HomeMy WebLinkAbout7. University Drive Improvement ProjectsUniversity Drive Improvements
Phases I and II
Presented to the City Council
By the Transportation and Public Works Department
June 8, 2021
Purpose
Provide an update on corridor improvements along University Drive
Phase I –West Rosedale Street to Riverfront Drive
•Scope
•Budget
•Schedule
Phase II –Trail Drive to West Rosedale Street
•Scope
•Budget
•Schedule
2
University Drive Corridor
4
Trail Drive to Cantey Street
PHASE IUniversity Dr S University DrPHASE II FUTURE PHASE Cantey StNorth
Project Need
•Traffic/pedestrian safety decline over
years
•Car-centric facility –Improvements
needed to enhance alternative
mobility
•Aesthetically not representative of
gateway to cultural landmarks
•Inadequate signage to attractions,
trails and other amenities
5
Phases I and II
•Projects have similar scopes
•Focus is on improving safety, enhancing alternative modes of transportation,
signage and aesthetics
•Neither phase intends to reconstruct or widen the existing pavement
Phase I –2018 Bond funds................$4 million
Phase II –Federal Funds...................$10.1 million
6
Phase I Limits
7
S. University Drive –W. Rosedale Street to Riverfront Drive
S UNIVERSITY DRIVE
North
S. University Drive –Phase I
Existing Conditions
8
UNIVERSITY DRIVE
North
Phase I Scope
Improve pedestrian safety by adding/
removing crosswalks at intersections and
provide traffic signal at Collinsworth St.
9
Improve traffic safety by adding medians
Incorporate aesthetic improvements in
median and at crosswalks S UNIVERSITY COLLINSWORTH
North NorthStreet Lights
Phase I Scope -continued
10
•Improve bike/pedestrian
connections to Trinity River
trail system and provide
safer crossing on
Old University Drive
•Add parking and bike lanes
along Old University Drive
connecting to Trinity Trails
•Extend sidewalks to fill existing
gaps to connect to Trinity trails
•Reroute pedestrians to safer
Old University connections by
signing sidewalk closures at
Rosedale overpass
North
Improve bus stop facilities to make
ADA compliant and to facilitate
installation of shelters by Trinity Metro
11
Phase I Scope -continued
Add roadway directional and
wayfinding signage
S. University Drive –Phase I
Proposed Improvements Concept Plan
12
S UNIVERSITY DR
COLLINSWORTHNorth
S. University Drive –Phase I
Proposed Improvements south of W Rosedale
13
North
S. University Drive –Phase I
Proposed Improvements at Old University Drive
14
University Park VillageNorth
S. University Drive –Phase I
Interim Improvements south of Old University Drive
15
North
Former
Residence
Inn Site
Westbend
S. University Drive –Phase I
Ultimate Improvements south of Old University Drive
16
COLLINSWORTH
North
Former
Residence Inn
site
S. University Drive –Phase I
Proposed Improvements northeast end of Old University Drive
17
North
S. University Drive –Phase I
Proposed Landscape Improvements
18 W RosedaleOld UniversityCollinsworthCollinsworth
University Drive Plant MaterialsProposed Evergreen Perennials & Ornamental GrassesPink Skullcap
(2 -4 feet x 1 –2 feet ht. )
at North Nose of Medians
Four Nerve Daisy
(8 –12 inches width/ht.)
at South Nose of Medians
Rosemary
Sideoats Grama
(2 feet x 2 –4 feet ht.)
Intermediate Plant at Medians
Little Bluestem (Spring/Summer, Fall, and Winter)
(3 feet + ht.)
Intermediate Plant at Medians
Desert Flamenco Hesperaloe
(30 inches x 30 inches)
Central Plant at Medians
Project Cost *
20
Construction Budget……………………………………………$2.4 million
Funding -2018 Bond Program…………………………………..$4 million
* Funding in excess of construction budget is for right-of-way/easement acquisition,
engineering, permitting, etc.
S. UNIVERSITY DRIVE –PHASE I
Phase I Project Schedule
•Final Design …………………………………………………..Submitted May 2021
•Right of Way Acquisition……………………………………...Fall 2020 –Dec 2021
•Utility Clearance……………………………………………….January 2021-Dec 2021
•Construction*…………..………………………………………Spring 2022-Spring 2023
* To minimize impact all major events to be taken into account when scheduling construction
•Three public meetings, including one dedicated to business/organization stakeholders only
•Outreach area from Rosedale to Park Hill Dr. south of Colonial Parkway
•Presentation given to Fort Worth Zoo staff at 60% milestone
21
Phase I Public Outreach
University Dr Phase II –
Trail Dr to W. Rosedale St
22
University Drive –Phase II
Proposed Improvements Schematic
23
Phase II Scope
24
5’ wide sidewalk along the westside of University Drive,
Trail Drive to Rock Springs Road
Incorporate aesthetic improvements in
median and at crosswalks
Streetlights under the three
bridges associated with the
IH30 and Chisholm Trail
interchanges
Improve bus stop facilities to make ADA
compliant and facilitate installation of
shelters by Trinity Metro from Trail Dr to
Rock Springs Rd
University Dr
25
Phase II Scope -continued
Add roadway directional and
wayfinding signageLandscape and irrigation
improvements between
Rock Springs Road and
•IH30
University Dr
Crosswalk improvements at
the intersection of Trail Dr.
Signal and cross walks at
Botanic Garden Boulevard
and Rock Springs Road
Project Cost *
26
Construction Budget……………………………………………$7 million
Total Funding –TXDOT………………………………………..$10.1 million
* Funding in excess of construction budget is for right-of-way/easement acquisition,
engineering, permitting, etc.
UNIVERSITY DRIVE –PHASE II
Phase II Project Schedule
•AFA Execution…………………………………………………… Mar 2021 –Jul 2021
•M&C 21-0403 on June 8, 2021 Council Agenda
•Selection of Design Consultant ……………………………….. Jul 2021 –Feb 2022
•Design…………………………………………………………….. Mar 2022 –Jan 2024
•Bid and award……………………………………………………. Nov 2024 –Oct 2025
•Construction…………..………………………………………….. Nov 2025
27
QUESTIONS