Loading...
HomeMy WebLinkAboutContract 42220-CO3 MOM% cop, FoR'FW0 'RT11,,,., City of Fort Worth MY Change Order Request CONTRACT NO, 4 zL-Lo--c cr5 Project Namel 2007 CIP Council District 5 Contract 513 City Sec# 4222�O Client Project#(s,)[—#(00947 Water,Sewer,'TP/W, DOE#5877 Project Description Pavement&Drainagey Water,Sewer,Avenue M,Edgewood Terrace,and Valley Vista Con�tractorl McClendon Construction ------- Change Order# 3 Date 1/30/2013 City Project Mgr.1 Khal Jaafari ....... City Inspector =arlos Vasquez Dept. TPW Water Sewer Contract Time Totals (CDJ $916,179.75 3:36 Original Contract Amount $608)062.30 $208,919-95 $991197.50 Extras to Date $14,600-010 $9i)679�.00: $`13)7610.00 $38,039.00 28 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $622,662-30 $218�598.95 $112,957.501 $954$218.75 364 t of Proposed Change Order $61550.00 $0.00 $0.00 $6,550-00 20 Revised'Contract Amount $�6291,212.�30 $218,598.95 $11 2s957.50 $196,017681.75, 384 0 10 10 Original Funds Available for Change Orders $25,00000 $101446-00 $6,1000.00 $41,446.00 Remaining Funds Available for this CO $10)400.001 $767.00 $0.00 $11,167.00 Additional Funding(if nec:es,sairy) CHANGE ORDERS to,DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.87% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+259/6) $1�11451224-69 At 708 Edgewood Terrace,two wrought iron driveway rolling gates where modified d'ue to the change in the street grade.The gates were mod'fied by extending the bottoms and constructing wall runners to both gates,.,Also, Sign&Markings were required on Edgewood'Terrace Northbound due to the street w�idth transitioning from new wider pavement to the narrow existing street.20 days are being added to the contract time for the additional work. 0 60 U CD C7 0 0 06 R&Wd R Gonzal Asl�/City 0 0 A'S C-3 It is,understood and agreed that the acceptance of this,Change Order by the contractor constitutes an accord and satisfaction and represents payment "I in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. "I', 011 /V/SEEM 1 0 alp,, ME, 0/0 M I;A4 /i/s; McClendon Construction �%QA XA r(, I Ado Ar-A 2/ Ka I" Ai 112 H-11 U o"/3 q. YV L1dC23rZJ1:::::J 1.3 JUX 4R //11-111al M&C Number I Mi�- Cinmet" "a WORTH9 w Co C) C) �u co Lo 0 CIO L-IIIIIIIIIIIIIIIII I I i :6 ,�. ,. 3C G"15' C N co, I Ca cul I m 0. cu 0 CD r A 0 0 'a z , WO i 0 mw LL tto loo CU o cc �L) ~~ c < CIO o' C.. Ll L 0 ca I LJ— c 0 M w �wj L(D 0- CL 9 E cu .. X 0 � 00 0 CD v � I I 0 Co co cr to � Cu I L I i I "" CL co mom 4-0 I I I 0 ."" LLJ ... LU LL 10 0 4- w tko c CJ ULJ c CD CO ' - CL a , E a C�o CL LJ , I *5 CL ca� ca 0 ' `+ ROOM—w- MIMMIN !MBE I Breakdown for this Change Order WON" MW'BE Su�b Type of Served for thi's CO ............. Total $0,00 0 Previous Change Orders 'T CO,# DATE A,MOUN'! .......... Tolta 1 $00 00 CCLENDON CONSTRUCTION CO.4F INCe P.O. Box 999 Burleson, Texas 76097 (817)295-0066 Fax(817)29"796 October I I�2012 C ty of Fort Worth 1000 Th rockmorton fort 'Worth,T'X 76102 Attn.- Carlos Vasquez Re: 2007 CCP District 5B Change Order Request Mr.Vasquez, At 708 Edge wood Terrace it was necessary to modify two,wrought iron dri.veway gates due to grade changes in both the road and driveway. The,grade of the street and driveway were lowered at both driveways on this residence,thus leaving the gate too short to match the existing fence that now sits on a retaining wall. Additionally,we had to construction a modified wall/trench runners for the gate to slide open. Below is the cost to complete this work. Extended, Pr' Deser ion Quanfit it Price ice Gate Extension/Modification 2, Ea $I 1,000-00 $21000.00 Wall/Trerich Runners for I J.'s $2,550.00 $2, 50-00 Both Gate "rotai cost -t .$4,1550.00 This work was decided on after the rest of the pro* .ject was complete,thus there has been some down time! in scheduling this work. We ask that WCD be added to the contract to schedule and complete this work. Sincerely, Justin Blair McClendon Construction A"""'LENDON CONSTRUCTION CO,,, INC* ck; P.O. Box 999 Budeson, Texas 760197 (817) 295-0066 Fax(8 17)295-6796 Januatv 17,2013 W City of Fort Worth 10007hrockmorton Fort WortIL TX 76102 Attn: Carlos Vasquez Re: 2007 CCP'District 5B Change Order Request Mr. Vasquez, Per your request,below is the cost to install a sign and buttons to direct traffic away from the existing retaining wall north oft a fi ts of our project. ............. Descri ptio Mt Unit Price Extended Price I&I Sip&Buttons I LS _$21000.00 S2100Q00 Total Cost, $2100.0.00 Contract time was stopped months ago when the original contract work was completed. If this change order wi H cause contract time to be again,the amount of contract time to add for this change order will need to be addressed. Sincerely, Justin Blair McClendo�n Construction C) C) C) LO 0 0 LO LO f--- ci 6 W 0) (0 LO UO C) 0; cvi cli cli (oil 6 LO Ck LO ILO C) 01 m C) C) C) (6 w4t (0 CD (0 LO qI (D 06 C6, 06 co N IN (a C) C) C) CD 0 C) CD m C), 10) C) M C) 01 C> (D (0 LO N C) Nt a- C) C) CN W uj U) wi a 0 0 m C* Cd 0 'r- W CD W) IRV ch W) 0 0 memo o > 0 -2 0 404040 40 60 61). 404040 0 > 'own" Q c w c z uj L: N co 0 ......... C) (D CO CO co (D (D 0 01 C) 0 on C) (D co 0 o C) 1 (4 - CL 2 N cm M 0 co a)i Loi 0 -0 10 0 co cni C) N w M 0. c) 0 C M E z 0 a) 4— 0 cn (D 0., 0 -C (1) 0 CD E E > -0 0 a) < w U) U) (n 4" "cn c: 0 0 0 C: CL Co 0 o c L 0 0 Z 0 Ems. z C: C) 4r-L 4— W 0 0 C: cu z 4-4 (1) — Uj W E 0 *-j -0 0) c ca- cx CU C: a) 0 W q- C: U) M 0 >N C: ' C: E E 0 0 < < ct