Loading...
HomeMy WebLinkAboutContract 41462-A1 AMENDMENT NO. i TO COMMUNITY FACILITIES AGREEMENT STATE OF TEXAS § CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT § AUTHORIZING M&C NO. WHEREAS, the City of Fort Worth (City) and Texas Health Resources (Developer) entered into a Community Facilities, Agreement, City Secretary Contract No. 41462 ("CFA"); and - WHEREAS, it has become necessary to execute Amendment No. I to the CFA to allow City participation in an amount of $72,515.96 for the City's portion of costs associated with construction, inspection, and material test-Ing of the 16-inch water main contemplated by the CFA; and, WHEREAS, the City Council authorized execution of Amendment No. I to the CFA on the 7th day of August, 2012 via M&C C-25769. NOW TUEREFORE, City and Developer, acting herein by and through their duty authorized representatives, enter into the following agreement, which amends the CFA: I. Cost Summary Table is amended to be and read: Developer Cost ciq--gor �t Total Cost A. Walter and Sewer Construction 1. Water $ 197,9198.50 $ 55�1,781-50 $ 2531780.00 2. Sewer $ 37,846.00 $ - $ 37,846.00 Total Construction $ 2351844.50 $ 551781-50 $ 2911626-00 With 25%Cqqpg��pq $ 235)844.50 $ 69 726-88 $ 3051571.38 y— Construction Fees,— B. 1�1§paction Fee(2,%)_. $ 41716.89 $ 11394154 $ 61111.43 C. Material Testing Fq� 20/9) ,. $-". 47716.89 $ 113914.54 $ 61,1111.43 Construction Fees Su 'Total $ 93433.78 $ 21789.08 $1 12)222.86 Total Water and Sewer Project $ 2,7828 $ 11 Cost 245 1 . 72 615.96 $ 31171794.24 The costs stated herein may be based upon construction estimates rather than actual cost. The City's portion of inspection and material testing fees are directly allocated to the City's, accounts, for charges, and does not reimburse the Water Inspection and Material Testing Fees, to the developer. The City's participation estimate shall be based upon unit prices contained in City of Fort Worth Ordinance No., 19192 approved on 6/22/2010 (or by public bid). The City's cost participation shall be in an amount not to exceed $72,515-96 ("Parti cipat ion"), but the reimbursement of the Participation (excluding inspection, and material testing fees) is not a lump sum amount and may be less, than stated above depending upon actual quantities from the Notice of Final Completion package ('Green sheet") and, unit prices from the construction contract document and Green sheet but not to exceed the unit prices contained in the City of Fort Worth Ordinance OFFICIAL RECORD , 0 L REC'ORD AMENDMENT NO.I 2O I 5 y RECEIVED MAR CITY SECREITARY Texas Health Resources Harris M' thod'ist Alliance Page 1 of 3 0 TH 0 TX FTs WORTHo TX R RIE C E I D MAR WATER COST SHARE(The Developer pays for 12-inch water line, the City pays for a difference between 1.2-inch and 16-inch) 1211/16 11 16 Difference It Un 121"Unit Unit or 1 m Diescri tin it Q Price Price Percentage Total Price I 16ti waterline LF 1131 $38.00 $53.00 $15.00 $191,650.00 E $8,1768. 2 16111 gate valve A 4 $17587.00 1.001 $28,724,00 T $69330. 3 Fittu'%s N 2 $31600.00 010 $2,7'30.1010 $514601.00, U 4 Traffic control LF 432 $15.00 $15.00 $3.7'5 $1 fi20.00 5 Trench safety LF 1 1�310 $1.00 $1,00 $0.25 $327.5 Totai Note: The traffic control and trench safety is calculated as follows: 16-12/16=25%. 2. All other provisions of the CFA, which are not expressly amended herein,, shall remain in full force and effect,. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) AMENDMENT O.1 Texas Health Resources Harris Methodist Alliance Page 2 of 3 .............. ...... ....... .................... aid EXECUTED on this th -day of' 2444 in Fort Wort Tarrant County, Texas. CITY OF FORT WORTH DEVEL ER Texas Ith Res ' 7F&WAAJ�&J'al fr 10104ravefflof et. Fernando Costa B r*1 an Assistant City Manager ate; �, to Recommended by: Transportation& Public Works Department NA Director "mater De artmt(A., Wendy Chi Babulal, E BA, P.E. S. Frank Crumb, P.E. Water Dev lopmen.t Engineen*ng Manager Water yep m ni.t Director A ro . .s to Form & Legality: ti g/ 0, i5oug s W. B � . Assistant City Attorney 7, 6�. __L-2`2__ Y.m ATTEST, + ................. ye r 0 . Mary City Secret/ry 00000,15 Ir OFFICIAL RECORD FFIC CITY AMENDMENT NO.1 WORTH,TX Texas Health Resources Harris Methodist Alliance Page 3 of 3 ��.�.,,,o� �� .,., i i C Fokt WORTH IO Age—/, ?', l 1 , 7 1, /1.1 / k /. 1. r ./.. i ,.- �,.- ✓ .i is , i e F ��, Imam loom=" DATE: 8/7/2012 REFERENCE NO.:**C-25769 LOG NAMEns 06THR HARRIS METHODIST ALLIANCE GOLDEN TRIANGLE CODE: C TYPE: CONSENT PUBLIC HEARING:NO SUBJECT: Authorize Execution of Amendment No. 1 to Community Facilities Agreement City Secretary Contract Flo.41462 with Texas Health Resources and Authorize City Participation in the rnolu�nt of$72,515.916 for the Construction of a Sixteen-Inch Water Klein to Serve Texas Health resources Harris Methodist at Alliance(COUNCIL DISTRICT 2' olll RECOMMENDATION. it is recommended that the City Council authorize the execution of Amendment rho. 1 to City Secretary Contract No. 4,1462, e , Community Facilities Agreement with Texas Health Resources,to,add City participation in the amount of$72,515..96 for the construction of a 16-inch water mein to serve Texas Hearth Resources Harris Methodist at Alliance. , r DISCUSSION. * w Texas Health Resources, the developer of Taxes Health Resources Herres Methodist Ilienoe-, has executed a contract for Community Facilities,agreement(CFA)to serve e development located in Fort'forth (see attached map) (City Secretary Contract viol. 41462). This Amendment Igo. 1 provides for City participation in the,amount of$x"2 515.86. Total construction cost for wader improvements for this development is$317,794.24. There is City participation for the construction of a 16-inch water mein that °ill improve service to the Texas Health Resources Harris Methodist at Alliance and surrounding urea. The Developer estimated costs for water and sewer improvements are subject to,construction inspection and material testing fees. Cost Summary Table. Developer Cost Ciitly Cost Total Cost A. 'dater and Sewer Construction . 1. Water $ 197998.50 $ 551781.50 $ 253,780.010 2. Sewer $1 371846.00 $ - $ 3171 46.00 Total Construction $1 351844.50 $ 551781.50 $ 2�91162 .00 With 25 percent Contingency $ 235,844.50 $ 691726.88 $ 305,571.3 Construction Fees:. B. Inspection Fee(two percent) $ 4716.89 $ 1 1394.54 6,111.43 C. Material Testing Fee(two percent) $ 41716-891 $ 1,394.54 $ 61111.43 Construction Fees Sub-Total $I 91433.781 $1 21789.08 $ 1 2,222.86 Total Water and Sewer $ $ Project Cost 214512788.28 729515m961 $ 317,794m24 This project i's located in C,OUi CI�L DISTRICT 2, Maplsco 21 L and 21 Q. http://app,s.cfwnet.org/coun,cil�-pla, c t/ c-revie .asp?I 17107&coup ild i e 8/7/20,12 2)[08/17/201 1:53:01 PM] a o''Fz '-.R,*e vie w V' 01 FISCAL INFORMATION/CERTIFICATION. The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Project Fund. TO Fu,n,d/Accolun::t/Centers FROM F!un�d�/Account/Cein�ters P265 539140 602150163083 $691,726-88 P265 531350 602'11 1 630185 $11394.54 P265 531200 602150163084 $11394.54 Subm'ftted for Oit Mangy q es Office by.w Fernando Costa(6122) Orig inert*lng Department Head: Randle Harwood (61 01) Addit'lonal Informatil'on Contacts, Jana Knight(2025) Viesha. Kaminska (842�8) ATTACHMENTS THR Harris Alliance CFA Exhiblit, df http://apps.cfwnet.org/council_packet/'mc_review.asp?ID=17107&councildate=8/'7/2,012(2 of'2)[08/17/2012 1:S3:01 PM] F`,;pp1 1"Ail I" 1 q G FoIRTWO,RT'H i ° , ,�a A,��F''��.I��I a H, �!�����,r a��.�,��TH R H o �ti M e hod 1 �t I I n ,i e � � ," 'EG E [ Eau.e .r, F,."'�� ."�..�,fi N„�,r..:�., .f1 4...�. 1.r P „ �. wr+a� `;r r} .�iw {-:;,4 9 4 �,t r A i,c I k r"x UH a J�' C f'R�"`o u ;� J° r Tfr' "r� �.,N L 1 T im r J w " " .,....,.. s„ .,,„w ........, .... n �' At✓.i� � VV'�f'%f �f� t � '� 9 .. V NromlH�ur JV1,�.. �S d'"":"''dMU R, ukVNi^D"r'i - ....,. mF, "a +� �a V j N p TR J "u'u� � ,I fiI i I , l � ) I� r� y ¢k`' �3 oa m. v M � v 'S i.�uNME1' q,9,N' ry a'<k .''9w CD .drrr„ dWdtu�HW a Pi en "� �y e THERN CRC'S r w w ✓ ` °a� " CL 4 1 Wd 0 m �. [ I r i 1 t , f u� I - � w �0 �n� X m 0 L) 0 dim "a r k I Irm IIIIYi!V41!'''. :,., /mro�w' , /u„ w r �,:��„ I, l Cr ` �v. W r � I/; " 41Nk .t r, C 0 Y a� ��0� u * W d ' Sri ' r.. � ''� � :4 Cr L, " "`' � ; / j l g� r/i i „, / o,, rr ' f W�A 000461011 ;,,/,, �� s- �ii:/��// ,,r; /��// /,'.., ,✓, ,�,.. Graf ,; �r a�% ,✓ �, „.,' r„ ii. too v, ate° gv l ri/ I / ©i Irk r� !hn "r/i 6 1l / 1. /r H, r;, / ;; '> '�, ;,,- � r,. �/�l%�� f��� %ll///%/%% .�'�,�uAnV.Y".amk%�'?,�:J�" �� r „'.. ,: „i /„ ,u, ...., ... � "' .r y � � %% .....,, ai l 11111 i r u^Mµ IC MANNI CL 1 rr„ Mu �wr i�aife x ,,,y% ✓qyv, ei,;, �,/ i, � ,,,,-„ �,,,,,,, „. �,; „" :,! i, �, ✓ iw!'I:�i ., 41"'bL Pu':.YIC� I / of r RRANT q-, P1,/ �/ H Wes.,, Ij�" ,�, ,',' ,!; ,,,IN y s r i r /, / j //ice psi *4,a k ,./l/r/i I i 7 y I 77 77 ,.iii ,/v,:���.r, ,,,�„, ,� ,%%� ;, r�%/r 77 ,,,;-, r/ ii-..i i „/� //i/%. a,J� %G s/ ✓d aw, i r I ... Leuvild 0 u pop; 40 V 01 0) r t-f to ro e 1 Water Line wW THR Harris Methodist o lliance �ll, 0 o 5 W5 00 16,5010 22,000 NA D1983 StaltePlane Texas North Central TIPS 4202 Feet Feet