Loading...
HomeMy WebLinkAboutContract 51009-A3 CSC No.51009-A3 AMENDMENT No.THREE TO CITY SECRETARY CONTRACT No. 51009 WHEREAS, the City of Fort Worth (CITY) and Wier & Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 51009, (the CONTRACT) which was authorized by M&C C-28764 on the 26th day of June, 2018 in the amount of $225, 000 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number One in the amount of $574, 237 . 00 which was authorized by M&C 20-0232 on May 27, 2020, and Amendment Number Two in the amount of $62, 482 . 00 which was administratively authorized on March 24, 2021; and WHEREAS, the CONTRACT involves engineering services for the following project: Golden Triangle Boulevard (from approximately 500 feet Northeast of Misty Redwood Trail to I-35W) , CPN 101013; and WHEREAS, it has become necessary to execute Amendment No. Three to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $7, 263 . 00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $868, 982 . 00. City of Fort worth, Texas OFFICIAL RECORD Prof Services Agreement Amendment Template Revision Date: November 23, 2021 CITY SECRETARY Page 1 of 4 FT. WORTH, TX 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. APPROVED: City of Fort Worth ENGINEER Wier & A o Ama LGdahWe�O Dana Bur�27,2�4:36 CST) Dana Burghdoff, AICP Ca o Silvestri, P.E. Assistant City Manager President DATE : Dec 27,2021 DATE: 12 Ar Zd Z APPROVAL RECOMMENDED: Wj(Dec 23,202 09:50 CST) William Johnson Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . Leon Wilson, Tn Leon Wilson,Jr.(Dec 21,202108:10 CST) Leon Wilson, Jr. , P.E . Senior Professional Engineer OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Golden Triangle Boulevard Prof Services Agreement Amendment Template CPN 101013 Revision Date: November 23, 2021 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: M&C: N/A WV, Date : N/A DBlack(Dec 27,202113:58 CST) Douglas W. Black Assistant City Attorney ATTEST: a '7 0 0001 000 � o Tgnnette S. Goo�lgll #o °0 Jannette S.Goodall(Dec 28,202106:59 CST) O d O ° Jannette Goodall o o ° City Secretary �� °00000000 a ��nEXAS.oAp OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Golden Triangle Boulevard Prof Services Agreement Amendment Template CPN 101013 Revision Date: November 23, 2021 Page 3 of 4 FUNDING BREAKDOWN SHEET City Secretary No. 51009 Amendment No. Three Department Fund-Account-Center Amount TPW 39008-0060419-5330500-101013-002330 $7, 263. 00 Total: $7, 263 . 00 City of Fort Worth, Texas Golden Triangle Boulevard Prof Services Agreement Amendment Template CPN 101013 Revision Date: November 23, 2021 Page 4 of 4 VNIER & ASSOCIATES, INC. V//At ENGINEERS SURVEYORS LAND PLANNERS P July 8, 2021 JOHN P. WIER, P.E., R.P IL.S. ULYS LANE III, P.E., R.P.L.S., CFM CARL❑ SILVESTRI, P.E. GREGG MADSEN, R.P.L.S. RANDALL S. EARDLEY, P.E. SENIOR ASSOCIATES PHILIP L. GRAHAM, P.E. Mr. Chad Allen, P.E. PRIYA ACHARYA, P.E. City of Fort Worth ASSOCIATES Transportation & Public Works Department T❑BY W. RODGER CASEY D. YORK 200 Texas Street Fort Worth, Texas 76102 Via Email to: Chad.Allenfortworthtexascov RE: W&A#17011: CONTRACT AMENDMENT NO. 3; CITY CONTRACT NO. 51009; GOLDEN TRIANGLE BOULEVARD (FROM 500' NE OF MISTY REDWOOD TRAIL TO I.H. 35-W), CITY OF FORT WORTH, TEXAS Dear Mr. Allen: The contract for engineering services related to City Contract No. 51009 was authorized by M&C No. C-28764 on June 26t", 2018 for the design of a Roundabout Intersection at the approximate location of the existing Golden Triangle Boulevard / Harmon Road "T" intersection. This contract was amended on May 27, 2020 to delete the roundabout, alter the alignment to follow the right-of-way dedications of the R&S Miller Family Addition and include design of the entire roadway from approximately 500' northeast of the Misty Redwood Trail intersection to I.H. 35W. The contract was further amended in March, 2021 to prepare a revised 30% design to alter the street sections between the Harmon Road intersection and I.H 35W. It is now our understanding that the city is requesting that a Traffic Signal Warrant Study be performed for the intersection of Golden Triangle Boulevard and Golden Heights Road. Wier & Associates, Inc. requests that our design services contract be modified as follows in accordance with the attached Amendment 3 Level of Effort spreadsheet: Base Design Services fee stated in our contract be modified by an increase of 7$ ,263.00 to a total of$868,982.00 for performing the requested Traffic Signal Warrant Study. Very truly yours, Philip Graham, P.E. Senior Associate 2201 E LAMAR BLVD., SUITE 200E, ARLINCTON, TEXAS 76006 (B17) 467-7700 FAX (B17) 467-7713 TEXAS ENGINEERING FIRM NO. F-2776 WWW.WIERAs SOCIATES.COM • TEXAS LAND SURVEYING FIRM NO. 10033900 #! ƒ) } } } }\\\\\�/\ lo Q 2 a e a ) ) n ) § / K ) } e ! _ � ) E � u § / R � ƒ 0 ° \ § kE §= k ° E _/ � R \2 4 __ $ �- � c -2 m ) « $ _ m ® 0a R 2 m & f77 ; � � & £ - k d - { §)\ \ w ])) f\} §\ \\