HomeMy WebLinkAboutContract 57029 CSC No.57029
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality
("CITY"), and Neel-Schaffer, Inc., authorized to do business in Texas, ("ENGINEER"), for a
PROJECT generally described as: Water and Sanitary Sewer Replacement Contract 2020,
WSM-J — Project No. 103420.
Article I
Scope of Services
The Scope of Services is set forth in Attachment A. Negotiated changes to this
Agreement, if any, are included in Attachment C.
Article II
Compensation
The ENGINEER's compensation shall be in the amount up to. $543,512.00 as set
forth in Attachment B. Payment shall be considered full compensation for all labor
(including all benefits, overhead and markups), materials, supplies, and equipment
necessary to complete the Services.
Engineer shall provide monthly invoices to City. The Engineer shall provide the City
sufficient documentation, including but not limited to meeting the requirements set forth in
Attachment D to this AGREEMENT, to reasonably substantiate the invoices.
Payments for services rendered shall be made in accordance with the Texas
Prompt Payment Act (Texas Government Code Ch. 2251).
Acceptance by Engineer of said payment shall release City from all claims or
liabilities under this Agreement for anything related to, performed, or furnished in
connection with the Services for which payment is made, including any act or omission of
City in connection with such Services.
Article III
Term
Time is of the essence. Unless otherwise terminated pursuant to Article VI. D.
herein, this Agreement shall be for a term beginning upon the effective date, as described
below, and shall continue until the expiration of the funds or completion of the subject
matter contemplated herein pursuant to the schedule, whichever occurs first. Unless
specifically otherwise amended, the original term shall not exceed five years from the
original effective date.
OFFICIAL RECORD
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services CITY SECRETARY
Revised Date:November 23,2021
Page 1 of 15 FT. WORTH, TX
Article IV
Obligations of the Engineer
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing under the same or similar circumstances and
professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that could
affect the total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 2 of 15
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong -to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the contract documents and any health or safety precautions
required by such construction work. The ENGINEER and its personnel have
no authority to exercise any control over any construction contractor or other
entity or their employees in connection with their work or any health or safety
precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that
the PROJECT, when completed, will be in accordance with the contract
documents, nor shall anything in the contract documents or this
AGREEMENT between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on-site inspections to discover
latent defects in the work or otherwise check the quality or quantity of the work
on the PROJECT. If the ENGINEER makes on-site observation(s) of a
deviation from the contract documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the contract documents.
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420)
Revised Date:November 23,2021
Page 3 of 15
II
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that
the CITY's actual PROJECT costs, financial aspects, economic
feasibility, or schedules will not vary from the ENGINEER's opinions,
analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
E_NGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the contract
documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are no other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 4 of 15
I. Business Equity Participation
City has goals for the full and equitable participation of minority business
and/or women business enterprises in City contracts greater than
$100,000. In accordance with the City's Business Equity Ordinance No.
25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in
Chapter 20, Article X of the City's Code of Ordinances, as amended, and any
relevant policy or guidance documents), the City has goals for the full and
equitable participation of minority business and/or women business
enterprises in City contracts greater than $100,000. Engineer acknowledges
the MBE and WBE goals established for this contract and its execution of this
Agreement is Engineer's written commitment to meet the prescribed MBE and
WBE participation goals. Any misrepresentation of facts (other than a
negligent misrepresentation) and/or the commission of fraud by the Engineer
may result in the termination of this Agreement and debarment from
participating in City contracts for a period of time of not less than three (3)
years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
(3) ENGINEER and subconsultant agree to reproduce such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of hard copies at the rate published in the Texas Administrative Code in
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 5 of 15
effect as of the time copying is performed.
K. INSURANCE
Engineer shall not commence work under this Agreement until it has
obtained all insurance required under Attachment F and City has approved
such insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY. The doctrine
of respondent superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required,
at its own cost and expense. However, if design changes are required due to
the changes in the permitting authorities' published design criteria and/or
practice standards criteria which are published after the date of this
Agreement which the ENGINEER could not have been reasonably aware of,
the ENGINEER shall notify the CITY of such changes and an adjustment in
compensation will be made through an amendment to this AGREEMENT.
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [10342.0]
Revised Date:November 23,2021
Page 6 of 15
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
A. City-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights-of-way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 7 of 15
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of such
materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at the construction site,
and provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third-Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering services
performed. Only the CITY will be the beneficiary of any
undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third-party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third-party beneficiary rights under this Agreement.
hall e construed as a waiver f an
4 Nothingcontained in this Section H. s b o
Y
right the CITY has to bring a claim against ENGINEER.
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services (103420]
Revised Date:November 23,2021
Page 8 of 15
I. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
J. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
CITY and ENGINEER shall exercise their best efforts to meet their
respective duties and obligations as set forth in this Agreement, but shall
not be held liable for any delay or omission in performance due to force
majeure or other causes beyond their reasonable control, including, but not
limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters,
epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
II City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 9 of 15
D. Termination
(1) This AGREEMENT may be terminated
a.) by the City for its convenience upon 30 days' written notice to
ENGINEER.
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days' written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Reasonable cost of reproduction or electronic storage of partial or
complete studies, plans, specifications or other forms of ENGINEER'S
work product;
b.) The reasonable time requirements for the ENGINEER'S personnel to
document the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all projected termination
expenses. The CITY'S approval shall be obtained in writing prior to
proceeding with termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
The ENGINEER shall indemnify or hold harmless the (CITY against
liability for any damage committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control to the extent that the damage is caused by
or resulting from an act of negligence, intentional tort, intellectual
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 10 of 15
property infringement, or failure to pay a subcontractor or supplier. CITY
is entitled to recover its reasonable attorney's fees in proportion to the
ENGINEER's liability.
G. Assignment
ENGINEER shall not assign all or any part of this AGREEMENT without the
prior written consent of CITY.
H. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
I. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
J. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the wort: hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or
may be enacted later by governing bodies having jurisdiction or authority for
such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless
CITY and all of its officers, agents and employees from and against all
claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
K. Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel,
have reviewed and revised Agreement and that the normal rule of contract
construction, to the effect that any ambiguities are to be resolved against
the drafting party, must not be employed in the interpretation of Agreement
or any amendments or exhibits hereto.
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 11 of 15
The failure of CITY or ENGINEER to insist upon the performance of any
term or provision of this Agreement or to exercise any right granted herein
shall not constitute a waiver of CITY's or ENGINEER's respective right to
insist upon appropriate performance or to assert any such right on any
future occasion.
L. Immigration Nationality Act
ENGINEER shall verify the identity and employment eligibility of its
employees who perform work under this Agreement, including completing
the (Employment Eligibility Verification Form (1-9). Upon request by CITY,
ENGINEER shall provide CITY with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this
Agreement. ENGINEER shall adhere to all Federal and State laws as well
as establish appropriate procedures and controls so that no services will be
performed by any ENGINEER employee who is not legally eligible to
perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD
CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES
DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER,
ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR.
LICENSEES. CITY, upon written notice to ENGINEER, shall have the right
to immediately terminate this Agreement for violations of this provision by
ENGINEER.
M. Prohibition Can Contracts With Companies Boycotting Israel
ENGINEER unless a sole proprietor, acknowledges that in accordance with
Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or
more full time-employees and the contract value is $100,000 or more, the
City is prohibited from entering into a contract with a company -for goods or
services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company"
shall have the meanings ascribed to those terms in Section 808.001 of the
Texas Government Code. By signing this contract, ENGINEER certifies
that ENGINEER'S signature provides written verification to the City
that if Chapter 22711, Texas Government Code applies, ENGINEER: (1)
does not boycott Israel; and (2) will not boycott Israel during the term
of the contract.
N. Prohibition on Boycotting Energy Companies
ENGINEER acknowledges that in accordance with Chapter 2274 of the
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 12 of 15
Texas Government Code-(as added by Acts 2021, 87th Leg., R.S., S.B. 13,
§ 2), the CITY is prohibited from entering into a contract for goods or
services that has a value of $100,000 or more, which will be paid wholly or
partly from public funds of the City, with a company (with 10 or more full-
time employees) unless the contract contains a written verification from the
company that it: (1) does not boycott energy companies; and (2) will not
boycott energy companies during the term of the contract. The terms
"boycott energy company" and "company" have the meaning ascribed to
those terms by Chapter 2274 of the Texas Government Code (as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274
of the Government Code is applicable to this Agreement, by signing
this Agreement, ENGINEER certifies that ENGINEER's signature
provides written verification to the CITY that ENGINEER: (1) does not
boycott energy companies; and (2) will not boycott energy companies
during the term of this Agreement.
O. Prohibition on Discrimination Against Firearm and Ammunition
Industries
ENGINEER acknowledges that except as otherwise provided by Chapter
2274 of the Texas Government Code (as added by Acts 2021, 87th Leg.,
R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more which will be paid
wholly or partly from public funds of the City, with a company (with 10 or
more full-time employees) unless the contract contains a written verification
from the company that it: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade
association; and (2) will riot discriminate during the term of the contract
against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the
meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent
that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, ENGINEER certifies that
ENGINEER's signature provides written verification to the CITY that
ENGINEER: (1) does not have a practice, policy, guidance, or directive
that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This AGREEMENT may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
same instrument.
City of Fort Worth,Texas [W/SS 2020,WSM-Jj
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 13 of 15
The following attachments and schedules are hereby made a part of this AGREEMENT:
Attachment A - Scope of Services
Attachment B - Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
Attachment F — Insurance Requirements
City of Fort Worth,Texas [W/SS 2020,WSM-J]
Standard Agreement for Engineering Related Design Services [103420]
Revised Date:November 23,2021
Page 14 of 15
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY: BY:
CITY OF FORT WORTH ENGINEER
Neel-Schaffer, Inc.
a�8cu-al2yaf�
Da na Bur Old n� 78iI
Dana Burghdoff
Assistant City Manager ames P. Amick, P.E.
Date: Jan 22,2022 a4 Engineering Manager
.a0F°F�RT�ad Date:
ATTEST: a�►o° °°�op��
o.
o 0�10
oodaa=a,=o==o, sT p o o o
°�c
o
Jannette Goodall da °°°°o°°° ° a
City Secretary ��>z�nExAs��p
APPROVAL RECOMMENDED:
By:CJt�
istophe,Ha,d (Jan 18,202213:13 CST)
Chris Harder, P. E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY Form 1295 No. 2021-817022
By:oeIa .=o==1718CST) _ M&C No,: 22-0049
Douglas W Black
Sr. Assistant City Attorney M&C Date: 01/11/2022
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
LiairC lon
Project Manager
OFFICIAL RECORD
City of Fort worth,Texas CITY SECRETARY
Standard Agreement for Engineering Related Design Services
Revised Date:November 23,2021 FT.WORTH, TX
Page 15 of 16
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
ATTACHMENT A
Scope for Engineering Design Related Services for Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
WATER AND SANITARY SEWER
REPLACEMENTS CONTRACT 2020, WSM-J
CITY PROJECT NO.: 103420
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
The primary purpose of the project is to replace existing water and sewer lines as described
in the table below.
All water distribution lines will be replaced with PVC pipe of the sizes noted (6"will be
replaced with 8", 10" and 12"will be replaced with 12"), by open cut. The 8"water lines will
be drawn up with two plan views per sheet and no profiles. The 24"water transmission line
in Mitchell will be replaced with a 24" PVC line. No intermediate connections to the 24"water
line are anticipated or included. No bid alternates of DI, Steel, or Concrete pipe are included
for the 24" water line. A corrosion study and design are also not included for that line.
All sewer lines will be replaced with 8" lines by open cut.
No modeling, calculations or sizing of water or sewer lines are included in this scope.
All water and sewer lines will generally be replaced in their respective existing trenches.
Additional manholes (to create chords) will be required on the sewer lines because most of
the streets have curves. Installation of the water pipe on a curve is allowed.
Approximately 307 water services will be replaced. Approximately 242 sewer services will be
replaced.
Additionally, any nearby manholes with 24" cones will be replaced with 30" cones.
One air release valve at the high point of the 24"water line is anticipated. No blow offs at
low points are anticipated for the water lines. Fire hydrants and valves that connect to an
existing water line, being replaced with a proposed water line, will also be replaced.
All trenches will have temporary repairs. No significant curb and gutter replacement is
included. The roads will be pulverized and overlaid. No drainage improvements are
included.
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 1 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
CITY OF FORT WORTH WATER DEPARTMENT
WATER AND SANITARY SEWER REPLACEMENTS
CONTRACT 2020, WSM-J & 103420
No.
of
Sewer Lead
Water Water Water Main Sewer Sewer Ser- Council Mapsco
Street From To Size (LF) Cl(LF) No. Size (LF) vices District No. Comments
Mitchell Moresby Ex 10" L- 6"to
Blvd. E. Berry St. to 12" 2107 954 3373 8" 1003 8 078 W
Mitchell Moresby Ex 24"
Blvd. E. Berry St. to 24" 2023 2023 1 8 078 W
Canberra Mitchell Ex 12"
E. Berry St. Ct. Blvd. to 12" 821 8 078 W
E. Berry Ex 10" L- 6"to
Canberra Ct. St. Spiller St, to 12" 686 3547 8" 133 8 078 W
L- 6"to
Shropshire Sandgate Mitchell Ex 6" 1467 3547A 8" 140 8 078 W
St. St. Blvd. to 8" L- 6"to
3547E 8" 207 8 078 W
L- 6"to
Lowriemore Sandgate Mitchell Ex 6" 3558 8" 575 8 078 W
Ln. St. Blvd. to 8" 1192 611 L- 6"to
3548 8" 511 8 078 W
L- 6"to
Sandgate Mitchell Ex 6" 3526 8" 431 8 078 W
Spiller St. St. Blvd. to 8" 1035 L- 6"to
3559 8" 584 8 078 W
L- 6"to
Sandgate Mitchell Ex 6" 3373 8" 405 8 078 W
Rattkin Rd. St. Blvd. to 8" 873 L- 6"to
3552 8" 419 8 078 W
Sandgate Mitchell Ex 6" L- 6"to
Moresby St. St. Blvd. to 8" 859 3551 8" 787 8 078 W
Shrop- Ex 10"
Sandgate St. Berry St. shire St. to 12" 1289 8 078 W
Mitchell Binkley Ex 8" L-
Burchill Rd. Blvd. St. to 8" 3300 3300 2513 307 8 078 W
Total 15652 6888 5502
WORK TO BE PERFORMED
Task 1. Design Management
Task 2. Conceptual Design
Task 3. Preliminary Design
Task 4. Final Design
Task 5. Bid Phase Services
Task 6. Construction Phase Services
City of Fort Worth,Texas
Attachment A
PNIO Release Date:08.1.2014
Page 2 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM-J
CITY PROJECT NO.:103420
Task 7. ROW/Easement Services
Task 8. Survey and Subsurface Utility Engineering Services
Task 9. Plan Submittal Checklists
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
■ communicate effectively,
■ coordinate internally and externally as needed, and
■ proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting
• Attend a pre-design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
• Conduct review meetings with the CITY at the end of each design phase
• Prepare invoices and submit monthly in the format requested by the CITY.
• Prepare and submit monthly progress reports in the format provided by the Water
Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
City of Fort Worth,Texas
Attachment A
PIVO Release Date:08.1.2014
Page 3 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub-consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• 18 MWBE reports will be prepared
• 8 meetings with city staff
• 18 monthly water department progress reports will be prepared
• 18 monthly project schedule updates will be prepared
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E. Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly M/WBE Report Form and Final Summary Payment Report Form
G. Plan Submittal Checklists (See Task 9)
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to
■ Study the project,
■ Identify and develop alternatives that enhance the system,
■ Present (through the defined deliverables) these alternatives to the CITY
■ Recommend the alternatives that successfully addresses the design problem, and
■ Obtain the CITY's endorsement of this concept.
ENGINEER will develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
• In addition to data obtained from the CITY, ENGINEER will research proposed
improvements in conjunction with any other planned future improvements that
may influence the project.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 4 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
• The ENGINEER will also identify and seek to obtain data for existing conditions
that may impact the project including but not limited to; utilities, agencies (TxDOT
and railroads), City Master Plans, and property ownership as available from the
Tax Assessor's office.
• The data collection efforts will also include conducting special coordination
meetings with affected property owners and businesses as necessary to develop
sewer re-routing plans.
• The ENGINEER shall visit the project site and obtain the meter numbers and sizes
on all existing meters to be replaced on the project and shall identify existing
sample stations and fire line locations.
2.2. Geotechnical Investigations
• ENGINEER shall advise the CITY of test borings and other subsurface
investigations that may be needed for the project. If the CITY determines that
such borings or investigations are needed, then the ENGINEER shall work with
the CITY and CITY's geotechnical consultant to draw up specifications for such
testing program. The cost of such testing will be paid for by the CITY.
2.3. Fire Line Reconnection
A fire line reconnection is not anticipated to be necessary for the lines that have
been identified and has therefore not been included in this scope of work.
However, the ENGINEER understands that if a fire line reconnection is
determined necessary, then the following procedure should be utilized for the
reconnection of fire lines during design and construction of water mains:
• All fire lines on existing water mains to be replaced shall be clearly identified on
the plans and when necessary, detailed sequence of construction should be
provided for the reconnection to ensure that affected properties have adequate
fire protection during and after construction. The engineer may need to visit with
affected property owners to obtain fire flow and pressure requirements and
incorporate the data into the fire service reconstruction design.
• Design Engineer must coordinate with Water Field Operations during the design
stage. For situations where the water main is removed and replaced in the same
trench, special attention should be given to maintain adequate fire protection. A
2-inch temporary water line is grossly inadequate to feed a fire line. The transfer
time of the fire line to the new water main must be kept to a minimum. Where
necessary design and appropriate pay items must be provided for adequate
temporary water service to feed fire service lines during construction. If there is
any question about the adequacy of the temporary service to the fire line, then
the inspector or project manager will request field operations to perform a
pressure test at the nearest fire hydrant or outlet to determine the adequacy of
the temporary connections. If the temporary connection is inadequate to provide
fire protection until the permanent feed is in place, the project manager will
assess the situation and make a determination as to the appropriate action.
• At pre-construction meeting, contractors should be informed of their responsibility
to locate, identify and maintain fire service to applicable buildings. The proposed
sequence of reconnection for fire lines should be discuss and enforced during
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 5 of 20
ATTACHMENTA
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
construction. The City inspector shall also inspect the project site and take
inventory of fire line locations.
• During construction, the inspector shall notify Water Department Field Operations
of the pending fire line shut down. In addition, the contractor must notify the local
fire station and property owners of the time frame that the fire line will be shut
down on company letter head and inspector shall receive a copy. No fire line shut
outs will be allowed without this letter.
• The project manager shall be responsible for the implementation and completion
of this procedure.
2.4. The Conceptual Design Package shall include the following:
• Cover Sheet
• Graphic exhibits and written summary of alternative design concepts considered,
strengths and weaknesses of each, and the rationale for selecting the
recommended design concept.
• Proposed phasing of any water and sanitary sewer work that is included in this
project documented in both the project schedule and narrative form.
• Documentation of key design decisions.
• Estimates of probable construction cost.
ASSUMPTIONS
• 0 Geotechnical borings are expected for this project.
• No hard copies of the conceptual design package (30% design) will be delivered.
A PDF submittal will be made.
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in BIM360
• ENGINEER shall prepare the meeting minutes of the Concept Review meeting
and revise the report, if needed.
• ENGINEER shall not proceed with Preliminary Design activities without obtaining
written approval by the CITY of the Conceptual Design Package.
DELIVERABLES
A. Conceptual Design Package
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 6 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development of Preliminary Design Drawings and Specifications shall include the
following:
• Cover Sheet
• A Project Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall
be indicated for each Control Point: Identified (existing City Monument#8901, PK
Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base. Z coordinate on City Datum only; descriptive location
(i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North Side Drive and North Main
Street).
• Overall protect easement layout sheet(s)with property owner information. Not
anticipated or included.
• Overall project water and/or sanitary sewer layout sheets. The water layout sheet
shall identify the proposed water main improvement/existing water mains in the
vicinity and all water appurtenances along with pressure plane boundaries, water
tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall
identify the proposed sewer main improvement/existing sewer mains and all
sewer appurtenances in the vicinity. There will be two water layout sheets at a
scale of 1"=400'. There will be one sewer layout sheet at a scale of 1"=400'.
• No Overall water and/or sanitary sewer abandonment sheet(s) will be produced.
• Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc.,
in the same coordinate system as the Control Points.
• Bench marks per 1,000 ft of plan/profile sheet—two or more.
• Bearings given on all proposed centerlines, or baselines.
• Station equations relating utilities to paving, when appropriate.
• Plan and profile sheets which show the following: proposed water and/or sanitary
sewer plan/profile and recommended pipe size, fire hydrants, water service lines
and meter boxes, gate valves, isolation valves, manholes, existing meter
numbers and sizes that are to be replaced, existing sample locations, existing fire
line locations, existing utilities and utility easements, and all pertinent information
needed to construct the project. Legal description (Lot Nos., Block Nos., and
Addition Names) along with property ownership shall be provided on the plan
view. It is anticipated that there will be 21 plan and profile sheets for the 24" and
12"water lines, 15 double plan view sheets for the 8" water lines, and 20 plan
and profile sheets for the sewer lines. All plan and profile sheets will be drawn at
a scale of 1"=20' horizontally and 1"= 4' vertically.
• The ENGINEER shall make provisions for reconnecting all identifiable water and/or
wastewater service lines which connect directly to any main being replaced,
including replacement of existing service lines within City right-of-way or utility
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 7 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
easement. When the existing alignment of a water and sanitary sewer main or
lateral is changed, provisions will be made in the final plans and/or specifications
by the ENGINEER to relocate all service lines which are connected to the existing
main and connect said service lines to the relocated main.
• The following shall be applicable at all locations where it is necessary to relocate or
reroute the existing private sanitary sewer service line due to the abandonment or
realignment of the existing public sanitary sewer lateral or main: The CITY shall
furnish the ENGINEER with a sample format of how the sewer service line
reroute/relocation should be designed and submitted for construction. During
design survey, if a rod can be inserted through the cleanout to the bottom of the
service line, the ENGINEER will obtain the flow line elevation and design the
service line prior to advertising the project for bid. If the service flow line
information cannot be obtained during design survey, the ENGINEER shall delay
the design of the sewer service line until after a Quality Level A Subsurface Utility
Engineering (SUE investigation has been performed). The Level A SUE will be
performed; (1) by the ENGINEER if included in the fee proposal; or(2) by the CITY
prior to bidding if the CITY determines that it is needed for satisfactory completion
of the design; or(3) by the Contractor after the project has been bid, by means of a
bid item to that effect. In all options, the ENGINEER shall propose appropriate de-
hole locations in the project and collect flow line elevation and other applicable
information of the sewer service line. The ENGINEER shall use this information to
provide the design for the sanitary sewer service line to be rerouted or relocated.
• Provide map showing location of new manhole construction at the end of existing
sewer segments, 90 degree bends, or tee connections. Site survey or specific
design plans for manhole construction is not included as part of the scope. The
contract documents shall specify that it is the Contractor's responsibility to
coordinate utility location, etc. manhole construction.
• The ENGINEER will prepare standard and special detail sheets for water line
installation and sewer rehabilitation or replacement that are not already included in
the D-section of the CITY's specifications. These may include connection details
between various parts of the project, tunneling details, boring and jacking details,
waterline relocations, details unique to the construction of the project, trenchless
details, and special service lateral reconnections. Special details are not
anticipated or included.
3.2. Geotechnical Investigation
• Soil investigations, including field and laboratory tests, borings, related
engineering analysis and recommendations for determining soil conditions will be
made. In addition to the above investigations, borings and appropriate field and
laboratory analysis will be made at reasonable intervals along the project
alignment for the Contractor's use in determining soil conditions for preparing
bids and a Trench Safety Plan. Investigation will include tests for corrosion
potential of the soil.
3.3. Constructability Review
• Prior to the 60 percent review meeting with the CITY, the ENGINEER shall
schedule and attend a project site visit with the CITY Project Manager and
City of Fort Worth.Texas
Attachment A
PMO Release Date:08.1.2014
Page 8 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
Construction personnel to walk the project. The ENGINEER shall summarize the
CITY's comments from the field visit and submit this information to the CITY in
writing.
3.4. Utility Clearance
• The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities,
private utilities, private utilities and government agencies to determine the
approximate location of above and underground utilities, and other facilities
(current and future) that have an impact or influence on the project. ENGINEER
will design CITY facilities to avoid or minimize conflicts with existing utilities, and
where known and possible consider potential future utilities in designs.
• The ENGINEER shall upload individual DWF files for each plan sheet of the
approved preliminary plan set to the designated project folder in BIM360 for
forwarding to all utility companies which have facilities within the limits of the
project. The DWF files should be created directly from the CAD files as opposed
to PDF files.
3.5. Traffic Control Plan
• Develop a traffic control plan utilizing standard traffic reroute configurations
posted as "Typicals" on the CITY's BIM360 website. The typicals need not be
sealed individually, if included in the sealed contract documents.
• Develop supplemental traffic control drawings as needed for review and approval
by the Traffic Division of the Transportation and Public Works Department.
These drawings shall be sealed by a professional engineer registered in the
State of Texas. Supplemental traffic control drawings are not anticipated or
included.
ASSUMPTIONS
• No water or sewer abandonment sheets.
• No easements anticipated or included.
• One public meeting(s) will be conducted or attended during the preliminary
design phase.
• Two borings at an average bore depth of ten feet each will be provided along
Mitchell for the 24"water line.
• Traffic Control "Typicals"will be utilized to the extent possible. It is assumed that
no additional project specific traffic control sheets will be developed.
• PDF's of the drawings will be submitted for the Constructability Review. No hard
copies.
• PDF's of the drawings will be submitted for the Preliminary Design (60% design).
No hard copies.
City of Fort Worth,Texas
Attachment A
PIVO Release Date:08.1.2014
Page 9 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
• PDF's of the specifications will be submitted for the Preliminary Design (60%
design). No hard copies.
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in BIM360.
• The CITY's front end and technical specifications will be used. The ENGINEER
shall supplement the technical specifications if needed.
• PDF's of the drawings will be submitted for Utility Clearance. No hard copies.
• ENGINEER shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications
B. Utility Clearance drawings
C. Traffic Control Plan
D. Storm Water Pollution Prevention Plan
E. Estimates of probable construction cost
F. Data Base listing names and addresses of residents and businesses affected by
the project.
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
• For projects that disturb an area greater than one (1) acre, the Contractor will be
responsible for preparing and submitting the Storm Water Pollution Prevention Plan
(SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM
Construction Plan according to the current CITY iSWM Criteria Manual for Site
Development and Construction (If required, as additional services) which will be
incorporated into the SWPPP by the contractor.
• Draft Final plans (90%) and specifications shall be submitted to CITY per the approved
Project Schedule.
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Construction Documents (100%) to the CITY per the approved Project Schedule.
Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in
State of Texas.
• The ENGINEER shall submit a final design estimate of probable construction cost with
both the 90% and 100% design packages. This estimate shall use ONLY standard CITY
bid items.
ASSUMPTIONS
City of Fort Worth.Texas
Attachment A
PMO Release Date:08.1.2014
Page 10 of 20
ATTACHMENTA
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
• Two sets of 22" x 34" size drawings and two sets of 11" x 17" size drawings and two
specifications will be delivered for the 90% Design package.
• Two sets of 22" x 34" size drawings and two specifications will be delivered for the 100%
Design package.
• A DWF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in BIM360.
• A DWF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in BIM360.
DELIVERABLES
A. 90% construction plans and specifications.
B. 100% construction plans and specifications.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
D. Original cover Bond Paper for the signatures of authorized CITY officials.
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto BIM360 for
access to potential bidders.
• Contract documents shall be uploaded in a .xls file.
• Unit Price Proposal documents are to be created utilizing CFW Bidtools only
and combined in a specified spreadsheet workbook, Bid Proposal Worksheet
Template, and will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to BIM360 in two formats, .pdf and .dwf files.
The .pdf will consist of one file of the entire plan set. The .dwf will consist of
individual files, one for each plan sheet, and will be numbered and named in
a manner similar to that of the plan set index.
• The ENGINEER shall sell contract documents and maintain a plan holders list on
BIM360 from documents sold and from Contractor's uploaded Plan Holder
Registrations in BIM360.
• The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 11 of 20
ATTACHMENTA
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
and the response thereto. The log shall be housed and maintained in the
project's BIM360 folder titled Request for Information. The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
addenda. The ENGINEER shall upload all approved addenda onto BIM360 and
mail addenda to all plan holders.
• Attend the prebid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only
are to be uploaded into the project's Bid Results folder on BIM360.
• Incorporate all addenda into the contract documents and issue conformed sets.
5.2 Final Design Drawings
1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall be created from the original
CAD drawing files and shall contain all associated sheets of the particular plan
set. Singular PDF and DWF files for each sheet of a plan set will not be
accepted. PDF and DWF files shall conform to naming conventions as follows:
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number of
sheets in this file.
Example: X-12755_org18.pdf
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 12 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in
BIM360.
2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet
as an individual DWG file with all reference files integrated into the sheet. If the plans
were prepared in DGN format, they shall be converted to DWG prior to uploading.
The naming convention to be used for the DWG files shall be as follows:
I. TPW files shall use the W number as for PDF and DWF files, but shall
include the sheet number in the name — "W-1956—SHT01.dwg", "W-
1956—SHT02.dwg", etc.
II. Water and Sewer file names shall use the X number as for PDF and
DWF files, but shall include the sheet number in the name — "X-
12155—SHT01.dwg", "X-12755—SHT02.dwg", etc.
For information on the proper manner to submit files and to obtain a file number for
the project, contact the Department of Transportation and Public Works Vault at
telephone number(817) 392-8426. File numbers will not be issued to a project
unless the appropriate project numbers and fund codes have been assigned and
are in the Department of Transportation and Public Works database.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• Five sets of construction documents will be sold to and made available on
BIM360 for plan holders and/or given to plan viewing rooms.
• Two sets of 22" x 34" size and two sets of 11" x 17" size drawings plans and Four
specifications (conformed, if applicable) will be delivered to the CITY.
• PDF, DWF and DWG files will be uploaded to BIM360.
DELIVERABLES
A. Addenda
B. Bid tabulations
C. CFW Data Spreadsheet
D. Recommendation of award
E. Construction documents (conformed, if applicable)
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
City of Fort Worth,Texas
Attachment A
PIVO Release Date:08.1.2014
Page 13 of 20
ATTACHMENTA
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
• The ENGINEER shall attend the preconstruction conference.
• After the pre-construction conference, the ENGINEER shall provide project
exhibits and attend public meeting to help explain the proposed project to
residents. The CITY shall select a suitable location and mail the invitation letters
to the affected customers.
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work.
The ENGINEER shall attend the "Final' project walk through and assist with preparation of
final punch list
6.2 Record Drawings
• The ENGINEER shall prepare Record Drawings from information provided by
the CITY depicting any changes made to the Final Drawings during construction.
The following information shall be provided by the CITY:
o As-Built Survey
o Red-Line Markups from Contractor
o Red-Line Markups from City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
• The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
o These Record Drawings were prepared using information provided by
others and represent the as constructed conditions to the extent that
documented changes were provided for recording. The ENGINEER
assumes no liability for undocumented changes and certifies only that the
documented changes are accurately depicted on these drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, in PDF format for record storage. The ENGINEER
may keep copies of the information provided by the CITY for their files, but all
original red-lined drawings shall be returned to the CITY with the Record
Drawings.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 14 of 20
ATTACHMENTA
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets
of the particular plan set. Singular PDF and DWF files for each sheet of a
plan set will not be accepted. PDF and DWF files shall conform to naming
conventions as follows:
I. TPW file name example — "W-1956_rec47.pdf' where "W-1956" is the
assigned file number obtained from the CITY, "_rec" designating the file is of
a record drawing plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_rec3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_rec36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_rec"
designating the file is of a record drawing plan set, "36" shall be the total
number of sheets in this file.
Example: X-12755_rec18.pdf
Both PDF and DWF files shall be uploaded to the project's Record Drawings folder
in BIM360.
ASSUMPTIONS
• Four RFI's are assumed.
• Zero Change Orders are assumed
• No more than four site visits are assumed.
• No more than five shop drawing reviews are assumed.
• Zero mylars will be delivered to the CITY.
DELIVERABLES
A. Public meeting exhibits
B. Response to Contractor's Request for Information
C. Review of Change Orders
D. Review of shop drawings
E. Final Punch List items
F. Record Drawings in PDF format
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 15 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
7.1. Right-of-Way Research
• The ENGINEER shall determine rights-of-way, easements needs for construction of the
project. Required temporary and permanent easements will be identified based on available
information and recommendations will be made for approval by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM
for real property acquisition
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's BIM360 site.
7.3. Temporary Right of Entry Preparation and Submittal
• Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry
documents for landowners to CITY PM for real property acquisition. It is assumed that letters
will only be required for land owners adjacent to temporary construction easements or who
are directly affected by the project and no easement is required to enter their property.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's BIM360 site.
ASSUMPTIONS
• One Easement or right-of-way document will be necessary.
• One Temporary right-of-entry document will be necessary.
• Right-of-Way research and mapping includes review of property/right-of-way records
based on current internet based Tarrant Appraisal District (TAD) information available at the
start of the project and available on-ground property information (i.e. iron rods, fences,
stakes, etc.). It does not include effort for chain of title research, parent track research,
additional research for easements not included in the TAD, right-of-way takings, easement
vacations and abandonments, right-of-way vacations, and street closures. Property surveys
are not included in this scope.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 16 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
B. Temporary Right of Entry Letters
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
• ENGINEER will perform field surveys to collect horizontal and vertical elevations and
other information needed by ENGINEER in design and preparation of plans for the project.
Information gathered during the survey shall include topographic data, elevations of all
sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities,
structures, trees (measure caliper, identify overall canopy, and have qualified arborist
identify species of trees), and other features relevant to the final plan sheets. Existing
drainage at intersections will be verified by field surveys. Spot elevations will be shown on
intersection layouts with cross slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the following:
A Project Control Sheet, showing ALL Control Points, used or set while gathering data.
Generally on a scale of not less than 1:400:
— The following information about each Control Point;
a. Identified (Existing. CITY Monument#8901, PK Nail, 5/8" Iron Rod)
b. X,Y and Z Coordinates, in an identified coordinate system, and a referred bearing base.
Z coordinate on CITY Datum only.
C. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North
Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main
Street).
— Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate
system, as the Control.
— No less than two horizontal bench marks, per line or location.
— Bearings given on all proposed centerlines, or baselines.
— Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of
Entry for landowners to CITY PM.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's BIM360 site.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 17 of 20
ATTACHMENTA
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM•J
CITY PROJECT NO.:103420
ASSUMPTIONS
• Topographic survey at intersection will include no more than 100 ft. in each direction.
• Two SUE Level A investigations for the 24" water line for the connections, to a depth of
about 10'.
DELIVERABLES
A. Copies of field survey data and notes signed and sealed by a licensed surveyor.
B. Drawing of the project layout with dimensions and coordinate list.
TASK 9. PLAN SUBMITTAL CHECKLISTS
Engineer shall complete and submit Plan Submittal Checklists in accordance with the
following table:
PLAN SUBMITTAL CHECKLIST REQUIREMENTS
Traffic Traffic Traffic
Street Water Control Control Control
Traffic Storm Storm Lights /Sewer Traffic 30% 60% 90%
Attachment"A" Signal Engineering
Water Water (Submit (Submit
Type (Submit All 30% 60% All @ All @ (Submit All
@ 30%) 30% 60%) @ 60%) Required for all work in City
ROW
Street X X X X X. X X X X
Storm Water X X X X X
Water/Sewer X X X X
*If included in street project
ASSUMPTIONS
DELIVERABLES
A.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 18 of 20
ATTACHMENT A
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM-J
CITY PROJECT NO.:103420
B.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition including temporary right-of-
entries.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre-qualification, bid protests, bid rejection and
re-bidding of the contract for construction.
• Construction management and inspection services
• Periodic site visits during construction phase
• Design phase public meetings
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services related to submitting for permits (ie.TxDOT, railroad, etc...)
• Services related to Subsurface Utility Engineering Levels A, B, C or D
Services related to Survey Construction Staking
• Services related to acquiring real property including but not limited to easements,
right-of-way, and/or temporary right-of-entries.
• Services to support, prepare, document, bring, defend, or assist in litigation
I
undertaken or defended by the CITY.
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 19 of 20
ATTACHMENTA
DESIGN SERVICES FOR
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020,WSM-J
CITY PROJECT NO.:103420
• Construction Shop drawing review, samples and other submittals submitted by the
contractor.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
• Pavement rehabilitation
• iSWM
• Mylars
• Bid Alternates
• Corrosion Study
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 20 of 20
ATTACHMENT B
COMPENSATION
Water and Sanitary Sewer Replacements Contract 2020, WSM-J
City Project No. 103420
Lump Sum Project
I. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $543,513 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV—Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item 111. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Water Department monthly progress reports and schedules in the format
required by the City.
I
Cityof Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 1 of 3
B-1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount
Prime Consultant
Neel-Schaffer, Inc. Design, Construction Phase $431,588 79.4%
Services
Proposed MBE/SBE Sub-Consultants
Salcedo Group, Inc. Survey $98,050 18.0%
The Rios Group Subsurface Utility Engineering $8,675 1.6%
Non-MBE/SBE Consultants
Alpha Testing, Inc. $5,200 1.0%
TOTAL $543,513 100%
Project Number& Name Total Fee MBE/SBE Fee MBE/SBE
103420 —Water & Sanitary Sewer $543,513 $106,725 19.6%
Replacement Contract 2020, WSM-J
City MBE/SBE Goal = 10% Consultant Committed Goal = 10%
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 2 of 3
B-2
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
City of Fart Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 3 of 3
B-3
aekaaae ==2«e o P 2 -0 -V
\\ � - /}%§k ) / \\' \
§\\}� j \ \ )
\\c / % \
° 3a 7 .. E
@
{ ( { _ ( / /
- 2
J: PO§ ) j 22
\ \
/ \ m m
/
) ® $
z CD %
0. / CD
ƒCD
m -neom \ ,
ƒ q § $»\ 7
> }> \
/ !
g/
k § §
S2i e ® `
22 \\
% ( ]
T. -
; 2
CL
\ \ } ( <
e [ 3 - - - -
(D \ \
> > - z
\ 2 ` 2 = ! ) . R ;
m , . . D -
} \ , / }
t @
ƒ 33 ( \ j
= f =
m /
� _ \ )
\ \ \ \
; !
/\ � (
( \
CL
0.
§ \) ( \
0 TO!*O T
v v O f l o o d " A
o CUM � �(h Fm O co
m
mdmA° y `OG Oc m0 '•*. In
o z co
n•• p� m Q m 7
3 ° v
3 -
xt �
(DD
D
m
3 Z'
(D (D
p Ao (n
cn
O� m 3 O
d O m
N O O v (D
N (n
(D
7 (D
A TA0M3
m ZJ
m d
o D O
m a (D
N (D
-p c 3
D y ym £ m - ,• � -
z 3
3 J a 3
3 fD
O � x
O
C » H N
(D N O
m D D a
3 9
0 O m
co p p D <
m K 3 = o
N O D
K � D
tU �
� D O
(P
G c o -
m
m
m n
� m
.. O
A�
3 -
0 0
c _.
V1 t�
- m
a
� n
< c
o
m
m K
d 3
g �
n
m �
o �
0"/\{ / [/00,1 /
(\\�&&
}}\/( \ \\ fin\ \
7 . ) E7 z a 2; /
e{!/' 2 .. ¥
.. .. ƒ
G_
\ � ƒ k
\ \
» %
E3 (D
o> ƒ
\
- =G : r ± ,
\ �
( § : / =§ !a \ § � \ [
-
z ;
( / - z
\ / j � 2.
o
/ 3
o ( /
\ { 3 ! /
E n
\ { ; r
o
o
\ \ / \
EXHIBIT B-2
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
Design Services for
Water and Sanitary Sewer Replacement Contract 2020,WSMJ
Ci Project No.103420
hor nwrra
Task Desedpllan Prefect ProJM Tobi Labor nse Tobl Eapnse Parwnl Remalnirq
Task No. Prl �ai Mane x CADD A
Inert EIT UMnislrathe Cest Sukconsullanl Travel flePreductlon
nc Cosl Task Suh Tebl Comple(e Bud$et
536o f200 5160 5135 5125 su MAHE Ron4AWBE
1.0 Pr ect M1Yna eme 10 18 1/ o 513 11 i1 So SO s0 s0 $1s
1.1 r Ve Teamnt 10 3 500 50 52500
1.2 Cam-tcO fte 50 SO '4
1.21 P-s nCoo Own 1 E2o0 50 52c0
1.22 Des nSWnttzl Fefev Nee fi $1200 w51200
1.23 Prt eBax!roSUeNi< 4 e 16 S3 so 534.
Repare Morthy RoOrezz RePORa wvh
124 SUe?h 8 w E 960 5 960 Is a10 50 125 Pre eN N6E5BER a to 3 UM
20 conce al Das n304'er<ent s 0 3/ so 62 s/ . I.W. W SO 318 Ss/ $266//
21 Dab Co4U0n 4 1fi 20 20 10 E9210 S1B Ste 5922B
22 Cor%e la Patlm 2 $- 50 54W
-1 Cover Sneel 1 sm SO 5]00
222 F3dWi5 and 5urcre 16 S 20 32 16 S123. SO 51 3
223 Pra' 2 E.0 . S.0
229 ConSnWnn EslaraY 4 2 12 5 620 so 5..
3.0 Pnlimina dsl n/O Perunl 0 131 1. 6J f081 /1/ Sb821 $1 26 $5 00 $1. $2 $111. -A
SS
3.1 ReYrba De P 50 52. 5250 5250
31.1 Carer 1 $IN SO $700
J12a De 1Neles51ee1 a 16 $3600 SO S36O0
a CIANtiea Sleet 2 1 e 16 54040 . Sd 040
112a 2-1Sheet 4 6 . E 55o So 54550
312b ONn3ta Wabr 3 6 16 53350 50 SJ 350
312c Ortraf La Sewb 3 6 0 5 350 50 52350
21 Pan and RarWro]b Skels 12'/N
3.1.3a Water 21 42 166 336 En9A w $]3920
315b 15R4NRan6-srm!or 15 30 1. 2. SS BOO . SS eo9
31.30 20 RaNRal�z$neHS Sever 20 . 1. 3. E]0403 so $7.11
400
313e Erosbn CONmisreet a 16 24 S]0. SO S]030
31]e Y2der Delals 4 6 3,6. EO 516.
I Sexn Debi 4 B E16. . Sifi.
2 PJ,erizeaM Pe Sheet 4 e a 24 E60. 30 %O80
J13n PUV rOeertl Qera Deb4 2 4 4 12 53010 SO 53040
]1 4 5 �Yanwa 12 16 a0 511]EO 50 stt]60
315 Cnnvwnn ESOnWe 2 6 6 51900 SO 3/900
32 ConWCWM Revers ] 4 $IO. SO St
33 L4 Oeanrce 4 8 16 20 E5]60 so 55-
3.4 GeolecMwlkwe tun 4 e E14. $5m $5 MO So.-
3 5 SUE 4 2 a s,1. EO6]6 f0- 310405
36 T-Cortrol Pan 4 e 12 33560 so ..-
3.7 Pubo Nee 2 2 e $1]20 Sta Ste $I]3a
36 Wh'a 2 1- $O $2%
312 5 Pdn B 12 a 53]80 so
4.o Final Des n o 6 18 101 . 3s I.A. s0 W SO s5 5500 314]0
Fw1IXae(9O%)CaaUucSon Flan eM
41 S 2 e . 1W 21 524120 42m 5250 $243]0
42 Fwl toOK Kara artl5 otaro 2 4 . a0 12 $110fi0 3250 3250 S173f0
430 Consducton Esbre4s 90%aM 100% 2 d 4 8 5 5.
dd P5F'a 2 5250 SO $2
6.o BIOPhase 0 13 to 1 28 48 $14N SO $1 $ $11 $1100 $1641
51 a0 SO 50 s4
5.1.1 4 4 Sa. SO $a.
yes CONext Docurcrts and Nav3aM
51 Wnllold:rsllsl 4 4 514a0 5550 5350 M.
5.13 Issue PdseMa e 4 9 16 Eli. SO $4 111.
5.14s Merl Re BO 2 2
1 s200- so S)20
514b MeM BO N SO 5200
51.5 TabJa:e BES and Reox+rcrtl AwarO 2 2 b 512. . 51230
52 con'omaE Seb a a 16 E39fi0 5550 $5% Y4510
53 DAF's 4 8 $1500 50 51-
s.0 ConsW4lbn Pnase eervlces 0 s0 24 s2 S18 W0 H SO $16 S $11/ $1.1.1.
61 Conslrvchon5 w s0 S4
6.1.1 MIM Re shutters Corfertm 2 2 $120 5p S]20
6,1.2 MeM Rrhic Ne 2 2 5120 E10 $Is $7.
515 S.Vsb 4 4 $11. Ba $it.
6.1.4 FFr6 4 e e .060 s9 s3 oa0
61fi 5 IXa 16 16 w]. s0 55]fi0
62 RemN IXan As gal 6 6 12 32 S7fifi0 5500 E500 $8160
P.o RoxlE same t ser- o 3 6 4 sf. $1 s f $u $1 a10 $ so
],1 Docvrerts 2 57. $- $110 s050
(apldoaYlayrEa xneN Repaa6on aM
7.2 SWreW 1 $200 51500 31500 11,7
SA gum 0 6 0 / S ss sud,50 S $1a S. SN]62 $88 8
0.1 Da' S 6 6 e sux $o6550 s162 5. 596M 499302
f0.0 AOORbnal3eMces 0 SSo Ooo so s0 SO so SO S]0000
101 Cryl S3o,000 . 530,000
Tobb 1 S02 >26 110/ S41],wo $1o9,T2$ S5,2oo 1216 52,60o 5111,/41 --1
YMer lax FoabOe 15,652 74% 1.11.Sums
Sewer Lkre Foe 6502 26% TOIY Hovs 2961
21164 tw% TOW tabor 541]6.
TOW Er me 511 d,B41
(AI TOW Fro .,- nN6E5BE Nti<JSBES
Surw WmwWN 11%11
(Bl YFee A-499,3a2 Ib SunwrauaaN 200
( TOW Fee 4sule Fee 5444131 10% SW I.rark 51.
Water Fee()4%ol C) Seeer Fee(26%ol C) NBElSBE Part�c Pa.an 1fi%
5328,65].IA 3115,4)d 00 TeblProe<t Ce51 SSIs,a1i.
Dew o VR Y2a[er Sever
Wntt IDes n Y]% 30 39659].00 53 64200
Prebma 4' 60% 30 519]19400 36920400
FwIQ 10% 30 33 06600 $1159].00
S 3o E]553000 32385200
5utloW 443410].IX2 5139,32500
Tobi 5543..-
Ory of FOeY.M11 Te®a
MxirreN B-leaelol ERwl5upplemeN
Typi'a l YhYr a rd Sener 1.Repb .
RYY/rRgiwl Rtleax Date:a W 2012
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Water and Sanitary Sewer Replacements Contract 2020, WSM-J
City Project No. 103420
<List any changes to the Standard Agreement>
None
City of Fort Worth,Texas 103420 Water and Sanitary Sewer Replacements Contract 2020,WSM-J
Attachment C
PMO Release Date:05.19.2010
Page 1 of 1
�p Z LL > WW ((JJ yy fJ �y fYJ NN NN 11JJ NN 1J
3 o mm o O �Oj O Olp 1p1u p tp 1p Y O
A fJ N O A o N fJ N -� J t° J to a W N O o`, S o W U
O o J o o No O
� m tJ u' tJl yy W W 41 _W _W iy fJ W iJ Wo
_ m W O o o O O o o m o T O O o o O o O O o
w Cl A y 'O
v, ° T
V D m [7 p D _
_ !Aj 6
0 3 1 3 j
R Tjj
v f o R. = R u £ 2 r v Z i° o.
i D c n 3 m F' 5 m 3
m _ �� m w of
g n Z v o
c u o m 3 F o $
ft 3ur
a
F � I
w a
W o o in
w � w
ngl' c r�3 n w nS' nQt nt' N N 3 3 = . N `' 2 3 0 0 ` m ' =
K m� N � tiNNNa _ I_ a 9 � ��o
w a W f
w � s a _s s N N
� A N
c n=a
A A W 0 A N A T N b ONo N N A N N U V J
0
Z
T N
vi b
BEL
m
3
A
•
Tr
41
A
O
3 +-�T
N
o-
ATTACHMENT E
LL
BERRY,3
w
\ ` RENAISSANCE,SQ.
0 �Fy
z
\ z
o LOWRIEMORE LN
/ \ \ A
MORESBY,ST --- -
R
L
a'
o /
FoRTWORTH
Source: E-sr' �'gitalGlobe G E e;,E'arthstar Geographics,,,CNE}S/Airbus
DS;USDA, SGS,A roGRd IGN and the GIS User Community
ATTACHMENT E
rn \
1 J � ICJ
[JH=IAVIE,El FIE]]=
F Uj ILI I I
AVE,K' W—L_J
`W---TTZ1 [[[:::jTAVE;LT
AVE-L o.
J4Rc w
v\� AgVE�
l
. S;BURCHILL RD_� --
�s
\ BIDEKERIAVE
cn
II �
FORT WORTH.
Y
Source: E--Sri,DigitaliGlobe, eo1Ef e, art sar �e gra ics, NE}-/Air us
IDS,USDA,!US'G'S,Ae�oGRID,�I'GN,and he �IS U r rnmunity,
Attachment "F"
Certificate of Liability Insurance
Design Services for
Water and Sanitary Sewer Replacements Contract 2020, WSM-J
City Project No. 103420
103420 Water and Sanitary Sewer Replacements Contract 2020.WSM-J
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, January 11, 2022 REFERENCE NO.: **M&C 22-0049
LOG NAME: 60WSSC20WSMJ-NSHAFFER
SUBJECT:
(CD 5 and CD 8) Authorize Execution of an Engineering Agreement with Neel Shaffer, Inc., in the Amount
of$543,512.00, for the Water & Sanitary Sewer Replacement Contract 2020, WSM-J
Project and Adopt Attached Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of an engineering agreement with Neel Shaffer, Inc., in the amount of
$543,512.00, for the Water & Sanitary Sewer Replacement Contract 2020, WSM-J project; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of$760,779.00, transferred from available
funds within the Water and Sewer Fund, for the Sanitary Sewer Replacement Contract 2020, WSM-
J (City Project No. 103420).
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize the execution of an engineering agreement
with Neel Shaffer, Inc., in the amount of$543,512.00, for the Water & Sanitary Sewer Replacement
Contract 2020, WSM-J project for the preparation of plans and specifications for sanitary sewer and water
main replacements on the following streets and alleyway:
Street From To Scope of Council
Work District
Mitchell F. Berry Street Moresby Water/ 8
Boulevardreet Sewer
E. Berry Canberra Court Mitchell Water 8
Street Boulevard
Canberra E. Berry Street Spiller Street Water/ 8
Court Sewer
Shropshire Sandgate Mitchell Water/ 8
Street IlStreet Boulevard Sewer
Lowriemore Sandgate Mitchell Water/ 8
La n e Street Boulevard Sewer
Sandgate Mitchell Water/
Spiller Street Street Boulevard Sewer 8
Sandgate Mitchell Water/
�Rattkin Road Street Boulevard Sewer 8
Moresby Sandgate Mitchell Water/ 8
Street Street Boulevard Sewer
Sandgate E. Berry Street Shropshire Water 8
Street South Street
Alleyway Burchill Road ��Mc Kenzie Sewer 5
I 11 JIStreet 111I
Burchill Road Mitchell Binkley Street Water 5 and 8
Boulevard
11
In addition to the contract amount, $217,267.00 (Water: $148,492.00; Sewer: $68,775.00) is required for
project management, real property acquisition, utility coordination, and material testing. This project will
have no impact on the Water Department's operating budget when completed. The sewer component of
the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program.
Appropriations for Water & Sanitary Sewer Replacement, Contract 2020 WSM-J are as depicted below:
Fund Existing Additional Project
Appropriations Appropriations Total*
W&S Capital Projects $0.00 $760,779.00 $760,779.00
- Fund 56002
Project Total 11$0.00 $760,779.00 $760,779.00
*Numbers rounded for presentation purposes.
Business Equity: Neel Shaffer, Inc., is in compliance with the City's Business Equity Ordinance by
committing to 20 percent Business Equity participation on this project. The City's Business Equity goal on
this project is 10 percent.
The project is located in COUNCIL DISTRICTS 5 AND 8.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Water and Sewer Fund, and
upon approval of the above recommendations and adoption of the attached appropriation ordinance,
funds will be available in the W&S Capital Projects Fund for the W/SS REPL Contract 2020 WSM-J
project to support the approval of the above recommendations and execution of the engineering
agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of
verifying the availability of funds.
FUND IDENTIFIERS (FIDs),:
TO
Fund Department ccount Project Program ctivity Budget Reference # mount
ID ID Year (Chartfield 2)
FROM
Fund Department ccount Project Program ctivityl Budget I Reference # mount
ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by: Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Liam Conlon (6824)
ATTACHMENTS
1. 60WSSC20WSMJ-NSHAFFER 1295 Form.pdf (CFW Internal)
2. 60WSSC20WSMJ-NSHAFFER Corrected Compliance Memo.pdf (CFW Internal)
3. 60WSSC20WSMJ-NSHAFFER Map(1),pdf (Public)
4. 60WSSC20WSMJ-NSHAFFER Map(2),pdf (Public)
5. 60WSSC20WSMJ-NSHAFFER SAM.pdf (CFW Internal)
6. 60WSSC20WSMJ-NSHAFFER.docx (CFW Internal)
7. 60WSSC20WSMJ-NSHAFFER FID TABLE (WCF 09.29.21) a.xlsx (CFW Internal)
8. 60WSSC20WSMJ NSHAFFER 56002 AO22(r2)_(1)r.docx (Public)
0
H
d
N N N N N N
n
Ul Lrl W W Ul Ul Ul W W W W Ul Ul Ul Ul Ul Ul l Ul w 1.71 Ul O
m m m m m m m m m m O O O m O Ol Ol Ul U- Dl Ol Ol Dl Ol
O O O O CD CD O O O O O O O O O O O O O O O O 7
O O O O O O O O O O O O O O O O O O O O cm) O O �l
NJ N N N NJ N N N N N Ili N N N N N t" N F' N N N N �,•�
z
x
O O O O O O O O O O O O O O O O O O O O O O O >
J V V J J V V V m m M M M m m J J CT) Dl J V Dl Dl
O CD CD O CD CD O O O O O O O O O O O O O O O O
O O O O O O O O O O O CD CD
O O O w O lD O O O CD
A A A A A A A A A A A A A A A A O A O A A A A
W W W W W W W W W W w w W W w w N W N w w w w
O CD O O O O O CD CD CD (D (D O O O O O O O O O O h7
w Ul w Ul Ul w Ul A w w w N w Ul A A Ul A Ln
W A A uy
W V w N V w F-� l0 W w W w Ul F-� lD lD LD LD lD lD LD
Ul rr
F, A W 0 0 W 0 m CD W C) W A 0 M a) In m Ut Ul Ul �
O O O O O O O Dl w 0 w w 0 0 O1 Ol CD Dl CY)0 0 Ol
W O C) N O 0 0 O W Ul W C) 0 0 O O O O O O O
Ul 0 O O 8 0 0 0 0 O Ul O O O O 0 0 O O O O
O O O F, O O I--+ O O O O F� F� F, F-' F-' F, F, F--'- V--�
F, F-> F-' F-' - - F-+ - - - F-'- f-'- - - F--
O O O O O O
NA AN N O O O O ON ON O O O O O
W W w w w WWW W W W W W W WON ON OWN Ow
A A A A A A A A A A A A A A A
N N N N N N N N N N
O OOCD O CD CD OO OCDO N
O O O O O O
O O O O O CD CD O O O O O CD CD
O O O O O O O O O O O O O O O O
V V V J J J J J J J V J J J V J
V A A A W W w OD 41 V W W W W W W
O O O O O O O A A O O O O O O O
lD l0 l0 LD l0 l0 lD lD lD lD lD lD lD lD Wl0 w Ili N N N
lO l0 LD lD lD lD lD l0 l0 lD l0 l0 l0 l0 lD lD lD O CD CD CD
w w w w lD LD w LD w w w w w w w LD w N N N N
W LD W lD LD W W W W W W W W W W LD l0 N N N N
t/T i/1 F, N N i/T t/ A VF Ul VF i/F U1 Ul N N U1 w
VT th if, F-* N W N O F-' Ul V)' CDif? al In N N In ('nCDO Ln In
N In In O O tO Ol Oo OD :p A AP. J N W W N N Oo Oo N N
O O O O O W V 1-' F-' W O F, O w m Q) (n Ol O)
O O O O CDN Ili N w O w O w J 0 0 J -,AO O J V
O O O O O In Ul CD W A O J O O lD 0 CD lD p O O l0 l0
O O O O O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O 00 O O O O O O
C m m m m n v o o c o c
rt' N N N N 7 N = _ _ _ c- d
fD (D M (D I-r _
3 3 3 3 n d N G n !D
+ r
OO h r3-F r�-F r7+ N '-D 0 rCF N
Q D D D D
nnnn WC)
n
7 O N n o
3
N C C C C In rh r+ d S In
rf N l/� t/i lA r-F -Nh pl r-F• r-F
O rF fi rF r+ r�F O
7 7 7 7