Loading...
HomeMy WebLinkAboutContract 55399-A1 AMENDMENT No. 1 CSC No.55399-A1 TO CITY SECRETARY CONTRACT WIME�. ,FAS, the City of Fort Worth (CITY) and Freese and Nichols , Inc. , (ENGINEER) made and entered into City Secretary Contract No. 55399, (the CONTRACT) which was authorized by M&C 21-0128 on the 16th day of February, 2021 in the amount of $1,001 ,447 . 00; and �f7i�F7 MAS, the CONTRACT involves engineering services for the following project: 3rd Barrel Parallel Sanitary Sewer to the Twin 90-inch Sewers Serving the Village Creek Wastewater Treatment Plant, Bank Protection at the Village Creek Wastewater Treatment Plant and Pipeline Erosion Analysis at Five Low Water Crossings Project; and WIEEMAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee . NOWTEUERFFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $94 ,871 . 00 (Sewer) . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1 ,096,318 . 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Freese and Nichols, Inc. Ddng Bf(O,t 8,2021 08 '} Dana Burghdoff cf 8,202108:46CDT) �/�,/J ��, Dana Burghdoff Nicholas Lester, P.E. Assistant City Manager Vice-President Oct 8,2021 DATE: DATE: 10/01/2021 APPROVAL RECOMMENDED : Cal ftDf��lBP/f6lPG18P CJTistopherH rd er(Oct4,20211fi:41 CDT) Chris Harder, P.E . Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee Pratima Poudyal, P.E. , Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A ow Date: N/A DBIack(Oct 7,2021 17:54 CDT) Douglas W. Black Form 1295 : N/A Senior Assistant City Attorney pq OR a 00000°O ������'''III ATTEST: "v 00 '00-0��� o° °p/6 0 0 v o o=� OFFICIAL RECORD ° o CITY SECRETARY Ronald Gonzales ��*°o° °° ,y 0 Acting City Secretary ��� EXpSoa� FT. WORTH, TX Page -2- FREESEInnovative approaches Practical results rm?'MICHOLS 4055 International Plaza,Suite 200 • Fort Worth,Texas 76109 • 817-735-7300 • fax 817-735-7492 www.freese.com July 27, 2021 Ms. Pratima Poudyal, P.E. Project Manager City of Fort Worth Water Department 311 West 10th Street Fort Worth,TX 76102 Re: Amendment 1 for the 3rd Barrel/Village Creek Bank Stabilization/5 Sites (City Project No. 103128) Dear Ms. Poudyal: Freese and Nichols, Inc. (FNI) is providing this proposal to amend the Engineering Design Services for the 3rd Barrel/Village Creek Bank Stabilization/5 Sites (City Project Number 103128).The following fee includes the costs for the preparation of an Individual Permit for the USACE, additional design efforts to comply with the IP, and credits for a reduction in geotechnical investigation, coordination with USACE under Nationwide Permit No.13, and the deletion of Site No.2 Verna Trail/ Live Oak technical memorandum. FNI records show that this proposal would serve as Contract Amendment No. 1. A summary of the additional costs is shown below: Item Fee USACE IP $52,153 Additional Plan Design $47,307 Additional Survey(tree and topo) $19,800 Additional Archeological Study $15,611 Geotechnical Investigation (Credit) ($10,000) Environmental Permitting and Support (Credit) ($20,000) Site No.2 (Verna Trail/ Live Oak)Tech Memo (Credit) ($10,000) Total $94,871 [FTW21267]T:\1.01 Contracts\Amendment No.1—USACE IP and Additional Design\Amendment Letter CPN 103128 Amendment No. 1 3rd Barrel/Village Creek Bank Analysis/5 Sites July 27, 2021 Page 2 of 2 Freese and Nichols, Inc. appreciates this opportunity, and we would like to meet with you to discuss these additional services at your convenience. Original Contract Amount $ 1,001,447 Amendment No. 1 $ 94,871 Contract Amount to Date $ 1,096,318 Sincerely, J v "t('on Nicholas Lester, P.E. Vice President Attachments Level of Effort Spreadsheet Attachment A-Scope [FTW21267]T:\1.01 Contracts\Amendment No.1—USACE IP and Additional Design\Amendment Letter ATTACHMENT A DESIGN SERVICES FOR PARALLEL SEWER(108-INCH OR 120-INCH)TO TWIN 90-INCH SEWER ATTACHMENT A Scope for Engineerinq Design Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR 3Ro BARREL PARALLEL SEWER TO TWIN 90-INCH SEWERS, VILLAGE CREEK BANK ANALYSIS I PLAN DEVELOPMENT AND PIPELINE EROSION RISK ANALYSIS FOR 5 SITES AMENDMENT NO.1 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Task Nos. 1-15 previously defined under the original contract. The purpose of this amendment is to amend Task 8.0 (Village Creek Bank Analysis) by including additional effort for obtaining an Individual Permit (IP) from the USACE for the Village Creek Bank Analysis and to amend Task 9.0 (Village Creek Plan Development) by including additional effort for the scope increase in the design of the bank stabilization as a result of the USACE IP. In addition, effort not needed as a result of the USACE IP includes the reduction in effort for geotechnical investigations (Task 9.7), environmental permitting and support (Task 9.8) for original design under Nationwide Permit 13, and the deletion of effort for development of a technical memorandum for Site No.2 (Verna Trail / Live Oak) (Task 11.0) WORK TO BE PERFORMED Task 8.7 USACE Individual Permit Task 9.10 Additional Design due to USACE IP TASK 8.7. USACE INDIVIDUAL PERMIT. The Engineer will prepare an Individual Permit in compliance with USACE requirements for the design of the bank stabilization adjacent to the Village Creek Water Reclamation Facility. The duties and responsibilities of the Resident Project Representative are as follows: ■ Document preparation including executive summary, identification of project location and nature of activity, defining the construction schedule, defining the purpose and need for the project, alternatives analysis comparison, alternatives analysis report section and summary narrative, description of avoidance and minimization. ■ Description of Jurisdictional Determination (JD). ■ Reviewing TXRAM (existing condition/site visits and post project). ■ Description of native vegetation, 100-year floodplain, existing soils and geology, stream geomorphology. City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 1 of 3 ATTACHMENT A DESIGN SERVICES FOR TWIN 90-INCH EMERGENCY BANK STABILIZATION ■ Description of threatened and endangered species and indirect and cumulative effects. • Description of proposed mitigation and ecological trajectory. ■ Description of public interest factors. ■ Description of recommended actions (conclusions). ■ Performing internal quality control and formatting of permit. ■ Preparation of USACE forms, IP checklist, ENG Form 4345, and Errata Sheet. Due to the nature of the improvements and location of the site located within City of Fort Worth property, it is anticipated that no public comments and/or opposition will be received, during the public comment phase, requiring redesign of the project. ■ Additional meetings with City and USACE. ■ Address comments from City, USACE and other Agencies. ■ Description of cultural resources. ■ Additional tree, bank and stream surveying. DELIVERABLES A. Permit application for City review and submittal to USACE. TASK 9.10. ADDITIONAL DESIGN DUE TO USACE IP. The Engineer will provide additional design for the bank stabilization in compliance to the USACE IP. The duties and responsibilities of the Engineer are as follows: ■ Additional geomorphic design effort. ■ Preparation of riverbed grading. ■ Preparation of a vegetative planting plan. ■ Preparation of an RCP outfall design plan. ■ Preparation of special specifications. ■ Design of additional river length. DELIVERABLES A. None — included in original contract. City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 2 of 3 ATTACHMENT A DESIGN SERVICES FOR TWIN 90-INCH EMERGENCY BANK STABILIZATION WORK TO BE DELETED A. Task 9.7 Geotechnical Investigations B. Task 9.8 Environmental Investigations C. Task 11.0 Site No.2 (Verma Trail / Live Oak Creek) TASK 9.7. GEOTECHNICAL INVESTIGATIONS. The original bank stabilization concept required an extensive geotechnical investigation including a slope stability analysis. The revised concept does not require the same level of geotechnical analysis. As a result, a credit of$10,000 is included in this Amendment No.1. TASK 9.8. ENVIRONMENTAL PERMITTING AND SUPPORT. The original bank stabilization concept required coordination with the USACE under the Nationwide Permit (NWP) No.13. The revised concept requires significant coordination with the USACE per the development of an Individual Permit (IP). Amendment No.1 includes the full effort required for development of the IP. As such, the effort required for NWP 13 coordination will not be required. As a result, a credit of$20,000 is included in this Amendment No.1. TASK 11.0. SITE No.2 (VERMA TRAIL / LIVE OAK CREEK). After a preliminary analysis and site visit to Site No.2, it was determined that modification to this sewer main would require a larger construction project than was initially anticipated. The City elected to remove this site from the Technical Memorandum and instead address the operational concerns under a separate project. As a result, the remaining effort not used will be returned to the City, as a credit of$10,000, and is included in this Amendment No.1. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services — Refer to original contract for additional services not included in the scope of services. City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 3 of 3 m QW m= a o a0 K n E 0 U a w w va va m N Y f 0 c o c Y. E_� m>> `n �.F u o oar N U m HH oa aina a F o r in in w_ c n mmo�?o a �� o m z rc w to �w 0 � z 0 u a w w � m N r MM m o m f U 60$ W _— o EF LL O v Z 3 N d NY O •� a E vQ aNi � E C Q.W w fn W a 0 E m v N Q 5 W U N Q N _ E 3 c 01 m 0 2 N d € c F v w m j fn 7 N X w = oy € — o w cn W J N Q N W C N c W Q O > •C W N N N LL° f lo n o Z E O ~- N � c y - °•U ¢ O V; T O m m O1 - N J Q m U C N Y E E > m c ° a £ a of o '�` a c oom_ m.E � - _ codes 10 m _ cE o E o >2- E N w m o d co¢g s m c m 2 2 76 N a c1°i c N o rd a o y m a > oE UU000��S a �O1UU d rd m mnoo E: �?maa0 Uam r 3�� da° m.6 RrLZ< mo o m a-aoa '- >a`❑w¢Hin� QC7�>d'N¢¢ �m tO z° MQin lo E mm a. N N M Q Yl N M Q Yl W r °,u U~ T»> Alternatives •fir - + _ • erosion based • '' '_ ' }� geomorphic Y • (2) alternatives .•- • - µme. created for �i West 1 Fork Trinity River Geornorphic Aerial Tributary Crossing CD j `..�..� It-Rd JO— CULL— U) YEfOj } o �, ? LL {1� • T r � Lu V�ls-lyl�hlie , t x Imager{Date:elO/ J2019