Loading...
HomeMy WebLinkAboutContract 54278-CO2 CSC No.54278-CO2 FORT WORTH Change Order Request Project Name 2018 CIP Year 2,Contract 15 City Sec No.154278 Project No.(s)56002.0600430/0700430-001780 DOE No. N/A City Pro.No.1 101476 Project Water,Sanitary Sewer,Storm Water improvements and Paving improvements on several streets in CD 8 Description Contractorl Texas Materials Group dba Texas Bit Change Order It 0 Date: 10/13/2021 City Project Mgr, Pralima Poudyal City Inspector Brian McGill Phone Number: 817-392-6149 Phone Number: 817-392-2695 Dept. Water Sewer TPW SW Totals contract'rho (Calandar Days) Original Contract Amount $3,234,583.46 $546.619.84 $3,542,419.34 $219,844.38 $7,543,467.02 540 Extras to Date $9,187.50 $21,187.50 $0.00 $0.00 $30,375.00 15 Credits to Dale Pending Change Orders(in M&C Process) Contract Cost to Date $3,243,770.96 $567,807.34 $3,542,419.34 $219,844.38 $7,573,842.02 555 Amount of Proposed Change Order $114,410.24 $0.00 $238,631.28 $39,566.20 $392,607.72 35 Revised Contract Amount $3,358,181.20 $567,807.34 $3,781,050.62 $259,410.58 $7,966,449.74 590 Orig.Funds Available for Change Orders $97,038.00 $27,331.00 $177,120.66 $21,984.62 $323,474.28 Remaining Funds Available for this CO $87,850.50 $6,143,50 $177,120.66 $21,984.62 $293,099.28 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT $9,429,333.78 JUSTIFICATION(REASONS)FOR CHANGE ORDER Due to failure of the concrete base on Essex Street,it is necessary to change the proposed paving procedure subsequent to water and sewer replacement from mill and overlay to pulverize and overlay,Change Order No.2 will provide the necessary pay items to allow for the change in procedure. The Change Order No,2 will provide the necessary pay item quantities for additional pavement repair beyond the trench width for the water and storm drain lines that are being installed as part of this project.Additional pay items will also be provided to realign a portion of the 4'x3'storm drain box culvert that during construction was determined to directly conflict with a previously unknown fiber optics communication cable. Staff recommends the approval of 35 additional calendar days for the change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and salisfaclion and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contraotol's Company Name Contractor Name Contractor Signature Date Texas Materials Group dba Texas Bit +lertit Aft Sam Davis-VP Construction _4,t' 10/26/2021 Inspector Project Manager Date Director Water Dept) n ruA a isor W e t Date Assistant City Attorney Assistant City Manager �/*Dat . 77 747 7 Nov 2,2021 Black(oRzs,mu n:oi CDT) aBurghdoff(N v� 14:021 Council Action if required) M&C Number 2-1—08-0-0--1 M&C Dale Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FOP.T WORTH City of Fort Worth Change Order Additions Project Narne 2018 CIP Year 2,Contract 15 City Sec No. 54278 Project No.(s) 56002-0600430/0700430-001780 DOENo.= City Pro.No, 101476 Project Water,Sanitary Sewer,Storm Water improvements and Paving improvements on several streets in CD 8 Description Contractor Texas Materials Group dba Texas Bit Change Order# u Date: 1011312021 City Project Mgr. Pralima Poudyal City Inspector I Brian McGill AOLY-FlUNS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 38 3201.0111 Temporary Asphalt Paving Repair(2"HMAC on 6"CTB) Water 1,184.0 LF $30.87 $36,550.08 52 3201.0201 Asphalt Pvrnt Repair Beyond DefinedWidth,Residential Water 1,500.0 SY $90.00 $135,000.06 8 0241.1000 Remove Conc Pvmt TPW 2,620.0 SY $27.90 $73,098.00 12 0241.170011"Pavement Pulverization TPW 3,520.0 SY $8.62 $30,342.46 22 3212.0303 3"Asphalt Pvmt Type D TPW 9,522.0 SY $19.21 $182,917.62 54 9999.0001 Cem-Lime(30111SY) TPW 60.0 TN $222.24 $13,334.40 74 3211.0112 6"Flexible Base,Type A,GR-1 TPW 4,200.0 SY $12.72 $53,424.00 75 0241.1507 3"Surface Milling TPW 7,066.0 SY $5.75 $40,629.50 76 9999.0015 2"Type D Mac MIX TPW 2,610.0 SY $16.04 $41,864.46 18 3341.1102 43 Box Culvert SW 10.0 LF $396.22 $3,962.20 25 3201.0117 10'Wide Perm Asphalt Pvrnt Repair,Residential SW 130.0 LF $120.00 $15,600.00 26 3201.0201 Asphalt Pvmt Repair Beyond Defined Width,Residential SW 50.0 SY $90.00 $4,500.00 27 9999.0003 Remove&Re-lay 4x3 Box SW 8.0 LF $288.00 $2,304.00 28 999.0004 Concrete Collars SW 2.0 EA $6,600.00 $13,200.05 Water $171,550.08 Sewer TPW $435,610.32 SW $39,566.20 Additions Sub Total $646,726.60 Page 1 of 1 FORT WORTH City of Fort Worth Change Order Deletions Project Name 2018 CIP Year 2,Contract 15 City Sec No. 54278 Project No.(s) 56002-0600430/0700430-001780 DOE No. N/A City Pro.No. 101476 Project Description Water,Sanitary Sewer,Storm Water improvements and Paving improvements on several streets in CD 8 Contractor Texas Materials Group dba Texas Bit Change Order#0 Dale 10/1312021 City Project Mgr. Pratima Poudyal City Inspector Brian McGill DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 50 3201,0111 4'Wide Asphalt Pvmt Repair,Residential Water 1184.00 LF $48.26 $57,139.84 11 0241.1506 2"Surface Milling TPW 9522.00 SY $4.34 $41,325.48 21 3212.0302 2"Asphalt Pvmt Type D TPW 12,132.00 SY $12.83 $155,653.56 Water $57,139.84 Sewer TPW $196,979.04 SW Deletions Sub Total $254,118.88 Page 1 of 1 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Conh•act co►nnliance Manage► By signing I acknowledge that I am the person responsible for themonitoring and administration of this contract,including ensuring all performance and rep ortingrequirements. Signature Pratima Poudyal,P.E. Name of Employee Project Manager Title a� OR ATTEST: 00 0o 41O�� o Pam° °_� ! 0 o V o Ronald Gonzales o °o Acting City Secretary °0° o d o0000000 ICY �tl SEX Asap OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, October 12, 2021 REFERENCE NO.: **M&C 21-0800 LOG NAME: 602018CIPY2C15CO2-TEXASBIT SUBJECT: (CD 8)Authorize Execution of Change Order No. 2 in the Amount of$392,607.72 and the Addition of 35 Calendar Days to a Contract with Texas Materials Group dba Texas Bit, for Combined Street Paving Improvements, Storm Drain and Water and Sanitary Sewer Main Replacements for 2018 Bond Street Reconstruction Contract 15 Project, for a Revised Contact Amount of$7,966,449.74 and Adopt Attached Appropriation Ordinances RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Change Order No. 2 in the amount of$392,607.72 and the addition of 35 calendar days to City Secretary Contract No. 54278 with Texas Materials Group dba Texas Bit, for combined street paving improvements, storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 15 project for a revised contract amount of$7,966,449.74; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of$114,411.00 transferred from available funds within the Water and Sewer Fund, for the purpose of funding the 2018 Bond Street Reconstruction Contract 15 project (City Project No. 101476); 3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Stormwater Capital Projects fund by increasing appropriations in the 2018 Bond Street Reconstruction Contract 15 project (City Project No. 101476) in the amount of$40,000.00 and decreasing estimated receipts and appropriations in the Drainage Improvements programmable project (City Project No. P00043) by the same amount; and 4. Adopt the attached appropriation ordinance adjusting appropriations in the 2018 Bond Program Fund by increasing appropriations in the 2018 Bond Street Reconstruction Contract 15 project in the amount of$329,808.00 and decreasing appropriations in the Street Construction/Recon/Rehab programmable project (City Project No. P130001) by the same amount. DISCUSSION: On June 23, 2020, Mayor and Council Communication (M&C) 20-0456, City Council authorized a contract with Texas Materials Group dba Texas Bit, in the amount of$7,543,467.02 for the combined street paving improvements, storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 15 Project. The contract was subsequently revised by Change Order No. 1 in the amount of$30,375.00 administratively authorized March 2, 2021 that provided for imported fill material to replace unsuitable trench material. Due to failure of the concrete base on Essex Street, it is necessary to change the proposed paving procedure subsequent to water and sewer replacement from mill and overlay to pulverize and overlay. Change Order No. 2 will provide the necessary pay items to allow for the change in procedure. The change order will also provide pay item quantities for additional pavement repair beyond the trench width for the water and storm drain lines that are being installed as part of this project. Additional pay items will also be provided to realign a portion of the 4'x3' storm drain box culvert that during construction was determined to directly conflict with a previously unknown fiber optics communication cable. The staff has reviewed and verified the quantities for the additional work under this Change Order No. 2. Additionally, to complete this work, staff recommends that the contract time be extended by 35 calendar days. Staff recommends use of the remaining project funds and contingency in 2018 Bond Program - Fund 34018 to fund the paving portion of this change order. This change order will have no impact of the Transportation and Public Works or on the Water Departments' annual operating budget. Appropriations for the combined street paving improvements, storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 15 Project will consist of the following: Fun �[Appropriations��Appropriations Existing Additional project Total* 2018 Bond Program - Fund $4,873,832.00 $0.00 $4,873,832.00 34018 Storm Water Capital Projects $282,500.00 $40,000.00 $322,500.00 Fund - 52002 Water& Sewer Capital Projects - $4,792,889.00 $114,411.00 $4,907,300.00 Fund 56002 Project Total ][—$9,949,221.0011 $154,411.00 $10,103,632.00 * Numbers rounded for presentation purposes. Funds for this project are included in the 2018 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing Official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 23209-05-2018) and subsequent actions taken by the Mayor and Council. Approval of Recommendation 4 would adjust appropriations between a programmable project and convert the 2018 Bond Street Reconstruction Contract 15 into a static capital project. This action is needed as future funding for the 2018 Bond Street Reconstruction Contract 15 is anticipated from other funding sources and the scope of the project differs from that of the current programmable project. Business Equity: Texas Materials Group, Inc. dba Texas Bit agrees to maintain its initial MBE commitment of 15 percent that it made on the original contract and extend and maintain that same MBE commitment of 15 percent to all prior change orders up to and inclusive of this Change Order No. 2. Therefore Texas Materials Group, Inc. dba Texas Bit remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the acceptance of Previous MBE Commitment from executed by an authorized representative of its company. This project is located in COUNCIL DISTRICT 8. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that funds are available in the current operating budget in the Water& Sewer Fund and in the capital budget for the Drainage Improvement Projects project within the Stormwater Capital Projects Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the Stormwater Capital Projects Fund and W&S Capital Projects Fund for the 2018 WSM-J-CIP Contract 15 project to support the approval of the above recommendations and execution of the change order to the contract. Prior to an expenditure being incurred, the Transportation & Public Works and Water Departments have the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs).: TO T and Department Account Project Program Activity Budget Reference # Amount ID ID Year Chartfield 2 Fund Department Account Project Program Activity Budget Reference Amount FROM ID ID Year (Chartfield 2) Fund Department ccoun Project Program ctivit Budget Reference # Amount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Pratima Poudyal (6149) ATTACHMENTS 1. 602018CIPY2C15CO2-SAM Search TexasBit.pdf (CFW Internal) 2. 602018CIPY2C15CO2-TEXASBIT Acceptance Form.pdf (CFW Internal) 3. 602018CIPY2C15CO2-TEXASBIT MAP.pdf (Public) 4. 602018CIPY2C15CO2-TEXASBIT 34018 A021(R4).docx (Public) 5. 602018CIPY2C15CO2-TEXASBIT 52002 A021(r3).docx (Public) 6. 602018CIPY2C15CO2-TEXASBIT 56002 A021 (r2).docx (Public) 7. 602018CIPY2C15CO2-TEXASBIT FID Table V.2 (09.02.21).xlsx (CFW Internal) 8. 60602018CIPY2C15CO2-TEXASBIT funds availability.docx (CFW Internal) 602018CIPY2Ct 5CO2.TEXASBFr III)Tnbk a ject ActNity Budget CF2 Program AnnouM Purpose Kier ID 2 1 56002 1 0700430 4956MI 101476 1 $114,411.00 2 56002 07OD430 r101476 2021 $114,411.00 3 52002 0200431 4952001 PGMBL $40,000.00 3 52002 020D431 UN2800 ($4000000)Budget Revenue Reduction from P00043 Programmable 3 52002 0200431 4952001 $40�.� BudgetAppmpriation Addition of Revenue to 101476 3 52002 0200431 $40,000.00 4 34018 0200341 PB0001 18010199 ($329,808.00) v+..ewae Mr..air..e.evaaajvw.rvmwwv 4 341118 ll2lxJ431 IUI47C, 18010199 5 329,808.1R1 uNu hire it mvNMPFIOpI of��Ilan'hetbs 101J)61nd as(Actual) , ID Year 2 56001 0709020 5956001 $114,411.00 2 56002 0700430 4956001 101476 9999 ($114,411.00) 52002 020D431 4952001 P00043 $40,000.00 Budget Revenue Reduction from P00043 Programmable 52002 02OD431 4952001 101476 ($40,000.00)Budget Appropriation Addition to P00043 IFIDs Rec#Fund IDept It lAccount Ilaroject JActivity Budget JCF2 JProgram I Amount Purpose War ID Year 3 56002 07OD430 5740010 101476 001780 9999 $114,410.24 1 34018 0200431 5740010 101476 002490 9999 18010199 $238,631.28 1 52002 020D431 5740010 101476 002880 9999 $39,566.20