HomeMy WebLinkAboutContract 55431-CO1 CSC No.55431-COl FORT WORTH. City of Fort Worth ~"� Change Order Request Project Name North Hill Lane and Greenfield Road Drainage Improvements City Sec# 55431 Client Project#(s) CPN 102974 Project Installation of Storm Drain and Repaving of North Hill Lane and Greenfield Road along with related utility adjustments and grading work. Description Contractor Reliable Paving,Inc. Change Order# 1 Date 12/15/2021 City Project Mgr. Michael Wellbaum City Inspector Eddie Walker Dept. TPW Contract Time Totals (CD) Original Contract Amount $925,172.88 $925,172.88 120 Extras to Date $0.00 0 Credits to Date $0.00 0 Pending Change Orders(in M&C Process) S0.00 0 Contract Cost to Date $925,172.88 $925,172.88 120 Amount of Proposed Change Order $99,159.70 $99,159.70 85 Revised Contract Amount $1,024,332.58 $1,024,332.58 205 Original Funds Available for Change Orders $131,639.12 $131,639.12 Remaining Funds Available for this CO $131,639.12 $131,639.12 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 10.72% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,156,466.10 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order provides for regrading and adding driveway culverts to the south side of North Hill Lane and addresses flooding concerns by residents.The initial design survey with one-foot contours indicated the area along the south side of North Hill Lane drained to the south.Driveway culverts had silted over the years to the point that none were visible or discovered by survey.Rain during construction and interviews with residents confirmed the roadside flooding and maintenance problems with silted and buried driveway culverts.These issues will be corrected with this change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor(Name Contract Signature Date Reliable Paving,Inc steven lancaster L.rie,coe o o Dec 20,2021 nspector/Inspection Supervisor Date Project and Contract Compliance Manager Date Dec 20,2021 717 Dec 20,2021 Program Manager Date Senior Capital Project Officer Date %^gaY a^9 Dec 22,2021P Dec 22,2021 Assistant Director(Dept) Date Director,Contracting Department(Dept) jm Date _---------- Dec 22,2021 Dec 23,2021 Assistant City Attorney Date nt City Manager Date „kip b,zo Dec 23,2021 �o Dec 27,2021 Council Action(drequired) M&C Number N/A M&C Date Approved N/A ATTEST:�acette S. �aa4pnn� J­ettes.eoodau(Dec 28,zono7:oaCST) �p0�FORr �a p *.. 00000 Jannette Goodall,City Secretary ��o° 0Po oo o ° OFFICIAL RECORD o6000000000 a daaz'rEXpSgod CITY SECRETARY ��naab� FT.WORTH,TX FORTWORTH City of Fort Worth V11- Change Order Additions Project Name North Hill Lane and Greenfield Road Drainage Improvements City Sec# 55431 ClientProject# CPN102974 Contractor Reliable Paving,Inc. PM Michael Wellbaum Inspector Eddie Walker Change Order Submittal# O1 Date 12/15/2021 AUUI I IUN5 Unit ni os o a Unit -TPW Stormwater Unclassitied Excavation by Plan -7-3124.0101 Embankment y Plan Temporary Asphalt Pvmt Repair,Residential(b'Wide)(21Ton Block o acement t.Augustine or Bermuda) Waterline Lowering Water Service,Meter Reconnection Water Service ap tor New Service and Plug Existng i ap ewer pipe rattic Control Construction Staking Unit 2-TPW Share - Remove Concrete Drive Remove Asphalt Drive - oncrete nveway - pat Unveway -77—9999.UUUU Modity and Relocate Sprinkler Systems ots - inspections ee s - Mobilization or Additional Work) - --V=- 9999.UUUU Allowance tor Additional Irrigation/Backflow Preventor 77W— TPVV Sub TotaJlions Change Order Additions Page 2 of4 FORTWORTH City of Fort Worth Ir- Change Order Deletions Project Name North Hill Lane and Greenfield Road Drainage Improvements City Sec# 55431 Client Project# CPN 102974 Contractor Reliable Paving,Inc. PM Michael Wellbaum Inspector Eddie Walker Change Order Submittal# O Date DELL I IONS y Unit ni os o a Temporary Asphalt PvmtRepair,Residential(4 vvide o Seeding,Hydromulch ewer ipe Construction Allowance Pre-CU I v inspection Gonstruction Allowance Sub Totale e ions Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00