Project Name:1 90-Inch(M-280)Sanitary Sewer Rehabilalation Project City Sec No.: 1 53962
Project No.(s): 56002-0700430-4956001-CO1266 DOE No. N/A CityProj.No.:l 01286
Project Description: Sanitary Sewer Rehabilatation M-280B Located in Gateway Park
Contractor: S.J.Louis Construction Of Texas,Ltd. Change Order it 0 Date: 1113/2022
City Project Mgr.1 Walter Norwood City Inspector: I Carmen Drake
Phone Number: (817)392-5026 Phone Number: (817)392-8347
Dept Water Sewer Totals
Contract Time
(Calender days)
Original Contract Amount $5,591,888.00 $5,591,888.00 456
Extras to Date $6,683.04 $6,683.04 0
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Dale $5,598,571.04 $5,598,571.04 456
Amount of Proposed Change Order $125,299.65 $125,299.65 0
Revised Contract Amount $5,723,870.69 $5,723,870.69 456
Original Funds Available for Change Orders $167,757.00 $167,767.00
Remaining Funds Available for this CO $161,073.96 $161,073.96
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.36%
MAX ALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $6,989,860,00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change Order No. 3 will provide for increased quantities of imported backfill,90-inch fiberglass pipe and repairs
to existing sanitary sewer structures due to actual conditions that were encountered during construction.
I
I
I
I
i
I
I
Contractor's Company Name Contractor Name ntractor i'nature D e
S.J.Louis Construction Of Texas,Ltd. Adam Lundsford I 2Z
ector. Date Project Manager Date
Gt. •a 1 �4 z
Director Water Dept Date Construction Supervisor Water Dept) Date
Ham Jan 20,2022
Assistant City Attorney Date Assistant City Manager Date
Jan 21,2022 Jan 22 2022
Council Action If Required)
M&C Number 22-0039 M&C Dale Approved 112022 OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
O_a-r WO RT H City of Fort Worth
Change Order Additions
Project Name 90-Inch(M-280)Sanitary Sewer Rehabilatation Project City Sec No.: C53962
Project No.(s): 56002-0700430-4956001-CO 1286 DOE No. N/A City Proj. No.: 01286
Project Sanitary Sewer Rehabilatation M-280B Located in Gateway Park
Description
Contractor S.J. Louis Construction Of Texas,Ltd. Change Order: .3 Date: 1/13/2022
City Project Mgr. Walter Norwood City Inspector Carmen Drake
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
16 Concrete Repair(Repair Mortar)-Riverside Box A Sewer 200.00 CY $75.00 $15,000.00
31 Imported Embedment/Backfill,Acceptable Backfill Sewer 4,380.00 CY $25.00 $109,500.00
38 Asphalt Pvmt Replacement Including Subbase Sewer 17.77 SY $45.00 $799.65
Water
Sewer $125,299.65
Page 2 of 4 Additions Sub Total $125,299.65
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name 90-Inch (M-280) Sanitary Sewer Rehabilatation Project City Sec No.: 53962
Project No.(s): 56002-0700430-4956001-001 286 DOE No. N/A City Proj. No.: 01286
Project Description Sanitary Sewer Rehabilatation M-280B Located in Gateway Park
Contractor S.J. Louis Construction Of Texas, Ltd. Change Order: EE Date 1/13/2022
City Project Mgr. Walter Norwood City Inspector: Carmen Drake
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Page 3 of 4 Deletions Sub Total
MMBE Breakdown for this Change Order
MBE Sub Type of Service Amount for this CO
Total
Previous Change Orders
CO# DATE AMOUNT
Total
Page 4 of 4
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Walter Norwood
Name of Employee
Project Manager
Title
ATTEST: o�FOR���lta
7 I oo000000O0
7G:�L%YGE2�'.S. ��/� ��O 0040,
Jannette S.Goodall(Jan 24,2022 07:37 CST) �° °0�
O
�vo o=d
o d
Jannette Goodall %*%00000000000
o ,d
City Secretary *XASoAp
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, January 11, 2022 REFERENCE NO.: **M&C 22-0039
LOG NAME: 602SSM280B901NP2B-SJLOUIS
SUBJECT:
(CD 4)Authorize Execution of Change Order No. 3 in the Amount of$125,299.65 to a Contract with S.J.
Louis Construction of Texas, Ltd. for Sanitary Sewer Main M-280-B Rehabilitation Project and Adopt
Attached Appropriation Ordinances
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Change Order No. 3 in the amount of$125,299.65 to City Secretary
Contract No. 53962 with S.J. Louis Construction of Texas, Ltd., for Sanitary Sewer Main M-280-B
Rehabilitation project for a revised contract amount of$5,723,870.69;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of$125,300.00, transferred from available
funds within the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer Main M-
280-B Rehabilitation project (City Project No. C01286); and
3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the
Water and Sewer Bond 2017 Fund in the amount of$5,591,888.00, by increasing estimated
receipts and appropriations in the Sanitary Sewer Main M-280-B Rehabilitation project (City Project
No. C01286), and decreasing estimated receipts and appropriations in the CWSRF Series 2017
programmable project (City Project No. P00100) by the same amount.
DISCUSSION:
On March 5, 2020, Mayor and Council Communication (M&C 20-0309), the City Council authorized a
construction contract in the amount of$5,591,888.00 with S.J. Louis Construction of Texas, Ltd. (City
Secretary Contract No. 53962) for Sanitary Sewer Main M-280-B Rehabilitation Project Located in
Gateway Park. The contract was subsequently revised by Change Order No. 1 with zero cost
administratively authorized November 6, 2020, that provided for concrete antimicrobial admixture in lieu
of epoxy coating for the project sewer manhole structures, and Change Order No. 2 in the amount of
$6,683.04 administratively authorized April 7, 2021, that provided for removal of previously unknown
concrete cap located in the trench of the existing 90 inch diameter sewer and the importation of borrow
material to replace the unsuitable backfill material.
Change Order No. 3 will provide for increased quantities of imported backfill, 90-inch fiberglass pipe and
repairs to existing sanitary sewer structures due to actual conditions that were encountered during
construction.
Appropriations for Sanitary Sewer Main M-280-B Rehabilitation, are as depicted below:
Fund Existing Additional Project Total*
_ Appropriations Appropriations
W&S Capital Projects Fund 56002 $782 707.00 $125,300.00 $908,007.00
�Water/Sewer Bond $750,000.00 $0.00 $750,000.00
2016 Fund 56005
Sewer Capital $1,852,243.00 $0.00 $1,852,243.00
Legacy Fund 59607
(Water & Sewer Bond $5,591,888.00 $0.00 $5,591,888.00
2017 Fund 56013
Project Total $8,976,838.00 1 $125,300.00 $9,102,138.00
*Numbers rounded for presentation purposes.
Business Equity: S.J. Louis Construction Of Texas, Ltd. agrees to maintain its initial M/WBE commitment
of seven percent that it made on the original contract and extend and maintain that same M/WBE
commitment of seven percent to all prior change orders up to and inclusive of this Change Order No. 3
Therefore S.J. Louis Construction of Texas, Ltd. remains in compliance with the City's M/WBE Ordinance
and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form
executed by an authorized representative of its company.
Approval of recommendation No. 3 would adjust appropriations between the programmable project and
convert the Sanitary Sewer Main M-280-B Rehabilitation project (City Project No. C01286) into a static
capital project. This action is needed as future funding for the Sanitary Sewer Main M-280-B
Rehabilitation project (City Project No. C01286) is anticipated from other funding sources and the scope
of this project differs from that of the current programmable project.
This project is located in COUNCIL DISTRICT 4.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and upon
approval of the above recommendations and adoption of the attached appropriation ordinances, funds
will be available in the W&S Capital Projects Fund for the VC Odor Control Improvements project. Prior to
an expenditure being incurred, the Water Department has the responsibility of verifying the availability of
funds.
FUND IDENTIFIERS (FIDs),:
TO
Fund Department ccount Project Program ctivity Budget Reference # mount
ID ID Year (Chartfield 2)
FROM
Fund Department ccount Project Program ctivity Budget Reference # mount
ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by_ Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Walter Norwood (5026)
ATTACHMENTS
1. 602SSM280B901NP2B-SJLOUIS 1295.pdf (CFW Internal)
2. 602SSM280B901NP2B-SJLOUIS APC.pdf (CFW Internal)
3. 602SSM280B901NP2B-SJLOUIS 56002 A022(r2)r.docx (Public)
4. 602SSM280B901NP2B-SJLOUIS 56013 A022(r3)r.docx (Public)
5. 602SSM280B901NP2B-ST LOUIS.pdf (CFW Internal)
6. 602SSM280B901NP2BC03-SJLOUIS FID Table (WCF 12.15.21).xlsx (CFW Internal)
7. 602SSM280B901NP2BC03-SJLOUIS SAM.pdf (CFW Internal)
8. 60SSM280B901NP2BC03-SJLOUIS Map.pdf (Public)
� H- V)
cLn Ln Lnc c
c o n00
•NJ
..
v v v
rt rt rt
�t �•
• •
D D D
n kDn •
OLrl Ln LrlO
C C C
M h
O 0 0
rt00 00rt
v v v
LO
to rj
D D D
70
v a v a o
,Or m M Or
• XPli
m �
Z Tv Tv
Z rt a
G)
r
m
3
0
r1i
Z
cD
a - -
c� -
a
v a �
0 0 0
o m m
� � m