Loading...
HomeMy WebLinkAboutContract 54738-FP2 City Secretary 54738 -FP2 Contract No. FORTWORTH. Date Received Dec 27,2021 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Sendera Ranch East Phase 23 City Project No.: 102553 Improvement Type(s): N Paving N Drainage N Street Lights ❑ Traffic Signals Original Contract Price: $1,555,386.50 Amount of Approved Change Order(s): $41,790.00 Revised Contract Amount: $1,597,176.50 Total Cost of Work Complete: $1,597,176.50 J d w Dec 21 2021 Jay rnell(Dec 21,2021 06:04 CST) Contractor Date Project manager Title Conatser Construction Tx Lp Company Name Ifgh2GSLdg�JLgL:2 lw Dec 21, 2021 Hershel Stanley Sutterfield(Dec 21,202106:31 CST) Project Inspector Date C"'A' Dec 21,2021 Project Manager Date � s"4n�-MOML-S- Dec 21 2021 Janie Scarlett Morales(Dec 21,2021 14:35 CST) CFA Manager Date Dc�nc� Bu�cih�%ff Dec 27 2021 Dana Burghdoff ec 27,202109:41 CST) 7 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Sendera Ranch East Phase 23 City Project No.: 102553 City's Attachments Final Pay Estimate 0 Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety 0 Statement of Contract Time Contract Time: 240 WD Days Charged: 209 Work Start Date: 127/07/2020 Work Complete Date: 12/16/2021 Completed number of Soil Lab Test: 505 Completed number of Water Test: 28 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name SENDERA RANCH EAST PHASE 23 PAVEMENT,WATER,SEWER,STOR Contract Limits Project Type DRAINAGE&PAVING&STREET LIGHTS City Project Numbers 102553 DOE Number 2553 Estimate Number 1 Payment Number 1 For Period Ending 12/15/2021 WD City Secretary Contract Number Contract Time 24WD Contract Date 9/22/2020 Days Charged to Date 209 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors MILLER,W / SUTTERFIELD Tuesday,December 21,2021 Page I of 5 City Project Numbers 102553 DOE Number 2553 Contract Name SENDERA RANCH EAST PHASE 23 PAVEMENT,WATER,SEWER,ST Estimate Number 1 Contract Limits Payment Number I Project Type DRAINAGE&PAVING&STREET LIGHTS For Period Ending 12/15/2021 Project Funding UNIT III:DRAINAGE IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ---- ---------------I TRENCH SAFETY 2852 LF $1.00 $2,852.00 2852 $2,852.00 2 21"RCP CLASS III 693 LF $48.00 $33,264.00 693 $33,264.00 3 24"RCP CLASS III 920 LF $58.00 $53,360.00 920 $53,360.00 4 27"RCP CLASS III 316 LF $63.00 $19,908.00 316 $19,908.00 5 33"RCP CLASS III 285 LF $88.00 $25,080.00 285 $25,080.00 6 42"RCP CLASS III 372 LF $140.00 $52,080.00 372 $52,080.00 7 54"RCP CLASS III 204 LF $210.00 $42,840.00 204 $42,840.00 8 4'STORM JUNCTION BOX 6 EA $4,000.00 $24,000.00 6 $24,000.00 9 5'STORM JUNCTION BOX 2 EA $5,000.00 $10,000.00 2 $10,000.00 10 6'STORM JUNCTION BOX I EA $6,000.00 $6,000.00 1 $6,000.00 11 10'CURB INLET 6 EA $3,200.00 $19,200.00 6 $19,200.00 12 15'CURB INLET 8 EA $4,200.00 $33,600.00 8 $33,600.00 13 INLET PROTECTION 14 EA $150.00 $2,100.00 14 $2,100.00 14 CONNECT TO EXISTING RCP 3 EA $1,000.00 $3,000.00 3 $3,000.00 15 2-7'X3'RCBs TxDOT PW-2 4:1 WINGWALL 62 LF $680.00 $42,160.00 62 $42,160.00 W/0.6'CURB HEIGHT 16 33"6: 1 SLOPED END HEADWALL 1 EA $4,500.00 $4,500.00 1 $4,500.00 17 54"SLOPED END HEADWALL 1 EA $6,500.00 $6,500.00 1 $6,500.00 18 2-7'X3'TxDOT PW-2 4:1 WINGWALL W/0.6 1 EA $28,500.00 $28,500.00 1 $28,500.00 CURB HEIGHT 19 2-7'X3'TxDOT PW-2 4"1 WINGWALL W/5'CURB 1 EA $31,500.00 $31,500.00 1 $31,500.00 HEIGHT 20 TxDOT PR-I 1 HANDRAIL 120 LF $145.00 $17,400.00 120 $17,400.00 21 18"'TYPE A'RIPRAP 158 SY $75.00 $11,850.00 158 $11,850.00 22 24"'TYPE A RIPRAP 96 SY $85.00 $8,160.00 96 $8,160.00 23 REMOVE EXISTING 24"HEADWALL 1 EA $1,500.00 $1,500.00 1 $1,500.00 24 REMOVE EXISTING 18"'TYP A'RIPRAP 16 SY $25.00 $400.00 16 $400.00 -------------------------------------- Sub-Total of Previous Unit $479,754.00 $479,754.00 UNIT IV:PAVING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total - --- ---- -------------------------------- Tuesday,December 21,2021 Page 2 of 5 I City Project Numbers 102553 DOE Number 2553 Contract Name SENDERA RANCH EAST PHASE 23 PAVEMENT,WATER,SEWER,ST Estimate Number I Contract Limits Payment Number 1 Project Type DRAINAGE&PAVING&STREET LIGHTS For Period Ending 12/15/2021 Project Funding 1 HYDRATED LIME(45 LBS/SY)(CO#2) 493 TN $175.00 $86,275.00 493 $86,275.00 2 6"LIME TREATMENT 21910 SY $3.00 $65,730.00 21910 $65,730.00 3 6"CONC PVMT 20530 SY $35.00 $718,550.00 20530 $718,550.00 4 S CONC SIDEWALK 7070 SF $3.25 $22,977.50 7070 $22,977.50 5 BARRIER FREE RAMP,TYPE P-1 12 EA $1,500.00 $18,000.00 12 $18,000.00 6 REMOVE BARRICADE AND CONNECT TO 6 EA $500.00 $3,000.00 6 $3,000.00 EXISTING PAVEMENT 7 STOP SIGNS 6 EA $350.00 $2,100.00 6 $2,100.00 8 STREET NAME BLADE 40 EA $200.00 $8,000.00 40 $8,000.00 9 STREET SIGN POLE 6 EA $300.00 $1,800.00 6 $1,800.00 10 TOPSOIL(CO#1) 144 SY $24.00 $3,456.00 144 $3,456.00 11 BLOCK SOD PLACEMENT(CO#1) 862 SY $8.00 $6,896.00 862 $6,896.00 -------------------------------------- Sub-Total of Previous Unit $936,784.50 $936,784.50 UNIT V:STREET LIGHTING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 2"CONDT PVC SCH 80(T)(CO#3) 4426 LF $10.00 $44,260.00 4426 $44,260.00 2 RDWY ILLUM ASSEMBLY TY 8,11,D-25 AND 33 EA $2,000.00 $66,000.00 33 $66,000.00 D-30 3 LED LIGHTING FIXTURE(50W)(CO#3) 34 EA $600.00 $20,400.00 34 $20,400.00 4 RDWY ILLUM FOUNDATION TY 1,2,AND 4(CO 34 EA $1,000.00 $34,000.00 34 $34,000.00 #3) 5 3-#10 COPPER WIRE(CO#3) 4426 LF $3.00 $13,278.00 4426 $13,278.00 6 RDWY ILLUM ASSEM.TY8,11,D-SAND D-30 1 EA $2,700.00 $2,700.00 1 $2,700.00 (CO 3) -------------------------------------- Sub-Total of Previous Unit $180,638.00 . $180,638.00 -------------------------------------- Tuesday,December 21,2021 Page 3 of 5 City Project Numbers 102553 DOE Number 2553 Contract Name SENDERA RANCH EAST PHASE 23 PAVEMENT,WATER,SEWER,ST Estimate Number 1 Contract Limits Payment Number 1 Project Type DRAINAGE&PAVING&STREET LIGHTS For Period Ending 12/15/2021 Project Funding Contract Information Summary Original Contract Amount $1,555,386.50 Chanize Orders Change Order Number 1 $10,352.00 Change Order Number 2 $24,850.00 Change Order Number 3 $6,588.00 Total Contract Price $1,597,176.50 Total Cost of Work Completed $1,597,176.50 Less %Retained $0.00 Net Earned $1,597,176.50 Earned This Period $1,597,176.50 Retainage This Period $0.00 Less Liquidated Damages Days @ /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,597,176.50 Tuesday,December 21,2021 Page 4 of 5 City Project Numbers 102553 DOE Number 2553 Contract Name SENDERA RANCH EAST PHASE 23 PAVEMENT,WATER,SEWER,ST Estimate Number I Contract Limits Payment Number I Project Type DRAINAGE&PAVING&STREET LIGHTS For Period Ending 12/15/2021 Project Funding Project Manager NA City Secretary Contract Number Inspectors MILLER,W / SUTTERFIELD Contract Date 9/22/2020 Contractor CONATSER CONSTRUCTION TxLP Contract Time 240 WD 5327 WICHITA ST Days Charged to Date 209 WD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded ---------------------------- Total Cost of Work Completed $1,597,176.50 Less %Retained $0.00 Net Earned $1,597,176.50 Earned This Period $1,597,176.50 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,597,176.50 Tuesday,December 21,2021 Page 5 of 5 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: SENDERA RANCH EAST PHASE 23 (UNIT IV)PAVEMENT,(UNIT 1)WATER,(UNIT II)SEWER,(UNIT III)STORMWATER& CHANGE CONTRACT: UNIT STREET LIGHTS ORDER No: CFA# 20-0034 CITY PARTICIPATION: NO CITY PROJECT# 102553 DOE 11 N/A 1 WATER PROJECT# FID#30114-0200431-102553-EO7685 SEWER PROJECT# IFID#301 1 4-020 04 31-1 02553-EO7685 FILE# W-2690 INSPECTOR: ERIC TINNER Phone No: 817-647-2566 PROJECT MANAGER: MITCHELL HOLMES Phone No: 817-392-6826 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREETLIGHTS CONTRACT Developer Developer Developer Developer Developer DAYS Cost City Cost Cost City Cost Cost City Cos! Cost City Cost Cost City Cost ORIGINAL CONTRACT $448,328.00 $0.00 $534,196.00 $0.00 $901,582.50 $0.00 $479,754.00 $0.00 $174,050.00 1 $0.00 240 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $448.328.00 $0.00 $534,196.00 $0.00 $901,582.50 $0.00 $479,754.00 $0.00 $174,050.00 $0.00 240 AMOUNT OF PROP.CHANGE ORDER $10,352.00 REVISED CONTRACT AMOUNT $448,328.00 $0.00 $534,196.00 $0.00 $911,934.50 1 $0.00 $470,754.00 1 $0,00 $174,050.00 $0.00 240 TOTAL REVISED CONTRACT AMOUNT PER UNIT $448,328.00 $534,195.00 $911,934.60 $479,754.00 1 $174,050.00 REVISED COST SHARE Dev.Cost: $2,648,261.50 City Cost: $0.00 TOTAL REVISED CONTRACT $2,548,261.50 Revised:10.12-2011 Page 1 You are directed(o make the follovrn cha es In the contract documents: CITY 0I0 ITEM PAY ITEM It I a QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL 101 3201.0100 144 CY TOPSOIL $24.00 $3.458.00 11 3292.0100 662 SY BLOCKSOD PLACEMENT 50.0D $6696.00 TOTAL $10 352.00 REASONS FOR CHANGE ORDER Bieck sod placement and toposoll Is being added In the parkvrays in front of open spaces,per City of Fort MrOi city staff,to make sure grass Is established In these areas prior to project acceptance. HO CITY FUI40S INVOLVED IN THIS CONTRACT.DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY VALL BE SOUGHT BY THE DEVELOPER, RECOMMENDED: APPROVED: APPROVED: (Consuhin�gg Engineer) (Developer) (Contractor) By: '"+ I�`v Ry: :/ Name: JAMIE MARCOUX P.E. Name;KYLE DICKERSON Name:BROCKHUGGINS Title:PROJECT MANAGER TPle:DIRECTOR OF LAND DEVELOPMENT Title:PRESIDENT Rovfsed:10.12.2011 PeOe 2 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: SENDERA RANCH EAST PHASE 23 (UNIT 1)WATER,(UNIT II)SEWER,(UNIT III)STORMWATER,(UNIT IV)PAVEMENT,S CHANGE CONTRACT: UNIT STREET LIGHTS ORDER No: CFA# 20-0034 CITY PARTICIPATION: NO CITY PROJECT# 102553 DOE# N/A 2 WATER PROJECT# IFID#30114-0200431-102553-EO7685 SEWER PROJECT# IND#30114.02 00 431-1025 53-E07685 FILE# W-2690 INSPECTOR: ERIC TINNER Phone No: 817-647-2566 PROJECT MANAGER: MITCHELL HOLMES Phone No: 817-392-6826 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREETLIGHTS CONTRACT Developer Developer Developer Developer Developer DAYS Cost city Cost cost City cost Cost City cost Cost City Cost cost City Cost ORIGINAL CONTRACT $448,328.00 $0.00 $534.195.00 $0.00 $901,682.60 $0.00 $479,764.00 $0.00 $174,060.00 $0.00 240 EXTRAS TO DATE $10,352.00 0 CREDITS TO DATE CONTRACT TO DATE $448.328.00 $0.00 $534,195.00 $0.00 $911,934.50 $0.00 $479,764.00 $0.00 $174,050.00 $0.00 240 AMOUNT OF PROP.CHANGE ORDER $ 28.000.00 $ 24,850.00 0 REVISED CONTRACT AMOUNT $448,328.00 1 $0.00 $562,195.00 i $0.00 $936,784.50 1 $0.00 $479,764.00 1 $0,00 $174,050.00 1 $0.00 240 TOTAL REVISED CONTRACT AMOUNT PER UNIT $448,328.00 _ $562,195.00 $936784.60 $479,764.00 $174.050.00 REVISED COST SHARE DOV.Cost: $2,601,111.60 :City Cost: $0.00 TOTAL REVISED CONTRACT $2,601,111.50 Revised:10-12-2011 Page 1 You are directed to make the follov4ng changes In the contract documents: CITY BID ITEM PAY ITEM rt A OUANTITY I UNIT REM DESCRIPTION UNIT PRICE I TOTAL SEWER 4 3331.3101 1 -28 1 EA I 4"Sewer Service 5 650.00 $ 18,200.00) 16' 1 9999.0021 1 28 1EA 4"Sewer Service to Exlst ng Main $ 1,650.OD $ 46.200.00 TOTALSEWER $ 28000.00 PAVING 1 3211.0400 1 -351 TN Hydrated Lime 32 lbs/s) S 175.00 $ 61,425.00 1 3211.0400 493 TN Hydrated Lime 45 ibs/s) $ 175.00 S 86.275.00 TOTAL PAVING $ 24 B50.00 Asterisk(•)Indicates new Pay Item REASONS FOR CHANGE ORDER This Is a Contractor requested change order that resulted from geld work.The approved construction plans call out sewer services on existing 8'sewer,but the executed project manual did not have a separate line Item for sewer services to an existing main.The Contractor requested sanitary sewer services to existing mains be a separate fine Item.Also,during lab testing of the sell,Rona Engineering determined that the lime series had to be Increased to minimize potential movement and to Increase stability.The pounds and tonnage of hydrated lime was Increased as a result. NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: (Consulting Engineer) (Developer) (Con Vacto ` By: % "I— By: i/� By. Name: JAMIE MARCOUX,P.E. Name: KYLE DICKERSON Name: BROCK HUGGINS Title:PROJECT MANAGER Title:DIRECTOR OF LAND DEVELOPMENT Title:PRESIDENT REVIEWED By Mitch Holmes at 9:42 am,Jul 02, 2021 Revised:100.12-2011 Page 2 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: SENDERA RANCH EAST PHASE 23 (UNIT 1)WATER,(UNIT II)SEWER,(UNIT III)STORMWATER,(UNIT IV)PAVEMENT,& CHANGE CONTRACT: UNIT STREET LIGHTS ORDER No: CFA# 20-0034 CITY PARTICIPATION: NO CITY PROJECT# 102553 DOE# N/A 3 WATER PROJECT# FID#30114-0200431-102553-EO7685 SEWER PROJECT# FID#30114-0200431-102553-E07685 FILE# W-2690 INSPECTOR: STANLEY SUTTERFIELD Phone No: 817-240-4037 PROJECT MANAGER: VICTOR TORNERO Phone No: 817-392-7830 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREETLIGHTS CONTRACT Developer Developer Developer F Developer DAYS Cost City Cost Cosl City Cost Cost City Cosl Cily Cosl Cost Cily Cosl ORIGINAL CONTRACT $448,328.60 $0.00 $534,195.00 $0.00 $901,582.50 $0.00 $0.00 $174,050.00 $0,00 240 EXTRAS TO DATE $28,000.00 $36,202.00 0 CREDITSTODATE CONTRACT TO DATE $448,328.00 $0.00 $562,195.00 $0.00 $936.784.60 $0.00 $0.00 $174,050.00 $0.00 240 AMOUNT OF PROP.CHANGE ORDER $ 6,588.00 0 REVISED CONTRACT AMOUNT $448,3211.00 $0,00 $562,195.00 $0.00 $936,784.50 $0,00 $479.754.00 $0,00 $180,138,00 $0.00 240 TOTAL REVISED CONTRACT AMOUNT PER UNIT $448,328.00 $562,195.00 $936,784.50 $479,764.00 $180,638.00 REVISED COST SHARE Day.Cost: $2,607,699.60 .City Cost: $0.00 TOTAL REVISED CONTRACT $2,607,699.50 Revised:10-12-2011 Page 1 You are directed to mako Iho followingthan es in Iho contmcl documents: CITY DID ITEM PAY ITEM It H QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL 1 2605.3015 176 LF 2-CONDT PVC SCH 00 5 10.00 $ 1,760.00 3 3441.3201 1 EA LED Lighting Fixture 50W 5 600.00 S 600.00 4 3441.3301 1 EA Rdwy Ilium Foundation TY 1,2,and 4 S 1,000.00 $ I.00 Oo 5 9999.0020 176 LF 3-010 COPPER WIRE S 3.00 S 520.00 6' 3441.3002 1 EA Rdyry Ilium Assembly TY 0.11,D-25,and 0.30 S 2.700.00 5 2.700.00 TOTAL PAVING $ 6,690.00 Asterisk(')Indicates now Pay Item REASONS FOR CHANGE ORDER This Is a Contractor requested change order insulting from field work.A few street lights are being proposed to move locations as shown In the approved construction plans duo to water,gas,and electric connicis In certain locations.One street light was added to the plans duo to spacing requirements. 110 CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: (Consulting Engineer) (Developer) (Contract By: •/+a v By:�l l BY 0��_ Name: JAMIE MARCOUX,P.E. Noma:KYLE DICKERSON Name:BROCK HUGGINS Title:PROJECT MANAGER Title:DIRECTOR OF LAND DEVELOPMENT Title:PRESIDENT Revised:10.12.2011 Pago 2 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS December 16, 2021 Conatser Construction TX, L.P. 5327 Wichita Street Fort Worth,Texas 76119 RE: Acceptance Letter Project Name: Sendera Ranch East Phase 23 Project Type:01,02,03,04&06 City Project No.: 102553 To Whom It May Concern: On December 7, 2021 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on December 16, 2021. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on December 16, 2021,which is the date of the punch list completion and will extend of two(2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-6251. Sincerely, C'�' Andrew Goodman, Project Manager Cc: Hershel Stanley Sutterfield, Inspector Wade Miller, Inspection Supervisor Ariel Duarte,Senior Inspector Victor Tornero, Program Manager UA Engineering, Inc, Consultant Conatser Construction TX, L.P.,Contractor Lennar Homes of Texas Land Construction, LTD, Developer File E-Mail: Douglas W. Wiersi , P.E., PhD., Director,TPW Chris Harder, P.E.,Assistant Director,Water g g Richard Martinez,Assistant Director,TPW Wendy Chi-Babulal, P.E.,Water Marisa Conlin,Traffic Engineering Tony Sholola, P.E., Water Allen Hall, Superintendent,TPW Richard Zavala, Director, PARD John Robert Carman, P.E., Director,Water David Creek,Assistant Director, PARD Rev.9/15/16 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority,a Notary Public in the state and county aforesaid, on this day Personally appeared Brock I luggins,President of Conatscr Management Group,Inc., general partner of go r 'onslruction TX.LI',known to me to be a credible person,who being by me duly sworn,upon his oath deposed and said: Thal till persons, fines,associations,corporations or other organisations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth,has been paid in full;and That there we no claims pending for personal injury and/or property damages; On Contract described its: SENDERA RANCI I FAST,PHASE 23 WATER,SANITARY SEWER,DRAINAGE,PAVING,AND STREET LIGFIT IMPROVEMENTS DOEM N/A CIrA PRJ M 20.0034 CITY PROJECT M 102553 CITY OF FORT WORTH STATE OF TEXAS CONATSIM CONSTRUCTION TX,1.11 rock Huggi Subscribed and swum to before me this 11 day of Decer ber,2021 ��trieROERtO Notary Public in Tarrant ounty,'1'cxas ' ..apnas..nr.rrw c:,.raMOYrsruas �1�� 1.ut✓c ra ln)1)lua dONSENT OF OWNER ID SURETY COMPANY ARCHITECT CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document 0707 Bend No 0232102 PROJECT: (name,address)Sende�a Ranch Lest,Phase 23 Fort Zrth,TX TO(Owner) ICITY OF FORT WORTH AND LENNAR WWFS OF ARCHITECT'S PROJECT NO: CFA 200034 TFrtAS(AND AND CONSTRIJCTJON.LTD. CONTRACT FOR: o 1707 Merkstplen Blvd,,Soto top Wide,Sa_ Isry So r,Dmi 21e'Pivoo,and Susel Lghtaq rw Senders R.rwn L""a 75063 J CONTRACT DATE: CONTRACTOR:CONATSER CONSTRUCTION TX,L P In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the owe Nwn—e end dddnu or sum cempNYl BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwkh CT 06M ,SURETY COMPANY on bond Of m.n hssrt nme eM.dd.w o1 cam.ctvt CONATSER CONSTRUCTION TX,LP. 5327 Wichda St Fc1 Worth TX 76115-W35 ,CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relicve the Surety Company of any of its obligations to ih..Ian—a oo&—ei one») CITY OF FORT WORTH AND LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION,LTD. 1707 Marketolace Blvd,Suite 100 Irving TX 75M ,OWNER, as set forth in the said Surety Company's bond. IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 30th day of Ncvember,2021 BERKLE'Y INSURANCE COMPANY Surety Company Attest: (Sea,): Signature of Authorized Representative Rmbl Mc,ales Attornei�n•Fart Title NOM TV*1—4 to be mod oe•Woven"eeWW*to AAA DOCURRE T 0706.CONTRACTOR-S AFFIDAVIT OF PAYMENT Or MTS AND Cuss. Cunt E6Len ONE PAGE