CSC No.57027 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality ("CITY"), and Kimley-Horn and Associates, Inc., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Marine Creek Sanitary Sewer Parallel Interceptor— Project No. 103497. Article I Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to. $1,454,775.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. OFFICIAL RECORD City of Fort Worth,Texas [Mari CITY SECRETARY Standard Agreement for Engineering Related Design Services Revised Date:November 23,2021 Page 1 of 15 FT. WORTH, TX Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 2 of 15 D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on-site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on-site observation(s) of a deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 3 of 15 F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 4 of 15 I. Business Equity Participation City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. In accordance with the City's Business Equity Ordinance No. 25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in Chapter 20, Article X of the City's Code of Ordinances, as amended, and any relevant policy or guidance documents), the City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. Engineer acknowledges the MBE and WBE goals established for this contract and its execution of this Agreement is Engineer's written commitment to meet the prescribed MBE and WBE participation goals. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor) Standard Agreement for Engineering Related Design Services [1034971 Revised Date:November 23,2021 Page 5 of 15 effect as of the time copying is performed. K. INSURANCE Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondent superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 6 of 15 P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights-of-way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITYwill examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 7 of 15 F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [1034971 Revised Date:November 23,2021 Page 8 of 15 I. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 9 of 15 D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [1034971 Revised Date:November 23,2021 Page 10 of 15 property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. I. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 11 of 15 The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time-employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2274 of the City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 12 of 15 Texas Government Code-(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full- time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 13 of 15 The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C -Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F — Insurance Requirements City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23,2021 Page 14 of 15 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: BY: CITY OF FORT WORTH ENGINEER Kimley-Horn nd Associa es Inc. Dana Bu,ghdoff(Jan 22,20 08:55 CST Dana Burghdoff Assistant City Manager Jo*)'hfi Atkins, P.E Date: Jan 22,2022 Vice President poi FORr�a�� Date: / �J ' Z2 ATTEST: ��.o° °°oO��d 0~o 0 J'ette 5 S a�4��CST) U O Q x �*o o* cy Jannette S. Goodall °°°°°°°°° a City Secretary a�4�nEXASaa APPROVAL RECOMMENDED: By:CJtnsto,'1 &,(Jan 18,202209:17 CST) Chris Harder, P. E. Director, Water Department APPROVED AS TO FORM AND LEGALITY Form 1295 No. 2021-802258 I&'i Y: DBl-k(Jan 21,202216:56 CST) Douglas W Black M&C No.: 22-0042 Sr. Assistant City Attorney M&C Date: 01/11/2022 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. It fyny�r�V1 Y—t 4 Liam Conlon OFFICIAL RECORD Project Manager CITY SECRETARY FT.WORTH, TX City of Fort Worth,Texas [Marine Creek SS Parallel Interceptor] Standard Agreement for Engineering Related Design Services [103497] Revised Date:November 23.2021 Page 15 of 15 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 ATTACHMENT A Scope for Engineering Design Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.: 103497 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVES Approximately 6,500 linear feet of 60-inch and 42-inch parallel interceptor from sanitary sewer main M-279 from Station 0+00 (south of E. Northside Dr.) to Station 51+10 (north of NE 23rd St.). This parallel interceptor includes a siphon under the West Fork Trinity River. The project also includes the following: • Approximately 1,300 linear feet of existing 68-inch and 72-inch sanitary sewer main M- 245-B crossing the BNSF railroad South of E. Northside Drive, • Approximately 1,800 linear feet of rehabilitation of the existing 48-inch sanitary sewer main M-279, • Replacing approximately 2,300 linear feet of existing 8-inch and 10-inch sanitary sewer lines in NE 16th St, NE 17th St and, adjacent to the BNSF Railroad. • Replacing approximately 2,500 linear feet of 4-inch, 6-inch, and 8-inch cast iron water lines in Samuels Ave, E. Northside Dr., NE 16th St, and NE 17th St. • Replacing approximately 2,000 linear feet of 10-inch water line in NE 23rd St. WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design and Rehabilitation vs. Replacement Analysis Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services — Not included in this contract Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Permits TASK 1 - DESIGN MANAGEMENT ENGINEER shall make efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall: ■ manage change, City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 1 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 ■ communicate effectively, ■ coordinate internally and externally as needed, and ■ proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1 Managing the Team • Lead, manage and direct design team activities. • Confirm quality control is practiced in performance of the work. • Communicate internally among team members. • Task and allocate team resources. 1.2 Communications and Reporting • Attend a pre-design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements. • Conduct review meetings with the CITY at the end of each design phase, • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project. • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design. • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub-consultants shall carry readily visible information identifying the name of the company and the company representative. City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 2 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 ASSUMPTIONS • Twenty-Four (24) MWBE reports will be prepared • Twenty-Four(24) meetings with city staff • Twenty-Four(24) monthly invoices • Twenty-Four(24) monthly water department progress reports will be prepared • Twenty-Four(24) monthly project schedule updates will be prepared DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form TASK 2 - CONCEPTUAL DESIGN AND Rehabilitation vs. Replacement Analysis (30 PERCENT) The Conceptual Design will be prepared by the ENGINEER and submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to: ■ Study the project, ■ Identify and develop alternatives that enhance the system, ■ Present (through the defined deliverables) these alternatives to the CITY, ■ Recommend the alternatives that successfully addresses the design problem, and ■ Obtain the CITY's endorsement of this concept. ENGINEER will develop the conceptual design of the infrastructure as follows: 2.1 Data Collection • In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project. • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. City of Fort Worth.Texas Attachment A PMO Release Date:08.1.2014 Page 3 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 • The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re- routing plans. (if applicable) • The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. (if applicable) 2.2 Rehabilitation Analysis and Alignment Alternatives • The CITY will provide the existing average dry weather, existing peak wet weather, and master plan design flows for M-279, M-136A*, M-162, M106R*, M-245-13, and M- 248. • The CITY will provide [CAP CCTV videos and logs for M-279, M-136A*, M-162, M106R*, M-245-13, and M-248. • The CITY will perform ICAP investigations on M-245-B and will provide the CCTV videos and logs. • The ENGINEER will evaluate the ICAP data and determine the feasibility of up to two (2) alternative and limits for each segment based on the condition and location of the main. • The ENGINEER with prepare a technical memo for the rehabilitation segments of the existing M-279 and M-245-B. The ENGINEER will evaluate up to two (2) alignments for the parallel/replacement interceptor main. The following items will be considered: o Probable construction cost o Surface restoration o Age and condition of existing sanitary sewer mains o Coordination/Permitting o Accessibility for maintenance o Obstructions (non-utility) o Conflicts with other utilities o Constructability and construction type o Business/Neighborhood disruption o Schedule o Working Space Analysis/Easements o Bypass Pumping 2.3 The Conceptual Design Package includes the following scope of services. • Cover Sheet City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 4 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 • Graphic exhibits (aerial at a scale of 1" = 50') for the ]CAP rehabilitation and parallel interceptor. • Identification of potential access routes and easement requirements. • Fire line reconnections • Proposed phasing of any water and sanitary sewer work that is included in this project documented in both the project schedule and narrative form. • Documentation of key design decisions. • Estimates of probable construction cost. ASSUMPTIONS • Two (2) copies of the conceptual design package (30% design) will be delivered and will consist of 11x17 Exhibits and letter summarizing alignment and design considerations. • Alignment, easements, and access route will be shown on aerial Exhibits. • ENGINEER will prepare meeting notes of the Concept Review meeting and revise the report, if needed. • ENGINEER shall not proceed with Preliminary Design activities without obtaining written approval by the CITY of the Conceptual Design Package. • List of property owners with corresponding property information will be included on Exhibits. DELIVERABLES A. Technical memo B. Conceptual Design Package TASK 3 - PRELIMINARY DESIGN (60 PERCENT) Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. Two separate bid packages may be required. ENGINEER will develop the preliminary design of the infrastructure as follows: 3.1 Development of Preliminary Design Drawings and Specifications shall include the following: • Cover Sheet • A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally, on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument#8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 5 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Overall project easement layout sheet(s) with property owner information. • Overall project water and/or sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvement/existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. • Overall water and/or sanitary sewer abandonment sheet. • Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. • Benchmarks per 1,000 ft of plan/profile sheet—two or more. • Bearings given on all proposed centerlines, or baselines. • Station equations relating utilities to paving, when appropriate. • Plan and profile sheets which show the following: proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. • The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. • The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or(2) by the CITY prior to bidding if the CITY determines City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 6 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de-hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. • Provide map showing location of new manhole construction at the end of existing sewer segments, 90-degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the CITY's Standard Details. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 3.2 Geotechnical Investigation • Perform a geotechnical analysis of the boring site utilizing a qualified geotechnical laboratory to determine subsurface conditions. Provide recommendations regarding foundation design parameters. The geotechnical analysis will include the following: o Subsurface exploration ■ Three (3) bores up to 100-ft deep ■ Eleven (11) bores up to 50-ft deep o Laboratory tests for classification purposes and strength characteristics ■ Moisture content and soil identification ■ Percent passing #200 sieve ■ Liquid and plastic limit determinations ■ Unconfined compression tests on soil ■ Unconfined compression tests on rock ■ Unit weight determinations ■ Absorption pressure and/or one-point pressure swell tests o The geotechnical report will present the results of the field and laboratory data as well as analyses and recommendations. The data contained in the geotechnical report will be made available to contractors during the bidding process for information purposes. The report will address: ■ General soil and ground water conditions City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 7 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 ■ Comments on general soil and rock excavation ■ Earthwork and Trench recommendations ■ Lateral Earth Pressure for Blocking ■ Pavement Design recommendations, where required 3.3 By Other than Open Cut Installation • Prepare trenchless alignments which include entry and exit locations, equipment layout, and other site constraints for the following trenchless crossings: o One (1) double barrel 42-inch and 30-inch sewer siphon carrier pipe by 600-LF crossing of the Trinity River. o Two (2) railroad crossings on N.E. 231d Street. o Rehabilitation of approximately 1,300 linear feet of existing 68-inch and 72-inch sanitary sewer main M-245-B crossing the BNSF railroad South of E. Northside Drive, o Rehabilitation of approximately 1,800 linear feet of the existing 48-inch sanitary sewer main M-279, 3.4 Special Structural Design: Develop Design (60 percent) calculations, drawings, specifications, for the following special structures: • Two (2) Siphon Structures with stop logs • Five (5) Junction Structures 3.5 Constructability Review and Site Visit • Prior to the preliminary design review meeting with the CITY, schedule and attend a PROJECT Part site visit with the CITY Project Manager and Construction personnel. Prepare meeting notes capturing the CITY's comments from the site visit. • The PROJECT requires coordination with other Fort Worth Central City Projects. Review modifications to the other Fort Worth Central City Project submittals to verify there are no changes affecting the existing and/or proposed water and wastewater infrastructure. 3.6 Utility Clearance • The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. City of Fort Worth,Texas Attachment A PIVO Release Date:08.1.2014 Page 8 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 • The ENGINEER shall upload a PDF file of the approved preliminary plan set to the designated project folder in BIM360 for forwarding to all utility companies which have facilities within the limits of the project. CAD files shall be made available to the utility companies, if requested. 3.7 Opinion of Probable Construction Cost • ENGINEER will update and prepare preliminary opinion of probable construction cost (OPCC) for the proposed water transmission main. ASSUMPTIONS • Fourteen (14) borings at an average bore depth of forty-five (45) feet each will be provided. • Three (3) sets of 22 x 34 size plans will be delivered for the Constructability Review for each bid phase. • Three (3) sets of 22 x 24 size plans will be delivered for the Preliminary Design (60% design). • One (1) set of preliminary specifications will be delivered for the Preliminary Design (60% design). • PDF files will be uploaded to the designated project folder in BIM360 for each bid package. • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. • One (1) PDF file of drawings will be delivered for Utility Clearance for each bid package. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings and specifications B. Utility Clearance drawings C. Traffic Control Plan D. Estimates of probable construction cost E. Data Base listing names and addresses of residents and businesses affected by the project (if applicable). TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). 4.1 Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule. City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 9 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. • Traffic Control Plan o Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's Buzzsaw website. The typicals need not be sealed individually, if included in the sealed contract documents. o Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. ASSUMPTIONS • One (1) virtual (WebEx, or other) public meeting will be attended upon completion of Preliminary Design. ENGINEER will provide up to two (2) exhibits to be included in the virtual presentation for the Public Meeting. • Traffic Control "Typicals"will be utilized to the extent possible. It is assumed an additional ten (10) project specific traffic control sheets will be developed. • Three (3) sets of 22 x 34 size drawings and three (3) sets of 11 x 17 size drawings and _one (1) set of specifications will be delivered for each 90% Design package. • A PDF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360 for each bid package. • Three (3) sets of 22 x 34 size drawings and three (3) specifications will be delivered for the 100% Design package for each bid package. • A PDF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360 for each bid package. • Final sheet list: cover, index and general notes, shutdown and phasing notes, control and benchmarks, overall location and proposed sheet reference (water and sanitary sewer) (3), overall existing (water & sanitary sewer) (4), proposed easements (4), line abandonment (3), plan and profiles (sanitary sewer) (20), plan and profiles (water) (6), detail sheets (15), surface repair (2), erosion control (4), trail detour (4), and traffic control (10). DELIVERABLES A. 90% construction plans and specifications. B. Traffic Control Plan. City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 10 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 C. 100% construction plans and specifications. D. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. E. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES ENGINEER will support the bid phase of the project as follows: 5.1 Bid Support • The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. o Contract documents shall be uploaded in a .xIs file. o Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. o Plan Sets are to be uploaded to BIM360 in PDF format. The .pdf will consist of one file of the entire plan set. • The ENGINEER shall sell contract documents and maintain a plan holders list on Buzzsaw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. • The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's Buzzsaw folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to all plan holders. • Attend the prebid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. City of Fort Worth,Texas Attachment A PIVO Release Date:08.1.2014 Page 11 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on Buzzsaw. • Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings • Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format. There shall be one (1) PDF file for the Water plan set. Each PDF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Sinqular PDF files for each sheet of a plan set will not be accepted. PDF files shall conform to naming conventions as follows: o TPW file name example—"W-1 956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053—org3.pdf and K-0320_org5.pdf o Water and Sewer file name example— "X-35667_org36.pdf" where "X-35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf o PDF files shall be uploaded to the project's Final Drawing folder in BIM360. ASSUMPTIONS • The project will be bid as two (2) separate units and awarded to two (2) contractors. • One (1) set of digital construction documents will be made available for plan holders via the City's purchasing website. • Three (3) sets of construction documents will be sold to and made available on City's Website/BIM 360 for plan holders and/or given to plan viewing rooms. • Six (6) sets of 22 x 34 size and six (6) sets of 11 x 17 size drawings plans and six (6) specifications (conformed, if applicable) will be delivered to the CITY. • PDF files will be uploaded to BIM360. DELIVERABLES A. Addenda City of Fort Worth.Texas Attachment A PMO Release Date:08.1.2014 Page 12 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 B. Bid tabulations C. CFW Data Spreadsheet D. Recommendation of award E. Construction documents (conformed, if applicable) TASK 6 - CONSTRUCTION PHASE SERVICES Construction Phase Services is not included in this contract. TASK 7 - ROW/EASEMENT SERVICES ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1 Right-of-Way Research • The ENGINEER shall determine rights-of-way, easements needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2 Right-of-Way/Easement Preparation and Submittal. • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. • The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. 7.3 Temporary Right of Entry Preparation and Submittal • Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry documents for landowners to CITY PM for real property acquisition. It is assumed that letters will only be required for landowners adjacent to temporary construction easements or who are directly affected by the project and no easement is required to enter their property. ENGINEER will prepare exhibits, as needed, for coordination with landowners outlining access to the properties. Exhibits will be prepared using aerial imagery and include dimensions and areas of impact, if requested by the CITY. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. ASSUMPTIONS City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 13 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 • Up to twenty-two (22) Easements (permanent and temporary construction) or right-of-way documents will be prepared. • Easements will be sized to accommodate two (2) sanitary sewer mains in locations directed by the City. • Up to fourteen (14) Temporary right-of-entry documents will be prepared. • Up to two (2) aerial exhibits will be prepared for coordination with landowners. • Right-of-Way research and mapping includes review of property/right-of-way records based on current internet-based Tarrant Appraisal District (TAD) information available at the start of the project and available on-ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. • CITY will provide Appraisals and Easement Acquisition services DELIVERABLES A. Easement exhibits and metes and bounds provided on CITY forms. B. Temporary Right of Entry Letters. C. Exhibits for coordination with landowners. TASK 8 - SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES ENGINEER will provide survey support as follows: 8.1 Design Survey • ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees 6-in and larger (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: o A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally, on a scale of not less than 1:400: o The following information about each Control Point: ■ Identified (Existing. CITY Monument#8901, PK Nail, 5/8" Iron Rod). City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 14 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 ■ X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. ■ Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). o Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. o No less than two horizontal benchmarks, per line or location. o Bearings given on all proposed centerlines, or baselines. o Station equations relating utilities to paving, when appropriate. 8.2 Temporary Right of Entry Preparation and Submittal • Temporary Right of Entry will be provided by the ENGINEER as described in Task 7. 8.3 Subsurface Utility Engineering (SUE): • The SUE shall be performed in accordance with Cl/ASCE 38-02. • Four different levels of SUE are identified. The following is a description of each level of SUE used on this project. o Level D— Collect level D as part of this scope of services. o Level C ■ Field locate and obtain horizontal position of visible utility surface features for all of the utility systems described within Level D. o Level B ■ Indicate by marking with paint, the presence and approximate horizontal location of subsurface utilities using geophysical prospecting techniques, including electromagnetic, sonic, and acoustical techniques. ■ Approximately 8 days of direct buried utilities are identified for Level B location. o Level A ■ Location (Test Hole) Services: Locating the horizontal and vertical position of the utility by excavating a test hole using vacuum excavation techniques and equipment. In performing locating (test hole) services ENGINEER will: — Excavate ten 10 test holes to expose the utility to be measured in such a manner that ensures the safety of the excavation and the integrity of the utility to be measured. Excavations will be performed using specially developed vacuum excavation equipment that is non-destructive to existing facilities. If contaminated soils are discovered during the excavation process, the ENGINEER will notify the CITY. City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 15 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 — Obtain x,y and Z information at each test hole. ASSUMPTIONS • Topographic survey will extend 30-ft on either side of selected alignment. • Topographic survey at intersections will include no more than 50-ft in each direction. • Level A Subsurface Utility Engineering will be performed for up to ten (10) locations. • Up to twelve (8) days (8-hour each day) of Level B Subsurface Utility Engineering will be performed. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. TASK 9 - PERMITS 9.1 United States Army Corps of Engineers (USACE) Permitting • USACE 408 Permit o Prepare 408 permit submittal cover letter. o Perform of an archaeological survey in accordance with USACE and Texas Historical Commission (THC) requirements of proposed open cut areas along the pipeline alignment. o Prepare a Waters of the United States (WOTUS) report and up to four (4) aerial exhibits dictating federal floodway boundary, proposed improvements, and WOTUS boundaries. o Preparation of up to six (6) aerial exhibits. o Review, respond and address up to two (2) rounds of USACE/TRWD comments. o Compile correspondence with USACE on hydrologic and hydraulic analysis study for proposed lift station site. o Compile official species list from U.S. Fish and Wildlife Service. o Prepare for and attend up to four (4) meetings with TRWD and USACE. • Global Stability and Seepage Analyses o Seepage along the horizontal bore beneath the levee will be evaluated for 3 possible sources. ■ Tail water flow thru existing trenches at each end of the alignment. ■ Horizontal seepage from the river thru porous and seams that may exist within anticipated surficial layers of clay and sandy clay. City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 16 of 19 ATTACHMENT DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 ■ Upward water mitigation from an anticipated pressurized granular aquifer soil beneath anticipated surficial layers of clay and sandy clay. o The seepage and slope stability analyses will consist of field and laboratory investigations, engineering analysis, and will be included in the geotechnical report prepared by a Registered Professional Engineer. o To perform the analyses, the scope of work will consist of the following: ■ Install two (2) monitoring wells. ■ Perform deep boring and install a monitoring well at the topo the existing levee. ■ Install shallow monitoring wells on the downstream and upstream of the levee for seepage analyses. ■ Perform Laboratory Testing. ■ Seepage analyses with Seep/W. ■ Slope Stability Analyses with Slope/W ■ Evaluate the impact on the levee and the horizontal utility line bore caused by possible seepage thru the annular space around the new utility line. o Results of field and laboratory work will be presented in an engineering report. The report will include recommendations to guide design and construction of the foundations and will include the following: ■ Recommendations for trenchless installation operation. ■ Water level reading records of the monitoring well. ■ Seepage analyses with Seep/W. ■ Sloe stability analyses with Slope/W 9.2 Burlington Northern and Santa Fe Railway (BNSF) and Fort Worth &Western Railroad (FWWR) • Coordinate up to three (3) railroad crossings. • Obtain Railroad crossing requirements. • Submit one (1) plan sheet to each railroad owner for each proposed utility crossing. • Plan sheets will be formatted per the AREMA guidelines. • Proposed utilities crossing railroads will be designed in accordance with the railroad owner and AREMA guidelines. • The ENGINEER will attend up to four (4) coordination meeting with the CITY PROJECT Manager and or a Representative from each Railroad. City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 17 of 19 ATTACHMENT A DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 • The ENGINEER will make one (1) visit to each proposed utility crossing with the CITY Project Manager and or a Representative from the Railroad to convey the design intent. 9.3 Gas/Petroleum Line Permitting • ENGINEER will coordinate with up to five (5) gas/petroleum entities for crossing permit applications • ENGINEER will file permit on behalf of the CITY. • ENGINEER will include executed permit(s) in contract documents for bidding. 9.4 TRWD Coordination • ENGINEER will coordinate with TRWD concerning the project being within TRWD property, adjacent to the Trinity River Vision project, and impacting the TRWD trails. Assumptions • One (1) site visit by ENGINEER's qualified scientist to gather information for the memo. Deliverables A. One pdf copy of applicable permits B. 1 copy of 90 percent CITY PROJECT submittal to TRWD C. USACE 408 Permit Additional Services not included in the existing Scope of Services —CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition including temporary right-of-entries. • Services associated with USACE Nationwide Permit 12 Pre-Construction Notification including wetlands mitigation, if required. • Services associated with preparation of an Individual Permit with the USACE. • Services associated with preparation and acquisition of a GLO Easement • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre-qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Construction management and inspection services • Periodic site visits during construction phase City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 18 of 19 ATTACHMENT DESIGN SERVICES FOR MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.:103497 • Additional public meetings not identified in the scope of services. • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services related to submitting for permits (ie.TxDOT, railroad, etc.), unless specifically addressed in scope of services. • Services related to Survey Construction Staking • Services related to acquiring real property including but not limited to easements, right- of-way, and/or temporary right-of-entries. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Construction Shop drawing review, samples and other submittals submitted by the contractor. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY in addition to the amount authorized by the original contract. City of Fort Worth,Texas Attachment A PIVO Release Date:08.1.2014 Page 19 of 19 ATTACHMENT B COMPENSATION Design Services for MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR CITY PROJECT NO.: 103497 Lump Sum Project I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $1,454,775 as summarized in Exhibit B-1 — Engineer Invoice and Section IV—Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III, Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 1 of 3 B-1 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount Prime Consultant Kimley-Horn and Design and Bidding $967,858 66.5% Associates, Inc. Proposed MBE/SBE Sub-Consultants Alliance Geotechnical Geotechnical Report $123,520 8.5% Group JQ Infrastructure, LLC Structural Engineering $72,590 5.0% Non-MBE/SBE Consultants Cox McLain Archeological Services $13,613 0.9% Gorrondona and Survey/Easements $145,724 10.0% Associates, Inc. The Rios Group Subsurface Utility Engineering $44,050 3.0% Bennett Trenchless Trenchless Engineering $87,420 6.0% Engineers TOTAL $1,454,775 100% Project Number & Name Total Fee MBE/SBE Fee MBE/SBE $1,454,775 $196,110 13.5% City MBE/SBE Goal = 10% Consultant Committed Goal = 13.5% City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 2 of 3 B-2 ■ * :E „ : m ET(n«;±± n e n -0 T \\ � (\\)2] ) \ \� \ \}\}� ! / \ § \ ( c ¢ q \ 7 .. A) @ GE ° - 7 ( (D / } ~ q $ o E ¥1. < o CL / CD w CD r 0 - § \ f / E ] m ƒ 2 k � \ -n- m o Li m ;am , / q qE»(_ \$ > o> E \ CL \ k > \ ) ! � / e _; \ T.\ § a � � # k = E \ 2 [ q - � > \ > 2 ! [ -cn ( § § Q § 3 \ \ ! - - < CD ® a ; _ CDo - } \ .0} \\ 2 \ } / & 2 x � \ p 0 \ § La $ / 0k ~ } ] ) CL ( } / \ \ } \ � ! ! ;¥ . 7 } / 0. / \ \ o \ - ;®® n Temkg� ) - }\3/\ ] \®�$©oo o �f 3 ® ea o m ( )§00 � z \ Mi \ eCD ! »41 & § ~/ $ / \ \ \ ` \ \ (D : m \ � a.L \ \ l, 77 2, : » — ; ,± »» ' ! � z3 ( / � _- o - � » » ( } } g go ! ) CD 0 E \ } - CD > 0 - : : IN - 0. { ( �2 / [ \ � \ -(n(n;_® % 0 'a § CD\\��� j \\ }�\ \ in ) 3K§ z a 2\ / e § % , \ u) \ = f 2 ) § 0 - / / [ ( \ J / ) ƒ / ° / ` J _ Q _3 ((kp \ o>� \ 4 $ m § \ m 2ƒ J£\ /} } ! 7 � ! : § % \ f\ ! ~ ° z3 m \ \ z �_ - � ) - \ ( \ \ 3 3 (D \ � o o. o. o 22 ( obi o N N o -- - - � l J N N N -� N - O N ,0.. IV IV N IV N IJ IV !J !J IJ IV !J N N N N�-� � N N N N F -+ (J !J !J IJ . !J :i7am. m mu01i D m 0 0 O g v O A o D A m 1 0 u O O O D 7u 1 A O x A x o. 0 q)zT O al x m D � o o m o 0 a -2 () O (0 v y v 'm 9: O m 3 0 °) R C �_ fDm _ 3. f o f _ O N ° c, v a m _ m m m o d �'° 3 `° n 0 3 m c j O T y T m j -_ o N ° - m m 3 d D y T O o v S' s T D N D o »_ »_ =. O m o 8. - - °- O 3 O '^D _ O ry 3 D ¢ 3 ET O H G N 3 0 3 3 - .m V O O d A V A A d w M d� A � r O W N A -+ N N W N N OI OJ -� Ol Ol A N A Ol O) A A W OJ dl A N N N A N N O M. •0 0 W N q o N W W W N m N w o 'D R. in = M O N j j A W Q) A A Of N W W Of W m N 0 0 O A 01 W N N N N 47 A A N - Q Er(p' Q m m N`z 0 C 2 N f�D TW1 A W �jj W -4 A W m N W O N O W .1.1. O O A Ol O A A O OJ A W 0 W CD D (p N a W D) -•n � Q v O O s (D � z. N• N.N.N W N � -N--N W N A A W W N A W Ut A V W Ut W A A A J J tli N t0 A N t0 V V W V � A �I .Hi y W A Of O V N V -� O m Q7 Ut N o �O IV IJ Gt o o O O O O O 0 0 N 0 0 0 0 0 0 0 N(n N O 0 0 N N O O O N O O O O O O O 0 0 0 0 O O O O 0 0 0 0 0 0 0 0 I .6 3 0 G 0 01 o m y 2 c O O 3 � x d ° x � G O O a T A A N a l0 '� �a c 3 o N N >> m n9 � O O N N j y b1 in N H! N N N O N N Va N N bi 0 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 0 O 0 0 0 0 O O 0 0 O N VI N N N fn f/i b1 N N N N N N H N N� y N N � O N N N N N N d N (D N A A W W N A W Ot A V W W A A A J J 4i N tp A N W V W W J A V -G OI A m O O O o o H1 w O W O a O b1 d1 0 O O0 N O 0 0 0 o O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 O O 0 0 0 0 0 0 0 0 D O 3 3 O a C ry w 1p a o ° v T ° � A N W N O N N � <<n D O A w N m C F _ G Z O 71 0 Drn O O O S O o < < < v -. N o O m N v m v oD, 0 0 0 (n O A w 0 0 < < D o x -i m e 21 w ° y = o o m m f O 2 ^. p _. y'v 3 �' l N �.' Q O in N�° _ ? n - , 3 T o �- d o_»3 ^' d N d rn 3 = N O O N j E CO N N N N A N O f�U y ° j N O Q ° < a < m ST P A 9 v N N A w k II d 'D fn - d CI O — 1 a O N N rn O T o ° — Jpa, w m ° o 'p 0 - (Q Q m x C N ID rn K M ID W A rn W rn W N O A rn A W Ut W O O O N m A rn O A W W rn rn rn N N N A jjN W UJJI N Uf O L , m IV�77'Q W ` W N a a -0 N T 0 3 ? N Q O N a)A N N N N y = 1 0 O Z CD rD w ip bi H ip Fly w N N N w' N N H H N I N w . O N N W' O ti N w W w N j W W N N N O) V N N N O N N N N W N W N I N N W N N b)N A N 4I Ut N »y CD 0 0 O O . .0 W W N N O O O O N.W 0 0 0 0 0 0 .O A o A rn (O rn N N A A V OI ip O � m rn 0 I0 0 0 0 0 0 E/1 O o O 0 0 0 b1 0 0 (p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 O 0 r1 W N N C3 Q N V tp N N m O O rn Z Q H � ° A W W n m E sn m x m1p V W A (Wli W N N W N A N O N N W W 9 O O O O A.Z7 o O O �n a c 0 0 � x W N.� d W V1 W W W N W N W O bi N to W W O En N N N w(�w fn N N N N N i/� N N W O w b1 N iN 4! �ry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -I d w W w W tO O O N O O O M U1 J 0 0 O O O O N .W W O O O O O O O O O O O O O O W N tO O O N 0 0 0 0 0 0 f11 O N V 0 0 0 0 0 0 0 0 0 0 0 O O O 0 0 0 0 0 0 D° O9 G ry .ems tD a o'° 9 � N 'rn N N O N m�D N N V m N�A W N W N -� N N N N !J N -+ N N N -+ -� -� — O N N N N m V V V V J N N N N N F o r� O A n m? N o oo n ;vvvaDO o m T m 3 T m a 1D o o < ° < < c �. c o 'V (n T d -o `° n�i a 3 o N v o a o .]in.. m p D z v O - c aN °am ?TR' o 3 H o a n 'o ' A < 3 2 mm o m a O 3 7l d N V N - O � D) O - 3 CD N u v CD NO o o n a m v o X D < 9 o yto 0— y (fl Q m X N eY ID tD WW OI N 0 0 0) A O1 O) W T W N N N N N Ol O O O O J O N A N T r. -k nDOO(n W O OCC ° N CD C M Z N N N j N N N N N W N N N N N N N N N N N N N N N N N N N N V N O (D N O H O 8 8 N ?!J 8 N Q)J l0 <.t W A O .m V fN --� O O O O O O O O N 0 0 0 0 0 0 O O O O N O O O O N O O O m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O .� M N j w 3 O N � 1 m o o m O N Z v O ] O N ° 3 ] O G o O A p m ] X 3 ° N W W O N V V N C F 0 0 01 V V O O m A N ° N'p �a c 0 o a o is m x NO N N N ff W . . N N N ? O N N A O N N N N to 0 .N N W NN N0 0 o 0 00 0. 1 �N N � N N N N w N N N L N�W N N A m W W N A Ut W AN O1 O O -+ NA tJ� N o A O O) V t0 W W A O O O OO N 0 0 o a o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o n I. 3 O v c � a n T O N v m � m] m" m W N Ut N TA D O w w 'OZ o tD t0 t0 �O �O O W W V V V V O �O t0�O N A l0 t0 10 t0 W �O t0 t0 l0 IJ tp 4I!J m V A W V V N A C� Q G IJ A W N -� A W N W �I 01 fly A GJ !J IV O a 3� u m m 0 z mo o N min 1 T m C VIn -I O W n A A ,'0 Z n 0�a A�n A N v_i 3 3 �n rn zz: 3 N m 3 of O � � c D q N 3 m� 3 m m 0 0 O 3 a T T o - _� m `� v 3 0'm y m m N °-' m '�° Z a _ C 0 a a m `�. c N 9. ' D s » v 1 N n n f j O 3 m N m v m m a x 03 M o C o p w T m - A a � w O O O O O M a T w a 3 n A O A N N N N N N N N N A A N N A A N jj 1j. M O T o � N (� o W W W O VIjj[ ,.« m a o w�a F c mkx IDz o 0 !. m `. WSW N Z ? A � 'C fD D N C, _ O 0 0 o y � C � Z W N W N W N W N V�41 VI H N� N A V . Ut w W . N A y. W (J UN N W w O fT W w O . W W V -� w. N W W 0 O' C! 0 0 . 0 0 0 O O O O W O O N 0 0 0 0 W O O f/�N O N M N to O (p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0 .v n 3 O m w I o w m o N z c 0 0- b N O O 7 W w A V W W C O m O N J I . N 0 o m w V W W O A A 0 0 0 m � m V W W N A V W W C O Ut W A (n O N w O N N W w 0 0 0 T A A �V �a A �p M 10 m N to M ? H M N N A n9 O O (n A O W V A m w w N O O N V N--N-- b) -- 0N N W N N W ff!N HI V tWli O W W V N N N d) V i/�N N W ~ry OI0 0 0 0 0 0 0 0 0 0 W O O w 0 0 O 0 0 0 0 O 0 0 0 0 0O O O 0 0 0 0 0 0 0 O n W j O N N W N W_ W_W N W O V W W�I 0 m A 8 cVii can o 0 0 .1.181.11. 0 0 0 0 0 0 0 0 0 0 o cJii a u o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 no 1 O C jp � w UO M O a o'a 9 � D A J O � \ A N 0 ge}/ )\\\ § \ }§ \\\ 7® EL \\o \ >§ cn . CD_ n am _ƒ (\ § 2 / ( =( . l � Ea — j . . \gqq ( ® $ ° ° — \\ƒ ` ° ^ / 9 \ 2\ § \ £ \ � e � (D2 & @ ® § [ /\ � � � ) � $ k k ; � O ; a , � \ m m\\R / m : ((\/\ � - a !&; , ; ! , /{ !} \} ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for MARINE CREEK SANITARY SEWER PARALLEL INTERCEPTOR City Project No. 103497 No changes City of Fort Worth,Texas Attachment C PMO Release Date:05.19.2010 Page I of 1 p W v J mlNn A N O J mA d d O N •O Z N o -u 0 N 7 oZi m o n c o D v a d o m ry m m 3 s o m s n to :il � n m < 3 s < W 'O ( o f m n- a m m o a 3 '� ci .< ,N--« m D !^ m o a m m v 2 nm v m e _ o w m ° O m cn m CD o x m o p C� m' m * : I m M Q � m � o m fn m m o ° N (D M n N a m m y m p o 3 n m C� o. m m o m O N T o < 3 0 0 0 n f° a 00 m cn c ' m ((D n a cfl 3 _ a S a y O n CD (7 S m (U 3 (D N (D (n (n CA Cl) (n W -A N CO (O N (n W Cn W w O Cn. O a °i j a o a a C) N o 0 0 0 0 0 o a C) a 0 0 a (D(n o o a o C N a O N a N w a a a a a a a a a N a w a a a a s 0 a N j m a m < < m m v m m m m m � l< m w m m m m o N K y 0 `G N N `G `G `G `G `G `G 'G `G `G (� `cn N `G `G W `G (n- U) N 0 (n (n N 0 N (n rn N (n N y � N a N � N N S S 7' 7' 7' C C S C 'S 7' S S 7' C C C C C C C C C Ca C C C C C C C C CC C C C CC C (D C (D (D (D (D (D (D fp 7 � � 07 0) 09 C` (` (\n (W W (\a W N N ` N .�A — N A t -' 3 S S S O O O N O N N ? (O A N N N N 2 2 2 N N N N' N N N N N N N N N N N N N W N j j �. N N zt N o m N N N N N N N N N N N N N N N CC CC ¢¢ � F m ° F (D (GD W ((D (CD W N (CD (Co N N (CD (CD (CD N N (D N N N (D (`D 0 0 0 0 0 CCD ' A z a a a a a a a a a a a a a a a a a a a a a a > >_ a s m n 00 N N N N N ; m N N N N N N N N N (n cn = N N O N N N N N N N N N N N N N N N N N N N NS, N CD m N D � Cn m 1 N v Z (D(n O CL Na � v j � fl o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ono m n Ln a o 0 o a o 0 3 � O v a m W o 'c 70 O a (D 3 3 N 'O O o n m O 3 O 0 � � m n N io = 0 O A 0 A A 0 A p) Q in in v+ in A l0 A A A A ..pp A A A w d AW A w wwww A N O 1p N fD N O N u R N T1 T v m W (7 m n C) N D 3 a In "rl ;0 m° m m ID I o y m o r, - Nm = 3 n N S O mm m s < o = w < O po> N w o (n C _w _ -0 m 0 m C 'O N a ,� 7 O � — cn (Q N y (D r. 2 < m �Q (o• C - o D o' m C < m � 3 F n CD m ° m o N O_ + O 3 ° m [n 3 in N m ((D W Q1 co A m .P. N N W W m .A i -� A (T N -� CT (It W W W --� A O a (n o 0 0 o m m o O o o D o n (n cn o' a o (n o a n o 0 0 o c _ n a a n n a o o a a n a o a a m CL a a m a n a w m CL a a a N m N N N fU a s S11 S11 N N a ill fU �< S11 f17 m < N N N 'G �< w N N N �G `G `G y `< `< (n �< (n en (n y y y y (n N .� y (n (n (n .0 y N y (n fn (n (n (n (n (n W (n (n y -I -i =r zy -I I' --I -I -I -1 (O (O (O (O f0 W m O1 (O ` M N In O N N N N N. N N N N N N N N N N' N N N N N N N N N N N N N N N N N N N T z m m m m m m m m m m m m m m m m m m m m m m m m m m m m Z a a a a a a a a a a a a a a a a a a a a a a a a a a a a s m N W -� W 00 A W A c0 W V (O — — — (0 — (O (O (O (o W n � O N O N \ O O 3 A D N N N O O (O N --• A (D A A W (O N W W .A N N A M A N N m W W W m N O m (O N m m m y W W N N N _N) N. N N N N N N N N N N N N N N N w W W N N N W N N N N N N N N N N N N N N =r N N Na N'. N N N N N N D 44 w (O W J m (n co N (O W m ? (n A W co A A co W a w n 0 ° n (o ® o o o o o o 0 0 0 0 0. o. o CD 0 00 o'. o o 0 0 o 0 0 0 0 0 o n m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 o a o 0 0 0 N _ 3 3 3 o - m w3 rl o m 70 0 -0 m a a m o N r O Z � u n m V 70 m i a I 0 o o A 0 N A o � � a N � Ty V J JW N O i0 (A J T to N O t0 OD N 0 N' O N 3 N N N n m v_n -n (o cwi v O C�C!l In N �7 0 m o -0 r (n O m � K _ N C O C C (p O O � S O (p N f° N: (� C n. a. (n Q y o' a• < °' o a w c� m Qoti0 _w m4n ID =° D ° ';'a' c ' , o F� n ID C n w �m 3 0 � O pw v (D °w N N jCD woN N Cn N N M.'O 3 3 0 .e 7' lfl O n N O � ((D N p�j 3 cN y B fll � (D 9 Cn O 3 O O w N O S O Q 0 W CD C O N N 0o - Cn Cn N Cn Cn -+ � .� Cn .P N Cn O 0 0 (n a m o o n o. a o a o_ o 0 o a n (n o o a (n a n c _ o a a w °i a s U7 w w w n w w a n e w w a n a w a w w rt n w w l< a. w w c. l � w l< l< w w w l< l< w w w l< w l `G ((n N N N N < N (� N N N N N N 0 N N N N N N (n N N o N 0 S S S S S 7' S S S S S S S S S S S S S S S S S S S =r C C C C C C C C C C C C C C C C C (\ N r � - N Oo ^D N N N N N N --' - _� (O N N -• n N N j w W W (NCI N N N N N N N - .i .i N W ? N N N N N N N N N W N N N N O O O N W W W W W W W W (W W W N N N (D (D (D (D (D CD (D (D (D (D (D CD (D CD (D CD (D (D —' (D Z a n n n a n a a a a a n n n a n n n n a a a n n n m (\n N .� .a W W s N N N N N .� — — — — N N N A N N N N (` Q Q N (`t W W\ W N N W. j m D N N C, (''� W N N N W m wS N A ? N -P N 4h- W W W W W W W N W W N N. .. N N 7C n (n (n W N N N N D co Oo -I V V Cn N m m m W W v Z (D N T -4 W to M -A O O O O 7 a Uf 4. .P A m to — o 0 o O. 0 0 0 0 0 C) 0 0 0 0. 0 0 0 0 0 0 0 0 0 (D 0 C)n o to w 0 0C. 0 0 C`G o N mW of b ;a O D c c 3 Z 2 2 N r O o r A m a N r oW u r mm m O N 2 � 7 � m o m 4� O 0 A O N ATTACHMENT E r \ o t+tl�l COD� L-, U) ` f U ui cl J iJ �\ .NEq J-1J L J J_JJa gym,. • r � j � ,. a.,� •. shock' , Yr LU IZ 1 NE-23RD:ST PROPOSED 42-inch M-279 REHABILITATION PROPOSED 42-inch M-279 - ti; PARALLEL INTERCEPTOR \ PROPOSED 69/72-inch J21ST.ST, / U'` - \ M-245B REHABILITATION gyp \ S���O�� OoNN ol Z, V14. NE 12TH_ P - I O PROPOSED 72-inch M-245B w PARALLEL INTERCEPTOR FORT �V'oRT ATTACHMENT - F City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, January 11, 2022 REFERENCE NO.: **M&C 22-0042 LOG NAME: 60MARINECSSPI-KHA SUBJECT: (CD 2 and CD 9) Authorize Execution of an Engineering Agreement with Kimley-Horn & Associates, Inc., in the Amount of$1,454,775.00 for Design of Marine Creek Sanitary Sewer Parallel Interceptor, Adopt Attached Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt and Adopt Attached Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Kimley-Horn & Associates, Inc., in the amount of$1,454,775.00 for design of Marine Creek Sanitary Sewer Parallel Interceptor; 2. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds of future debt for the Marine Creek Sanitary Sewer Parallel Interceptor project; and 3. Adopt the attached appropriation ordinance adjusting appropriations in the Water and Sewer Commercial Paper Fund by increasing appropriations in the amount of $2,824,580.00 in the Marine Creek Sanitary Sewer Parallel Interceptor project (City Project No. 103497) and decreasing appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount. DISCUSSION: This Mayor and Council Communication is to authorize the execution of an engineering agreement with Kimley-Horn & Associates in the amount of$1,454,775.00 for the Marine Creek Sanitary Sewer Parallel Interceptor project for the preparation of plans and specifications for sanitary sewer main installation, rehabilitation and water main replacement on the following streets, alleys and easements. STREET FROM TO SCOPE OF WORK COUNCIL DISTRICT NE 23rd Street Stockmans Samuels Water & Sewer 2 Drive Avenue Samuels Avenue NE 23rd E. Northside Sewer 2/9 Street Drive East Northside Drive Samuels 200 LF east of Sewer 9 Avenue RR Samuels Avenue Northpark NE 12th Street Water JE�] Drive Burlington NE 12th Street Samuels Northern Water/Sewer 9 Avenue Railway right-of- way Burlington NE 13th Street Samuels Northern Water/Sewer 9 Avenue Railway right-of- way NE 14th Street Samuels Burlington Water/Sewer �F 97� Avenue Northern Railway right-of- way Burlington NE 16th Street Samuels Northern Water/ Sewer 9 Avenue Railroad right- of-way Burlington NE 17th Street Samuels Northern Water/ Sewer 9 Avenue Railroad right- of-way Easement between Samuels Avenue and Burlington Northern 12th Street 1690 feet north Sewer 9 Railroad right-of-way Burlington Sewer Burlington Easement north of North Park Drive Samuels NorthernAvenue Railroad right- Northern Railroad 9 right-of-way of-way The proposed scope of services includes route analysis, floodplain and railroad permits, design survey, sewer main design, easement preparation and sub-surface utility environmental engineering. The project includes design of a 42-inch parallel interception to sanitary sewer main M-279, design of a 68/72-inch parallel interceptor to sanitary sewer main M-245B and design for the rehabilitation of the existing sanitary sewer main M-279. Kimley-Horn & Associates, Inc., proposes to provide all the necessary design services for the Marine Creek Sanitary Sewer Parallel Interceptor, for a fee of $1,454,775.00. Staff considers the proposed fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $1,369,805.00 (Water: $36,700.00; Sewer: $1,333,105.00) is required for project management, utility coordination, real property acquisition and material testing. This project is anticipated to be included in a future revenue bond issue for the Water and Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used to provide interim financing for this project until debt is issued. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement Resolution. Under federal law, debt must be issued within approximately three years to provide reimbursement for these expenses. Adoption of this resolution does not obligate the City to sell bonds, but preserves the ability to reimburse the City from tax-exempt bond proceeds. Funding for the Marine Creek Sanitary Sewer Parallel Interceptor project is depicted in the table below: FUND Existing Additional project Total* Appropriations Appropriations W&S Commercial $0.00 $2,824,580.00 $2,824,580.00 Paper Fund 56020 Project Total $0.00 $2,824,580.00 $2,824,580.00 * Numbers rounded for presentation Business Equity: Kimley-Horn & Associates, Inc., is in compliance with the City's Business Equity Ordinance by committing to 10 percent Business Equity participation on this project. The City's Business Equity goal on this project is 10 percent. The project is located in COUNCIL DISTRICTS 2 and 9. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified-All Funds project within the W&S Commercial Paper Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Commercial Paper Fund for the SS Main M-245B & M-279 REPL project to support the approval of the above recommendations and execution of the agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs),: TO Fund Department ccount Project Program ctivity Budget Reference # mount ID ID Year (Chartfield 2) FROM Fund Department ccount Project Program ctivity Budget Reference # mount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by_ Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Liam Conlon (6824) ATTACHMENTS 1. 60MARINECSSPI-KHA Fid Table (NN 10.06.21).xlsx (CFW Internal) 2. 60MARINECSSPI-KHA Compliance Memo.pdf (CFW Internal) 3. 60MARINECSSPI-KHA Form 1295.pdf (CFW Internal) 4. 60MARINECSSPI-KHA funds availability.docx (CFW Internal) 5. 60MARINECSSPI-KHA MAP.pdf (Public) 6. 60MARINECSSPI-KHA 56020 A022(r3)r.docx (Public) 7. 60MARINECSSPI - KHA Reimb Resolution(r).docx (Public) 8. Kimley-Horn &Associates, Inc. SAM.pdf (CFW Internal) N N N N N N N N N N N N N N N 90 90 90 90 90 90 90 N 90 90 90 - 90 90 RO 90 9 W W W W W w W W W W W W W W W Ul Ul Ul In Vl Ul Ul w Ul Ul In In Ul Ul In U1 Ul Q1 Q1 Ol Ol Ol O1 Ol O1 Ol Ql Ol Ol Ql MCI) Dl cn n O O O O O O O O O O O O O O O O O � N N N N N N N N N " N N N N N N N O O O O O O O O O O O O O O O O O N O O O O O O O cm) O O O O O O O V J V V V V V V Ili J m Ol V m Ql O O O O CD O O O O O O O O O O O O O O O O O O O O CD CD A A A A A A A A A A A A A (� A A w W w W w w W W W W W W W CD CD CD O CDO O O O O O O GT O O U7 In w U7 Ul U7 Ul Ln Ul Ul Vl Ln W W W V W J w N W W F' O Z O Z N W N A w F-' "' W F-� F. w F, A � LIJ A "Ln D O O O O CDCDO CD CDO O O w w W O Ul V-' O Ul F, W Vl 1--' LnO Ul F, C. 0 F, O 0 Ul 0 0 V �mj lVD n 0 0 0 0 0 F-'- 0 0 F� O O N o C O C O O O O 0 O O O O 0 CD O O O Z O Z w w w w w w W W w W w w W In F, In A A A A A A A A A A A A A A -0 A lD tD W tD tD w w t0 tD w w w W W M W m V V V V V V V V V V V V J O n O n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 F--� F- F� "' V J V V J V J V V J J 00 00 V A A A W W W J W W A A O O CD O O O O O O O J tD w to tD W tD W w tD tD w tD tD N N N N W tD W tD W tD tD tD W tD to tD lD O O O O tD w tD t0 W tD W w tD to tD w lfl N N N N w w tD tD w w tD tD tD w to tD tD N N NNJ N �• • {/ V V1 V* VT V? V? ~' LT V> N N VT L? V� V> N F, F-` m O N W Vf W W A A W 0o V? O O O O Dl V> CDV> tD W w w N N H W w O O O O F� Ul Ul tD tD W m 0 0 0 0 0 to O F- O V V O O A A m A O O O o 0 w O O O w O tD w 00 00 Ul O O O O O O Ol O O O lD O F, lD ID 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O In In m m m m n v C n O O c lv d d -• 3 N = w h h or d 3 3 3 3 fu m `�° lS c n m m m m n p In n n In h h + 00 h �-'' h �O-r Q ' Q D D D D n n m n n i -0 i Ln a0- p3j C C C S �- O E O ill N In -�+ h O h• r-F h_• h• O LA O O O O O O 3 7 7