HomeMy WebLinkAboutContract 55455-CO1 CSC No.55455-COI
FORT WORTH- City of Fort Worth
r Change Order Request
Project Name Hulen Street and Granbury Road Intersection Improvements City Sec# 1 55455
Client Project#(s) 101017
Project Reconstruction of approximately 500 linear feet in all directions from the Hulen Street and Granbury Road intersection. The major items of work
Description consiste of widening the intersection to construct double left turn lanes,new traffic signals and street lights.
Contractor Reyes Group,LTD Change Order# 1 Date 10/7/2021
City Project Mgr. Alejandra Ayala City Inspector Jarad Souders
Contract Time
Dept. TPW Totals CD
Original Contract Amount $1,895,849.50 $1,895,849.50
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,895,849.50 $1,895,849.50
Amount of Proposed Change Order $0.00
Revised Contract Amount $1,895,849.50 $1,895,849.50
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,369,811.88
JUSTIFICATION(REASONS)FOR CHANGE ORDER
The traffic signal at the intersection had to be redesigned to a dual mast arm configurtaion. Oncor did not fully vet the review of the construction plans during the
franchise review process. When the Reyes Group set up an onsite meeting to discuss the installation of the signal,Oncor did not approve of the placement of the traffic
signal pole and arm under the high transmission power lines which run parallel to Granbury Road. The traffic signal was re-designed for a dual mast arm in order to
eliminate the pole and signal arm under Oncor's high transmission power lines. The cost difference for the dual mast arm signal will be funded by the deduction of Line
Item 9999.0164 Temporary Traffic Signal since a temporary traffic signal is no longer needed to be installed at the intersection. The net change order value is$0.00.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractor's Company a on rac or(Name) Miract Slg ate
7a mh Ge�iah Oct 10,2021
Reyes Group,LTD Jaison Cherian
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
.Ta✓ad saudevs Oct 11,2021 Oct 12,2021
o� n
Program Manager Date Senior Capital Project Officer Date
0 ra Oct 12,2021 Oct 13,2021
Assistant Director Qpntl Date Dkg&JULContracting Department(Dept) Date
,o z�og,g pn Oct 13,2021 QL �n Oct 13,2021
Date Assistant City Manager Date
IBM Oct 18,2021 —8-�Ialff Oct 19,2021
C
��,�, ` I , ,,_ ,,- M&C Number M&C Date Approved
ATTEST:` � —f-a�"`ia'+°�M'�'-'^
o�°FORrk�aa
Ronald P.Gonzales,Acting City Secretary �,�o° o� d
�o o���
�vo �_� OFFICIAL RECORD
°000 o d
°
00 CITY SECRETARY
00000
��ar4 SEX p5
b�p FT.WORTH, TX
FORT NVORTu City of Fort Worth
-r Change Order Additions
Project Name I Hulen Street and Granbury Road Intersection Improvements City Sec# 55455
Client Project# 1 101017
contractorl Reyes Group,LTD PMJ Alejandra Ayala inspectof Jarad Souders
Change Order Submittal# 0 Date 10/7/2021
ADDITIONS
HEM DESCRIPTION DEFT ty Unit Unitost I o a
9999.0024 urnis nstaDual asArm)
9999. 0025 Furnish/InstallDual asArm) TPW 1.00000000 EA 48,627.00
9999.0026 Furnish/Install TXDOT TY 48-A Signal Foundation TPW 2.00000000 EA 19,800.00
TPW S137.745.00
Sub Total Additions S137.745.00
Change Order Additions Page 2 of 4
Fo r WW City of Fort Worth
Change Order Deletions
Project Name Hulen Street and Granbury Road Intersection Improvements City Sec# 55455
Client Project# 101017
Contractor Reyes Group,LTD PMJ Alejandra Ayala Inspector Jarad Souders
Change Order Submittal# O1 Date 10(7/2021
DELETIONS
ni ni os o a
urnis nsa ypeSignal Pole
Furnish/Install Mast Arm - TPW EA
TY Signal Foundation TPW EA
Temporary Traffic Signal TPW EA
TPW
Sub Total Deletions
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
NA
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Ineilre S City Of Fort Worth
GROUP
Hueln @ Granbury Project
CPN# 101017
Change Order Request#001
Dual Arm Pole
SUBMITTED 6/3/2021
DATE:
TO: City of Fort Worth
CPN# 101017
FROM: Reyes Group LTD
Job#202101
QTY UOM Unit Cost Total Cost
Change Order#1
1 Furnish/Install-65L/40-80 GV LAB(TXDOT Dual Mast Arm)(I EA) 1.0 EA $ 49,518.00 $ 49,518.00
1 Furnish/Tnstall -65L/36-80 GV LAB(TXDOT Dual Mast Arm)(1 EA) 1.0 EA $ 48,627.00 $ 48,627.00
1 Furnish/Install-TXDOT TY 48-A Signal Foundation(2 EA) 2.0 EA $ 19,800.00 $ 39,600.00
1 Delete-Furnish/Tnstall Type 46 Signal Pole -4.0 EA $ 12,198.00 $ (48,792.00)
2 Delete-Fu-nish/Tnstall Mast Arm 52'-60' -4.0 EA $ 6,216.00 $ (24,864.00)
3 Delete-TY 5 Signal Foundation -4.0 EA $ 8,255.00 $ (33,020.00)
Total Change order value $ 31,069.00
Not Valid until signed by the City Of Fort worth and Contractor.
Digitally slg dby J.—
Dip Nally signed by Alejandra Ayala,P.E. Jaison Cherian -
DN:G-US,E=alejandra.ayala@toravortMsxas.gov _ - cb_ria°
Alejandra Ayala, P.E.W.,ky N-Akjad, Ay.hanspatlatianBPudlic i�eeasaa
Works. 11,1%Ith,a Ayala.P.E."
Reason:I have reviewed this document
Date:2a21-.41 15:59'.43-05'4
Approved Date: Jaison Cherian
Project manager
Jcherian(d)reyesproup.com
(M)(469)-837-6054
File Name:Change Order 001_Dual mast Arms CoverSheet Rev(3/2015)