HomeMy WebLinkAbout2021/11/09-Attachments-M&C 21-0849City of Fort Worth, Mayor and Texas Council Communication DATE: 11/09/21 M&C FILE NUMBER: M&C 21-0849 LOG NAME: 20PARKER HENDERSON ENG AMEND 6 SUBJECT (CD 5) Authorize Execution of Amendment Number 6 in the Amount of $29,320.00 with Bridgefarmer & Associates, Inc. for the Parker -Henderson Road Construction Project from Mansfield Highway to Martin Street for a Revised Contract Amount of $1,194,821.45 RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment Number 6, in the amount not to exceed $29,320.00 to City Secretary Contract Number 44165 with Bridgefarmer & Associates, Inc., thereby increasing the total contract amount to $1,194,821.45 (City Project No. C01419). DISCUSSION: The 2008 Capital Improvement Program allocated funds for the reconstruction of Parker Henderson Road from Mansfield Highway to David Strickland Road with the construction of sidewalks from David Strickland Road to Martin Street. An Engineering Services Agreement, City Secretary No. 44165 with Bridgefarmer & Associates, Inc. ("Consultant'), was authorized for the design of the project that included full concrete reconstruction of the roadway from Mansfield Highway to Prairie Dog Creek, a new bridge at Prairie Dog Creek and sidewalks from the new bridge to Martin Street. Amendment No. 6 provides compensation to the Consultant for the following services: Subsurface Utility Engineering (SUE) was not included in the scope of services under Amendment No. 4 when the Prairie Dog Creek culvert was redesigned in order to expedite finalizing the design and bidding the project. During construction of the Prairie Dog Creek culvert, a private water line and various franchise utilities were encountered during excavation that would typically be discovered during the utility exploration for the Subsurface Utility Engineering. Once discovered, these utilities had to be coordinated with the franchise companies for relocation and while doing so, the construction of the culvert had to be halted. The Consultant expended additional hours in construction services by attending onsite meetings with the franchise utilities and answering questions regarding the relocations. The Consultant was advised by the City to redesign the retaining walls of the culvert in order to avoid gas meters and cable boxes near the retaining walls. The redesign allowed the City to continue work on the culvert and stay on schedule. The following table summarizes previous contract actions and amendments: M&C Amount Justification Number Date Initial Contract $39,300.00 Conceptual Design of Parker NA 2/13/2013 Henderson Road from Mansfield Highway to Martin Street Amendment No. 1 $393,767.65 Final Design Plans C-26422 1/26/2010 Amendment No. 2 $131,637.20 Subsurface Utility Investigations, C-26846 7/22/2014 Additional Geotechnical Investigations, Right-of-way Surveys and Exhibits Amendment No. 3 $39,740.00 Waterline Design Revisions NA 8/8/14 Amendment No. 4 $478,620.00 Revision of project scope to C-28035 12/13/2016 maintain project within $4.7 million and design box culverts over Prairie Dog Creek Amendment No. 5 $82,436.60 Hydraulic analysis for the NA 3/6/2020 esign of Prairie Dog Creek to iinate unsightly failed check n downstream of the posed culverts and maintain is of grading per wetland gation ment No. 6 1 $29,320.00ISee above I This M&C Contract Total 1 $1,194,821 The funding for this project is shown in the following table: Fund Existing Appropriations Amount this Total M&C 2008 Street Improvements $7,817,807.28 $0.00 $7,817,807.28 Fund (39407) 2018 Bond Program Fund $2,000,000.00 $0.00 $2,000,000.00 (34018) Stormwater Capital Projects $199,428.10 $0.00 $199,428.10 Fund(59651) W&S Capital Projects Fund $1,119,502.00 $0.00 $1,119,502.00 (56002) Water Capital Projects Fund $201,336.49 $0.00 $201,336.49 (59601) Project Total $11,338,073.87 $0.00 $11,338,073.87 The project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated in the Street Improvements 2008 Fund for the Parker -Henderson Road Mansfiel project to support the approval of the above recommendation and execution of the amendment to the contract. Prior to any expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds. Submitted for City Manager's Office b� Dana Burghdoff 8018 Originating Business Unit Head: William Johnson 7801 Additional Information Contact: Monty Hall 8662