3991
Dept. Water Sewer Paving Totals Contract Time
(Calender days)
Original Contract Amount $1,263,052.00 $1,739,313.80 $771,157.65 $3,773,523.45 510
Previous Allowances Allocated $0.00 $41,905.00 $0.00
$0.00 0
Amount of Proposed Allocation $0.00 $27,000.00 $0.00 $27,000.00 0
Original Allowance Available for Allocation $100,000.00 $140,000.00 $80,000.00 $320,000.00
Remaining Funds Available for this Allocation $100,000.00 $98,095.00 $80,000.00 $278,095.00
Revised Contract Time 510
JUSTIFICATION(REASONS)FOR ALLOWANCE
Allowance No. 4 will provide for the installation of a 7' conflict structure to allow for a project 8-inch sewer
main to cross an existing 48-inch storm drain and the installation of a 20 foot segment of sewer pipe at a
location where an existing brick manhole will be removed.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.
Contractor's Company Name Contractor Name Contractor Signature Date
Woody Contractors,Inc. Troy Woody
Inspec r Q4Date Project M,anagvi Date
9-24-2021
Directo Wafer Dept Date Construction u ervisor TPW Dept) Date
opne,abe,sep a,o a:a o„ T' Sep 28,2021 .e9 �� 9/25/21
Assistant City Attorney Date Assistant City Manager Date
DB[.,k(S.p29 Sep 29,2021 , Sep 29,2021
4Bhdo«<sepzs
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
F_ 7RT WO City of Fort Worth
Construction Allowance Request
Project Name Water and Sanitary Sewer Replacements Contract 2019,WSM-E City Sec No. 55573
Project No.(s) 56002-0600430/0700430-102301-001780 M&C: 21 0127 City Proj.No. 102301
Project
Description Tt�e replacement of water(including lead services)and sewer mains on several streets.
Contractor Woody Contractors,Inc. Allowance No: ® Date: 9/24/2021
City Project Mgr. Brenda Oropeza City Inspector FPedro Hernandez
_ CONSTRUCTION ALLOWANCE ITEMS TO BE ADDED
Il I _____ DEPT Qty Unit Unit CosF7 Total
60 15-in PVC SS Sewer 20 LF $250.00 $5,000.00
61 7'Conflict Structure(15'depth) Sewer 1 EA $22,000.00 $22,000.00
Water
Sewer $27,000.00
Paving
Page 2 of 4 Additions Sub Total $27,000.00
Fc,)IzT WO RTH City of Fort Worth
'--I Construction Allowance Request
Project Name Water and Sanitary Sewer Replacements Contract 2019,WSM-E City Sec No. 55573
Project No.(s) 56002-0600430/0700430-102301-001780 M&C: F-2—io-1-2-71 City Proj.No. 102301
Project Description The replacement of water(including lead services)and sewer mains on several streets.
Contractor Woody Contractors,Inc. Allowance No: ® Date 9/24/2021
City Project Mgr. Brenda Oropeza City Inspector Pedro Hernandez
CONSTRUCTION ALLOWANCE I T LIMS TO DE DELETED
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Paving
Page 3 of 4 Deletions Sub Total
MIWBE Breakdown for this Change Order
S w
MMESubArioUrit.for�h�s G�
Total
Previous Change Orders
r7-
Total0 00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge thatl am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Name of Employee
Title X�;4a����
4 o!00--OR T ed
d
ATTEST: P I., o�.p�
000
�j1 pOO O00 T�~ -
Y
Ronald Gonzales �� °000000 a
Acting City Secretary. �11�EXp$oa�
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX