Loading...
HomeMy WebLinkAboutContract 51535-CO2 CSC No.51535-CO2 FC3R71- WORTH Change Order Request Project Name Sanitary Sewer Rehabilitation Contract 91-Part 1 City Sec No.51535 Project No.(s)56007J52002-0700430/0200431-001783/C01780 DOE No. N/A City Pro.No.C01957/C01669 Project Description Drainage Improvement project that is partnered with the Water Department for construction. Contractor um c a o ;on n Company Change0rder# 0 Date: 10/21I2021 CityPrcjectM9r.1 Scott Taylor,PE City Inspector I Pedro Hemandez Phone Number. 817-392-7240 Phone Number: 817-392.8445 Dept. Water Sewer Stormwater Paving Totals CantmdThe Pelandar Days) Original Contract Amount $0.00 2,109,985.07 1,975,329.00 $947,485.00 $4,932,799.07 365 Extras to Date 0.00 7,000. 0 — 254,050,00 0.00 $261,050,00 300 Credits to Date Pending Change Orders(In M&C Process) Contract Cost to Date $0.00 $2,116,985,07 2,229,379.00 $847.485.00 $5,193,849.07 665 Amount of Proposed Change Order $92,825.00 $438,982.00 $40,955.00 $0.00 $572,762.00 280 Revised Contract Amount $92,825.00 $2,555,967.07 $2,270,334.00 $847,485.00 $5,766,611.07 945 Odg.Funds Available for Change Orders $0.00 $105,499.00 $987766. 0 — 2,374.00 $246,639.00 Remaining Funds Available for this CO $0.00 $98,499.00 $0.00 $42,374.00 $140,873.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 16.90ph $6,165,998.84 JUSTIFICATION(REASONS)FOR CHANGE ORDER Change Order No.2 provides for the realignment and adjustment of a proposed storm sewer box culvert in Suffolk Drive,necessitated by conflict with an unknown gas line.To accommodate the new alignment of the box culvert in Suffolk Drive,it was necessary to relocate and replace the existing sanitary sewer and water mains in Suffolk Drive.This change order also includes the cleaning of the existing storm sewer pipe and installation of bulkheads to prevent storm sewer pipe manholes from being displaced during heavy rainfall events. The 280 additional calendar days provides for the time to obtain the railroad permit for the contractor right of entry and tunneling operations to install the storm drain. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date NSaam J Sdwat nc dba Cycle C consbvdion Convany Teri Skelly Q'is'Z IrApedor Project Mana Director Water Dept) Construction Supervisor(TPW De'q Date hri-phe,Hab m,<z,,zC2„o:osCDT) T ie Y �� 10/26/21 Assistant City Attorney Assistant CiI Manager Date —)oR 28,202116:45 COT) Nov 1,2021 na Bur hdoff w120210.9:3]CI oun 1. on it required M&C Number 21 0827 M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX ® T VVOP.,rm City of Fort Worth Change Order Additions Project Name Sanitary Sewer Rehabilitation Contract 91-Part 1 I City Sec No. 51535 Project No.(s) F 56002152002-0700430/0200431-CO1783/CO1780 DOENo.= City Pro.No. C01957/C01 Project Drainage Improvement project that is partnered with the Water Department for construction. Description Contractor William J Schultz Inc dba Circle C Construction Company Change Order# F-2--] Date; 10/21/2021 City Project Mgr. SooftTaylor,PE City Inspector Pedro Hemandez JTIEW ADDITIONS D T Unit n Cost otal ra is control Stormwater $15,0670 88 Post-CCTV Inspection Stormwater 1,485.00 LF $3.00 $4,455.00 89 Pipe Cleaning-Existing Pipe Stormwater 1.00 LS 12,500.00 $12,500.00 90 7x5'Bulkhead Stormwater 1.00 EA $3,250.00 3,250.00 91 5k4'Bulkhead Stormwater 1.00 EA $2,500.00 $2,600.00 92 60"Bulkhead Stormwater 1.00 EA $2,500.00 $2,600.00 3Manhole Lid Ring Replacement Stormwater 1.00 EA 50,00 750.00 8"PVC S R•26 Sewer Pipe Sewer 6 6.00 F $58.00 $35,1 8. O 2 Pipe Enlargement 6"to 8) ewer 286.00 LF $52. 0 14,872.00 3 Service Reinstatement,Pipe Enlargement including Installation of Sewer sets 0 Sewer 22.00 EA $ ,500.00 8,000,00 4 4"Sewer Service,open cut Sewer 41.00 EA $800.00 $32,800.00 6 "Sewer Abandonment Plug -Sewer 3.00 EA 800.00 2,400.00 7 Sanitary Line Groubng Sewer 8.00 CY $150.00 1,200.00 9 4'Standard Manhole Sewer 20.00 EA ,500.00 90,000.00 14 oncrete collar Sewer 7.00 EA 300.00 2,100.00 16 Manhole Vacuum Testing Sewer 7.00 EA $150.00 1,050.00 18 Remove 4'Sewer Manhole Sewer 5.00 EA $800.00 $4,000.00 9 PreInspection Sewer 1,400.00 LF 3.00 200.00 20 Past Inspection ewer 732.00 F 3, 2,196,00 2Trench Safety Sewer 8. 0 LF 1.00 48,00 27 Temporary Asphalt Repair(2-fnch HMAC on&4nc CTB) Sewer 2,496. LF $18,00 44,928.00 29 6'Wide Asphalt Pvmt Repair,Arterial Sewer 385.00 LF $60.00 $23,100.00 38 Asphalt Pavement and Base Repair 3 313 33 3 Sewer 0.00-Cy $150.00 $15,000.00 48 Remove&Replace Existing Concrete Curb and Gutter(60160)(Units 1&3) Sewer 380.00 LF 5.00 $17,100.00 49 Remove&Replace 6'Concrete Driveway(60 50)(Un is 1&3 Sewer 600.00 SF $15.00 9,000.00 58 4"Solld White Thermoplastic HotApplied Spray(HAS)Lane Lines 5 Units 1 Sewer 5Q0.00 LF 5.00 2,500.00 59 4"Solid e ow Thermoplastic Hot Applied Sptray(HAS)Centedine(s)(50150)(M Sewer 600.00 LF 5.Oo $3,000.00 63 Painting H66se Addresses 50150)(Units 1&3) Sewer 32.00 EA $50.0D 1,600.00 64 Grass Sod Replacement 50 50 (Units 1&3) Sewer 300.00 SY $8.00 2,400.00 65 Topsoil(60/50)(Units 1&3 Sewer 5.00 CY $25,00 $125.05 Traffic ntrol Sewer 6.00 0 ,000.00 $30,00o,00 69 ra is Control De ails Sewer 1.00 LS $2,000.00 $2,000.00 70 SWPPP>1 acre Sewer 1.00 LS 2,500.00 $2,50 . 71 Construction Survey(GPS As-built Red Line survey Sewer 1.00 LS $4,000.00 ,000.00 72 Construction Stalang Sewer 0.75 LS $5,000.00 $3,750.00 4 12"M Pipe Sewer 3000-0 $95. 0 29,07 .0 75 Remove 8'Sewer Line Sewer 306.00 LF 2 .00 6,120.00 76 8"HDPE Pipe Sewer 120.00 LF 95.00 11,400.00 77 8"Ductile Iron Pipe Sewer 130.00 LF 95.00 12,350.00 78 Remove&Replace 8"PVC Pipe Sewer 125.00 LF 85.00 10,625.00 1 8'PVC Water Pipe Water 20.00 LF 70.00 1,400,00 2 8" ate Valve ncluding Cone Collar ater 1.00 EA 1780 .00 1,800.00 Ductile Iron Water Fittings w estra nt<=12 inch Water 1.0D TN $8,000.00 $8,000.00 4 Temporary Mater Services ater L00 LS --ST0-,T0T0 sio,000.00 5 !'Water Service,MotorReconnec on Water 3.00 EA 1,100.00 3,300.00 6 V Water Service Water 3.0 --9---Tff5-.O $1,005.0c 7 Remove Concrete Curb and Gutter(50/50) Water 300.00 LF 7.00 2,100.00 8 Concrete Curb and Gutter(60/50) Water 300.00 LF $40.00 12,000.00 9 Traffic Control Water 1.00 MO 3,ODO.00 3,000.00 10 Trafric Control Details ater 1.00 S 2,000.00 , 0.00 11 SWPPP>1 acre Water 1.00 LS 2,500.00 2,600.00 12 Construction Survey(GPS As-butt Red Line survey) Water 1.00 L5 $4,000.00 $4.000.00 13 Construction Slaking Water 1.00 LS $2,500.00 $2,500.00 14 12"PVC Water Pipe Water 332.00 LF $85.00 28,220.00 15 12" elve Water 4.00 2,750.00 11,000.o0 WaterE$5727 [StormwAater ewer Page 1 of 1 aving ddi6o Fk)K*I, W40P.-Fil City of Fort Worth Change Order Deletions Project Name Sanitary Sewer Rehabilitation Contract 91-Part 1 City Sec No. 51535 Project No.(s) 56002/52002-0700430/0200431-001783/C01780 DOE No. I N/A City Pro.No. C01957/C01 Project Description Drainage Improvement project that is partnered with the Water Department for construction. Contractor William J Schultz Inc dba Circle C Construction Company Change Order#= Date 10/21/2021� City Project Mgr. Scott Taylor,PE City Inspector Pedro Hernandez DELETIONS ITEM DESCRIPTION DEPT Qty `, Unit Unit Cost Total Water Sewer Stormwater Paving Deletions Sub Total Page 1 of 1 MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature Name of Bmployee Title on ATTEST: pF*0000 °°°°°°° � d �v° �_� Ronald Gonzales ° ° °Acting City Secret 00000°° b i i OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, October 19, 2021 REFERENCE NO.: **M&C 21-0827 LOG NAME: 60SSR91P1CO2-CIRCLEC SUBJECT: (CD 3 and CD 9)Authorize Execution of Change Order No. 2 in the Amount of$572,762.00 and the Addition of 280 Calendar Days to a Contract with William J. Schultz, Inc. dba Circle C Construction Company to Sanitary Sewer Rehabilitation Contract 91, Part 1 and Westcliff Phase 2B Drainage Improvements and Adopt Attached Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1.Authorize the execution of Change Order No. 2 in the amount of$572,762.00 and the addition of 280 calendar days to City Secretary No. 51535 with William J. Schultz, Inc. dba Circle C Construction Company(City Project Nos. C01957 and C01669)thereby increasing the contract amount to$5,766,611.07; and 2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the General Capital Projects Fund, by increasing estimated receipts and appropriations in the amount of$1,050,034.00 in the Sanitary Sewer Rehabilitation Contract 91, Part 1 project(City Project No. C01957), and by decreasing estimated receipts and appropriations in the Contract Street Maintenance Programmable Project(City Project No. P00020)by the same amount; and 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of$531,807.00,transferred from available funds within the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer Rehabilitation Contract 91, Part 1 project(City Project No. C01957). DISCUSSION: On September 11, 2018, by Mayor and Council Communication (M&C) C-28839, the City Council authorized a contract with William J. Schultz, Inc. dba Circle C Construction Company in the amount of $4,932,799.07 for the construction of Sanitary Sewer Rehabilitation Contract 91, Part 1 and Westcliff Phase 2B Drainage Improvements (WP2BDI). The contract was subsequently revised by Change Order No. 1 In the amount of$261,050.00 authorized by M&C 20-0702 on September 22, 2020 that provided for pre-construction television inspection of deteriorated sewer mains in the project area and the installation of the project 90-inch storm drain pipe by hand tunneling instead of by trenchless means. Change Order No. 2 provides for the realignment and adjustment of a proposed storm sewer box culvert in Suffolk Drive, necessitated by conflict with an unknown gas line. To accommodate the new alignment of the box culvert in Suffolk Drive, it was necessary to relocate and replace the existing sanitary sewer and water mains in Suffolk Drive. This change order also includes the cleaning of the existing storm sewer pipe and installation of bulkheads to prevent storm sewer pipe manholes from being displaced during heavy rainfall events. The 280 additional calendar days requested is allocated for this work along with the time to obtain the railroad permit for the contractor right of entry and tunneling operations to install the storm drain. Appropriations for Sanitary Sewer Rehabilitation Contract 91, Part 1 and Westcliff Phase 2B Drainage Improvements: Existing Additional Fund _ Project Total [Appropriations i Appropriations General Capital 11 $1,550,034.00� $0.00 $1,550,034.M Projects Fund 30100 11 Storm Water Capital Projects Fund 520021 $11,871,000.00�� $ $11,871,000.00 Stormwtr Cap Proj l_ _ Legacy Fund 59652 $23,288.00` $0.00 $23,288.00 Cap Prof�IStormwater 2007 Fund 59653 $587.001[ $0.00 $587.00 Water& Sewer ;Capital Projects I $2,465,110.00 $531,807.00 F2,996,917.00! Fund 56002 Water Capital Fund 59601 $125,042.00 $0.00� $125 042.00 Sewer Capital [:$498,439.001 $0.00 $498,439.OQ�Fund Legacy 59607 ( - Projects Storm / Capitalater Bond Fund $3,788,009.00 $0.001 $3,788,009.00� 59651 ;Project Total $20,321,509.00� $531,807.00 $20,853,316.00 *Numbers rounded for presentation purposes. M/WBE OFFICE-A waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, in accordance with the applicable Ordinance, because the purchase of goods or services is from sources where subcontracting or supplier opportunities are negligible; Approval of recommendation 2 would adjust appropriations between a programmable project and convert the Sanitary Sewer Rehabilitation Contract 91, Part 1 project into a static capital project. This action is needed as future funding for the Sanitary Sewer Rehabilitation Contract 91, Part 1 project is anticipated from other funding sources and the scope of this project differs from that of the current programmable project. This project is located in COUNCIL DISTRICTS 3 and 9. FISCAL_ INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are currently available within the Water& Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the SS Rehab Contract 91 and funds are available in the current capital budget, as previously appropriated, in the Stormwater Capital Projects Fund for the Westcliff Drainage project. Prior to any expenditure being incurred, the Water and the Transportation & Public Works Departments have the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO (Fundl Department Account; Project ProgramActivityi Budget Reference# :Amountj ID ID Year (Chartfield 2) FROM ID Project ProgramActivity; Budget Reference# �Amountl Fund'Department,Account 1 ID ( g Year (Chartfield 2) j CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Scott Taylor (7240) ATTACHMENTS 1. 60SSR91P1CO2-CIRCLEC funds availability,docx (CFW Internal) 2. 60SSR91P1CO2-CIRCLEC MAP.pdf (Public) 3. 60SSR91P1CO2-CIRCLEC SAM. gov.pdf (CFW Internal) 4. 60SSR91P1CO2-CIRCLEC Waiver.pdf (CFW Internal) 5, 60SSR91 P1 CO2-CIRCLEC 1295.pdf (CFW Internal) 6. 60SSR91 P1 CO2-CIRCLEC 30100 A021(r2).docx (Public) 7. 60SSR91P1302-CIRCLEC 56002 A021 (r3).docx (Public) 8. Copy of 60SSR91 P1CO2-CIRCLEC FID Table updated.xlsx (CFW Internal) RO RO RO RO W W kk V' W W W W C Vl N Ul W W w w Ul Ln N ul 0 0 0 0 Na) Dl m m m m Ol Ql m m O O CD O O O O O O C) O O O O O O O O O O O O O O C) O 0 0 0 0 O O O O 0 0 0 O O O O 0 0 0 0 0 0 0 0 (7 N V m V V m m V V al m A A A A O O O O O O O 0 0 0 0 W W W W A CD A A O A OOP. A A ~ ~ ~ ~ W W W W N W N W W W W N F- O O O O O C) O O O O o. A A to w vi A to A to A A V V V U0 w w w LO LD A A A In w W In Ul In O O O O O 0 0 0 0 O O O O 1" F-• F+ O O O O O O O O O O O fl O O O O nO 0 0 O O O O O O ~ O I-+ O _ lD O w O lD p LD LD W W V O V O Ol Ul lfl Ul Ul Ul Ul Ul Ul LO V V V V V V V V n n c) C) C) O O O O O co V Ili V V 00 00 00 W W O W W O O N N N N O O O O N N N N lD - - LO LO N N lD LD \D LO lD C:) O O O lD lD LO w lD N N N N lD LD lD lb U7 r � iA t/ N if* in A {n A in Va A A V)-V) O O p 0 A W wW W w wW W wp Ul Ul Ul O 0o N 00 OO N N 00 Oo N N O D O lD ID 0o U) lD 00 00 LD lD 0o - O Cl p O lD 00 N w 0o N N 00 0o N N W W W W Ul N N N N Ul p N N L, In A A' A ? O O O 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O D W _ y 0 o 5. 0 _ x 3 3 ate. 3 l> c � o r F � m 0 Fn 9 T O y O Vi 3 o-