HomeMy WebLinkAboutContract 56087-A1 CSC No.56087-A1
AMENDMENT No.1
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and CDM Smith, Inc. ,
(ENGINEER) made and entered into City Secretary Contract No. 56087,
(the CONTRACT) which was authorized by M&C 21-0463 on the 22nd day
of June, 2021 in the amount of $439,445 .00;
WHEREAS, the CONTRACT involves engineering services for the
following project:
Eagle Mountain and Westside Water Treatment Plants Weatherproof
Enclosures; and
WHEREAS, it has become necessary to execute Amendment No. 1 to
the CONTRACT to include an increased scope of work and revised
fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal letter attached hereto
and incorporated herein. The cost to City for the additional design
services to be performed by Engineer totals $99,332 . 00.
2 .
Article II of the CONTRACT is amended to provide for an increase
in the fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee
paid by the City for all work and services shall be an amount of
$538,787 . 00.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
Page -1- CITY SECRETARY
FT.WORTH,TX
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED: ENGINEER
City of Fort Worth CDM Smith, Inc.
&A
Dana Burghdoff Stacy L. Barna
Assistant City Manager Client Services Leader
Nov 23,2021
DATE: DATE: 11/18/2021
APPROVAL RECOMMENDED:
C Lri a r ffarder
H
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for
the monitoring and administration of this contract, including
ensuring all performance and reporting requirements .
lr-1114� ?±=
Dena Johnson, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
�/�� Date: N/A
r�-�I Mack(Nov 23,202110:05 CST) Form 1295: N/A
Douglas W. Black
Senior Assistant City Attorney
lATTEST: p joFORT�aa
a �O�!d�
—00 0►1d
Ronald Gonzales 000 S=�
o
0
Acting City Secretary �� �000000p000
OFFICIAL RECORD
Page -2_ CITY SECRETARY
FT.WORTH,TX
CDM.
Smith
801 Cherry Street
Unit 33,Suite 1820
Fort Worth,Texas 76102
(817)332-8727
November 17,2021
Dena Johnson,PE
Fort Worth Water Department
1000 Throckmorton
Fort Worth,Texas 76102
Subject: Eagle Mountain and Westside Water Treatment Plants
Pump Station Weatherproof Enclosures Project
City Secretary Contract No.56087
Request for Amendment
Dear Ms.Johnson:
CDM Smith was requested to perform additional design services for the referenced project to
include:Task 4-Interior Drainage Design,Task 5-Ground Penetrating Radar Investigation,Task 6—
Eagle Mountain HSPS 1 Ductbank Re-route,Task 7-Eagle Mountain HSPS 2 Roadway Re-alignment.
These improvements will be added to the design plans and specifications for the project. We
request an amendment to our current contract for performing these additional services.The
attached scope of work provides a more detailed explanation for these additional design services.
Also attached is our fee proposal table developed for the additional scope of work.
The requested fee for base services is$99,332. This fee is broken down as follows:
• CDM Smith $58,952
• Gehrig,Inc. $2,500
• Gupta&Associates $37,880
A summary of the total contract amount is provided below:
• Original Contract Amount $439,455
• Requested Amendment 1 $99,332
• Revised Contract Amount $538,787
Please review and if acceptable prepare an amendment for this work. Please contact me if you have
p p P
any questions or comments.
Sincerely,
L�0
WATER+ENVIRONMENT+TRANSPORTATION+ENERGY+FACILITIES
CDM
Smith
Dena Johnson,PE
November 17,2021
Page 2
71_4'�"--
Matt Dobbertien,PE,PMP
Project Manager
CDM Smith Inc.
Cc; Stacy Barna,CDM Smith
Eagle Mount a In and West side WTP Weatherproof Enclosures Project-Anion dment No.I Request Letter
SCOPE OF SERVICES
FOR
EAGLE MOUNTAIN AND WESTSIDE WATER TREATMENT PLANT
PUMP STATION WEATHERPROOF ENCLSOURES PROJECT 103335
AMENDMENT NO. 1 - ADDITIONAL DESIGN AND INVESTIGATIONS
BACKGROUND
The Fort Worth Water Department's Eagle Mountain Water Treatment Plant and Westside
Water Treatment Plant operate High Service Pump Stations to distribute treated water to its
customers.To provide for more redundancy and resiliency during extreme weather events,the
City desires to enclose three(3)High Service Pump Stations (HSPS)by installing prefabricated
metal buildings over each facility's pumps and associated piping. Two of the pump stations are
located at the Eagle Mountain Water Treatment Plant("Eagle Mountain HSPS 1" and"Eagle
Mountain HSPS 2") and one is located at the Westside Water Treatment Plant("Westside HSPS
1"). The three HSPS enclosures collectively consist the"Project".
The original scope of work included three new pre-engineered metal buildings to cover existing
HSPS to cover all header piping and generally extend to the back of the curb.The new
structures would include provisions for equipment access via rollup doors and roof hatched.
The new structures would have new deep foundations and the existing CMU wall at Eagle
Mountain HSPS 1 would be evaluated for reuse,which ultimately resulted in the determination
to reuse the existing CMU wall.
During detailed design progression of the Project,several additional scope of services items
were identified as required or requested by the City that were not included in CDM Smith's
original scope of services. These include the following:
■ Task 4--Interior Drainage Design
■ Task 5-Ground Penetrating Radar Investigation
■ Task 6-Eagle Mountain HSPS 1 Ductbank Re-Route Design
■ Task 7-Eagle Mountain HSPS 2 Roadway Realignment Design
These four additional work items will include building mechanical,structural,civil,and
electrical work. CDM Smith will perform additional building mechanical,structural,and civil
work related to Tasks 4 and 7. Gehrig,Inc.will perform the ground penetrating radar
investigation in Task 5. Gupta and Associates,Inc. (GAI)will perform the electrical work in
Task 6.
SCOPE OF WORK-BASE SERVICES
The scope of work presented below describes the additional base services included in this
Amendment No.1.
Task 4-Interior Drainage Design
Eagle Mountain and Westside WTP Weatherproof Enclosures Project(10335) 1
Scope of Work—Amendment No.1 11/12/2021
Per the added request of the City to provide increased floor drainage.The additional scope for
this task includes adding trench or floor drains with associated piping sloping to a floor sump.
Electrical receptacles to be located near the sump.No pump or Scada controls are included in
scope. Under this Task 4,CDM Smith will develop additional design documents (drawings
and specifications)for the added interior floor drainage components and incorporate into the
Project's bidding documents. The following additional building mechanical and structural
drawings presented below will be prepared.
Building Mechanical(Plumbing)Drawings
■ Plumbing Legends,Abbreviations,Symbols,and Notes
■ Eagle Mountain HSPS 1 Plumbing Floor Plan
■ Eagle Mountain HSPS 2 Plumbing Underfloor Plan
■ Eagle Mountain HSPS 2 Plumbing Floor Plan
■ Westside HSPS Plumbing Underfloor Plan
■ Westside HSPS Plumbing Floor Plan
■ Plumbing Standard Details
Structural Drawings
■ Typical Sump Details
Task 5 - Ground Penetrating Radar (GPR) Investigation
The City requested a GPR investigation be performed to help mitigate construction risk and
indicated the CDM Smith should proceed with the Gehrig proposal effective 10/22/2021.Under
Task 5, CDM Smith and team subconsultant Gehrig, Inc. will conduct field geophysical
investigation to locate potential near-surface buried utilities to inform design locations of drilled
shafts and grade beams, and thereby reduce risks of unforeseen subsurface conflicts during the
project's construction phase. This task work includes:
■ Field(ground penetrating radar(GPR)Survey generally 20 ft around structure-see
attached figures in Gehrig scope
Task 6 Eagle Mountain HSPS 1 Ductbank Re-route Design
During design development,the true location of an existing large electrical duct bank feeding
HSPS1 was found to be in a different location than as built drawings-nominally 10 feet north
and 2 feet shallower-turning and running on top of another ductbank.The true location
conflicts with the structural foundation of the building.Under this Task 6,CDM Smiths
subconsultant,GAI will develop additional design documents (drawings and specifications)for
inclusion of the work to relocate approximately 70 linear feet of duct bank into the Project's
bidding documents. The following additional electrical drawings are anticipated to be
required:
■ Partial Site Plan-Demolition
■ Existing Electrical Room-Demolition
Eagle Mountain and Westside WTP Weatherproof Enclosures Project(10335) 2
Scope of Work—Amendment No.1 11/12/2021
■ Existing HSPS 1 -Demolition
■ Existing One-Line Diagram-Demolition
■ Existing Interface Diagram&Panelboard Schedule-Demolition
■ Demolition Pictures
■ Partial Site Plan-Modifications
■ Existing Electrical Room-Modifications
■ Existing HSPS I -Modifications
■ Existing Clearwell-Modifications
■ Existing One-Line Diagram-Modifications
■ Existing Interface Diagram&Panelboard Schedule-Modifications
■ Riser Diagram and Details
Task 7 Eagle Mountain HSPS 2 Roadway Realignment Design
Under Task 7,CDM Smith will prepare additional site/ design(drawings and
specifications)for the relocation of approximately 225 linear feet of plant roadway at Eagle
Mountain HSPS2 to accommodate the proposed enclosure building which will encroach onto
the existing roadway. The additional design documents will be incorporated into the Project's
bidding documents,with anticipated additional civil drawings anticipated to include the
following;
■ Existing HSPS 2 Demolition Plan
■ Eagle Mountain HSPS 2 Paving Plan
■ Eagle Mountain HSPS 2 Road Re-alignment Plan and Section
Schedule
Completion of Tasks 4 through 7 will require 4 weeks of design effort to complete after receipt
of written authorization of work and Notice to Proceed from the City.
END OF SCOPE OF WORK
Eagle Mountain and Westside WIT Weatherproof Enclosures Project(10335) 3
Scope of Work—Amendment No.1 11/12/2021
o - __
m o
n
in
a
_ �
e ti
a -
= u
---$-
�8
F
r`
8 ---
�s a
a?.
S s -- -
ti8
s
�q
A __
�'B
d�
i
ss
�„
tt
� u
G F "�
H
.. 9
8 q
Y
8
��x
a
_ o$ �
u a � 9
3 � � �
'a
E tt
n' � 3
1 g
2
� a
3
aE S
� -�&
f � d�
_ox �