HomeMy WebLinkAboutContract 55428-CO1 CSC No.55428-COI
FORT WORTH. City of Fort Worth
~"� Change Order Request
Project Name North Riverside Drive Reconstruction,Shiver Rd to N Tarrant Parkway City Sec# 55428
Client Project#(s) 100453
Project Reconstruction of Roadway section of N Riverside Drive from two lanes to four lanes with the addition of shared use paths,improved drainage and Arterial
Description improvements.Complete reconstruction of N Tarrant Parkway/N Riverside Dr intersection including signals and accessibility,
Contractor McMahon Contracting Change Order# 1 Date Dec 16,2021
City Project Mgr. Bradley Radovich City Inspector Stan Sufferfield
Dept. TPW Contract Time
Totals (CD)
Original Contract Amount $6,208,416.20 $6,208,416.20 430
Extras to Date $0.00
Credits to Date $0.00
Pending Change Orders(in M&C Process)
Contract Cost to Date $6,208,416.20 $6,208,416.20 430
Amount of Proposed Change Order $0.00 $0.00
Revised Contract Amount $6,208,416.20 $6,208,416.20 430
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $0.00 $0.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $7,760,520.25
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Improvements to the traffic Control Plan for earlier completion and elimination of considerable low profile barrier from project.Unforseen obstacles uncovered during
excavations including unmarked water services and an abandoned gas main.Differences between plan quantities and actual quantities primarily due to acceleration of bid
process to bid with 30%plans for intersection.Acceleration of developer coordination with Behavioral Health development to make agreement that will reimburse City for
the expenses incurred(estimated$51,955.25,including$17,651.81 for Water Tee and$34,303.44 for left turn lanes).Updates to Traffic Control based on feedback from
stakeholders to improve flow and safety which included the addition of an additional crossover in the median West of N Riverside on N Tarrant Pwky.Improvements to
signals for safety concerns upon field observation of detoured traffic.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractor's Company Name'l Contractor(Name MIIContract Signature
McMahon Contracting James Proulx yz�1216Lm Dec 21,2021
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
�444-41— Dec 21,2021 ;a MrR; o¢a%°" Dec 21,2021
Program Manager Date Senior Capital Project Officer Date
Wd"96 Dec 21,2021 a P Dec 21,2021
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
ie Dec 21,2021 Dec 23,2021
sistant City Attorney Date nt City Manager Date
8�5 Dec 23,2021 Dec 27,2021
oRo�z,,zo
ouncil Action(drequired)
M&C Number N/A M&C Date Approved N/A
ATTEST: a�OR T��4
� s o 7�CG as`` a
Ja nnette s.Gooda 11(Dec 28,202107:4 CST) OS�DOOOOOp0o
Janette Goodall,City Secretary pro , dd
0 00
Pao �$��1d
Pvo o=d
d� o o*� OFFICIAL RECORD
0IV
daa�rEXAoI 1z' CITY SECRETARY
�tlnaao� FT.WORTH,TX
FORTWORTH City of Fort Worth
Ir- Change Order Additions
Project Name North Riverside Drive Reconstruction,Shiver Rd to N Tarrant Parkway City Sec# 55428
ClientProject# 100453
Contractor McMahon Contracting PM Bradley Radovich Inspector Stan Sutterfield
Change Order Submittal# O1 Date Dec 16,2021
AUUI I IONS
Unit I UnitCostTotal
oncre a avemen
22 nc assi ie xcavation by Plan
Change Order Additions Page 2 of 6
one Pvmt
Asphalt Grind and Overlay
ur an utter
U-TRetaining Wall
x -Pedestrian Rail
Valve BoxAdjustment>
Class III TPT_
Headwall
30.1 Flume wide, u s
x -net
xYield Lines
Pavement Marking
wy Ilium Foundation TY 3,5,6,an
Furnish/Install Lighting Fixture watt A 1132 Cobra ea
39.3 Furnish/Install way Ilium I Y I b Pole
Furnish/Install Type 33A Arm
on t
4-Sect Signal Headsm y
Multi-Conductor a e
Reconnect Conductor
Signal Foundation
Furnish/Install Signal Controller
Furnish/Install - e oe Assembly
Furnish/Install Ethernet Cable
Furnish/Install amen
Furnish/Install Modem with xtemaAntenna
97—Unclassified Excavation by Plan
Change Order Additions Page 3 of 6
Glass
water owenng
Storm Junction Box
onstmctwn etours
ecesse net
Relocate NB Signalpan(safety concerns)
emp nveway
DeveloperImprovements- xTee and Valve
Developer Improvements-:e tum Lane addition
Storm Sewer Cleanout
TPW
u ota lions
Change Order Additions Page 4 of 6
FORTWORTH City of Fort Worth
Ir- Change Order Deletions
Project Name North Riverside Drive Reconstruction,Shiver Rd to N Tarrant Parkway City Sec# 55428
Client Project# 100453
Contractor McMahon Contracting PM Bradley Radovich Inspector Stan Sutterfiekl
Change Order Submittal# O Date I Dec 16,2
DELL I IONS
y Unit ni os o a
oncre a Pavement
oncre a Pavement
oncre 7eDnveway
Barrier Free Ramp,Type -
emove Concrete Water Vault
Gate Valvew au
emoveStorm Line
Glass
Raised Marker
KEFL Raised Marker I Y II-G-K
3-Sect ignal Head Assmbly
MuitFuonductor Cable
Insulated Eec Condr
Bare Liec Uondr
Seeding,Hydromulch
Low Protile Gon BarrierRemoval
on ruc an wance
Construction Allowance
Sub Totale e ions
Change Order Deletions Page 5 of 6
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00