HomeMy WebLinkAboutContract 54682-A1 CSC No.54682-A1
AMENDMENT No. 1
TO CITY SECRETARY CONTRACT
WE ERFAS, the City of Fort Worth (CITY) and VRX, Inc. , (ENGINEER)
made and entered into City Secretary Contract No. 54682 , (the CONTRACT)
which was authorized by M&C 20-0703 on the 22nd day of September, 2020
in the amount of $199,803 . 00; and
WIME FAS, the CONTRACT involves engineering services for the
following project:
Sanitary Sewer Rehabilitation, Contract 105 project; and
R7i�Fi BFAS, it has become necessary to execute Amendment No. 1 to
the CONTRACT to include an increased scope of work and revised fee.
NOW7`EUFRFFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives , enter into the following
agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in the proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $36,743 . 00 (Sewer) .
2 .
Article II of the CONTRACT is amended to provide for an increase
in the fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City
for all work and services shall be an amount of $236,546 . 00 .
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page -1-
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED: ENGINEER
City of Fort Worth VRX, Inc.
Dana QahW,o�
Dana Bur 1,2�37 CDT) r�
Dana Burghdoff Nawal Ibrahim, P.E.
Assistant City Manager President
Nov 1,2021
DATE: DATE: 10/18/2021
APPROVAL RECOMMENDED:
Christopher Harder
Christopher Harder(Oct 26,202109:04 CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring
all performance and reporting requirements .
Name of Employee
Prat' a Poiidvy l, P.E. , Project Manager
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
9890l Date: N/A
DBlack(Oct 28,202116:40 CDT)
Douglas W. Black Form 1295: N/A
Senior Assistant City Attorney
pq FFOR 4�
a 1*00`00Op00 p�O��
0 0 v�
ATTEST: ��o° °
`-( �► P ° ° °�_
0°
Ronald Gonzales ��d'h °°O °° �� OFFICIAL RECORD
Acting City Secretary ����EXAsa�� CITY SECRETARY
FT. WORTH, TX
Page -2-
September 14, 2021
Ms. Pratima Poudyal, P.E.; Project Manager
Water Department, City of Fort Worth
311 W. 101h St.
Fort Worth, Texas 76102
Re: Amendment No. 1 Request City Proj ect No. 02721
Sanitary Sewer Rehabilitation Contract 9105
Dear Ms. Poudyal,
This letter is in reference to contract No. 02725 between VRX, Inc. and the City of Fort
Worth (the City) dated September 22, 2020,herein referred to as the "Contract."
This letter requests an amendment revising the previously approved subject project design plans
and contract documents. Specifically,this amendment includes the provision of
additional work associated with the following items; See attached exhibit A.
1. Addition of Sanitary Sewer Design
2. Additional Topographical Survey for Sanitary Sewer
3. Addition of ROW/Easement Services (Total 5 Easements)
Addition of Sanitary Sewer Design
The original contract work did not include replacing sanitary sewer lines M-36N and L-3580.
The city decided to replace these lines. This amendment will add these lines totaling
approximately 1600LF.
Additional work: $18,113
Addition Topographic Survey
This amendment will include obtaining topography of lines M-36N and L-3580.
• Additional Work: $10,880
Addition of ROW/Easements
This amendment will include 5 easement preparations for lines M-36N and L-3580.
0 Additional Work: $7,750
Water/Sanitary
Original Contract $199,803
Amendment No. 1 $36,743
Total $236,546
I sincerely appreciate your consideration of this request. Please call or email me if you have any
questions or would like to discuss the details included in this letter.
Respectfully,
Al Radaydeh, P.E.
Senior Project Manager
VRX
Enclosure:
Original Contract
Supplemental LOE
Sanitary Sewer Proposed Exhibit
« § §]
° o
E \\ It
«\k
\` §)`,`,* ------- �, �� �,` � ��\ ��
§ ;
)),,,,,,,,,,,, H-i-�-lHJ-,,,, ,,, ®------- ------- --\, ®\„ )
2
§/ \
\\\, \\,®,®, `\\, ®------- -------
----
----
) R )
(§,
�r-. = t
-;
/
10
mll—
£! `
ti
n_
§ � - � (\ ® -
om
- ` )\ )§2
--
�)Qt® ;l- \
-( - \)!!{!\!_ ;* §! � (j \ / )\| ej 2E
; _ \
5.
j _ §;)§ ! ))§ \ 6§!{e)!f) 1E k \;|! |l\ -! ky _
m.
m.
m.
o
s M
,\;
) k ; q/ (§\§ ) j /) ) !\\) §§ §) oo
\ / \ - o | ):e]jE-
it
=L°I!{
/:` §§ :§ §§ § §§ § ;: :: ;:_ :; ;: ;_ ;; : ;1 ;; ;; / : / §§ Z1 ;: ; \§/ j