Loading...
HomeMy WebLinkAboutContract 43923-A5 CSC No.43923-A5 AMENDMENT No.5 TO CITY SECRETARY CONTRACT VVILEA MS, the City of Fort Worth %CITY) and Parsons Water & Infrastructure, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 43923, (the CONTRACT) which was authorized by M&C C-25877 on the 25t' day of September, 2012 in the amount of $391,453.00; and WHIEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount $206,797 .00 which was authorized by M&C C-26229 on 71 day of May, 2013 and Amendment Number 2 in the amount of $43, 929.00 which was approved administratively on the lst day of May 2015 and Amendment No. 3 in the amount of $52, 133.00 which was approved administratively on the 3rd day of March 2019; and Amendment 4 in the amount of $145, 919.00 which was approved by M&C 19-0379 on the loth day of December,2019. WHERFAi4, the CONTRACT involves engineering services for the following project: Little Fossil Creek Interceptor Improvements at Various Locations within the Little Fossil Creek Drainage Basin; and WHERKAN, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal attached hereto and incorporated herein. The cost to City for the additional professional services to be performed by Engineer totals $209,281 .00. 2. OFFICIAL RECORD CITY SECRETARY Page -1- FT. WORTH, TX Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall_ be an amount of $1,049,512.00. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City Of Fort Worth Parson Water & Infrastructure, Inc. Dana Burghdoff(Dec],2021 4:13 CST) C'Z� Dana Burghdoff Randy alachek Assistant City Manager vice President DATE: Dec 7,2021 DATE: ?- ` 2C, 3Q Z APPROVAL. RECOMMENDED: CA✓istonAe✓Na✓de✓ Christopher Ha NarlDa13,202114:08 CST) Christopher Harder, P.E. Director, Water Department Contract Compliance Mianager: By signing; I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Wd. r NICrW04 V-alter 1Vorwood, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: MSC: 21-0920 Date: 11/30/21 D-A(—3,202116:000ST) 1295 #: 2021-802363 Douglas W. Black Senior Assistant City Attorney a�FpR���� A0°°°°°°°°°° odd 0 ATTEST: ado Tc+nnHte S Goodall ��o °Z.. . e a d=wo ,,za .ass m ° ° *�d OFFICIAL RECORD Ja_nnette Goodall Pia °°° ci City Secretary N T°°°°g o.p ��nExAo�.p CITY SECRETARY FT. WORTH, TX Page -2- IMP PARSONS 1301 West President George Bush Highway,Suite 350 1 Richardson,TX 75080 P:+1972.244.6000 1 F:+1972.244.6077 1 www.parsons.com September 7,2021 Walter Norwood, P.E. Senior Professional Engineer City of Fort Worth - Water Department 200 Texas Street Fort Worth, Texas 76102 Subject: Revised request for Amendment 5 for Additional Level of Effort (LOE) for Little Fossil Creek Interceptor Rehabilitation Project - Part 2A Locations 1, 3, and 5A Dear Walter, This letter represents a revised request from Parsons Water& Infrastructure Group, Inc. (Parsons)for Amendment 5 for the increased level of effort(LOE)for updating the design and bid packages for the above-referenced project as follows: • Part 2A: Location 1 - Revise design to upsize three locations of 39-inch pipes to 48 inches, which had been previously designated for lining. • Part 2A: Location 3 - Advance the design to 100% including review of the bypass plan. • Part 2A: Location 5A - Revise drawings to move the alignment to the south and, out of the creek. • Part 2A: Locations 1, 3, and 5A prepare permanent and temporary easement documents. • Part 2A: Locations 1, 2, 3, and 5A prepare detailed bypass plans. Background The Little Fossil Creek Interceptor Rehabilitation Project entails approximately 17,000 linear feet(LF) of pipeline rehabilitation at five locations over a reach of over 8 miles. It was originally intended to be bid as one construction package. Pursuant to direction from Fort Worth Water Department (FWWD), Parsons separated the above-referenced project into multiple bidding packages. The first bidding package, Part 1 Location 5, encompassed the enlargement (pipe bursting) of over 5000 linear feet(LF) of existing 18-and 21-inch pipeline to 24-inch, manhole replacement, and open cut repairs. Part 1 was advertised in September 2014, with the bid opening in October 2014, and construction was completed with As-Builts accepted by the City on March 10, 2016. The remainder of the project, Part 2 (Locations 1, 2, 3, 4 &5A), encompasses nearly 12,000 LF of improvements to 18- to 48-inch pipe, including CIPP and spiral-wound rehabilitation, removal and replacement, rehabilitation and replacement of manholes, rehabilitation of an existing meter station structure, construction of new sewer pipeline and meter station, and connection structure to the Twin 90-inch interceptors along the Trinity River. Part 213 - Locations 4A, 413, and 4C were designed and provided to BHB Inc.,to include in their Contract 1A which was bid and awarded February 4, 2020. Construction _ _ WORLD Walter Norwood, P.E. City of Fort Worth -Water Department September 7,2021 is in progress. Part 2A - Location 2 is now under construction. The status of the pipeline sections is summarized in the table below. Location Status/Plan Part 1- Location 5 Construction phase completed March 10, 2016 Part 2A- Location 1 Design revisions(solar design)submitted to City- at 100%. City subsequently requested upsizing existing 39" RCP Sanitary Sewer pipe sections to 48" CCFRMP/PVC pipe.This includes design,and update drawings, cost estimate, proposal workbook,specification updates and references-prepare for bid and construction services. Part 2A- Location 2 Project was advertised on 11/12/2020 and 11/19/2020. Project is under construction. Part 2A- Location 3 City requested 90%design be advanced and bid with Locations 1 and 5A. Part 2A- Location 5A City requested design to be revised to move the alignment out of the creek and bid with Locations 1 and 3. Part 2B - Location 4A,413, Parsons submitted final design package to BHB to include in BHB's Contract 4C 1A. Project is in construction. (Part of Parsons Amendment 3) Scope and Budget Parsons requests approval for: • Additional work associated with revising the design for the Part 2A - Location 1 to replace sections of existing 39-inch pipe, that was slated for lining, with 48-inch pipe. This entails significant revisions to the bid package, including additional project management, geotechnical investigation for boring under the THE tracks, final design, significant correspondence with TOOT, and other permitting services, as well as easement document preparation. This work is anticipated to require revisions to 14 drawings, an additional sheet of details, and specifications for boring under the THE right-of-way. • Advance Location 3 design to final (minimal anticipated effort) • Revise the design for Location 5A to move the alignment to the south, out of the creek. This includes geotechnical investigation,topographic survey, and permitting services(Blue Mound). This effort will require the revision of 4 drawings and the creation of 18 new drawings. • Prepare detailed bypass plans for Locations 1, 3, and 5A including permits for crossing roads or temporary easements for crossing private property. Bypass plans will include space of pump setup and access routes for the pumps/bypass piping to be monitored during use. • Log and review submittals for Locations 1, 2, 3, and 5A • This amendment includes revision of design drawings and specifications to include new pipe design and layout, and additional hours to update the plans to accommodate Haltom City, Blue Mound, TOOT and THE permit requirements. This amendment also includes preparation of documents for permanent and temporary easements needed for Locations 1, 3, and 5A. PARSONS 2 Walter Norwood, P.E. City of Fort Worth -Water Department September 7,2021 The attached spreadsheet for Amendment 5 summarizes the level of effort required to revise the design. This level of effort is based on the assumption that the construction work is not split into more than two construction contracts. For submittal review it is assumed that there will be separate construction contracts for Locations 1 and 2,and a single construction contractfor combined locations 3 and 5A. In this Amendment 5, please note the following: 1. Task No. 4.0, Reflects the City's request for revised scope of work for modifications to the above locations, completion of the design, bid services and construction phase services, and reflects the LOE required to bring the documents for City's final review from the previous 90% based on lining design in 2014, including new designs for THE right-of-way crossing, moving Location 5 out of the creek, and others noted above. 2. Task 9.0 (Survey) - reflects the topographic surveying needed for Location 5A, and a spot check for the pipe replacement section in Location 3, and surveying needed for easement documents. 3. Task 10.0 (Permitting) -the LOE is included based on having to interact with multiple entities (Haltom City, Blue Mound, TxDOT, and TRE). In addition, a large billboard is on one of the easements. Parsons will complete the changes to revise and advance the Location 1, 3, and 5A drawings, specifications, and proposal workbook to Bid Phase, and Construction Phase Services. See attached drawings for Locations 1 and 5A. The following table provides a summary of the contract amounts to date: Original LOE $391,453 Amendment No. 1(for -5000 LF of pipe) $206,797 Amendment No. 2 $43,929 Amendment No. 3 $52,133 Amendment No. 4 $145,919 Total LOE with Amendment Nos. 1, 2, 3 and 4 $840,231 Proposed Amendment No. 5 base amount for Location 1, 3, $209,281 and 5A, including submittal review for Location 2 Total LOE with Amendment Nos. 1, 2, 3, 4 and 5 $1,049,512 With this amendment, the contract M/WBE participation is at 24.2%, well above the project goal of 22%. PARSONS 3 Walter Norwood, P.E. City of Fort Worth -Water Department September 7,2021 Please note that not all the work included in the attached Gorrondona proposals is included in the scope of this proposals. The items not included in this scope are lined-out in the Gorrondona proposals. Should you have any questions, please don't hesitate to contact me at 512-719-6006. Sincerely, Randy M. Palachek Vice President PARSONS 4 m W 1 i, i r�•r O � rnr C �e 7 q fD r•r � ru , Ln - o o w y' �J•_. 1 1 W Q j rD r� ' m J - * 4L Zia - - Y —h N 3 �Y"i rlitr 7 pq * y n � 2 .. fD O - Ui VOW x Q T (!1 rF aj rF Q � O _ o ' -� a "s m W,T12K 9 0 2NN ,TIDN DDDoO o�Dh DNC W W 2 OOT T.m T�!220o ZN�Z �I NUUUOU(�9 m 3 0 _e.C m °a n n n n w o'`y n D n O a N 9 a __�.D O C C e e.C�° m <w w w o.0 3�. o n N °?4 0 O T n N U U 2 3 m m n v 0 0 5. w >> w m _m m m N w am 5 oowx.x.n o, w°,w_Nn ., � `z T T T w 'w 'y a w O n n o 3 m w v v a, 4�'n w" o m. .O o m 3 3'Tm N F O w w w w 10 2So 5 N 'w 3 3'w w m D n w A v y p a m 3 x _ W w so N w .�.W n _ - W. -. 3 n = 2 3 3 3 O 3 ,N N 3 O 3 _ o 5 3 n N 3 0 = y c m m o x J o w O s ooSo n - n w --- U ^�'�' w N yOF w n o n £ n gx 3 _ D 3 ti m F A sn Z - � D � _ r m ° T 3 D o3 V 0 3 3 N Q' om° m Z vo �Co 3 N m O r n m D o oo too w m Q=m 3 N O O w Z'y^ A M o 0 o Q m m o� o D(n w � T,v o ER a, o"`^ NmoNmoN„N� _ . "c •�• Z a e N Dww N 9 www� 'D o � 3 O O N O N m 3 m ID N N - W A O m o � N om D o o o 9 ti z mo r x n a N o w 3 V N Q m `v o So 3 e ��',_ 3 - ti cc e m a a mp w w wig w O 3 N ti N�N°wi°wi AtA tNi� Nt�i EpNwwww' •�'NO .°�iN 8i ���tA N N N N- m eNW ootJi°wi 1p mm W W W oowoo vv W W w'W V w o o d�D D O A w w A A��°m O o O�o w a � V City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, November 30, 2021 REFERENCE NO.: **M&C 21-0920 LOG NAME: 60LITTLEFOSS5-PARSONS SUBJECT: (CD 4 and City of Haltom City) Authorize Execution of Amendment No. 5 with Parsons Water and Infrastructure, Inc. in the Amount of$209,281.00 to an Engineering Agreement with Little Fossil Creek Interceptor Improvements at Various Locations for a Revised Contract Amount of$1,049,512.00 and Adopt Attached Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 5 to City Secretary Contract No. 43923, an engineering agreement with Parsons Water and Infrastructure, Inc., in the amount of$209,281.00 for Little Fossil Creek Interceptor Improvements at Various Locations for a revised contract amount of $1,049,512.00 (City Project No. C01960); and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Project Fund in the amount of$354,044.00 transferred from available funds within the Water and Sewer Fund for the Little Fossil Creek Interceptor Improvements at Various Locations project (City Project No. C01960). DISCUSSION: On September 25, 2012, Mayor and Council Communication (M&C) C-25877, the City Council authorized execution of an engineering agreement with Parsons Water and Infrastructure, Inc., in the amount of $391,453.00 for the preparation of plans and specifications for the Little Fossil Creek Interceptor Improvements at Various Locations project. The agreement was subsequently revised by Amendment No. 1 in the amount of$206,797.00 approved by City Council on May 7, 2013, (M&C No. 26229) that provided for additional project management, real property acquisition and utility coordination on the project, Amendment No. 2 in the amount of$43,929.00 administratively authorized May 1, 2015, that provided additional bid packages for the project, Amendment No. 3 in the amount of$52,133.00, administratively authorized March 25, 2019, that provided for the updating and design producing two bid packages and Amendment No. 4 in the amount of$145,919.00, approved by City Council on December 10, 2019, (M&C No. 19-0379) that provided for converting the meter station to solar power, updating the structural design of the meter station and creating additional bid packages. Amendment No. 5 will provide for the following that are necessary on the project: Additional design for sewer pipe replacement, additional design survey, permanent and temporary construction easement preparation, geotechnical investigation and permit applications for various agencies. In addition, $144,763.00 is required for project management, public involvement, real property acquisitions and material testing. Appropriations for the Little Fossil Creek Interceptor Improvements at Various Locations project are as depicted below: FUND Existing Additional Project Total Appropriations Appropriations W&S Capital Projects -Fund $145,919.00 $354,044.00 $499,963.00 56002 W&S Rev Bonds Series 2021 — Fund $1,837,913.00 $0.00 $1,837,913.00 56019 Water & Capital - $14,200.00 $0.00 $14,200.00 Fund 59601 P ewer Legacy - $3,874,193.00 $0.00 $31874,193.00 und 59607 Project Total $5,872,225.00 $354,044.00 $6,226,269.00 *Numbers rounded for presentation purposes. Business Equity: Parsons Water & Infrastructure Inc. is in compliance with the City's Business Equity Ordinance by committing to 11 percent Business Equity participation on this project. The City's Business Equity goal on this project is 11 percent. This project is located in COUNCIL DISTRICT 4 and the City of Haltom City. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current operating budget in the Water& Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the Little Fossil Creek Interceptor project to support the approval of the above recommendations and execution of the amendment to the engineering agreement. Prior to any expenditure being incurred, the Water Department is responsible to validate the availability of funds. FUND IDENTIFIERS (FIDs).: TO Fund Department ccoun Project Program ctivity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department ccount Project Program ctivity Budget Reference # Amount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by_ Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Walter Norwood (5020) ATTACHMENTS 1. 60 LITTLE FOSS5-PARSONS funds availability.docx (CFW Internal) 2. 60 LITTLE FOSS5-PARSONS Compliance Memo.pdf (CFW Internal) 3. 60LITTLEFOSS5-PARSONS FID Table (WCF 09.14.21).xlsx (CFW Internal) 4. 60LITTLEFOSS5-PARSONS Form 1295.pdf (CFW Internal) 5. 60LITTLEFOSS5-PARSONS MAP 1.pdf (Public) 6. 60LITTLEFOSS5-PARSONS MAP 2.pdf (Public) 7. 60LITTLEFOSS5-PARSONS MAP 3.pdf (Public) 8. 60 LITTLE FOSS5-PARSONS 56002 AO22(r2).pdf (Public) 9. SAM Parsons Water and Infrastructure, Inc.pdf (CFW Internal) 0 N N N N N h N N N N N N N N r r� N Ul Ul Ul Ul Ul Ul Ul Ul Ul Ul n U l Il Ul (n N Dl 01 Dl Ol Ol Dl Ol O7 al Ol al Ol 01 Ql O O O O O O O O O O O O 0 0 O O O O O O O O O O O O 00 N N N N N N N N N Vl 'C 00 0 00 0 0OOo 00 00 �i V J J V V V V V V J V V J V 0 0 0 0 0 0 0 0 0 0 O O O O Z O O O O O O O O O O 0 lD O O A A A A A A A A A A A O A A W W W W W W W W W W W N W W O O O O O O O O O O O O O O LrlG W Ul Ul W Ul Ul Ul In Ul A A Ul LO A W W 41 W F- J W In N O lO lD Ul 0 W A W 0 0 W A 0 Ul Vl Vl m O O O O O O O O O Ol 01 Ol 0 W Ul O Lrl0 H O Ul C) hD O 0 0 O In O F' O O 0 0 0 0 O O O O O O O O F-� O O n n n n n n n n n n n n n 0 0 0 0 0 0 0 0 0 0 O O O lD lD lD W lD WlD LD l0 lD lD lD 0 m m1 01 Ol 01 01 CY) 01 � a) 0 01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n n n n n n n n 0 0 0 0 0 0 0 0 0 0 J J J J J V J -'I J J CO Co CO A A W W W W 0 o 0 0 0 0 0 0 0 l0 lD lD lD m l0�lD lD lD lD l0 lD lD W W lD lD lD lD lD lD lD 00 lD W lD W lD lO W lD W lD lD N N lD lD lD lD lO lD W lD lD lD lD F, F, in to �n n N 1/>• t/) 1 N N in W W Ww tR F-� N 1/f I-� O i/f N Ul � In (n lD lD 0l In W A l0 N W A AS, A Ol O O O O N O m O O �O In 00 0 0 0 0 00 O N A A A O 00 0 0 0 0 I--1 O In A A A 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 ,2 O In In m m m m y 0 0 w w W W on c (D N ID (D D 6 h v � 333 3v � � Cr 0 0 0 0 h p Nr -1 n ,may. rD-r h m D D D D c a s n 0 rt fr; rt; fF f+ O O O O 7 7 7 7 O � N (D G ,O+