HomeMy WebLinkAboutContract 52517-A2 CSC No.52517-A2 AMENDMENT No.2 TO CITY SECRETARY CONTRACT WIIEREAS, the City of Fort Worth (CITY) and CDM Smith, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 52517 , (the CONTRACT) which was authorized by M&C C-29181 on the 25th day of June, 2019 in the amount of $192 , 600 .00; WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $97,448 . 00 administratively authorized May 29, 2020; and WHEREAS, the CONTRACT involves engineering services for the following project: Westside Water Treatment Plant Plate Settler Expansion; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal letter attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $141,740 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $431,788 . 00 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY Page -1- FT. WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth CDM Smith, Inc. baru�BcuAGu7a� - Dana BUDana rgh9 113:1� Dana Burghdoff Stacy L. Barna Assistant City Manager Client Services Leader Oct 19 2021 DATE: DATE: 2-1 APPROVAL APPROVAL RECOMMENDED: h-.ph.,Hab (Oct 14,202116A7�T, Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring 11 performance and reporting requirements . Scott Taylor, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: 21-0540 Date: August 3, 2021 DBlack(Oct 18,202115:06 CDT) Form 1295: 2021-758777 Douglas W. Black Senior Assistant City Attorney ATTEST: pOF FORt �� G~o*- 04 OA Ronald Gonzales V oo° ° Acting City Secretary � * *�COOOOOO �EXASo�a OFFICIAL RECORD Page -2- CITY SECRETARY FT. WORTH, TX CDM. Smith 801 Cherry Street Unit 33,Suite 1820 Fort Worth,Texas 76102 (817)332-8727 April 30,2021 Scott Taylor,PE Fort Worth Water Department 1000 Throckmorton Fort Worth,Texas 76102 Subject: Westside Water Treatment Plant Plate Settler Expansion Project City Secretary Contract No.52517 Request for Amendment No. 2 Dear Mr.Taylor: CDM Smith was requested to provide additional engineering services during construction for the referenced project. These services include providing on-site inspection services. We will also provide construction related activities,such as shop drawing review and RFI responses related to the additional design scope of work from Amendment No.1. We request an amendment to our current contract for performing these additional services.The attached scope of work provides a more detailed explanation for these additional engineering services during construction. Also attached is our fee proposal table developed for the additional scope of work. The total requested fee for the additional engineering services during construction is$141,740, This fee is broken down as follows: • CDM Smith $124,940 • Gupta&Associates $ 16,800 The not-to exceed amount of the current agreement would be modified as follows: • Original Agreement Amount: $192,600.00 • Amendment 1 Amount: $ 97,448.00 • Amendment No.2 Amount: $141,740.00 • Revised Agreement Amount: $431,788.00 Note that we have based the on-site resident project representative (RPR) effort on an average of eight hours per week for 56 weeks of construction. CDM Smith will provide an RPR to be full-time on-site for the duration of construction,but he will only charge bill time actually spent on the WATER+ENVIRONMENT+TRANSPORTATION+ENERGY+FACILITIES CDM Smith Scott Taylor,P.E. April 30,2021 Page 2 project. Sterling Gerlock is the proposed RPR. He will be supported by senior engineering staff from CDM Smith and Gupta and Associates as needed,specifically for process mechanical,electrical and instrumentation and control work. Please review and if acceptable prepare an amendment for this work. Please contact me if you have any questions or comments. Sincerely, J.Dan Shannon,P.E. Project Manager CDM Smith Inc. cc; Tony Sholola (FWWD) Doug Varner(CDM Smith) i0 SCOPE OF SERVICES FOR WESTSIDE WATER TREATMENT PLANT PLATE SETTLER EXPANSION PROJECT AMENDMENT NO. 2 Background CDM Smith contracted with the City of Fort Worth for the Westside Water Treatment Plant (WSWTP) -Plate Settler Expansion Project. The initial scope of work included development of design for adding additional plate settlers to the three sedimentation basins at the WSWTP to expand their capacity from the existing 15 MGD capacity to 18 MGD. Amendment No.1 to the contract was executed to provide additional design and construction services for the electrical and instrumentation design for the addition of Filter No.5 and any coordination of changes related to the membrane addition. Amendment No.1 also included additional design services for the following items: ■ Replace the existing raw water transit time meter and flow control valve with a magnetic flow meter for better accuracy, ■ Provide an additional membrane feed pump with variable frequency drive,and ■ Relocate the potable water sample point following the clearwell storage tank. Amendment No.1 did not include any additional engineering services during construction related to shop drawing review and RFI responses for civil and process-mechanical items associated with Filter No. 5,the raw water meter and flow control valve,the membrane feed pump,or the potable water sample pump. The original contract and Amendment No.1 includes four construction meetings and two site visits throughout the 13-month construction period. It does not include any on-site inspection services. This proposal presents the additional scope of work and engineering fee for providing additional engineering services during construction. CDM Smith will provide an on-site resident project representative (RPR)for the entirety of the construction project,supported as needed by senior technical staff,with partial/limited observation of work based on 8 hours of observation per week (RPR will be engaged in other work during other periods). CDM Smith will also provide submittal reviews related to the additional design scope from Amendment No.1. Gupta and Associates,Inc. (GAI)will provide as-needed inspection services related to electrical and instrumentation work. Scope of Work The scope of work presented below describes the additional engineering services to be provided tinder this Amendment No. 2 by Task. Task 1-Project Management CDM Smith will provide additional engineering services related to day-to-day management of the project for an additional 10 months beyond the originally planned construction completion date of Westside Water Treatment Plant Plate Settler Expansion 1 Scope of Work—Amendment No.2 04/30/2021 August 2020,as shown in the contract project schedule. Task 2 —Basis of Design Memorandum No changes in scope of work. Task 3 —TCEQ Coordination No changes in scope of work. Task 4— Final Design No changes in scope of work. Task 5—Bidding Phase Services No changes in scope of work. Task 6— Construction Phase Services Task 6.1 Construction Support ■ The ENGINEER shall provide additional provide review of shop drawings for the additional process-mechanical and civil work associated with the items identified in the Background Section of this Amendment No.2. It assumed that an additional 10 shop drawings and four RFIs will be submitted by the Contractor for this additional work. ■ The ENGINEER shall provide additional review and response to Contractor requests for information for the process-mechanical and civil work associated with the items identified in the Background Section of this Amendment No.2. It is assumed than an additional 4 RFIs will be submitted by the Contractor for this additional work. ■ The ENGINEER shall receive and track all shop drawing submittals (shop drawings and RFIs) and maintain shop drawing log on BIM360. ■ The ENGINEER shall provide the services of an engineer for on-site resident project representation(RPR) and review of work throughout the construction contract. Engineer will review the quality of work,respond to field questions from the Contractor, and prepare a summary report for each day on-site. The on-site representative will be located at the Westside WTP site for the entirety of the construction period (S6 weeks). It is assumed that the RPR will spend an average of eight hours per week on work specific to this project. ■ The RPR will supported by senior level engineering staff on an as-needed basis during construction to provide inspection services related to process-mechanical,electrical and instrumentation phases of the project. It is estimated that a total of 40 hours will be provided for process-mechanical work;80 hours for electrical work;and 48 hours for instrumentation work. This work will be provided during the specific periods when these areas of construction are being performed. Limits of On-Site Representation Responsibility: The purpose of on-site representation during the project will be to enable ENGINEER to carry out the duties and responsibilities assigned and undertaken by ENGINEER during the Construction Westside Water Treatment Plant Plate Settler Expansion 2 Scope of Work—Amendment No.2 04/30/2021 Phase,and,in addition,by the exercise of ENGINEER's efforts as an experienced and qualified design professional,to provide the CITY with a greater degree of confidence that the completed work will conform to the Contract Documents and that the Contractor and its Subcontractors have implemented and maintained the integrity of the design concept of the completed Project as a functioning whole as indicated in the Contract Documents.ENGINEER shall not be assumed to have reviewed work undertaken and covered or buried when not on site. ENGINEER will not,during such visits or as a result of such observations of the contractor's work in progress,supervise, direct,or have control over the Contractor or its Subcontractor's work,nor shall ENGINEER have authority over or responsibility for the means,methods,techniques, sequences,or procedures of construction selected or used by the Contractor,for security or safety on the site,for safety precautions and programs incident to the Contractor's or its Subcontractors work,nor for any failure of the Contractor or its Subcontractors to comply with Laws and Regulations applicable to the Contractor furnishing and performing the work. Compensation The total requested amount of this proposed Amendment No.2 is$141,740 per attached Fee Development Spreadsheet. The Labor Rate Schedule shall be revised to include hourly billing rates for 2021 and 2022 as shown below. Labor Category 2019 Rate 2020 Rate 2021 Rate 2022 Rate $/hour) ($/hour) $/hour Officer/Principal $275.00 $280.00 $290.00 $300.00 Senior Technical Specialist $250.00 $255.00 $265.00 $270.00 Project Manager $230.00 $235.00 $240.00 $250.00 Senior Engineer Level 7/8 $230.00 $235.00 $240.00 $250.00 Project Engineer Level 5/6 $180.00 $185.00 $190.00 $195.00 Engineer Level3/4 $150.00 $155.00 $160.00 $165.00 Graduate Engineer Level 1/2 $140.00 $145.00 $150.00 $155.00 CADD Designer/Drafter $130.00 $135.00 $140.00 $145.00 Senior Administration $125.00 $130.00 $135.00 $140.00 Contract Administration $120.00 $125.00 $130.00 $135.00 Clerical/Administration $100.00 $100.00 $105.00 $105.00 Schedule The project schedule for work associated with this Amendment No.2 will run concurrently with the construction schedule,estimated to start on July 1,2021 and completing in 400 calendar days on July 31,2022. END OF SCOPE OF SERVICES Westside Water Treatment Plant Plate Settler Expansion 3 Scope of Work-Amendment No.2 04/30/2021 n v � m a < d � o o a � N d A � - m � N imp N ] O N d 3 m m 2 � N N N O O � � a A N 3 � A Z N1n N p O W o Ll O mo D � v o N Y to � O O �l O $� N N yr N N A N N ONO EO m y� N � w o O _ N N N N ut AO R p r Y O g �N Y N rii o a City of Fort Worth, Texas Mayor and Council Communication DATE: 08/03/21 M&C FILE NUMBER: M&C 21-0540 LOG NAME: 60WSWTPPSET-CRESCENT&CDM SUBJECT (CD 3)Authorize Execution of Amendment No.2 to an Engineering Agreement with CDM Smith, Inc.,in the Amount of$141,740,00,for Westside Water Treatment Plant Plate Settler Expansion Project,Authorize Execution of a Contract with Crescent Constructors,Inc,in the Amount of $3,697,000.00 for Westside Water Treatment Plant Plate Settler Expansion Project,Provide for Project Costs for a Project Total in the Amount of $4,841,657.00,and Adopt Attached Appropriation Ordinances RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No.2 to City Secretary Contract No.52517 in the amount of$141,740.00,an engineering agreement with CDM Smith, Inc.for construction support services for Westside Water Treatment Plant Plate Settler Expansion project for a revised contract amount of$431,788.00; 2. Authorize execution of a contract with Crescent Constructors,Inc.in the amount of$3,697,000.00 for the Westside Water Treatment Plant Plate Settler Expansion project; 3. Adopt the attached appropriation ordinance increasing receipts and appropriations in the Water Impact Fee Fund in the amount of $4,191,569.00 from available funds for the purpose of transferring funds from the Water/Wastewater Wholesale Impact Fees and Water/Wastewater Retail Impact Fee projects(City Project Nos. B20004 and B20005)to the Westside Water Treatment Plant Plate Settler Expansion project;and 4. Adopt the attached appropriation ordinance increasing receipts and appropriations in the Water Impact Fee Fund in the amount of $4,191,569.00 transferred from within the Water Impact Fee Fund to the Westside Water Treatment Plant Plate Settler Expansion project (City Project No. 102052). DISCUSSION: On June 25,2019,Mayor and Council Communication(M&C C-29181)authorized an engineering agreement with CDM Smith, Inc.,(City Secretary Contract No.52517), in the amount of$192,600.00 for the Westside Water Treatment Plant Plate Settler Expansion project. The agreement was subsequently revised by Amendment No.1 administratively authorized May 29,2020,to provide additional design for the replacement of the raw waterflow meter,the addition of filter No.5,the addition of membrane feed pump No.5 and relocating the finished water sample point. As part of Amendment No.2,the engineer will perform construction support services for construction of the project that includes shop drawings and submittals reviews,change order review,record drawings and update plant operational manual in the amount of$141,740.00. Construction of the project was advertised for bid on March 4,2021 and March 11.2021 in the Fort Worth Star-Telegram.On April 1,2021,the following bids were received: Bidder ]F-6—a—se—Bj7d1 Contract Time Crescent Constructors, Inc. F$3,697,000.0011400 Calendar Days ll Crossland Heavy Contractors,Inc. $3,782,000.00 In addition to the contract cost,$167,979.00 is required for project management,material testing and inspection and$184,850.00 is provided for project contingency. This project will have no impact on the Water Department operating budget when complete. Funding for the Westside Water Treatment Plant Plate Settler Expansion project is depicted below: Fund Existing Additional project Total* Appropriations Appropriations Water Impact Fee $650,088.00 $4,191,569.00$4,841,657.00 -Fund 56003 Project Total=1 $650,088.001 $4.191,569.00$4,841,657.00 *Numbers rounded for presentation purposes. Business Equity:Crescent Constructors, Inc.is in compliance with the City's Business Equity Ordinance by committing to six percent participation on this project.The City's goal on this project is six percent. Business Equity:CDM Smith, Inc,is in compliance with the City's Business Equity Ordinance by committing to nine percent participation on this project.The City's Business Equity goal on this project is nine percent. The project is located in COUNCIL DISTRICT 3. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are currently available In the W/WW Wholesale Impact Fees and W/WW Retail Impact Fees projects within the Water Impact Fee Fund and approval of the above recommendations and adoption of the attached appropriation ordinances,funds will be available in the Water Impact Fee Fund for the Westside WTP Plate Settlers project to support the approval of the above recommendations and execution of the amendment to the agreement,Prior to an expenditure being Incurred,the Water Department has the responsibility of verifying the availability of funds. Submitted for City Manager's Office byL Dana Burghdoff 8018 Originating Business Unit Head: Chris Harder 5020 Additional Information Contact: Scott Taylor 7240 W W W W W A N ~ A A AA ~ 90 A A A A A w w W W i u, Ln m v, to w w v, (n u, v, v Ln Ln v, v, Lq b m m m m m m m m m m m m m m m m m 0 0 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W W W W w W W W W w W W W W w W W n 0 0 0 0 0 0 0 0 O O O O O O O O O n m m m m m m m m m m m m m m m m CD CD O O CD CD0 O O O O O O O O O Z O O O O O O O O O O O O O O O O O p.] A A A ? A A w A A A A A A A W A A A W W W W W W W W w W w w W W W W O O O O O O O O O O O O O O O O O a to to to In to In to In A to to V V W w W W r r lD LD lD l0 to A LD A A A w A r W r r Vt CD O In O r O r O O CD O 0 0 O m 0 0 In r W In r r O o O O o 0 0 0 m r r O O Ul O O O CD r r O r N r N C O O O r O O r r w m m w m A m w r r r r r r r r r w co r r m m w w O o 0 0 0 0 0 0 0 N N N N N N N N N o O " " O O O O 0 0 0 0 CD 0 C) ( O CD CD0 0 0 0 O CD N N N N N N N N N OW N NJ On Lnn A A O O O O O O O O O W W O CD CD O O O O 0 CD O Vt Vl VI In Vl W In W In N A N A A A A A A A A o O 00 00 w w 00 0o 00 w w 0 0 0 CDA A 0 0 0 0 0 w w LD lD w w LD W LD LD lD N N N N N N lD w w w w w w w LD LD lD O O O O O O W W LD W W W W W LD lD to N N N N N N lD lD w LD LD lD LE) W lD l0 lD r r r r r r I yR W yn. A N N A A N N N N w � A v) L? r w w lDD W to �-' ID lD lD LD lD A V r W lD lD V 00 r Vl Vt ID I-, Vl Vl l71 Vl w o V O V A 0 Oo in J J In 1-4 J V J v, O A o 0 0 A r m 0o 00 ^ m A A co 00 O O O O Vn lD m lD lD :P, In lD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -i 0 0 c 0 c a m m n n rri O l O O h• 7, (a m (D a ° o oq 7 o 7 d D. aq (p O 3 1 m