HomeMy WebLinkAboutContract 51009-A3 CSC No.51009-A3
AMENDMENT No.THREE
TO CITY SECRETARY CONTRACT No. 51009
WHEREAS, the City of Fort Worth (CITY) and Wier & Associates, Inc. ,
(ENGINEER) made and entered into City Secretary Contract No. 51009, (the
CONTRACT) which was authorized by M&C C-28764 on the 26th day of June, 2018
in the amount of $225, 000 . 00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
One in the amount of $574, 237 . 00 which was authorized by M&C 20-0232 on
May 27, 2020, and Amendment Number Two in the amount of $62, 482 . 00 which
was administratively authorized on March 24, 2021; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Golden Triangle Boulevard (from approximately 500 feet Northeast
of Misty Redwood Trail to I-35W) , CPN 101013; and
WHEREAS, it has become necessary to execute Amendment No. Three to
the CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $7, 263 . 00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $868, 982 . 00.
City of Fort worth, Texas OFFICIAL RECORD
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 CITY SECRETARY
Page 1 of 4
FT. WORTH, TX
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City' s
designated Assistant City Manager.
APPROVED:
City of Fort Worth ENGINEER
Wier & A o
Ama LGdahWe�O
Dana Bur�27,2�4:36 CST)
Dana Burghdoff, AICP Ca o Silvestri, P.E.
Assistant City Manager President
DATE : Dec 27,2021 DATE: 12 Ar Zd Z
APPROVAL RECOMMENDED:
Wj(Dec 23,202 09:50 CST)
William Johnson
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
Leon Wilson, Tn
Leon Wilson,Jr.(Dec 21,202108:10 CST)
Leon Wilson, Jr. , P.E .
Senior Professional Engineer
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Golden Triangle Boulevard
Prof Services Agreement Amendment Template CPN 101013
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
WV, Date : N/A
DBlack(Dec 27,202113:58 CST)
Douglas W. Black
Assistant City Attorney
ATTEST:
a
'7 0 0001 000 �
o
Tgnnette S. Goo�lgll #o °0
Jannette S.Goodall(Dec 28,202106:59 CST) O
d O °
Jannette Goodall o
o °
City Secretary �� °00000000 a
��nEXAS.oAp
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Golden Triangle Boulevard
Prof Services Agreement Amendment Template CPN 101013
Revision Date: November 23, 2021
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 51009
Amendment No. Three
Department Fund-Account-Center Amount
TPW 39008-0060419-5330500-101013-002330 $7, 263. 00
Total: $7, 263 . 00
City of Fort Worth, Texas Golden Triangle Boulevard
Prof Services Agreement Amendment Template CPN 101013
Revision Date: November 23, 2021
Page 4 of 4
VNIER & ASSOCIATES, INC.
V//At ENGINEERS
SURVEYORS
LAND PLANNERS
P
July 8, 2021 JOHN P. WIER, P.E., R.P IL.S.
ULYS LANE III, P.E., R.P.L.S., CFM
CARL❑ SILVESTRI, P.E.
GREGG MADSEN, R.P.L.S.
RANDALL S. EARDLEY, P.E.
SENIOR ASSOCIATES
PHILIP L. GRAHAM, P.E.
Mr. Chad Allen, P.E. PRIYA ACHARYA, P.E.
City of Fort Worth ASSOCIATES
Transportation & Public Works Department T❑BY W. RODGER
CASEY D. YORK
200 Texas Street
Fort Worth, Texas 76102
Via Email to: Chad.Allenfortworthtexascov
RE: W&A#17011: CONTRACT AMENDMENT NO. 3; CITY CONTRACT NO. 51009;
GOLDEN TRIANGLE BOULEVARD (FROM 500' NE OF MISTY REDWOOD
TRAIL TO I.H. 35-W), CITY OF FORT WORTH, TEXAS
Dear Mr. Allen:
The contract for engineering services related to City Contract No. 51009 was
authorized by M&C No. C-28764 on June 26t", 2018 for the design of a Roundabout
Intersection at the approximate location of the existing Golden Triangle Boulevard /
Harmon Road "T" intersection. This contract was amended on May 27, 2020 to delete
the roundabout, alter the alignment to follow the right-of-way dedications of the R&S Miller
Family Addition and include design of the entire roadway from approximately 500'
northeast of the Misty Redwood Trail intersection to I.H. 35W. The contract was further
amended in March, 2021 to prepare a revised 30% design to alter the street sections
between the Harmon Road intersection and I.H 35W. It is now our understanding that
the city is requesting that a Traffic Signal Warrant Study be performed for the intersection
of Golden Triangle Boulevard and Golden Heights Road.
Wier & Associates, Inc. requests that our design services contract be modified as
follows in accordance with the attached Amendment 3 Level of Effort spreadsheet:
Base Design Services fee stated in our contract be modified by an increase of
7$ ,263.00 to a total of$868,982.00 for performing the requested Traffic Signal Warrant
Study.
Very truly yours,
Philip Graham, P.E.
Senior Associate
2201 E LAMAR BLVD., SUITE 200E, ARLINCTON, TEXAS 76006 (B17) 467-7700 FAX (B17) 467-7713
TEXAS ENGINEERING FIRM NO. F-2776 WWW.WIERAs SOCIATES.COM • TEXAS LAND SURVEYING FIRM NO. 10033900
#!
ƒ) } } } }\\\\\�/\
lo
Q 2 a e a
)
)
n ) § / K
) } e !
_ � )
E � u § /
R � ƒ 0 °
\ § kE §= k °
E _/
� R \2 4
__ $ �- �
c -2
m
) « $ _
m ® 0a R
2 m & f77 ; �
�
& £ -
k
d
-
{ §)\ \
w ]))
f\} §\
\\