Loading...
HomeMy WebLinkAboutContract 55171-A1 CSC No.55171-A1 AMENDMENT No. 1 TO CITY SECRETARY CONTRACT WHEREAS , the City of Fort Worth (CITY) and Half Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 55171, (the CONTRACT) which was authorized on the 15th day of December, 2020 in the amount of $530,314 . 00; and WHEREAS , the CONTRACT involves engineering services for the following project: Northside IV 24-Inch Water Transmission Main Phase 1B; and WHEREAS , it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee . NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives , enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal letter attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $123,768 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $654 ,082 . 00 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Halff Associates, Inc. ISA,YLAi�GLAN a,,9"''.4' D ana Bu rgh d oc :46 CST) y �`^— -- Dana Burghdoff Dennis Haar, P.E. Assistant City Manager Public Works Team Leader Dec 14,2021 DATE: DATE: JfL- APPROVAL RECOMMENDED: Ch,i,t,ph,,Ha,d (Dec 14,202106:52 CS) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Suzanne Abbe, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: 21-0921 00A Date: November 30 , 2021 DBt,,k(D,,14, Douglas W. Black Form 1295: 2021-804128 Senior Assistant City Attorney a ATTEST: ��0--0R 4' a o 09 o ° J ette 5.600da 11(Dec 15,202115' CSr) �00 O=� v° o° °° �� Jannette Goodall � F °° d City Secretary °°°°°°°00 a SEX Asap OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -2- MEN HALFF MEN September 20,2021 34486.001 Ms. Suzy Abbe,PE Senior Engineer, Capital Projects Delivery- Facilities City of Fort Worth Water Department 200 Texas Street Fort Worth,Texas 76102 RE: Amendment No. 1 —Northside IV 24-inch Water Line City Project No. 102687 Dear Ms. Abbe: Halff Associates is pleased to present this Amendment No. 1 for additional services to City Project No. 102687. Amendment No. 1 includes the effort necessary to design a transfer valve vault for the proposed pipeline. Although a transfer valve was considered during the negotiations of the original contract, the City ultimately decided not to include the design work associated with that valve in the project. The transfer valve vault is planned to be a cast in place concrete vault, including a motor operated valve,pressure sustaining valve, and flow meter. The transfer valve vault design scope will include civil/mechanical, structural, electrical,instrumentation, and control engineering. To perform the EIC engineering,Halff will add a new team member to conduct those services: Gupta Associates, Inc. GAI is a qualified business equity (MBE/WBE) firm. To support the structural design, a previously budgeted Geotech bore will be located at the proposed vault site, so the amendment does NOT increase the cost of geotechnical services on the project. This amendment does NOT include the addition of automatic flushing station. Per direction from the City, a fire hydrant will be located along the pipeline at the desired flushing location. Additionally,this Amendment also includes budget for SUE work on the project. The budget included in this amendment corrects a formula error in the original contract. Although the budget for SUE services on the project for$68,680 was agreed to in the original contract negotiations,a formula error in the LUE spreadsheet excluded that amount from the contract total. To correct that error, this amendment adds$68,680 to the contract total to cover SUE services. The Level of Effort spreadsheet for Amendment 1 is attached for reference. A summary of the proposed budget for this amendment is as follows: 3.0 Preliminary Design $135736 4.0 Final Design $255016 5.0 Bid Phase $832 6.0 Construction Phase Services $155504 8.0 SUE $68,680 TOTAL PROPOSED AMENDMENT NO. 1 $123,768 HALFF ASSOCIATES,INC. 4000 FOSSIL CREEK BOULEVARD TEL (817)847.1422 WWW.HALFF.COM FORT WORTH,TX 76137.2720 FAX (817)232.9784 MEN MENH A L F F Ma Abbeent Citp of Fort Worth Water Department ■■■ September 13,2021 Page 2 The additional business equity effort included in this amendment is $31,076, or 25% of the amendment total. Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Following is project fee summary: Original Contract $530,314 Amendment No. 1 $123,768 REVISED CONTRACT AMOUNT $654,082 Sincerely, I IALFF ASSOCIATES, INC. Preston C. Dillard,PE Sr. Project Manager TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY on the transfer vault as part of the overall project package, per the approved Project Schedule. ENGINEER will develop the preliminary design of the transfer vault as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: • Civil/mechanical preliminary design, including vault location and dimensions • Structural preliminary design • Electrical, Instrumentation, and Control preliminary design ASSUMPTIONS • Automated flushing valve vault is NOT included in this scope. • Transfer valve vault will be located close to the north end of the 36-inch Chapel Hill water line along Bus US Hwy 287, near the intersection of Muscogee Drive. Land or easement acquisition for the transfer vault is NOT included in this scope. • Valve will be placed a typical water line depth. • Structural design based upon the 13 borings previously obtained as part of the original Engineering Agreement. • New electric service will be required • No generator will be installed • Transfer vault will consist of a motorized valve and flow meter. Typical vault appurtenances such as receptacles, lights, etc. will be included. • An RTU cabinet will be installed for remote communications. There is no automatic control, only local and remote manual control. DELIVERABLES A. Preliminary Design drawings and specifications for the Transfer Vault will be included with the overall Preliminary Design package B. A preliminary design memo describing the EIC components of the vault will be provided. TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as described in the original Engineering Agreement, and will include drawings and specifications for the Transfer Vault: • Civil/mechanical design • Structural design • Electrical, Instrumentation, and Control design DELIVERABLES A. Design drawings and specifications for the Transfer Vault will be included with the overall Design package TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the Transfer Vault as described in the original Engineering Agreement. TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the Transfer Vault as described in the original Engineering Agreement. TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide Subsurface Utility Engineering services as described in the original Engineering Agreement. r \ �; ; \ \ \ \ -T --- -------- .......I I I I I - ;z § k§)�� \ ,� d k l .m ! £E L0Z | E:3 &Ef ® t 2' o� § `° a/>i » w $° ! � k° £ ! � / ) jA -)E ! _ - - \\ o. )0) &\ / # - _ E. o - |): );}]!)!«!§ \ _ _ o & ��\\�\E\\\�\\\ \�\\\ §}\\\\\\\ )\\\} \\ \\ 2 != 2 :::nn2§§ ;:m::=:;_ ; ;2= 4 o \\\ r \ � ! 7 7 / ; ; ; E o, ! aaa/ aa k§)�� \ § k CLW r ! £w 0Z | 0tea# w E� &Ef ® t 0.2 § ` ° pia/» > £ ! � / z j\! : ; $ { §_� T w. oo o {\ | o - ) _ �f)\)k/ 7) {(} �!j\ ) \\ ) !; 5o 2t;f± |{ zz; �!Es ` ® i !]§!§!y, # #!§tom: ! ]/] ] , 7ti;zl,�l; ;f {(! *'!§ |§;2:®;2 / U-1 11-11 11 &::::: ::u Ul nn l:m= ;=m===== \}\ \\0 /\ \ a a 15 ) - 77- r ! § - $ 2, ` k§)0.� \ § k lL.m ! £E 0Z | %2 ,CL § > pia/» \� $° ! � § IN £ ! � ww / \|k ` ) j�! k ; \}l \\0 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, November 30, 2021 REFERENCE NO.: **M&C 21-0921 LOG NAME: 60NSIV24INWATERMPl BA1-HALFF-A1 SUBJECT: (CD 7) Authorize Execution of Amendment No.1 with Halff Associates, Inc. in the Amount of$123,768.00 for Additional Design Services for Northside IV 24-Inch Water Transmission Main Phase 1 B Project, and Adopt Attached Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 1 in the amount of$123,768.00 to City Secretary Contract No. 55171 with Halff Associates, Inc. for additional design services for the Northside IV 24-Inch Water Transmission Main Phase 1 B Project for a revised contract amount of$654,082.00; and 2. Adopt the attached appropriation ordinance adjusting appropriations in the Water/Sewer Bond 2016 Fund by increasing appropriations in the amount of$423,768.00 for the Northside IV 24-inch Water Transmission Main Phase 1 B project (City Project No. 102687) and decreasing appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount. DISCUSSION: On December 15, 2020, Mayor and Council Communication (M&C) 20-0983, the City Council authorized an engineering agreement with Halff Associates, Inc., in the amount of$530,314.00 for the preparation of plans and specifications for the Northside IV 24-Inch Water Transmission Main Phase 1 B project. Amendment No. 1 will provide for the design of a transfer station that will allow emergency transfer of water between the Northside III and Northside IV pressure planes as well as fund subsurface utility exploration for design of the transmission main. In addition to the amendment amount, an additional $300,000.00 is necessary for real property acquisition. Appropriations for the Northside IV 24-Inch Water Transmission Main Phase 1 B project, are as depicted below: Fund Existing Existing Project Appropriations Appropriations Total W&S Rev Bonds Series 2021 - $1,965,799.00 $0.00 $1,965,799.00 Fund 56019 Water/Sewer Bond 2016 — $0.00 $423,768.00 $423,768.00 Fund 56005 Project Total $1,965,799.00 $423,768.00 $2,389,567.00 Business Equity: Halff Associates, Inc. is in compliance with the City's DBE Program by committing to 25 percent DBE participation on this amendment. The City's DBE goal on this project is 12 percent. The project is located in COUNCIL DISTRICT 7. http://apps.cfwnet.org/ecouncil/printmc.asp?id=29469&print=true&DocType=Print 12/2/2021 FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified -ALL FUNDS project within the Water/Sewer Bond 2016 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Water/Sewer Bond 2016 Fund for the NS IV 24"Water Main Phase 1 B project to support the approval of the above recommendations and execution of the amendment. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department Account Project Program ctivity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project JProgram ctivitylBuia-g—et7 Reference # mount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Suzanne Abbe (8209) ATTACHMENTS 1. 60NIS241NWATERMP1BA1-HALFF-A1.docx (CFW Internal) 2. 60NSIV241NWATERMP1 B-HALFF-Al Compliance Memo.pdf (CFW Internal) 3. 60NSIV24INWATERMPl BA1-HALFF FID Table.xlsx (CFW Internal) 4. 60NSIV24INWATERMPl BA1-HALFF Map.pdf (Public) 5. 60NSIV241NWATERMP1 BA1-HALFF-A1 1295 Form.pdf (CFW Internal) 6. 60NSIV24INWATERMPl BA1-HALFF-A1 56005 AO22(r2)r.pdf (Public) 7. SAM.gov Halff Associates, Inc.pdf (CFW Internal) http://apps.cfwnet.org/ecouncil/printmc.asp?id=29469&print=true&DocType=Print 12/2/2021 00 00 O O O O O O O O M ro M rri M M M' 0 0 0' V V V V -1 -(�V). N rV rV N N N N Ol al al al al rV rV N N N N m al al al al O O O O O O al al al al al rV N N N N N al al al al al U o U O U O o 0 0 0 0 Z O Z O Z O O O O O O :D (D Z:) O D O O O O O O v i, v I, U r, il il il il i. a W a W a W w w � � � N N Ln N N N N N N N N Z O Z O Z O O O O O O cc O O O O O O O ILn IUl a) Ln Ln Ln O O O O O O O O O m r-I m r-I F Q> Q> a> al m Ln m In n n � � i� � ll ill ill In In w w w o o 0 0 0 o O O O O O �-1 m m m m m m m m m m m O O O O O O o 0 0 0 0 O O O O O O o 0 0 0 0 O O O O O O O O O O O d o 0 0 0 0 0 0 0 0 0 0 Pa ul Ln Ln ul ul ul Ln Ln Ln Ln Lh 00 00 O O O O O O O 00 00 O O O O O O O ul ul ul ul al ul Ln Ln Ln Ln Lh a N QS QS co co co co c-I QS QS QS QS o N N N N N N N N N N