NOTICE OF PROJECT COM PLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: EVERMAN PARKWAY DEVELOPMENT
City Project No.: 102714
Improvement Type(s): Water 0 Sewer 0
Original Contract Price: $17,852.00
Amount of Approved Change Order(s): $7,476.00
Revised Contract Amount: $25,328.00
Total Cost of Work Complete: $25,328.00
Eric Van Dusen(Dec 20,2021 10:37 CST) Dec 20,2021
Contractor Date
FA Pei nado
Title
Project Manager
Company Name
Ba 10 Dec 20,2021
Rodrick Wallace(Dec 20,202112:21 CST)
Pro�ect Inspector Date
ges atel,P.E.(Dec 20,202112:25 CST) Dec 20,2021
Project ManagerDate
.7ge%G c�GGI!'LG��Awnlef Dec 20 2021
Janie Scarlett Morales(Dec 20,202112:28 CST)
CFA Manager Date
bay B�AGu7 Dana Burghdoff(Mc 27,20 Dec 27
09:52 CST) ,2021
Asst. City Manager Date
Notice of Project Completion OFFICIAL RECORD
CITY SECRETARY
Page 1 of 2
FT. WORTH, TX
Project Name: EVERMAN PARKWAY DEVELOPMENT
City Project No.: 102714
City's Attachments
Final Pay Estimate ❑x
Change Order(s): 0 Yes ❑ N/A
Pipe Report: ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 30 WD Days Charged: 165
Work Start Date: 1/18/2021 Work Complete Date: 10/11/2021
Completed number of Soil Lab Test: 71
Completed number of Water Test: 2
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name EVERMAN PARKWAY DEVELOPMENT
Contract Limits
Project Type WATER&SEWER
City Project Numbers 102714
DOE Number 2714
Estimate Number 1 Payment Number 1 For Period Ending 11/11/2021
WD
City Secretary Contract Number Contract Time 3UD
Contract Date Days Charged to Date 165
Project Manager NA Contract is 100.00 Complete
Contractor FA PEINADO,LLC
15815 EXECUTIVE DR#500
FRISCO, TX 75033
Inspectors OWEN / WALLACE
Thursday,November 11,2021 Page 1 of 4
City Project Numbers 102714 DOE Number 2714
Contract Name EVERMAN PARKWAY DEVELOPMENT Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 11/11/2021
Project Funding
WATER
Item Estimated Estimated Completed Completed
Description of Items Unit Unit Cost
No. Quanity Total Quanity Total
---------------------------------------
1 8"WATER PIPE 42 LF $38.00 $1,596.00 42 $1,596.00
2 12"WATER PIPE 12 LF $49.00 $588.00 12 $588.00
3 CONNECTION TO EXISTING 16"WATER MAIN 1 EA $1,658.00 $1,658.00 1 $1,658.00
5 16"X 8"TAPPING SLEEVE&VALVE 1 EA $3,455.00 $3,455.00 1 $3,455.00
Sub-Total of Previous Unit $7,297.00 $7,297.00
---------------------------------------
SEWER
Item Estimated Estimated Completed Completed
Description of Items Unit Unit Cost
No. Quanity Total Quanity Total
---------------------------------------
1 POST CCTV INSPECTION CO#1 44 LF $10.00 $440.00 44 $440.00
2 MANHOLE VACUUM TESTING 1 EA $150.00 $150.00 1 $150.00
3 TRENCH SAFETY CO#1 44 LF $1.00 $44.00 44 $44.00
4 6"SEWER PIPE CO#1 44 LF $28.00 $1,232.00 44 $1,232.00
5 4'MANHOLE 1 EA $4,780.00 $4,780.00 1 $4,780.00
6 4'EXTRA DEPTH MANHOLE 7 VF $175.00 $1,225.00 7 $1,225.00
7 RELOCATE CARV VENT CO#1 1 EA $10,160.00 $10,160.00 1 $10,160.00
Sub-Total of Previous Unit $18,031.00 $18,031.00
---------------------------------------
Thursday,November 11,2021 Page 2 of 4
City Project Numbers 102714 DOE Number 2714
Contract Name EVERMAN PARKWAY DEVELOPMENT Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 11/11/2021
Project Funding
Contract Information Summary
Original Contract Amount $17,852.00
Change Orders
Change Order Number 1 $7,476.00
Total Contract Price $25,328.00
Total Cost of Work Completed $25,328.00
Less %Retained $0.00
Net Earned $25,328.00
Earned This Period $25,328.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $25,328.00
Thursday,November 11,2021 Page 3 of 4
City Project Numbers 102714 DOE Number 2714
Contract Name EVERMAN PARKWAY DEVELOPMENT Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 11/11/2021
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors OWEN / WALLACE Contract Date
Contractor FA PEINADO,LLC Contract Time 30 WD
15815 EXECUTIVE DR#500 Days Charged to Date 165 WD
FRISCO, TX 75033 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $25,328.00
Less %Retained $0.00
Net Earned $25,328.00
Earned This Period $25,328.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $25,328.00
Thursday,November 11,2021 Page 4 of 4
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
November 3, 2021
F.A. Peinado Construction
15815 Executive Dr.
Frisco,Tx.75033
RE: Acceptance Letter
Project Name: Everman Parkway Development
Project Type: Developer- Water,Sanitary Sewer, Paving
City Project No.: 102714
To Whom It May Concern:
On October 25, 2021 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on November 3, 2021. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. Thewarranty period will start on November 3, 2021, which is the date
of the punch list completion and will extend of two(2)years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at(817)
392-2373.
,Sincerely,
ges atel,P.E.(Dec 20,202112:25 CST)
Yogesh Patel P.E., Project Manager
Cc: Rodrick Wallace, Inspector
MarkOwen, Inspection Supervisor
Joe Rogers,Senior Inspector
VictorToneroJr. P.E., Program Manager
Pacheco Koch,Consultant
F.A. Peinado Construction, Contractor
Everman Owner, L.P, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev.8/20/19
FORT WORTH
P- 00wJ
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Everman Parkway Development
PROJECT NUMBER: 102714
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Open Trench 8" PVC 42LF
Open Trench 12" PVC 12LF
FIRE HYDRANTS:N/A VALVES(16"OR LARGER) N/A
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Passed
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Open Trench 6" PVC 44LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Passed
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817) 392-7845
k ~
k
8
( ) # # G # # K
;
° » _ -- - - --
3 !
^ { § § § § \ §
g —— -
/ \ 2
0 2 °° » ;
\ [
\ �
GJ—
J ƒ )) 52 ; ; ; ; ;
§ a )) § / _ / 16
(
Of
} E
) -
$
-j
(
§ --
IL
# ;
� k
0 (
) ) \§\ [ o
f y e e ; 2o oe
) @ G /� ( \ ` � } \) \ }
b [ § °b ` � `
we � ® < « )� } ) / ) > ea
§ 0U- 0 /} ; 037E -
CL000c = = . . _. 0 R 'SI ®
z
w
§ m
�� \n \
§` §.tea { \ )
} 2\ ®G I
§
( ) � ^ I
$ § IL
)]\£.\ }
o O cocc
\
§�2i�) � —
;\
(\ !
t. < § ( §gym
() § )§ § 3; Ui
ew §
�u
{ $ k§ # 2 z / k
® (
§
) � §
a� 5! k —
§ j \
t ) ( -( f w
\\ o� /
k ( z
$ \ $ k
� 2- 6 q `! /( § \ \ 2 » CC
7
/[ \ ƒ z� § 2 ! !
2 f / Q cc
\
. ! §
, m
§
0 \
\ 0 \
[Final] Bills-Paid Affidavit
Date: November r,-7, 2021
Owner: EVERMAN OWNER, DST, a Delaware Statutory Trust
f/k/a Everman Owner, LP
Owner's Mailing Address:
c/o Invesco Advisers, Inc.,
2001 Ross Avenue, Suite 3400
Dallas, Texas 75201
Attention: Asset Management
Contractor: F. A. Peinado, LLC
Contractor's Mailing Address: 15815 Executive Drive
Suite 500
Frisco, Texas 75033
Attention: Teddy PeinadoBrett Shirley
Phone: (214) 200-9140
Email: brett@fapeinado.com
Affiant: the undersigned
Affiant's Mailing Address: Same as Contractor's Mailing Address (see above)
Property: See Exhibit A
Improvements: improvements located on Property
ACTIVE 60009866v3
Affiant swears on behalf of Contractor that the following statements are true and within the
personal knowledge of Affiant:
1. Affiant has personal knowledge of the facts stated in this affidavit. Affiant has full
authority to make the agreements in this affidavit on behalf of Contractor.
2. Affiant understands that Owner has required this affidavit as a condition of payment for
labor or materials used in construction of the Improvements.
3. Contractor has paid each of Contractor's subcontractors, laborers, and materialmen in full
for all labor and materials provided to Owner or Contractor for construction of the
Improvements, excepting only the amounts owed to the persons identified below:
Name: None
Address:
Telephone number:
Amount owed:
Contractor warrants and represents that the following specified bills or classes of bills will be
paid by Contractor from the funds paid to Contractor by Owner in reliance on this affidavit:
Name of payee or description of class: N/A, all paid
Amount:
In consideration of the funds paid to Contractor by Owner in reliance on this affidavit,
Contractor waives and releases all of Contractor's statutory and constitutional mechanic's lien
rights connected with the construction of the Improvements, conditioned on the actual payment
or collection if payment is made by check or draft.
Contractor agrees to indemnify and hold Owner harmless from any loss or expense resulting
from false or incorrect information in this affidavit.
(AFFIANT)
F.A. PEINADO, LLC
By: ,
Name:
ACTIVE 60009866V3
Title:
STATE OF TEXAS }
}
COUNTY OF Collin— }
SWORN TO, SUBSCRIBED AND ACKNOWLEDGED BEFORE ME, a notary public, in and
for said County and State, on this rJ day of November, 2021, by
(title) of F.A. Peinado, LLC, on
behalf of said co
SAMANTHA 9. BATTAGLIA
`�1PH UB�i
a°r =Notary Public, State of Texas
�9 +; Comm. Expires 01-23.2022
Notary ID 129496696LW7
Notary Public, State oNxas
Notary's printed name: 1 ICL
My commission expires: IIj
3
ACTIVE 60009866v3
EXHIBIT A
PROPERTY DESCRIPTION
Being Lots 4R and 5, in Block 8, of Carter Industrial Park, an Addition to the City of Fort Worth,
Tarrant County, Texas, according to the Final Plat thereof recorded in cc#D220250494, Real
Property Records, Tarrant County, Texas.
ACTIVE 60009866v3
[Final] Bills-Paid Affidavit
Date: November r,-7, 2021
Owner: EVERMAN OWNER, DST, a Delaware Statutory Trust
f/k/a Everman Owner, LP
Owner's Mailing Address:
c/o Invesco Advisers, Inc.,
2001 Ross Avenue, Suite 3400
Dallas, Texas 75201
Attention: Asset Management
Contractor: F. A. Peinado, LLC
Contractor's Mailing Address: 15815 Executive Drive
Suite 500
Frisco, Texas 75033
Attention: Teddy PeinadoBrett Shirley
Phone: (214) 200-9140
Email: brett@fapeinado.com
Affiant: the undersigned
Affiant's Mailing Address: Same as Contractor's Mailing Address (see above)
Property: See Exhibit A
Improvements: improvements located on Property
ACTIVE 60009866v3
Affiant swears on behalf of Contractor that the following statements are true and within the
personal knowledge of Affiant:
1. Affiant has personal knowledge of the facts stated in this affidavit. Affiant has full
authority to make the agreements in this affidavit on behalf of Contractor.
2. Affiant understands that Owner has required this affidavit as a condition of payment for
labor or materials used in construction of the Improvements.
3. Contractor has paid each of Contractor's subcontractors, laborers, and materialmen in full
for all labor and materials provided to Owner or Contractor for construction of the
Improvements, excepting only the amounts owed to the persons identified below:
Name: None
Address:
Telephone number:
Amount owed:
Contractor warrants and represents that the following specified bills or classes of bills will be
paid by Contractor from the funds paid to Contractor by Owner in reliance on this affidavit:
Name of payee or description of class: N/A, all paid
Amount:
In consideration of the funds paid to Contractor by Owner in reliance on this affidavit,
Contractor waives and releases all of Contractor's statutory and constitutional mechanic's lien
rights connected with the construction of the Improvements, conditioned on the actual payment
or collection if payment is made by check or draft.
Contractor agrees to indemnify and hold Owner harmless from any loss or expense resulting
from false or incorrect information in this affidavit.
(AFFIANT)
F.A. PEINADO, LLC
By: ,
Name:
ACTIVE 60009866V3
Title:
STATE OF TEXAS }
}
COUNTY OF Collin— }
SWORN TO, SUBSCRIBED AND ACKNOWLEDGED BEFORE ME, a notary public, in and
for said County and State, on this rJ day of November, 2021, by
(title) of F.A. Peinado, LLC, on
behalf of said co
SAMANTHA 9. BATTAGLIA
`�1PH UB�i
a°r =Notary Public, State of Texas
�9 +; Comm. Expires 01-23.2022
Notary ID 129496696LW7
Notary Public, State oNxas
Notary's printed name: 1 ICL
My commission expires: IIj
3
ACTIVE 60009866v3
EXHIBIT A
PROPERTY DESCRIPTION
Being Lots 4R and 5, in Block 8, of Carter Industrial Park, an Addition to the City of Fort Worth,
Tarrant County, Texas, according to the Final Plat thereof recorded in cc#D220250494, Real
Property Records, Tarrant County, Texas.
ACTIVE 60009866v3