PROJECT MANUAL
FOR
SHE �vN,"S n U CT 10%N OF
Westland 5.0 MG Ground Storage Tank
Rehab I'litat ion Project
City Project o. 01952
Betsy Price Tom Higgins
Mayor City Manager
q. Pr t Crumb, P.E.
`, rear Water Department
Andrew T. Cron r; ,P.E.,Assistant Director
Charly C. Anga icheril,Assistant Director
Prepared fob,
The City of Fort Worth
October 2012
effifel er Central, Inc.
Texas,Registered erect Engineering Firm No. 5592
OFFICIAL 0-CORD
'1Ty Sp
citsirARY
IFT W01t
M&C Review Rage 1 of 2
official site of ttie Citi of Fort'Worth,Texas
Afft FoRTWORTII
L AGENDA
L ITY
11 VII
C01UNCIL ACTION: Approved on 1/2912013
I 1 11 1 lo 11'1 11111 -
REF'ERENCE **C.26074 - 60WESTLAND GROUND
DATE.- 1/291201�3 LOG NAME,
NO.* STORAGE TANK REHAB
1 IRLIC
CODE: C TYPE: CONSENT "P�N-v NO
HEARING-.
SUBJECT: Authorize Execution of a Contract with Bla,s,tco Texas, Inc., in the Amount of$,705,300-00
for the Westland Ground Storage Tank Rehabilitation Project, 'Located at'11 066 Doirfan
Street(COUNCIL DISTRICT 7)
V 1''Al
RECOMMENDATION.
It is recommended t,hiat the City Council authorize the execution of a contract with Blastco Texas, Inc.,
in the amount of$705,300.00 for the Westland Ground Storage Tank Rehabililtation Project, located
at 1 1066 Dorfan, Street.
DISCUSSION.,
The Westland five million gallon ground storage tank was constructed in 1994 and provides potable
water storage for areas, in far west Fort Worth. This ground storage tank has never been repainted,
though Staff has performed structural repairs to the roof deck and vent due to,failed coatings allowing
corrosion of the steel structure.,
On January 12, 2012, a Request*,'or Proposals (R.F.P1.was iss,le flor several Water Departmtent
IF r,
projects, it potable water storage tank rehabilitation pr pjects. On Februar
10, 2012,, a total of
five proposals were received from engineering consultants for the tank rehabilitation projects. A Staff
consultant selection committee recommended Kleinfelder Central, Inc.,, for the Westland ground
storage tank rehabilitation project. On Jiu�lly 17, 2 12, (M&C, C-25740)the City Council authorized
execution of an engineer i'ng Agreement with Kleinfelder Central, Inc., for the design and preparabon
of contract doGuments for the recoating and structural repairs of the Westland ground storage tank.
Thee project was advertised on October 25, 2012 and November 1 3 2012 in the fort Worth Star
Telegram, On November 29, 2012,the following seven b!ids were receivedo.
IRIDDER BID AMOUNT ICONTRACT
IBIastco Texas, Inc. 11$ 705,300. 1180 calendar day
Landmark Structures 1, L.P. 11$ 89231971.00
IN.G. P86inting, L.P. $ 994,200
L.C. United Painting Company,i Inc; 1$101151000.
lClassic, Proltective Coatings, Inc. $1,155,500.00
�Thomas Industrial Coatings, [roc, $111851314.00
TMI Coatings, Inc. $1,499,700.00
Blastco Texas, Inc., is in compliance,with the City':s B Ordinance by committing to 13 percent IVIBE
participation. The City's goal on this project is five percent.
The project is located in COUNCIL DI "Tr ICT7.
rfr r- F'ISCAL INFO RMATIO,NI'CERTI F11 CATION
http-//apps.cfwnet.org`/council
0. _packet/mc—rev few.asp'-?ID=I 7907&coU11C1*1date-1/29/2013 1/30/2013
M&C Review Page 2 of 2
The Financial Managernent Services, Director certifies that funds are available in the current capital
budget, as appropriated, of the Water Capital Projects Fund.
TO Fund/Account/Centers, FROM Fund,/Arc ount/Centers
P2,53 541,200 60 "1 801 95280 $700 0.00
Submitted for Cif vUlanag ir'sOfficeb Fernando Costa (6122)
riginnfin r% r% Ue"Al
is a V:a Aw* al"OLM I A I I GNU 0
11 1- N C..,u,,ib�82207)
gas *S4%.A& e%r%t Frank
Ad for all InformatIon Contact: Chris Harder(829!3)
ATTACHMENTS
GO Westland Ground Storage Tank*Rehab rn
http:-//apps.cfwnet.org/counc'll
_packet/me revie w.asp?ID=17907&councildate=1/29/2013 1130/2013
ADDENDUM N . I
WESTLANDX MG GROUND STORAGE TANK REHAB PROJECT
City of Fort Worth Water Department
City Project Number: 01952
November 21,2012
T hi's Addendum forms a pan Muontract ana ciannes, corrects or modifies original Bid Documents, dated October
25, 2012. Acknowledge receipt of this addendum n space provided on bid form. Failure to do so may subject
bidder to disqualification.
,arolect Manual Revisions:
Item 1: Section 00 42 43-PROPOSAL FORM
A) DELETE the Section'in its entirety,
Audi REPLACE with.
The attached REVISED Sac ti�o:n 010,42 431 4 pages total,'
Item 2: Section 0151211' -WELDING
A) DELETE the Section in its entirety
And REPLACE with&
$I
'The attached REVISED Section 0512 1)5 pages total.
This addendum consists of 10 page(s)/sheet(s)total.
Approved by OWNER
Approved y ENGEER'
END
Addendum No.I Page 1 of iD Pages
WESTLAND 5.0 MG GROUND STORAGE TANK October 25,2012
REHABILITATION PROJECT Revised November 21,2012
SECTION 05121-WELDING
PARTI-GENERAL
1.1 SUMMARY
A,. This specification applies to new and existing welds.
B. All welding shall conform to the latest edition of AWWA 13-1011. A.11 equipment used for welding, and
cutting shall be designed and manufactured to allow all qualified welders to follow the procedures and
attain the results specified herein.
C. All welders shall pass welding test that simulates production connections using matenials on the same
grade that will be used during:construction. These tests must be performed at the job site and observed
by the wner. All welders and welding procedures shall be certified in accordance with AWS prior,to
beginning work on the project.
D. No welding will be allowed when the air temperature is lower than 32'F at the work area.No welding
"will occur when the steel or the welding operators are exposed to inclement weather including rain,snow,
or high wind.
E. Any moisture present at the point of"welding shall be driven off by beat before welding commences.
Wind breaks shall be required for the protection of all welding,operations.
F. Wben low hydrogen type electrodes are used, a suitable oven capable of maintaining a minimum
temperature of 250"F shall be provided and used under the direction of the welding supervisor to control
moisture levels of the electrodes.
T,
G. Certified welders, shall make all welds, including tack welds that are to be 'incorporated into the final
welds. Defective,cracked,or broken tack welds shall be removed before final welding,
H. Depressions,undercuts,or gouges in the base metal or weld metal caused by the,removal of staging clips,
lugs,braces,etc.,shall be filled with sound continuous weld metal and ground to a smooth surface even
with the plate surface.
1. Related work:Specifications-.0 133 00,02221,05120,0,7721,and 0987 1-WGST
1.2 SUBMITTALS
A. The CONTRACTOR shall submit the following(if applicable):,
1. M11 test reports for all materials supplied,where applicable.
2. Provide descriptions of welding techniques and type of process to be used.
3. Copies of Charpy impact tests for weld, heat affected zone, and base metals, as specified i
AWWA D-1 ,where applicable.
4. Welding procedure specifications as per ASNE BPV-M Article H and/or AWS D1.1 as
applicable. The CONTRACTOR shall qualify the welding procedure specification by taking
welding test coupons, performing testing of these spec ens and submit record data and test
results in accordance with the AS ME BPV-1X,"procedure qualification record"and/or AWS D1.1
when applicable.
5. Variable welding data as required by ASW BPV-IX,article IV,and/or, AWS as applicable,wben
a change is made in the welding process submitted mi the paragraph above.,
WELDING 05121-1
WESTLAND,5.01 MG GROUND STORAGE TANK October 25,2012
1
REHABILITATION PROJECT Revised'—Molvember 21,2012
6. Qualifications of all welders. The CONTRACTOR shall complete and submit ASME BPV-IX
and/or A D 1.1 Welder Qualifications as applicable.
7. Written reports at the conclusion of the work as specified in the latest version of A D-100,
Section 11.2.,
8. Certification to the OWIsMR of compliance with AAA D-1001,observation requirements. Use
standard format specified in AWWA D-1 .
1.3 QUALITY ASSURANCE:QUALIFICATIONS OF WELDERS AND PROCEDURES:
A. The CONTRACTOR shall submit a list of all welders and provide a copy of current welding
certifications for each welder prior to beginning construction. All welders shall be qualified in
accordance witb the current AS PV-1X for pipe welding. All welders perform Mig structural steel
1% A
plate welding and/or repair work shall be qualified in accordance with the latest edition or AWS,D 1.1.All
welders shall have passed welder qualification tests within the previous six months.
B. The CONTRACTOR shall submit written welding procedures to the OWNER,for review,at least five(5)
working days prior to the specific construction or repair.
C. The written welding procedures shall include joint types to be used,sequence of placing weld metal,type
of electrodes of A designation, size of electrodes, methods of cleaning(goug,ling,chipping,grinding,
etc.),positioning and type of jigs for automatic welding,type of equipment to be used,wire type and Size,
type and grade of fluxing material,volts, amperes and speed of travel used for welding and for making
qualification test, copies of all required qualification test; method by which low hydrogen electrodes will
be stored and/or heated for moisture control; and other pertinent 'Information necessary for the welded
fabrication as required by ASME-B PV-IX and/or AWS 1 1.1.
D. The OWNER'S representative will review welding procedures and may require additional field welder
sts;.
qualification te LC
1.4 TESTING AND OBSERVATION
A. Observation and testing of materials and welds shall be as provided in the latest edition of 13-
100, Section 11, except where specified otherwise herein. The OWNER'S representative shall complete
final observation and testing prior to coating of welds.
B The OWNER shall be allowed free access to all work and shall receive notice,by the CONTRACTOR in
6
wntiing,at least(3)three days in advance of the start of all fabricattion operations.
C. The OWNER shall be notified,by the CONTRACTOR,three (31),days in advance of weld observations
on the job site. If without further notification, welding requirements have not been completed for
observation as scheduled,the additional cost to the OWNER'S testing laboratory shall] be borne by the
CONTRACTOR as a re-test item. All welding and fabrication equipment used shall conform to the
standard requirements of the latest AWS Specifications for such equipment.
DI. The CONTRACTOR shall submit proof of conformance with latest AWS Specifications of an welding
and fabrication equipment to the OWNER before any welding or cutting beg-inS.
E. When the quality,of a welder's work appears to be below the requirements of these specifications,the
OWNER may require testing for re-qualification.
F. After completion of field fabrication, erection and field coating, the tank shall be filled with water to
check water tightness (during tank disinfection). Any leaks detected shall be repaired by cutting out
WELDING 05121 -2
Oil!
VofESTLAND 5.0 MG GROUND STORAGE TANK October 25,2012
REHABELITATION PROJECT Revised–Movember 2 It 2012
defective welds, and re-welding. Coatings damaged in repairing the leaks, shall be repaired by the
CONTRACTOR at no additional cost to the OWNER. No welding repair work shall be done unless the
water is completely drained from the tank.
1.5 WELD QUALITY
A. The CONTRACTOR will be responsible to perform quality control, inspections of his work prior to the
te, rrorming observations.
0 WINE R p e ^
B. The gill 11 perform observations of welds to determine compliance with applicable codes.
1. Allweld metal shall be sound throughout,and there shall be no cracks in any weld or weld pass.
2. All welds shall be free from overlap with no undercutting allowed.
3. All craters shall be filled to the full cross-section of the weld.
4. The CONTRACTOR shall 'inspect all welds and remove, weld scale or slag, spatter, burrs,, and
other sharp or rough projections in a manner that will leave the surface suitable for any required
non-destructive testing and the subsequent cleaning,blasting,and coating.
1-6 CORRECTIONS
,A. When, welding is unsatisfactory.or indicates poor workmanship, as determined by the OV;NER"S
representative,the following corrective measures Will be required.
B, Where requirements prescribe the removal of part of the weld or a portion of the base metal, such
removal shall be by chipping or grinding. Gouging may be performed only with the specific approval of
the CONTRACTOR'S welding foreman and OWNER- Where corrections require the deposition of
additional weld metal,the sides of the area to be welded shall have not less,than a one to one slope to 10
allow sufficient room for depositing new metal,.,
C. Defective or unsound welds shall be corrected either by removing and replacing the entire weld, or as
follows:
I. Excessive convexity,reduce size of excess weld metal by grinding.
2. Shrinkage cracks,crack in base,metal,craters, and excessive porosity.Remove defective portions
of base metal by grinding to sound metal and deposit additional sound weld metal.
3. Undercutting,undersize,and excessive concavity. Clean and deposit additional weld metal.
4. Overlapping and incomplete fusion,remove and replace the defective portion of weld.
5. Slag inclusions,remove those parts of the weld containing slag and H With and weld metal.
6. Removal of adjacent base metal during welding,clean and form full size by depositing additional
weld metal,
D. Where corrections require the deposition of additional weld metal,the electrode used shall be the same
size or smaller than the electrode used for making the original weld. The surface shall be cleaned
thoroughly before re-welding.
E. A cracked weld shall be removed throughout its length. The weld or base metal, as applicable, shall be
gouged to sound metal 2"beyond each end of the crack.
0 ........ .....'' -_ — __V-, .''I -i– iin-
Where wofk--- le ormed SuFseqauen to- the making of Ce6c i wefd has rendered the weld�inacces�sible
or has caused new conditions ineffectual the original conditions shall be restored by removal of welds or
members or both before making the necessary corrections or the deficiency shall be compensated by
additional work according to the revised design approved by the OWNEK
WELDING O�5121-3
WESTLAND 5.0 MG GROUND STORAGE TANK October 25,2012
REHABILITATION PROJECT Revised—Novembe,r 21,2012
G. Improperly fitted and mis-aligned parts shall be cut apart and re-welded. Members d'istorted by the heat
of welding shall be straightened by mechanical means or by,the carefully Supervised application of a
limited amount of localized beat. Heated areas shall not exceed 1200 degrees Fahrenheit measured by
tempilsticks. Parts to be heated for stralighteffling shall be substantially free of stress from external forces
except when mechanical means are used in conjunction with the application of heat. CONTRACTOR
shall provide a plan for distortion.
H. In the event that faulty welding or its removal for re-weld ling!damages the base metal 'in the judgment of
+11 10
Lile 01,YlYWEIP,the FONT FOR shMaull remove and replace the damaged material or siliall,compensate
for the deficiency in a manner acceptable to the OV*rNER.
1.7 WRITTEN REPORTS
. e CONTRACTOR shall refer to Section 0133 00 for all criteria pertaining to observations and detailed
written reports.
wn,
PART 2—EXECUTION
2.1 N4ATERLkLS:ELECTRODES,
Welding electrodes shall be as follows.-
STEEL WELDING ELECTRODE SCHEDULE
IMATERIAL ELECTRODE TYPE
CARBON STEEL TO CARBON STEEL AWS E-70 IS
iAIS1304L TO CARBON"ST EEL A WS,E-309- b
11/1 V///FF I
AISI 304L TO AST 304L AWS E-3081L
AISI 316L TO CARBON STEEL AWS E-3 I 0-Mo
-IN
AISIJ 16L TO AISI 316L AWS E-316L
2.2 DOOR SBFET ACCESS-WAY
A. At the CONTRACTOR'S sole option and without additional compensation, a door sheet (10-ft x, 10-ft
max)may be out out of the tank shell to facilitate personnel and equipment access. The CONTRACTOR
shall submit design drawings and calculations prepared by a registered engLineer in the State of'Texas for
review by the OWNER and OWNER'S CONSULTANT that address all aspects of the door sheet
opening in accordance with A-PI 650 and API 653 (API Codes), including cutting the door sheet,
stabilizing the door sheet,the tank and tank opening,replacing the door sheet, and testing the welds for
compliance with these specifications dl I Codes.In addition to the design drawings and calculations,
the submittal shall 'include,a complete written plan for removal and replacement of the door sheet. TWs,
plan shall include a welding procedure that incorporates distortion control.
B. The door sheet shall be removed and reinstalled in accordance with procedures described in "A"7
including all structural,welding,testing, and evaluation requirements. The edges of the door sheet shall
not be closer than 6-inches to an existing vertical or horL'wnW weld,seam.When removing the fillet weld
at the bottom of the door sheet where the shell is welded to the floor plate, the fillet weld shall be
removed 6-iches beyond the vertical cuts of the door sheet.Guides such as tracks for track torches shall
be used for flame cutting the door sheet from the reservoir. All cut, edges shall be true and without
gouges. The top corners of the cuts shall be a true six(6) inch radius mim' imum and shall be cut using
radius guides. The curvature of the dolor sheet shall be preserved during removal, storage, and
WELDING 05121-4
WESTLAND 5.0 MG GROUND STORAGE TANK October 25,2012
REHABELITATION PROJECT Revised—November 21,2012
reinstallation.The door sheet shall be stored in a safe location agreed upon by the CONTRACTOR an
OWNER to prevent damage. After completion of ating for the interior ceihng and wall, surface
preparation and prune coating of the floor and prior to intermediate and final coating of the floor, and
after reinstallation of the door street,the door sheet welds shall be tested and shall be incompliance with
these specifications and the API Codes. The door sheet exterior welds shall be ground flush and shall
merge smoothly with the reservoir exterior surface,grinding shall not reduce the thickness of the shell or
door sheet:. If the thickness is reduced,the reduced thickness shall be repaired by welding and then the
repair weld shall be ground flush and shall merge smoothly with the reservoir exterior surface.Removal
of supp►o�rt far irg�o n U e door sheet acid reservoir shell Shale not leave debits rn the steel or nuggets of
gelds on the steel surface. Surfaces where the framing is removed shall be ground flush and shall merge
smoothly with the reservoir exterior surface.The door sheet weld interior profile shall be in accordance
with AWS 1.1, The exterior weld area and abraded area shall be abrasive blasted to SPCC-Sly' 61,
43cornrnercia,l blast cleaning" and the interior geld area and abraded area shall be abrasive blasted to
SS C SP 1 "near white blast,cleanin f. The door sheet shall be coated with the interior and exterior
system specified for the reservoir. '"The CONTRACTOR is responsible for cutting out the door sheet,
stabilizing the reservoir opening while the door sheet is out, replacing the door sheet, and testing the
replaced door sheet using qualified engineering and testing services(see C"below).
C. The OWNER requires the following testing methods to be performed on the door sheet access-way welds
by a third party inspection company provided by and paid for by the CONTRACTOR. CONTRACTOR
shall coordinate testing with the OWNERS CONS
1. 5 total x-rays: 2 vertical, 2 corners and 1 horizontal, (For complete joint penetration welds in
accordance with AS NE, Section Vl Division/ and the AWWA Code for Welded Steel Water
Storage Tanks.)
2. 100%ul onic testing.(For complete joint penetration welds in accordance with AWS D1. .
3. Leak testing with diesel fuel from the outside on inside fillet welds at the floor before deposing;
outside fillet weld in accordance with API Standard 3 ..
2.3 REPAIRS
A. The CONTRACTOR shall submit their proposed method of repairs of welded scams, pits and patch
repair to the OWNER for their review and approval before beginning blasting. Repairs shall meet or
exceed the following requirements for the roof"plates..
I All pits with a remaining gall of 3T/5 or less or pit depth of 1/16"'or greater shall be re-welded
incorporating patch plates.
2. All pits with a remaining wall from T/ to 3T/4 shall be epoxy filled flush to the surface of the
shell plates.Epoxy shall be compatible with the coatings to be installed.
3. All pits with a remaining wall greater than 3T/4 require no filling,
4. Linear corrosion defects adj acent to welds in excess of 1/16"deep shall be re-welded if
a The length exceeds 1 inch on 3/8"plate and the bottom 1/4"',plates.
b. The length exceeds 2 inches on the top `4"plates.
5. Linear corrosion defects ba welds,adjacent to welds and in plates greater than 3/8"thickness shall.
be repaired by welding if the depth of corrosion is equal to or greater than..O�.2''l"`".
6. Use criteria oft and 3 above for corrosion defects which do not require welding adjacent to welds.
2.4 NUSCELLANEOUS WELDING
A. The CONTRACTOR shall add to his base bid an allowance prescribed in the proposal Fo n for
miscellaneous weldin
END OF'SECTION 05121
WELDING 05121-5
0 52 4 -1.
Agreement
Page I of 4
SECTION O'O 52 43
2 AGREEMENT
3
4 THIS AGREEMENT, ,authorized on JANUARY 291.201 is made by and between the City of
5 Fort Worth, a Texas hone rule municipality, acting by and through its duly authorized City
Manager, Blastco authorized t business in Texas, acting by and
through its duly authorized representative,("Contractor").
8 City and Contractor, in consideration of the mutual covenants hereinafler set forth., are as
follows:
10 Article .1.'"CORK
11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
12 Project identified herein,
13 Article 2.PROJECT
4 The project for which the Work under the Contract Documents may he the whole or only a part is
15 generally described as follows:
16 Westland . w MG Ground Stora T"a,nl RehabiIitati rr jec
1 Pro l..ect No. 0 1952
18 Article 3. CONTRACT TIME
19 3.1 Time ins of the essence.
20 All time limits for Milestones, if any, and Final acceptance as stated in the Contract
.ct
21 Documents are of the essence to this Contract.
22 3. Final Acceptance.
23 The Work will be complete for Final Acceptance within n 180 days after the date when the
24 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions.
25 3.3 Liquidated damages
26 Contractor recognizes that time is of the essence of this agreement and that City will
27 suffer financial loss if the Work is not completed within the tines speciTiea in Paragraph
28 3.2 above, PIius any extension thereof allowed in accordance with article 12 of the
29 General Conditions. The Contractor also recognizes the delays, expense and difficulties
310 involved in proving in a legal proceeding the actual loss suffered by the City if the Work
31 is not completed on time. accordingly, instead of requiring any such proof, Contractor
32 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay
33 City Five Hundred Dollars ($500.00) for each day that expires after the time specified
34 in Paragraph 3.2 for Final acceptance until the City issues the Final. Fetter of
35 acceptance.
f
CITY OF'FORT WORTH Westland 5.0 UG Ground Storage Tank Re ahilitation Project
STANDARD CONSTRUC710N SPECIFICAMN DOCUMENTS S .fro" t No.01
R vied hine 4,2012
005243-2
Agreement
Page 2 of 4
36 Article 4. CONTRACT PRICE
37 City agrees to pay Contractor for performance oaf the Work in accordance with the Contract
38 Documents an amount in current funds of Seven hundred and five thousand three hundred Dollars
39 ($705,300.00).
40 Article 5. CONTRACT DOCUMENTS
41 5.1 CONTENTS:
42 A. The Contract Documents which comprise the entire agreement between City and
43 Contractor concerning the Work consist of the following-,
44 1. This Agreement.
45 2. Attachments,to this Agreement.-
46 a. Bid Form
47 1) Proposal Form
48 2) Vendor Compliance to State Later'.:C Bidder
49 3) Pre qualification Statement
50 4) State,and Federal documents(project specific)
51 b. Current Prevailing Wage to Table
52 c. Insurance ACORD Form(s)
53 d. Payment Bond
54 e. Performance Bond
55 f Maintenance Bond
56 g. Power of Attorney for the Bonds
57 h. Worker's Compensation Affidavit
58 1' MBE Commitment Form
5 3. General Conditions.
60 4. Supplementary Conditions.
61 5. Specifications specifically made a part of the Contract Documents by attachment
62 or,) if not attached, as incorporated by reference and described in the Table of
63 Contents of the Project's Contract Documents.
64 6. Drawings.
65 7. Addenda.
66 8. Documentation submitted by Contractor prior to Notice of Award.
67 9. The following which may be delivered or issued after the Effective Date of the
68 Agreement and, if issued, become an incorporated part of the Contract Documents,,,
69 a. Notice to Proceed.
70 b. Field Orders.
71 c. Change Orders.
72 d. Letter of Final Acceptance.
73
74
CITY OF FORT WORTH Westland 5.O MCY Ground Storage Tank Rehabilitation Project
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No 019 52
Revised June 4,2012
rtUll/
(O 52 43-3
Agreement
Page 3 of 4
75 Article 6. MEMNIEFICATION
76 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the clt , its officers, servants and employees, from and against any and all
78 claims arising out of, or alleged to arise out of, the word and services, to be performed
79 by the contractor,tor, its officers, agents,
employees, subcontractors, licenses or invitees
o under, this contract., This lndemnfl atloo provision on l spec if all intend d
to operate
1 and be effective oven if t i s all d or proven that all or some of the damages b�lra
Loup wer caused lu whole or�In art � an a��t omission or one l�l orr o of the of ..
3 This indemnity provision is intended to 'Include, wit out limitation, ind :nity for
costs,expenses and legal fees �in urred b the city in.defending against such claims and
5 causes of actions.
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
88 the city,its officers,servants and employees,from and against any and all loss,damage
89 or destruction of property of the city,arising out of,or alleged to arise out of the work
o and services to be performed by the contractor, its officers, agents, employees,
91 subcontractors, licensees or invitees under this contract. This indemnification
92 Provision is s cciflcall intended to operate and be effective every if it %s alle ed or
93 proven that all or some of the damages,bei 119 sou ht were caused jnwhole or an pgrt.,
94 bj anj act omission or rye li ence of the ciRy.
5
96 Article 7. MISCELLANEOUS
97 7.1 Terms.
Terms used in this Agreement which are defined in Article 1 of the General Condit onas will
9�9 have the meanings medicated in the General Conditions.
100 7.2 Ass ignment of Contract.
101 This Agreement, including all of the Contract Documents, may not be assigned by the
102 Contractor without the advanced' express written consent of the City.
103 7.3 Successors and Assigns.
104 City and Contractor each binds itself, its partners, successors, assigns and legal
105 representatives to the other party hereto, in respect to all covenants, agreements and
106 obligations contained in the Contract Documents.
107 7.4 Severability..
108 Any provision or part of the Contract Documents hold to be unconstitutional, void or
109 unenforceable by a court of competent Jurisdiction shall be deemed stricken, and all
110 remaining provisions shall continue to be valid. and binding upon CITY and
111 CONTRACTOR.
112 7.5 Governing 1,aw and venue..
113 This Agreement including all of the Contract Documents is performable in the State of
114 Texas. venue shall be Tarrant Count, Texas, or the United, States District Court for the
1.15 Northern District of"Fex,as, Fort Worth Division.
IF
CITY OF FORT WORTH Westland..0 MG GroundStorage Tank Rehahild ti ,P r(ye t
STANDARD CONSTRUCT 101N SPECIFICATION DOCUMENTS Project M.0195,x'
Revised Juana 4.,2012
b
00 52 43
Agreement
Page 4 of 4
116 7.6 Other Provisions.
sions.
11.7 The Contractor agrees, to pay at least minimum wage per hour for all labor as the same is
118 classified, promulgated gate and set out by the Cif, a copy of which is attached hereto and
119 made a pa rt hereof the same as if it were copied verbatim herein.
120 7.7 Authority to Sign.
121 Contractor shall attach evidence of authority to sign Agreement, if other than duly
122 authorize ' signatory of the Contractor.
123
124 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple.
125 courrterpIarts.
126
127 This Agreement 's effective as of the last date signed by the parties("Effective Date").
128
Contractor City of Fort Worth
�w
Fern n o Costa
Assistant City Manager
(signature)
Tate 41..., � ,.
__7
(Printed Narn ....
Mary J.Kayser,
City Secretz
*00000QC)
(Seal) Xnr 0 D 0 Att
Title.- Xf I e %0
N,
0
,.
Address: 0
0
4 M&C C
0
Tate: �0000 000
44
Mate�i pro as to Form an itywU�_6��_
Tate Douglas W.Black
Assistant City Attorney
129
130
131 APPROVAL RECOMMEN' D:
132 OFFICIAL L¢
1 "
135 S. Frank- rumb .E
136 DIRECTOR,
13,7 Water De)ar tm nt
1,
,JJr
CITY OF FORT WORTH Westland 5.0 MG Ground Slorage 7;2nk Rehabilitation Project
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project No. 195 2
Reprised June 4,2012