Loading...
HomeMy WebLinkAboutContract 44169 FoRTW ��` crry SECRET ARY c omTRACT 00"000 M" PROJECT MANUAL FOR THE CONSTRUCTION OF 'A TAR, PA VINE AN',t�DRAINA1.E' I PR0VEMEN"T "FOR (AL TA VITA TO PARS" VISTA) City Project No.00791 Betsy Price Teraw"a Higgins Mayor City Manager S. Frank Crumb,P.E. Director,War Department Douglas VW ier ig, P.E. Director,Transportation and Public is `or s Department Prepared for The City of Fort Worth Transportation and Public Works Water Department 2,012 A PE NS T.Am. TFAGUE, NALL ANDRK Civil Engineering, I Surveying � Landscape Architecture ; Manning TBPE R e i tratian "n. F-230 ► 1100 Macon Street '0 " �� � Ma4AY � .Fart Worth, Texas 76102 �. � .,.. �. Carp ,.+. i$ C OITY as 1,t �.: 00 52 43- I Agreement Page I of 4 WOO 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on a 7niq is made by and between the City of Forth 11111r, 4 Worth, a Texas home rule municipality, tihg' y-and through its duly authorized City Manager, 5 ("City"), and McClendon Construction, Inc., authorized to do business in Texas, acting by and 6 through its duly authorized representative, ("Contractor"). fllffla 7 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 Construction of Keller-Hicks Road from 800 Feet East of Alta Vista Road to Park Vista 16 Boulevard 17 City Project iYunt ber 00 791 18 Article 3. CONTRACT TIME 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. "(00 23 The Work will be complete for Final Acceptance with-in i'360 days after the date when the 24 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 25 3.3 Liquidated damages WOO 26 Contractor recognizes that time is of the essence of this Agreement and that City will 27 suffer financial loss if the Work is not completed within the times specified in Paragraph 28 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 29 General Conditions. The Contractor also recognizes the delays, expense and difficulties 30 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 31 is not completed on time. Accordingly, instead of requiring any such proof, Contractor 32 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 33 City Six Hundred Thirty Dollars ($630.00 for each day that expires after the time 34 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 35 Acceptance. WIWI CITY OF FORT WORTH Construction of Keller-Hicks Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Citv Project,''umber 007911 Revised August 17,2012 raiarrn 005243-2 Agreement Page 2 of 4 36 Article 4. CONTRACT PRICE 37 City agrees to pay Contractor for performance of the Work in accordance with the Contract 38 Documents an amount in current funds of One Million Nine Hundred Twenty-nine Thousand 39 Six Hundred Thirty-six and 44/100..............................Dollars ($1,929,636.44). 40 Article 5. CONTRACT DOCUMENTS 41 5.1 CONTENTS: 42 A. The Contract Documents which comprise the entire agreement between City and 43 Contractor concerning the Work consist of the following: 44 1. This Agreement. � 45 2. Attachments to this Agreement: 46 a. Bid Form 47 1) Proposal Form 48 2) Vendor Compliance to State Law Non-Resident Bidder 49 3) Prequalification Statement 50 4) State and Federal documents (project specific) 51 b. Current Prevailing Wage Rate Table 52 c. Insurance ACORD Form(s) 53 d. Payment Bond 54 e. Performance Bond 55 f Maintenance Bond 56 g. Power of Attorney for the Bonds 57 h. Worker's Compensation Affidavit AS, 58 i. MBE and/or SBE Commitment Form 59 3. General Conditions. 60 4. Supplementary Conditions. 61 5. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings. 65 7. Addenda. 66 8. Documentation submitted by Contractor prior to Notice of Award. 67 9. The following which may be delivered or issued after the Effective Date of the 68 Agreement and, if issued, become an incorporated part of the Contract Documents: t 69 a. Notice to Proceed. 70 b. Field Orders. 71 c. Change Orders. 72 d. Letter of Final Acceptance. 73 74 as MIN CITY OF FORT WORTH Construction o/Keller-Hicrks Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CNY Project Number 007911 Revised August 17,2012 "'AN 005243-3 Agreement Page 3 of 4 75 Article 6. INDEMNIFICATION 76 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 77 expense, the city, its officers, servants and employees, from and against any and all 78 claims arising out of, or alleged to arise out of, the work and services to be performed 79 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 80 tinder this contract. This indemnification provision is specifically intended to operate 81 and be effective even if it is alleged or proven that all or some of the damages being 82 soti2ht were caused, in whole or in part, by any act, omission or negligence of the city. 83 This indemnity provision is intended to include, without limitation, indemnity for 84 costs, expenses and legal fees incurred by the city in defending against such claims and 85 causes of actions. 86 87 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 88 the city, its officers, servants and employees,from and against any and all loss, damage 89 or destruction of property of the city,arising out of,or alleged to arise out of,the work 90 and services to be performed by the contractor, its officers, agents, employees, 91 subcontractors, licensees or invitees under this contract. This indemnification 92 provision is specifically intended to operate and be effective even if it is alleged or 93 proven that all or some of the damages being sought were caused, in whole or in pa 94 by any act, omission or negligence of the city. 95 VON 96 Article 7. MISCELLANEOUS 97 7.1 Terms. 98 Terms used in this Agreement which are defined in Article I of the General Conditions will 99 have the meanings indicated in the General Conditions. 100 7.2 Assignment of Contract. 101 This Agreement, including all of the Contract Documents may not be assigned by the 102 Contractor without the advanced express written consent of the City. 103 7.3 Successors and Assigns. 104 City and Contractor each binds itself, its partners, successors, assigns and legal 105 representatives to the other party hereto, in respect to all covenants, agreements and 106 obligations contained in the Contract Documents. 107 7.4 Severability. 108 Any provision or part of the Contract Documents held to be unconstitutional, void or 109 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 110 remaining provisions shall continue to be valid and binding upon CITY and ill CONTRACTOR. 112 7.5 Governing Law and Venue. 113 This Agreement, including all of the Contract Documents is performable in the State of 114 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 115 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTI I Cons1ruclion of Keller-Kicks Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Ci1v Projeci,,Vwnber 007911 Revised August 17,2012 V 005243-4 Agreement Page 4 of 4 116 7.6 Other Provisions. 117 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 118 classified, promulgated and set out by the City, a copy of which is attached hereto and 119 made a part hereof the same as if it were copied verbatim herein. 120 7.7 Authority to Sign. WIN, 121 Contractor shall attach evidence of authority to sign Agreement, if other than duly 122 authorized signatory of the Contractor. AM* 123 124 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple 125 counterparts. % 126 127 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 128 Contractor: City of Fort Worth By: ��0044 Fernando Costa By: Assistant City Manager (§-Ignature) Date WWI tAN McrU-'VD0m,, PnESIDENIT Atte t: (Printed Name) city Seer t nor (Seal) Ay Ay w T a oo itle: pvw-s 1 -04 N N;p , 'N 71100 0 OX P.O� L-30X 996 woo 0 p3 Address: 0 n, M&C Date: - r 1 000 IEP pia �City/State/Zip: Approva&,4s t Form and Legality: Date Douglas W. Black Assistant City Attorney 129 WOO 130 131 APPROVAL RECOMMENDED: 132 401 133 134 135 Doug lVic, 9 136 DIRECT IN 137 Transportalion Public TVorks, 138 100 Nhla CITY OF FORT WORTH Cmwrtiction ojKeller-Hicks Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Citv Project Number 007911 Revised August 17,2012 10 dea Bond No. TXC 604810 006113-1 PERFORMANCE BOND ON(* Page I of 2 ANN 1 SECTION 00 6113 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § VAN 7 McClendon Construction Company, Inc. 8 That we, ,known as"Principal"herein and fouk 9 Merchants Bonding Company a corporate surety(sureties,if more than to one)duly authorized to do business in the State of Texas,known as"Surety"herein(whether one 02%, 11 or more),are held and firmly bound unto the City of Fort Worth,a municipal corporation created 12 pursuant to the laws of Texas,known as"City"herein, in the penal sum of, One Mallon Nine 13 Hundred Twenty-nine Thousand Six Hundred Thirty-six and 44/100...................Dollars AND 14 ($1,929,636.44),lawful money of the United States,to be paid in Fort Worth,Tarrant County, 15 Texas for the payment of which sum well and truly-to be made,we bind ourselves,our heirs, 450 16 executors,administrators,successors and assigns,jointly and severally,firmly by these presents. 17 WHEREAS,the Principal has entered into a certain written contract with the City frUO 18 awarded the_day of JAN 0 8 2013 20____,which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein,to furnish all materials,equipment NUN 20 labor and other accessories defined by law,in the prosecution of the Work, including any Change 21 Orders,as provided for in said Contract designated as Construction of Keller-Hicks Road from M0111 22 800 Feet East of Alta Vista Road to Park Vista Boulevard City Proiect#:00791 23 NOW,THEREFORE,the condition of this obligation is such that if the said Principal KNIA 24 shall faithfully perform it obligations under the Contract and shall in all respects duly and 25 faithfully perform the Work, including Change Orders,under the Contract,according to the plans, 26 specifications,and contract documents therein referred to, and as well during any period of 27 extension of the Contract that may be granted on the part of the City,then this obligation shall be 28 and become null and void,otherwise to remain in full force and effect. 29 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 30 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 31 Worth Division. OWN, CITY OF FORT WORTH Consbwfion qf Keller-KkArs Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City PrqJecy#_-00791 frufa Revised July 1,2011 fwffio 1 N, 0061 13-2 PERFORMANCE BOND Page 2 of 2 --_Thus-bdfid ismade and exeented in eomplianee with the provisions oi'-Chaptea2253'of the ,ai��O 2 Texas Government Code,as amended,and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF,the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the JAN Q 8 2013 day of 7 PRINCIPAL: SAM 8 McClendon Construction Companv, Inc. 9 10 11 BY: lt_�, bell 12 ignatnre 13 ATT ST. 14 bAN LENDON, PRESIDENT 15 " ANN 16 (P Secre Name and Title 17 18 Address: Po Box 996 19 Burleson TX 76097 ff fr�tr 24 21 , 22 s as to Prin fpal On 23 SURETY: 24 Merchants Bonding Com an 25 ku 27 B , 28 29 (*11 ���:...,_ 30 Jennifer J. Clark, Attorney-in-Fact awu 31 Name and Title 32 33 Address: 2100 Fleur Drive 34 Des Moines IA 50321 trot 35 I 36 37 Witnessas to Surety - Danielle Dinser Telephone Number: 515 243-8171 38 iriarr 39 40 41 *Note: If signed by an officer of the Surety Company,there must be on file a certified extract „ 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address, both trust be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. 45 r,�rr CITY OF FORT WORTH Construction ofKello-Hicks Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENT'S Cl(v Project ii:00791 Revised July 1,2011 ifar!�fa ARNO Bond No. TXC 604810 OD 6114-1 PAYMENT BOND Page I of 2 SECTION 00 6114 2 PAYMENTBOND 3 WNW 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § McClendon Construction Company, Inc. ;rrlrwwo 7 That we, known as "Principal" herein, and 8 Merchants Bonding Company I a corporate surety AN" 9 (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal 11 corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the ima 12 penal sum of One Million Nine Hundred Twenty-nine Thousand Six Hundred Thirty-six and 13 44/100........,... Dollars ($1,2636.�44 , lawful money of the United States, to be paid in Fort NO 14 Worth, Tarrant County, Texas, for the,payment of which sum well and truly be made, we bind 15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, fflaffifl 16 firmly by these presents: 17 WHEREAS,Principal has entered into a certain written Contract with City, awarded the ONA 18 day of 1. — 3 -_ d '�.` 2q._, which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein,to famish all materials,equipment, 20 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 21 said Contract and designated as Construction of Keller-Hicks Road from 800 Feet East of Alta 22 Vista Road to Park Vista Boulevard City Project#: 00791. 23 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 24 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 25 Chapter 2253 of the Texas Government Code,as amended)in the prosecution of the Work under 26 the Contract, then this obligation shall be and become null and void; otherwise to remain in fall 27 force and effect. 28 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 29 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 30 accordance with the provisions of said statute, fey 31 AN& CITY OF FORT WORTH Construction ofKellcr-Hicks Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CityProjeciff:00791 rid Revised July 1,2011 006114-2 PAYMENT BOND Tree Page 2 of 2 1 V WITNESS WHEREOF,the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the JAN 0 8 2013 day of 3 ,20 rrr, 4 PRINCIPAL: NO McClendon Construction Company, Inc. ATTEST: BY: .�, ature �w .. DAN cCL :N , PRESIDENT ,,,rw " Secretary Name and Title Address: Po Box 996 / n Burleson, TX 76097 lrra� V!l. witness as to Pnnci a NO SURETY: Merchants Bonding Company ATTEST: Si tur f Jennifer J. Clark, Attorney-in-Fact (Surety)Secretary - colleen Romo Name and Title Address: 2100 Fleur Drive Des Moines, IA 50321 witness aS t0 Surety Danielle Dinser Telephone Number: (515) 243-8171 5 6 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 7 bylaws showing that this person has authority to sign such obligation. If Surety's physical 8 address is different from its mailing address, both must be provided 9 10 The date of the bond shall not be prior to the date the Contract is awarded. «X 11 END OF SECTION O 12 rr��a CITY OF FORT WORTH Consbucdion ofKeller-Hicks Road WHO, Revised CONSTRUCTION SPECIFICATION DOCUMENTS 0o Profecl d: 00791 Revised July 1,2011 �r�rrR Bond No. TXC 604810 006119-1 ?4AINTENANCE BOND Page I of 3 SECTION 00 6119 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § NSA 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 McClendon Construction Comoanv, Inc. 8 That we --- --- —----)known as"Principal"herein and 9 Merchants Bonding Company a corporate surety(sureties,if more than 10 one)duly authorized to do business in the State of Texas,known as"Surety"herein(whether one 11 or more),are held and firmly bound unto the City of Fort Worth,a municipal corporation created 12 pursuant to the laws of the State of Texas,known as"City"herein,in the sum of One Million 13 Nine Hundred TwenW-nine Thousand Six Hundred Thirty-six and 44/100..............Dollars 14 ($1,929,636.44),lawful money of the United States,to be paid in Fort Worth,Tarrant County, 15 Texas,for payment of which sum well and truly be made unto the City and its successors,we 16 bind ourselves,our heirs, executors,administrators,successors and assigns,jointly and severally, NMI'm 17 firmly by these presents. 18 ka, 19 WHEREAS,the Principal has entered into a certain written contract with the City awarded 20 the day of JAN 0 8 2013—,20 which Contract is hereby WIN# 21 referred to and a made part hereof for all purposes as if fully set forth herein,to famish all 22 materials,equipment labor and other accessories as defined by law,in the prosecution of the 23 Work,including any Work resulting from a duly authorized Change Order(collectively herein, NO 24 the"Work")as provided for in said contract and designated as Construction of Keller-Hicks 25 Road from 800 Feet East of Alta Vista Road to Prak Vista Boulevard City Project#: 007913 AM* 26 and 27 0001 28 WHEREAS,Principal binds itself to use such materials and to so construct the Work in 29 accordance with the plans,specifications and Contract Documents that the Work is and will 30 remain free from defects in materials or workmanship for and during the period of two(2)years 31 after the date of Final Acceptance of the Work by the City("Maintenance Period");and 32 CITY OF FORT WORTH Consinxtion ofKeller-Hick Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project#.-00 791 Revised July 1,2011 t2iWRrfr 006119-2 MAINTENANCE BOND rrrl Page 2 of 3 1 -- -AM REAS,Principalfi indsitself-to-repair-orreeonstnzct-the Work-in-whole-orin-part -- - -- 2 upon receiving notice from the City Of the need therefor at any time within the Maintenance 3 period. 4 5 NOW THEREFORE,the condition of this obligation is such that if Principal sbal l 6 remedy any defective Work„for which timely notice was provided by City,to a completion Uv 7 satisfactory to the City,then this obligation shall become null and void;otherwise to remain in 8 full farce and effect. aura 9 10 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 11 noticed defective Work,it is agreed that the City may cause any and all such defective Work to 12 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 13 the Surety under this Maintenance bond; and frog 14 15 PROVIDED FURTHER,that if any legal action be filed on this Bond, venue shall lie in (00001 16 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fart 17 Worth Division;and N 18 19 PROVIDED FURTHER,that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. rm. 21 22 23 'rrrrmu u,* ark CITY OF FORT WORTH Construction of Keller-Hicks Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 0tv ProJcct p_- 00791 rrrr Revised July 1,2011 ir�rP�a 006119-3 MAINTENANCE BONA Page 3 of 3 �rrti 1 IN'WITNESS WHEREOF,the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the day of JAN 0 S 2013 3 ,20 WNW, 4 5 PRINCIPAL: 6 Mccie n Construction Company, Inc. ro 7 8 / 9 BY: A WZ�I�L 10 Signature (00000 11 ATTEST .. 12 DAN. , RES1 " 13 14 cc etary Name and Title 15 16 Address: PO sox 996 17 Burleson, TX 76097 11169 18 19 20 W'It-ne6VsLeovPrinci 21 SURETY: 22 Merchants Banding Company 23 24 25 26 27 28 Jennifer J. Clark, Attorney-in-Fact 29 ATTEST: Name and Title ' 30 8 31 ri 2100 Fleur Drive °'��.�^. ': Address: 32 (S ty)Secretary - Col pen Romo Des Moines, IA 50321 r 33 34 . ...ar` 35 Witness astoSurety - Danielle Dinser Telephone Number: (515) 243-8171 36 VON, 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address,both must be provided. WNW 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 rrrrUr �n CrrY OF FORT WORTH Conatructton of Keller-Hicks Road STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Clty Projeci l: (10791 icnr Revised July I,2011 nrua� ,,190 M E .0 HANT 7_�k BONDING COMPANY IMPORTANT NOTICE To obtain information or make a complaint: You may contact your insurance agent at the telephone number provided by your insurance agent. You may call Merchants Bonding Company's toll-free telephone number for information or to make a complaint at: 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Offs Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us (001 E-mail: ConsumerProtection@tdi,state.tx.us PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. 4ffi e SUP 0032 TX (1/09) kne W061 Nmw MERCHANTS 1�k } BONDING COMPANY,. k(a POWER OF ATTORNEY Know All Persons ay These Presents,that MERCHANTS BONDING COMPANY(muTuAL)and MERCHANTS NATIONAL BOwmwo. � INC.,both being corporations duly organized under the laws of the State of Iowa(herein collectively called the"Companies"), Aaww and that the Companies do hereby make,constitute and appoint, individually, Betty J Raah; Bryan K Moore; Gary Wayne Wheatley; Jennifer Clark; Joseph Hal ' C|ayburD8; Michael [} Hendrickson; Pat Moore; Richard Deal | 10019 of San Antonio and State u/ TX their true and lawful Anome~in'pact.with full power and authority hereby conferred in their name, place and stead,to sign,execute, acknowledge and deliver in their behalf as surety any and an uonuv. undertakings, ,ouognizwnm:oo,other written obligations in the nature thereof, subject to the limitation that any i such instrument shall not exceed the amount of: � WON THREE MILLION(03,000,UUO.O0)DOLLARS and tu bind the Companies thereby as fully and to the same extent aoi/such bond u,undertaking was signed uy the duly authorized officers of the Companies, and all the acts of said Attorney-in-Fact, pursuant tu the authority herein given, are « hereby ratified and confirmed. � -- This power-of-xovmcy is made and executed pursuant to and by authority of the following Lamm adopted by the emmm of Directors o,the Merchants Bonding Company<MumuVu^April zx.un11 and adopted»y the Board o,Directors m Merchants National Bonding, mc,00 October z4.zo11 � "The President, Secretary,Treasurer,or any Assistant Treasurer or any Assistant Secretary any Vice President shall have J11AN11 power and authority mappoint Amn -in-Fact,and to authorize them to execute on behalf of the Company,and attach mc seal nr the Company thereto. bonds and undertakings, recognizances,contracts of indemnity and other writings obligatory in the nature thereof. U The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to YJAIA any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking,recognizance, or other suretyship obligations of the Cvmpany, and such a.gnwmm and seal when so used aoao have the same force and effect as though manually nxeu^ � |n Witness mme"eor.mcCompanies have caused miomat,vmontw»e signed and sealed mia 1mday o, January . eo1u, MERCHANTS BONDING COMPANY(Murux4 v� ``' — MERCHANTS NATIONAL BONDING,INC. 7V 1 1933 ov '.~ . STATE or|OWA COUNTY OppOLnvv. ~°^^~~*— ~°^° p�xmoo On this im day o January . 2012 before me appeared Lanyrayv,./omopepmnallyknnwn.wmuuoinm»rmouvlyowomum � say that he is President of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,/mC.;and NO that the seals affixed m the foregoing instrument m the Corporate Seals or the Companies:and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, Iowa,the day and year 8� first above written. 101 art ^ aNMARANDAGREENWALT � My Commission Expires i � October 28,2014 wotatypvulic,Polk County,Iowa " STATE oFIOWA fiffs COUNTY OrpoLxxv | mxmamwame, Jr aemew�orma MERCHANTS aOmmwGCOMPANY(MuTuAL)and MERCHANTS NATIONAL oOmmws INC., �oxemuypa��t�at��xoaoovoand��gomgmatmcand:one�mmyuYmopOvvsn-OF+\TrOnmsvexecuteduvaamCnmpan'ie. 411460,�~ which is still in full force and effect and has not been amended o,revoked. In Witness Whereof,I have hereunto set my hand and affixed the seal of the Companies on ^"N 0 m 2013 this day of ..°°.. .°~...... � ~ ~~ ummmfy ' 1933 POAUO14 (11/11) DATE CERTIFICATE OF LIABILITY INSURANCE 30/20(MMfDDffYYY) 1/ 13 THIS CERTIFICATE IS ISSUED As A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED Irrrr REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(jes)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsomenqs). CTACT PRODUCER NAME: Q_Qa03_Wb1_eY 1BTX Risk Services DFW PHONE 14-2.6 6363 N. State Hwy 161, Suite 100 dAip,N9-ml A -9--tQ-Q- 9 E-MAIL Irving TX 75038 m N INSURER(S)AFFORDING COVERAGE AIC,# INSURER AAmej3AE_e_9u1.u_a1 I ns-C-c1_.. 9 3_3_9B INSURED -INSURER B: McClendon Construction Co, Inc. INSURER C: PC Box 996 INSURER D: Burleson TX 76097 INSURER El- INSURER F: COVERAGES CERTIFICATE NUMBER: 1293770111 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. POLICY EFF POLICY EXP LTR TYPE OF INSURANCE IN SR WVD POLICY NUMBER (MMIDDrYYYY) LIMITS INSIR tMMIDDrYYYYl A GENERAL LIABILITY PP2051702 1/3112013 /31/2014 EACH OCC1JRRENCF $1,000,000 X COMMERCIAL GENERAL LIABILITY bAm-K6E fOAE�WLD` -PREMISE 5� CLAIMS-MADE X7 OCCUR MED 17XP(Any one person) $10,000 'Fla PERSONAL&A[W INJURY GENERAL AGGREGAI U 1$2,000,000 GEN1 AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $2,000,000 POLICY PRO- LOC $ I IJECT I I A AUTOMOBILE LIABILITY CA2051701 1/3112013 1/3112014 (Ea accident) $1,000,000 X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED AUTOS AUTOS BODILY INJURY(Per accident) $ X NON-OWNED PROPERTY DAMAGE Afib x $ HIRED AUTOS (Per accident) A �X UMBRELLA LIAB x OCCUR �CU 2051703 1/31/2013 /31/2014 EACH OCCURRENCE EXCESS LIAB Cl AI� "I MS-MADF OCCURR $2,000,AG GREG x $2 DIED RETENTIONSO $ A WORKERS COMPENSATION C-2051704 1/31/2013 1/31/2014 iX TORY TATU- , 0TH- ' AND EMPLOYERS'LIABILITY YIN WC S(LIMITS t ANY PROPRIETORIPARVNER/EXECUTIVE N N/A F I EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? Mandatory in NH) ELPdescribe EASE EA EMPLOYEE $1,000,000 ..... I(yes,describe under DESCRIPTION OF OPERATIONS below E L.DISEASE-POLICY LIMIT $1,000,000 ,00 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) The General Liability and Automobile policies include a blanket automatic additional insured endorsement[CG7085 12/11 &CA7118 11/09] W that provides this feature only when there is a written contract between the named insured and the Certificate holder that requires such status.The General Liability,Automobile,and Workers' Compensation policies include a blanket automatic waiver of subrogation endorsement[CG7063 12/11, CA7118 11/09&WC420304A]that provides this feature only when there is a written contract between the named insured and the Certificate holder that requires such status, Primary Non-Contributory wording per endorsement[CG7085 12/11 Cancellation per attached[11-7045 05/07], See Attached, CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Fort Worth ACCORDANCE WITH THE POLICY PROVISIONS. 1000 Throckmorton Street Fort Worth TX 76102 AUTHORIZED REPRESENTATIVE Not <J �����+! 1 988-201 0 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: rml LOG#: ADDITIONAL REMARKS SCHEDULE Page I of 1 AGENCY NAMEDINSURED IBTX Risk Services DFW McClendon Construction Co, Inc. ................. PO Box 996 POLICY NUMBER Burleson TX 76097 CARRIER NAIC CODE -------... .......... ....... EFFECTIVE DATE ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE RE: Construction of Keller-Hicks Road from 800 Feet East of Alta Vista Road to Park Vista Boulevard- Project#00791 Ads iii (d Ww 1 adeo, ;;40 rrrr ACORD 101 (2008/01) 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD /Mw rage i. Or L siio or the Cagy of Fort Woilh, texas Czar COUNCIL AGENDA FORM fk aran !mMUwummrvwiaYY.W1Ma^auwimo w iwre^vdID r ..m wimunwr vx»rrc auw.,n,m mma mi a ari sfrmmn.mar ra,t.waruvwwm, nmmm smrru arvuwm2v nu xr. n w wuxar e...iumu�rxmimwaw� wu..e�mmw r+w.w.wnde, mxw.wWWmwrm!w.:arvraz mmrz'trnn COUNCIL ACTION: Approved on 1/8/2013 - Ordinance Nos. 20578-01-2013 & 20579-01-2013 DATE: 1/8/2013 REFERENCE C-26050 LOG NAME: 20KELLER-HICKS NO.: CONSTRUCTION 00791 CODE: C TYPE: CONSENT HEARING: NO SUBJECT: Authorize Execution of a Contract with McClendon Construction Co., Inc., in the Amount of$1,929,636.44 for the Construction of Keller-Hicks Road from 800 Feet East of Alta Vista Road to Park Vista Boulevard and $77,363.56 for Contingencies, $40,000.00 for City Furnished Materials, and $202,000.00 for Construction Services for a Project Total in the Amount of$2,249,000.00 and Adopt Appropriation Ordinances (COUNCIL DISTRICT MOW the S RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the AN Special Assessments Fund in the amount of $343,404.68 from available funds; 2. Authorize the transfer in the amount of$343,404.68 from the Special Assessments Fund to the 2007 Critical Capital Projects Fund; NN 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the 2007 Critical Capital Projects Fund in the amount of$343,404.68 from available funds; and i0 4. Authorize execution of a contract in the amount of$1,929,636.44 with McClendon Construction Co., Inc., for the construction of Keller-Hicks Road from 800 feet east of Alta Vista Road to Park Vista Boulevard. A DISCUSSION: "ayark This project provides for the construction of Keller-Hicks Road from 800 feet east of Alta Vista Road to Park Vista Boulevard as a four-lane undivided arterial roadway. Construction is funded by the 2007 Critical Capital Program and developer contributions of future improvement funds received through Community Facilities Agreements. The project was advertised in the Fort Worth Star-Telegram on October 18, 2012, October 25, 2012, and the following bids were opened on November 15, 2012: Bidder Bid Amount McClendon Construction Co., Inc. $1,929,636.44 McMahon Contracting $2,044,434.23 Conatser Construction $2,056,056.00 JLB Contracting LLC $2,075,855.88 CPS Civil, LLC $2,237,762.19 ,Ara Jackson Construction, Ltd. $2,298,099.25 RKM Utility Services, Inc. $2,328,969.50 L.H. Lacy Construction $2,480,000.00 %°N Staff has reviewed the bids and determined the unit prices are consistent with other recently submitted bids for similar size and type of projects. 1110 http: //apps . cfwnet . org/council_pacl<et/mc_review . asp?ID=17 . . . 2/1/2013 Ise M&C Review � In addition to the contract cost, funding in the amount of $77,363.56 will be utilized for contingencies, $40.000.00 for City furnished nnabaha|y. and $202.000.00 for construction services fora project total � in the amount of$2,249,000.00. McClendon Construction Co.. Inc., is in compliance with the City's BOE Ordinance by committing to ' nine percent MBE participation and documenting good faith effort on this combined project. The City's / �= MBE goal on this combined project is 11 percent, This project inlocated on W1APSC() 22K and 22LinCOUNCIL DISTRICT 2. \ ON(" . � The Financial Management Services Director certifies that upon approval of the above � recommendations and adoption of the attached appropriation ordinances, funds will be available in ON, the current capital bodget, as appropriated, of the 2007 Critical Capital Projects Fund. TO Fund/Account/Centers FROM Fund/AccounVCenters t � 1) L GS94 488100 020941369010 ����� ����� 1l 4) � $343,404.68 C295 541200 202230079183 $1,92$1,929,636.44�fU�l �� � 2&3) C295 472094 202230079183 $343,404.68 � 3) C295 541200 202230079183 SO ====== � » Fernando Costa (6122) Originating Department Head:� Douglas VV. VWenzig (78O1) — Mike Weiss (8485) WOO 20KELLER-HICKS CONSTRUCTION 00791 A013.doc 20KELLER-HICKS CONSTRUCTION 00791 MAP.pd � ATTACHMENTS � 20KELLER-HICKS CONSTRUCTION 00791 C295A013,doc JAIA � fffav � ` � � http: //apDs . [fwDet ' 0FQ /[DUn[il_Da[ket/m[_reView. JsD?TD=17 . . ' 71117013 NO