HomeMy WebLinkAboutContract 54210-CO7 CSC No.54210-CO7
FORT 'WORTH City of Fort Worth
—~ Change Order Request
Project Name:I Water and Sanitary Sewer Replacement Contract 2014 WSM-B,Part 1 City Sec No.: 1 54210
Project No.(s):1 VM2,oMnaI Ito-16 zoloorx"1r",m7xor»mw DOE No. N/A CiIyProj.No.:1 2383
Project Description: Water and Sanitary Sewer and Pavement Rehabilitation on Ranch View Road,Hills Circle and Westclilf Road South
Contractor Jackson Construction,Ltd. Change Order II Dale: 1112/2022
City Project Mgr.1 Scott Taylor City Inspector: I Ramon Chavez
Phone Number: 817.392-7240 Phone Number: 817-392-8306
Dept. Water Sewer TPW Totals Contract Time
Calenderdays)
Original Contract Amount $3,573,699.00 $1,802.598.00 $1,238,615.00 $6,614,912.00 540
Extras to Dale $169 786.75 $0.00 $10.00 $159,796.75 0115
Credits to Date $14,872.30 $210.71 $0.00 $15,083.01
Pending Change Orders(In M&C Process) $0.00 $0.00 $0.00
Contract Cost to Dale $3,718,613.45 $1,802,387.29 $1,238,625.00 $6,769,625.74 t655EJ
Amount of Proposed Change Order $138 369.60 $214 459.00 $311 147.50 $663 976.00
Revised Contract Amount $3,856,982.95 $2,016,846.29 $1,649,772.50 $7,423,601,74
Original Funds Available for Change Orders $107,211.00 $54,078.00 $0.00 $161,289.00
Remaining Funds Available for Oils CO $0.00 $54,288.71 $0.00 $54,288.71
Additional Funding(if necessary) 1 $130,369.50 1 $138,369.60
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 12.23%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $8,268,640.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change Order No.7 will provide additional pay item quantities for cutting/plugging the outlets on a 42-inch
water main that were inadvertently omitted at the time the project was advertised for bid. Pay item quantities
are also needed to install a subdrain at the Ranch View Road/Echo Drive intersection to eliminate ground water
penetration and installation of pavement markings on both sides of Ranch View Road as requested by residents.
The Change order will also provide increased pay item quantities of curb/gutter,pavement pulverization and
asphalt pavement due to actual field conditions that were encountered during construction.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signatur4 Z ibate
Jackson Construction,Ltd. Carmen Este
alnvecd4jor Date Pr ec a ale
er Dept)' Date Con'lruclion Su arvi or T W Dept) ate
,18,2022 1/14/22
Assistant City Attorney Dale Assistant City Manager Date
v Jan 21,2022 Jan 22,2022
Council Action If Required)
M&C Number 22 0036 M&C Dale Approved OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
Von-r W"]?,TI-1 City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer Replacement Contract 2014 WSM-B,Par[1 City Sec No,: 54210
Project No.(s): 56002106004301C01780.56002107004301C01780 DOE No, N/A City Proj,No.: 2383
Project Water and Sanitary Sewer and Pavement Rehabilitation on Ranch View Road,Hills Circle and Weslcllff Road South
Description
Contractor Jackson Construction,Ltd. Change Order: ] Date: 111212022
City Project Mgr. Scoll Taylor City Inspeclor FRamonchavez
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
36 Remove Curb and Gutter Water 420.00 LF $10.00 $4,200.00
37 7"Curb and Gutter Water 420.00 LF $76.00 $31,500.00
38 Remove Concrete Driveway Water 257.00 SF $2.00 $514.00
39 6"Concrete Driveway Water 257.00 SF $12.50 $3,212.50
41 2"Asphalt Pavement Type D Water 590.00 SY $14.00 $8,260.00
48 10"Pavement Pulverization Water 590.00 SY $9.00 $5,310.00
67 Cut&Plug 20"outlets on 42"main Water 1,00 LS $66,794.00 $66,794.00
68 16"Concrete Water Line Connection Water 1.00 LS $13,205.00 $13,206,00
69 SWPPP> IAcre Water 1.00 LS $1,864.00 $1,864.00
70 Cement Modification,26Lbs.ISY Water 18.00 TN $195.00 $3,610.00
27 Remove Curb and Gutter Sewer 420,00 LF $10.00 $4,200.00
28 7"Curb and Gutter Sewer 420.00 LF $75.00 $31,500.00
29 Remove Concrete Driveway Sewer 2,580.00 SF $2.00 $5,160.00
30 6"Concrete Driveway Sewer 258.00 SF $12.50 $3,225.00
32 3"Asphalt Pavement,Type D Sewer 5,500.00 SY $20.00 $110,000.00
39 11"Pavement Pulverization Sewer 5,500,00 SY $10.00 $55,000.00
43 Cement Modification,26Lbs.1SY Sewer 18.00 TN $195.00 $3,510.00
44 SWPPP> IAcre Sewer 1.00 LS $1,864.00 $1,864.00
5 Remove Curb and Gutter TPW 840.00 LF $10.00 $8,400.00
6 7"Curb and Gutter TPW 840.00 LF $75.00 $63,000.00
7 Remove Concrete Driveway TPW 408.00 SF $2.00$816.00
8 6"Concrete Driveway TPW 515.00 SF $12.50 $6,437.50
10 3"Asphalt Pavement,Type D TPW 5,500.00 SY $20.00 $110,000.00
17 11"Pavement Pulverization TPW 6,500.00 SY $10.00$56,000.00
18 Cement Modification,26Lbs,1SY TPW 36.00 TN $195.00 $7,020.00
34 Pavement Markings TPW 1,700,00 LF $20.00 $34,000.00
32 SWPPP> I Acre TPW 1.00 LS $3,728.00 $3,728.00
33 6"Sub-Drain TPW 408.00 LF $55.75 $22,746.00
Water $138,369.50
Sewer $214,459.00
TPW $311,147.50
Page 2 of 4 Additions Sub Total $663,976.00
FOIPT WO P,-r i-1 City of Fort Worth
Change Order Deletions
Project Name Water and Sanitary Sewer Replacement Contract 2014 WSM-B,Part 1 City Sec No.: 54210
Project No.(s): DOE No. = City Proj.No,: 2383
Project Description Water and Sanitary Sewer and Pavement Rehabilitation on Ranch View Road,Hills Circle and Westcliff Road
South
Contractor Jackson Construction,Ltd. Change Order: F Date F 1/1212022
City Project Mgr. Scott Taylor City Inspector: F Ramon Chavez
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
TPW
Page 3 of 4 Deletions Sub Total
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
coif DATE AMOUNT
Total $0.00
III Page 4 of 4
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Scott Taylor,P.E.
Name of Employee
Project Manager
Title
ATTEST; F°�°°°°��
a
°09
��. ° °
° °
Tannelle S.Goodall ° °
Ja—tte S.C.dMI(Jan 24,202207:37 CST) 00
0 °
o ° ��
Jannette Goodall °° ° ICY
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, January 11, 2022 REFERENCE NO.: **M&C 22-0036
LOG NAME: 602014AWSMBP1C07-JACKSON
SUBJECT:
(CD 3)Authorize Execution of Change Order No. 7 in the Amount of$663,976.00 to a Contract with
Jackson Construction, Ltd.,for Water and Sanitary Sewer Replacement Contract 2014 WSM-B, Part 1
Project,for a Revised Contract Amount of$7,423,601.74 and Adopt Attached Appropriation Ordinances
RECOMMENDATION:
It is recommended that the City Council:
1.Authorize execution of Change Order No. 7 In the amount of$663,976.00 to City Secretary
Contract No. 54210 with Jackson Construction, Ltd., for Water and Sanitary Sewer Replacement
Contract 2014 WSM-B, Part 1 project for a revised contract amount of$7,423,601.74;
2.Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of$352,829.00 transferred from available
funds within the Water and Sewer Fund for the purpose of funding the Water and Sanitary Sewer
Replacement Contract 2014 WSM-B, Part 1 project (City Project No. CO2383); and
3.Adopt the attached appropriation ordinance to adjusting estimated receipts appropriations in the
General Capital Projects Fund by decreasing the estimated receipts and appropriations in the
Contract Street Maintenance Programmable Project(City Project No. P00020) in the amount of
$311,148.00 and increasing the estimated receipts and appropriations in the Water and Sanitary
Sewer Replacement WSM-B Part 1 project(City Project No. CO2383) by the same amount.
DISCUSSION:
On June 2, 2020, Mayor and Council Communication (M&C) 20-0377 the City Council authorized a
contract with Jackson Construction, Ltd., in the amount of$6,614,912.00 for the Water and Sanitary
Sewer Replacement Contract 2014 WSM-B, Part 1 Project.
The contract was subsequently revised by Change Order No. 1 with a net total amount of$47,175.00
administratively authorized October 16, 2020 that provided for the installation of 1 '/z-inch water meters
and service relocations on the project instead of 1-inch meter that was initially called for; Change Order
No.2 with a net total amount of$22,350.00 administratively authorized November 4, 2020 provided for
the installation of additional 1 '/Z and 2-inch water and service relocations on the project; Change Order
No. 3 with a credit of$14,247.30 administratively authorized January 27, 2021 provided for the
installation of a 42-inch x 12-inch tapping sleeve and valve instead of a 42-inch x 12-inch tee to minimize
closure time at the Ranch View Drive/Overton Park Drive West intersection; Change Order No. 4 with a
credit of$835.71 administratively authorized March 22, 2021 provided for by other than open cut
Installation instead of open cut installation in order to minimize traffic disruption at the Ranch View
Road/South Hulen Street intersection Change Order No. 5 with a net total amount of
$10.00 administratively authorized April 9, 2021 that provided for the removal of excess pavement
material on the project and on August 24, 2021, M&C 21-0621, the City Council authorized Change Order
No. 6 with a net total amount of$90,261.75 that provided for increased quantities of 8-inch PVC on the
project and for the looping the water system by connecting a newly installed water main on Westcliff Road
South to the existing dead end water main on Hilltop Road.
This M&C is to authorize execution of Change Order No. 7 in the amount of$663,976.00 to City
Secretary Contract No. 54210 with Jackson Construction, Ltd., for Water and Sanitary Sewer
Replacement Contract 2014 WSM-B, Part 1 project for a revised contract amount$7,423,601.74. Change
Order No. 7 will provide additional pay item quantities for cutting/plugging the outlets on a 42-inch water
main that were inadvertently omitted at the time the project was advertised for bid. Pay item quantities are
also needed to Install a subdrain at the Ranch View Road/Echo Drive intersection to eliminate ground
water penetration and Installation of pavement markings on both sides of Ranch View Road as requested
by residents. The change order will also provide increased pay item quantities of curb/gutter, pavement
pulverization and asphalt pavement due to actual field conditions that were encountered during
construction.
Appropriations for the 2014 Water Line & Sanitary Sewer Replacement WSM-B, Part 1 project are as
depicted below:
Existing Additional
Fund Appropriations Appropriations Project Total*
Water Capital Fund $206,719.00 $0.00 $206,719.00
59601
Sewer Capital Legacy $139,147.00 $0.00 $139,147.00
Fund 59607
Water& Sewer
Capital Projects Fund $6,176,211.00 $352,829.00 $6,529,040.00
56002
General Capital $1,312,932.00 $311,148.00 $1,624,080.00
Projects Fund 30100
Project Total $7,835,009.00 $663,977.00 $8,498,986.00
*Numbers rounded for presentation purposes.
Business Equity: Jackson Construction, Ltd. agrees to maintain its Initial MBE commitment of three
percent that it made on the original contract and extend and maintain that same MBE commitment of
three percent to all prior change orders up to and inclusive of this Change Order No. 7.Therefore
Jackson Construction, Ltd. remains in compliance with the City's BDE Ordinance and attests to it
commitment by its signature on the Acceptance of Previous MBE Commitment form executed by an
authorized representative of its company.
This project is located in COUNCIL DISTRICT 3.
I
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current operating budget in the Water&
Sewer Fund, and upon approval of the above recommendations and adoption of the attached
appropriation ordinances, funds will be available in the W&S Capital Projects and General Capital
Projects Funds for the W&S Repl. Ct. 2014WSM-B project to support the approval of the above
recommendation and execution of the change order to the contract. Prior to any expenditure being
incurred, the Water and Transportation and Public Works Departments have the responsibility of verifying
the availability of funds.
FUND IDENTIFIERS (FIDs):
TO
Fund Department ccount Project Program ctivity Budget Reference # mount
ID ID Year (Chartfield 2)
FROM
Fund Department ccount Project Program ctivity Budget Reference # mount
ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by_ Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Scott Taylor (7240)
ATTACHMENTS
1.602014AWSMBP1 C07-JACKSON.docx (CFW Internal)
2.602014AWSMBP1C07-JACKSON 1295.pdf (CFW Internal)
3. 602014AWSM13MCO7-JACKSON FID Table Draft (CAH) 11.18.21.xlsx (CFW Internal)
4. 602014AWSMBP1C07-JACKSON SAM.pdf (CFW Internal)
5. 602014AWSMBP1CO7-JACKSON 30100 AO22(r3)r.do9x (Public)
6. 602014AWSMBP1 CO7-JACKSON 56002 AO22(r2)r.docx (Public)
7. 602014WSMBP1C07-JACKSON APC-TS.pdf (CFW Internal)
8. 602014WSMBP1C07-JACKSON Map.pdf (Public)
0 0 0 0 Cl Cl 0 o Iq
c o 0 0 0 0 Iq oo
fl, Ln Lne H h h 4n n '
H �D vl V
CID
co co
m m H H °rcl
vHl +Niter mm � ,� � Nm ii N m
N Vt In 4/T Vl VF Vt L}
N
o.
• a
m
..
U
ot3
1c,
N N N N IN N N N O1 m of m • m m m N
N N N N N N N N of of of of 01 O1 Cl)
O O O O CD O O O m m m m r
N N N N N N N N ' m m m m Cl) Ch Oml O
O
N
_ • f0
E
0
0 0 m CD 0 0 oco co
ar
N H H N u
V 8 u U U U
l
C
L
fu
m M M M o m o m m m O m m m m o
m (n W W N 00 N co W OO N co 00 OO OD
�p
m m m m o m o m m m o r� t�r N m m U
N N N O N O N N N O N N
0 00 0 0 0 0 0 CD C. C. 0 0 0
U U U U m U n. U U U °. U U U U
ru
3
H H O O H H H H O O O O O N
C. O CD -0 O O 0 0 O O H H H
Cl O H H O ID O O H H O O O
lD w C. CDw ID w lD O O pp O O >-
In In li H In In In Ln H H 0eT V' d• M
rn m m m m m m m m m n 1l r M
ul V' in uvl Ln in v
!~q1 u
W O O O O H H H H O O 0 0 H H O O H
z M m m m m M m m N M N M m m M m m
V' V d' It * 3 V It V' CD- V 't v -4 w
O O O O O CD CD Cl) 0 m 0 0 0 O m
O O O O O O O CD O O O O O O O O
LD LD I, r, N N N N W ID n 1, N tV lO I N 3
U O O 0 0 O O O O O O O O 0 0 CLO Oej
O
h
� N
U N N N N 0 0 0 0 H N H N 0 0 N N O r
0 0 0 0 0 0 0 0 O O CD 0 0 O O O N
O O S. O H H H H O O O O H H O O H OO
Lz� 1D W lD LD O C. O O W tD W LO O O l0 w CD
N m m m m vl m m m vl m vl m m ul Ln m 3
3 LL
°
v_
o N N N N m m fD m N N N N M M H H H al
rl
�D �