Loading...
HomeMy WebLinkAboutContract 55428-CO1 CSC No.55428-COI FORT WORTH. City of Fort Worth ~"� Change Order Request Project Name North Riverside Drive Reconstruction,Shiver Rd to N Tarrant Parkway City Sec# 55428 Client Project#(s) 100453 Project Reconstruction of Roadway section of N Riverside Drive from two lanes to four lanes with the addition of shared use paths,improved drainage and Arterial Description improvements.Complete reconstruction of N Tarrant Parkway/N Riverside Dr intersection including signals and accessibility, Contractor McMahon Contracting Change Order# 1 Date Dec 16,2021 City Project Mgr. Bradley Radovich City Inspector Stan Sufferfield Dept. TPW Contract Time Totals (CD) Original Contract Amount $6,208,416.20 $6,208,416.20 430 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders(in M&C Process) Contract Cost to Date $6,208,416.20 $6,208,416.20 430 Amount of Proposed Change Order $0.00 $0.00 Revised Contract Amount $6,208,416.20 $6,208,416.20 430 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $0.00 $0.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $7,760,520.25 JUSTIFICATION(REASONS)FOR CHANGE ORDER Improvements to the traffic Control Plan for earlier completion and elimination of considerable low profile barrier from project.Unforseen obstacles uncovered during excavations including unmarked water services and an abandoned gas main.Differences between plan quantities and actual quantities primarily due to acceleration of bid process to bid with 30%plans for intersection.Acceleration of developer coordination with Behavioral Health development to make agreement that will reimburse City for the expenses incurred(estimated$51,955.25,including$17,651.81 for Water Tee and$34,303.44 for left turn lanes).Updates to Traffic Control based on feedback from stakeholders to improve flow and safety which included the addition of an additional crossover in the median West of N Riverside on N Tarrant Pwky.Improvements to signals for safety concerns upon field observation of detoured traffic. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name'l Contractor(Name MIIContract Signature McMahon Contracting James Proulx yz�1216Lm Dec 21,2021 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date �444-41— Dec 21,2021 ;a MrR; o¢a%°" Dec 21,2021 Program Manager Date Senior Capital Project Officer Date Wd"96 Dec 21,2021 a P Dec 21,2021 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date ie Dec 21,2021 Dec 23,2021 sistant City Attorney Date nt City Manager Date 8�5 Dec 23,2021 Dec 27,2021 oRo�z,,zo ouncil Action(drequired) M&C Number N/A M&C Date Approved N/A ATTEST: a�OR T��4 � s o 7�CG as`` a Ja nnette s.Gooda 11(Dec 28,202107:4 CST) OS�DOOOOOp0o Janette Goodall,City Secretary pro , dd 0 00 Pao �$��1d Pvo o=d d� o o*� OFFICIAL RECORD 0IV daa�rEXAoI 1z' CITY SECRETARY �tlnaao� FT.WORTH,TX FORTWORTH City of Fort Worth Ir- Change Order Additions Project Name North Riverside Drive Reconstruction,Shiver Rd to N Tarrant Parkway City Sec# 55428 ClientProject# 100453 Contractor McMahon Contracting PM Bradley Radovich Inspector Stan Sutterfield Change Order Submittal# O1 Date Dec 16,2021 AUUI I IONS Unit I UnitCostTotal oncre a avemen 22 nc assi ie xcavation by Plan Change Order Additions Page 2 of 6 one Pvmt Asphalt Grind and Overlay ur an utter U-TRetaining Wall x -Pedestrian Rail Valve BoxAdjustment> Class III TPT_ Headwall 30.1 Flume wide, u s x -net xYield Lines Pavement Marking wy Ilium Foundation TY 3,5,6,an Furnish/Install Lighting Fixture watt A 1132 Cobra ea 39.3 Furnish/Install way Ilium I Y I b Pole Furnish/Install Type 33A Arm on t 4-Sect Signal Headsm y Multi-Conductor a e Reconnect Conductor Signal Foundation Furnish/Install Signal Controller Furnish/Install - e oe Assembly Furnish/Install Ethernet Cable Furnish/Install amen Furnish/Install Modem with xtemaAntenna 97—Unclassified Excavation by Plan Change Order Additions Page 3 of 6 Glass water owenng Storm Junction Box onstmctwn etours ecesse net Relocate NB Signalpan(safety concerns) emp nveway DeveloperImprovements- xTee and Valve Developer Improvements-:e tum Lane addition Storm Sewer Cleanout TPW u ota lions Change Order Additions Page 4 of 6 FORTWORTH City of Fort Worth Ir- Change Order Deletions Project Name North Riverside Drive Reconstruction,Shiver Rd to N Tarrant Parkway City Sec# 55428 Client Project# 100453 Contractor McMahon Contracting PM Bradley Radovich Inspector Stan Sutterfiekl Change Order Submittal# O Date I Dec 16,2 DELL I IONS y Unit ni os o a oncre a Pavement oncre a Pavement oncre 7eDnveway Barrier Free Ramp,Type - emove Concrete Water Vault Gate Valvew au emoveStorm Line Glass Raised Marker KEFL Raised Marker I Y II-G-K 3-Sect ignal Head Assmbly MuitFuonductor Cable Insulated Eec Condr Bare Liec Uondr Seeding,Hydromulch Low Protile Gon BarrierRemoval on ruc an wance Construction Allowance Sub Totale e ions Change Order Deletions Page 5 of 6 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00