HomeMy WebLinkAboutContract 41910-A4 CITY SECRETARY CONTRACT NO.
AMENDMENT NO. 4 TO
CITY SECRETARY CONT'RACT' N'O. 41910
SYSTEM PURCHASE AGREEMENT
BETWEEN CITY OF FORT WORTH AND
MOTOROLA SOLUTIONS INC.
This Amendment, No. 4 ("Amendment") to City Secretary Contract No 41910 System Purchase
Agreement ("Agreement"), is made and entered, into by and between the City of Fort Worth the
"City"), a home rule municipal corporation situated in portions of Tarrant,, Denton, and Wise
Counties, Texas acting by and through Susan Alanis, its duly authorized Assistant City
Manager, and Motorola Solutions, Inc., ("Consultant"), acting by and through Dian Delaney its
duly authorized, MSS1 Vice President, collectively referr,ed to as the "Parties,."'
RECITALS
The following provis,ions are true and correct and, form the bas,is of this Amendment:
WHEREAS, on or about June 14, 2011, the parties entered into a System Purchase Agreement
("Agreement") to purchase a P,25 Radio Communication System. The Agreement is a public
document on fil�e in the City's Secretary Office and referenced as City Secretary Contract No.
(
``CSC") 419100 and
WHEREAS, on or about May 23, 2012, the parties subsequently amended the Agreement via
CSC No. 419,101-Al, to incorporate changes agreed to during the Design Review and in
accordance with the Agreement, to modify pricing structure, systern description, scope of
services, acceptance testing, equipment, LTE services, and other items as deemed necessary
and agreed to by the Parties� and further amended the agreement on or about May 23, 2012,
via CSC No. 41910-A2, to extend the pricing provision and modify provisions for equipment
storage; and further amended the Agreement on or about Aug usit 1, 20,12, via CSC No. 41911 O-
A-3 to incorporate changes in the, Astro Repeater (ARS,) site location from Texas Motor
Speedway ("TMS") to American Tower Corporation Roanoke Site: ("Roanoke ATC"). CSC Nos.,
419,10, 4 10-Al�) 41910-A2 and 41910-A3 are hereby collectively referred to as the
("Agreement"')I" and
I
WHEREAS, the Parties wish, to amend the agreement to incorporate changes for subscriber
hardware and, installations, training, and work at radio sitels deemed; necessary and agreed to, by
the Parties.
NOW, THEREFORE, for good, and valuable consideration, the receipt and adequacy of which
are hereby acknowledged, the City and Consultant agree as follows-.
CFW/MOTOROLA OFFICIAL,RECORD
Amendment No. 4,to CSC No. 4,1910 cay secRETARY
Page 1
FT
V#OM, TX
P
2 4 1 1 piq
The agreement shall be; modified to incorporate changes, agreed to by the Parties set
forth h�erein and in Change Order No. 4 and Generator Preventive Maintenance (PM) Statement
of Work (SOW), which are attached hereto or incorporated by reference and hereby made part
of
Chi's Agreement.,
2.
All other provisions of the Agreement that are not expressly amended herein shall
remain in full force and effect.
Executed on this the day of 2013.
CITY OF FORT WORTH: MOTOROLA SOL N IN
By: By".
usan Alanis
ssist'anit City Manager
Date: Date.-
4
F0
0000000
0?1
004
AT1/TE 0�T.
"o
f'7
(,�,
T
By: 0
lary Ji. Kayser 0 0
City 0 0
City Secretary r.) 0 0
)L 000 00�"'"
00000
1144
�AS 4��
APPROVED, AS TO FORM AND LEGALITY19-
B
Male ia, Farmer
Assistant City Attorney
0
Contract Authoriization:
M&C G-17303
Date Approved: June 14, 2011
CFW/MOTOROLA
Amendment Nol. 4 to,CS,C No. 41910 OFFICIAL RECORD
Page 2 CITY SECRETARY
C
no WORTHI TX
011 1 OWN
ffOrOMOLA SOLUTIONS CHANGE ORDER
Change Order No. 4
Date: December 21, 20 12
Project Name,,,, Fort Worth P25 q jade ec ; -1.011 92A
Customer Name: fit of Fort'Wo�rth
Customer Project Mgr,- Alan Girton
The purpose of this Change Order is to
Make various specific changes for subscriber hardware and installations, training, and work at radio sites, as
has beco�me necessary due to further analysis of requirements during early implementation phase of the
project.
Contract# Citv of Fort Worth-. Contract 41910 Contract Date,, 6/23/11
11...........
Motorola Solutions Contract.- 11-1 16/DL
In accordance with the terms,and conditions of the contract identified, above between the City of Fort
Worth and Motorola Solutions, Inc., the following changes are approved*.
Contract,Prime Ad justments
Original Contract Value,*. $3913451641-55
Previous,Change Order amounts,for Change Order numbers
through No Price Adjustments
0 3
Reduce project credit frorn $3,0813,,432.19
This Change Order-. to$2,7'27,,651.64. Total purchased with
I credit in this change order is $355,780.55
New Contract Value. $3913451641.551
Compleflon Date Adjustments
Original Completion Date,*. 12/31/2014
Current Completion Date prior to this Change Order" 2/28/2015
New Completion Date- NI/A
0,
Changes to System Purchase�qreement(SP rovisions.
There are no changes to,the System Purchase Agreement(SPA) Provisions with this change order.
Changes in Eq TP ent:
—m ... ......
See attached Change Order 4 Summary listing dated' 12/21/12
Chanes. 'in Services: -
See attached Generator PM SOW.
Schedule Changes.
Fort Worth P,25 U pg rade Page 1 of 2
Project
CHANGE ORDER
MOrOROLA SOLUTIONS
There .'no schedule_ changes with this Charge Order.
f_heP�ice of'the contract is not altered h this Change As a result,of this change
outstanding project purchasing credit remaining available for the City of Fort Worth is charged from
$3 credit this 55.
��. ��"�?� � .� . fi�� �r�h.���d��I�+�r�di �� ���change order �����,��!�...�..
Warranty,Changes:
There are no Warranty changes with this Change Order.
Customer Rqs � ii t
attached Change Order 4 Summary.. �
Payment Schedule Charges:
'here are no Payment Schedu n as with this Change Order.
Unless amended above, all other fauns and conditions of the Contract shad remain in full force. If there
are any inconsistencies between the provisi,ores of fts Change Order and the provisions of the Contract,
the provisions of the Change,Order �%I�r
ro
Reviewed by.' Date;
Mpt
_!9kol ect anager
Reviewed by: Date,
City of Fart Worth Project Manager
Fort Worth, P25 , grade Page 2 of 2
Project
CITY OF PERT WORTH P25 UPGRADE PROJECT CHANGE ORDER 4 SUMMARY-DECEMBER 21, 2012
CFW Price with
# Site or Dept Description Incentive's HG AC Price List Price
u� � III I�u I�I�� I�wriwuq IUIM�q�
� ' Westland $1,983.21
III►.,� ,rr
All Departments
_$940.,2314 671 $1.33QJ02.69
Add 580 PD H1820 05 Remote
Po $286,452-801 ; 0
Add 5610 "D H1182,0 Dash W7 to 05
Police Department 'Remote Mount Installs $144,557.451
...... $2311636-36�
Police Department
a alr �a
Add 16 P
Police Department lConversion Kits $61086-5ZI $%241.60' of
Add 16 PD H11819 Dash
Police Department
Add 20 PD 8
Motorcycle
Police Department CoInvers,ion Kits $90483.84" $141400.010 $181000.00'
Add 20 PD H,1,822 Motorcycle
PDepartment 05i Installs
$101727.27
IL
Add 6 PD H1818 Dash 05 to Remote
Police DepartTent
• A w •
Add 6 PD H,1818 Dash 05 to Remote'
Police Department , ,
Add 151 FD H1819 Dash 05
Fire Department Conversion Kits 6 $10%022.00
Add 147 FD "' Dash W7 to
Fire ' e ►
7� Add 4 FD H1819 Dash W7 to, Dash
conversions, no vehicle
Department Fire
Add 6 FD HI1820 05 Remote
Fire Department Kits $2,963.30 $i4,1499.I40 11621W
Add 6 FD H1820 Dash W7 to 05
Fire Department Remote Mount Installs $41963-64
Add PW H1819 Dash 05
Public o ►01� $376.f595-201, $4701744.001
Add 652 PiW H1819 .
Public
��rl/(��iT��rt�l�������������a���o����.n��� a a.�
CITY OF FORT WORTH P25 UPGRADE PROJECT -CHANGE ORDER 4 SUMMARY !DECEMBER 21',2012
CFW Price with
Site or Depot Description Incenfives HGAC Price List Price
IA
dd*tional Flash and Programming
.r • of
All Departments for each 015,control head) $7,850.45 $81636-36� r.
installation
,additional 05 control head
All Departments installations $31253.81 $3,F579��
Add 27 New PD XTL-5000
Police Department '!'Motorcycle Radios $1661822.20 $207fiO3.00
Add Radio
Mobile Police Department l�and Programming(2 touches) $261,774.1811 291454.55�
Add 8, 0 Flashes-
Police P O $4,t"7316000' $5.,920.0U
Add 17 a1
DIGITAL RTMIU'LTIK�EY AND ENHANCED DIGITAL
Police Department DISPLAY ONLY $7 467-87 $11.339.00�� $13,855-001
Add 25 Mobile ZONE WITH
MIU'LTIK�EY AND ENHANCED DIGITAL
Police Department DISPLAY ONLY $7 467-87 $11.339.00�� $13,855-001
Add 25 Mobile T7000 Flash Installs
0W Police Diu 'r I 5.2 3 ,
Add 20 T6697 Motorcycle Flash $261106.90d $391640.0U, $46,600.06
"Police Department
,
Add 6 Motorcycle
Flash
Police Departm�n"Install and Programming (I touch) $3,454.55j
Add DIGITAL
I Add 1 T6751 Flash DIGITAL
Dep _
IF.....
Police Department Add 11 flash and program (1 touch) Mill
Encryption
Police �► 11
Add 1 NlNTN4935 AES Encryption
Police ! oar i ru
Pollicei Department 1
NTN4935 AES Encryption
Police Department "LKit UCIVI, 1 ! $4;375.00
'Add 20 NNTN4935 Encryption
Police Department 'Kit UCIVII $61586.06 $10,000,001 $121500-OG
CITY OF FORT WORTH P25 UPGRADE PROJECT -CHANGE ORDER 4 SUMMARY DECEMBER 21, 20 1,2
CF's rl*ce with
Site or Dept Description Incentives HGAC Price List Price
JiAdd I NNTN4197A AES Encryption
0
iAdd +r Installations
d 1i UCM Portable •, r
Police Department kits above) $41772.25'' $512510.0Q
Add 2,,000 NAF5080 Antenna 1/2,
Police Department Wave 7"'Whip 700/800 MHz $501904.001 $561000.0Q, $700,000.00
Add 20 NNTN7686A APX Charger
Adapter
It
Police I
g :,, SIN' 1N
class " "" "` $201500-0&
Training Additional
nr Digital
�Simulcast with GTR8000 Repeaters
1. $18,r634.50:' t
0
Phase;2 changes-changed
frequency plan, update Region 40
plain, reprogram set freq,uencies
�from staging and then b
later,, swap Burnett antenina,s to
r
Maintenance Police Department 2,90i HLN61875A 3"' Belt Clips $21743.65
Radio Services 30 APX600;0 Portables 58,91164.59
i� Description of Preventative
e
• the p • e attached
SOWis and will be aictive
during the Maintenancle Period
Phase r r� °•
Miu
Operations Ithe cointract Exhibit E-1.
CITY OiF' FOiRT WORTH P25 UPGRADE' PROJECT -CHANGE ORDER 4 SUMMARY- DECEMBER 21,2012
CFW Price
Site or Dept Description Incentives HGAC Price List Price
er analysis requirements,
Motorola will: remove 3 antenna
siy terns; move 2 live aintennas;
extend cable ladder from 230'to
250', and install additional 200'
cable ladder as described in aloe '
tower analysis dated Nov 07, 2012. $230861.25 $26,250.00
Due to the existing foundation
being unable to,support the new
ener at�r, Motorola will: design
and install new foundation; update
A&E drawings; install ground halo
59 around foundations supply, install $15,.748.51 $17.306.06
$355,780.55 $391.,740.44
Page 4
nnn tlmYflryIffflVWl .. a wow,w.wrmwww,wa�«„,,,w ... .. .. -
Statement of Work
MS —Generator Preventative Maintenance
1.0 Description
MS—Generator Preventative Maintenance will provide two(2)Preventative Maintenance inspections of
the equipment listed in Section 6.0 per year at approximately six(6)month intervals. MS—Generator
Preventative Maintenance will be perfon-ned,during regular business hours,8:001AM to 5:00 PM,Monday
through Friday. If the System or Customer requirements dictate this service must occur outside of regular
business hours,Motorola will provide an additional quotation. Customer is responsible for any charges
associated with helicopter or other unusual access requirements or expenses.,
2.0 Motorola has the following responsibilities:
2.1 Notify the Customer of any possible System downtime and that Generator Alarms will be
activated with this Service.
2.2 Change the Oil once per year.
2,.3 Change the Oil Filter at the time of the Oil Change.
2.4 Change the Fuel Filter(if applicable),once per year.
2.5 Perform,an Oil Analysis at the time of the Oil Change.
2.6 Change the Coolant Filter if applicable)once per year.
Check the Coolant Freeze Point and Inhibitor at each visit.
2.8 Perform task listed in the Generator Preventative Maintenace Level I Inspecton Service Level
Checks table Semi-Annually.
2.9 Perform task listed tinder the Generator Preventative Maintenace Level 2 Inspecton Service Level
Checks Annually.
2.10 Report to the Customer any repairs deemed necessary for proper operation of the standby power
system at the time of inspection. Any repairs will be referred to the Customer for action and
additional authorization. Cost for repairs will invoiced separately.
3.0 Customer has the following responsibilities:
3.1 Provide safe access to the Equipment so that the Servicer may provide services. All sites shall be
accessabel by standard service vehicle.
3.2 Cooperate with Motorola and perform all acts that are reasonable or necessary to enable Servicer
to provide the MS—Generator Preventative Maintenance services to Customer.
3.3 Authorize and acknowledge any scheduled System downtime.
3.4 Provide adequate Fuel needed to perform the MS—Generator Preventative Maintenance.
4.0 Generator Preventative Maintenance Level I Inspection Service Level Checks to be perfumed Semi-
Annually)
--777
�7'
...........
R,
,v
Engline Electrical(Starting 'ystern) Batteries — Check battery water level, age, specific gravity
& perform load test. Clean batteries, externally including
cables& osts,.
Alternator — Visually inspect alternator & alternator belt.
Measure &record alternator DC voltage out put.
W Plugs (where applicable) — Check for proper
Page 11,
.......e.............
in
eration
Starting Motor—Visually inspect,test for proper operation
(Perfornied durin g engine start)
Spark Plugs (where applicable), — Check spark plugs &
spark plug wires conditions & annotate recommendations
for re pair or replacement.
Distribution Cap (where applicable) — Inspect. Annotate
recommendations for repair or replacement.
Generator Windim!s—Visually ins indings
Bear,ings-,--Inspect for proper lubrication
Brushes[Diodes—Visually inspect for wear
Circuit Breaker—Test for proper 2peration
Mounts/Botts,—Visually ins pect for wear and/or dame
Nolise—Annotate operational noise indicators of mechanical
malfunctions.
Safety Controls/Control Panel Voltage (where applicable) — Measure & record loaded &
unloaded AC volt4ge
Frequency (where applicable!) — Measure & record loaded
&unloaded Hertz frequency
Amperage (where applicable), — Measure! & record loaded
alip era g,e
Shutdowns— Visually inspect wiring deterioration. Verify
proper 2peration of shutdowns.
Pre-alarms—Verify proper annunciation of pre-alarrns
Remote Annunciator (where applicable) — Inspect for
per 2peration
Instrumentation 0*11 Pressure Gauge — Check for proper operation.
Measure&record oil pressure PSI
Water Temperature Gauge— Check for proper operation.
Measure&record water temperature in de ces,Fahrenheit
Ammeter—Check for proper operation, Measure &record
anip era ge in D;C a,Lnps,.,
AC Electric Meters — Check for proper operation.
Measure&record readings
•
Control Panel Wiring--Visually inspect for signs of wear
&correct of loose comiections
Air Induction& Exhaust Precleaner Visually inspect condition & clean when
necessaTy
Air Filter Inspect & clean air filter. Recommend
replacement when necessary. Note condition of filter
housing.
Intake— Visually inspect & not condition of intake piping
&gaskets.
Turbocharger -- Visually inspect turbocharger for leaks,
hysical condition,&annotate auditory indicators of wear.
Exhaust/Silencer — Visually inspect for leaks & proper
operation including rain cap (where applicable), Annotate
anomalies in exhaust,smoke.
Lubrication System Lubrication Olii,,-,-Check for proper oil level
rankcase Breather — Clean breather (where applicable).
Annotate condition&any excessive blow by.
Governor—Check oil level
Tubes, Lines, Seats & Gaskets — Visually inspect for
deterioration or indications of wear.
Page 12
..........
Cooling System Radiator Visually inspect radiator core condition,
annotate indication of coolant leakage or core blockage.
Check coolant level.
Radiator Cap—Check-,for indications of wear
Coolant—Measure&record antifteeze point&PH level
Hoses — Visually inspect hoses, clamps, gaskets &
connectors
Fan Assembly— Visually inspect fan, fan bearing, pulleys
& belts for indications, of wear. Measure belt tension for
pro er operation
Water Pump—Visually inspect for proper operation, leaks,
or audible indications of wear.
Jacket Water Heater — Inspect from proper operation,
indications, of wear on heater & associated hoses and
claas.
I'liermostat—Check for proper operation
Fuel Systems Fuel Lines & Connections — Visually inspect f r proper
operation&indications of deterioration
Priming Pump (where applicable) -- Verify proper
operations&inspect for seal damage or deterioration
Fuel Filters — Visually inspect for damages, leaks, &
2roper 2peration
Governor & Controls — Inspect controls & linkage for
pLoper 2peration
Carburetor/Mixer — Visually inspect & verify proper
operation
Day Tan due Cell — Visually inspect for leaks & check
foIr proper operation. Make note of water in fuel cell &
level of fuel.
5.0 Generator Preventative Maintenance Level 2 Inspection Service Level Checks to be perforried Annually)
5.1 Includes all Services in Level I Inspection
5.2 Fuel S ystem—Fuel filter&fuel/water separator filter replacement. Check from proper seal&
operation.,
5.3 Lubricating System—Replace oil filters. Inspect all gaskets&seals. Remove,existing
lubricating oil and properly dispose of offlite. Fill with fi-esh oil. Collect and send for analysis.
5.4 Generator—Lubricate bearings if applicable. Lubricate lochs and hinges. Clean generator
cabinet.
6.0 Exclusions.-
6.1 MS--Generator Preventative Maintenance covers only those Generators provided by Motorola
through the AS,TR02,5 Migration Project.
6.1.1 45O kW Currirnins Generator located at Eagle Mountain. Serial number 42959.
6.1.2 130 kW Generac Generator located at Westland 6. Serial number 2115003.
6.1.3 130 kW Generac Generator located at North Beach. Serial number 2115002.
6.1.4 130 kW Generac Generator located at Rolling Hills. Serial number 2115004.
6.2 Replacement or repair of equipment and parts,unless specified in Sections 2.01,4.0 and 5.01.
6.3 Failures resulting from improper or unauthorized installation,misuse, accident,,over-loading,
over-speeding,repairs made by soineone other than Motorola or an authorized Motorola
Subcontractor,fire,flooding, vandalism,theft,or other acts beyond the control.of Motorola.
Page 3
Page 14
,x M&CReview
Offidal site of the City of Fott Wotth, Texas,
""r/0
eq ✓
R W4P VOW r.
EM
...........
............-------0--i---------------- Now"
,,.,.,/',�,(r�//r,Ir,fig,.. /.I.,..r✓�Y�/ ,✓rM.�,✓�✓e ..,,,. N ri.,rr r/' r,n/,,..,....r,,.,✓...r.rr/l r.rw,:L�r/..✓w,,,,.: r,✓/.r,...,. ,J,.r„>s„.......,✓ ,. ✓.r r.,.r/ ,, .,o..,r.�.,.J,i(rr r/r �,,.r/ ., .. ,.r,l. ,.�..,re r,..rrr.r,Yr.ri,....r.,r,r,,..�.,✓,,.)r.,nu�.ev/e✓r,,.r..,..,.�,,;,rr,,Ml,rl/,,,,,/,.,..,,�../,r�!.✓,n/,x�rrt�/;/r�., n,�/✓Nr��.,r. �r�rer l,�,.✓a,,���h dr�
NMMI IL 01 Aft' SL a 13TAX
OL%PATCN 6/114/2011 RoMalm"EREENCOE”, INURS, (.1 17303 LOU NAMCIR NOTES 11
X 10� a
C®DENI 0 TYPE91 NON-CONSENT PUBLIC HEARING: NO
SUBJECT: Approve One-Ti,me Exception to the Financial Management Poll,icy Mate meiits to Allow the Use
of Debt Structures Involving Balloon Payments for,the Sole Purpose of Financing the Upgrade
to the City's Public Safety and Public Works Radio Communications System Via Tax Notes,
Adopt Ordinance Authorizing Issuance of Tax Notes in the Principal,Amount of'$431,050,000.00,
Approving the Sale of the Notes to, JP Morgan Chase, Providing for the Levy, Assessment and
Collection of a Tax Sufficient to Pay the Interest on Said Notes, Create a Sinking, Fund for the
Payment of the, Principal Thereof and Ordaining Other Matters Related Theretol Authorize
Execution, of a System Purchase Agreement in the Amount Not to Exceed $39,,3145,641.551 with
Motorola Solutions, Inc., for Equipment and Professional Services, Using a Houston-Gaiveston
Area Contract, and Authorize Execution of Amendment No. 2 to City Secretary Contract No.
40264 with Buford Goff&Associates to Provide Engineering and Quality Assurance Services, in
the Amount, Not to Exceed $�2,9 I ,000O�. I0
I k I ..............
RECOMMENDATIONN
It is recommended that the City Council
I. Approve a one-�time exception to the Financi:a,l Management Poliicy Statements to,
allow the use of debt st,ruict,ures involving balloon payments for the sole, purpose of
financing the upgrade to the City's Public Safety and Public Works radio
comm unicatilons system via Tax Noties,
2,. Adopt the attached ordinance authorizing the issuance of Tax Notes in the
principal amount of$43,050,0001.00, approving the sale of the notes to, JP1 Morgan
Chase-, providing for the levy, assessment and collection of a tax sufficient to, pay the
interest on, said', notes and to create a sinking fund for the payment of the principal
thereof andl ordaining other matters, related, thereto;
31. Authorize execution of a system, purchase agreement in the amount, not to
exceed $39,345,,641.55 with Motorola Solutions,, Inc.,, for equiipment and
professional services using Houston-Galveston Area Contract number RA011-081; and
4. Authorize execution of Amendment No. 2 to City Secretary Contract No. 40264
with Buford Goff& Associates to provide eng,ineering, and quality assurance services
in the amount not to exceeld $2,900,000-00.
W
DISCUSSIIQNMI
hdp://,a,pps.,dwniet.org,/cou Ill di
—Packet/mc reviiew.as,p'?IID=15442& incildiate 2011(I of , '2011 10:09#25 AM]
...................................
m&C Review
If approved, this M&C,will approve a one-time exception to the Financial
Management Policy Statements (F'MPS) regarding debt structures with balloon
payments, authorize the issuance and sale of Tax Notes to JP Morgan Chase in
order to fund the project to upgrade the City;s public safety and public works radio
communications system instead of using the lease-purchase agreement previously
approved, and authorize the execution: of the related purchase and services
agreements.
The FMPS, adopted by the City Council on December 14, 2010, prohibits balloon
debt repayment scheldiu!lles which, consist,of low annula:l payments and one large
payment of the balance due at the end of the term. However; due to a unique
combination of circumstances, including rare market conditions, financing
restrictions, and the urgency of the project to ensure continued maximum public
safety, staff is seeking a one-time exception to the policy for the, Rolle purpose of
funding this long-term project via Tax Notes which have a maximum life of seven
years. The principal pay-down schedule would mirror a standard 1 0-year issue for
the first six years, thus avoiding the spirit of typical balloon-payment financing. It is
anticipated that the Tax Notes will be refunded prior to final maturity to accomplish
proper amortization periods.,
On May 17', 2011, (M&C P-1 11234 revised)the City Council approved: the acqulisition
of hardware, software and services to upgrade the City' ► public safety and public
works radio communications system., On this same M&C, the staff recommendation,
was to fund this project via a lease-purchase agreement with Motorola. On today's
Agenda is M&C G-1 7302 for separate consideration as staffs recommendation to
escind that authorization and repeal the re b
related ordinances. because of current
market conditions, the City can finance this project quickly via Tax Notes, resulting in
a projected savings of approximat,ely $500,000.,00 annually over the lease-purchase
cost. Although the method of financing is transferring from lease-purchase to
financed purchase, the General Fund will continue to be the source of repayment.
The upgrade to a current generation digital system will more effectively meet the
requirements of first responders,, and fulfills state and federal objectives for
interoperability amongst the region's similar agencies. This system will replace the
City's current system acquired in 1992, which is no, longer supported' by the
manu�facturer.
On September 16, 20018, M'&C 0-23055 was approved,, authorizing Buford Goff and
Associates, Inc., (BGA)to perform an assessment of the public safety radio system.
In March 2009, BGA presented a report,that key components of'"the system had
reached end of their life expectancy, were no longer supported by the manufacturer
and could suffer failures when taxed by emergencies and increased traffic. In light of
these factors, the City was encouraged to act as soon as possible.,
On May 18, 20110, City Council approved M C-24221 authorizing B,GA to develop
a master plan for the City to upgrade its radio, systems, and negotiate a
com petitively-priced agreement with the City's communications provider,, Motorola
Solutions, Inc. The master plan reinforced the urgency of the 2009 study. Given the
current fragile state of the system, increasing service ce outages, the unavailability of
replacement parts, and the financial challenges the City is facing, the Master Plan
attempted to balance these factors, and ensure a stable, reliable and secure
communications infrastructure for Police, Fire, Water, Transportation and Public
Works, Parks and Community Service and other City departments.
http://apps.cfwnet.org/counciil_packet/m�_review.asp?ID=15442&counc,ildate=6/14/2011(2 of 4)[6/16/201110:09:25 AM]
10
V
M&C-Review
On June 15, 2,0101, M C-24272 was approved to authorize the acquisition of the
Project 25 (P25') standard master switch, or the core, of a, current generation radio
system along with one small site to operate as a potential backup to the existing
I
system. The plan proposed by BGIA and Motorola Solutions, Inc., builds upon -the
installation of this master switch and the i1nitial site,.
Because of the maginit'udle of this project, the full build-out and migration is expected
to require almost 48 months to complete. Assuming contract execution in July 2011,
the project,would be scheduled for completion in the first quarter of'2015.
The total cost of the project is estimated not to exceed $53,,0010,01001.00. This total
includes, $39,31451,641.55 for hardware, software and' services acquired through the
System Purchase Agreement with Motorola Solutions, Inc.; $2,900,000.001 for
engineering, consulting, and other professional services from BGA through March
20�15; and additional costs for project management and site construction. Additional
M&Cs,will be submitted to the City Council for approval of these other projec costs
as necessary.
staff recommends: execution of the System Purchase Agreement with Motoroll�a
Solutions,. Under this agreement, the system implemented will include expanded
coverage areas, specifically in west Fort Worth ii and at Texas Motor Speedway, and
it will provide additional security features which will help prevent unauthorized
i
monitoring of public safety comnmun�ications transmissions. Public works, personnel
will also utlizel a segment of this system, and if a significant,event occurs, public
safety personnel will have access to the public,works portion as welli. Ongoing
support capabilities will be enhanced through 7x24 monitoring and dispatch by
Motorola's network operations center.
Staff also recommends execution of Amendment No. 2, to City Secretary Contract
No. 40264 with Buford Goff& Associates,for the provision of eng�ineering, consulting
and other professional services, through March 2015., These services will include
detailed work regarding system design reviews, frequency licensing, acceptance
testing and other criticali program functions,.
Staff is continuing to explore cooperative measures with other agencies,for potential
cost sharing and joint participation. This project is stru'cturedi in such a way to enable
such measures if they are realized in the future. It is anticipated that the Crime
Control and Prevention District(CCP )will transfer funds, at a future date via, M&C,
to offset a portion of the total cost and provide a funding source for the Fiscal Year
2012 debt service payment. Additionally, it is anticipated that the City Manger's
Proposed Budget will include General Fund debt service transfers beginning in
Fiscal Year 2013.
PRICE ANALYSIS -The HGAC contract offers,fixed discounts ranging from five
I
percent to 25 percent, which remain unchanged from the previous purchase,
Agreement approved by City Council on March 18, 2003,1 M&C P"-10 '50. Staff
reviewed the pricing and determined it to be fair ands reasonable.
COOPERATIVE PURCHASE, - State law provides that a local,l government
purchasing an item under a cooperative purchasing Agreement satisfies any state
law requiring that the l�oica,l government seek competitive bids for purchase of the
item. The Houston-Galveston Area Council contract was competitively bid to
increase and simplify,-the purchasing plower,of government entities.
M/WBE - Buford Golff and associates, Inc.,, agrees,to, maintain its initial M/WBE
commitment of five percent that it made on the original agreement and extend and
http://apps.cfvvnet.org/co�nciI_packet/mc—review.aisp?ID=15442&counci[date=6/14/2011(3 of 4)[6/16/20111 101:019:25 AM']
M&C Review
maintain that same M'/WBE commitment of five percent to this Amendment No. 2.
Therefore Buford' Goff and Associates, Inic., remains in compliance with the City's M/
WBE Ordinance and ai ftests, to its commitment by its signature on the Acceptance of
Previous M/WRE Commitment form executed by an authorized representative of its
company. A waiver of the goal for M/WBE subcontracting requirements for Motorola
Solutionsy Inc.,,, was, approved by the M/WBE Ciffice because the purchase of goods
or services is from sources her subcontracting or supplier opportunities are
negl:igible.
FISCAL INFO RMATION/CEIRTIFICATIONIS
The Financial ManagementServices Director certifies that fug s will be available
upon completion of the sale, closing and delivery of approximately $43,0501000.00
City of Fort Worth, Texas, Tax Notes, Series 2011.
The Financial Management Services Director also certifies that finds will be
available to, make the debt service payments on these obligations, and funds will be
a flable in the General: Fund, as appropriated, to, satisfy the City I s obligations.
vai 11 1
TO Fund/AccountlCeniters FROM Fund/Account/Centers
Submifted for City Main,aqer`s Karen, Montgomery(6222)
Office by:
0 10 a
inaton,g Depla,rtment Head S Lena Ellis, (85 7)
Adclift'l*onall llnformaflon� Contacts", J!ames, Mauldin (24318)
ATTACHMENTS,
note Ord draft 06061 tdoc
http://apps.cfiN nett rgi/'counciil_packet/mc—review. ?ID=15442&councildate=6/14/201,1(4 of 4)1[6/16/20,11 10:091:25 AMi]