Loading...
HomeMy WebLinkAboutContract 54916-PM1CONTRACT FOR THE CONSTRUCTION OF Water Improvements to Serve IH35W Global Logistics IPRC Record No. IPRC20-0088 City Project No. 102818 FID No. 30114-0200431-102828-E07685 X File No. X-26579 Betsy Price David Cooke Mayor City Manager Chris Harder Director, Water Department William Johnson Director, Transportation and Public Works Department Prepared for The City of Fort Worth Transportation and Public Works Department November 2020 3803 Parkwood Blvd. Frisco, TX 75034 (214) 937-3936 TBPELS Firm No. F-312 LI CENSEDSTATEOF T EXAS P ROF ESS IONAL ENGINEER136549 JOSEPH W. BUCHANAN CSC No. 54916-PM1 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS–DAP City Project Number 102818 Revised March 20, 2020 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised 00 11 13 Invitation to Bidders 03/20/2020 00 21 13 Instructions to Bidders 03/20/2020 00 41 00 Bid Form 04/02/2014 00 42 43 Proposal Form Unit Price 05/22/2019 00 43 13 Bid Bond 04/02/2014 00 45 11 Bidders Prequalification’s 04/02/2014 00 45 12 Prequalification Statement 09/01/2015 00 45 13 Bidder Prequalification Application 03/09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 00 45 40 Minority Business Enterprise Goal 08/21/2018 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 00 72 00 General Conditions 11/15/2017 00 73 00 Supplementary Conditions 07/01/2011 00 73 10 Standard City Conditions of the Construction Contract for Developer Awarded Projects 01/10/2013 Division 01 - General Requirements Last Revised 01 11 00 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 01 31 20 Project Meetings 07/01/2011 01 32 33 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 55 26 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS–DAP City Project Number 102818 Revised March 20, 2020 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project’s Contract Documents Division 02 - Existing Conditions Date Modified 02 41 13 Selective Site Demolition 02 41 14 Utility Removal/Abandonment NONE 02 41 15 Paving Removal Division 03 - Concrete 03 30 00 Cast-In-Place Concrete 03 34 13 Controlled Low Strength Material (CLSM) 03 34 16 Concrete Base Material for Trench Repair 03 80 00 Modifications to Existing Concrete Structures Division 26 - Electrical 26 05 00 Common Work Results for Electrical 26 05 10 Demolition for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems Division 31 - Earthwork 31 10 00 Site Clearing 31 23 16 Unclassified Excavation 31 23 23 Borrow 31 24 00 Embankments 31 25 00 Erosion and Sediment Control NONE 31 36 00 Gabions 31 37 00 Riprap Division 32 - Exterior Improvements 32 01 17 Permanent Asphalt Paving Repair 32 01 18 Temporary Asphalt Paving Repair 32 01 29 Concrete Paving Repair 32 11 23 Flexible Base Courses 32 11 29 Lime Treated Base Courses 32 11 33 Cement Treated Base Courses 32 11 37 Liquid Treated Soil Stabilizer 32 12 16 Asphalt Paving 32 12 73 Asphalt Paving Crack Sealants 32 13 13 Concrete Paving 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 32 13 73 Concrete Paving Joint Sealants 32 14 16 Brick Unit Paving 32 16 13 Concrete Curb and Gutters and Valley Gutters 32 17 23 Pavement Markings 32 17 25 Curb Address Painting 32 31 13 Chain Fences and Gates 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS–DAP City Project Number 102818 Revised March 20, 2020 32 31 26 Wire Fences and Gates 32 31 29 Wood Fences and Gates 32 32 13 Cast-in-Place Concrete Retaining Walls 32 91 19 Topsoil Placement and Finishing of Parkways 32 92 13 Hydro-Mulching, Seeding, and Sodding 32 93 43 Trees and Shrubs Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 33 01 31 Closed Circuit Television (CCTV) Inspection 33 03 10 Bypass Pumping of Existing Sewer Systems 33 04 10 Joint Bonding and Electrical Isolation 33 04 11 Corrosion Control Test Stations 33 04 12 Magnesium Anode Cathodic Protection System 33 04 30 Temporary Water Services 33 04 40 Cleaning and Acceptance Testing of Water Mains NONE 33 04 50 Cleaning of Sewer Mains 33 05 10 Utility Trench Excavation, Embedment, and Backfill NONE 33 05 12 Water Line Lowering 33 05 13 Frame, Cover and Grade Rings - Cast Iron 33 05 13.10 Frame, Cover and Grade Rings - Composite 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 33 05 16 Concrete Water Vaults NONE 33 05 17 Concrete Collars 33 05 20 Auger Boring NONE 33 05 21 Tunnel Liner Plate 33 05 22 Steel Casing Pipe NONE 33 05 23 Hand Tunneling 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate NONE 33 05 26 Utility Markers/Locators 33 05 30 Location of Existing Utilities 33 11 05 Bolts, Nuts, and Gaskets NONE 33 11 10 Ductile Iron Pipe NONE 33 11 11 Ductile Iron Fittings NONE 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe NONE 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 33 11 14 Buried Steel Pipe and Fittings 33 11 15 Pre-Stressed Concrete Cylinder Pipe 33 12 10 Water Services 1-inch to 2-inch NONE 33 12 11 Large Water Meters 33 12 20 Resilient Seated Gate Valve NONE 33 12 21 AWWA Rubber-Seated Butterfly Valves 33 12 25 Connection to Existing Water Mains NONE 33 12 30 Combination Air Valve Assemblies for Potable Water Systems 33 12 40 Fire Hydrants NONE 33 12 50 Water Sample Stations NONE 33 12 60 Standard Blow-off Valve Assembly 33 31 12 Cured in Place Pipe (CIPP) 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS–DAP City Project Number 102818 Revised March 20, 2020 33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe 33 31 22 Sanitary Sewer Slip Lining 33 31 23 Sanitary Sewer Pipe Enlargement 33 31 50 Sanitary Sewer Service Connections and Service Line 33 31 70 Combination Air Valve for Sanitary Sewer Force Mains 33 39 10 Cast-in-Place Concrete Manholes 33 39 20 Precast Concrete Manholes 33 39 30 Fiberglass Manholes 33 39 40 Wastewater Access Chamber (WAC) 33 39 60 Epoxy Liners for Sanitary Sewer Structures 33 41 10 Reinforced Concrete Storm Sewer Pipe/Culverts 33 41 11 High Density Polyethylene (HDPE) Pipe for Storm Drain 33 41 12 Reinforced Polyethlene (SRPE) Pipe 33 46 00 Subdrainage 33 46 01 Slotted Storm Drains 33 46 02 Trench Drains 33 49 10 Cast-in-Place Manholes and Junction Boxes 33 49 20 Curb and Drop Inlets 33 49 40 Storm Drainage Headwalls and Wingwalls Division 34 - Transportation 34 41 10 Traffic Signals 34 41 10.01 Attachment A – Controller Cabinet 34 41 10.02 Attachment B – Controller Specification 34 41 10.03 Attachment C – Software Specification 34 41 11 Temporary Traffic Signals 34 41 13 Removing Traffic Signals 34 41 15 Rectangular Rapid Flashing Beacon 34 41 16 Pedestrian Hybrid Signal 34 41 20 Roadway Illumination Assemblies 34 41 20.01 Arterial LED Roadway Luminaires 34 41 20.02 Freeway LED Roadway Luminaires 34 41 20.03 Residential LED Roadway Luminaires 34 41 30 Aluminum Signs 34 71 13 Traffic Control 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS–DAP City Project Number 102818 Revised March 20, 2020 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City’s website at: http://fortworthtexas.gov/tpw/contractors/ or https://apps.fortworthtexas.gov/ProjectResources/ Division 02 - Existing Conditions Last Revised 02 41 13 Selective Site Demolition 12/20/2012 02 41 14 Utility Removal/Abandonment 12/20/2012 02 41 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast-In-Place Concrete 12/20/2012 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Common Work Results for Electrical 11/22/2013 26 05 10 Demolition for Electrical Systems 12/20/2012 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 26 05 50 Communications Multi-Duct Conduit 02/26/2016 Division 31 - Earthwork 31 10 00 Site Clearing 12/20/2012 31 23 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control 12/20/2012 31 36 00 Gabions 12/20/2012 31 37 00 Riprap 12/20/2012 Division 32 - Exterior Improvements 32 01 17 Permanent Asphalt Paving Repair 12/20/2012 32 01 18 Temporary Asphalt Paving Repair 12/20/2012 32 01 29 Concrete Paving Repair 12/20/2012 32 11 23 Flexible Base Courses 12/20/2012 32 11 29 Lime Treated Base Courses 12/20/2012 32 11 33 Cement Treated Base Courses 12/20/2012 32 11 37 Liquid Treated Soil Stabilizer 08/21/2015 32 12 16 Asphalt Paving 12/20/2012 32 12 73 Asphalt Paving Crack Sealants 12/20/2012 32 13 13 Concrete Paving 12/20/2012 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 13 73 Concrete Paving Joint Sealants 12/20/2012 32 14 16 Brick Unit Paving 12/20/2012 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS–DAP City Project Number 102818 Revised March 20, 2020 32 17 23 Pavement Markings 11/22/2013 32 17 25 Curb Address Painting 11/04/2013 32 31 13 Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 32 31 29 Wood Fences and Gates 12/20/2012 32 32 13 Cast-in-Place Concrete Retaining Walls 06/05/2018 32 91 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Hydro-Mulching, Seeding, and Sodding 12/20/2012 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 33 01 31 Closed Circuit Television (CCTV) Inspection 03/03/2016 33 03 10 Bypass Pumping of Existing Sewer Systems 12/20/2012 33 04 10 Joint Bonding and Electrical Isolation 12/20/2012 33 04 11 Corrosion Control Test Stations 12/20/2012 33 04 12 Magnesium Anode Cathodic Protection System 12/20/2012 33 04 30 Temporary Water Services 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 33 05 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 33 05 12 Water Line Lowering 12/20/2012 33 05 13 Frame, Cover and Grade Rings – Cast Iron 01/22/2016 33 05 13.10 Frame, Cover and Grade Rings – Composite 01/22/2016 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 12/20/2012 33 05 16 Concrete Water Vaults 12/20/2012 33 05 17 Concrete Collars 12/20/2012 33 05 20 Auger Boring 12/20/2012 33 05 21 Tunnel Liner Plate 12/20/2012 33 05 22 Steel Casing Pipe 12/20/2012 33 05 23 Hand Tunneling 12/20/2012 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 06/19/2013 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 12/20/2012 33 11 14 Buried Steel Pipe and Fittings 12/20/2012 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 33 12 11 Large Water Meters 12/20/2012 33 12 20 Resilient Seated Gate Valve 12/20/2012 33 12 21 AWWA Rubber-Seated Butterfly Valves 12/20/2012 33 12 25 Connection to Existing Water Mains 02/06/2013 33 12 30 Combination Air Valve Assemblies for Potable Water Systems 12/20/2012 33 12 40 Fire Hydrants 01/03/2014 33 12 50 Water Sample Stations 12/20/2012 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 7 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS–DAP City Project Number 102818 Revised March 20, 2020 33 12 60 Standard Blow-off Valve Assembly 06/19/2013 33 31 12 Cured in Place Pipe (CIPP) 12/20/2012 33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 12/20/2012 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer 12/20/2012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe 12/20/2012 33 31 22 Sanitary Sewer Slip Lining 12/20/2012 33 31 23 Sanitary Sewer Pipe Enlargement 12/20/2012 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 33 31 70 Combination Air Valve for Sanitary Sewer Force Mains 12/20/2012 33 39 10 Cast-in-Place Concrete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 33 39 30 Fiberglass Manholes 12/20/2012 33 39 40 Wastewater Access Chamber (WAC) 12/20/2012 33 39 60 Epoxy Liners for Sanitary Sewer Structures 12/20/2012 33 41 10 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01/2011 33 41 11 High Density Polyethylene (HDPE) Pipe for Storm Drain 12/20/2012 33 41 12 Reinforced Polyethlene (SRPE) Pipe 11/13/2015 33 46 00 Subdrainage 12/20/2012 33 46 01 Slotted Storm Drains 07/01/2011 33 46 02 Trench Drains 07/01/2011 33 49 10 Cast-in-Place Manholes and Junction Boxes 12/20/2012 33 49 20 Curb and Drop Inlets 12/20/2012 33 49 40 Storm Drainage Headwalls and Wingwalls 07/01/2011 Division 34 - Transportation 34 41 10 Traffic Signals 10/12/2015 34 41 10.01 Attachment A – Controller Cabinet 12/18/2015 34 41 10.02 Attachment B – Controller Specification 02/2012 34 41 10.03 Attachment C – Software Specification 01/2012 34 41 11 Temporary Traffic Signals 11/22/2013 34 41 13 Removing Traffic Signals 12/20/2012 34 41 15 Rectangular Rapid Flashing Beacon 11/22/2013 34 41 16 Pedestrian Hybrid Signal 11/22/2013 34 41 20 Roadway Illumination Assemblies 12/20/2012 34 41 20.01 Arterial LED Roadway Luminaires 06/15/2015 34 41 20.02 Freeway LED Roadway Luminaires 06/15/2015 34 41 20.03 Residential LED Roadway Luminaires 06/15/2015 34 41 30 Aluminum Signs 11/12/2013 34 41 50 Single-Mode Fiber Optic Cable 02/26/2016 34 71 13 Traffic Control 11/22/2013 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 8 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS–DAP City Project Number 102818 Revised March 20, 2020 Appendix GC-4.01 Availability of Lands GC-4.02 Subsurface and Physical Conditions GC-4.04 Underground Facilities GC-4.06 Hazardous Environmental Condition at Site GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GC-6.09 Permits and Utilities GC-6.24 Nondiscrimination GR-01 60 00 Product Requirements END OF SECTION 0o az aa UAP- BID PROPoSAL Pege 1 of I SECTION 00 42 49 Devebper Awarded Projects - PROPOSAL FORM UNIT PRICE BID - WATER IMPROVEMENTS 7'his Bid is submitted 6Y the entity named below: BIDDER Contrac[or qgrees to tomplete WORK for F7NAL ACCEPTANCE within CONTRAC[ eommencen to run as provided lo t6e Ceneral Conditioos. END OF SECTION crrvoFFoerwonrn STATd[)qRDCON57Rl1CfION SPECIFICATIONDOCVMENTS-DEVELOPEA AWARUEO PROJECfS Fmm Version Mey 22, 2019 IPRC20-0088 Bidder's Annlication BY: �~ l �''�`_ � DATE: _ ` 110 working days aRer the d�te whm fhe IH35 W GLOBAL IAGISI'ICS ClyAnjedNumber IO;RlB 00 45 11 - 1 BIDDERS PREQUALIFICATIONS Page 1 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised April 2, 2014 SECTION 00 45 11 BIDDERS PREQUALIFICATIONS 1. Summary. All contractors are required to be prequalified by the City prior to submitting bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder Prequalification Application in accordance with the requirements below. The prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. The information must be submitted seven (7) days prior to the date of the opening of bids. For example, a contractor wishing to submit bids on projects to be opened on the 7th of April must file the information by the 31st day of March in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder’s Prequalification Application, the following must accompany the submission. a. A complete set of audited or reviewed financial statements. (1) Classified Balance Sheet (2) Income Statement (3) Statement of Cash Flows (4) Statement of Retained Earnings (5) Notes to the Financial Statements, if any b. A certified copy of the firm’s organizational documents (Corporate Charter, Articles of Incorporation, Articles of Organization, Certificate of Formation, LLC Regulations, Certificate of Limited Partnership Agreement). c. A completed Bidder Prequalification Application. (1) The firm’s Texas Taxpayer Identification Number as issued by the Texas Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification number visit the Texas Comptroller of Public Accounts online at the following web address www.window.state.tx.us/taxpermit/ and fill out the application to apply for your Texas tax ID. (2) The firm’s e-mail address and fax number. (3) The firm’s DUNS number as issued by Dun & Bradstreet. This number is used by the City for required reporting on Federal Aid projects. The DUNS number may be obtained at www.dnb.com. d. Resumes reflecting the construction experience of the principles of the firm for firms submitting their initial prequalification. These resumes should include the size and scope of the work performed. e. Other information as requested by the City. 2. Prequalification Requirements a. Financial Statements. Financial statement submission must be provided in accordance with the following: (1) The City requires that the original Financial Statement or a certified copy be submitted for consideration. 00 45 11 - 2 BIDDERS PREQUALIFICATIONS Page 2 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised April 2, 2014 (2) To be satisfactory, the financial statements must be audited or reviewed by an independent, certified public accounting firm registered and in good standing in any state. Current Texas statues also require that accounting firms performing audits or reviews on business entities within the State of Texas be properly licensed or registered with the Texas State Board of Public Accountancy. (3) The accounting firm should state in the audit report or review whether the contractor is an individual, corporation, or limited liability company. (4) Financial Statements must be presented in U.S. dollars at the current rate of exchange of the Balance Sheet date. (5) The City will not recognize any certified public accountant as independent who is not, in fact, independent. (6) The accountant’s opinion on the financial statements of the contracting company should state that the audit or review has been conducted in accordance with auditing standards generally accepted in the United States of America. This must be stated in the accounting firm’s opinion. It should: (1) express an unqualified opinion, or (2) express a qualified opinion on the statements taken as a whole. (7) The City reserves the right to require a new statement at any time. (8) The financial statement must be prepared as of the last day of any month, not more than one year old and must be on file with the City 16 months thereafter, in accordance with Paragraph 1. (9) The City will determine a contractor’s bidding capacity for the purposes of awarding contracts. Bidding capacity is determined by multiplying the positive net working capital (working capital = current assets – current liabilities) by a factor of 10. Only those statements reflecting a positive net working capital position will be considered satisfactory for prequalification purposes. (10) In the case that a bidding date falls within the time a new financial statement is being prepared, the previous statement shall be updated with proper verification. b. Bidder Prequalification Application. A Bidder Prequalification Application must be submitted along with audited or reviewed financial statements by firms wishing to be eligible to bid on all classes of construction and maintenance projects. Incomplete Applications will be rejected. (1) In those schedules where there is nothing to report, the notation of “None” or “N/A” should be inserted. (2) A minimum of five (5) references of related work must be provided. (3) Submission of an equipment schedule which indicates equipment under the control of the Contractor and which is related to the type of work for which the Contactor is seeking prequalification. The schedule must include the manufacturer, model and general common description of each piece of equipment. Abbreviations or means of describing equipment other than provided above will not be accepted. 3. Eligibility to Bid a. The City shall be the sole judge as to a contractor’s prequalification. b. The City may reject, suspend, or modify any prequalification for failure by the contractor to demonstrate acceptable financial ability or performance. c. The City will issue a letter as to the status of the prequalification approval. 00 45 11 - 3 BIDDERS PREQUALIFICATIONS Page 3 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised April 2, 2014 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid the prequalified work types until the expiration date stated in the letter. END OF SECTION 40 45 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work T� ze" box rovide the com lete ma'or work t e and actual descri tion as rovided b the Water Department for water and sewer and TPW for paving Major Work Type Contractor/Subcontractor Company Name Prequalification Ex iration Date Water Distribution all sizes Wright Construction Co., Inc. 4/3/2021 Sewer Collection System — all sizes Wright Construction Co., Inc. 4/3/2021 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Wright Construction Co., Inc. BY: 601 W. Wall Street Grapevine, Texas 76051 j TITLE: President DATE: October 21, 2020 END OF SECTION CITY OF FORT WORTH STANDARDCONSTRUCTIONPREQUALIFICATIONSTATEMENT—DEVELOPERAWARDEDPROlECTS 004512_Prequalification5tatement2015 DAPBIank.docx Form Version September 1, 2015 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 2 3 4 5 6 7 8 9 10 �� 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATIOlv LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifaes that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 102818. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: ._ �, 1�L� Company ��_�' . I�r Address -� �' _ , �( ��j � ��7 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § B�: FYa.r�l� �• �u �.ad 6 (Please Print) Signa Title: _ � � � (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared F12k1�1 ��, �• � N�tpn , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of �_ I N Tab LLG for the purposes and consideration therein expressed and in the capacity therein stated. GNEN UNDER MY HAND AND SEAL OF OFFICE this day of I�inv�Nl��R. , aa�• ����RYp���I� SAMANTHA E. BATTAGLIA ��{P,... �9 i �_,• �.Notary Public, State of Texas ���:}Q� Comm. Expires 01-23-2022 '.,�; oF,�:.`` Notary ID 129498696 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION 3PECIFICATION DOCUMENTS Revised Apri12, 2014 � II335W GLOBAL LOGISTICS City Project Number 102818 00 52 43 -1 Developer Awatded Project A�t Page 1 of 4 1 SECTION 00.52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on �(VGII %0'W is made by and between the Developer, 4 FW I-35 Logistics 1, LLC, autliorized to do business in Texas ("Developei'� , and 5 �-��C �'�(it�'_u c�. O� _ , authorized to do G business in Texas, acting by and ti�rough its duly authorized representative, ("Contractor"). 7 Developer and Contractor, in consideration of the�mutual covenants hereinafter set forth, agree as 8 follows: Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Conlract Documents for the 11 Project identified herein. 12 13 14 IS 16 ArticIe 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Water rovements to Serve IH35W Glabal Lo isrics Cit Pro'ect Number 1U2818 17 Article 3. CONI'RACT TIlVIE 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to tlus Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within 2� working days after the date 23 when the Contract Time commences to nm as provided in Paragrapk 12.04. of the Standard 24 City Conditions of the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 27 28 29 30 31 32 33 34 35 Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer iinancial loss if the Work is nat completed .wit,�in tt�e.:..tipxes specifed in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Ariicte 10 of the Standard City Conditions of the Con�struction Contract for Develaper Awarded Projects. The Contractor also recognizes the delays, expense and dif�culties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any sucfi pioof ,'Con"ti�actor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer e� Dollars ($p�Q) for each day that expires after the time spec�ed in Paragraph 3.2 for Fina1 Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATTON DOCUMENTS — DSVSLOPER AWARDED PROJECI'S GY1y Projece Nranber 102818 Revised Jime 16, 2016 oosan3-s Developa Awarded Project Agre�ment Page 2 of4 36 Article 4. CONTRACT PRICE 37 Developer agrees to pay Con�actor for performance of the Wor$ in aciordance wit� �he Contract 38 Documents an amount in current funds of -:.� Y r�4t �.� ��, s�, ft : t- i- 1�". Yi. -�', ��<. ��'t� }ollars 39 �$_�_� z3`_��+a �. —�-wa inurtdred,-� i ��, �o����a� 40 Artfcle 5. CONTRACT DQCUMENTS -�1r {,1/W � � � 41 5.1 CONTENTS: . 42 A. The Contract Documents which comprise the entire agreement between Developer and 43 Contractor conceming the Work consist of the following: 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 1. This Agreemet►t. 2. Attachmerrts to this Agreement: a. Bid Faam (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement 3) State and Federal dceuments (project specific) b: Insurance ACORD Form(s) c. Payment Bond {DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version} f Power of Attorney for the Honds g. Worker's Compensation Affidavit h. MBE and/or SBE Commitment Farm (If required) 3. Standard City General Conditions of the Constntction Conh�act for Developer Awarded Projects. 4. Supplementary Conditions. b0 5. Specifications specifically made a part of the Contract Documents by attacLsnent 61 or, if not attached, as incorporabed by reference and described in the Table of b2 Contents of the Project's Contract Dceutnents. 63 6. Drawings. 64 7. Addenda. 65 66 67 68 69 70 71 72 73 8. Documentation submitted by Contr.actor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WdRTH TH35W GLOBAL IAGISTICS STANDARD CONSTRUCTION SPECIFiCATiON AOCUMENTS — DEVELOPER AWARDID PROJECTS City Project Number 102818 Revised June 16, 2016 005243-3 Devetoper Awarded Projed Agreement Page 3 of 4 74 75 76 77 78 74 80 8I 82 83 84 SS Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own eapense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and servir,es to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This in�demnification rovision is s ecificall►� intended to o erate and be e�'ective even if it is alle ed or roven that all or some of the damg�es bein� snu �ht wcre caused in whole or in �art, b►� an� ac� omission or ne li ence of the cir►�. This indemnity provision is intended to inclade, wiithout limitation, indemnity fur costs, ezpenses and legal fees incurred by the city in defending against such claims and causes of actions. 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own eapense, 87 the city, its officers, servants and emplayees, from and against any and aII luss, damage 88 or destructian of property of the city, arising aut of, or alleged to arise out of, the work 89 and services to be performed by the coatractor, its officers, agents, employees, 90. subcontractors, lic$nsees or invitees nnder this contrac� This indemnification 91 rovision is s ecificall►� intended to o erate and be effective even if it is alle ed or 92 �roven that all ar some of the dama �es be' � souQ�t were c�used. in whole or in ar� 93 b►• anv act. omission or ne��lf ence of the cin�, 94 95 Article 7. NIISCELLANEOUS 96 7.1 Terms. 97 Tenns used in this Agreement are defined in Article 1 of the Standard City Conditions of 98 the Consh�uction Contract for Developer Awazded Projects. 94 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigneri by the 101 Contractor without the advanced express writ�en consent of the Developer. t02 7.3 Successors andAssigne. 103 Developer a.nd Contractor each binds itself, its partners, �successors, assigns and �legal 104 representatives to the other p.ariy hereto, in respect to all covenants, agreements and 105 obligations contained in the Gontract Documents. 106 7.4 5everability. 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shall continue to b� valid and binding upon DEVELOPER and i l0 CONTRACTOR. 1] 1 7.5 Governing Law and Venue. I 12 This Agreement, including all of the Contract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Caurt for the 114 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH IH35W GLOBAL'LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPEIi AWARDED pROJECTS City ProjectNember IQ2878 Revised hme 16, 2016 005143-4 Develop� Avrxrded Projed Agrcement Pege 4 of 4 115 116 7.6 Authority to Sign. 117 118 119 120 121 122 123 124 Contractor shall attach evidence of authority to sign Agrcement, if other than duly suthorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: r � JO LL �+'. F r1'+G� (��sre) (Printed Name) _ � Title: � � Company Name: � ; Address: ;, - 125 Cit� /State/Zip: � � ����( �] -�j�3u ?�.� �; � 2D2U Date �� Developer: �� I.��S �.oytSY�ts 1, ��-C. c. Gti I �L'dc c, (Si�nature) �TEvf.�! i7. 3�47F � (Printed Name) Title: P'�:h�lA�i/�i4 h1F.rt8F,Q Company name: F wI I- 3S �4i sYrcS �., �+-C Address: 350o Go�.6�-rE IQ�r�u� 'D t.�.. 75�2. Cit� /State/Zi��: �� �z�1 �zozv -- Date CITY OF FORT WORTH IH35W GLOBAL LOGISfICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPfiR AWARDED PROJECfS C�ty Project Nem6er 101818 Revised June 16, 2016 � 1 2 3 4 5 6 7 8 9 10 I1 12 13 14 15 16 17 SECTION QO 62 !3 PERFORMANCE BOND Bond #TXC613130 006213-1 PERFORMANCE BOND Page 1 of2 THE STATE OF TEXAS § COUNTY OF TARRANT § �OW ALL BY THESE PRESENTS: � 'I'j�t �yg Wright Construction Co., Inc. ��p� � , "PTincip3l" herein and Merchants Bonding Company (Mutual) , a corporate surety{sureties, if more than one) duly authorized to do business in #he State of Texas, lrnown as "Surety" herein {whether one or more}, are held and firmly bound unto the Developer, FW I-35 Logistics 1, LLC, authorized to do business in Texas ("Developer'� and the City of Fort Worth, a Texas municipal corporation ("City'�, in the penal sum of, Five Hundred Fifty Five Thousand Two Hundred Thir;y Six Dollars and FortyCents�*******************�***** Dp]]az's �$ 555,236.40************** j _ _ � lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the Developer and the City as dual obligees, we bind ourseIves, our heirs, executors, administrat�rs, successors and assigns, jointly and severa.ily, firmiy by these presents. I8 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth by and through a Community Facilities 20 Agreement, CFA Number CFA24-0107;and 21 WHEREAS, the Principal has entered into a certain written contract with tl�e Developer awazded 22 the 23rd �y og November , 20 20 , which Contract is hereby referred to and made a 23 part hereof for all purposes as if fully set forth herein, to fumish all materials, equipment labor 24 and other accessories defined by law, in the prosecution of the Work, including any Change 25 Orders, as provided for in said Contract designated as Water Imprnvements to Serve IH35W 26 Globa! Lagistics. 27 NOW, THEREFOItE, the condition of this obligation is such that if the said Principal sha11 28 faithfully perfarm it obliga#ions under the Contract and sha11 in all respects duly and faithfully 29 perform the Work, including Change Orders, under the Contract, according to the plans, 30 speciftcations, atld coniract documents therein referred to, and as well during any period of 31 extension of the Contract that may be granted on the part of the Developer and/or City, then this 32 obligation sha11 be and become null and void, otherwise to remain in full force and effec� CiTY QF FORT WORTH �i35W GLOBAL LOGISTICS 5TANDARD CITY COND1TIpNS — DEVELOP�R AWARDED PROJECI'S Clty ProjectNumber 102818 Revised Ianvary 3 i, 2012 00 62 13 - 2 PERFOR11dANCE BOND Page 2 of 2 1 PROVIDED F[TRTHER, that if any legat action be filed on this Bond, venue shall lie in 2 Tarrant Couniy, Texas or the United States District Court for the Northern District of Teicas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the pravisions of Chapter 2253 of the 5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance wi#h the provisions of said statue. 7 IN WITNESS `WAEREOF, the Priacipal and the Surety ha.ve SIGNED and SEALED 8 this instrument by duly authorized agents and officers on this the 23rd �y of g November � Z� 20 10 ri 12 13 14 15 16 17 Ig 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 ATTBST: .� � cipal Secretary �.; , � ' , � �� _ .� � 1TVitness as to Principal � PRINCIPAL: Wright Constru ' ., Inc. BY: Signat�ue l _ ^ � \f. , ���' y�_ � �`_�.' � • PlT �lame and Tifle Address: 601 W. Wall Street 4Grapevine, TX 76051 SURETY: Merchants Bonding Company (Mutual) BY: Signature Elena Sells, Attorney-In-Fact Name and Title ',' 1'����.�� � f W ess as to Si�r�t3' lennifer Clark Address: P•0. Box 14498 Des Moines, IA 5�� Telephone Number: ( 515) 243-8171 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has aathority to sign such obligation. If Surety's physical addtess is different from its mailing address, both must be provided. The date of the bond shall ttot be prior to the date the Contract is awarded. CITY �F FORT WORTH IH35W GLOBAL LOCrIS'fICS STAlVDARD C11Y CONDITION5 — DEVELOPER AWARDED PROJECfS Ct1y ProjectNwnber 1 D2818 Revised January 31, ?Al2 Bond #TXC613130 QO 62 l4 - 1 PAYMENTBOND Page 1 of 2 1 2 3 4 5 6 7 8 9 l0 11 12 13 i4 15 16 17 THE STATE OF TEXAS COUNTY OF TARRANT SECTION 00 6214 PAYMENT BOND § § KNOW ALL BY TFIESE PRESENTS: § That we Wright Construction Co., Inc. *�� � � -- "Principal" herein, and _ Merchants Bonding Company (Mutual) a , corporate surety ( or sureties if mare than one}, duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound umo the Developer, FW I-35 Logistics 1, LLC, authorized to do business in Texas "{Developer'�, and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum Five Hundred Fifty Five Thousand Two Hundred Of ThirtySixDollarsandFortyCents**********•**•************ ]�O�(� ��555,236.40************** y� lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payrnent of which sum well and truly be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, joint�y and severally, firmly by these presents: 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilifies in the City o€ Fort Worti�, by and through a Community Facitities 20 Agreement, CFA Ntunber CFA20-ola�; and 21 WH�REAS, Principal has entered into a certain written Contract with Developer, 22 awarded the z3rd �y og November , z� 20 ,�,�,�ch Contract is hereby 23 refened to and rnade a part hereof for a11 purposes as if fully set forttz herein, to furnish all 24 materials, equipment, Iabor and other accessories as defined by law, in the pmsecution of the 25 Work as provided for in said Contract and designated as Water Improvements to Serve IH35W 26 Global Logistics. 27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 28 Principal sha11 pay a11 monies owing to any (and all) payment bond beneficiary (as defined in 29 Cha.pter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 30 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 31 force and effect. C1TY pF FORT WORTH STANDARD CITY CONDTTIONS — DEVELOPER AWARD&D PROJECTS Revised January 31, 2012 IH35W GLOBAL LOGISTICS CityProjectNwnber 102818 oo6z �a-z PAYMENTBOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Govemment Code, as amended, and a11 liabiiities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 5 6 7 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and afficers on this the 23rd day of November _� Zp20 PRINCIPAL: Wright i ATTEST: �- rinci ) Secretary — � �� � • .Y.__i �Vltil1CS5 8S t0 PlIriC1pA1 Inc. BY: ' 7 - y. ./ _ � i;, , �� � � , 6t� _ _I� '1'I� Narv� and Title Address: 601 W. Wall Street Grapevine, TX 76051 SURETY: Merchants Bonding Company (Mutual) ATTEST: gy; Signature � N/A (Surety) Secretary -- Elena Sells, Attorney-In-Fact Name and Title , + � �(/ l ,,�5 -� '�_�L � �l.' � Witnes�' a�� t0 Sur�ty lennifer Clark ./ 8 9 10 11 12 13 Address: P•O. Box 14498 Des Moines, IA 50306 Tetephone Number: (515) 243-8171 Note: If signed by an officer of the Surety, there must be on file a cerkified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The da.te of the bond siiall not be prior to #he date the Contract is awarded. 14 �ND OF SECTION CTI'Y OF FORT WORTFi STANDARD CITY CONDTTIONS — DEVELQPER AWARDED PROJECTS Itevised danuary 31, 2b12 IIi35W GLaBAL LOGiSTICS City ProjectNwnber 1a2818 Bond #TXC613130 OOG219-I MAIlVT'ENTANCE BOND Page 1 of 3 1 2 3 4 5 6 7 8 4 10 11 i2 13 14 15 16 I7 18 19 THE STATE OF TEXAS COUNI'Y OF TARRANT SECTION 00 6219 MAINTENANCE BOND � § IiNOW ALL BY THESE PRESENTS: § That we �Nright Construction Co., Inc. ��o� as "Principal" herein and Merchants Bonding Company (Mutual) _, a corporate surety (sureties, ifmore than one) duly authorized to do business in the State of Texas, lrnown as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, FW I-35 Logistics 1, LLC, authorized to do business in Texas (°°Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum Five Hundred Fifty Five Thousand Two Hundred Of ThirtySix Dollarsand FortyCents*******"************** Doilars ($ 555,236.40************** �� lawful maney of the United States, to be paid in Fort Worth, Tarrant County, Texas, for pa.yment of which sum well and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 20 WAEREAS, Developer and City have entered into an Agreement for the construction of 21 community facilities in the City of Fort Worth by and through a Community Facilities 22 Agreernert#, CFA Number CFA20-OI07 ;and 23 WHEREAS, the Principai has exrtered into a. certain written contract with the Developer 24 awarded the 23rd day of November , 20 20 , which Contract is 25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish alI 26 materials, equipment labor and other accessories as defined by Iaw, in the prosecution of the 27 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 28 the "Work") as provided for in said Contract and designated as i3�ater Improvements to Serve 29 IH35W Global Logistics; and 30 31 WHEREAS, Principal binds itselfto use such materials and ta so construct the Work in 32 accordance with the plans, specifications and Contract Documents that the Work is and wiil 33 remain free from defects in materials or workmanship for and during the period of two (2) years 34 after the date af Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 IH35W GLABAL LOGISTIC3 Ciry Project Numberl01818 d06219-2 MADVTBNANCE BON17 Page 2 of 3 1 2 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 3 upon receiving notice from the Developer and/or City of the need thereof at any titne within the 4 Maintenance Period. 5 6 NQW THEREFORE, the condition oithis obligation is such that if Principal shall 7 remedy any defective Work, for which tirnely notice was provided by Developer or City, ta a 8 completion satisfactAry to the City, then this obligation shall become null and void; otherwise to 9 remain in fu11 force and effect. 10 11 PROVIDED, HOWEVER, if Principal shall faii so to repair or reconstruct any timely 12 noticed defective Work, it is agreed that the Developer or City may cause any and atI such 13 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 14 by the Principal and the Surety under this Maintenance Bond; and 15 16 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 17 Taxrant County, Texas or the United States District Court for the Northern District of Teacas, Fort 18 Worth Division; and 19 20 PROVIDED FURTFIER, that this oblig�ation shall be continuous in nature and 21 successive recoveries may be had hereon for successive breaches. 22 23 24 CITY OF FORT WORTH [H35W GLOBAL LOGISTICS STANDARD CTfY CDNDITIONS — DEVELOPER AWAKDED PRUJEC'TS Ciry PmJ¢ct Nwn6er 102818 Revise� Jemmry 31, 2012 00 62 19 - 3 MAINTENANC& BONi? Pege 3 of3 1 2 IN WITNESS WHEREOF, the Principa] and the Surety have each SIGNED and SEALED this instrettnent by duly authorized agents and officers on this the 23rd �ay of 3 November 2Q 20 � , 4 5 6 7 8 9 1Q 11 12 13 14 15 I6 17 18 19 20 21 22 23 24 zs 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 L�� ATTE�T: � ^ rincip Secretary ; ' •� L . Viiitness as to Principal Y ATTEST: N/A is+zc�t}') S�refiary _ � '� . � I� ,�� VJi�ess t Surety Jennifer Clark .I PRINCIPAL: Wright Cons t' Co nc. BY: � re Name and Title Address: 601 W. Wall Street Grapevine, TX 76051 SURETY: Merchants Bonding Company (Mutual) � / � �.��,� Elena Sells, Attorney-In-Fact � Name and Title � Address: P•0. Box 14498 Des Moines, IA 50306 Telephone Nuxnber: _ �515) 243-8171 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this persan has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Cflntract is awarded. CITY OF FORT WORTH IH3SW GLOBAL LOG[STICS STANDARb CITY CONDTfIONS - DEVELOPER AWARBED PROJEC7S Ciry ProjectNwnber 102818 Revised January 3l, 2Q12 � i 4 �. l.... .. ,.�, IMPORTANT NOTICE To obtain information or make a complaint: You may contact your insurance agent at the telephone number provided by your insurance agent. You may call Merchants Bonding Company's toll-free telephone number for information or to make a complaint at: 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. SUP 0032 TX (1/09) 23 � V ��R�,i11`1`�+1 T�� Bond #TXC613130 BONDING C0�1iLPANYzN POWER OF ATTORNEY KnowAll Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of lowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Elena Sells; Jennifer Picchi; Kathy Sells; Lanny Land; Steven W Lewis their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of MerchantsNational Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recagnizances, contracts af indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship o bligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and constructian contracts required 4y the State of Florida Department of Transportation. It is fully understood that consenting to the State ofFlorida DepaRment of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner- Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 11th day of February , 2020 �����........,., . • - • . ��.• pt10NA� '•., .•Q�NG Cp'•. '� �' EtPOIp'',�•�p•� ��Q�O�p()��'�,�•� MERCHANTS BONDING COMPANY (MUTUAL) � y�.� V 'O�.Z�; MERCHANT NATIONAL BONDING, INC. ;�. 'G >' :Z • =�'2 -o- 0:�7 :�:2 c�; • _�` 2003 � sz; : a 1933 �' e; By � ;� ; � : .y�. .�;, l � . •.,d'vi� ,,. � .,,:;a�,. .�b��. . � .. •`1a� President STATEOFIOWA •���'•��■+•"'`�' +��'•••''� COUNTY OF DALLAS ss. On this 11th day of February 2020 before me appeared Larry Taylor, to me personally known, who being by me duly swarn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. ,���A� s POLLY MASON z a o a� Commission Number 750576 � ��� . . My Commission Expires �� � P January 07, 2023 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 23rd day of November , 2020 . ���........,�� � �... . � � ��.•�• 10N • .• NG C •. pt , A� �.,� � �p\ ,.... �O�jr,o, � aj , oiKPO%p,4 . C•S ; �O D�P0�9. qy. � . � `2;2G �' :Z; ; 'c,� - �•..c: " �. -o- oi0; .ay.;� -a- "`� : � % v' 20Q3 ;;,�; ;� 193� a�e; Secretary : d• : � ; . v�. 'r:• . • . �� .,�,.�� � :�a'�. .•�,�„ � . . +.: POA 0018 (1/20) •�'••'••'•••••••' •••••••• CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 – Definitions and Terminology .......................................................................................................... 1 1.01 Defined Terms ............................................................................................................................... 1 1.02 Terminology .................................................................................................................................. 6 Article 2 – Preliminary Matters ......................................................................................................................... 7 2.01 Copies of Documents .................................................................................................................... 7 2.02 Commencement of Contract Time; Notice to Proceed ................................................................ 7 2.03 Starting the Work .......................................................................................................................... 8 2.04 Before Starting Construction ........................................................................................................ 8 2.05 Preconstruction Conference .......................................................................................................... 8 2.06 Public Meeting .............................................................................................................................. 8 2.07 Initial Acceptance of Schedules.................................................................................................... 8 Article 3 – Contract Documents: Intent, Amending, Reuse ............................................................................ 8 3.01 Intent .............................................................................................................................................. 8 3.02 Reference Standards...................................................................................................................... 9 3.03 Reporting and Resolving Discrepancies....................................................................................... 9 3.04 Amending and Supplementing Contract Documents ................................................................. 10 3.05 Reuse of Documents ................................................................................................................... 10 3.06 Electronic Data ............................................................................................................................ 11 Article 4 – Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points........................................................................................................... 11 4.01 Availability of Lands .................................................................................................................. 11 4.02 Subsurface and Physical Conditions .......................................................................................... 12 4.03 Differing Subsurface or Physical Conditions ............................................................................. 12 4.04 Underground Facilities ............................................................................................................... 13 4.05 Reference Points ......................................................................................................................... 14 4.06 Hazardous Environmental Condition at Site .............................................................................. 14 Article 5 – Bonds and Insurance ..................................................................................................................... 16 5.01 Licensed Sureties and Insurers ................................................................................................... 16 5.02 Performance, Payment, and Maintenance Bonds ....................................................................... 16 5.03 Certificates of Insurance ............................................................................................................. 16 5.04 Contractor’s Insurance ................................................................................................................ 18 5.05 Acceptance of Bonds and Insurance; Option to Replace ........................................................... 19 Article 6 – Contractor’s Responsibilities ........................................................................................................ 19 6.01 Supervision and Superintendence............................................................................................... 19 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 6.02 Labor; Working Hours ................................................................................................................ 20 6.03 Services, Materials, and Equipment ........................................................................................... 20 6.04 Project Schedule.......................................................................................................................... 21 6.05 Substitutes and “Or-Equals” ....................................................................................................... 21 6.06 Concerning Subcontractors, Suppliers, and Others.................................................................... 24 6.07 Wage Rates.................................................................................................................................. 25 6.08 Patent Fees and Royalties ........................................................................................................... 26 6.09 Permits and Utilities .................................................................................................................... 27 6.10 Laws and Regulations ................................................................................................................. 27 6.11 Taxes ........................................................................................................................................... 28 6.12 Use of Site and Other Areas ....................................................................................................... 28 6.13 Record Documents ...................................................................................................................... 29 6.14 Safety and Protection .................................................................................................................. 29 6.15 Safety Representative.................................................................................................................. 30 6.16 Hazard Communication Programs ............................................................................................. 30 6.17 Emergencies and/or Rectification ............................................................................................... 30 6.18 Submittals .................................................................................................................................... 31 6.19 Continuing the Work................................................................................................................... 32 6.20 Contractor’s General Warranty and Guarantee .......................................................................... 32 6.21 Indemnification ......................................................................................................................... 33 6.22 Delegation of Professional Design Services .............................................................................. 34 6.23 Right to Audit .............................................................................................................................. 34 6.24 Nondiscrimination....................................................................................................................... 35 Article 7 – Other Work at the Site ................................................................................................................... 35 7.01 Related Work at Site ................................................................................................................... 35 7.02 Coordination ................................................................................................................................ 36 Article 8 – City’s Responsibilities................................................................................................................... 36 8.01 Communications to Contractor ................................................................................................... 36 8.02 Furnish Data ................................................................................................................................ 36 8.03 Pay When Due ............................................................................................................................ 36 8.04 Lands and Easements; Reports and Tests................................................................................... 36 8.05 Change Orders............................................................................................................................. 36 8.06 Inspections, Tests, and Approvals .............................................................................................. 36 8.07 Limitations on City’s Responsibilities ....................................................................................... 37 8.08 Undisclosed Hazardous Environmental Condition .................................................................... 37 8.09 Compliance with Safety Program ............................................................................................... 37 Article 9 – City’s Observation Status During Construction ........................................................................... 37 9.01 City’s Project Manager ……...................................................................................................... 37 9.02 Visits to Site ................................................................................................................................ 37 9.03 Authorized Variations in Work .................................................................................................. 38 9.04 Rejecting Defective Work .......................................................................................................... 38 9.05 Determinations for Work Performed .......................................................................................... 38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 Article 10 – Changes in the Work; Claims; Extra Work ................................................................................ 38 10.01 Authorized Changes in the Work ............................................................................................... 38 10.02 Unauthorized Changes in the Work ........................................................................................... 39 10.03 Execution of Change Orders....................................................................................................... 39 10.04 Extra Work .................................................................................................................................. 39 10.05 Notification to Surety.................................................................................................................. 39 10.06 Contract Claims Process ............................................................................................................. 40 Article 11 – Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement...................... 41 11.01 Cost of the Work ......................................................................................................................... 41 11.02 Allowances .................................................................................................................................. 43 11.03 Unit Price Work .......................................................................................................................... 44 11.04 Plans Quantity Measurement ...................................................................................................... 45 Article 12 – Change of Contract Price; Change of Contract Time................................................................. 46 12.01 Change of Contract Price ............................................................................................................ 46 12.02 Change of Contract Time ............................................................................................................ 47 12.03 Delays .......................................................................................................................................... 47 Article 13 – Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 48 13.01 Notice of Defects ........................................................................................................................ 48 13.02 Access to Work ........................................................................................................................... 48 13.03 Tests and Inspections .................................................................................................................. 48 13.04 Uncovering Work........................................................................................................................ 49 13.05 City May Stop the Work ............................................................................................................. 49 13.06 Correction or Removal of Defective Work ................................................................................ 50 13.07 Correction Period ........................................................................................................................ 50 13.08 Acceptance of Defective Work................................................................................................... 51 13.09 City May Correct Defective Work ............................................................................................. 51 Article 14 – Payments to Contractor and Completion .................................................................................... 52 14.01 Schedule of Values...................................................................................................................... 52 14.02 Progress Payments ...................................................................................................................... 52 14.03 Contractor’s Warranty of Title ................................................................................................... 54 14.04 Partial Utilization ........................................................................................................................ 55 14.05 Final Inspection ........................................................................................................................... 55 14.06 Final Acceptance ......................................................................................................................... 55 14.07 Final Payment.............................................................................................................................. 56 14.08 Final Completion Delayed and Partial Retainage Release ........................................................ 56 14.09 Waiver of Claims ........................................................................................................................ 57 Article 15 – Suspension of Work and Termination ........................................................................................ 57 15.01 City May Suspend Work............................................................................................................. 57 15.02 City May Terminate for Cause ................................................................................................... 58 15.03 City May Terminate For Convenience ....................................................................................... 60 Article 16 – Dispute Resolution ...................................................................................................................... 61 16.01 Methods and Procedures ............................................................................................................. 61 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 Article 17 – Miscellaneous .............................................................................................................................. 62 17.01 Giving Notice .............................................................................................................................. 62 17.02 Computation of Times ................................................................................................................ 62 17.03 Cumulative Remedies ................................................................................................................. 62 17.04 Survival of Obligations ............................................................................................................... 63 17.05 Headings ...................................................................................................................................... 63 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 1 of 63 ARTICLE 1 – DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement—The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment—The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award – Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder—The individual or entity who submits a Bid directly to City. 8. Bidding Documents—The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day – A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Calendar Day – A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 2 of 63 12. Change Order—A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 13. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 14. City Attorney – The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 15. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 16. City Manager – The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 17. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 18. Contract—The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 19. Contract Documents—Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 20. Contract Price—The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 21. Contract Time—The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 22. Contractor—The individual or entity with whom City has entered into the Agreement. 23. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 3 of 63 24. Damage Claims – A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 25. Day or day – A day, unless otherwise defined, shall mean a Calendar Day. 26. Director of Aviation – The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 27. Director of Parks and Community Services – The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Planning and Development – The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Transportation Public Works – The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Water Department – The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 32. Effective Date of the Agreement—The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 33. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 34. Extra Work – Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 35. Field Order — A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 36. Final Acceptance – The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 4 of 63 37. Final Inspection – Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 38. General Requirements—Sections of Division 1 of the Contract Documents. 39. Hazardous Environmental Condition—The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 40. Hazardous Waste—Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 41. Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 42. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 43. Major Item – An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 44. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 45. Notice of Award—The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 46. Notice to Proceed—A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 47. PCBs—Polychlorinated biphenyls. 48. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 49. Plans – See definition of Drawings. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 5 of 63 50. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor’s plan to accomplish the Work within the Contract Time. 51. Project—The Work to be performed under the Contract Documents. 52. Project Manager—The authorized representative of the City who will be assigned to the Site. 53. Public Meeting – An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 54. Radioactive Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 55. Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 56. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 57. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 58. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor’s Applications for Payment. 59. Site—Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 60. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 61. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 6 of 63 62. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 63. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 64. Superintendent – The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 65. Supplementary Conditions—That part of the Contract Documents which amends or supplements these General Conditions. 66. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 67. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 68 Unit Price Work—See Paragraph 11.03 of these General Conditions for definition. 69. Weekend Working Hours – Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 70. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 71. Working Day – A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms “as allowed,” “as approved,” “as ordered,” “as directed” or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives “reasonable,” “suitable,” “acceptable,” “proper,” “satisfactory,” or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word “defective,” when modifying the word “Work,” refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City’s written acceptance. D. Furnish, Install, Perform, Provide: 1. The word “Furnish” or the word “Install” or the word “Perform” or the word “Provide” or the word “Supply,” or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 – PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given no earlier than 14 days after the Effective Date of the Agreement, unless agreed to by both parties in writing. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 – CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as “the Contractor shall,” “in conformity with,” “as shown,” or “as specified” are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading “Related Sections include but are not necessarily limited to:” and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Contractor’s Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor’s Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City’s review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City’s written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City’s on-line electronic document management and collaboration system site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user’s sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data’s creator. ARTICLE 4 – AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the “technical data” contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such “technical data” is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor’s purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any “technical data” or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any “technical data” on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City’s judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the “technical data” contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such “technical data” is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor’s purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any “technical data” or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City’s own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual’s or entity’s own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5 – BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor’s obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (other evidence of insurance requested by City or any other additional insured) in at least the minimum amount as specified in the Supplementary Conditions which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as “Additional Insured” on all liability policies. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor’s general liability insurance shall include a, “per project” or “per location”, endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers’ compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor’s obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the “occurrence basis”. If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage’s and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor’s insurance. 5.04 Contractor’s Insurance A. Workers Compensation and Employers’ Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers’ Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers’ Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor’s performance of the Work and Contractor’s other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers’ compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor’s employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on “any auto”, defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 – CONTRACTOR’S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor’s representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City’s written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 01 32 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and “Or-Equals” A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or “or-equal” item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. “Or-Equal” Items: If in City’s sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an “or-equal” item, in which case review and approval of the proposed item may, in City’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City’s sole discretion an item of material or equipment proposed by Contractor does not qualify as an “or-equal” item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor’s achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City’s Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No “or-equal” or substitute will be ordered, installed or utilized until City’s review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an “or-equal.” City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor’s expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City’s Cost Reimbursement: City will record City’s costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor’s Expense: Contractor shall provide all data in support of any proposed substitute or “or-equal” at Contractor’s expense. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City’s MBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor’s own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City’s determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor’s responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor’s compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor’s responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor’s obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller’s Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller’s Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. http://www.window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City’s safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor’s safety program, if any, with which City’s employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor’s duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor’s designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City’s review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City’s Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City’s review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City’s review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City’s review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City’s review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor’s General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor’s warranty and guarantee. B. Contractor’s warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor’s obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor’s obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor’s responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional’s written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City’s review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City’s review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 – OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City’s employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City’s employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor’s Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor’s Work. Contractor’s failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor’s Work except for latent defects in the work provided by others. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 – CITY’S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements; Reports and Tests City’s duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City’s identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City’s responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 37 of 63 8.07 Limitations on City’s Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor’s means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor’s failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City’s responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City’s employees and representatives shall comply with the specific applicable requirements of Contractor’s safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 – CITY’S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City’s Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City’s Project Manager during construction are set forth in the Contract Documents. The City’s Project Manager for this Contract is identified in the Supplementary Conditions. 9.02 Visits to Site A. City’s Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor’s executed Work. Based on information obtained during such visits and observations, City’s Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City’s Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City’s Project Manager’s efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City’s Project Manager’s visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Variations in Work City’s Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City’s Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City’s Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City’s written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City’s written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 – CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City’s correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor’s responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City’s Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor’s written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant’s last submittal (unless Contract allows additional time). C. City’s Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City’s sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 41 of 63 D. City’s written action under Paragraph 10.06.C will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11 – COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.01.B, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.01.B, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers’ compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers’ field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor’s Cost of the Work and fee shall be determined in the same manner as Contractor’s Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor’s employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor’s fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor’s officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor’s principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.01.A.1 or specifically covered by Paragraph 11.01.A.4, all of which are to be considered administrative costs covered by the Contractor’s fee. 2. Expenses of Contractor’s principal and branch offices other than Contractor’s office at the Site. 3. Any part of Contractor’s capital expenses, including interest on Contractor’s capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor’s Fee: When all the Work is performed on the basis of cost-plus, Contractor’s fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor’s fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.B, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre-bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 44 of 63 a. the pre-bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor’s costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre-bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor’s overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under “Price and Payment Procedures” varies by more than 25% (or as stipulated under “Price and Payment Procedures” for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 46 of 63 E. For callout work or non-site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 – CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.01.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.01.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor’s fee for overhead and profit (determined as provided in Paragraph 12.01.C). C. Contractor’s Fee: The Contractor’s additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.01.A.1, 11.01.A.2. and 11.01.A.3, the Contractor’s additional fee shall be 15 percent except for: 1) rental fees for Contractor’s own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.01.A.5, the Contractor’s fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.01.C.2.a and 12.01.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.01.A.6, and 11.01.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor’s fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor’s sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 – TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City’s acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor’s purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory (“Testing Lab”) to perform any inspections or tests (“Testing”) for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a “fail”, “did not pass” or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor’s cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor’s expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City’s observation and replaced at Contractor’s expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City’s request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. 1. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City’s special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor’s use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City’s written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City’s written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor’s obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City’s evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City’s representatives, agents, consultants, employees, and City’s other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City’s rights and remedies under this Paragraph 13.09. ARTICLE 14 – PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City’s interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor’s legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City’s processing of any payment requested in an Application for Payment will be based on City’s observations of the executed Work, and on City’s review of the Application for Payment and the accompanying data and schedules, that to the best of City’s knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor’s performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor’s Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor’s performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City’s satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City’s acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor’s insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor’s final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 – SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor’s persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City’s Business Diversity Enterprise Ordinance #20020-12-2011established under Paragraph 6.06.D); 2. Contractor’s disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor’s repeated disregard of the authority of City; or 4. Contractor’s violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor’s failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.B, Contractor’s services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor’s services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 – DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City’s action under Paragraph 10.06.C or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.D shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 – MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. 00 73 00 SUPPLEMENTARY CONDITIONS Page 1 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised March 9, 2020 SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, “Resolving Discrepancies” Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4.01A.1., “Availability of Lands” The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of October 20, 2020: Outstanding Right-Of-Way, and/or Easements to Be Acquired PARCEL NUMBER OWNER TARGET DATE OF POSSESSION NONE NONE NONE The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. SC-4.01A.2, “Availability of Lands” 00 73 00 SUPPLEMENTARY CONDITIONS Page 2 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised March 9, 2020 Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of October 20, 2020: EXPECTED OWNER UTILITY AND LOCATION TARGET DATE OF ADJUSTMENT The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., “Subsurface and Physical Conditions” The following are reports of explorations and tests of subsurface conditions at the site of the Work: A Geotechnical Report No. 23197 , dated November, 2019 , prepared by Reed Engineering Group, a sub-consultant of Ascendant Commercial, a consultant of the City, providing additional information on the general subsurface conditions of the site. The following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site of the Work: None SC-4.06A., “Hazardous Environmental Conditions at Site” The following are reports and drawings of existing hazardous environmental conditions known to the City: None SC-5.03A., “Certificates of Insurance” The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: (3) Other: SC-5.04A., “Contractor’s Insurance” The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutory limits NONE NONE NONE 00 73 00 SUPPLEMENTARY CONDITIONS Page 3 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised March 9, 2020 Employer's liability $100,000 each accident/occurrence $100,000 Disease - each employee $500,000 Disease - policy limit SC-5.04B., “Contractor’s Insurance” 5.04B. Commercial General Liability, under Paragraph GC-5.04B. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2,000,000 aggregate limit The policy must have an endorsement (Amendment – Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide “X”, “C”, and “U” coverage’s. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., “Contractor’s Insurance” 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor’s Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non-owned. $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250,000 Bodily Injury per person / $500,000 Bodily Injury per accident / $100,000 Property Damage SC-5.04D., “Contractor’s Insurance” The Contractor’s construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks. None The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a “Right of Entry Agreement” with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor’s use of private and/or construction access roads crossing said railroad company’s properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor’s operations and work cross, occupy, or touch railroad property: (1) General Aggregate: 00 73 00 SUPPLEMENTARY CONDITIONS Page 4 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised March 9, 2020 (2) Each Occurrence: Required for this Contract x Not required for this Contract With respect to the above outlined insurance requirements, the following shall govern: 1. Where a single railroad company is involved, the Contractor shall provide one insurance pol icy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right -of-way or where several railroad companies are involved and operated on their own separate rights -of-way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. 3. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company’s right-of-way at a location entirely separate from the grade separation or at- grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company’s right -of- way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company’s property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor’s beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., “Project Schedule” Project schedule shall be tier 2 for the project. SC-6.07., “Wage Rates” The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: CFW Horizontal Wage Rate Table A copy of the table is also available by accessing the City’s website at: https://apps.fortworthtexas.gov/ProjectResources/ You can access the file by following the directory path: 02-Construction Documents/Specifications/Div00 – General Conditions 00 73 00 SUPPLEMENTARY CONDITIONS Page 5 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised March 9, 2020 SC-6.09., “Permits and Utilities” SC-6.09A., “Contractor obtained permits and licenses” The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: SC-6.09B. “City obtained permits and licenses” The following are known permits and/or licenses required by the Contract to be acquired by the City: 1. TxDOT Utility Installation Permit. SC-6.09C. “Outstanding permits and licenses” The following is a list of known outstanding permits and/or licenses to be acquired, if any as of October 20, 2020. Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION T['2T 8tilit\ Installation PerPit SC-6.24B., “Title VI, Civil Rights Act of 1964 as amended” During the performance of this Contract, the Contractor, for itself, its assignees and successors in interest (hereinafter referred to as the "Contractor") agrees as follows: 1. Compliance with Regulations: The Contractor shall comply with the Regulation relative to nondiscrimination in Federally-assisted programs of the Department of Transportation (hereinafter, “DOT”) Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. 2. Nondiscrimination: The Contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, or national origin, in the selection and retention of subcontractors, including procurements of mate rials and leases of equipment. The Contractor shall not participate either directly or indirectly in the discrimination prohibited by 49 CFR, section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations. 3. Solicitations for Subcontractors, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, inclu ding procurements of materials or leases of equipment, each potential subcontactor or supplier shall be notified by the Contractor of the Contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. 00 73 00 SUPPLEMENTARY CONDITIONS Page 6 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised March 9, 2020 4. Information and Reports: The Contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information and its facilities as may be determined by City or the Texas Department of Transportation to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive po ssession of another who fails or refuses to furnish this information the contractor shall so certify to the City, or the Texas Department of Transportation, as appropriate, and shall set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of the Contractor's noncompliance with the nondiscrimination provisions of this Contract, City shall impose such contract sanctions as it or the Texas Department of Transportation may determine to be appropriate, including, but not limited to: a. withholding of payments to the Contractor under the Contract until the Contractor complies, and/or b. cancellation, termination or suspension of the Contract, in whole or in part. 6. Incorporation of Provisions: The Contractor shall include the provisions of paragraphs (1) through (6) in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The Contractor shall take such action with respect to any subcontract or procurement as City or the Texas Department of Transportation may direct as a means of enforcing such provisions including sanctions for non -compliance: Provided, however, that, in the event a contractor becomes involved in, or is th reatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request City to enter into such litigation to protect the interests of City, and, in addition, the contractor may request the United States to enter into such litigation to protect the interests of the United States. Additional Title VI requirements can be found in the Appendix. SC-7.02., “Coordination” The individuals or entities listed below have contracts with the City for the performance of other work at the Site: Vendor Scope of Work Coordination Authority SC-8.01, “Communications to Contractor” NONE SC-9.01., “City’s Project Manager” The City’s Project Manager for this Contract is Kiran Konduru, or his/her successor pursuant to written notification from the Director of Infrastructure Plan Review. SC-13.03C., “Tests and Inspections” 00 73 00 SUPPLEMENTARY CONDITIONS Page 7 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised March 9, 2020 SC-16.01C.1, “Methods and Procedures” END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., “City’s Project Representative” wording changed to City’s Project Manager. 3/9/2020 D.V. Magaña SC-6.07, Updated the link such that files can be accessed via the City’s website. CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 – Definitions and Terminology .......................................................................................................... 1  1.01 Defined Terms ............................................................................................................................... 1  1.02 Terminology .................................................................................................................................. 5  Article 2 – Preliminary Matters ......................................................................................................................... 6  2.01 Before Starting Construction ........................................................................................................ 6  2.02 Preconstruction Conference .......................................................................................................... 6  2.03 Public Meeting .............................................................................................................................. 6  Article 3 – Contract Documents and Amending ............................................................................................... 6  3.01 Reference Standards ..................................................................................................................... 6  3.02 Amending and Supplementing Contract Documents .................................................................. 6  Article 4 – Bonds and Insurance ....................................................................................................................... 7  4.01 Licensed Sureties and Insurers ..................................................................................................... 7  4.02 Performance, Payment, and Maintenance Bonds ........................................................................ 7  4.03 Certificates of Insurance ............................................................................................................... 7  4.04 Contractor’s Insurance .................................................................................................................. 9  4.05 Acceptance of Bonds and Insurance; Option to Replace ........................................................... 12  Article 5 – Contractor’s Responsibilities ........................................................................................................ 12  5.01 Supervision and Superintendent ................................................................................................. 12  5.02 Labor; Working Hours ................................................................................................................ 13  5.03 Services, Materials, and Equipment ........................................................................................... 13  5.04 Project Schedule .......................................................................................................................... 14  5.05 Substitutes and “Or-Equals” ....................................................................................................... 14  5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) ..................................... 16  5.07 Concerning Subcontractors, Suppliers, and Others ................................................................... 16  5.08 Wage Rates.................................................................................................................................. 18  5.09 Patent Fees and Royalties ........................................................................................................... 19  5.10 Laws and Regulations ................................................................................................................. 19  5.11 Use of Site and Other Areas ....................................................................................................... 19  5.12 Record Documents ...................................................................................................................... 20  5.13 Safety and Protection .................................................................................................................. 21  5.14 Safety Representative ................................................................................................................. 21  5.15 Hazard Communication Programs ............................................................................................. 22  5.16 Submittals .................................................................................................................................... 22  5.17 Contractor’s General Warranty and Guarantee .......................................................................... 23  CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification ........................................................................................................................... 24  5.19 Delegation of Professional Design Services .............................................................................. 24  5.20 Right to Audit: ............................................................................................................................ 25  5.21 Nondiscrimination....................................................................................................................... 25  Article 6 – Other Work at the Site ................................................................................................................... 26  6.01 Related Work at Site ................................................................................................................... 26  Article 7 – City’s Responsibilities................................................................................................................... 26  7.01 Inspections, Tests, and Approvals .............................................................................................. 26  7.02 Limitations on City’s Responsibilities ....................................................................................... 26  7.03 Compliance with Safety Program ............................................................................................... 27  Article 8 – City’s Observation Status During Construction ........................................................................... 27  8.01 City’s Project Representative ..................................................................................................... 27  8.02 Authorized Variations in Work .................................................................................................. 27  8.03 Rejecting Defective Work .......................................................................................................... 27  8.04 Determinations for Work Performed .......................................................................................... 28  Article 9 – Changes in the Work ..................................................................................................................... 28  9.01 Authorized Changes in the Work ............................................................................................... 28  9.02 Notification to Surety .................................................................................................................. 28  Article 10 – Change of Contract Price; Change of Contract Time ................................................................ 28  10.01 Change of Contract Price ............................................................................................................ 28  10.02 Change of Contract Time............................................................................................................ 28  10.03 Delays .......................................................................................................................................... 28  Article 11 – Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 29  11.01 Notice of Defects ........................................................................................................................ 29  11.02 Access to Work ........................................................................................................................... 29  11.03 Tests and Inspections .................................................................................................................. 29  11.04 Uncovering Work ....................................................................................................................... 30  11.05 City May Stop the Work ............................................................................................................. 30  11.06 Correction or Removal of Defective Work ................................................................................ 30  11.07 Correction Period ........................................................................................................................ 30  11.08 City May Correct Defective Work ............................................................................................. 31  Article 12 – Completion .................................................................................................................................. 32  12.01 Contractor’s Warranty of Title ................................................................................................... 32  12.02 Partial Utilization ........................................................................................................................ 32  12.03 Final Inspection ........................................................................................................................... 32  12.04 Final Acceptance ......................................................................................................................... 33  Article 13 – Suspension of Work .................................................................................................................... 33  13.01 City May Suspend Work ............................................................................................................ 33  Article 14 – Miscellaneous .............................................................................................................................. 34  14.01 Giving Notice .............................................................................................................................. 34  CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.02 Computation of Times ................................................................................................................ 34  14.03 Cumulative Remedies ................................................................................................................. 34  14.04 Survival of Obligations ............................................................................................................... 35  14.05 Headings ...................................................................................................................................... 35  00 73 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 1 – DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day – A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw – City’s on-line, electronic document management and collaboration system. 5. Calendar Day – A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home-rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) -–A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract—The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents—Those items that make up the contract and which must include the Agreement, and it’s attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement 00 73 10- 2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non-Resident Bidder iii. Prequalification Statement c. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions l. Supplementary Conditions m. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project’s Contract Documents o. Drawings p. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor—The individual or entity with whom Developer has entered into the Agreement. 11. Day or day – A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer – An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance – The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. 00 73 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 16. Final Inspection – Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements—A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non-Participating Change Order—A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order—A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans – See definition of Drawings. 24. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor’s plan to accomplish the Work within the Contract Time. 25. Project—The Work to be performed under the Contract Documents. 26. Project Representative—The authorized representative of the City who will be assigned to the Site. 27. Public Meeting – An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 00 73 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 30. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site—Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions – That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent – The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions—That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours – Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 00 73 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 41. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non-Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day – A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word “defective,” when modifying the word “Work,” refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City’s written acceptance. C. Furnish, Install, Perform, Provide: 1. The word “Furnish” or the word “Install” or the word “Perform” or the word “Provide” or the word “Supply,” or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. 00 73 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 2 – PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non- Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 – CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non-Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 00 73 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. City’s or Engineer’s review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City’s written interpretation or clarification. ARTICLE 4 – BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor’s obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 00 73 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. The certificate of insurance shall document the City, an as “Additional Insured” on all liability policies. 2. The Contractor’s general liability insurance shall include a, “per project” or “per location”, endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers’ compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor’s obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the “occurrence basis”. If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In 00 73 10- 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage’s and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor’s insurance. 4.04 Contractor’s Insurance A. Workers Compensation and Employers’ Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers’ Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers’ Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor’s performance of the Work and Contractor’s other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers’ compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor’s employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment – Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide “X”, “C”, and “U” coverage’s. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on “any auto”, defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor’s Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non-owned. 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1) $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor’s construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: None 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a “Right of Entry Agreement” with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor’s use of private and/or construction access roads crossing said railroad company’s properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor’s operations and work cross, occupy, or touch railroad property: a. General Aggregate: None b. Each Occurrence: None 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at-grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights-of- 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company’s right-of-way at a location entirely separate from the grade separation or at-grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company’s right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company’s property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor’s beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 – CONTRACTOR’S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor’s representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City’s written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and “Or-Equals” A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or “or-equal” item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. “Or-Equal” Items: If in City’s sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an “or-equal” item, in which case review and approval of the proposed item may, in City’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City’s sole discretion an item of material or equipment proposed by Contractor does not qualify as an “or-equal” item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor’s achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City’s Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No “or-equal” or substitute will be ordered, installed or utilized until City’s review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an “or-equal.” City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor’s expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City’s Cost Reimbursement: City will record City’s costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor’s Expense: Contractor shall provide all data in support of any proposed substitute or “or-equal” at Contractor’s expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre-qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Required for this Contract. Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City’s MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor’s own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract X 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates Required for this Contract. Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City’s determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and X 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor’s compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor’s responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor’s obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City’s safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor’s safety program, if any, with which City’s employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor’s duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor’s designated safety representative at the Site. 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City’s review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City’s Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City’s review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 2. City’s review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City’s review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City’s review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor’s General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor’s warranty and guarantee. B. Contractor’s warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor’s obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor’s obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor’s responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional’s written approval when submitted to City. 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City’s review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City’s review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 6 – OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City’s employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City’s employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor’s Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor’s Work. Contractor’s failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor’s Work except for latent defects in the work provided by others. ARTICLE 7 – CITY’S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City’s responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City’s Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor’s means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor’s failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 7.03 Compliance with Safety Program While at the Site, City’s employees and representatives shall comply with the specific applicable requirements of Contractor’s safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 – CITY’S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City’s Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City’s representative during construction are set forth in the Contract Documents. A. City’s Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor’s executed Work. Based on information obtained during such visits and observations, City’s Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City’s Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City’s Project Representative’s efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City’s Project Representative’s visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City’s Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City’s Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City’s Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City’s written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 – CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor’s responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 – CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 11 – TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City’s acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor’s purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory (“Testing Lab”) to perform any inspections or tests (“Testing”) for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a “fail”, “did not pass” or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor’s cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City’s observation and replaced at Contractor’s expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City’s special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor’s use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City’s written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City’s written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor’s obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 stored elsewhere. Contractor shall allow City, City’s representatives, agents, consultants, employees, and City’s other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City’s rights and remedies under this Paragraph 11.09. ARTICLE 12 – COMPLETION 12.01 Contractor’s Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor’s performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City’s satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor’s insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 – SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 – MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. 01 11 00 - 1 DAP SUMMARY OF WORK Page 1 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects City Project Number 102818 Revised December 20, 2012 SECTION 01 11 00 1 SUMMARY OF WORK 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes: 5 1. Summary of Work to be performed in accordance with the Contract Documents 6 B. Deviations from this City of Fort Worth Standard Specification 7 1. None. 8 C. Related Specification Sections include, but are not necessarily limited to: 9 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 10 2. Division 1 - General Requirements 11 1.2 PRICE AND PAYMENT PROCEDURES 12 A. Measurement and Payment 13 1. Work associated with this Item is considered subsidiary to the various items bid. 14 No separate payment will be allowed for this Item. 15 1.3 REFERENCES [NOT USED] 16 1.4 ADMINISTRATIVE REQUIREMENTS 17 A. Work Covered by Contract Documents 18 1. Work is to include furnishing all labor, materials, and equipment, and performing 19 all Work necessary for this construction project as detailed in the Drawings and 20 Specifications. 21 B. Subsidiary Work 22 1. Any and all Work specifically governed by documentary requirements for the 23 project, such as conditions imposed by the Drawings or Contract Documents in 24 which no specific item for bid has been provided for in the Proposal and the item is 25 not a typical unit bid item included on the standard bid item list, then the item shall 26 be considered as a subsidiary item of Work, the cost of which shall be included in 27 the price bid in the Proposal for various bid items. 28 C. Use of Premises 29 1. Coordinate uses of premises under direction of the City. 30 2. Assume full responsibility for protection and safekeeping of materials and 31 equipment stored on the Site. 32 3. Use and occupy only portions of the public streets and alleys, or other public places 33 or other rights-of-way as provided for in the ordinances of the City, as shown in the 34 Contract Documents, or as may be specifically authorized in writing by the City. 35 a. A reasonable amount of tools, materials, and equipment for construction 36 purposes may be stored in such space, but no more than is necessary to avoid 37 delay in the construction operations. 38 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects City Project Number 102818 Revised December 20, 2012 b. Excavated and waste materials shall be stored in such a way as not to interfere 1 with the use of spaces that may be designated to be left free and unobstructed 2 and so as not to inconvenience occupants of adjacent property. 3 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 4 manner as not to interfere with the operation of the railroad. 5 1) All Work shall be in accordance with railroad requirements set forth in 6 Division 0 as well as the railroad permit. 7 D. Work within Easements 8 1. Do not enter upon private property for any purpose without having previously 9 obtained permission from the owner of such property. 10 2. Do not store equipment or material on private property unless and until the 11 specified approval of the property owner has been secured in writing by the 12 Contractor and a copy furnished to the City. 13 3. Unless specifically provided otherwise, clear all rights-of-way or easements of 14 obstructions which must be removed to make possible proper prosecution of the 15 Work as a part of the project construction operations. 16 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 17 lawns, fences, culverts, curbing, and all other types of structures or improvements, 18 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 19 appurtenances thereof, including the construction of temporary fences and to all 20 other public or private property adjacent to the Work. 21 5. Notify the proper representatives of the owners or occupants of the public or private 22 lands of interest in lands which might be affected by the Work. 23 a. Such notice shall be made at least 48 hours in advance of the beginning of the 24 Work. 25 b. Notices shall be applicable to both public and private utility companies and any 26 corporation, company, individual, or other, either as owners or occupants, 27 whose land or interest in land might be affected by the Work. 28 c. Be responsible for all damage or injury to property of any character resulting 29 from any act, omission, neglect, or misconduct in the manner or method or 30 execution of the Work, or at any time due to defective work, material, or 31 equipment. 32 6. Fence 33 a. Restore all fences encountered and removed during construction of the Project 34 to the original or a better than original condition. 35 b. Erect temporary fencing in place of the fencing removed whenever the Work is 36 not in progress and when the site is vacated overnight, and/or at all times to 37 provide site security. 38 c. The cost for all fence work within easements, including removal, temporary 39 closures and replacement, shall be subsidiary to the various items bid in the 40 project proposal, unless a bid item is specifically provided in the proposal. 41 01 11 00 - 3 DAP SUMMARY OF WORK Page 3 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects City Project Number 102818 Revised December 20, 2012 1.5 SUBMITTALS [NOT USED] 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE [NOT USED] 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6 1.11 FIELD [SITE] CONDITIONS [NOT USED] 7 1.12 WARRANTY [NOT USED] 8 PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 END OF SECTION 11 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 01 25 00 - 1 DAP SUBSTITUTION PROCEDURES Page 1 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 SECTION 01 25 00 SUBSTITUTION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or-equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or-equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or-equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, 01 25 00 - 2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. 01 25 00 - 3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer’s opinion, acceptance will require substantial revision of the original design d. In the City’s or Developer’s opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 25 00 - 4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended Recommended as noted Firm Not recommended Received late Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date 01 31 19 - 1 DAP PRECONSTRUCTION MEETING Page 1 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 SECTION 01 31 19 PRECONSTRUCTION MEETING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor’s work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material l. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre-Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City’s representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment jj. Questions or Comments 01 31 19 - 3 DAP PRECONSTRUCTION MEETING Page 3 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 32 33 - 1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 SECTION 01 32 33 PRECONSTRUCTION VIDEO PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 33 00 - 1 DAP SUBMITTALS Page 1 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 SECTION 01 33 00 DAP SUBMITTALS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. General methods and requirements of submissions applicable to the following Work-related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. 01 33 00 - 2 DAP SUBMITTALS Page 2 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) “By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 ½ inches x 11 inches to 8 ½ inches x 11inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions 01 33 00 - 3 DAP SUBMITTALS Page 3 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom-prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City’s Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City’s Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing-in diagrams and templates 5) Catalog cuts 6) Product photographs 01 33 00 - 4 DAP SUBMITTALS Page 4 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 7) Standard wiring diagrams 8) Printed performance curves and operational-range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare-parts listing and printed product warranties 12) As applicable to the Work H. Samples 1. As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on-site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City’s Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) 01 33 00 - 5 DAP SUBMITTALS Page 5 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 01 33 00 - 6 DAP SUBMITTALS Page 6 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non-conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor’s risk if not marked b. Submittals for each item will be reviewed no more than twice at the City’s expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative’s then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City’s discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. 01 33 00 - 7 DAP SUBMITTALS Page 7 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 01 33 00 - 8 DAP SUBMITTALS Page 8 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August 30, 2013 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days 01 35 13 - 1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August, 30, 2013 SECTION 01 35 13 1 SPECIAL PROJECT PROCEDURES 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes: 5 1. The procedures for special project circumstances that includes, but is not limited to: 6 a. Coordination with the Texas Department of Transportation 7 b. Work near High Voltage Lines 8 c. Confined Space Entry Program 9 d. Air Pollution Watch Days 10 e. Use of Explosives, Drop Weight, Etc. 11 f. Water Department Notification 12 g. Public Notification Prior to Beginning Construction 13 h. Coordination with United States Army Corps of Engineers 14 i. Coordination within Railroad permits areas 15 j. Dust Control 16 k. Employee Parking 17 B. Deviations from this City of Fort Worth Standard Specification 18 1. None. 19 C. Related Specification Sections include, but are not necessarily limited to: 20 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 21 2. Division 1 – General Requirements 22 3. Section 33 12 25 – Connection to Existing Water Mains 23 24 1.2 REFERENCES 25 A. Reference Standards 26 1. Reference standards cited in this Specification refer to the current reference 27 standard published at the time of the latest revision date logged at the end of this 28 Specification, unless a date is specifically cited. 29 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 30 High Voltage Overhead Lines. 31 3. North Central Texas Council of Governments (NCTCOG) – Clean Construction 32 Specification 33 1.3 ADMINISTRATIVE REQUIREMENTS 34 A. Coordination with the Texas Department of Transportation 35 1. When work in the right-of-way which is under the jurisdiction of the Texas 36 Department of Transportation (TxDOT): 37 a. Notify the Texas Department of Transportation prior to commencing any work 38 therein in accordance with the provisions of the permit 39 01 35 13 - 2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August, 30, 2013 b. All work performed in the TxDOT right-of-way shall be performed in 1 compliance with and subject to approval from the Texas Department of 2 Transportation 3 B. Work near High Voltage Lines 4 1. Regulatory Requirements 5 a. All Work near High Voltage Lines (more than 600 volts measured between 6 conductors or between a conductor and the ground) shall be in accordance with 7 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 8 2. Warning sign 9 a. Provide sign of sufficient size meeting all OSHA requirements. 10 3. Equipment operating within 10 feet of high voltage lines will require the following 11 safety features 12 a. Insulating cage-type of guard about the boom or arm 13 b. Insulator links on the lift hook connections for back hoes or dippers 14 c. Equipment must meet the safety requirements as set forth by OSHA and the 15 safety requirements of the owner of the high voltage lines 16 4. Work within 6 feet of high voltage electric lines 17 a. Notification shall be given to: 18 1) The power company (example: ONCOR) 19 a) Maintain an accurate log of all such calls to power company and record 20 action taken in each case. 21 b. Coordination with power company 22 1) After notification coordinate with the power company to: 23 a) Erect temporary mechanical barriers, de-energize the lines, or raise or 24 lower the lines 25 c. No personnel may work within 6 feet of a high voltage line before the above 26 requirements have been met. 27 C. Confined Space Entry Program 28 1. Provide and follow approved Confined Space Entry Program in accordance with 29 OSHA requirements. 30 2. Confined Spaces include: 31 a. Manholes 32 b. All other confined spaces in accordance with OSHA’s Permit Required for 33 Confined Spaces 34 D. Use of Explosives, Drop Weight, Etc. 35 1. When Contract Documents permit on the project the following will apply: 36 a. Public Notification 37 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 38 prior to commencing. 39 2) Minimum 24 hour public notification in accordance with Section 01 31 13 40 E. Water Department Coordination 41 1. During the construction of this project, it will be necessary to deactivate, for a 42 period of time, existing lines. The Contractor shall be required to coordinate with 43 the Water Department to determine the best times for deactivating and activating 44 those lines. 45 01 35 13 - 3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August, 30, 2013 2. Coordinate any event that will require connecting to or the operation of an existing 1 City water line system with the City’s representative. 2 a. Coordination shall be in accordance with Section 33 12 25. 3 b. If needed, obtain a hydrant water meter from the Water Department for use 4 during the life of named project. 5 c. In the event that a water valve on an existing live system be turned off and on 6 to accommodate the construction of the project is required, coordinate this 7 activity through the appropriate City representative. 8 1) Do not operate water line valves of existing water system. 9 a) Failure to comply will render the Contractor in violation of Texas Penal 10 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 11 will be prosecuted to the full extent of the law. 12 b) In addition, the Contractor will assume all liabilities and 13 responsibilities as a result of these actions. 14 F. Public Notification Prior to Beginning Construction 15 1. Prior to beginning construction on any block in the project, on a block by block 16 basis, prepare and deliver a notice or flyer of the pending construction to the front 17 door of each residence or business that will be impacted by construction. The notice 18 shall be prepared as follows: 19 a. Post notice or flyer 7 days prior to beginning any construction activity on each 20 block in the project area. 21 1) Prepare flyer on the Contractor’s letterhead and include the following 22 information: 23 a) Name of Project 24 b) City Project No (CPN) 25 c) Scope of Project (i.e. type of construction activity) 26 d) Actual construction duration within the block 27 e) Name of the contractor’s foreman and phone number 28 f) Name of the City’s inspector and phone number 29 g) City’s after-hours phone number 30 2) A sample of the ‘pre-construction notification’ flyer is attached as Exhibit 31 A. 32 3) Submit schedule showing the construction start and finish time for each 33 block of the project to the inspector. 34 4) Deliver flyer to the City Inspector for review prior to distribution. 35 b. No construction will be allowed to begin on any block until the flyer is 36 delivered to all residents of the block. 37 G. Public Notification of Temporary Water Service Interruption during Construction 38 1. In the event it becomes necessary to temporarily shut down water service to 39 residents or businesses during construction, prepare and deliver a notice or flyer of 40 the pending interruption to the front door of each affected resident. 41 2. Prepared notice as follows: 42 a. The notification or flyer shall be posted 24 hours prior to the temporary 43 interruption. 44 b. Prepare flyer on the contractor’s letterhead and include the following 45 information: 46 1) Name of the project 47 2) City Project Number 48 01 35 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August, 30, 2013 3) Date of the interruption of service 1 4) Period the interruption will take place 2 5) Name of the contractor’s foreman and phone number 3 6) Name of the City’s inspector and phone number 4 c. A sample of the temporary water service interruption notification is attached as 5 Exhibit B. 6 d. Deliver a copy of the temporary interruption notification to the City inspector 7 for review prior to being distributed. 8 e. No interruption of water service can occur until the flyer has been delivered to 9 all affected residents and businesses. 10 f. Electronic versions of the sample flyers can be obtained from the Project 11 Construction Inspector. 12 H. Coordination with United States Army Corps of Engineers (USACE) 13 1. At locations in the Project where construction activities occur in areas where 14 USACE permits are required, meet all requirements set forth in each designated 15 permit. 16 I. Coordination within Railroad Permit Areas 17 1. At locations in the project where construction activities occur in areas where 18 railroad permits are required, meet all requirements set forth in each designated 19 railroad permit. This includes, but is not limited to, provisions for: 20 a. Flagmen 21 b. Inspectors 22 c. Safety training 23 d. Additional insurance 24 e. Insurance certificates 25 f. Other employees required to protect the right-of-way and property of the 26 Railroad Company from damage arising out of and/or from the construction of 27 the project. Proper utility clearance procedures shall be used in accordance 28 with the permit guidelines. 29 2. Obtain any supplemental information needed to comply with the railroad’s 30 requirements. 31 J. Dust Control 32 1. Use acceptable measures to control dust at the Site. 33 a. If water is used to control dust, capture and properly dispose of waste water. 34 b. If wet saw cutting is performed, capture and properly dispose of slurry. 35 K. Employee Parking 36 1. Provide parking for employees at locations approved by the City. 37 01 35 13 - 5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August, 30, 2013 1.4 SUBMITTALS [NOT USED] 1 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.6 CLOSEOUT SUBMITTALS [NOT USED] 3 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.8 QUALITY ASSURANCE [NOT USED] 5 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6 1.10 FIELD [SITE] CONDITIONS [NOT USED] 7 1.11 WARRANTY [NOT USED] 8 PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 END OF SECTION 11 12 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.3.B – Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 13 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August, 30, 2013 EXHIBIT A 1 (To be printed on Contractor’s Letterhead) 2 3 4 5 Date: 6 7 CPN No.: 8 Project Name: 9 Mapsco Location: 10 Limits of Construction: 11 12 13 14 15 16 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 17 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 18 PROPERTY. 19 20 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 21 OF THIS NOTICE. 22 23 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 24 ISSUE, PLEASE CALL: 25 26 27 Mr. <CONTRACTOR’S SUPERINTENDENT> AT <TELEPHONE NO.> 28 29 OR 30 31 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 32 33 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 34 35 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 36 37 01 35 13 - 7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised August, 30, 2013 EXHIBIT B 1 2 3 4 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised March 20, 2020 SECTION 01 45 23 TESTING AND INSPECTION SERVICES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City’s document management system, or another form of distribution approved by the City. 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised March 20, 2020 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City’s Project Representative 4. Provide City’s Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magaña Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City’s document management system. 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised JULY 1, 2011 SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City’s Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised JULY 1, 2011 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City’s established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off-site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised JULY 1, 2011 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on-call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE-INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised JULY 1, 2011 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 55 26 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised July 1, 2011 SECTION 01 55 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 34 71 13 – Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. 01 55 26 - 2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised July 1, 2011 1) Allow a minimum of 5 working days for permit review. 2) Contractor’s responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor’s responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City’s Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION 01 55 26 - 3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised July 1, 2011 Revision Log DATE NAME SUMMARY OF CHANGE 01 57 13 - 1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised July 1, 2011 SECTION 01 57 13 STORM WATER POLLUTION PREVENTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 31 25 00 – Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 31 25 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised July 1, 2011 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 31 25 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP 1. Submit in accordance with Section 01 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review 01 57 13 - 3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised July 1, 2011 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 01 33 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised March 20, 2020 SECTION 01 60 00 PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City’s website at: https://apps.fortworthtexas.gov/ProjectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City’s Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City’s Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City’s Standard Product List. C. Although a specific product is included on City’s Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer’s standard product. D. See Section 01 33 00 for submittal requirements of Product Data included on City’s Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised March 20, 2020 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City’s Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magaña Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City’s website. 01 66 00 - 1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 SECTION 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer’s recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer’s recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City’s Project Representative. 5. Provide off-site storage and protection when on-site storage is not adequate. a. Provide addresses of and access to off-site storage locations for inspection by City’s Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers’ unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City’s Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City’s Project Representative. 01 66 00 - 3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non-Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Page 1 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 SECTION 01 70 00 MOBILIZATION AND REMOBILIZATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor’s personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor’s operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor’s personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor’s operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor’s personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor’s personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor’s personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor’s operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor’s personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor’s operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor’s personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price per each “Specified Remobilization” in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 01 70 00 - 3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 3. Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price per each “Work Order Mobilization” in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section 1.1.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price per each “Work Order Emergency Mobilization” in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION Page 4 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 01 74 23 - 1 DAP CLEANING Page 1 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 SECTION 01 74 23 CLEANING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 32 92 13 – Hydro-Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. 01 74 23 - 2 DAP CLEANING Page 2 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. 01 74 23 - 3 DAP CLEANING Page 3 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on-site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re-seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 01 77 19 - 1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 SECTION 01 77 19 CLOSEOUT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City’s Project Representative. 01 77 19 - 2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 01 78 39 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion 01 77 19 - 3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor’s Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 01 78 23 - 1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 ½ inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer’s printed data, or neatly typewritten 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly-leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut-down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 – title of section removed 4/7/2014 M.Domenech Revised for DAP Application 01 78 39 - 1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 SECTION 01 78 39 PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City’s Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". 01 78 39 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents 1. Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DAP City Project Number 102818 Revised April 7, 2014 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application 02 41 14 - 1 UTILITY REMOVAL/ABANDONMENT Page 1 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 0SECTION 02 41 14 UTILITY REMOVAL/ABANDONMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Direction for the removal, abandonment or salvaging of the following utilities: a. Cathodic Protection Test Stations b. Water Lines c. Gate Valves d. Water Valves e. Fire Hydrants f. Water Meters and Meter Box g. Water Sampling Station h. Concrete Water Vaults i. Sanitary Sewer Lines j. Sanitary Sewer Manholes k. Sanitary Sewer Junction Boxes l. Storm Sewer Lines m. Storm Sewer Manhole Risers n. Storm Sewer Junction Boxes o. Storm Sewer Inlets p. Box Culverts q. Headwalls and Safety End Treatments r. Trench Drains B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 03 34 13 – Controlled Low Strength Material (CLSM) 4. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 5. Section 33 05 24 – Installation of Carrier Pipe in Casing or Tunnel Liner Plate 6. Section 33 11 11 – Ductile Iron Fittings 7. Section 33 11 13 – Concrete Pressure Pipe, Bar-wrapped, Steel Cylinder Type 8. Section 33 11 14 – Buried Steel Pipe and Fittings 9. Section 33 12 25 – Connection to Existing Water Mains 1.2 PRICE AND PAYMENT PROCEDURES A. Utility Lines 1. Abandonment of Utility Line by Grouting a. Measurement 02 41 14 - 2 UTILITY REMOVAL/ABANDONMENT Page 2 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1) Measurement for this Item shall be per cubic yard of existing utility line to be grouted. Measure by tickets showing cubic yards of grout applied. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price per cubic yard of “Line Grouting” for: a) Various types of utility line c. The price bid shall include: 1) Low density cellular grout or CLSM 2) Water 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 2. Utility Line Removal, Separate Trench a. Measurement 1) Measurement for this Item shall be per linear foot of existing utility line to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per linear foot of “Remove Line” for: a) Various types of existing utility line b) Various sizes c. The price bid shall include: 1) Removal and disposal of existing utility pipe 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 3. Utility Line Removal, Same Trench a. Measurement 1) This Item is considered subsidiary the proposed utility line being installed. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the installation of proposed utility pipe and shall be subsidiary to the unit price bid per linear foot of pipe complete in place, and no other compensation will be allowed. 4. Manhole Abandonment a. Measurement 1) Measurement for this Item will be per each manhole to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Abandon Manhole” for: 02 41 14 - 3 UTILITY REMOVAL/ABANDONMENT Page 3 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a) Various diameters b) Various types c. The price bid shall include: 1) Removal and disposal of manhole cone 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Cutting and plugging of existing sewer lines 4) Concrete 5) Acceptable material for backfilling manhole void 6) Pavement removal 7) Excavation 8) Hauling 9) Disposal of excess materials 10) Furnishing, placement and compaction of backfill 11) Surface restoration 12) Clean-up 5. Cathodic Test Station Abandonment a. Measurement 1) Measurement for this Item will be per each cathodic test station to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Abandon Cathodic Test Station”. c. The price bid shall include: 1) Abandon cathodic test station 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up B. Water Lines and Appurtenances 1. Installation of a Water Line Pressure Plug a. Measurement 1) Measurement for this Item shall be per each pressure plug to be installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid for each “Pressure Plug” installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing pressure plug 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess material 6) Gaskets 7) Bolts and Nuts 02 41 14 - 4 UTILITY REMOVAL/ABANDONMENT Page 4 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 8) Furnishing, placement and compaction of embedment 9) Furnishing, placement and compaction of backfill 10) Disinfection 11) Testing 12) Clean-up 2. Abandonment of Water Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid for each “Water Abandonment Plug” installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 3. Water Valve Removal a. Measurement 1) Measurement for this Item will be per each water valve to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Remove Water Valve” for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of valve 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 4. Water Valve Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water valve to be removed and salvaged. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Salvage Water Valve” for: a) Various sizes 02 41 14 - 5 UTILITY REMOVAL/ABANDONMENT Page 5 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 c. The price bid shall include: 1) Removal and Salvage of valve 2) CLSM 3) Delivery to City 4) Pavement removal 5) Excavation 6) Hauling 7) Disposal of excess materials 8) Furnishing, placement and compaction of backfill 9) Clean-up 5. Water Valve Abandonment a. Measurement 1) Measurement for this Item will be per each water valve to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Abandon Water Valve” for: a) Various Sizes c. The price bid shall include: 1) Abandonment of valve 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 6. Fire Hydrant Removal and Salvage a. Measurement 1) Measurement for this Item will be per each fire hydrant to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Salvage Fire Hydrant”. c. The price bid shall include: 1) Removal and salvage of fire hydrant 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 7. Water Meter Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water meter to be removed and salvaged. b. Payment 02 41 14 - 6 UTILITY REMOVAL/ABANDONMENT Page 6 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Salvage Water Meter” for: a) Various sizes 2) If a “Water Meter Service Relocate” is performed in accordance with Section 33 12 10, removal and salvage or disposal of the existing (2-inch or smaller) water meter shall be subsidiary to the cost of the “Water Meter Service Relocate”, no other compensation will be allowed. c. The price bid shall include: 1) Removal and salvage of water meter 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 8. Water Sampling Station Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water sampling station to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Salvage Water Sampling Station”. c. The price bid shall include: 1) Removal and salvage of water sampling station 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 9. Concrete Water Vault Removal a. Measurement 1) Measurement for this Item will be per each concrete water vault to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Remove Concrete Water Vault”. c. The price bid shall include: 1) Removal and disposal of concrete water vault 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Removal, salvage and delivery of any valves to City, if applicable 4) Removal, salvage and delivery of any water meters to City, if applicable 5) Pavement removal 6) Excavation 02 41 14 - 7 UTILITY REMOVAL/ABANDONMENT Page 7 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 7) Hauling 8) Disposal of excess materials 9) Furnishing, placement and compaction of backfill 10) Clean-up C. Sanitary Sewer Lines and Appurtenances 1. Abandonment of Sanitary Sewer Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid for each “Sewer Abandonment Plug” for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 2. Sanitary Sewer Manhole Removal a. Measurement 1) Measurement for this Item will be per each sanitary sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Remove Sewer Manhole” for: a) Various diameters c. The price bid shall include: 1) Removal and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Cutting and plugging of existing sewer lines 4) Pavement removal 5) Excavation 6) Hauling 7) Disposal of excess materials 8) Furnishing, placement and compaction of backfill 9) Clean-up 3. Sanitary Sewer Junction Structure Removal a. Measurement 1) Measurement for this Item will be per each sanitary sewer junction structure being removed. b. Payment 02 41 14 - 8 UTILITY REMOVAL/ABANDONMENT Page 8 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the lump sum bid per each “Remove Sewer Junction Box” location. c. The price bid shall include: 1) Removal and disposal of junction box 2) Removal, salvage and delivery of frame and cover to City. 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up D. Storm Sewer Lines and Appurtenances 1. Abandonment of Storm Sewer Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug to be installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid for each “Storm Abandonment Plug” installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 2. Storm Sewer Manhole Removal a. Measurement 1) Measurement for this Item will be per each storm sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Remove Manhole Riser” for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 02 41 14 - 9 UTILITY REMOVAL/ABANDONMENT Page 9 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3. Storm Sewer Junction Box Removal a. Measurement 1) Measurement for this Item will be per each storm sewer junction structure to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Remove Storm Junction Box” for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of junction box 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 4. Storm Sewer Junction Structure Removal a. Measurement 1) Measurement for this Item will be per each storm sewer junction structure being removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the lump sum bid per each “Remove Storm Junction Structure” location. c. The price bid shall include: 1) Removal and disposal of junction structure 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 5. Storm Sewer Inlet Removal a. Measurement 1) Measurement for this Item will be per each storm sewer inlet to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Remove Storm Inlet” for: a) Various types b) Various sizes c. The price bid shall include: 1) Removal and disposal of inlet 2) Pavement removal 3) Excavation 02 41 14 - 10 UTILITY REMOVAL/ABANDONMENT Page 10 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 6. Storm Sewer Junction Box Removal a. Measurement 1) Measurement for this Item shall be per linear foot of existing storm sewer box to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per linear foot of “Remove Storm Junction Box” for all sizes. c. The price bid shall include: 1) Removal and disposal of Storm Sewer Box 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 7. Headwall/SET Removal a. Measurement 1) Measurement for this Item will be per each headwall or safety end treatment (SET) to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per each “Remove Headwall/SET”. c. The price bid shall include: 1) Removal and disposal of Headwall/SET 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 8. Trench Drain Removal a. Measurement 1) Measurement for this Item shall be per linear foot of storm sewer trench drain to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” shall be paid for at the unit price bid per linear foot of “Remove Trench Drain” for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of storm sewer line 2) Pavement removal 3) Excavation 02 41 14 - 11 UTILITY REMOVAL/ABANDONMENT Page 11 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Contact Inspector and the Water Department Field Operation Storage Yard for coordination of salvage material return. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Protect and salvage all materials such that no damage occurs during delivery to the City. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 MATERIALS 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 REMOVAL, SALVAGE, AND ABANDONMENT A. General 02 41 14 - 12 UTILITY REMOVAL/ABANDONMENT Page 12 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1. Manhole Abandonment a. All manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover as coordinated with City. d. Deliver salvaged material to the City. e. Cut and plug sewer lines to be abandoned. f. Backfill manhole void in accordance with City Standard Details. B. Water Lines and Appurtenances 1. Water Line Pressure Plugs a. Ductile Iron Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. b. PVC C900 and C905 Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. c. Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10 2) Plug using: a) A fabricated plug restrained by welding or by a Snap Ring in accordance with Section 33 11 13; or b) A blind flange in accordance with Section 33 11 13 3) Perform Cut and Plug in accordance with Section 33 12 25. d. Buried Steel Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug using: a) A fabricated plug restrained by welding in accordance with Section 33 11 14; or b) A blind flange in accordance with Section 33 11 14 3) Perform Cut and Plug in accordance with Section 33 12 25. 2. Water Line Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Plug with CLSM in accordance with Section 03 34 13. 3. Water Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater from existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 4. Water Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipe line and properly dispose as approved by City. 02 41 14 - 13 UTILITY REMOVAL/ABANDONMENT Page 13 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 5. Water Valve Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and dispose of valve bonnet, wedge and stem. c. Fill valve body with CLSM in accordance with Section 03 34 13. 6. Water Valve Removal and Salvage a. Excavate and backfill in accordance with Section 33 05 10. b. Remove valve bonnet, wedge and stem. c. Deliver salvaged material to the Water Department Field Operation Storage Yard. d. Protect salvaged materials from damage. e. Fill valve body with CLSM in accordance with Section 03 34 13. 7. Water Valve Abandonment a. Excavate and backfill in accordance with Section 33 05 10. b. Remove the top 2 feet of the valve stack and any valve extensions. c. Fill the remaining valve stack with CLSM in accordance with Section 03 34 13. 8. Fire Hydrant Removal and Salvage a. Excavate and backfill in accordance with Section 33 05 10. b. Remove Fire Hydrant. c. Place abandonment plug on fire hydrant lead line. d. Deliver salvaged fire hydrant to the Water Department Field Operation Storage Yard. e. Protect salvaged materials from damage. 9. Water Meter Removal and Salvage a. Remove and salvage water meter. b. Return salvaged meter to Project Representative. c. City will provide replacement meter for installation. d. Meter Box and Lid 1) Remove and salvage cast iron meter box lid. 2) Remove and dispose of any non-cast iron meter box lid. 3) Return salvaged material to the Water Department Field Operation Storage Yard. 4) Remove and dispose of meter box. 10. Water Sample Station Removal and Salvage a. Remove and salvage existing water sample station. b. Deliver salvaged material to the Water Department Field Operation Storage Yard. 11. Concrete Water Vault Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and salvage vault lid. c. Remove and salvage valves. d. Remove and salvage meters. e. Deliver salvaged material to the Water Department Field Operation Storage Yard. f. Remove and dispose of any piping or other appurtenances. g. Demolish and remove entire concrete vault. h. Dispose of all excess materials. 12. Cathodic Test Station Abandonment a. Excavate and backfill in accordance with Section 33 05 10 02 41 14 - 14 UTILITY REMOVAL/ABANDONMENT Page 14 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 b. Remove the top 2 feet of the cathodic test station stack and contents. c. Fill any remaining voids with CLSM in accordance with Section 03 34 13. C. Sanitary Sewer Lines and Appurtenances 1. Sanitary Sewer Line Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and dispose of any sewage. c. Plug with CLSM in accordance with Section 03 34 13. 2. Sanitary Sewer Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater and dispose of any sewage from the existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 3. Sanitary Sewer Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipe line and properly dispose as approved by City. 4. Sanitary Sewer Manholes Removal a. All sanitary sewer manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover. d. Deliver salvaged material to the Water Department Field Operation Storage. e. Demolish and remove entire concrete manhole. f. Cut and plug sewer lines to be abandoned. 5. Sanitary Sewer Junction Structure Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and salvage manhole frame and cover. c. Deliver salvaged material to the Water Department Field Operation Storage. d. Demolish and remove entire concrete manhole. e. Cut and plug sewer lines to be abandoned. D. Storm Sewer Lines and Appurtenances 1. Storm Sewer Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater line. c. Plug with CLSM in accordance with Section 03 34 13. 2. Storm Sewer Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater the existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 3. Storm Sewer Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove existing pipe line and properly dispose as approved by City. 4. Storm Sewer Manhole Removal 02 41 14 - 15 UTILITY REMOVAL/ABANDONMENT Page 15 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a. All storm sewer manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Demolish and remove entire concrete manhole. d. Cut and plug storm sewer lines to be abandoned. 5. Storm Sewer Junction Box and/or Junction Structure Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete structure. c. Cut and plug storm sewer lines to be abandoned. 6. Storm Sewer Inlet Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete inlet. c. Cut and plug storm sewer lines to be abandoned. 7. Storm Sewer Box Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipe line and properly dispose as approved by City. 8. Headwall/SET Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete inlet. c. Cut and plug storm sewer lines to be abandoned. 9. Storm Sewer Trench Drain Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove existing pipe line and dispose as approved by City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] 02 41 14 - 16 UTILITY REMOVAL/ABANDONMENT Page 16 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/12 D. Johnson 1.2.C.3.c. – Include Frame and Cover in Payment description Throughout – added abandonment of storm and sewer manholes when requested and/or approved by City 31 25 00 - 1 EROSION AND SEDIMENT CONTROL Page 1 of 9 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 31 25 00 EROSION AND SEDIMENT CONTROL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Implementation of the project’s Storm Water Pollution Prevention Plan (SWPPP) and installation, maintenance and removal of erosion and sediment control devices B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Storm Water Pollution Prevention Plan <1 acre a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the structure or Items being bid and no other compensation will be allowed. 2. Storm Water Pollution Prevention Plan ≥ 1 acre a. Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for “SWPPP ≥ 1 acre”. c. The price bid shall include: 1) Preparation of SWPPP 2) Implementation 3) Permitting fees 4) Installation 5) Maintenance 6) Removal 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. ASTM Standard: 31 25 00 - 2 EROSION AND SEDIMENT CONTROL Page 2 of 9 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a. ASTM D3786, Standard Test Method for Bursting Strength of Textile Fabrics—Diaphragm Bursting Strength Tester Method b. ASTM D4632, Standard Test Method for Grab Breaking Load and Elongation of Geotextiles c. ASTM D4751, Standard Test Method for Determining Apparent Opening Size of a Geotextile d. ASTM D4833, Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products 3. Texas Commission on Environmental Quality (TCEQ) TPDES General Permit No. TXR150000 4. TxDOT Departmental Material Specifications (DMS) a. DMS-6230 “Temporary Sediment Control Fence Fabric” 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Storm Water Pollution Prevention Plan (SWPPP) B. TCEQ Notice of Intent (NOI) for Storm Water Discharges Associated with Construction Activity under the TPDES General Permit C. Construction Site Notice D. TCEQ Notice of Termination (NOT) for Storm Water Discharges Associated with Construction Activity under the TPDES General Permit E. Notice of Change (if applicable) 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 PRODUCT TYPES AND MATERIALS A. Rock Filter Dams 1. Aggregate a. Furnish aggregate with hardness, durability, cleanliness and resistance to crumbling, flaking and eroding acceptable to the Engineer. b. Provide the following: 1) Types 1, 2 and 4 Rock Filter Dams 31 25 00 - 3 EROSION AND SEDIMENT CONTROL Page 3 of 9 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a) Use 3 to 6 inch aggregate. 2) Type 3 Rock Filter Dams a) Use 4 to 8 inch aggregate. 2. Wire a. Provide minimum 20 gauge galvanized wire for the steel wire mesh and tie wires for Types 2 and 3 rock filter dams b. Type 4 dams require: 1) Double-twisted, hexagonal weave with a nominal mesh opening of 2½ inches x 3 ¼ inches 2) Minimum 0.0866 inch steel wire for netting 3) Minimum 0.1063 inch steel wire for selvages and corners 4) Minimum 0.0866 inch for binding or tie wire B. Geotextile Fabric 1. Place the aggregate over geotextile fabric meeting the following criteria: a. Tensile Strength of 250 pounds, per ASTM D4632 b. Puncture Strength of 135 pounds, per ASTM D4833 c. Mullen Burst Rate of 420 psi, per ASTM D3786 d. Apparent Opening Size of No. 20 (max), per ASTM D4751 C. Sandbag Material 1. Furnish sandbags meeting Section 2.5 except that any gradation of aggregate may be used to fill the sandbags. D. Stabilized Construction Entrances 1. Provide materials that meet the details shown on the Drawings and this Section. a. Provide crushed aggregate for long and short-term construction exits. b. Furnish aggregates that are clean, hard, durable and free from adherent coatings such as salt, alkali, dirt, clay, loam, shale, soft or flaky materials and organic and injurious matter. c. Use 3 to 5 inch coarse aggregate with a minimum thickness of 12 inches. d. The aggregate shall be placed over a geotextile fabric meeting the following criteria: 1) Tensile Strength of 300 pounds, per ASTM D4632 2) Puncture Strength of 120 pounds, per ASTM D4833 3) Mullen Burst Rate of 600 psi, per ASTM D3786 4) Apparent Opening Size of No. 40 (max), per ASTM D4751 E. Embankment for Erosion Control 1. Provide rock, loam, clay, topsoil or other earth materials that will form a stable embankment to meet the intended use. F. Sandbags 1. Provide sandbag material of polypropylene, polyethylene or polyamide woven fabric with a minimum unit weight of 4 ounces per square yard, a Mullen burst- strength exceeding 300 psi, and an ultraviolet stability exceeding 70 percent. 2. Use natural coarse sand or manufactured sand meeting the gradation given in Table 1 to fill sandbags. 3. Filled sandbags must be 24 to 30 inches long, 16 to 18 inches wide, and 6 to 8 inches thick. Table 1 31 25 00 - 4 EROSION AND SEDIMENT CONTROL Page 4 of 9 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 Sand Gradation Sieve # Maximum Retained (% by Weight) 4 3 percent 100 80 percent 200 95 percent G. Temporary Sediment Control Fence 1. Provide a net-reinforced fence using woven geo-textile fabric. 2. Logos visible to the traveling public will not be allowed. a. Fabric 1) Provide fabric materials in accordance with DMS-6230, “Temporary Sediment Control Fence Fabric.” b. Posts 1) Provide essentially straight wood or steel posts with a minimum length of 48 inches, unless otherwise shown on the Drawings. 2) Soft wood posts must be at least 3 inches in diameter or nominal 2 x 4 inch 3) Hardwood posts must have a minimum cross-section of 1-1/2 x 1-1/2 inch 4) T- or L-shaped steel posts must have a minimum weight of 1.3 pounds per foot. c. Net Reinforcement 1) Provide net reinforcement of at least 12-1/2 gauge galvanized welded wire mesh, with a maximum opening size of 2 x 4 inch, at least 24 inches wide, unless otherwise shown on the Drawings. d. Staples 1) Provide staples with a crown at least 3/4 inch wide and legs 1/2 inch long. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Storm Water Pollution Prevention Plan 1. Develop and implement the project’s Storm Water Pollution Prevention Plan (SWPPP) in accordance with the TPDES Construction General Permit TXR150000 requirements. Prevent water pollution from storm water runoff by using and maintaining appropriate structural and nonstructural BMPs to reduce pollutants discharges to the MS4 from the construction site. B. Control Measures 1. Implement control measures in the area to be disturbed before beginning construction, or as directed. Limit the disturbance to the area shown on the Drawings or as directed. 31 25 00 - 5 EROSION AND SEDIMENT CONTROL Page 5 of 9 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 2. Control site waste such as discarded building materials, concrete truck washout water, chemicals, litter and sanitary waste at the construction site. 3. If, in the opinion of the Engineer, the Contractor cannot control soil erosion and sedimentation resulting from construction operations, the Engineer will limit the disturbed area to that which the Contractor is able to control. Minimize disturbance to vegetation. 4. Immediately correct ineffective control measures. Implement additional controls as directed. Remove excavated material within the time requirements specified in the applicable storm water permit. 5. Upon acceptance of vegetative cover by the City, remove and dispose of all temporary control measures, temporary embankments, bridges, matting, falsework, piling, debris, or other obstructions placed during construction that are not a part of the finished work, or as directed. C. Do not locate disposal areas, stockpiles, or haul roads in any wetland, water body, or streambed. D. Do not install temporary construction crossings in or across any water body without the prior approval of the appropriate resource agency and the Engineer. E. Provide protected storage area for paints, chemicals, solvents, and fertilizers at an approved location. Keep paints, chemicals, solvents, and fertilizers off bare ground and provide shelter for stored chemicals. F. Installation and Maintenance 1. Perform work in accordance with the TPDES Construction General Permit TXR150000. 2. When approved, sediments may be disposed of within embankments, or in areas where the material will not contribute to further siltation. 3. Dispose of removed material in accordance with federal, state, and local regulations. 4. Remove devices upon approval or when directed. a. Upon removal, finish-grade and dress the area. b. Stabilize disturbed areas in accordance with the permit, and as shown on the Drawings or directed. 5. The Contractor retains ownership of stockpiled material and must remove it from the project when new installations or replacements are no longer required. G. Rock Filter Dams for Erosion Control 1. Remove trees, brush, stumps and other objectionable material that may interfere with the construction of rock filter dams. 2. Place sandbags as a foundation when required or at the Contractor’s option. 3. For Types 1, 2, 3, and 5, place the aggregate to the lines, height, and slopes specified, without undue voids. 4. For Types 2 and 3, place the aggregate on the mesh and then fold the mesh at the upstream side over the aggregate and secure it to itself on the downstream side with wire ties, or hog rings, or as directed. 5. Place rock filter dams perpendicular to the flow of the stream or channel unless otherwise directed. 31 25 00 - 6 EROSION AND SEDIMENT CONTROL Page 6 of 9 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 6. Construct filter dams according to the following criteria, unless otherwise shown on the Drawings: a. Type 1 (Non-reinforced) 1) Height - At least 18 inches measured vertically from existing ground to top of filter dam 2) Top Width - At least 2 feet 3) Slopes - At most 2:1 b. Type 2 (Reinforced) 1) Height - At least 18 inches measured vertically from existing ground to top of filter dam 2) Top Width - At least 2 feet 3) Slopes - At most 2:1 c. Type 3 (Reinforced) 1) Height - At least 36 inches measured vertically from existing ground to top of filter dam 2) Top Width - At least 2 feet 3) Slopes - At most 2:1 d. Type 4 (Sack Gabions) 1) Unfold sack gabions and smooth out kinks and bends. 2) For vertical filling, connect the sides by lacing in a single loop–double loop pattern on 4- to 5-inches spacing. At 1 end, pull the end lacing rod until tight, wrap around the end, and twist 4 times. At the filling end, fill with stone, pull the rod tight, cut the wire with approximately 6 inches remaining, and twist wires 4 times. 3) For horizontal filling, place sack flat in a filling trough, fill with stone, and connect sides and secure ends as described above. 4) Lift and place without damaging the gabion. 5) Shape sack gabions to existing contours. e. Type 5 1) Provide rock filter dams as shown on the Drawings. H. Construction Entrances 1. When tracking conditions exist, prevent traffic from crossing or exiting the construction site or moving directly onto a public roadway, alley, sidewalk, parking area, or other right of way areas other than at the location of construction entrances. 2. Place the exit over a foundation course, if necessary. a. Grade the foundation course or compacted subgrade to direct runoff from the construction exits to a sediment trap as shown on the Drawings or as directed. 3. At drive approaches, make sure the construction entrance is the full width of the drive and meets the length shown on the Drawings. a. The width shall be at least 14 feet for 1-way and 24 feet for 2-way traffic for all other points of ingress or egress or as directed by the Engineer. I. Earthwork for Erosion Control 1. Perform excavation and embankment operations to minimize erosion and to remove collected sediments from other erosion control devices. a. Excavation and Embankment for Erosion Control Measures 1) Place earth dikes, swales or combinations of both along the low crown of daily lift placement, or as directed, to prevent runoff spillover. 31 25 00 - 7 EROSION AND SEDIMENT CONTROL Page 7 of 9 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 2) Place swales and dikes at other locations as shown on the Drawings or as directed to prevent runoff spillover or to divert runoff. 3) Construct cuts with the low end blocked with undisturbed earth to prevent erosion of hillsides. 4) Construct sediment traps at drainage structures in conjunction with other erosion control measures as shown on the Drawings or as directed. 5) Where required, create a sediment basin providing 3,600 cubic feet of storage per acre drained, or equivalent control measures for drainage locations that serve an area with 10 or more disturbed acres at 1 time, not including offsite areas. b. Excavation of Sediment and Debris 1) Remove sediment and debris when accumulation affects the performance of the devices, after a rain, and when directed. J. Sandbags for Erosion Control 1. Construct a berm or dam of sandbags that will intercept sediment-laden storm water runoff from disturbed areas, create a retention pond, detain sediment and release water in sheet flow. 2. Fill each bag with sand so that at least the top 6 inches of the bag is unfilled to allow for proper tying of the open end. 3. Place the sandbags with their tied ends in the same direction. 4. Offset subsequent rows of sandbags 1/2 the length of the preceding row. 5. Place a single layer of sandbags downstream as a secondary debris trap. 6. Place additional sandbags as necessary or as directed for supplementary support to berms or dams of sandbags or earth. K. Temporary Sediment-Control Fence 1. Provide temporary sediment-control fence near the downstream perimeter of a disturbed area to intercept sediment from sheet flow. 2. Incorporate the fence into erosion-control measures used to control sediment in areas of higher flow. Install the fence as shown on the Drawings, as specified in this Section, or as directed. a. Post Installation 1) Embed posts at least 18 inches deep, or adequately anchor, if in rock, with a spacing of 6 to 8 feet and install on a slight angle toward the run-off source. b. Fabric Anchoring 1) Dig trenches along the uphill side of the fence to anchor 6 to 8 inches of fabric. 2) Provide a minimum trench cross-section of 6 x 6 inches 3) Place the fabric against the side of the trench and align approximately 2 inches of fabric along the bottom in the upstream direction. 4) Backfill the trench, then hand-tamp. c. Fabric and Net Reinforcement Attachment 1) Unless otherwise shown under the Drawings, attach the reinforcement to wooden posts with staples, or to steel posts with T-clips, in at least 4 places equally spaced. 2) Sewn vertical pockets may be used to attach reinforcement to end posts. 3) Fasten the fabric to the top strand of reinforcement by hog rings or cord every 15 inches or less. 31 25 00 - 8 EROSION AND SEDIMENT CONTROL Page 8 of 9 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 d. Fabric and Net Splices 1) Locate splices at a fence post with a minimum lap of 6 inches attached in at least 6 places equally spaced, unless otherwise shown under the Drawings. a) Do not locate splices in concentrated flow areas. 2) Requirements for installation of used temporary sediment-control fence include the following: a) Fabric with minimal or no visible signs of biodegradation (weak fibers) b) Fabric without excessive patching (more than 1 patch every 15 to 20 feet) c) Posts without bends d) Backing without holes 3.5 REPAIR/RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. Waste Management 1. Remove sediment, debris and litter as needed. 3.11 CLOSEOUT ACTIVITIES A. Erosion control measures remain in place and are maintained until all soil disturbing activities at the project site have been completed. B. Establish a uniform vegetative cover with a density of 70 percent on all unpaved areas, on areas not covered by permanent structures, or in areas where permanent erosion control measures (i.e. riprap, gabions, or geotextiles) have been employed. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. Install and maintain the integrity of temporary erosion and sedimentation control devices to accumulate silt and debris until earthwork construction and permanent erosion control features are in place or the disturbed area has been adequately stabilized as determined by the Engineer. B. If a device ceases to function as intended, repair or replace the device or portions thereof as necessary. C. Perform inspections of the construction site as prescribed in the Construction General Permit TXR150000. D. Records of inspections and modifications based on the results of inspections must be maintained and available in accordance with the permit. 31 25 00 - 9 EROSION AND SEDIMENT CONTROL Page 9 of 9 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 32 91 19 - 1 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS Page 1 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 32 91 19 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Furnish and place topsoil to the depths and on the areas shown on the Drawings. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include but are not necessarily limited to 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Measurement for this Item shall be by cubic yard of Topsoil in place. 2. Payment a. The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per cubic yard of Topsoil. b. All excavation required by this Item in cut sections shall be measured in accordance with provisions for the various excavation items involved with the provision that excavation will be measured and paid for once, regardless of the manipulations involved. 3. The price bid shall include: a. Furnishing Topsoil b. Loading c. Hauling d. Placing 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 ACTION SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 32 91 19 - 2 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS Page 2 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Topsoil 1. Use easily cultivated, fertile topsoil that: a. Is free from objectionable material including subsoil, weeds, clay lumps, non- soil materials, roots, stumps or stones larger than 1.5 inches b. Has a high resistance to erosion c. Is able to support plant growth 2. Secure topsoil from approved sources. 3. Topsoil is subject to testing by the City. 4. pH: 5.5 to 8.5. 5. Liquid Limit: 50 or less 6. Plasticity Index: 20 or less 7. Gradation: maximum of 10 percent passing No. 200 sieve B. Water: Clean and free of industrial wastes and other substances harmful to the growth of vegetation 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Finishing of Parkways 1. Smoothly shape parkways, shoulders, slopes, and ditches. 2. Cut parkways to finish grade prior to the placing of any improvements in or adjacent to the roadway. 3. In the event that unsuitable material for parkways is encountered, extend the depth of excavation in the parkways 6 inches and backfill with top soil. 4. Make standard parkway grade perpendicular to and draining to the curb line. a. Minimum: 1/4 inch per foot b. Maximum: 4:1 c. City may approve variations from these requirements in special cases. 5. Whenever the adjacent property is lower than the design curb grade and runoff drains away from the street, the parkway grade must be set level with the top of the curb. 6. The design grade from the parkway extends to the back of the walk line. 7. From that point (behind the walk), the grade may slope up or down at maximum slope of 4:1. 32 91 19 - 3 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS Page 3 of 3 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 B. Placing of Topsoil 1. Spread the topsoil to a uniform loose cover at the thickness specified. 2. Place and shape the topsoil as directed. 3. Hand rake finish a minimum of 5 feet from all flatwork. 4. Tamp the topsoil with a light roller or other suitable equipment. 3.5 REPAIR/RESTORATION] [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 32 92 13 - 1 HYDROMULCHING, SEEDING AND SODDING Page 1 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 32 92 13 HYDROMULCHING, SEEDING AND SODDING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Furnishing and installing grass sod and permanent seeding as shown on Drawings, or as directed. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 3. Section 32 91 19 – Topsoil Placement and Finishing of Parkways 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Block Sod Placement a. Measurement 1) Measurement for this Item shall be by the square yard of Block Sod placed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per square yard of Block Sod placed. c. The price bid shall include: 1) Furnishing and placing all sod 2) Rolling and tamping 3) Watering (until established) 4) Disposal of surplus materials 2. Seeding a. Measurement 1) Measurement for this Item shall be by the square yard of Seed spread. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per square yard of Seed placed for various installation methods. c. The price bid shall include: 1) Furnishing and placing all Seed 2) Furnishing and applying water for seed fertilizer 3) Slurry and hydraulic mulching 4) Fertilizer 5) Watering and mowing (until established) 6) Disposal of surplus materials 3. Mowing a. Measurement 32 92 13 - 2 HYDROMULCHING, SEEDING AND SODDING Page 2 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1) Measurement for this Item shall per each. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per each. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 ACTION SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS A. Seed 1. Vendors’ certification that seeds meet Texas State seed law including: a. Testing and labeling for pure live seed (PLS) b. Name and type of seed 2. All seed shall be tested in a laboratory with certified results presented to the City in writing, prior to planting. 3. All seed to be of the previous season's crop and the date on the container shall be within 12 months of the seeding date. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Block Sod 1. Protect from exposure to wind, sun and freezing. 2. Keep stacked sod moist. B. Seed 1. If using native grass or wildflower seed, seed must have been harvested within 100 miles of the construction site. 2. Each species of seed shall be supplied in a separate, labeled container for acceptance by the City. C. Fertilizer 1. Provide fertilizer labeled with the analysis. 2. Conform to Texas fertilizer law. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 2.2 MATERIALS AND EQUIPMENT A. Materials 32 92 13 - 3 HYDROMULCHING, SEEDING AND SODDING Page 3 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1. Block Sod a. Sod Varieties (match existing if applicable) 1) "Stenotaphrum secundatum" (St. Augustine grass) 2) "Cynodon dactylon" (Common Bermudagrass) 3) "Buchloe dactyloides" (Buffalograss) 4) an approved hybrid of Common Bermudagrass 5) or an approved Zoysiagrass b. Sod must contain stolons, leaf blades, rhizomes and roots. c. Sod shall be alive, healthy and free of insects, disease, stones, undesirable foreign materials and weeds and grasses deleterious to its growth or which might affect its subsistence or hardiness when transplanted. d. Minimum sod thickness: 3/4 inch e. Maximum grass height: 2 inches f. Acceptable growing beds 1) St. Augustine grass sod: clay or clay loam topsoil 2) Bermuda grasses and zoysia grasses: sand or sandy loam soils g. Dimensions 1) Machine cut to uniform soil thickness. 2) Sod shall be of equal width and of a size that permits the sod to be lifted, handled and rolled without breaking. h. Broken or torn sod or sod with uneven ends shall be rejected. 2. Seed a. General 1) Plant all seed at rates based on pure live seed (PLS) a) Pure Live Seed (PLS) determined using the formula: (1) Percent Pure Live Seed = Percent Purity x [(Percent Germination + Percent Firm or Hard Seed) + 100] 2) Availability of Seed a) Substitution of individual seed types due to lack of availability may be permitted by the City at the time of planting. b) Notify the City prior to bidding of difficulties locating certain species. 3) Weed seed a) Not exceed ten percent by weight of the total of pure live seed (PLS) and other material in the mixture b) Seed not allowed: (1) Johnsongrass (2) Nutgrass seed 4) Harvest seed within 1-year prior to planting b. Non-native Grass Seed 1) Plant between April 15 and September 10 Lbs. PLS/Acre Common Name Botanical Name Purity (percent) Germination (percent) 25 Bermuda (unhulled) cynodon dactylon 85 90 75 Bermuda (hulled) cynodon dactylon 95 90 2) Plant between September 10 and April 15 Lbs. PLS/Acre Common Name Botanical Name Purity (percent) Germination (percent) 32 92 13 - 4 HYDROMULCHING, SEEDING AND SODDING Page 4 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 220 Rye Grass lolium multiflorum 85 90 75 Bermuda (unhulled) cynodon dactylon 95 90 c. Native Grass Seed 1) Plant between February 1 and October 1. Lbs. PLS/Acre Common Name Botanical Name 1.6 Green Sprangletop Leptochloa dubia 5.5 Sideoats Grama* Bouteloua curtipendula 3.7 Little Bluestem* Schizachyrium scoparium 17.0 Buffalograss Buchloe dactyloides 1.8 Indian Grass* Sorghastrum nutans 0.5 Sand Lovegrass* Eragrostis trichodes 6.0 Big Bluestem Andropogon gerardii 8.0 Eastern Grama Tripscacum dactyloides 1.2 Blue Grama Bouteloua gracilis 1.8 Switchgrass Panicum virgatum 10.0 Prairie Wildrye* Elymus canadensis d. Wildflower Seed 1) Plant between the following: a) March 5 and May 31 b) September 1 and December 1 Lbs. PLS/Acre Common Name Botanical Name 3.0 Bush Sunflower Sinsia calva 5.0 Butterfly Weed Asclepias tuberosa 2.0 Clasping Coneflower* Rudbeckia amplexicaulis 3.0 Golden - Wave Coreopsis basalis 13.4 Illinois Bundleflower Desmanthus illinoensis 13.6 Partridge Pea Cassia fasciculata 2.0 Prairie Verbena Verbena bipinnatifida 8.0 Texas Yellow Star Lindheimeri texana 8.0 Winecup Callirhoe involcrata 2.0 Black-eyed Susan Rudbeckia hirta 18.0 Cutleaf Daisy Engelmannia pinnatifida 2.0 Obedient Plant Physostegia intermedia 3.0 Pitcher Sage Salvia azurea 2.0 Plains Coreopsis Coreopsis tinctoria 8.0 Scarlet Sage Salvia coccinea *not to be planted within ten feet of a road or parking lot or within three feet of a walkway e. Temporary Erosion Control Seed 1) Consist of the sowing of cool season plant seeds. 3. Mulch a. For use with conventional mechanical or hydraulic planting of seed. b. Wood cellulose fiber produced from virgin wood or recycled paper-by-products (waste products from paper mills or recycled newspaper). c. No growth or germination inhibiting factors. d. No more than ten percent moisture, air dry weight basis. e. Additives: binder in powder form. 32 92 13 - 5 HYDROMULCHING, SEEDING AND SODDING Page 5 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 f. Form a strong moisture retaining mat. 4. Fertilizer a. Acceptable condition for distribution b. Applied uniformly over the planted area c. Analysis 1) 16-20-0 2) 16-8-8 d. Fertilizer rate: 1) Not required for wildflower seeding 2) Newly established seeding areas - 100 pounds of nitrogen per acre 3) Established seeding areas - 150 pounds of nitrogen per acre 5. Topsoil: See Section 32 91 19. 6. Water: clean and free of industrial wastes or other substances harmful to the germination of the seed or to the growth of the vegetation. 7. Soil Retention Blanket a. "Curlex I" from American Excelsior, 900 Ave. H East, Post Office Box 5624, Arlington, Texas 76001, 1-800-777-SOIL or approved equal. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION A. Surface Preparation: clear surface of all material including: 1. Stumps, stones, and other objects larger than one inch. 2. Roots, brush, wire, stakes, etc. 3. Any objects that may interfere with seeding or maintenance. B. Tilling 1. Compacted areas: till 1 inch deep 2. Areas sloped greater than 3:1: run a tractor parallel to slope to provide less seed/water run-off 3. Areas near trees: Do not till deeper than 1/2 inch inside "drip line" of trees. 3.4 INSTALLATION A. Block Sodding 1. General a. Place sod between curb and walk and on terraces that is the same type grass as adjacent grass or existing lawn. b. Plant between the average last freeze date in the spring and 6 weeks prior to the average first freeze in the fall. 2. Installation 32 92 13 - 6 HYDROMULCHING, SEEDING AND SODDING Page 6 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a. Plant sod specified after the area has been completed to the lines and grades shown on the Drawings with 6 inches of topsoil. b. Use care to retain native soil on the roots of the sod during the process of excavating, hauling and planting. c. Keep sod material moist from the time it is dug until planted. d. Place sod so that the entire area designated for sodding is covered. e. Fill voids left in the solid sodding with additional sod and tamp. f. Roll and tamp sod so that sod is in complete contact with topsoil at a uniform slope. g. Peg sod with wooden pegs (or wire staple) driven through the sod block to the firm earth in areas that may slide due to the height or slope of the surface or nature of the soil. 3. Watering and Finishing a. Furnish water as an ancillary cost to Contractor by means of temporary metering / irrigation, water truck or by any other method necessary to achieve an acceptable stand of turf as defined in 3.13.B. b. Thoroughly water sod immediately after planted. c. Water until established. d. Generally, an amount of water that is equal to the average amount of rainfall plus 1/2 inch per week should be applied until accepted. If applicable, plant large areas by irrigation zones to ensure areas are watered as soon as they are planted. B. Seeding 1. General a. Seed only those areas indicated on the Drawings and areas disturbed by construction. b. Mark each area to be seeded in the field prior to seeding for City approval. 2. Broadcast Seeding a. Broadcast seed in 2 directions at right angles to each other. b. Harrow or rake lightly to cover seed. c. Never cover seed with more soil than twice its diameter. d. For wildflower plantings: 1) Scalp existing grasses to 1 inch 2) Remove grass clippings, so seed can make contact with the soil. 3. Mechanically Seeding (Drilling): a. Uniformly distribute seed over the areas shown on the Drawings or as directed. b. All varieties of seed and fertilizer may be distributed at the same time provided that each component is uniformly applied at the specified rate. c. Drill seed at a depth of 1/4 inch to 3/8 inch utilizing a pasture or rangeland type drill. d. Drill on the contour of slopes e. After planting roll with a roller integral to the seed drill, or a corrugated roller of the "Cultipacker" type. f. Roll slope areas on the contour. 4. Hydromulching a. Mixing: Seed, mulch, fertilizer and water may be mixed provided that: 1) Mixture is uniformly suspended to form a homogenous slurry. 32 92 13 - 7 HYDROMULCHING, SEEDING AND SODDING Page 7 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 2) Mixture forms a blotter-like ground cover impregnated uniformly with grass seed. 3) Mixture is applied within 30 minutes after placed in the equipment. b. Placing 1) Uniformly distribute in the quantity specified over the areas shown on the Drawings or as directed. 5. Fertilizing: uniformly apply fertilizer over seeded area. 6. Watering a. Furnish water by means of temporary metering / irrigation, water truck or by any other method necessary to achieve an acceptable stand of turf as defined in 3.13.B. b. Water soil to a minimum depth of 4 inches within 48 hours of seeding. c. Water as direct by the City at least twice daily for 14 days after seeding in such a manner as to prevent washing of the slopes or dislodgement of the seed. d. Water until final acceptance. e. Generally, an amount of water that is equal to the average amount of rainfall plus 1/2 inch per week should be applied until accepted. 3.5 REPAIR/RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. Block Sodding 1. Water and mow sod until completion and final acceptance of the Project or as directed by the City. 2. Sod shall not be considered finally accepted until the sod has started to peg down (roots growing into the soil) and is free from dead blocks of sod. B. Seeding 1. Water and mow sod until completion and final acceptance of the Project or as directed by the City. 2. Maintain the seeded area until each of the following is achieved: a. Vegetation is evenly distributed b. Vegetation is free from bare areas 3. Turf will be accepted once fully established. a. Seeded area must have 100 percent growth to a height of 3 inches with 1 mow cycle performed by the Contractor prior to consideration of acceptance by the City. C. Rejection 32 92 13 - 8 HYDROMULCHING, SEEDING AND SODDING Page 8 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 1. City may reject block sod or seeded area on the basis of weed populations. 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 33 05 10 - 1 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 1 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 SECTION 33 05 10 UTILITY TRENCH EXCAVATION, EMBEDMENT AND BACKFILL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavation, Embedment and Backfill for: a. Pressure Applications 1) Water Distribution or Transmission Main 2) Wastewater Force Main 3) Reclaimed Water Main b. Gravity Applications 1) Wastewater Gravity Mains 2) Storm Sewer Pipe and Culverts 3) Storm Sewer Precast Box and Culverts 2. Including: a. Excavation of all material encountered, including rock and unsuitable materials b. Disposal of excess unsuitable material c. Site specific trench safety d. Pumping and dewatering e. Embedment f. Concrete encasement for utility lines g. Backfill h. Compaction B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 02 41 13 – Selective Site Demolition 4. Section 02 41 15 – Paving Removal 5. Section 02 41 14 – Utility Removal/Abandonment 6. Section 03 30 00 – Cast-in-place Concrete 7. Section 03 34 13 – Controlled Low Strength Material (CLSM) 8. Section 31 10 00 – Site Clearing 9. Section 31 25 00 – Erosion and Sediment Control 10. Section 33 05 26 – Utility Markers/Locators 11. Section 34 71 13 – Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 33 05 10 - 2 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 2 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 1. Trench Excavation, Embedment and Backfill associated with the installation of an underground utility or excavation a. Measurement 1) This Item is considered subsidiary to the installation of the utility pipe line as designated in the Drawings. b. Payment 1) The work performed and the materials furnished in accordance with this Item are considered subsidiary to the installation of the utility pipe for the type of embedment and backfill as indicated on the plans. No other compensation will be allowed. 2. Imported Embedment or Backfill a. Measurement 1) Measured by the cubic yard as delivered to the site and recorded by truck ticket provided to the City b. Payment 1) Imported fill shall only be paid when using materials for embedment and backfill other than those identified in the Drawings. The work performed and materials furnished in accordance with pre-bid item and measured as provided under “Measurement” will be paid for at the unit price bid per cubic yard of “Imported Embedment/Backfill” delivered to the Site for: a) Various embedment/backfill materials c. The price bid shall include: 1) Furnishing backfill or embedment as specified by this Specification 2) Hauling to the site 3) Placement and compaction of backfill or embedment 3. Concrete Encasement for Utility Lines a. Measurement 1) Measured by the cubic yard per plan quantity. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per cubic yard of “Concrete Encasement for Utility Lines” per plan quantity. c. The price bid shall include: 1) Furnishing, hauling, placing and finishing concrete in accordance with Section 03 30 00 2) Clean-up 4. Ground Water Control a. Measurement 1) Measurement shall be lump sum when a ground water control plan is specifically required by the Contract Documents. b. Payment 1) Payment shall be per the lump sum price bid for “Ground Water Control” including: a) Submittals b) Additional Testing c) Ground water control system installation d) Ground water control system operations and maintenance e) Disposal of water 33 05 10 - 3 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 3 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 f) Removal of ground water control system 5. Trench Safety a. Measurement 1) Measured per linear foot of excavation for all trenches that require trench safety in accordance with OSHA excavation safety standards (29 CFR Part 1926 Subpart P Safety and Health regulations for Construction) b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per linear foot of excavation to comply with OSHA excavation safety standards (29 CFR Part 1926.650 Subpart P), including, but not limited to, all submittals, labor and equipment. 1.3 REFERENCES A. Definitions 1. General – Definitions used in this section are in accordance with Terminologies ASTM F412 and ASTM D8 and Terminology ASTM D653, unless otherwise noted. 2. Definitions for trench width, backfill, embedment, initial backfill, pipe zone, haunching bedding, springline, pipe zone and foundation are defined as shown in the following schematic: 33 05 10 - 4 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 4 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 3. Deleterious materials – Harmful materials such as clay lumps, silts and organic material 4. Excavated Trench Depth – Distance from the surface to the bottom of the bedding or the trench foundation 5. Final Backfill Depth a. Unpaved Areas – The depth of the final backfill measured from the top of the initial backfill to the surface b. Paved Areas – The depth of the final backfill measured from the top of the initial backfill to bottom of permanent or temporary pavement repair B. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. ASTM Standards: a. ASTM C33-08 Standard Specifications for Concrete Aggregates b. ASTM C88-05 Soundness of Aggregate by Use of Sodium Sulfate or Magnesium Sulfate c. ASTM C136-01 Test Method for Sieve Analysis of Fine and Coarse Aggregate d. ASTM D448-08 Standard Classification for Sizes of Aggregate for Road and Bridge Construction. e. ASTM C535-09 Standard Test Method for Resistance to Degradation of Large- Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine f. ASTM D588 – Standard Test method for Moisture-Density Relations of Soil- Cement Mixture g. ASTM D698-07 Test Method for Laboratory Compaction Characteristics of Soil Using Stand Efforts (12,400 ft-lb/ft3 600 Kn-m/M3)). h. ASTM 1556 Standard Test Methods for Density and Unit Weight of Soils in Place by Sand Cone Method. i. ASTM 2487 – 10 Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System) j. ASTM 2321-09 Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications k. ASTM D2922 – Standard Test Methods for Density of Soils and Soil Aggregate in Place by Nuclear Methods (Shallow Depth) l. ASTM 3017 - Standard Test Method for Water Content of Soil and Rock in place by Nuclear Methods (Shallow Depth) m. ASTM D4254 - Standard Test Method for Minimum Index Density and Unit Weight of Soils and Calculations of Relative Density 3. OSHA a. Occupational Safety and Health Administration CFR 29, Part 1926-Safety Regulations for Construction, Subpart P - Excavations 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Utility Company Notification a. Notify area utility companies at least 48 hours in advance, excluding weekends and holidays, before starting excavation. 33 05 10 - 5 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 5 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 b. Request the location of buried lines and cables in the vicinity of the proposed work. B. Sequencing 1. Sequence work for each section of the pipe installed to complete the embedment and backfill placement on the day the pipe foundation is complete. 2. Sequence work such that proctors are complete in accordance with ASTM D698 prior to commencement of construction activities. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to construction. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Shop Drawings 1. Provide detailed drawings and explanation for ground water and surface water control, if required. 2. Trench Safety Plan in accordance with Occupational Safety and Health Administration CFR 29, Part 1926-Safety Regulations for Construction, Subpart P - Excavations 3. Stockpiled excavation and/or backfill material a. Provide a description of the storage of the excavated material only if the Contract Documents do not allow storage of materials in the right-of-way of the easement. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage 1. Within Existing Rights-of-Way (ROW) a. Spoil, imported embedment and backfill materials may be stored within existing ROW, easements or temporary construction easements, unless specifically disallowed in the Contract Documents. b. Do not block drainage ways, inlets or driveways. c. Provide erosion control in accordance with Section 31 25 00. d. Store materials only in areas barricaded as provided in the traffic control plans. e. In non-paved areas, do not store material on the root zone of any trees or in landscaped areas. 2. Designated Storage Areas a. If the Contract Documents do not allow the storage of spoils, embedment or backfill materials within the ROW, easement or temporary construction easement, then secure and maintain an adequate storage location. b. Provide an affidavit that rights have been secured to store the materials on private property. c. Provide erosion control in accordance with Section 31 25 00. 33 05 10 - 6 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 6 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 d. Do not block drainage ways. e. Only materials used for 1 working day will be allowed to be stored in the work zone. B. Deliveries and haul-off - Coordinate all deliveries and haul-off. 1.11 FIELD [SITE] CONDITIONS A. Existing Conditions 1. Any data which has been or may be provided on subsurface conditions is not intended as a representation or warranty of accuracy or continuity between soils. It is expressly understood that neither the City nor the Engineer will be responsible for interpretations or conclusions drawn there from by the Contractor. 2. Data is made available for the convenience of the Contractor. 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS 2.2 MATERIALS A. Materials 1. Utility Sand a. Granular and free flowing b. Generally meets or exceeds the limits on deleterious substances per Table 1 for fine aggregate according to ASTM C 33 c. Reasonably free of organic material d. Gradation: sand material consisting of durable particles, free of thin or elongated pieces, lumps of clay, loam or vegetable matter and meets the following gradation may be used for utility sand embedment/backfill, and graded with following limits when tested in accordance with ASTM C136. Sieve Size Percent Retained ½” 0 ¼” 0-5 #4 0-10 #16 0-20 #50 20-70 #100 60-90 #200 90-100 2. Crushed Rock a. Durable crushed rock or recycled concrete b. Meets the gradation of ASTM D448 size numbers 56, 57 or 67 c. May be unwashed d. Free from significant silt clay or unsuitable materials e. Percentage of wear not more than 40 percent per ASTM C131 or C535 f. Not more than a 12 percent maximum loss when subjective to 5 cycles of sodium sulfate soundness per ASTM C88 33 05 10 - 7 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 7 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 3. Fine Crushed Rock a. Durable crushed rock b. Meets the gradation of ASTM D448 size numbers 8 or 89 c. May be unwashed d. Free from significant silt clay or unsuitable materials. e. Have a percentage of wear not more than 40 percent per ASTM C131 or C535 f. Not more than a 12 percent maximum loss when subjective to 5 cycles of sodium sulfate soundness per ASTM C88 4. Ballast Stone a. Stone ranging from 3 inches to 6 inches in greatest dimension. b. May be unwashed c. Free from significant silt clay or unsuitable materials d. Percentage of wear not more than 40 percent per ASTM C131 or C535 e. Not more than a 12 percent maximum loss when subjected to 5 cycles of sodium sulfate soundness per ASTM C88 5. Acceptable Backfill Material a. In -situ or imported soils classified as CL, CH, SC or GC in accordance with ASTM D2487 b. Free from deleterious materials, boulders over 6 inches in size and organics c. Can be placed free from voids d. Must have 20 percent passing the number 200 sieve 6. Blended Backfill Material a. In -situ soils classified as SP, SM, GP or GM in accordance with ASTM D2487 b. Blended with in-situ or imported acceptable backfill material to meet the requirements of an Acceptable Backfill Material c. Free from deleterious materials, boulders over 6 inches in size and organics d. Must have 20 percent passing the number 200 sieve 7. Unacceptable Backfill Material a. In -situ soils classified as ML, MH, PT, OL or OH in accordance with ASTM D2487 8. Select Fill a. Classified as SC or CL in accordance with ASTM D2487 b. Liquid limit less than 35 c. Plasticity index between 8 and 20 9. Cement Stabilized Sand (CSS) a. Sand 1) Shall be clean, durable sand meeting grading requirements for fine aggregates of ASTM C33 and the following requirements: a) Classified as SW, SP, or SM by the United Soil Classification System of ASTM D2487 b) Deleterious materials (1) Clay lumps, ASTM C142, less than 0.5 percent (2) Lightweight pieces, ASTM C123, less than 5.0 percent (3) Organic impurities, ASTM C40, color no darker than standard color (4) Plasticity index of 4 or less when tested in accordance with ASTM D4318. b. Minimum of 4 percent cement content of Type I/II portland cement 33 05 10 - 8 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 8 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 c. Water 1) Potable water, free of soils, acids, alkalis, organic matter or other deleterious substances, meeting requirements of ASTM C94 d. Mix in a stationary pug mill, weigh-batch or continuous mixing plant. e. Strength 1) 50 to 150 psi compressive strength at 2 days in accordance with ASTM D1633, Method A 2) 200 to 250 psi compressive strength at 28 days in accordance with ASTM D1633, Method A 3) The maximum compressive strength in 7 days shall be 400 psi. Backfill that exceeds the maximum compressive strength shall be removed by the Contractor for no additional compensation. f. Random samples of delivered product will be taken in the field at point of delivery for each day of placement in the work area. Specimens will be prepared in accordance with ASTM D1632. 10. Controlled Low Strength Material (CLSM) a. Conform to Section 03 34 13 11. Trench Geotextile Fabric a. Soils other than ML or OH in accordance with ASTM D2487 1) Needle punch, nonwoven geotextile composed of polypropylene fibers 2) Fibers shall retain their relative position 3) Inert to biological degradation 4) Resist naturally occurring chemicals 5) UV Resistant 6) Mirafi 140N by Tencate, or approved equal b. Soils Classified as ML or OH in accordance with ASTM D2487 1) High-tenacity monofilament polypropylene woven yarn 2) Percent open area of 8 percent to10 percent 3) Fibers shall retain their relative position 4) Inert to biological degradation 5) Resist naturally occurring chemicals 6) UV Resistant 7) Mirafi FW402 by Tencate, or approved equal 12. Concrete Encasement a. Conform to Section 03 30 00. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION A. Verification of Conditions 1. Review all known, identified or marked utilities, whether public or private, prior to excavation. 33 05 10 - 9 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 9 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 2. Locate and protect all known, identified and marked utilities or underground facilities as excavation progresses. 3. Notify all utility owners within the project limits 48 hours prior to beginning excavation. 4. The information and data shown in the Drawings with respect to utilities is approximate and based on record information or on physical appurtenances observed within the project limits. 5. Coordinate with the Owner(s) of underground facilities. 6. Immediately notify any utility owner of damages to underground facilities resulting from construction activities. 7. Repair any damages resulting from the construction activities. B. Notify the City immediately of any changed condition that impacts excavation and installation of the proposed utility. 3.3 PREPARATION A. Protection of In-Place Conditions 1. Pavement a. Conduct activities in such a way that does not damage existing pavement that is designated to remain. 1) Where desired to move equipment not licensed for operation on public roads or across pavement, provide means to protect the pavement from all damage. b. Repair or replace any pavement damaged due to the negligence of the contractor outside the limits designated for pavement removal at no additional cost to the City. 2. Drainage a. Maintain positive drainage during construction and re-establish drainage for all swales and culverts affected by construction. 3. Trees a. When operating outside of existing ROW, stake permanent and temporary construction easements. b. Restrict all construction activities to the designated easements and ROW. c. Flag and protect all trees designated to remain in accordance with Section 31 10 00. d. Conduct excavation, embedment and backfill in a manner such that there is no damage to the tree canopy. e. Prune or trim tree limbs as specifically allowed by the Drawings or as specifically allowed by the City. 1) Pruning or trimming may only be accomplished with equipments specifically designed for tree pruning or trimming. f. Remove trees specifically designated to be removed in the Drawings in accordance with Section 31 10 00. 4. Above ground Structures a. Protect all above ground structures adjacent to the construction. b. Remove above ground structures designated for removal in the Drawings in accordance with Section 02 41 13 5. Traffic 33 05 10 - 10 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 10 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 a. Maintain existing traffic, except as modified by the traffic control plan, and in accordance with Section 34 71 13. b. Do not block access to driveways or alleys for extended periods of time unless: 1) Alternative access has been provided 2) Proper notification has been provided to the property owner or resident 3) It is specifically allowed in the traffic control plan c. Use traffic rated plates to maintain access until access is restored. 6. Traffic Signal – Poles, Mast Arms, Pull boxes, Detector loops a. Notify the City’s Traffic Services Division a minimum of 48 hours prior to any excavation that could impact the operations of an existing traffic signal. b. Protect all traffic signal poles, mast arms, pull boxes, traffic cabinets, conduit and detector loops. c. Immediately notify the City’s Traffic Services Division if any damage occurs to any component of the traffic signal due to the contractors activities. d. Repair any damage to the traffic signal poles, mast arms, pull boxes, traffic cabinets, conduit and detector loops as a result of the construction activities. 7. Fences a. Protect all fences designated to remain. b. Leave fence in the equal or better condition as prior to construction. 3.4 INSTALLATION A. Excavation 1. Excavate to a depth indicated on the Drawings. 2. Trench excavations are defined as unclassified. No additional payment shall be granted for rock or other in-situ materials encountered in the trench. 3. Excavate to a width sufficient for laying the pipe in accordance with the Drawings and bracing in accordance with the Excavation Safety Plan. 4. The bottom of the excavation shall be firm and free from standing water. a. Notify the City immediately if the water and/or the in-situ soils do not provide for a firm trench bottom. b. The City will determine if any changes are required in the pipe foundation or bedding. 5. Unless otherwise permitted by the Drawings or by the City, the limits of the excavation shall not advance beyond the pipe placement so that the trench may be backfilled in the same day. 6. Over Excavation a. Fill over excavated areas with the specified bedding material as specified for the specific pipe to be installed. b. No additional payment will be made for over excavation or additional bedding material. 7. Unacceptable Backfill Materials a. In -situ soils classified as unacceptable backfill material shall be separated from acceptable backfill materials. b. If the unacceptable backfill material is to be blended in accordance with this Specification, then store material in a suitable location until the material is blended. c. Remove all unacceptable material from the project site that is not intended to be blended or modified. 33 05 10 - 11 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 11 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 8. Rock – No additional compensation will be paid for rock excavation or other changed field conditions. B. Shoring, Sheeting and Bracing 1. Engage a Licensed Professional Engineer in the State of Texas to design a site specific excavation safety system in accordance with Federal and State requirements. 2. Excavation protection systems shall be designed according to the space limitations as indicated in the Drawings. 3. Furnish, put in place and maintain a trench safety system in accordance with the Excavation Safety Plan and required by Federal, State or local safety requirements. 4. If soil or water conditions are encountered that are not addressed by the current Excavation Safety Plan, engage a Licensed Professional Engineer in the State of Texas to modify the Excavation Safety Plan and provide a revised submittal to the City. 5. Do not allow soil, or water containing soil, to migrate through the Excavation Safety System in sufficient quantities to adversely affect the suitability of the Excavation Protection System. Movable bracing, shoring plates or trench boxes used to support the sides of the trench excavation shall not: a. Disturb the embedment located in the pipe zone or lower b. Alter the pipe’s line and grade after the Excavation Protection System is removed c. Compromise the compaction of the embedment located below the spring line of the pipe and in the haunching C. Water Control 1. Surface Water a. Furnish all materials and equipment and perform all incidental work required to direct surface water away from the excavation. 2. Ground Water a. Furnish all materials and equipment to dewater ground water by a method which preserves the undisturbed state of the subgrade soils. b. Do not allow the pipe to be submerged within 24 hours after placement. c. Do not allow water to flow over concrete until it has sufficiently cured. d. Engage a Licensed Engineer in the State of Texas to prepare a Ground Water Control Plan if any of the following conditions are encountered: 1) A Ground Water Control Plan is specifically required by the Contract Documents 2) If in the sole judgment of the City, ground water is so severe that an Engineered Ground Water Control Plan is required to protect the trench or the installation of the pipe which may include: a) Ground water levels in the trench are unable to be maintained below the top of the bedding b) A firm trench bottom cannot be maintained due to ground water c) Ground water entering the excavation undermines the stability of the excavation. d) Ground water entering the excavation is transporting unacceptable quantities of soils through the Excavation Safety System. 33 05 10 - 12 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 12 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 e. In the event that there is no bid item for a Ground Water Control and the City requires an Engineered Ground Water Control Plan due to conditions discovered at the site, the contractor will be eligible to submit a change order. f. Control of ground water shall be considered subsidiary to the excavation when: 1) No Ground Water Control Plan is specifically identified and required in the Contract Documents g. Ground Water Control Plan installation, operation and maintenance 1) Furnish all materials and equipment necessary to implement, operate and maintain the Ground Water Control Plan. 2) Once the excavation is complete, remove all ground water control equipment not called to be incorporated into the work. h. Water Disposal 1) Dispose of ground water in accordance with City policy or Ordinance. 2) Do not discharge ground water onto or across private property without written permission. 3) Permission from the City is required prior to disposal into the Sanitary Sewer. 4) Disposal shall not violate any Federal, State or local regulations. D. Embedment and Pipe Placement 1. Water Lines less than, or equal to, 12 inches in diameter: a. The entire embedment zone shall be of uniform material. b. Utility sand shall be generally used for embedment. c. If ground water is in sufficient quantity to cause sand to pump, then use crushed rock as embedment. 1) If crushed rock is not specifically identified in the Contract Documents, then crushed rock shall be paid by the pre-bid unit price. d. Place evenly spread bedding material on a firm trench bottom. e. Provide firm, uniform bedding. f. Place pipe on the bedding in accordance with the alignment of the Drawings. g. In no case shall the top of the pipe be less than 42 inches from the surface of the proposed grade, unless specifically called for in the Drawings. h. Place embedment, including initial backfill, to a minimum of 6 inches, but not more than 12 inches, above the pipe. i. Where gate valves are present, the initial backfill shall extend to 6 inches above the elevation of the valve nut. j. Form all blocking against undisturbed trench wall to the dimensions in the Drawings. k. Compact embedment and initial backfill. l. Place marker tape on top of the initial trench backfill in accordance with Section 33 05 26. 2. Water Lines 16-inches through 24-inches in diameter: a. The entire embedment zone shall be of uniform material. b. Utility sand may be used for embedment when the excavated trench depth is less than 15 feet deep. c. Crushed rock or fine crushed rock shall be used for embedment for excavated trench depths 15 feet, or greater. d. Crushed rock shall be used for embedment for steel pipe. e. Provide trench geotextile fabric at any location where crushed rock or fine crushed rock come into contact with utility sand 33 05 10 - 13 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 13 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 f. Place evenly spread bedding material on a firm trench bottom. g. Provide firm, uniform bedding. 1) Additional bedding may be required if ground water is present in the trench. 2) If additional crushed rock is required not specifically identified in the Contract Documents, then crushed rock shall be paid by the pre-bid unit price. h. Place pipe on the bedding according to the alignment shown on the Drawings. i. The pipe line shall be within: 1) ±3 inches of the elevation on the Drawings for 16-inch and 24-inch water lines j. Place and compact embedment material to adequately support haunches in accordance with the pipe manufacturer’s recommendations. k. Place remaining embedment including initial backfill to a minimum of 6 inches, but not more than 12 inches, above the pipe. l. Where gate valves are present, the initial backfill shall extend to up to the valve nut. m. Compact the embedment and initial backfill to 95 percent Standard Proctor ASTM D 698. n. Density test may be performed by City to verify that the compaction of embedment meets requirements. o. Place trench geotextile fabric on top of the initial backfill. p. Place marker tape on top of the trench geotextile fabric in accordance with Section 33 05 26. 3. Water Lines 30-inches and greater in diameter a. The entire embedment zone shall be of uniform material. b. Crushed rock shall be used for embedment. c. Provide trench geotextile fabric at any location where crushed rock or fine crushed rock come into contact with utility sand. d. Place evenly spread bedding material on a firm trench bottom. e. Provide firm, uniform bedding. 1) Additional bedding may be required if ground water is present in the trench. 2) If additional crushed rock is required which is not specifically identified in the Contract Documents, then crushed rock shall be paid by the pre-bid unit price. f. Place pipe on the bedding according to the alignment shown on the Drawings. g. The pipe line shall be within: 1) ±1 inch of the elevation on the Drawings for 30-inch and larger water lines h. Place and compact embedment material to adequately support haunches in accordance with the pipe manufacturer’s recommendations. i. For steel pipe greater than 30 inches in diameter, the initial embedment lift shall not exceed the spring line prior to compaction. j. Place remaining embedment, including initial backfill, to a minimum of 6 inches, but not more than 12 inches, above the pipe. k. Where gate valves are present, the initial backfill shall extend to up to the valve nut. l. Compact the embedment and initial backfill to 95 percent Standard Proctor ASTM D 698. 33 05 10 - 14 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 14 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 m. Density test may be performed by City to verify that the compaction of embedment meets requirements. n. Place trench geotextile fabric on top of the initial backfill. o. Place marker tape on top of the trench geotextile fabric in accordance with Section 33 05 26. 4. Sanitary Sewer Lines and Storm Sewer Lines (HDPE) a. The entire embedment zone shall be of uniform material. b. Crushed rock shall be used for embedment. c. Place evenly spread bedding material on a firm trench bottom. d. Spread bedding so that lines and grades are maintained and that there are no sags in the sanitary sewer pipe line. e. Provide firm, uniform bedding. 1) Additional bedding may be required if ground water is present in the trench. 2) If additional crushed rock is required which is not specifically identified in the Contract Documents, then crushed rock shall be paid by the pre-bid unit price. f. Place pipe on the bedding according to the alignment shown in the Drawings. g. The pipe line shall be within ±0.1 inches of the elevation, and be consistent with the grade shown on the Drawings. h. Place and compact embedment material to adequately support haunches in accordance with the pipe manufacturer’s recommendations. i. For sewer lines greater than 30 inches in diameter, the embedment lift shall not exceed the spring line prior to compaction. j. Place remaining embedment including initial backfill to a minimum of 6 inches, but not more than 12 inches, above the pipe. k. Compact the embedment and initial backfill to 95 percent Standard Proctor ASTM D 698. l. Density test may be performed by City to verify that the compaction of embedment meets requirements. m. Place trench geotextile fabric on top of the initial backfill. n. Place marker tape on top of the trench geotextile fabric in accordance with Section 33 05 26. 5. Storm Sewer (RCP) a. The bedding and the pipe zone up to the spring line shall be of uniform material. b. Crushed rock shall be used for embedment up to the spring line. c. The specified backfill material may be used above the spring line. d. Place evenly spread bedding material on a firm trench bottom. e. Spread bedding so that lines and grades are maintained and that there are no sags in the storm sewer pipe line. f. Provide firm, uniform bedding. 1) Additional bedding may be required if ground water is present in the trench. 2) If additional crushed rock is required which is not specifically identified in the Contract Documents, then crushed rock shall be paid by the pre-bid unit price. g. Place pipe on the bedding according to the alignment of the Drawings. 33 05 10 - 15 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 15 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 h. The pipe line shall be within ±0.1 inches of the elevation, and be consistent with the grade, shown on the Drawings. i. Place embedment material up to the spring line. 1) Place embedment to ensure that adequate support is obtained in the haunch. j. Compact the embedment and initial backfill to 95 percent Standard Proctor ASTM D 698. k. Density test may be performed by City to verify that the compaction of embedment meets requirements. l. Place trench geotextile fabric on top of pipe and crushed rock. 6. Storm Sewer Reinforced Concrete Box a. Crushed rock shall be used for bedding. b. The pipe zone and the initial backfill shall be: 1) Crushed rock, or 2) Acceptable backfill material compacted to 95 percent Standard Proctor density c. Place evenly spread compacted bedding material on a firm trench bottom. d. Spread bedding so that lines and grades are maintained and that there are no sags in the storm sewer pipe line. e. Provide firm, uniform bedding. 1) Additional bedding may be required if ground water is present in the trench. 2) If additional crushed rock is required which is not specifically identified in the Contract Documents, then crushed rock shall be paid by the pre-bid unit price. f. Fill the annular space between multiple boxes with crushed rock, CLSM according to 03 34 13. g. Place pipe on the bedding according to the alignment of the Drawings. h. The pipe shall be within ±0.1 inches of the elevation, and be consistent with the grade, shown on the Drawings. i. Compact the embedment initial backfill to 95 percent Standard Proctor ASTM D698. 7. Water Services (Less than 2 Inches in Diameter) a. The entire embedment zone shall be of uniform material. b. Utility sand shall be generally used for embedment. c. Place evenly spread bedding material on a firm trench bottom. d. Provide firm, uniform bedding. e. Place pipe on the bedding according to the alignment of the Plans. f. Compact the initial backfill to 95 percent Standard Proctor ASTM D698. 8. Sanitary Sewer Services a. The entire embedment zone shall be of uniform material. b. Crushed rock shall be used for embedment. c. Place evenly spread bedding material on a firm trench bottom. d. Spread bedding so that lines and grades are maintained and that there are no sags in the sanitary sewer pipe line. e. Provide firm, uniform bedding. 1) Additional bedding may be required if ground water is present in the trench. 33 05 10 - 16 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 16 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 2) If additional crushed rock is required which is not specifically identified in the Contract Documents, then crushed rock shall be paid by the pre-bid unit price. f. Place pipe on the bedding according to the alignment of the Drawings. g. Place remaining embedment, including initial backfill, to a minimum of 6 inches, but not more than 12 inches, above the pipe. h. Compact the initial backfill to 95 percent Standard Proctor ASTM D698. i. Density test may be required to verify that the compaction meets the density requirements. E. Trench Backfill 1. At a minimum, place backfill in such a manner that the required in-place density and moisture content is obtained, and so that there will be no damage to the surface, pavement or structures due to any trench settlement or trench movement. a. Meeting the requirement herein does not relieve the responsibility to damages associated with the Work. 2. Backfill Material a. Final backfill depth less than 15 feet 1) Backfill with: a) Acceptable backfill material b) Blended backfill material, or c) Select backfill material, CSS, or CLSM when specifically required b. Final backfill depth 15 feet or greater: (under pavement or future pavement) 1) Backfill depth from 0 to15 feet deep a) Backfill with: (1) Acceptable backfill material (2) Blended backfill material, or (3) Select backfill material, CSS, or CLSM when specifically required 2) Backfill depth from 15 feet and greater a) Backfill with: (1) Select Fill (2) CSS, or (3) CLSM when specifically required c. Final backfill depth 15 feet or greater: (not under pavement or future pavement) 1) Backfill with: a) Acceptable backfill material, or b) Blended backfill material d. Backfill for service lines: 1) Backfill for water or sewer service lines shall be the same as the requirement of the main that the service is connected to. 3. Required Compaction and Density a. Final backfill (depths less than 15 feet) 1) Compact acceptable backfill material, blended backfill material or select backfill to a minimum of 95 percent Standard Proctor per ASTM D698 at moisture content within -2 to +5 percent of the optimum moisture. 2) CSS or CLSM requires no compaction. b. Final backfill (depths 15 feet and greater/under existing or future pavement) 1) Compact select backfill to a minimum of 98 percent Standard Proctor per ASTM D 698 at moisture content within -2 to +5 percent of the optimum moisture. 33 05 10 - 17 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 17 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 2) CSS or CLSM requires no compaction. c. Final backfill (depths 15 feet and greater/not under existing or future pavement) 1) Compact acceptable backfill material blended backfill material, or select backfill to a minimum of 95 percent Standard Proctor per ASTM D 698 at moisture content within -2 to +5 percent of the optimum moisture. 4. Saturated Soils a. If in-situ soils consistently demonstrate that they are greater than 5 percent over optimum moisture content, the soils are considered saturated. b. Flooding the trench or water jetting is strictly prohibited. c. If saturated soils are identified in the Drawings or Geotechnical Report in the Appendix, Contractor shall proceed with Work following all backfill procedures outlined in the Drawings for areas of soil saturation greater than 5 percent. d. If saturated soils are encountered during Work but not identified in Drawings or Geotechnical Report in the Appendix: 1) The Contractor shall: a) Immediately notify the City. b) Submit a Contract Claim for Extra Work associated with direction from City. 2) The City shall: a) Investigate soils and determine if Work can proceed in the identified location. b) Direct the Contractor of changed backfill procedures associated with the saturated soils that may include: (1) Imported backfill (2) A site specific backfill design 5. Placement of Backfill a. Use only compaction equipment specifically designed for compaction of a particular soil type and within the space and depth limitation experienced in the trench. b. Flooding the trench or water setting is strictly prohibited. c. Place in loose lifts not to exceed 12 inches. d. Compact to specified densities. e. Compact only on top of initial backfill, undisturbed trench or previously compacted backfill. f. Remove any loose materials due to the movement of any trench box or shoring or due to sloughing of the trench wall. g. Install appropriate tracking balls for water and sanitary sewer trenches in accordance with Section 33 05 26. 6. Backfill Means and Methods Demonstration a. Notify the City in writing with sufficient time for the City to obtain samples and perform standard proctor test in accordance with ASTM D698. b. The results of the standard proctor test must be received prior to beginning excavation. c. Upon commencing of backfill placement for the project the Contractor shall demonstrate means and methods to obtain the required densities. d. Demonstrate Means and Methods for compaction including: 1) Depth of lifts for backfill which shall not exceed 12 inches 2) Method of moisture control for excessively dry or wet backfill 33 05 10 - 18 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 18 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 3) Placement and moving trench box, if used 4) Compaction techniques in an open trench 5) Compaction techniques around structure e. Provide a testing trench box to provide access to the recently backfilled material. f. The City will provide a qualified testing lab full time during this period to randomly test density and moisture continent. 1) The testing lab will provide results as available on the job site. 7. Varying Ground Conditions a. Notify the City of varying ground conditions and the need for additional proctors. b. Request additional proctors when soil conditions change. c. The City may acquire additional proctors at its discretion. d. Significant changes in soil conditions will require an additional Means and Methods demonstration. 3.5 REPAIR [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD QUALITY CONTROL A. Field Tests and Inspections 1. Proctors a. The City will perform Proctors in accordance with ASTM D698. b. Test results will generally be available to within 4 calendar days and distributed to: 1) Contractor 2) City Project Manager 3) City Inspector 4) Engineer c. Notify the City if the characteristic of the soil changes. d. City will perform new proctors for varying soils: 1) When indicated in the geotechnical investigation in the Appendix 2) If notified by the Contractor 3) At the convenience of the City e. Trenches where different soil types are present at different depths, the proctors shall be based on the mixture of those soils. 2. Density Testing of Backfill a. Density Tests shall be in conformance with ASTM D2922. b. Provide a testing trench protection for trench depths in excess of 5 feet. c. Place, move and remove testing trench protection as necessary to facilitate all test conducted by the City. d. For final backfill depths less than 15 feet and trenches of any depth not under existing or future pavement: 1) The City will perform density testing twice per working day when backfilling operations are being conducted. 2) The testing lab shall take a minimum of 3 density tests of the current lift in the available trench. e. For final backfill depths 15 feet and greater deep and under existing or future pavement: 33 05 10 - 19 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 19 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 1) The City will perform density testing twice per working day when backfilling operations are being conducted. 2) The testing lab shall take a minimum of 3 density tests of the current lift in the available trench. 3) The testing lab will remain onsite sufficient time to test 2 additional lifts. f. Make the excavation available for testing. g. The City will determine the location of the test. h. The City testing lab will provide results to Contractor and the City’s Inspector upon completion of the testing. i. A formal report will be posted to the City’s Buzzsaw site within 48 hours. j. Test reports shall include: 1) Location of test by station number 2) Time and date of test 3) Depth of testing 4) Field moisture 5) Dry density 6) Proctor identifier 7) Percent Proctor Density 3. Density of Embedment a. Storm sewer boxes that are embedded with acceptable backfill material, blended backfill material, cement modified backfill material or select material will follow the same testing procedure as backfill. b. The City may test fine crushed rock or crushed rock embedment in accordance with ASTM D2922 or ASTM 1556. B. Non-Conforming Work 1. All non-conforming work shall be removed and replaced. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.2 – Added Item for Concrete Encasement for Utility Lines Various Sections – Revised Depths to Include 15’ and greater 3.3.A – Additional notes for pavement protection and positive drainage. 3.4.E.2 – Added requirements for backfill of service lines. 3.4.E.5 – Added language prohibiting flooding of trench 33 05 10 - 20 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 20 of 20 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 12, 2016 6/18/2013 D. Johnson 1.2.A.3 – Clarified measurement and payment for concrete encasement as per plan quantity 2.2.A – Added language for concrete encasement 12/12/16 Z. Arega 2.2.A.1.d Modify gradation for sand material 33 05 16 - 1 CONCRETE WATER VAULTS Page 1 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 33 05 16 CONCRETE WATER VAULTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Concrete vaults to be used in water utility applications B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 03 30 00 – Cast-In -Place Concrete 4. Section 03 80 00 – Modifications to Existing Concrete Structures 5. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. This Item is considered subsidiary to Water Meter and Vault. 2. Payment a. The work performed and materials furnished in accordance with this Item are subsidiary to the unit price bid per each “Water Meter and Vault” complete in place and no other compensation will be allowed. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. American Association of State Highway and Transportation Officials (AASHTO). 3. American Concrete Institute (ACI): a. 350, Code Requirements for Environmental Engineering Concrete Structures and Commentary. 4. ASTM International (ASTM): a. A615, Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement. b. C857, Standard Practice for Minimum Structural Design Loading for Underground Precast Concrete Utility Structures c. C858, Standard Specification for Underground Precast Concrete Utility Structures 33 05 16 - 2 CONCRETE WATER VAULTS Page 2 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 d. C891, Standard Practice for Installation of Underground Precast Concrete Utility Structures. e. C923, Standard Specification for Resilient Connectors Between Reinforced Concrete Manholes Structures, Pipes, and Laterals. 5. Occupational Safety and Health Administration (OSHA) a. 1910.23, Guarding Floor and Wall Openings and Holes 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Product Data 1. Precast Concrete Vault 2. Connection materials 3. Pipe connections at vault walls 4. Stubs and stub plugs 5. Grade ring 6. Ladder 7. External coating material 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Meet the requirements of ACI 318. 1.10 DELIVERY, STORAGE, AND HANDLING A. Deliver vault or panels (units) to project site in such quantity to assure continuity of installation. B. Store units at the project site in a manner which prevents cracking, distortion, staining or other physical damage. C. Lift units by designed lifting points or supports. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY A. Manufacturer Warranty 1. Manufacturer’s Warranty shall be in accordance with Division 1. 33 05 16 - 3 CONCRETE WATER VAULTS Page 3 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, MATERIALS A. Manufacturers 1. Only the manufacturers as listed on the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. B. Performance / Design Criteria 1. Vault a. Vault dimensions per the Drawings b. Opening per the Drawings c. Incorporate a sump into the base or floor of the vault. 1) Avoid conflicts with piping. 2) Do not locate directly under the access location if applicable. d. Place floor on a minimum 2 percent slope towards the sump. 2. Water Pipe Penetrations a. Use adjustable-linked rubber seal devices or grout, as shown in Drawings, to provide seals around pipe penetrations. 3. Vault Access a. Cover / Door 1) For non-traffic areas – non H-20 loading 30-inch x 36-inch steel single leaf door, Bilco Type J model or approved equal 2) For traffic areas – 32-inch hinged ductile iron frame and cover or as shown in manhole lid assembly in Drawings 3) With steel door, provide an automatic hold-open arm with release handle and locking device. 4) Provide Bilco type fall protection grating under aluminum door that meets OSHA 29 CFR 1910.23 requirements or approved equal. 5) Incorporate a drain gutter with an outlet routed to the exterior of the vault lid. b. Ladder 1) Provide aluminum ladder by Heron Industries or approved equal. 2) Provide ladder to dimensions shown on Drawings. C. Materials 1. Concrete for utility construction – Conform to Section 03 30 00. 2. Frame and Cover – Conform to Section 33 05 13. 3. Grade Ring – Conform to Section 33 05 13 and ASTM C 478. 4. Reinforcing Steel – Conform to Section 03 30 00. 5. Sewer Pipe Connections – Conform to ASTM C923 or ASTM C1628. 6. Adjustable-linked rubber seal devices a. Manufactured by Link-Seal or approved equal 7. Interior Coating or Liner – Conform to Section 33 39 60. 33 05 16 - 4 CONCRETE WATER VAULTS Page 4 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 8. Exterior Coating a. Coal Tar Bitumastic for below grade damp proofing b. Dry film thickness (DFT) no less than 12 mils and no greater than 30 mils c. Solids content is 68 percent by volume ± 2 percent. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION A. Evaluation and Assessment 1. Verify lines and grades are in accordance to the Drawings. 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Vault a. Perform installation in accordance to ASTM C891. b. Construct vault to dimensions shown on Drawings. c. Precast Sections 1) Clean bell spigot and gaskets a) Lubricate and join 2) Minimize number of segments. d. Vault Base 1) Place vault base on 6-inch minimum base of compacted crushed rock (per Section 33 05 10) over undisturbed soils and grade level to elevation shown on the Drawings. 2. Water Pipe Penetrations a. Install adjustable-linked rubber seal devices around pipe penetrations in accordance with the manufacturer’s recommendation. 3. Modifications and pipe penetrations into vaults shall conform to Section 03 80 00. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 33 05 16 - 5 CONCRETE WATER VAULTS Page 5 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 2.2.B.3 – Modified vault hatch door and ladder requirements 2.2.C.6 – Modified rubber seal requirements 33 05 20 - 1 AUGER BORING Page 1 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 33 05 20 AUGER BORING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Minimum requirements for auger boring using 48-inch and smaller casing pipe with lengths less than 350 feet at the locations shown on the Drawings B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 4. Section 33 05 22 – Steel Casing Pipe 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. This Item is considered subsidiary to steel casing pipe construction. 2. Payment a. The work performed and materials furnished in accordance with this Item are subsidiary to the unit price bid per linear foot of By Other Than Open Cut to be complete in place, and no other compensation will be allowed. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Occupational Safety and Health Administration (OSHA) a. OSHA Regulations and Standards for Underground Construction, 29 CFR Part 1926, Subpart S, Underground Construction and Subpart P, Excavation. 1.4 ADMINISTRATIVE REQUIREMENTS A. Pre-installation 1. Provide written notice to the City at least 3 workings days in advance of the planned launch of auger boring operations. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. 33 05 20 - 2 AUGER BORING Page 2 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Contractor a. All boring work shall be performed by an experienced subcontractor or Contractor who has at least 5 years of experience in performing tunneling work and has completed at least 5 boring projects of similar diameter and ground conditions. 1) At least 1 of the projects shall have an individual boring length equal to or greater in length than the longest tunnel on this project. 2) Submit details of referenced projects including owner’s name and contact information, project superintendent and machine operators. b. The project superintendent shall have at least 5 years of experience supervising boring construction. 1) The Contractor may be required to submit details of referenced project including owner’s name, contact information and project superintendent. c. The site safety representative and personnel responsible for air quality monitoring shall be experienced in tunnel construction and shall have current certification by OSHA. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Description 1. Steel Casing Pipe shall be in accordance with Section 33 05 22. 2. Tunnel Liner Plate is not permitted for use with Auger Boring. B. Design Criteria 1. Design excavation methods and spoil conveyance system for the full range of ground conditions described in the Geotechnical Reports anticipated 2. Tolerance a. Pressurized Carrier pipe 33 05 20 - 3 AUGER BORING Page 3 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1) Lateral or vertical variation in the final position of the pipe casing from the line and grade established by the Drawings shall be permitted only to the extent of 1inch in 10 feet provided that such variation shall be regular and only in the direction that will not detrimentally affect the function of the carrier pipe and clearances from other underground utilities or structures. b. Gravity Carrier Pipe 1) Lateral variation in the final position of the pipe casing from the line and grade established by the Drawings shall be permitted only to the extent of 1inch in 10 feet provided that such variation shall be regular and only in the direction that will not detrimentally affect the function of the carrier pipe and clearances from other underground utilities or structures. 2) Grades shown on Drawings must be maintained vertically. 3. Use methods and equipment that control surface settlement and heave above the pipeline to prevent damage to existing utilities, facilities and improvements. a. Limit any ground movements (settlement/heave) to values that shall not cause damage to adjacent utilities or surface features (i.e. pavement, structures, railroad tracks, etc.) b. Repair any damage caused by ground movements at no cost to the City. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION A. Boring shall not begin until the following have been completed: 1. Review of available utility drawings and location of conduits and underground utilities in all areas where excavation is to be performed. a. Notify the applicable one-call system prior to any excavation to avoid interference with the existing conduits and utilities in accordance with Division 1. 1) Repair damage to existing utilities resulting from excavation at no additional cost to the City. b. Follow notification requirements of permit provider where applicable. 2. Complete pit excavations and support systems for each drive in accordance with the requirements of the Specifications. 3.4 INSTALLATION A. General 1. Immediately notify the City if any problems are encountered with equipment or materials or if the Contractor believes the conditions encountered are materially and significantly different than those represented within the Contract Documents. 33 05 20 - 4 AUGER BORING Page 4 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 2. Where pipe is required to be installed under railroad embankments or under highways, streets or other facilities, construction shall be performed in such a manner so as to not interfere with the operation of the railroad, street, highway or other facility, and so as not to weaken or damage any embankment or structure. 3. During construction operations, furnish and maintain barricades and lights to safeguard traffic and pedestrians until such time as the backfill has been completed and then remove from the site. 4. Properly manage and dispose of groundwater inflows to the shafts in accordance with requirements of specifications and all permit conditions. a. Discharge of groundwater inflow into sanitary sewers is not allowed without proper approval and permits. 5. Furnish all necessary equipment, power, water and utilities for tunneling, spoil removal and disposal, grouting and other associated work required for the methods of construction. 6. Promptly clean up, remove and dispose of any spoil or slurry spillage. 7. Do not disturb roadways, railroads, canal channels, adjacent structures, landscaped areas or existing utilities. a. Any damage shall be immediately repaired to original or better condition and to the satisfaction of the Engineer or permit grantor at no additional cost to the City. 8. Whenever there is a condition that is likely to endanger the stability of the excavation or adjacent structures, operate with a full crew 24 hours a day, including weekends and holidays, without interruption, until those conditions no longer jeopardize the stability of the Work. 9. Notify the Texas One Call system (800-245-4545) to request marking of utilities by utility owners / operators that subscribe to One Call, and shall individually notify all other known or suspected utilities to request marking of these utilities. a. Confirm that all requested locates are made prior to commencing boring operations. b. Visually confirm and stake necessary existing lines, cables, or other underground facilities including exposing necessary crossing utilities and utilities within 10 feet laterally of the designed tunnel. c. Control drilling and grouting practices to prevent damage to existing utilities. B. Boring Methods 1. Tunnel liner plate shall not be used for auger boring. 2. The Contractor shall be fully responsible for insuring the methods used are adequate for the protection of workers, pipe, property and the public and to provide a finished product as required. 3. Blasting is not allowed. C. Pits and Trenches 1. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking operations and for placing end joints of the pipe. 2. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from caving in. 33 05 20 - 5 AUGER BORING Page 5 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3. The location of the pit shall meet the approval of the City. 4. The pits of trenches excavated to facilitate these operations shall be backfilled in accordance with Section 33 05 10 immediately after the casing and carrier pipe installation has been completed. D. Boring 1. Install steel casing pipe by boring hole with the earth auger and simultaneously jacking pipe into place. 2. The boring shall proceed from a pit provided for the boring equipment and workmen. 3. Pilot Hole, required for 24-inch and larger casings a. By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. b. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. c. Other methods of maintaining line and grade on the casing may be approved if acceptable to the Engineer. d. Placed excavated material near the top of the working pit and disposed of as required. 1) If no room is available, immediate haul off is required. 4. The use of water or other fluids in connection with the boring operation will be permitted only to the extent required to lubricate cuttings. a. Jetting or sluicing will not be permitted. 5. In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10 percent of high grade carefully processed bentonite may be used to: a. Consolidate cuttings of the bit b. Seal the walls of the hole c. Furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter 6. Allowable variation from the line and grade shall be as specified in this Specification. 7. All voids in excess of 2 inches between bore and outside of casing shall be pressure grouted. E. Contact Grouting 1. Contact grout any voids caused by or encountered during the boring. a. Modify equipment and procedures as required to avoid recurrence of excessive settlements or damage. F. Control of Line and Grade 1. Monitor line and grade continuously during boring operations. a. Record deviation with respect to design line and grade once at each casing joint. 2. If the pipe installation does not meet the specified tolerances, correct the installation, including any necessary redesign of the pipeline or structures and acquisition of necessary easements. 33 05 20 - 6 AUGER BORING Page 6 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3.5 CLEANUP AND RESTORATION A. After completion of the boring, all construction debris, spoils, oil, grease and other materials shall be removed from the pipe, pits and all work areas. B. Restoration shall follow construction as the Work progresses and shall be completed as soon as reasonably possible. 1. Restore and repair any damage resulting from surface settlement caused by shaft excavation or boring. 2. Any property damaged or destroyed shall be restored to a condition equal to or better than existing prior to construction. 3. Restoration shall be completed no later than 30 days after boring is complete, or earlier if required as part of a permit or easement agreement. 4. This provision for restoration shall include all property affected by the construction operations. 3.6 RE-INSTALLATION [NOT USED] 3.7 SITE QUALITY CONTROL A. Field Tests and Inspections 1. Allow access to the City and furnish necessary assistance and cooperation to aid in the observations, measurements, data and sample collection, including, but not limited to the following: a. The City shall have access to the boring system prior to, during and following all boring operations. b. The City shall have access to the tunneling shafts prior to, during and following all boring operations. 1) This shall include, but not be limited to, visual inspection of installed pipe and verification of line and grade. 2) The Contractor shall provide safe access in accordance with all safety regulations. c. The City shall have access to spoils removed from the boring excavation prior to, during and following all boring operations. 1) The City shall be allowed to collect soil samples from the muck buckets or spoil piles a minimum of once every 10 feet and at any time when changes in soil conditions or obstructions are apparent or suspected. B. Safety 1. The Contractor is responsible for safety on the job site. a. Perform all Work in accordance with the current applicable regulations of the Federal, State and local agencies. b. In the event of conflict, comply with the more restrictive applicable requirement. 2. No gasoline powered equipment shall be permitted in receiving shafts/pits. a. Diesel, electrical, hydraulic, and air powered equipment are acceptable, subject to applicable local, State and Federal regulations. 3. Furnish and operate a temporary ventilation system in accordance with applicable safety requirements when personnel are underground. a. Perform all required air and gas monitoring. 33 05 20 - 7 AUGER BORING Page 7 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 b. Ventilation system shall provide a sufficient supply of fresh air and maintain an atmosphere free of toxic or flammable gasses in all underground work areas. 4. Perform all work in accordance with all current applicable regulations and safety requirements of the Federal, State and Local agencies. 5. Comply with all applicable provisions of OSHA 29 CFR Part 1926, Subpart S, Underground Construction and Subpart P, Excavations. a. In the event of conflict, comply with the more stringent requirements. 6. If personnel will enter the pipe during construction, the Contractor shall develop an emergency response plan for rescuing personnel trapped underground in a shaft excavation or pipe. a. Keep on-site all equipment required for emergency response in accordance with the agency having jurisdiction. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 33 05 22 - 1 STEEL CASING PIPE Page 1 of 6 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 33 05 22 STEEL CASING PIPE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Minimum requirements for manufacturing, furnishing and transporting Steel Casing Pipe to be installed by Open Cut or By Other than Open Cut at the locations shown on the Drawings B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 4. Section 33 05 20 – Auger Boring 5. Section 33 05 23 – Hand Tunneling 6. Section 33 05 24 – Installation of Carrier Pipe in Casing or Tunnel Liner Plate 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Open Cut a. Measurement 1) Measured horizontally along the surface for length of Steel Casing Pipe installed b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per linear foot of “Casing, By Open Cut” installed for: a) Various Sizes c. The price bid shall include: 1) Furnishing and installing Steel Casing Pipe as specified by the Drawings 2) Mobilization 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess material 7) Furnishing, placement, and compaction of embedment 8) Furnishing, placement, and compaction of backfill 9) Clean-up 2. By Other than Open Cut a. Measurement 33 05 22 - 2 STEEL CASING PIPE Page 2 of 6 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1) Measured horizontally along the surface for length of Steel Casing Pipe installed b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per linear foot of “Casing/Tunnel Liner Plate, By Other than Open Cut” installed for: a) Various Sizes 2) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per linear foot of “Casing, By Other than Open Cut” installed for: a) Various Sizes c. The price bid shall include: 1) Furnishing and installing Steel Casing Pipe as specified by the Drawings 2) Mobilization 3) Launching shaft 4) Receiving shaft 5) Pavement removal 6) Excavation 7) Hauling 8) Disposal of excess material 9) Furnishing, placement, and compaction of backfill 10) Clean-up 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. ASTM International (ASTM): a. A139, Standard Specification for Electric-Fusion (Arc)-Welded Steel Pipe (NPS Sizes 4 and Over). 3. American Water Works Association (AWWA): a. C203, Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot Applied. 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Product Data 1. Exterior Coating a. Material data b. Field touch-up procedures 2. Interior Coating 33 05 22 - 3 STEEL CASING PIPE Page 3 of 6 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a. Material data b. Field touch-up procedures B. Shop Drawings 1. No shop drawings required for Auger Boring 2. For Tunneling, provide the following: a. Furnish details for Steel Casing Pipe outlining the following: 1) Grout/lubrication ports 2) Joint details 3) Other miscellaneous items for furnishing and fabricating pipe b. Submit calculations in a neat, legible format that is sealed by a Licensed Professional Engineer in Texas, consistent with the information provided in the geotechnical report, and includes: 1) Calculations confirming that pipe jacking capacity is adequate to resist the anticipated jacking loads for each crossing with a minimum factor of safety of 2 2) Calculations confirming that pipe capacity is adequate to safely support all other anticipated loads, including earth and groundwater pressures, surcharge loads, and handling loads 3) Calculations confirming that jointing method will support all loading conditions 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Delivery, Handling, and Storage 1. Prior to delivery of the pipe, end/internal bracing shall be furnished and installed, as recommended by the manufacturer, for protection during shipping and storage. 2. Deliver, handle and store pipe in accordance with the Manufacturer's recommendations to protect coating systems. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Design Criteria 1. The Contractor is fully responsible for the design of Steel Casing Pipe that meets or exceeds the design requirements of this Specification and that is specifically designed for installation by the intended trenchless method. 2. For Steel Casing Pipe utilized for tunneling projects, consider the following: 33 05 22 - 4 STEEL CASING PIPE Page 4 of 6 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a. Design of the casing pipe shall account for all installation and service loads including: 1) Jacking loads 2) External groundwater and earth loads 3) Traffic loads 4) Practical consideration for handling, shipping and other construction operations 5) Any other live or dead loads reasonably anticipated b. Design shall be sealed and signed by a registered Professional Engineer licensed in the State of Texas. c. The allowable jacking capacity shall not exceed 50 percent of the minimum steel yield stress. 3. Steel Casing Pipe shall have a minimum wall thickness as follows: Casing Pipe Diameter (inches) Minimum Wall Thickness (inches) 14 – 18 .3125 (5/16) 20 – 24 .375 (3/8) 26 – 32 .5 (1/2) 34 – 42 .625 (5/8) 44 – 48 .6875 (11/16) Greater than 48 Project specific design 4. Steel Casing Pipe shall be provided with inside diameter sufficient to efficiently install the required carrier pipe with casing spacers as required in Section 33 05 24. a. Allowable casing diameters are shown on the Drawings for each crossing. 5. Furnish in lengths that are compatible with Contractor’s shaft sizes and allowable work areas. 6. Random segments of pipe will not be permitted for straight runs of casing. a. Closing piece segments, however, shall be acceptable. 7. When required by installation method, provide grout/lubricant ports along the pipe at intervals of 10 feet or less. a. Ports and fittings shall be attached to the pipe in a manner that will not materially affect the strength of the pipe nor interfere with installation of carrier pipe. b. Plugs for sealing the fittings shall be provided by the Contractor and shall be capable of withstanding all external and internal pressures and loads without leaking. B. Materials 1. Provide new, smooth-wall, carbon steel pipe conforming to ASTM A139, Grade B. 2. Dimensional Tolerances a. Furnishing and installing Steel Casing Pipe with dimensional tolerances that are compatible with performance requirements and proposed installation methods that meet or exceed the specific requirements below: 1) Minimum wall thickness at any point shall be at least 87.5 percent of the nominal wall thickness. 33 05 22 - 5 STEEL CASING PIPE Page 5 of 6 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 2) Outside circumference within 1.0 percent or 3/4 inch of the nominal circumference, whichever is less. 3) Outside diameter of the pipe shall be within 1/8 inch of the nominal outside diameter. 4) Roundness such that the difference between the major and minor outside diameters shall not exceed 0.5 percent of the specified nominal outside diameter or 1/4 inch, whichever is less. 5) Maximum allowable straightness deviation of 1/8 inch in any 10-foot length. 3. All steel pipe shall have square ends. a. The ends of pipe sections shall not vary by more than 1/8 inch at any point from a true plane perpendicular to the axis of the pipe and passing through the center of the pipe at the end. b. When pipe ends have to be beveled for welding, the ends shall be beveled on the outside to an angle of 35 degrees with a tolerance of ± 2½ degrees and with a width of root face 1/16 inch ± 1/32 inch. 4. Steel Casing Pipe shall be fabricated with longitudinal weld seams. a. All girth weld seams shall be ground flush. C. Finishes 1. Provide inside and outside of Steel Casing Pipe with a coal-tar protective coating in accordance with the requirements of AWWA C203. a. Touch up after field welds shall provide coating equal to those specified above. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Install Steel Casing Pipe for By Other than Open Cut in accordance with Section 33 05 20 or Section 33 05 23. Install Steel Casing Pipe for Open Cut in accordance with Section 33 05 10. 1. Steel Casing Pipe connections shall be achieved by full penetration field butt welding or an integral machine press-fit connection (Permalok or equal) prior to installation of the pipe, depending on the type of carrier pipe. 2. Allowable joint types for each crossing are shown on the Drawings. 3. Field butt welding a square end piece of steel pipe to a 35 degree beveled end of steel pipe is acceptable. 4. Integral machined press-fit connections shall be installed in accordance with the manufacturer’s installation procedures and recommendations. 33 05 22 - 6 STEEL CASING PIPE Page 6 of 6 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 B. Carrier pipe shall be installed inside Steel Casing Pipe in accordance with Section 33 05 24. C. Contact grouting of the annulus outside the casing pipe shall be performed in accordance with Section 33 05 23 or Section 33 05 20. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 2.2.A – Formatting modified to apply thickness requirements for all casing installation methods 33 05 24 - 1 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 1 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 SECTION 33 05 24 1 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes: 5 1. Requirements for the installation of carrier pipe into steel casings or tunnel liner 6 plate at locations shown on the Drawings 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the 11 Contract 12 2. Division 1 – General Requirements 13 3. Section 33 01 30 – Sewer and Manhole Testing 14 4. Section 33 11 13 - Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Installation of Sanitary Sewer Carrier Pipe in Casing/Tunnel Liner Plate 18 a. Measurement 19 1) Measured horizontally along the surface from centerline to centerline of the 20 beginning of the casing/liner to the end of the casing/liner 21 b. Payment 22 1) The work performed and materials furnished in accordance with this Item 23 and measured as provided under “Measurement” shall be paid for at the 24 unit price bid per linear foot for “Sewer Carrier Pipe” complete in place for: 25 a) Various Sizes 26 c. The price bid shall include: 27 1) Furnishing and installing Sanitary Sewer Main (Pipe) in Casing/Tunnel 28 Liner Plate as specified by the Drawings 29 2) Mobilization 30 3) Grout 31 4) Casing Spacers 32 5) End seals 33 6) Excavation 34 7) Hauling 35 8) Disposal of excess material 36 9) Clean-up 37 2. Installation of Water Carrier Pipe in Casing/Tunnel Liner Plate 38 a. Measurement 39 1) Measured horizontally along the surface from centerline to centerline of the 40 beginning of the casing/liner to the end of the casing/liner Payment 41 33 05 24 - 2 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 2 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 b. Payment 1 1) The work performed and materials furnished in accordance with this Item 2 and measured as provided under “Measurement” shall be paid for at the 3 unit price bid per linear foot for “Water Carrier Pipe” complete in place for: 4 a) Various Sizes 5 c. The price bid shall include: 6 1) Furnishing and installing Water Main (Pipe) in Casing/Tunnel Liner Plate 7 as specified by the Drawings 8 2) Mobilization 9 3) Grout 10 4) Joint restraint 11 5) Casing Spacers 12 6) End seals 13 7) Excavation 14 8) Hauling 15 9) Disposal of excess material 16 10) Clean-up 17 1.3 REFERENCES 18 A. Definitions 19 1. Carrier Pipe: Permanent pipe for operational use that is used to convey flows 20 2. Casing: A steel pipe or tunnel liner installed by trenchless methods that supports the 21 ground and provides a stable underground excavation for installation of the carrier 22 pipe 23 B. Reference Standards 24 1. Reference standards cited in this Specification refer to the current reference 25 standard published at the time of the latest revision date logged at the end of this 26 Specification, unless a date is specifically cited. 27 2. American Society of Testing and Materials (ASTM) 28 a. C39, Standard Test Method for Compressive Strength of Cylindrical Concrete 29 Specimens. 30 b. C109, Standard Test Method for Compressive Strength of Hydraulic Cement 31 Mortars (Using 2-in or [50 mm] Cube Specimens). 32 c. D638, Standard Test Method for Tensile Properties of Plastics. 33 3. International Organization for Standardization (ISO): 34 a. 9001, Quality Management Systems - Requirements. 35 4. Occupational Safety and Health Administration (OSHA) 36 a. OSHA Regulations and Standards for Underground Construction, 29 CFR Part 37 1926, Subpart S, Underground Construction and Subpart P, Excavation. 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS 40 A. Submittals shall be in accordance with Section 01 33 00. 41 B. All submittals shall be approved by the City prior to delivery. 42 33 05 24 - 3 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 3 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 1 A. Product Data 2 1. Casing Isolators/Spacers 3 a. Material Data 4 2. Grout Mix 5 a. Material Data 6 B. Shop Drawings 7 1. Required for 24-inch and larger pipe installations 8 2. Submit Work Plan describing the carrier pipe installation equipment, materials and 9 construction methods to be employed. 10 3. Casing Spacers/Isolators 11 a. Detail drawings and manufacturer’s information for the casing isolators/spacers 12 that will be used. 13 1) Include dimension and component materials and documentation of 14 manufacturer’s ISO 9001:2000 certification. 15 b. Alternatives to casing spacers/isolators may be allowed by the City on a case-16 by-case basis. 17 c. For consideration of alternate method, submit a detailed description of method 18 including details. 19 4. End seal or bulkhead designs and locations for casing/liners. 20 5. Annular Space (between casing pipe and casing/tunnel liner plate) Grouting Work 21 Plan and Methods including: 22 a. Grouting methods 23 b. Details of equipment 24 c. Grouting procedures and sequences including: 25 1) Injection methods 26 2) Injection pressures 27 3) Monitoring and recording equipment 28 4) Pressure gauge calibration data 29 5) Materials 30 d. Grout mix details including: 31 1) Proportions 32 2) Admixtures including: 33 a) Manufacturer’s literature 34 b) Laboratory test data verifying the strength of the proposed grout mix 35 c) Proposed grout densities 36 d) Viscosity 37 e) Initial set time of grout 38 (1) Data for these requirements shall be derived from trial batches from 39 an approved testing laboratory. 40 e. Submit a minimum of 3 other similar projects where the proposed grout mix 41 design was used. 42 f. Submit anticipated volumes of grout to be pumped for each application and 43 reach grouted. 44 g. For pipe installations greater than 36-inches, without hold down jacks or a 45 restrained spacer, provide buoyant force calculations during grouting and 46 measures to prevent flotation. 47 33 05 24 - 4 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 4 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 1) Calculations sealed by a licensed Engineer in the State of Texas. 1 h. Description of methods and devices to prevent buckling of carrier pipe during 2 grouting of annular space, if required 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Certifications 7 1. Casing isolator/spacer manufacturer shall be certified against the provisions of 8 ISO9001:2000. 9 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 10 1.11 FIELD [SITE] CONDITIONS [NOT USED] 11 1.12 WARRANTY [NOT USED] 12 PART 2 - PRODUCTS 13 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 14 2.2 MATERIALS 15 A. Manufacturers 16 1. Only the manufacturers as listed on the City’s Standard Products List will be 17 considered as shown in Section 01 60 00. 18 a. The manufacturer must comply with this Specification and related Sections. 19 2. Any product that is not listed on the Standard Products List is considered a 20 substitution and shall be submitted in accordance with Section 01 25 00. 21 3. The Casing Spacers/Isolators shall be new and the product of a manufacturer 22 regularly engaged in the manufacturing of casing spacers/isolators. 23 B. Design Criteria and Materials 24 1. Carrier pipe shall be installed within the horizontal and vertical tolerances as 25 indicated in PART 3 of this Specification, incorporating all support/insulator 26 dimensions required. 27 Diameter (inches) Material Specification Reference Water Line 6-12 DIP (Restrained) 33 11 10 16-20 DIP (Restrained) AWWA C303 (Restrained) 33 11 10 33 11 13 24 and greater DIP (Restrained) AWWA C303 (Restrained) AWWA C301 (Restrained) 33 11 10 33 11 13 33 11 15 Sanitary Sewer Line 8-16 DIP (with Ceramic Epoxy) PVC C900 DR14 33 11 10 33 31 20 18 and greater DIP (with Ceramic Epoxy) Fiberglass 33 11 10 33 31 13 33 05 24 - 5 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 5 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 2. Grout of annular space 1 a. For gravity sewer carrier pipe installation: 2 1) Fill all voids between the carrier pipe and the casing or liner with grout. 3 2) All exterior carrier pipe surfaces and all interior casing or liner surfaces 4 shall be in contact with the grout. 5 b. For water line installation: 6 1) No annular space fill will be used. 7 3. Grout Mixes 8 a. Low Density Cellular Grout (LDCC) 9 1) Annular space (between sewer carrier pipe and casing/liner) grout shall be 10 LDCC. 11 2) The LDCC shall be portland cement based grout mix with the addition of a 12 foaming agent designed for this application. 13 3) Develop 1 or more grout mixes designed to completely fill the annular 14 space based on the following requirements: 15 a) Provide adequate retardation to completely fill the annular space in 1 16 monolithic pour. 17 b) Provide less than 1 percent shrinkage by volume. 18 c) Compressive Strength 19 (1) Minimum strength of 10 psi in 24 hours, 300 psi in 28 days 20 d) Design grout mix with the proper density and use proper methods to 21 prevent floating of the carrier pipe. 22 e) Proportion grout to flow and to completely fill all voids between the 23 carrier pipe and the casing or liner. 24 4. End Seals 25 a. Provide end seals at each end of the casing or liner to contain the grout backfill 26 or to close the casing/liner ends to prevent the inflow of water or soil. 27 1) For water piping less than 24-inch diameter, use hard rubber seals, Model 28 PL Link Seal as manufactured by the Thunderline Corporation or approved 29 equal. 30 2) For water piping 24-inch diameter and greater, use pull-on, 1/8 inch thick, 31 synthetic rubber end seals, Model C, as manufactured by Pipeline Seal and 32 Insulator, Inc. or approved equal. 33 3) For sewer piping, no end seals are required since the annular space between 34 the carrier pipe and the casing will be grouted. 35 b. Design end seals to withstand the anticipated soil or grouting pressure and be 36 watertight to prevent groundwater from entering the casing. 37 5. Casing Spacers/Insulators 38 a. Provide casing spacers/insulators to support the carrier pipe during installation 39 and grouting (where grout is used). 40 1) For concrete pressure pipe, mortar bands may be allowed in lieu of casing 41 spacers/isolators. 42 2) Mortar bands shall be in accordance with Section 33 11 13. 43 b. Casing Spacers/Isolators material and properties: 44 1) Shall be minimum 14 gage 45 2) For water pipe, utilize Stainless Steel. 46 3) For sewer pipe, utilize Coated Steel. 47 4) Suitable for supporting weight of carrier pipe without deformation or 48 collapse during installation 49 33 05 24 - 6 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 6 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 c. Provide restrained-style casing spacers to hold all pipes stable during grouting 1 operations and prevent floating or movement. 2 d. Provide dielectric strength sufficient to electrically isolate each component 3 from one another and from the casing. 4 e. Design risers for appropriate loads, and, as a minimum: 5 1) Provide 10 gage steel risers 6 a) Provide stainless steel bands and risers for water installations. 7 f. Band material and criteria 8 1) Provide polyvinyl chloride inner liner with: 9 a) Minimum thickness of 0.09 inches 10 b) Durometer “A” of 85-90 hardness 11 c) Minimum dielectric strength of 58,000 volts 12 g. Runner material and criteria 13 1) Provide pressure-molded glass reinforced polymer or UHMW with: 14 a) Minimum of 2 inches in width and a minimum of 11 inches in length. 15 2) Attach to the band or riser with 3/8 inch minimum welded steel or stainless 16 steel studs. 17 3) Runner studs and nuts shall be recessed well below the wearing surface of 18 the runner 19 a) Fill recess with a corrosion inhibiting filler. 20 h. Riser height 21 1) Provide sufficient height with attached runner allow a minimum clearance 22 of 2 inches between the outside of carrier pipe bells or couplings and the 23 inside of the casing liner surface. 24 2.3 ACCESSORIES [NOT USED] 25 2.4 SOURCE QUALITY CONTROL [NOT USED] 26 PART 3 - EXECUTION 27 3.1 INSTALLERS [NOT USED] 28 3.2 EXAMINATION [NOT USED] 29 3.3 PREPARATION [NOT USED] 30 3.4 INSTALLATION 31 A. General 32 1. Carrier pipe installation shall not begin until the following tasks have been 33 completed: 34 a. All required submittals have been provided, reviewed and accepted. 35 b. All casing/liner joints are watertight and no water is entering casing or liner 36 from any sources. 37 c. All contact grouting is complete. 38 d. Casing/liner alignment record drawings have been submitted and accepted by 39 City to document deviations due to casing/liner installation. 40 e. Site safety representative has prepared a code of safe practices and an 41 emergency plan in accordance with applicable requirements. 42 33 05 24 - 7 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 7 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 2. The carrier pipe shall be installed within the casings or liners between the limits 1 indicated on the Drawings, to the specified lines and grades and utilizing methods 2 which include due regard for safety of workers, adjacent structures and 3 improvements, utilities and the public. 4 B. Control of Line and Grade 5 1. Install Carrier pipe inside the steel casing within the following tolerances: 6 a. Horizontal 7 1) ± 2 inches from design line 8 b. Vertical 9 1) ±1 inch from design grade 10 2. Check line and grade set up prior to beginning carrier pipe installation. 11 3. Perform survey checks of line-and-grade of carrier pipe during installation 12 operations. 13 4. The Contractor is fully responsible for the accuracy of the installation and the 14 correction of it, as required. 15 a. Where the carrier pipe installation does not satisfy the specified tolerances, 16 correct the installation, including if necessary, redesign of the pipe or structures 17 at no additional cost to City. 18 C. Installation of Carrier Pipe 19 1. Pipe Installation 20 a. Remove all loose soil from casing or liner. 21 b. Grind smooth all rough welds at casing joints. 22 2. Installation of Casing Spacers 23 a. Provide casing spacers, insulators or other approved devices to prevent 24 flotation, movement or damage to the pipe during installation and grout backfill 25 placement. 26 b. Assemble and securely fasten casing spacers to the pipeline to be installed in 27 casings or tunnels. 28 c. Correctly assemble, evenly tighten and prevent damage during tightening of the 29 insulators and pipe insertion. 30 d. Install spacers in accordance with manufacturer’s recommendations. 31 e. Install carrier pipe so that there is no metallic contact between the carrier pipe 32 and the casing. 33 f. Carrier pipe shall be installed without sliding or dragging it on the ground or in 34 the casing/liner in a manner that could damage the pipe or coatings. 35 1) If guide rails are allowed, place cement mortar on both sides of the rails. 36 g. Coat the casing spacer runners with a non-corrosive/environmentally safe 37 lubricant to minimize friction when installing the carrier pipe. 38 h. The carrier pipe shall be electrically isolated from the carrier pipe and from the 39 casing. 40 i. Grade the bottom of the trench adjacent to each end of the casing to provide a 41 firm, uniform and continuous support for the pipe. If the trench requires some 42 backfill to establish the final trench bottom grade, place the backfill material in 43 6-inch lifts and compact each layer. 44 j. After the casing or tunnel liner has been placed, pump dry and maintain dry 45 until the casing spacers and end seals are installed. 46 3. Insulator Spacing 47 33 05 24 - 8 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 8 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 a. Maximum distance between spacers is to be 6 feet. 1 b. For 18 and 20 foot long joints, install a minimum of 4 spacers. 2 1) Install 2 spacers within 1 foot on each side of the bell or flange. 3 2) Remaining 2 spacers shall be spaced equally. 4 c. If the casing or pipe is angled or bent, reduce the spacing. 5 d. The end spacer must be within 6 inches of the end of the casing pipe, regardless 6 of size of casing and pipe or type of spacer used. 7 e. Install spacers on PVC pipe at the insertion line to prevent over-insertion of the 8 spigot into the bell. 9 4. After installation of the carrier pipe: 10 a. Mortar inside and outside of the joints, as applicable 11 b. Verify electrical discontinuity between the water carrier pipe and tunnel liner. 12 1) If continuity exists, remedy the short, by all means necessary including 13 removing and reinstalling the carrier pipe, prior to applying cellular grout. 14 c. If hold down jacks or casing spacers are used, seal or plug the ends of the 15 casing. 16 d. If steel pipe is used and not welded prior to installation in casing/liner, welding 17 of pipe will only be allowed after grouting of annular space is complete. 18 D. Installation of End Seals 19 1. For Water Pipes 20 a. Grout end of casing/liner a minimum of 6 inches and a maximum of 12 inches. 21 b. Place pull-on synthetic rubber end seals on the pipe and pull over the end of the 22 casing. Securely fasten with stainless steel bands. 23 2. For Sewer Pipes 24 a. Grout annular space between carrier pipe and casing as indicated in this 25 Specification. 26 E. Annular Space Grouting (For Sewer Only) 27 1. Prepare pipe as necessary to prevent the pipe from floating during grouting 28 operation as necessary. 29 2. Mixing of Grout 30 a. Mix material in equipment of sufficient size to provide the desired amount of 31 grout material for each stage in a single operation. 32 1) The equipment shall be capable of mixing the grout at the required densities 33 for the approved procedure and shall be capable of changing the densities 34 as required by field conditions. 35 3. Backfill Annular Space with Grout 36 a. Prior to filling of the annular space, test the carrier pipe in accordance with 37 Section 33 01 30. 38 b. Verify the maximum allowable pressure with the carrier pipe manufacturer and 39 do not exceed this pressure. 40 c. After the installation of the carrier pipe, the remaining space (all voids) between 41 the casing/liner and the carrier shall be filled with LDCC grout. 42 1) All surfaces of the exterior carrier pipe wall and casing/liner interior shall 43 be in contact with the grout. 44 2) Grout shall be pumped through a pipe or hose. 45 3) Use grout pipes, or other appropriate materials, to avoid damage to carrier 46 pipe during grouting. 47 33 05 24 - 9 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 9 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 4. Injection of LDCC Grout 1 a. Grout injection pressure shall not exceed the carrier pipe manufacturer’s 2 approved recommendations or 5 psi (whichever is lower). 3 b. Pumping equipment shall be of a size sufficient to inject grout at a volume, 4 velocity and pressure compatible with the size/volume of the annular space. 5 c. Once grouting operations begin, grouting shall proceed uninterrupted, unless 6 grouting procedures require multiple stages. 7 d. Grout placements shall not be terminated until the estimated annular volume of 8 grout has been injected. 9 5. Block the carrier pipe during grouting to prevent flotation during grout installation. 10 6. Protect and preserve the interior surfaces of the casing from damage. 11 3.5 REPAIR / RESTORATION [NOT USED] 12 3.6 RE-INSTALLATION [NOT USED] 13 3.7 FIELD [OR] SITE QUALITY CONTROL 14 A. Reports and Records required for pipe installations greater than 48-inches and longer 15 than 350 feet 16 1. Maintain and submit daily logs of grouting operations. 17 a. Include: 18 1) Grouting locations 19 2) Pressures 20 3) Volumes 21 4) Grout mix pumped 22 5) Time of pumping 23 2. Note any problems or unusual observations on logs. 24 B. Grout Strength Tests 25 1. City will perform testing for 24-hour and 28-day compressive strength tests for the 26 cylinder molds or grout cubes obtained during grouting operations. 27 2. City will perform field sampling during annular space grouting. 28 a. City will collect at least 1 set of 4 cylinder molds or grout cubes for each 100 29 cubic yards of grout injected but not less than 1 set for each grouting shift. 30 b. City will perform 24-hour and 28-day compressive strength tests per ASTM 31 C39 (cylindrical specimens) or ASTM C109 (cube specimens). 32 c. Remaining samples shall be tested as directed by City. 33 C. Safety 34 1. The Contractor is responsible for safety on the job site. 35 a. Perform all Work in accordance with the current applicable regulations of the 36 Federal, State and local agencies. 37 b. In the event of conflict, comply with the more restrictive applicable 38 requirement. 39 2. No gasoline powered equipment shall be permitted in jacking shafts and receiving 40 shafts/pits. 41 a. Diesel, electrical, hydraulic and air powered equipment is acceptable, subject to 42 applicable local, State and Federal regulations. 43 33 05 24 - 10 INSTALLATION OF CARRIER PIPE IN CASING OR TUNNEL LINER PLATE Page 10 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised June 19, 2013 3. Methods of construction shall be such as to ensure the safety of the Work, 1 Contractor's and other employees on site and the public. 2 4. Furnish and operate a temporary ventilation system in accordance with applicable 3 safety requirements when personnel are underground. 4 a. Perform all required air and gas monitoring. 5 b. Ventilation system shall provide a sufficient supply of fresh air and maintain an 6 atmosphere free of toxic or flammable gasses in all underground work areas. 7 5. Perform all Work in accordance with all current applicable regulations and safety 8 requirements of the federal, state and local agencies. 9 a. Comply with all applicable provisions of OSHA 29 CFR Part 1926, Subpart S, 10 Underground Construction and Subpart P, Excavations. 11 b. In the event of conflict, comply with the more stringent requirements. 12 6. If personnel will enter the pipe during construction, the Contractor shall develop an 13 emergency response plan for rescuing personnel trapped underground in a shaft 14 excavation or pipe. 15 a. Keep on-site all equipment required for emergency response in accordance with 16 the agency having jurisdiction 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION [NOT USED] 22 3.13 MAINTENANCE [NOT USED] 23 3.14 ATTACHMENTS [NOT USED] 24 END OF SECTION 25 26 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 2.2.B.1 – Modified minimum water line diameter from 8-inches to 6-inches 6/19/2013 D. Johnson Added Blue Text for clarification 1.1.C – Added Concrete Pressure Pipe Specification reference. 2.2.B.5 – Added provisions for mortar bands on concrete pressure pipe. 3.4.C.3 – Revised language related to spacing of casing spacers to correspond to the City’s Standard Detail. 27 33 05 26 - 1 UTILITY MARKERS/LOCATORS Page 1 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 33 05 26 UTILITY MARKERS/LOCATORS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Buried and surface utility markers for utility construction B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Measurement for this Item will be by lump sum. 2. Payment a. The work performed and materials furnished in accordance with this Item will be paid for at the lump sum price bid for “Utility Markers”. 3. The price bid shall include: a. Furnishing and installing Utility Markers as specified by the Drawings b. Mobilization c. Pavement removal d. Excavation e. Hauling f. Disposal of excess material g. Furnishing, placement and compaction of backfill h. Clean-up 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. American Public Works Association (AWPA): a. Uniform Color Code. 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. 33 05 26 - 2 UTILITY MARKERS/LOCATORS Page 2 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Product Data 1. Buried Marker 2. Surface Marker 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Manufacturers 1. Only the manufacturers as listed on the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. 3. Provide new Utility Markers/Locators from a manufacturer regularly engaged in the manufacturing of Utility Markers/Locators. B. Materials 1. Buried Markers (Detectable Warning Tape) a. Provide detectable warning tape as follows: 1) 5.0 mil overall thickness 2) Width – 3 inch minimum 3) Weight – 27.5 pounds per inch per 1,000 square feet 4) Triple Layer with: a) Minimum thickness 0.35 mils solid aluminum foil encased in a protective inert plastic jacket (1) 100 percent virgin low density polyethylene (2) Impervious to all known alkalis, acids, chemical reagents and solvents within soil (3) Aluminum foil visible to both sides 5) Locatable by conductive and inductive methods 6) Printing encased to avoid ink rub-off 7) Color and Legends a) Potable water lines 33 05 26 - 3 UTILITY MARKERS/LOCATORS Page 3 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 (1) Color – Blue (in accordance with APWA Uniform Color Code) (2) Legend – Caution Potable Water Line Below (repeated every 24 inches) b) Reclaimed water lines (1) Color – Purple (in accordance with APWA Uniform Color Code) (2) Legend – Caution Reclaimed Water Line Below (repeated every 24 inches) c) Sewer Line (1) Color – Green (in accordance with APWA Uniform Color Code) (2) Legend – Caution Sewer Line Below (repeated every 24 inches) 2. Surface Markers a. Provide as follows: 1) 4-inch diameter, 6-feet minimum length, polyethylene posts, or equal 2) White posts with colored, ultraviolet resistant domes as follows: a) Water Lines (1) Color – Blue (in accordance with APWA Uniform Color Code) (2) Legend – Caution Potable Water Line Below b) Reclaimed water lines (1) Color – Purple (in accordance with APWA Uniform Color Code) (2) Legend – Caution Reclaimed Water Line Below c) Sewer lines (1) Color – Green (in accordance with APWA Uniform Color Code) (2) Legend – Caution Sewer Line Below 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Buried Markers (Detectable Warning Tape) 1. Install in accordance with manufacturer’s recommendations below natural ground surface and directly above the utility for which it is marking. a. Allow 18 inches minimum between utility and marker. b. Bury to a depth of 3 feet or as close to the grade as is practical for optimum protection and detectability. B. Surface Markers 1. Bury a minimum of 2 feet deep, with a minimum of 4 feet above ground 2. The warning sign for all surface markers shall be 21 inches (not including post cap). 3. Where possible, place surface markers near fixed objects. 4. Place Surface Markers at the following locations: 33 05 26 - 4 UTILITY MARKERS/LOCATORS Page 4 of 4 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a. Buried Features 1) Place directly above a buried feature. b. Above-Ground Features 1) Place a maximum of 2 feet away from an above-ground feature. c. Water lines 16-inches and larger 1) Each right-of-way line (or end of casing pipe) for: a) Highway crossings b) Railroad crossings 2) Utility crossings such as: a) High pressure or large diameter gas lines b) Fiber optic lines c) Underground electric transmission lines d) Or other locations shown on the Drawings, or directed by the City d. Surface markers not required for 12-inch and smaller water lines e. For sanitary sewer lines: 1) In undeveloped areas, place marker maximum of 2 feet away from an above-ground feature such as a manhole or combination air valve vault. 2) Place at 500-foot intervals along the pipeline. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson Removed references to Utility Marker Balls throughout. 33 11 05 - 1 BOLTS, NUTS, AND GASKETS Page 1 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 33 11 05 BOLTS, NUTS, AND GASKETS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. All nuts, bolts and gaskets associated with pressurized water utility lines including: a. T-Bolts and Nuts b. Flange Bolts and Nuts c. Threaded Rods d. Push-on Gaskets e. Mechanical Joint Gaskets f. Flange Gaskets g. Flange Isolation Kits h. Petrolatum Tape Systems B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 33 04 10 – Joint Bonding and Electrical Isolation 4. Section 33 11 10 – Ductile Iron Pipe 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Hydrocarbon Resistant Gaskets a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for all “Hydrocarbon Resistant Gaskets”. 2. All Other Items a. Measurement 1) The Items in this Section are considered subsidiary to the Item being installed. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the unit price bid for the Item being installed and no other compensation will be allowed. 33 11 05 - 2 BOLTS, NUTS, AND GASKETS Page 2 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. American Iron and Steel Institute (AISI). 3. American Society of Mechanical Engineers (ASME): a. PCC-1-2012 Guidelines for Pressure Boundary Bolted Flange Joint Assembly. 4. American Society of Testing and Materials (ASTM): a. A193, Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications. b. A194, Standard Specification for Carbon and Alloy Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both. c. A242, Standard Specification for High-Strength Low-Alloy Carbon Structural Steel d. B117, Salt Spray Testing e. F436, Standard Specification for Hardened Steel Washers 5. American Water Works Association (AWWA): a. C111/A21.11, Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. b. C207, Steel Pipe Flanges for Waterworks Service – Sizes 4 In. Through 144 In. (100 mm Through 3,600 mm). c. C600, Installation of Ductile-Iron Mains and Their Appurtenances. d. M11, Steel Pipe. e. M41, Ductile-Iron Pipe and Fittings. 6. Fastener Quality Act (FQA) a. Public Law 106-34 (P.L. 106-34) 7. NSF International (NSF): a. 61, Drinking Water System Components - Health Effects. 8. Society for Protective Coating (SSPC) Surface Preparation Standards (SP): a. SP2, Hand Tool Cleaning b. SP3, Power Tool Cleaning 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery and/or fabrication for specials. 1.6 ACTION SUBMITTALS / INFORMATIONAL SUBMITTALS A. Product Data 1. Bolts and nuts for mechanical and or flange joints 2. Gaskets B. Certificates 33 11 05 - 3 BOLTS, NUTS, AND GASKETS Page 3 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1. Furnish an affidavit certifying that all fasteners, excluding T-Bolts, shall conform to the Fastener Quality Act (FQA) (P.L. 106-34). 2. Furnish an affidavit certifying that the Xylan Coating is manufactured by Whitford Corporation, or a Whitford Corporation certified Applicator. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Manufacturers a. Fastener manufacturing operations (bolts, nuts, gaskets and coatings) shall be performed under the control of the manufacturer. b. All gaskets shall meet or exceed the latest revisions NSF 61 and shall meet or exceed the requirements of this Specification. B. Preconstruction Testing 1. The City may, at its own cost, subject random fittings for destructive testing by an independent laboratory for compliance with this Specification. a. The compliance test shall be performed in the United States. b. Any visible defects or failure to meet the quality standards herein will be grounds for rejecting the entire order. 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Secure and maintain a location to store the material in accordance with Section 01 66 00. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES AND MATERIALS A. Manufacturers 1. Only the manufacturers as listed on the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. B. Regulatory Requirements 1. All fasteners, excluding T-Bolts, shall conform to the Fastener Quality Act (FQA) (P.L. 106-34). All fasteners shall meet the marking requirements set forth by this Act. 33 11 05 - 4 BOLTS, NUTS, AND GASKETS Page 4 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 C. T-Bolts and Nuts 1. Standard Xylan Coated T-bolt and Nut a. High strength, corrosion-resistant, low-carbon weathering steel in accordance with AWWA/ANSI C111/A21.11 and ASTM A242 b. Xylan Coating in accordance with this Section 2. Stainless Steel T-bolt with Xylan Coated Stainless Steel Nut a. Stainless Steel T-bolt and Nut in accordance with AISI 304. b. Coat nut with Xylan in accordance with this Section. D. Flange Bolts and Nuts 1. Stainless Steel Bolt and Xylan Coated Nut a. Meet requirements of AWWA C207 b. Bolts: ASTM A193, Grade B8, Class 1(AISI 304 Stainless Steel, carbide solution treated) c. Nuts and Washers: ASTM A194, Grade 8 Nuts with AISI 304 Stainless Steel Washers 1) Coat nut with Xylan in accordance with this Section. E. Threaded Rods 1. Meet requirements of AWWA C207 2. Rods: ASTM A193, Grade B8, Class 1(AISI 304 Stainless Steel, carbide solution treated) 3. Nuts and Washers: ASTM A194, Grade 8 Nuts with AISI 304 Stainless Steel Washers a. Coat nut with Xylan in accordance with this Section. F. Push-on Gaskets 1. Conforming to the physical and marking requirements specified in ANSI/AWWA C111/A21.11. 2. All gaskets shall meet or exceed the latest revisions NSF 61. 3. Rubber gaskets shall be made of vulcanized styrene butadiene rubber SBR, unless otherwise specified in Drawings. 4. Gaskets shall be free from porous areas, foreign material and other defects that make them unfit for intended use. 5. Gaskets shall be the size and shape required to provide an adequate compressive force against the plain end and socket after assembly to affect a positive seal under all combinations of joint and gasket tolerances. G. Mechanical Joint Gaskets 1. Conforming to the physical and marking requirements specified in ANSI/AWWA C111/A21.11. 2. All gaskets shall meet or exceed the latest revisions NSF 61. 3. Rubber gaskets shall be made of vulcanized styrene butadiene rubber SBR, unless otherwise specified in Drawings. 4. Gaskets shall be free from porous areas, foreign material and other defects that make them unfit for intended use. H. Flange Gaskets 1. Class E Flanges 33 11 05 - 5 BOLTS, NUTS, AND GASKETS Page 5 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a. Full face b. Manufactured true to shape from minimum 80 durometer SBR rubber stock of a thickness not less than 1/8 inch c. Virgin stock d. Conforming to the physical and test requirements specified in AWWA/ANSI C111/A21.11 e. All gaskets shall meet or exceed the latest revisions NSF 61. f. Finished gaskets shall have holes punched by the manufacturer and shall match the flange pattern in every respect. g. Frayed cut edges are not acceptable. h. Field cut sheet gaskets are not acceptable. I. Hydrocarbon Resistant Gaskets 1. Furnish Viton® (Fluorocarbon) Rubber, hydrocarbon resistant gaskets, when required. J. Flange Isolation Kits 1. Flanges which are required by the Drawings to be Isolation Flanges shall conform to Section 33 04 10. 2. For bolts used with isolation sleeves per Section 33 04 10, threading must extend to bolt head with no grip to ensure sleeves fit properly. K. Petrolatum Tape System 1. Petrolatum Tape Primer: Denso Paste, or approved equal 2. Molding and Filler mastic: Densyl Mastic, or approved equal 3. All Purpose Petrolatum Tape: Densyl Tape, or approved equal L. Xylan Coating a. Coat nuts and bolts with a ceramic-filled, baked on fluorocarbon resin, when required. b. Coated nuts and bolts shall be prepared “near white” or “white” when coated to the coating manufacturer’s recommended thickness by a certified applicator. c. Coating shall be of Xylan as manufactured by Whitford Corporation and applied by Whitford Corporation or Whitford Corporation Recommended Coater. d. Coating shall be free from holidays and defects. e. Coating thickness shall between 0.0007-inches and 0.0012-inches and shall be such that the nut turns freely on the bolt. f. Coating shall conform to the performance requirements of ASTM B117, “Salt Spray Test” and shall include, if required, a certificate of conformance. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 33 11 05 - 6 BOLTS, NUTS, AND GASKETS Page 6 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Mechanical Joints 1. Assemble mechanical joints in accordance with ANSI/AWWA C111/A21.11 Appendix A, AWWA C600 and AWWA Manual M41. 2. Use Standard Xylan Coated T-bolts and Nuts. a. Stainless Steel T-bolts with Xylan Coated Stainless Steel Nuts shall only be used when specifically required in the Drawings. B. Flanged Joints 1. Install in accordance with ASME PCC-1-2012. 2. Use Stainless Steel Bolts and Xylan Coated Nuts. 3. Wrap all buried steel flanges for AWWA C200, C301 or C303 pipe with Petrolatum Tape System. a. If only 1 flange in a joint is steel (AWWA C200, C301, or C303), petrolatum tape wrapping will be required. b. If a joint is made between two ductile iron flanges, the joint should be polyethylene encased in accordance with Section 33 11 10. 4. Flange bolts are normally spaced evenly around the flange. 5. During assembly, tighten nuts gradually and equally using a three-pass method in accordance with ASME PCC-1-2012. a. For the first pass, tighten the nuts to 50 percent at diametrically opposite sides to prevent misalignment and to ensure that all bolts carry equal loads. b. For the second pass, tighten the nuts to 100 percent again in a diametrically opposite pattern. c. Allow a minimum of 1 hour to pass to provide time for settlement between bolts and nuts and gasket relaxation. d. Complete the third pass by checking each bolt in a clockwise pattern. Each nut should be tightened until it will no longer turn. This step compensates for elastic interaction and brings all bolts into parity. 6. The threads of the bolts should protrude a minimum of ½-inch from the nuts. C. Flanged Joints with Isolation Kit 1. Flange Isolation Kits shall be installed in accordance with Section 33 04 10. 2. City will verify Isolation in accordance with Section 33 04 10. D. Threaded Rod 1. Install as part of joint harness assembly in accordance with AWWA Manual M11. 2. Space rods evenly around the pipe. 3. During assembly, tighten nuts gradually and equally using a three-pass method in accordance with ASME PCC-1-2012. a. For the first pass, tighten the nuts to 50 percent at diametrically opposite sides to prevent misalignment and to ensure that all bolts carry equal loads. b. For the second pass, tighten the nuts to 100 percent again in a diametrically opposite pattern. 4. The threads of the bolts should protrude a minimum of ½-inch from the nuts. 33 11 05 - 7 BOLTS, NUTS, AND GASKETS Page 7 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 5. Wrap joint harness assembly with Petrolatum Tape System. E. Petrolatum Tape System 1. Surfaces should be free from dirt, loose rust, scale or flaking coatings. a. Clean surfaces in accordance with SSPC SP2 or SSPC SP3. 1) High pressure wash of 3,000 to 7,000 psi is also suitable. b. Surfaces may be damp but shall not have droplets or continuous film of water. 2. Apply a uniform, thin coat of Petrolatum Tape Primer to the entire surface by stiff brush, gloved hand or rag at normal ambient temperatures. 3. By hand application, apply Molding and Filler Mastic to a rounded configuration to fill irregular shapes and reduce sharp-edged surfaces. 4. Spirally wrap All Purpose Petrolatum Tape with a minimum overlap of 1 inch. a. For severely corrosive environments, an overlap of 55 percent is recommended. b. Press air pockets out and smooth all lap seams. 5. For additional mechanical protection, overwrap may be applied to increase impact strength and electrical resistance. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 33 11 10 - 1 DUCTILE IRON PIPE Page 1 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 33 11 10 DUCTILE IRON PIPE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ductile Iron Pipe 3-inch through 64-inch for potable water, wastewater and reuse applications B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 33 01 31 – Closed Circuit Television (CCTV) Inspection 4. Section 33 04 10 – Joint Bonding and Electrical Isolation 5. Section 33 04 40 – Cleaning and Acceptance Testing of Water Mains 6. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 7. Section 33 05 24 – Installation of Carrier Pipe in Casing or Tunnel Liner Plate 8. Section 33 11 05 – Bolts, Nuts, and Gaskets 9. Section 33 11 11 – Ductile Iron Fittings 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Ductile Iron Pipe a. Measurement 1) Measured horizontally along the surface from center line to center line of the fitting, manhole, or appurtenance b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per linear foot for “DIP” installed for: a) Various sizes b) Various types of backfill c) Various linings d) Various Depths, for miscellaneous sewer projects only e) Various restraints f) Various uses c. The price bid shall include: 1) Furnishing and installing Ductile Iron Pipe with joints as specified by the Drawings 33 11 10 - 2 DUCTILE IRON PIPE Page 2 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 2) Mobilization 3) Polyethylene encasement 4) Lining 5) Pavement removal 6) Excavation 7) Hauling 8) Disposal of excess material 9) Furnishing, placement and compaction of embedment 10) Furnishing, placement and compaction of backfill 11) Trench water stops 12) Thrust restraint, if required in Contract Documents 13) Bolts and nuts 14) Gaskets 15) Clean-up 16) Cleaning 17) Disinfection 18) Testing 1.3 REFERENCES A. Definitions 1. Gland or Follower Gland a. Non-restrained, mechanical joint fitting 2. Retainer Gland a. Mechanically restrained mechanical joint fitting B. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. American Association of State Highway and Transportation Officials (AASHTO). 3. American Society of Mechanical Engineers (ASME): a. B16.1, Gray Iron Pipe Flanges and Flanged Fittings (Classes 25, 125 and 250). 4. ASTM International (ASTM): a. A193, Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications b. A194, Specification for Carbon and Alloy Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both c. A242, Standard Specification for High-Strength Low-Alloy Structural Steel. d. A307, Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength. e. A674, Standard Practice for Polyethylene Encasement for Ductile Iron Pipe for Water or Other Liquids. f. B117, Standard Practice for Operating Salt Spray (Fog) Apparatus. g. B633, Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel. 5. American Water Works Association (AWWA): 33 11 10 - 3 DUCTILE IRON PIPE Page 3 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a. C203, Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot Applied. b. C600, Installation of Ductile-Iron Water Mains and their Appurtenances. c. M41, Ductile-Iron Pipe and Fittings. 6. American Water Works Association/American National Standards Institute (AWWA/ANSI): a. C104/A21.4, Cement–Mortar Lining for Ductile-Iron Pipe and Fittings. b. C105/A21.5, Polyethylene Encasement for Ductile-Iron Pipe Systems. c. C111/A21.11, Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. d. C115/A21.15, Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded Flanges. e. C150/A21.50, Thickness Design of Ductile-Iron Pipe. f. C151/A21.51, Ductile-Iron Pipe, Centrifugally Cast, for Water. g. C600, Installation of Ductile-Iron Water Mains and their Appurtenances 7. NSF International (NSF): a. 61, Drinking Water System Components - Health Effects. 8. Society for Protective Coatings (SSPC): a. PA 2, Measurement of Dry Coating Thickness with Magnetic Gages. 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery and/or fabrication for specials. 1.6 ACTION SUBMITTALS / INFORMATIONAL SUBMITTALS A. Product Data 1. Interior lining a. If it is other than cement mortar lining in accordance with AWWA/ANSI C104/A21.4, including: 1) Material 2) Application recommendations 3) Field touch-up procedures 2. Thrust Restraint a. Retainer glands, thrust harnesses or any other means 3. Gaskets a. If hydrocarbon or other special gaskets are required B. Shop Drawings – Furnish for Ductile Iron Pipe used in the water distribution system or for a wastewater force main for 24-inch and greater diameters, including: 1. Wall thickness design calculations sealed by a Licensed Professional Engineer in Texas including: a. Working pressure b. Surge pressure c. Deflection 33 11 10 - 4 DUCTILE IRON PIPE Page 4 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 2. Provide thrust restraint calculations for all fittings and valves, sealed by a Licensed Professional Engineer in Texas, to verify the restraint lengths shown in the Drawings. 3. Lay schedule/drawing for 24-inch and greater diameters, sealed by a Licensed Professional Engineer in Texas including: a. Pipe class b. Joints type c. Fittings d. Stationing e. Transitions f. Joint deflection C. Certificates 1. Furnish an affidavit certifying that all Ductile Iron Pipe meets the provisions of this Section, each run of pipe furnished has met Specifications, all inspections have been made, and that all tests have been performed in accordance with AWWA/ANSI C151/A21.51. 2. Furnish a certificate stating that buried bolts and nuts conform to ASTM B117. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Manufacturers a. Finished pipe shall be the product of 1 manufacturer. 1) Change orders, specials, and field changes may be provided by a different manufacturer upon City approval. b. Pipe manufacturing operations (pipe, lining, and coatings) shall be performed under the control of the manufacturer. c. Ductile Iron Pipe 1) Manufactured in accordance with AWWA/ANSI C151/A21.51 a) Perform quality control tests and maintain results as outlined within standard to assure compliance. 2) Subject each pipe to a hydrostatic test of not less than 500 psi for duration of at least 10 seconds. B. Preconstruction Testing 1. The City may, at its own cost, subject random lengths of pipe for testing by an independent laboratory for compliance with this Specification. a. The compliance test shall be performed in the United States. b. Any visible defects or failure to meet the quality standards herein will be grounds for rejecting the entire order. 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Ductile Iron Pipe shall be stored and handled in accordance with the guidelines as stated in AWWA M41. 33 11 10 - 5 DUCTILE IRON PIPE Page 5 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 2. Secure and maintain a location to store the material in accordance with Section 01 66 00. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES AND MATERIALS A. Manufacturers 1. Only the manufacturers as listed in the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. B. Pipe 1. Pipe shall be in accordance with AWWA/ANSI C111/A21.11, AWWA/ANSI C150/A21.15, and AWWA/ANSI C151/A21.51. 2. All pipe shall meet the requirements of NSF 61. 3. Pipe shall have a lay length of 18 feet or 20 feet except for special fittings or closure pieces and necessary to comply with the Drawings. 4. As a minimum the following pressures classes apply. The Drawings may specify a higher pressure class or the pressure and deflection design criteria may also require a higher pressure class, but in no case should they be less than the following: Diameter (inches) Min Pressure Class (psi) 3 through 12 350 14 through 20 250 24 200 30 through 64 150 5. Pipe markings shall meet the minimum requirements of AWWA/ANSI C151/A21.51. Minimum pipe markings shall be as follows: a. “DI” or “Ductile” shall be clearly labeled on each pipe b. Weight, pressure class and nominal thickness of each pipe c. Year and country pipe was cast d. Manufacturer’s mark 6. Pressure and Deflection Design a. Pipe design shall be based on trench conditions and design pressure class specified in the Drawings. 33 11 10 - 6 DUCTILE IRON PIPE Page 6 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 b. Pipe shall be designed according to the methods indicated in AWWA/ANSI C150/A21.50, AWWA/ANSI C151/A21.51, and AWWA M41 for trench construction, using the following parameters: 1) Unit Weight of Fill (w) = 130 pcf 2) Live Load = AASHTO HS 20 3) Trench Depth = 12 feet minimum, or as indicated in Drawings 4) Bedding Conditions = Type 4 5) Working Pressure (Pw) = 150 psi 6) Surge Allowance (Ps) = 100 psi 7) Design Internal Pressure (Pi) = Pw + Ps or 2:1 safety factor of the actual working pressure plus the actual surge pressure, whichever is greater. a) Test Pressure = (1) No less than 1.25 minimum times the stated working pressure (187 psi minimum) of the pipeline measured at the highest elevation along the test section. (2) No less than 1.5 times the stated working pressure (225 psi minimum) at the lowest elevation of the test section. 8) Maximum Calculated Deflection (Dx) = 3 percent 9) Restrained Joint Safety Factor (Sf) = 15 percent c. Trench depths shall be verified after existing utilities are located. 1) Vertical alignment changes required because of existing utility or other conflicts shall be accommodated by an appropriate change in pipe design depth. 2) In no case shall pipe be installed deeper than its design allows. 7. Provisions for Thrust a. Thrust at bends, tees, plugs or other fittings shall be mechanically restrained joints when required by the Drawings. b. Thrust at bends adjacent to casing pipe shall be restrained by mechanical means through casing and for a sufficient distance each side of casing. c. No thrust restraint contribution shall be allowed for the restrained length of pipe within the casing. d. Restrained joints, when required, shall be used for a sufficient distance from each side of the bend, tee, plug, valve or other fitting to resist thrust which will be developed at the design pressure of the pipe. For the purpose of thrust, the following shall apply: 1) Valves shall be calculated as dead ends. 2) Design pressure shall be greater than the working pressure of the pipe or the internal pressure (Pi) whichever is greater. 3) Restrained joints shall consist of approved mechanical restrained or push- on restrained joints as listed in the City’s Standard Products List as shown in Section 01 60 00. e. The Pipe Manufacturer shall verify the length of pipe with restrained joints to resist thrust in accordance with the Drawings, AWWA M41, and the following: 1) The weight of earth (We) shall be calculated as the weight of the projected soil prism above the pipe, for unsaturated soil conditions. 2) Soil density = 130 pcf (maximum value to be used), for unsaturated soil conditions 3) If indicated on the Drawings and the Geotechnical Borings that ground water is expected, account for reduced soil density. 33 11 10 - 7 DUCTILE IRON PIPE Page 7 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 8. Joints a. General – Comply with AWWA/ANSI C111/A21.11. b. Push-On Joints c. Mechanical Joints d. Push-On Restrained Joints 1) Restraining Push-on joints by means of a special gasket a) Only those products that are listed in Section 01 60 00 b) The working pressure rating of the restrained gasket must exceed the test pressure of the pipe line to be installed. c) Approved for use of restraining Ductile Iron Pipe in casing with a carrier pipe of 4-inches to 12-inches d) Otherwise only approved if specially listed on the Drawings 2) Push-on Restrained Joint bell and spigot a) Only those products list in the standard products list will be allowed for the size listed in the standard products list per Section 01 60 00. b) Pressure rating shall exceed the working and test pressure of the pipe line. e. Flanged Joints – AWWA/ANSI C115/A21.15, ASME B16.1, Class 125 f. Flange bolt circles and bolt holes shall match those of ASME B16.1, Class 125. g. Field fabricated flanges are prohibited. 9. Gaskets a. Provide Gaskets in accordance with Section 33 11 05. 10. Isolation Flanges a. Flanges required by the drawings to be Isolation Flanges shall conform to Section 33 04 10. 11. Bolts and Nuts a. Mechanical Joints 1) Provide bolts and nuts in accordance with Section 33 11 05. b. Flanged Ends 1) Meet requirements of AWWA C115. a) Provide bolts and nuts in accordance with Section 33 11 05. 12. Flange Coatings a. Connections to Steel Flanges 1) Buried connections with Steel Flanges shall be coated with a Petrolatum Tape System in accordance with Section 33 11 05. 13. Ductile Iron Pipe Exterior Coatings a. All ductile iron shall have an asphaltic coating, minimum of 1 mil thick, on the pipe exterior, unless otherwise specified in the Contract Documents. 14. Polyethylene Encasement a. All buried Ductile Iron Pipe shall be polyethylene encased. b. Only manufacturers listed in the City’s Standard Products List as shown in Section 01 60 00 will be considered acceptable. c. Use only virgin polyethylene material. d. Encasement for buried pipe shall be 8 mil linear low density (LLD) polyethylene conforming to AWWA/ANSI C105/A21.5 or 4 mil high density cross-laminated (HDCL) polyethylene encasement conforming to AWWA/ANSI C105/A21.5 and ASTM A674. 33 11 10 - 8 DUCTILE IRON PIPE Page 8 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 e. Marking: At a minimum of every 2 feet along its length, the mark the polyethylene film with the following information: 1) Manufacturer’s name or trademark 2) Year of manufacturer 3) AWWA/ANSI C105/A21.5 4) Minimum film thickness and material type 5) Applicable range of nominal diameter sizes 6) Warning – Corrosion Protection – Repair Any Damage f. Special Markings/Colors 1) Reclaimed Water, perform one of the following: a) Label polyethylene encasement with “RECLAIMED WATER”, b) Provide purple polyethylene in accordance with the American Public Works Association Uniform Color Code; or c) Attach purple reclaimed water marker tape to the polyethylene wrap. 2) Wastewater, perform one of the following: a) Label polyethylene encasement with “WASTEWATER”; b) Provide green polyethylene in accordance with the American Public Works Association Uniform Color Code; or c) Attach green sanitary sewer marker tape to the polyethylene wrap. g. Minimum widths Polyethylene Tube and Sheet Sizes for Push-On Joint Pipe Nominal Pipe Diameter (inches) Min. Width – Flat Tube (inches) Min. Width – Sheet (inches) 3 14 28 4 14 28 6 16 32 8 20 40 10 24 48 12 27 54 14 30 60 16 34 68 18 37 74 20 41 82 24 54 108 30 67 134 36 81 162 42 81 162 48 95 190 54 108 216 60 108 216 64 121 242 15. Ductile Iron Pipe Interior Lining a. Cement Mortar Lining 33 11 10 - 9 DUCTILE IRON PIPE Page 9 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1) Ductile Iron Pipe for potable water shall have a cement mortar lining in accordance with AWWA/ANSI C104/A21.04 and be acceptable according to NSF 61. b. Ceramic Epoxy or Epoxy Linings 1) Ductile Iron Pipe for use in wastewater applications shall be lined with a Ceramic Epoxy or Epoxy lining as designated in the City’s Standard Products List as shown in Section 01 60 00. 2) Apply lining at a minimum of 40 mils DFT. 3) Due to the tolerances involved, the gasket area and spigot end up to 6 inches back from the end of the spigot end must be coated with 6 mils nominal, 10 mils maximum using a Joint Compound as supplied by the manufacturer. a) Apply the joint compound by brush to ensure coverage. b) Care should be taken that the joint compound is smooth without excess buildup in the gasket seat or on the spigot ends. c) Coat the gasket seat and spigot ends after the application of the lining. 4) Surface preparation shall be in accordance with the manufacturer’s recommendations. 5) Check thickness using a magnetic film thickness gauge in accordance with the method outlined in SSPC PA 2. 6) Test the interior lining of all pipe barrels for pinholes with a non- destructive 2,500 volt test. a) Repair any defects prior to shipment. 7) Mark each fitting with the date of application of the lining system along with its numerical sequence of application on that date and records maintained by the applicator of his work. 8) For all Ductile Iron Pipe in wastewater service where the pipe has been cut, coat the exposed surface with the touch-up material as recommended by the manufacturer. a) The touch-up material and the lining shall be of the same manufacturer. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Install pipe, fittings, specials and appurtenances as specified herein, as specified in AWWA C600, AWWA M41 and in accordance with the pipe manufacturer’s recommendations. 2. See Section 33 11 11 for installation requirements for Ductile Iron Fittings. 33 11 10 - 10 DUCTILE IRON PIPE Page 10 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3. Lay pipe to the lines and grades as indicated in the Drawings. 4. Excavate and backfill trenches in accordance with Section 33 05 10. 5. Embed Ductile Iron Pipe in accordance with Section 33 05 10. 6. For installation of carrier pipe within casing, see Section 33 05 24. B. Pipe Handling 1. Haul and distribute pipe and fittings at the project site. 2. Handle piping with care to avoid damage. a. Inspect each joint of pipe and reject or repair any damaged pipe prior to lowering into the trench. b. Do not handle the pipe in such a way that will damage the interior lining. c. Use only nylon ropes, slings or other lifting devices that will not damage the surface of the pipe for handling the pipe. 3. At the close of each operating day: a. Keep the pipe clean and free of debris, dirt, animals and trash – during and after the laying operation. b. Effectively seal the open end of the pipe using a gasketed night cap. C. Joint Making 1. Mechanical Joints a. Bolt the follower ring into compression against the gasket with the bolts tightened down evenly then cross torqued in accordance with AWWA C600. b. Overstressing of bolts to compensate for poor installation practice will not be permitted. 2. Push-on Joints a. Install Push-on joints as defined in AWWA/ANSI C111/A21.11. b. Wipe clean the gasket seat inside the bell of all extraneous matter. c. Place the gasket in the bell in the position prescribed by the manufacturer. d. Apply a thin film of non-toxic vegetable soap lubricant to the inside of the gasket and the outside of the spigot prior to entering the spigot into the bell. e. When using a field cut plain end piece of pipe, refinish the field cut and scarf to conform to AWWA C600. 3. Flanged Joints a. Use erection bolts and drift pins to make flanged connections. 1) Do not use undue force or restraint on the ends of the fittings. 2) Apply even and uniform pressure to the gasket. b. The fitting must be free to move in any direction while bolting. 1) Install flange bolts with all bolt heads faced in one direction. 4. Joint Deflection a. Deflect the pipe only when necessary to avoid obstructions or to meet the lines and grades and shown in the Drawings. b. The deflection of each joint must be in accordance with AWWA C600 Table 3. c. The maximum deflection allowed is 50 percent of that indicated in AWWA C600. d. The manufacturer’s recommendation may be used with the approval of the Engineer. D. Polyethylene Encasement Installation 33 11 10 - 11 DUCTILE IRON PIPE Page 11 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1. Preparation a. Remove all lumps of clay, mud, cinders, etc., on pipe surface prior to installation of polyethylene encasement. 1) Prevent soil or embedment material from becoming trapped between pipe and polyethylene. b. Fit polyethylene film to contour of pipe to affect a snug, but not tight encase with minimum space between polyethylene and pipe. 1) Provide sufficient slack in contouring to prevent stretching polyethylene where it bridges irregular surfaces such as bell-spigot interfaces, bolted joints or fittings and to prevent damage to polyethylene due to backfilling operations. 2) Secure overlaps and ends with adhesive tape and hold. c. For installations below water table and/or in areas subject to tidal actions, seal both ends of polyethylene tube with adhesive tape at joint overlap. 2. Tubular Type (Method A) a. Cut polyethylene tube to length approximately 2 feet longer than pipe section. b. Slip tube around pipe, centering it to provide 1-foot overlap on each adjacent pipe section and bunching it accordion-fashion lengthwise until it clears pipe ends. c. Lower pipe into trench and make up pipe joint with preceding section of pipe. d. Make shallow bell hole at joints to facilitate installation of polyethylene tube. e. After assembling pipe joint, make overlap of polyethylene tube, pull bunched polyethylene from preceding length of pipe, slip it over end of the new length of pipe and wrap until it overlaps joint at end of preceding length of pipe. f. Secure overlap in place. g. Take up slack width at top of pipe to make a snug, but not tight, fit along barrel of pipe, securing fold at quarter points. h. Repair cuts, tears, punctures or other damage to polyethylene. i. Proceed with installation of next pipe in same manner. 3. Tubular Type (Method B) a. Cut polyethylene tube to length approximately 1 foot shorter than pipe section. b. Slip tube around pipe, centering it to provide 6 inches of bare pipe at each end. c. Take up slack width at top of pipe to make a snug, but not tight, fit along barrel of pipe, securing fold at quarter points; secure ends. d. Before making up joint, slip 3-foot length of polyethylene tube over end of proceeding pipe section, bunching it accordion-fashion lengthwise. e. After completing joint, pull 3-foot length of polyethylene over joint, overlapping polyethylene previously installed on each adjacent section of pipe by at least 1 foot; make each end snug and secure. 4. Sheet Type a. Cut polyethylene sheet to a length approximately 2 feet longer than piece section. b. Center length to provide 1-foot overlap on each adjacent pipe section, bunching it until it clears the pipe ends. c. Wrap polyethylene around pipe so that it circumferentially overlaps top quadrant of pipe. d. Secure cut edge of polyethylene sheet at intervals of approximately 3 feet. 33 11 10 - 12 DUCTILE IRON PIPE Page 12 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 e. Lower wrapped pipe into trench and make up pipe joint with preceding section of pipe. f. Make shallow bell hole at joints to facilitate installation of polyethylene. g. After completing joint, make overlap and secure ends. h. Repair cuts, tears, punctures or other damage to polyethylene. i. Proceed with installation of next section of pipe in same manner. 5. Pipe-Shaped Appurtenances a. Cover bends, reducers, offsets and other pipe-shaped appurtenances with polyethylene in same manner as pipe and fittings. 6. Odd-Shaped Appurtenances a. When it is not practical to wrap valves, tees, crosses, and other odd-shaped pieces in tube, wrap with flat sheet or split length polyethylene tube by passing sheet under appurtenances and bringing it up around body. b. Make seams by bringing edges together, folding over twice and taping down. c. Tape polyethylene securely in place at the valve stem and at any other penetrations. 7. Repairs a. Repair any cuts, tears, punctures or damage to polyethylene with adhesive tape or with short length of polyethylene sheet or cut open tube, wrapped around fitting to cover damaged area and secured in place. 8. Openings in Encasement a. Provide openings for branches, service taps, blow-offs, air valves and similar appurtenances by making an X-shaped cut in polyethylene and temporarily folding back film. b. After appurtenance is installed, tape slack securely to appurtenance and repair cut, as well as other damaged area in polyethylene with tape. c. Service taps may also be made directly through polyethylene, with any resulting damaged areas being repaired as described above. 9. Junctions between Wrapped and Unwrapped Pipe: a. Where polyethylene-wrapped pipe joins an adjacent pipe that is not wrapped, extend polyethylene wrap to cover adjacent pipe for distance of at least 3 feet. b. Secure end with circumferential turns of tape. c. Wrap service lines of dissimilar metals with polyethylene or suitable dielectric tape for minimum clear distance of 3 feet away from Cast or Ductile Iron Pipe. 3.5 REPAIR/RESTORATION A. Patching 1. Excessive field-patching is not permitted of lining or coating. 2. Patching of lining or coating will be allowed where area to be repaired does not exceed 100 square inches and has no dimensions greater than 12 inches. 3. In general, there shall not be more than 1 patch on either the lining or the coating of any 1 joint of pipe. 4. Wherever necessary to patch the pipe: a. Make patch with cement mortar as previously specified for interior joints. b. Do not install patched pipe until the patch has been properly and adequately cured and approved for laying by the City. 33 11 10 - 13 DUCTILE IRON PIPE Page 13 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 5. Promptly remove rejected pipe from the site. 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Potable Water Mains 1. Cleaning, disinfection, hydrostatic testing and bacteriological testing of water mains a. Clean, flush, pig, disinfect, hydrostatic test and bacteriological test the water main as specified in Section 33 04 40. B. Wastewater Lines 1. Closed Circuit Television (CCTV) Inspection a. Provide a Post-CCTV Inspection in accordance with Section 33 01 31. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.2.A.1.b. – Updated Payment types 1.3 – Added definitions of gland types for clarity 2.2.B.9, 10, 11 and 12 – Added reference to Section 33 11 05 and removed material specification for bolts, nuts and gaskets 33 11 11 - 1 DUCTILE IRON FITTINGS Page 1 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 33 11 11 DUCTILE IRON FITTINGS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ductile Iron Fittings 3-inch through 64-inch for potable water, wastewater, and other liquids for use with Ductile Iron Pipe and Polyvinyl Chloride (PVC) Pipe 2. All mechanical joint fittings shall be mechanically restrained using restrained wedge type retainer glands. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 03 30 00 – Cast-in-Place Concrete 4. Section 33 04 10 – Joint Bonding and Electrical Isolation 5. Section 33 04 40 – Cleaning and Acceptance Testing of Water Mains 6. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 7. Section 33 11 05 – Bolts, Nuts, and Gaskets 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Ductile Iron Water Fittings with Restraint a. Measurement 1) Shall be per ton of fittings supplied 2) Fittings weights are the sum of the various types of fittings multiplied by the weight per fitting as listed in AWWA/ANSI C153/A21.53. 3) The fitting weights listed in AWWA/ANSI C110/A21.10 are only allowed for specials where an AWWA/ANSI C153/A21.53 is not available, or if the Drawings specifically call for an AWWA/ANSI C110/A21.10 fittings. 4) If the Contractor chooses to supply AWWA/ANSI C110/A21.10 (full body) Ductile Iron Fittings in lieu of AWWA/ANSI C153/A21.53 (compact) Ductile Iron Fittings at his convenience, then the weight shall be measured in accordance with AWWA/ANSI C153/A21.53. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per ton of “Ductile Iron Water Fittings with Restraint”. c. The price bid shall include: 1) Furnishing and installing Ductile Iron Water Fittings as specified by the Drawings 33 11 11 - 2 DUCTILE IRON FITTINGS Page 2 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 2) Polyethylene encasement 3) Lining 4) Pavement removal 5) Excavation 6) Hauling 7) Disposal of excess material 8) Furnishing and installing bolts, nuts, and restraints 9) Furnishing, placement and compaction of embedment 10) Furnishing, placement and compaction of backfill 11) Trench water stops 12) Clean-up 13) Cleaning 14) Disinfection 15) Testing 2. Ductile Iron Sewer Fittings a. Measurement 1) Shall be per ton of fittings supplied 2) Fittings weights are the sum of the various types of fittings multiplied by the weight per fitting as listed in AWWA/ANSI C153/A21.53. 3) The fitting weights listed in AWWA/ANSI C110/A21.10 are only allowed for specials where an AWWA/ANSI C153/A21.53 is not available, or if the Drawings specifically call for an AWWA/ANSI C110/A21.10 fittings. 4) If the Contractor chooses to supply AWWA/ANSI C110/A21.10 (full body) Ductile Iron Fittings in lieu of AWWA/ANSI C153/A21.53 (compact) Ductile Iron Fittings at his convenience, then the weight shall be measured in accordance with AWWA/ANSI C153/A21.53. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per ton of “Ductile Iron Sewer Fittings”. c. The price bid shall include: 1) Furnishing and installing Ductile Iron Water Fittings as specified by the Drawings 2) Epoxy Coating 3) Polyethylene encasement 4) Lining 5) Pavement removal 6) Excavation 7) Hauling 8) Disposal of excess material 9) Furnishing and installing bolts, nuts, and restraints 10) Furnishing, placement and compaction of embedment 11) Furnishing, placement and compaction of backfill 12) Clean-up 13) Cleaning 14) Disinfection 15) Testing 33 11 11 - 3 DUCTILE IRON FITTINGS Page 3 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1.3 REFERENCES A. Definitions 1. Gland or Follower Gland a. Non-restrained, mechanical joint fitting 2. Retainer Gland a. Mechanically restrained mechanical joint fitting, consisting of multiple gripping wedges incorporated into a follower gland meeting the applicable requirements of ANSI/AWWA C110/A21.10. B. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. American Society of Mechanical Engineers (ASME): a. B16.1, Gray Iron Pipe Flanges and Flanged Fittings (Classes 25, 125 and 250). 3. ASTM International (ASTM): a. A193, Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications b. A194, Specification for Carbon and Alloy Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both c. A242, Standard Specification for High-Strength Low-Alloy Structural Steel. d. A674, Standard Practice for Polyethylene Encasement for Ductile Iron Pipe for Water or Other Liquids. e. B117, Standard Practice for Operating Salt Spray (Fog) Apparatus. 4. American Water Works Association (AWWA): a. C203, Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot Applied. b. C600, Installation of Ductile-Iron Water Mains and their Appurtenances. c. M41, Ductile-Iron Pipe and Fittings. 5. American Water Works Association/American National Standards Institute (AWWA/ANSI): a. C104/A21.4, Cement–Mortar Lining for Ductile-Iron Pipe and Fittings. b. C105/A21.5, Polyethylene Encasement for Ductile-Iron Pipe Systems. c. C110/A21.10, Ductile-Iron and Gray-Iron Fittings. d. C111/A21.11, Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. e. C115/A21.15, Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded Flanges. f. C151/A21.51, Ductile-Iron Pipe, Centrifugally Cast, for Water. g. C153/A21.53, Ductile-Iron Compact Fittings for Water Service. 6. NSF International (NSF): a. 61, Drinking Water System Components - Health Effects. 7. Society for Protective Coatings (SSPC): a. PA 2, Measurement of Dry Coating Thickness with Magnetic Gages. 33 11 11 - 4 DUCTILE IRON FITTINGS Page 4 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery and/or fabrication for specials. 1.6 ACTION SUBMITTALS / INFORMATIONAL SUBMITTALS A. Product Data 1. Ductile Iron Fittings a. Pressure class b. Interior lining c. Joint types 2. Polyethylene encasement and tape a. Planned method of installation b. Whether the film is linear low density or high density cross linked polyethylene c. The thickness of the film provided 3. The interior lining, if it is other than cement mortar lining in accordance with AWWA/ANSI C104/A21.4 a. Material b. Application recommendations c. Field touch-up procedures 4. Thrust Restraint a. Retainer glands b. Thrust harnesses c. Any other means 5. Gaskets a. Provide Gaskets in accordance with Section 33 11 05. 6. Isolation Flanges a. Flanges required by the drawings to be Isolation Flanges shall conform to Section 33 04 10. 7. Bolts and Nuts a. Mechanical Joints 1) Provide bolts and nuts in accordance with Section 33 11 05. b. Flanged Ends 1) Meet requirements of AWWA C115. a) Provide bolts and nuts in accordance with Section 33 11 05. 8. Flange Coatings a. Connections to Steel Flanges 1) Buried connections with Steel Flanges shall be coated with a Petrolatum Tape System in accordance with Section 33 11 05. B. Certificates 1. The manufacturer shall furnish an affidavit certifying that all Ductile Iron Fittings meet the provisions of this Section and meet the requirements of AWWA/ANSI C110/A21.10 or AWWA/ANSI C153/A21.53. 2. Furnish a certificate stating that buried bolts and nuts conform to ASTM B117. 33 11 11 - 5 DUCTILE IRON FITTINGS Page 5 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Manufacturers a. Fittings manufacturing operations (fittings, lining, and coatings) shall be performed under the control of the manufacturer. b. Ductile Iron Fittings shall be manufactured in accordance with AWWA/ANSI C110/A21.10 or AWWA/ANSI C153/A21.53. 1) Perform quality control tests and maintain the results as outlined in these standards to assure compliance. B. Preconstruction Testing 1. The City may, at its own cost, subject random fittings for destructive testing by an independent laboratory for compliance with this Specification. a. The compliance test shall be performed in the United States. b. Any visible defects or failure to meet the quality standards herein will be grounds for rejecting the entire order. 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store and handle in accordance with the guidelines as stated in AWWA M41. 2. Secure and maintain a location to store the material in accordance with Section 01 66 00. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES AND MATERIALS A. Manufacturers 1. Only the manufacturers as listed on the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. B. Ductile Iron Fittings 1. Ductile Iron Fittings shall be in accordance with AWWA/ANSI C110/A21.10, AWWA/ANSI C153/A21.53. 2. All fittings for potable water service shall meet the requirements of NSF 61. 3. Ductile Iron Fittings, at a minimum, shall meet or exceed the pressures classes of the pipe which the fitting is connected, unless specifically indicated in the Drawings. 33 11 11 - 6 DUCTILE IRON FITTINGS Page 6 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 4. Fittings Markings a. Meet the minimum requirements of AWWA/ANSI C151/A21.51. b. Minimum markings shall include: 1) “DI” or “Ductile” cast or metal stamped on each fitting 2) Applicable AWWA/ANSI standard for that the fitting 3) Pressure rating 4) Number of degrees for all bends 5) Nominal diameter of the openings 6) Year and country fitting was cast 7) Manufacturer’s mark 5. Joints a. Mechanical Joints with mechanical restraint 1) Comply with AWWA/ANSI C111/A21.11 and applicable parts of ANSI/AWWA C110/A21.10. 2) The retainer gland shall have the following working pressure ratings based on size and type of pipe: a) Ductile Iron Pipe (1) 3-inch – 16-inch, 350 psi (2) 18-inch – 48-inch, 250 psi b) PVC C900 and C905 (1) 3-inch – 12-inch, 305psi (2) 14-inch – 16-inch, 235psi (3) 18-inch – 20-inch, 200psi (4) 24-inch – 30 –inch 165psi c) Ratings are for water pressure and must include a minimum safety factor of 2 to 1 in all sizes 3) Retainer glands shall have specific designs for Ductile Iron and PVC and it should be easy to differentiate between the 2. 4) Gland body, wedges and wedge actuating components shall be cast from grade 65-45-12 ductile iron material in accordance with ASTM A536. 5) Mechanical joint restraint shall require conventional tools and installation procedures per AWWA C600, while retaining full mechanical joint deflection during assembly as well as allowing joint deflection after assembly. 6) Proper actuation of the gripping wedges shall be ensured with torque limiting twist off nuts. 7) A minimum of 6 wedges shall be required for 8 inch diameter PVC pipe. b. Push-On, Restrained Joints 1) Restraining Push-on joints by means of a special gasket a) Only those products that are listed in 01 60 00 b) The working pressure rating of the restrained gasket must exceed the test pressure of the pipe line to be installed. c) Approved for use of restraining Ductile Iron Pipe in casing with a carrier pipe of 4-inches to 12-inches d) Otherwise only approved if specially listed on the drawings 2) Push-on Restrained Joint bell and spigot a) Only those products list in the standard products list will be allowed for the size listed in the standard products list per Section 01 60 00 33 11 11 - 7 DUCTILE IRON FITTINGS Page 7 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 b) Pressure rating shall exceed the working and test pressure of the pipe line c. Flanged Joints 1) AWWA/ANSI C115/A21.15, ASME B16.1, Class 125 2) Flange bolt circles and bolt holes shall match those of ASME B16.1, Class 125. 3) Field fabricated flanges are prohibited. 6. Gaskets a. Provide Gaskets in accordance with Section 33 11 05. 7. Isolation Flanges a. Flanges required by the drawings to be Isolation Flanges shall conform to Section 33 04 10. 8. Bolts and Nuts a. Mechanical Joints 1) Provide bolts and nuts in accordance with Section 33 11 05. b. Flanged Ends 1) Meet requirements of AWWA C115. a) Provide bolts and nuts in accordance with Section 33 11 05. 9. Flange Coatings a. Connections to Steel Flanges 1) Buried connections with Steel Flanges shall be coated with a Petrolatum Tape System in accordance with Section 33 11 05. 10. Ductile Iron Fitting Exterior Coatings a. All Ductile Iron Fittings shall have an asphaltic coating, minimum of 1 mil thick, on the exterior, unless otherwise specified in the Contract Documents. 11. Polyethylene Encasement a. All buried Ductile Iron Fittings shall be polyethylene encased. b. Only manufacturers listed in the City’s Standard Products List as shown in Section 01 60 00 will be considered acceptable. c. Use only virgin polyethylene material. d. Encasement for buried fittings shall be 8 mil linear low density (LLD) polyethylene conforming to AWWA/ANSI C105/A21.5 or 4 mil high density cross-laminated (HDCL) polyethylene encasement conforming to conforming to AWWA/ANSI C105/A21.5 and ASTM A674. e. Marking: At a minimum of every 2 feet along its length, the mark the polyethylene film with the following information: 1) Manufacturer’s name or trademark 2) Year of manufacturer 3) AWWA/ANSI C105/A21.5 4) Minimum film thickness and material type 5) Applicable range of nominal diameter sizes 6) Warning – Corrosion Protection – Repair Any Damage f. Special Markings/Colors 1) Reclaimed Water, perform one of the following: a) Label polyethylene encasement with “RECLAIMED WATER”, b) Provide purple polyethylene in accordance with the American Public Works Association Uniform Color Code; or 33 11 11 - 8 DUCTILE IRON FITTINGS Page 8 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 c) Attach purple reclaimed water marker tape to the polyethylene wrap. 2) Wastewater, perform one of the following: a) Label polyethylene encasement with “WASTEWATER”; b) Provide green polyethylene in accordance with the American Public Works Association Uniform Color Code; or c) Attach green sanitary sewer marker tape to the polyethylene wrap. g. Minimum widths Polyethylene Tube and Sheet Sizes for Push-On Joint Fittings Nominal Fittings Diameter (inches) Min. Width – Flat Tube (inches) Min. Width – Sheet (inches) 3 14 28 4 14 28 6 16 32 8 20 40 10 24 48 12 27 54 14 30 60 16 34 68 18 37 74 20 41 82 24 54 108 30 67 134 36 81 162 42 81 162 48 95 190 54 108 216 60 108 216 64 121 242 12. Ductile Iron Fittings Interior Lining a. Cement Mortar Lining 1) Ductile Iron Fittings for potable water shall have a cement mortar lining in accordance with AWWA/ANSI C104/A21.4 and be acceptable according to NSF 61. b. Ceramic Epoxy or Epoxy Linings 1) Ductile Iron Fittings for use in wastewater applications shall be lined with a Ceramic Epoxy or Epoxy lining as designated in the Standard Products List as shown in Section 01 60 00. 2) Apply lining at a minimum of 40 mils DFT 3) Due to the tolerances involved, the gasket area and spigot end up to 6 inches back from the end of the spigot end must be coated with 6 mils nominal, 10 mils maximum using a Joint Compound as supplied by the manufacturer. a) Apply the joint compound by brush to ensure coverage. 33 11 11 - 9 DUCTILE IRON FITTINGS Page 9 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 b) Care should be taken that the joint compound is smooth without excess buildup in the gasket seat or on the spigot ends. c) Coat the gasket seat and spigot ends after the application of the lining. 4) Surface preparation shall be in accordance with the manufacturer’s recommendations. 5) Check thickness using a magnetic film thickness gauge in accordance with the method outlined in SSPC PA 2. 6) Test the interior lining of all fittings for pinholes with a non-destructive 2,500 volt test. a) Repair any defects prior to shipment. 7) Mark each fitting with the date of application of the lining system along with its numerical sequence of application on that date and records maintained by the applicator of his work. 8) For all Ductile Iron Fittings in wastewater service where the fitting has been cut, coat the exposed surface with the touch-up material as recommended by the manufacturer. a) The touch-up material and the lining shall be of the same manufacturer. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Install fittings, specials and appurtenances as specified herein, as specified in AWWA C600, AWWA M41, and in accordance with the fittings manufacturer’s recommendations. 2. Lay fittings to the lines and grades as indicated in the Drawings. 3. Excavate and backfill trenches in accordance with 33 05 10. 4. Embed Ductile Iron Fittings in accordance with 33 05 10. B. Joint Making 1. Mechanical Joints with required mechanical restraint a. All mechanical joints require mechanical restraint. b. Bolt the retainer gland into compression against the gasket, with the bolts tightened down evenly then cross torqued in accordance with AWWA C600. c. Overstressing of bolts to compensate for poor installation practice will not be permitted. 2. Push-on Joints (restrained) a. All push-on joints shall be restrained push-on type. b. Install Push-on joints as defined in AWWA/ANSI C111/A21.11. c. Wipe clean the gasket seat inside the bell of all extraneous matter. 33 11 11 - 10 DUCTILE IRON FITTINGS Page 10 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 d. Place the gasket in the bell in the position prescribed by the manufacturer. e. Apply a thin film of non-toxic vegetable soap lubricant to the inside of the gasket and the outside of the spigot prior to entering the spigot into the bell. f. When using a field cut plain end piece of pipe, refinished the field cut and scarf to conform to AWWA M-41. 3. Flanged Joints a. Use erection bolts and drift pins to make flanged connections. 1) Do not use undue force or restraint on the ends of the fittings. 2) Apply even and uniform pressure to the gasket. b. The fitting must be free to move in any direction while bolting. 1) Install flange bolts with all bolt heads faced in 1 direction. 4. Joint Deflection a. Deflect the pipe only when necessary to avoid obstructions or to meet the lines and grades and shown in the Drawings. b. The deflection of each joint must be in accordance with AWWA C600 Table 3. c. The maximum deflection allowed is 50 percent of that indicated in AWWA C600. d. The manufacturer’s recommendation may be used with the approval of the Engineer. C. Polyethylene Encasement Installation 1. Preparation a. Remove all lumps of clay, mud, cinders, etc., on fittings surface prior to installation of polyethylene encasement. 1) Prevent soil or embedment material from becoming trapped between fittings and polyethylene. b. Fit polyethylene film to contour of fittings to affect a snug, but not tight encase with minimum space between polyethylene and fittings. 1) Provide sufficient slack in contouring to prevent stretching polyethylene where it bridges irregular surfaces such as bell-spigot interfaces, bolted joints or fittings, and to prevent damage to polyethylene due to backfilling operations. 2) Secure overlaps and ends with adhesive tape and hold. c. For installations below water table and/or in areas subject to tidal actions, seal both ends of polyethylene tube with adhesive tape at joint overlap. 2. Tubular Type (Method A) a. Cut polyethylene tube to length approximately 2 feet longer than fittings section. b. Slip tube around fittings, centering it to provide 1 foot overlap on each adjacent pipe section and bunching it accordion-fashion lengthwise until it clears fittings ends. c. Lower fittings into trench with preceding section of pipe. d. Make shallow bell hole at joints to facilitate installation of polyethylene tube. e. After assembling fittings make overlap of polyethylene tube, pull bunched polyethylene from preceding length of pipe, slip it over end of the fitting and wrap until it overlaps joint at end of preceding length of pipe. f. Secure overlap in place. 33 11 11 - 11 DUCTILE IRON FITTINGS Page 11 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 g. Take up slack width at top of fitting to make a snug, but not tight, fit along barrel of fitting, securing fold at quarter points. h. Repair cuts, tears, punctures or other damage to polyethylene. i. Proceed with installation of next fitting in same manner. 3. Tubular Type (Method B) a. Cut polyethylene tube to length approximately 1 foot shorter than fitting section. b. Slip tube around fitting, centering it to provide 6 inches of bare fitting at each end. c. Take up slack width at top of fitting to make a snug, but not tight, fit along barrel of fitting, securing fold at quarter points; secure ends. d. Before making up joint, slip 3-foot length of polyethylene tube over end of proceeding pipe section, bunching it accordion-fashion lengthwise. e. After completing joint, pull 3-foot length of polyethylene over joint, overlapping polyethylene previously installed on each adjacent section of pipe by at least 1 foot; make each end snug and secure. 4. Sheet Type a. Cut polyethylene sheet to a length approximately 2 feet longer than piece section. b. Center length to provide 1-foot overlap on each fitting, bunching it until it clears the fitting ends. c. Wrap polyethylene around fitting so that it circumferentially overlaps top quadrant of fitting. d. Secure cut edge of polyethylene sheet at intervals of approximately 3 feet. e. Lower wrapped fitting into trench with preceding section of pipe. f. Make shallow bell hole at joints to facilitate installation of polyethylene. g. After completing joint, make overlap and secure ends. h. Repair cuts, tears, punctures or other damage to polyethylene. i. Proceed with installation of fittings in same manner. 5. Pipe-Shaped Appurtenances a. Cover bends, reducers, offsets, and other pipe-shaped appurtenances with polyethylene in same manner as pipe and fittings. 6. Odd-Shaped Appurtenances a. When it is not practical to wrap valves, tees, crosses and other odd-shaped pieces in tube, wrap with flat sheet or split length polyethylene tube by passing sheet under appurtenances and bringing it up around body. b. Make seams by bringing edges together, folding over twice and taping down. c. Tape polyethylene securely in place at the valve stem and at any other penetrations. 7. Repairs a. Repair any cuts, tears, punctures or damage to polyethylene with adhesive tape or with short length of polyethylene sheet or cut open tube, wrapped around fitting to cover damaged area, and secure in place. 8. Openings in Encasement a. Provide openings for branches, service taps, blow-offs, air valves and similar appurtenances by making an X-shaped cut in polyethylene and temporarily folding back film. 33 11 11 - 12 DUCTILE IRON FITTINGS Page 12 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 b. After appurtenance is installed, tape slack securely to appurtenance and repair cut, as well as other damaged area in polyethylene with tape. c. Service taps may also be made directly through polyethylene, with any resulting damaged areas being repaired as described above. 9. Junctions between Wrapped and Unwrapped Fittings a. Where polyethylene-wrapped fitting joins an adjacent pipe that is not wrapped, extend polyethylene wrap to cover adjacent pipe for distance of at least 3 feet. b. Secure end with circumferential turns of tape. c. Wrap service lines of dissimilar metals with polyethylene or suitable dielectric tape for minimum clear distance of 3 feet away from cast or Ductile Iron Fittings. D. Blocking 1. Install concrete blocking in accordance with Section 03 30 00 for all bends, tees, crosses and plugs in the pipe lines as indicated in the Drawings. 2. Place the concrete blocking so as to rest against firm undisturbed trench walls, normal to the thrust. 3. The supporting area for each block shall be at least as great as that indicated on the Drawings and shall be sufficient to withstand the thrust, including water hammer, which may develop. 4. Each block shall rest on a firm, undisturbed foundation or trench bottom. 5. If the Contractor encounters soil that appears to be different than that which was used to calculate the blocking according to the Drawings, the Contractor shall notify the Engineer prior to the installation of the blocking. 3.5 REPAIR/RESTORATION A. Patching 1. Excessive field-patching is not permitted of lining or coating. 2. Patching of lining or coating will be allowed where area to be repaired does not exceed 100 square inches and has no dimensions greater than 12 inches. 3. In general, there shall not be more than 1 patch on either the lining or the coating of any fitting. 4. Wherever necessary to patch the fitting: a. Make patch with cement mortar as previously specified for interior joints. b. Do not install patched fitting until the patch has been properly and adequately cured and approved for laying by the City. c. Promptly remove rejected fittings from the site. 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Potable Water Mains 1. Cleaning, disinfection, hydrostatic testing and bacteriological testing of water mains a. Clean, flush, pig, disinfect, hydrostatic test and bacteriological test the water main as specified in Section 33 04 40. 33 11 11 - 13 DUCTILE IRON FITTINGS Page 13 of 13 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.2.A.1.c – Restraints included in price bid 1.2.A.2.c – Restraints included in price bid 1.3 – Added definitions of gland types for clarity 2.2.B.5 – Removed unrestrained push-on and mechanical joints 2.2.B.6, 7, 8, and 9 – Added reference to Section 33 05 10 and 33 04 10; removed material specifications for bolts, nuts and gaskets. 3.4 – Requirement for all mechanical and push-on joints to be restrained 3.4.D – Corrected reference 9/20/2017 W. Norwood 2.2.B.5.a.7 – Added requirement for 6 wedges on MJ Restraint for 8 inch PVC pipe 33 11 12 - 1 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE Page 1 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised November 16, 2018 SECTION 33 11 12 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Polyvinyl Chloride (PVC) Pressure Pipe 4-inch through 36-inch for potable water, wastewater and reuse applications B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. 33 01 31 – Closed Circuit Television (CCTV) Inspection 4. 33 04 40 – Cleaning and Acceptance Testing of Water Mains 5. 33 05 10 – Utility Trench Excavation, Embedment and Backfill 6. 33 05 24 – Installation of Carrier Pipe in Casing or Tunnel Liner Plate 7. 33 11 11 – Ductile Iron Fittings 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Measured horizontally along the surface from center line to center line of the fitting, manhole, or appurtenance 2. Payment a. The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per linear foot of “PVC Water Pipe” installed for: 1) Various sizes 2) Various types of backfill b. The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per linear foot of “Sewer Force Main” installed for: 1) Various sizes 3. The price bid shall include: a. Furnishing and installing PVC Pressure Pipe with joints as specified by the Drawings b. Mobilization c. Pavement removal d. Excavation e. Hauling 33 11 12 - 2 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE Page 2 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised November 16, 2018 f. Disposal of excess material g. Furnishing, placement and compaction of embedment h. Furnishing, placement and compaction of backfill i. Trench water stops j. Thrust restraint, if required by Contract Documents k. Gaskets l. Clean-up m. Cleaning n. Disinfection o. Testing 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. American Association of State Highway and Transportation Officials (AASHTO). 3. ASTM International (ASTM): a. D1784, Standard Specification for Rigid Poly(Vinyl-Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds. b. D3139, Standard Specification for Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals. 4. American Water Works Association (AWWA): a. C600, Installation of Ductile-Iron Water Mains and their Appurtenances. b. C605, Underground Installation of Polyvinyl Chloride (PVC) Pressure Pipes and Fittings for Water. c. C900, Polyvinyl Chloride (PVC) Pressure Pipe, and Fabricated Fittings, 4 IN through 60 IN, for Water Transmission and Distribution. d. M23, PVC Pipe – Design and Installation. e. M41, Ductile-Iron Pipe and Fittings. 5. NSF International (NSF): a. 61, Drinking Water System Components – Health Effects. 6. Underwriters Laboratories, Inc. (UL). 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS / INFORMATIONAL SUBMITTALS A. Product Data 1. For PVC Pressure Pipe that is used for water distribution, wastewater force mains or wastewater gravity mains, including: a. PVC Pressure Pipe b. Manufacturer c. Dimension Ratio 33 11 12 - 3 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE Page 3 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised November 16, 2018 d. Joint Types 2. Restraint, if required in Contract Documents a. Retainer glands b. Thrust harnesses c. Any other means of restraint 3. Gaskets B. Shop Drawings: When restrained joints are required, furnish for PVC Pressure Pipe used in the water distribution system or for a wastewater force main for 24-inch and greater diameters, including: 1. Wall thickness design calculations sealed by a Licensed Professional Engineer in Texas including: a. Working pressure b. Surge pressure c. Deflection 2. Provide thrust restraint calculations for all fittings and valves, sealed by a Licensed Professional Engineer in Texas, to verify the restraint lengths shown on the Drawings. 3. Lay schedule / drawing for 24-inch and greater diameters sealed by a Licensed Professional Engineer in Texas including: a. Pipe class b. Joints type c. Fittings d. Stationing e. Transitions f. Joint deflection C. Certificates 1. Furnish an affidavit certifying that all PVC Pressure Pipe meets the provisions of this Section, each run of pipe furnished has met Specifications, all inspections have been made and that all tests have been performed in accordance with AWWA C900. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Manufacturers a. Finished pipe shall be the product of 1 manufacturer for each size, unless otherwise approved by the City. 1) Change orders, specials, and field changes may be provided by a different manufacturer upon City approval. b. Pipe manufacturing operations shall be performed under the control of the manufacturer. c. All pipe furnished shall be in conformance with AWWA C900. 33 11 12 - 4 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE Page 4 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised November 16, 2018 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store and handle in accordance with the guidelines as stated in AWWA M23. 2. Secure and maintain a location to store the material in accordance with Section 01 66 00. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES AND MATERIALS A. Manufacturers 1. Only the manufacturers as listed in the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. B. Pipe 1. Pipe shall be in accordance with AWWA C900. 2. PVC Pressure Pipe for potable water shall meet the requirements of NSF 61. 3. Pressure Pipe shall be approved by the UL. 4. Pipe shall have a lay length of 20 feet except for special fittings or closure pieces necessary to comply with the Drawings. 5. The pipe material shall be PVC, meeting the requirements of ASTM D1784, with a cell classification of 12454. Outside diameters must be equal to those of cast iron and ductile iron pipes. 6. As a minimum the following Dimension Ratio’s apply: Diameter (inch) Min Pressure Class (psi) 4 through 12 DR 14 16 through 24 DR 18 7. Pipe Markings a. Meet the minimum requirements of AWWA C900. Minimum pipe markings shall be as follows: 1) Manufacturer’s Name or Trademark and production record 2) Nominal pipe size 3) Dimension Ratio 4) AWWA C900 5) Seal of testing agency that verified the suitability of the pipe 33 11 12 - 5 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE Page 5 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised November 16, 2018 C. Pressure and Deflection Design 1. Pipe design shall be based on trench conditions and design pressure class specified in the Drawings. Pipe shall be designed according to the methods indicated in AWWA M23 for trench construction, using the following parameters: a. Unit Weight of Fill (w) = 130 pcf b. Live Load = AASHTO HS 20 c. Trench Depth = 12 feet minimum, or as indicated in Drawings d. Maximum E’ = 1,000 max e. Deflection Lag Factor = 1.0 f. Working Pressure (Pw) = 150 psi g. Surge Allowance (Ps) = 100 psi minimum h. Test Pressure = 1) No less than 1.25 times the stated working pressure (187 psi minimum) of the pipeline measured at the highest elevation along the test section. 2) No less than 1.5 times the stated working pressure (225 psi minimum) at the lowest elevation of the test section. i. Maximum Calculated Deflection = 3 percent j. Restrained Joint Safety Factor (SF) = 1.5 k. Maximum Joint Deflection = 50 percent of the manufacturer’s recommendations. 2. Verify trench depths after existing utilities are located. a. Accommodate vertical alignment changes required because of existing utility or other conflicts by an appropriate change in pipe design depth. b. In no case shall pipe be installed deeper than its design allows. 3. Provisions for Thrust a. Thrusts at bends, tees, plugs or other fittings shall be mechanically restrained joints when required by the Drawings. b. No thrust restraint contribution shall be allowed for the restrained length of pipe within the casing. c. Restrained joints, where required, shall be used for a sufficient distance from each side of the bend, tee, plug, valve, or other fitting to resist thrust which will be developed at the design pressure of the pipe. For the purpose of thrust the following shall apply: 1) Calculate valves as dead ends. 2) Design pressure shall be greater than the pressure class of the pipe or the internal pressure (Pi), whichever is greater. 3) Restrained joints shall consist of approved mechanical restrained or push- on restrained joints as listed in the City’s Standard Products List as shown in Section 01 60 00. 4) Restrained PVC pipe is not allowed for pipe greater than 12 inches. d. The Pipe Manufacturer shall verify the length of pipe with restrained joints to resist thrust in accordance with the Drawings and the following: 1) Calculate the weight of the earth (We) as the weight of the projected soil prism above the pipe, for unsaturated soil conditions. 2) Soil density = 115 pcf (maximum value to be used), for unsaturated soil conditions 3) In locations where ground water is encountered, reduce the soil density to its buoyant weight for the backfill below the water table. a) Reduce the coefficient of friction to 0.25. 33 11 12 - 6 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE Page 6 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised November 16, 2018 4. Joints a. Joints shall be gasket, bell and spigot and push-on type conforming to ASTM D3139. b. Since each pipe manufacturer has a different design for push-on joints, gaskets shall be part of a complete pipe section and purchased as such. c. Lubricant must be non-toxic and NSF approved for potable water applications. d. Push-On Restrained Joints shall only be as approved in the Standard Products List in Section 01 60 00. 5. Detectable Markers a. Provide detectable markers in accordance with Section 33 05 26. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Install pipe, fittings, specials and appurtenances as specified herein, as specified in AWWA C600, AWWA C605, AWWA M23 and in accordance with the pipe manufacturer’s recommendations. 2. Lay pipe to the lines and grades as indicated in the Drawings. 3. Excavate and backfill trenches in accordance with Section 33 05 10. 4. Embed PVC Pressure Pipe in accordance with Section 33 05 10. 5. For installation of carrier pipe within casing, see Section 33 05 24. B. Pipe Handling 1. Haul and distribute pipe and fittings at the project site. 2. Handle piping with care to avoid damage. a. Inspect each joint of pipe and reject or repair any damaged pipe prior to lowering into the trench. b. Use only nylon ropes, slings or other lifting devices that will not damage the surface of the pipe for handling the pipe. 3. At the close of each operating day: a. Keep the pipe clean and free of debris, dirt, animals and trash – during and after the laying operation. b. Effectively seal the open end of the pipe using a gasketed night cap. C. Joint Making 1. Mechanical Joints a. In accordance with Section 33 11 11. 33 11 12 - 7 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE Page 7 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised November 16, 2018 2. Push-on Joints a. Install Push-On joints as defined in AWWA C900. b. Wipe clean the gasket seat inside the bell of all extraneous matter. c. Place the gasket in the bell in the position prescribed by the manufacturer. d. Apply a thin film of non-toxic vegetable soap lubricant to the inside of the gasket and the outside of the spigot prior to entering the spigot into the bell. e. When using a field cut plain end piece of pipe, refinish the field cut to conform to AWWA C605. 3. Joint Deflection a. Deflect the pipe only when necessary to avoid obstructions, or to meet the lines and grades shown in the Drawings. b. Joint deflection shall not exceed 50 percent of the manufacturer’s recommendation. D. Detectable Metallic Tape Installation 1. See Section 33 05 26. 3.5 REPAIR/RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Potable Water Mains 1. Cleaning, disinfection, hydrostatic testing, and bacteriological testing of water mains: a. Clean, flush, pig, disinfect, hydrostatic test and bacteriological test the water main as specified in Section 33 04 40. B. Wastewater Lines 1. Closed Circuit Television (CCTV) Inspection a. Provide a Post-CCTV Inspection in accordance with Section 33 01 31. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] 33 11 12 - 8 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE Page 8 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised November 16, 2018 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 2.2.C.1 and 3.4.C.3 – revised maximum joint deflection requirements 3.4.C.1 – Added reference to Ductile Iron Fittings 3.4.D – Removed Marker Balls 1.1 Modified acceptable range for specification from up to 24-inch to up to 36-inch 4/1/2013 F. Griffin Change Section 2.2 B. 5. from “The pipe material shall be PVC, meeting the requirements of ASTM D1784, with a cell classification of 12454-B.” to “The pipe material shall be PVC, meeting the requirements of ASTM D1784, with a cell classification of 12454”. 11/14/2018 D.V. Magaña All references to the use of C905 are no longer applicable and are deleted. 1.3.A.4.c. – Updated to reflect C900 applicable on PVC pipe sizes 4” through 60”. 33 12 10 - 1 WATER SERVICES 1-INCH TO 2-INCH Page 1 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 SECTION 33 12 10 WATER SERVICES 1-INCH TO 2-INCH PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Lead-free 1-inch to 2-inch water service lines from the water main to the right-of- way, fittings and water meter boxes complete in place, as shown on the Drawings, directed by the Engineer, and specified herein for: a. New Water Service b. New Water Service (Bored) c. Water Meter Service Relocate d. Private Water Service B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Products Installed but not Furnished Under this Section 1. Water meters for various sizes D. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 33 04 40 – Cleaning and Acceptance Testing of Water Mains 4. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 5. Section 33 12 25 – Connection to Existing Water Mains 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. New Water Service a. Measurement 1) Measurement for this Item shall be per each new “Water Service” complete in place from the tap of the main to the installation of the meter box and associated appurtenances where the service line is installed by open cut construction. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per each “Water Service” installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing New Service Line as specified by the Drawings 2) Submitting product data 3) Tapping saddle 4) Corporation stop 5) Curb stop 33 12 10 - 2 WATER SERVICES 1-INCH TO 2-INCH Page 2 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 6) Fittings 7) Service line installed by open cut 8) Connection to meter 9) Meter Box and Lid 10) Pavement removal 11) Excavation 12) Hauling 13) Disposal of excess material 14) Surface Restoration associated with Meter Box installation and connection, excluding grass (seeding, sodding or hydro-mulch paid separately) 15) Clean-up 16) Disinfection 17) Testing 2. New Bored Water Service a. Measurement 1) Measurement for this Item shall be per each new Water Service complete in place from the tap of the main to the installation of the meter box and associated appurtenances where the service line is installed by trenchless method. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid per each “Bored Water Service” installed for: a) Various sizes c. The price bid shall include: 1) Submitting product data 2) Tapping saddle 3) Corporation stop 4) Curb stop 5) Fittings 6) Service line installed by trenchless method 7) Connection to meter 8) Meter Box and Lid 9) Pavement removal 10) Excavation 11) Hauling 12) Disposal of excess material 13) Surface restoration associated with Meter Box installation and connection, excluding grass (seeding, sodding or hydro-mulch paid separately) 14) Clean-up 15) Disinfection 16) Testing 1.3 REFERENCES A. Definitions 1. New Service 33 12 10 - 3 WATER SERVICES 1-INCH TO 2-INCH Page 3 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 a. Installation of new 1-inch to 2-inch Water Service Line by open cut construction from the water main to the right-of-way, including corporation stop, curb stop, fittings and water meter boxes complete in place, as shown on the Drawings. 2. New Service (Bored) a. Installation of new 1-inch to 2-inch Water Service Line by trenchless construction method from the water main to the right-of-way, including corporation stop, curb stop, fittings and water meter boxes complete in place, as shown on the Drawings. 3. Meter Service Reconnection a. Relocation and reconnection of the private service line from an existing meter to be abandoned and a new meter installed that lies within 5 feet of the existing meter. 4. Private Service Relocation a. Relocation and reconnection of private service line behind the water meter where the existing meter to be abandoned and the new meter installed is greater than 5 feet of the existing meter. A licensed plumber is required to relocate the private service. 5. Lead-free a. Lead-free pipes and plumbing fittings and fixtures shall contain less than 0.25 percent lead in accordance with the reduction of Lead in Drinking Water Act (P.L. 111-380). B. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. ASTM International (ASTM): a. A48, Standard Specification for Gray Iron Castings. b. A536, Standard Specification for Ductile Iron Castings. c. B88, Standard Specification for Seamless Copper Water Tube. d. B98, Standard Specification for Copper-Silicon Alloy Rod, Bar and Shapes. e. C131, Standard Specification for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. f. C150, Standard Specification for Portland Cement. g. C330, Standard Specification for Lightweight Aggregates for Structural Concrete. h. C857 (RL), Standard Practice for Minimum Structural Design Loading for Underground Precast Concrete Utility Structures i. D883, Standard Terminology Relating to Plastics. j. D1693, Standard Test Method for Environmental Stress-Cracking of Ethylene Plastics 3. American Water Works Association (AWWA): a. C700, Cold-Water Meters - Displacement Type, Bronze Main Case. b. C800, Underground Service Line Valves and Fittings. 4. NSF International (NSF): a. 61, Drinking Water System Components - Health Effects. 5. Reduction of Lead in Drinking Water Act 33 12 10 - 4 WATER SERVICES 1-INCH TO 2-INCH Page 4 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 a. Public Law 111-380 (P.L. 111-380) 6. General Services Administration (GSA): a. RR-F-621E, Frames, Covers, Gratings, Steps, Sump and Catch Basin, Manhole 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Provide advance notice for service interruptions and meet requirements of Division 0 and Division 1. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Product Data, if applicable: 1. Tapping Saddle 2. Corporation stop 3. Curb Stop 4. Service Line 5. Meter Box 6. Meter Box Lid B. Certificates and Test Reports 1. Prior to shipment of any Water Service components, the manufacturer shall submit the following: a. A Certificate of Adequacy of Design stating that the components to be furnished comply with all regulatory requirements identified in this Section including: 1) The Reduction of Lead in Drinking Water Act (P.L. 111-380) 2) AWWA C800 3) NSF 61 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Manufacturers a. Water Services shall meet or exceed the latest revisions of AWWA C800, NSF 61, the Reduction of Lead in Drinking Water Act and shall meet or exceed the requirements of this Specification. 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 33 12 10 - 5 WATER SERVICES 1-INCH TO 2-INCH Page 5 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 1. Protect all parts such that no damage or deterioration will occur during a prolonged delay from the time of shipment until installation is completed and the units and equipment are ready for operation. 2. Protect all equipment and parts against any damage during a prolonged period at the site. 3. Prevent plastic and similar brittle items from being directly exposed to sunlight or extremes in temperature. 4. Secure and maintain a location to store the material in accordance with Section 01 66 00. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED PRODUCTS A. Water meters for various sizes 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Manufacturers 1. Only the manufacturers as listed on the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. 3. The Water Services and appurtenances shall be new and the product of a manufacturer regularly engaged in the manufacturing of Water Services and appurtenances having similar service and size. B. Description 1. Regulatory Requirements a. All materials shall conform to the Reduction of Lead in Drinking Water Act (P.L. 111-380). This Act defines “Lead-free” for pipes and other appurtenances to be less than 0.25 percent lead. b. Water Services shall meet or exceed the latest revisions of AWWA C800 and shall meet or exceed the requirements of this Specification. c. All Water Services components in contact with potable water shall conform to the requirements of NSF 61. C. Materials/Design Criteria 1. Service Lines a. Provide Type K Copper Tubing per ASTM B88. b. Furnish in the annealed conditions, unless otherwise specified in the Contract Documents. 2. Service Couplings a. Fitting Ends 1) Flared Copper Tubing with thread dimensions per AWWA C800 33 12 10 - 6 WATER SERVICES 1-INCH TO 2-INCH Page 6 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 2) Provide coupling nuts with a machined bearing skirt of a length equal to the tubing outer diameter (O.D.). b. Provide with hexagonal wrench grip compatible with the coupling size. c. Provide lead-free service couplings in accordance with the Reduction of Lead in Drinking Water Act. 3. Corporation stops a. Provide brass castings per AWWA C800 for: 1) Bodies 2) Plugs 3) D washers 4) Bottom nuts b. Machining and Finishing of Surfaces 1) Provide 1 ¾ inch per foot or 0.1458 inch per inch ± 0.007 inch per inch taper of the seating surfaces for the key and body. 2) Reduce large end of the tapered surface of the key in diameter by chamfer or turning for a distance that will bring the largest end of the seating surface of the key into the largest diameter of the seating surface of the body. 3) Relieve taper seat in the body on the small end. 4) Extend small end of the key there-through to prevent the wearing of a shoulder and facilitate proper seating of key. 5) Design key, key nut and washer such that if the key nut is tightened to failure point, the stem end of the key shall not fracture. 6) Design nut and stem to withstand a turning force on the nut of at least 3 times the necessary effort to properly seat the key without failure in any manner. 7) Port through corporation stop shall be full size to eliminate turbulence in the flow way. 8) Design stop for rotation about the axis of the flow passageway inside the following minimum circles in order to properly clear the tapping machine: a) Two 7/8-inch for 1-inch corporation stops b) Four 15/16-inch for 1 ½ -inch and 2-inch corporation stops c. Provide lead-free corporation stops in accordance with the Reduction of Lead in Drinking Water Act. 4. Curb Stops a. Provide brass castings per AWWA C800. b. Valve plugs shall be: 1) Cylinder type 2) Plug type, or 3) Ball type c. Incorporate full flow porting. d. Provide for full 360 degree plug rotation clockwise or counter-clockwise. e. Overall Length 1) 3-5/16 inch + 1/8 inch for 1-inch diameter 2) 4-1/32 inch + 9.32 for 1-inch diameter f. Cylindrical Plug Type 1) Provide O-ring seal at top and bottom. a) O-ring at top only is acceptable if bottom of curb stop body is closed. 2) Seals shall be Buna N. 33 12 10 - 7 WATER SERVICES 1-INCH TO 2-INCH Page 7 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 3) 1 O-ring seal shall surround the outlet port of the curb stop and act to effectively seal in the closed position. 4) The port in the plug shall provide a straight through, full size flow way, so shaped as to eliminate turbulence. 5) All waterways shall be smooth and free of burrs or rough areas. 6) Design the curb stop to provide ease and accuracy of operation and positive shut-off of water. g. Tapered Plug Type 1) Provide O-ring seal at top and bottom. 2) The tapered plug and cylindrical recess in the valve body shall be machined to match within approved manufacturing tolerances. 3) Inlet and outlet ports shall be sealed by O-rings or combination Teflon U- shaped seal rings backed with O-rings. 4) The port in the plug shall provide a straight through, full size flow way, so shaped as to eliminate turbulence. 5) All waterways shall be smooth and free of burrs or rough areas. 6) Design the curb stop to provide ease and accuracy of operation and positive shut-off of water. h. Ball Plug Type 1) Provide double O-ring seals on the stem. 2) The ball shall seal against rubber rings mounted in the valve body at the inlet and outlet ports. 3) The ball shall be bronze with a smooth Teflon coating. 4) The port in the plug shall provide a straight through, full size flow way, so shaped as to eliminate turbulence. 5) All waterways shall be smooth and free of burrs or rough areas. i. Provide lead-free curb stops in accordance with the Reduction of Lead in Drinking Water Act. 5. Straight Adapters a. Brass castings and threads per AWWA C800 b. Provide lead-free straight adapters in accordance with the Reduction of Lead in Drinking Water Act. 6. Three Part Copper Unions a. Brass castings and threads per AWWA C800 b. Provide lead-free Three Part Copper Unions in accordance with the Reduction of Lead in Drinking Water Act. 7. Straight Meter Couplings a. Brass castings per AWWA C800 b. Threads per AWWA C700 c. Tailpiece with outside iron pipe thread d. Chamfer corners on threaded end of meter nut. e. Machine inside and outside of tailpiece. f. Provide lead-free Straight Meter Couplings in accordance with the Reduction of Lead in Drinking Water Act. 8. Branch Connections a. Brass castings per AWWA C800 b. Inlet and outlet connections per AWWA C800 c. Provide lead-free branch connections in accordance with the Reduction of Lead in Drinking Water Act. 33 12 10 - 8 WATER SERVICES 1-INCH TO 2-INCH Page 8 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 9. Service Saddles a. Castings 1) Brass or Nylon coated ductile iron castings per AWWA C800 2) Free of porosity with sharp edges removed 3) Saddle a) Form to fit firmly against side of maximum diameter of water main with approximately 180 degrees wrap around. 4) Outlet a) Design outlet boss for no thread distortion by bending moments. b) Tapped for taper threaded corporation stop conforming to AWWA C800. b. Straps 1) Conform to ASTM B98. 2) Form flat to fit uniformly against the wall of the water main. 3) Shall be double straps 4) Rod diameter not less than 5/8 inch flattened to 1 inch on one side. 5) Straps shall be threaded 5/8 inch (11-NC-2A) for a distance such that ½ inch remains after clamp is fully tightened on the pipe. 6) Chamfer strap ends to protect the starting threads. 7) The threads shall be full and free from shear. 8) 4-inch and larger pipe shall be in accordance with Section 33 12 25. c. Nuts 1) Bronze material a) Same material as straps 2) Dimensions equal to or larger than heavy hexagon nuts 3) Tapped 5/8 inch (11-NC-2B) d. Gaskets 1) Neoprene rubber material 2) Cemented to saddle and positioned to facilitate installation 10. Brass Flanged Angle Valve a. For 1 ½-inch and 2-inch services b. Brass castings per AWWA C800 c. Valve Body with integral outlet flange and inlet wrenching flat d. Fit together key and body by turning key and reaming body 1) Key with O-ring seal seat at the upper end 2) Lap key and body seat are to conform to corporation stop requirements of this Specification. 3) The outlet flange shall contain an O-ring seat or a uniform flat drop-in flange gasket surface. 4) Drop-in flange gasket surface shall contain gasket retaining grooves milled circular about the axis of the flange. 5) The size of the outlet flange and the diameter and spacing of the bolt holes shall conform to AWWA C700. 6) The flange on 2-inch angle valves shall be double drilled to permit connection to l ½ -inch meters. 7) The inlet port of the valve shall be tapered to conform to AWWA C800 taper pipe thread. 8) The key cap shall include a wrenching tee marked with a raised or recessed arrow to show whether the valve is open or closed. 9) Valve Assembly (main body, key, key cap) 33 12 10 - 9 WATER SERVICES 1-INCH TO 2-INCH Page 9 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 a) Brass material per AWWA C800 b) O-ring seal on the top of the key between the key and body seat c) Key cap shall complete the assembly by attaching to the key by means of a strong bronze pin with phosphor bronze spring washer(s) depressed between the key cap and the top of the valve main body. d) Provide with padlock wings for locking the valve in the closed position. e) There shall be a uniform application of cold water valve grease between the body and the key. f) The valve shall be capable of being easily opened and stopping lugs. g) The waterway through the valve shall be smooth and rounded for minimum pressure loss, and shall be free of burrs or fins. h) The valve shall be strong, well designed, neat in appearance, water- tight and entirely adequate for the intended purpose. i) Provide with either a high quality rubber drop-in gasket or an O-ring seal depending on the manufacturer's flange seal surface design choice. e. Provide lead-free brass flanged angle valves in accordance with the Reduction of Lead in Drinking Water Act. 11. Meter Boxes shall: a. Be constructed of: 1) Polymer, black polyethylene material as defined in ASTM D883. a) Minimum wall thickness of 3/8-inch throughout with no blowing agents or foaming plastics b) Body shall be black throughout, blended at the time of manufacture, and shall have a molded recycled emblem with a minimum of 35 percent Post Industrial/ Pre Consumer Recycled Content- verified with a Leed Product Documentation. c) Have a tensile strength greater than 1700 pounds per square inch (psi). d) Smooth edges and corners and be free from sharp edges so the unit can be handled safely without gloves. e) Exterior free from seams or parting lines. f) Have crush resistant ribbing along the outside of the box. g) Have a flange around the lid opening to help prevent settling and aide in adjustment to grade. h) Not to be installed in roadway – designed to withstand loading in non- deliberate and incidental traffic only. 2) Concrete a) Frame of No. 6 gauge wire welded closed b) Type I or Type II Portland cement, in accordance with ASTM C150, portioned with lightweight aggregate, in accordance with ASTM C330 (1) Percentage of wear not to exceed 40 per ASTM C131 (2) Minimum 28 day compressive strength of 3,000 psi b. Be able to withstand a minimum 15,000 pounds vertical load c. Withstand a minimum 400 pounds sidewall load. d. Have pipe holes measuring a minimum of 2-1/2” x 3-1/4”. e. 1-inch Standard Meter Box (Class A) 1) For use with services utilizing 5/8-inch x ¾-inch, ¾-inch or 1-inch meter Single or Dual service meter. 2) Polymer a) Size: working of not less than 10 inches x 16 inches, 12 inches high 3) Concrete 33 12 10 - 10 WATER SERVICES 1-INCH TO 2-INCH Page 10 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 a) Size: working area not less than 10-inches x 16-inches, 12 inches high f. 2-inch Standard Meter Box (Class C) 1) For use with services utilizing 1-1/2-inch or 2-inch Single service meter. 2) Polymer a) Size: working area not less than 14-inches x 28-inches, 12 inches high 3) Concrete a) Size: working area not less than 15-inches x 26-1/2-inches, 12 inches high g. Bullhead Standard Meter Box (Class B) 1) For use with services utilizing two 5/8-inch x ¾-inch or ¾-inch or 1-inch Single service meter. 2) Polymer a) Size: working area not less than 15-inches x 18-inches, 12 inches high 3) Concrete a) Size: working area not less than 15-inches x 18-inches, 12 inches high 12. Meter Box Lid a. Meter Box Lids Shall: 1) Be solid throughout with reinforcing ribs. 2) Have City of Fort Worth ‘Molly’ logo molded into the lid. 3) Bear the Manufacturer’s IS (name or logo) and Country of Origin. 4) Be designed both with and without AMI receptacles 5) Have a molded tread-plate 6) Seat securely and evenly inside the meter box and shall not overlap the top edge of the meter box. 7) Have a molded pick bar for use by meter reading tool. 8) Have Automated Meter Infrastructure (AMI) snap locking slide mounts for number of meters/endpoints associated with meter box 9) Have an opening to accept the AMI end-point. Opening shall accommodate an endpoint with a 1-7/8 inches diameter. 10) Have recessed AMI end point area, to alleviate a trip hazard, centered over AMI slide mount. Recess area should be 4-1/2 inches in diameter and 3/8” deep. 11) Have built-in anti-flotation devices. b. Cast Iron or Ductile Iron 1) Lids for Concrete Meter Boxes shall be constructed out of a cast iron and meet RRF-621 specification. 2) Shall withstand a minimum vertical load of 15,000 pounds 3) Coat castings with a bituminous emulsified asphalt unless otherwise specified in the Contract Documents, ground smooth, and cleaned with shot blasting, to get a uniform quality free from strength defects and distortions. 4) Dimensions shall be within industry standards of ±1/16 inch per foot. 5) Shall have a plug inserted in to the AMI receptacle to avoid water entering through opening until the AMI receptacle is used 6) Be a minimum of 1-3/4 inches thick at reinforcing ribs. 7) Casting weights may vary ±5 percent from drawing weight per industry standards. c. Plastic(Composite) 1) The lid shall : a) Constructed of Engineered Plastic as defined in ASTM D883 33 12 10 - 11 WATER SERVICES 1-INCH TO 2-INCH Page 11 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 (1) Have a molded recycled emblem with a minimum of 50 percent Post Consumer Recycled and 50 percent Post Industrial/ Pre Consumer Recycled Content- verified with a Leed Product Documentation. (2) Be designed to fit a concrete box/cast iron box in retrofit installations. (3) Have a tensile strength greater than 1700 psi. (4) Have a ‘knock-out” plug to accept the AMI end- point. Knock-out diameter shall be 1-7/8 inch diameter. A removable plug may be substituted for the knock-out plug. (5) Be constructed out of a composite material blend for maximum durability and corrosion resistance. (6) Be black throughout with no blowing agents or foaming plastics (7) Smooth edges and corners and be free from sharp edges so the unit can be handled safely without gloves. (8) Exterior free from seams or parting lines. (9) Have a molded tread-pattern- tread dimensions shall be .188-inch x .938-inch x .150-inch deep. (10) Have “City of Fort Worth” molded into the lid. (11) Have “Water Meter” molded into the lid- Font shall be standard Fadal CNC font with 1-inch characters x .150-inch deep. (12) Have a molded pick hole pocket- dimensions shall be 3-inch x 9/16-inch x Thru Hole with 3/16-inch 304 stainless steel rod. (13) Have 2 pieces of ½-inch rebar located in lid pockets for locatability as shown in Drawings. (14) Have location capability using metal detector. b) Domestic Manufacture Only-Made in USA molded on Lid. c) Not to be installed in roadway or parking area d) Be designed to withstand H-10 loading for non-deliberate and incidental traffic only as . e) Have ultraviolet protection. 2) 1-inch Standard Plastic Meter Box Lid (Class A) a) For use with services utilizing 5/8-inch x ¾-inch, ¾-inch or 1-inch meter Single or Dual service meter. b) Size: 11-7/8-inch x 17-7/8-inch, 1-1/2 inches high c) For use with Class A Standard Meter Box. d) Polymer lid shall seat evenly inside meter box and shall not overlap the top edge of the meter box. 3) 2-inch Standard Plastic Meter Box Lid (Class C) a) For use with services utilizing 1-1/2-inch or 2-inch Single service meter. b) Size 27-inches x 15-1/4-inches, 1-7/8 inches high c) For use with Class C Standard Meter Box. d) Polymer lid shall seat evenly inside meter box and shall not overlap the top edge of the meter box. 4) Bullhead Standard Plastic Meter Box Lid (Class B) a) For use with services utilizing two 5/8-inch x ¾-inch or ¾-inch or 1- inch Single service meter: b) Size: 16-5/8-inch x 14—5/8-inch, 1-3/4 inches high c) For use with Class B Standard Meter Box. 33 12 10 - 12 WATER SERVICES 1-INCH TO 2-INCH Page 12 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 d) Polymer lid shall seat evenly inside meter box and shall not overlap the top edge of the meter box. 13. Horizontal Check Valve a. Equip 1 ½-inch and 2-inch Water Services with a horizontal check valve, with pipe plug, only if specified in the Drawings. b. If an existing backflow preventer is present, the Contractor is to leave it, and is not required to provide an additional horizontal check valve. c. Provide lead-free horizontal check valves in accordance with the Reduction of Lead in Drinking Water Act. 14. Service Marker a. 3 inch wide, 5 mil blue vinyl tape 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL A. Tests and Inspections 1. At the City’s option, the manufacturer shall be required to provide certification records showing conformance of materials, design and testing to these Specifications. 2. The test procedures shall conform to AWWA C800. a. In the event that a chosen valve fails the City’s hydrostatic test, the cost of the test shall be at the expense of the supplier. b. Proof testing of the remainder of the valves shall be at the cost and responsibility of the supplier. c. These tests will be the basis of acceptance or rejection of the remainder of the shipment by the City. 3. The City reserves the right to select products at random for testing. The failure of materials to conform to the applicable Specification may result in the rejection of the entire shipment. B. Marking 1. Service saddle castings shall be clearly marked by letters and numerals cast thereon showing: a. Manufacturer’s name b. Type c. Size of Pipe PART 3 - EXECUTION 3.1 INSTALLERS A. A licensed plumber is required for installations on the outlet side of the service meter. 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 33 12 10 - 13 WATER SERVICES 1-INCH TO 2-INCH Page 13 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 1. Install Water Services and appurtenances in accordance with AWWA C800. 2. Install Water Service Lines 5 feet north or east of center of lot frontage on lots 75 feet or wider, or where shown on Drawings. 3. Install Water Service Lines on lot center line on lots less than 75 feet wide, unless otherwise shown on the Drawings. 4. Install services at a minimum depth of 36 inches below final grade/proposed top of curb, unless otherwise specified in the Contract Documents. 5. Perform leak tests in accordance with Section 33 04 40. 6. Replace existing ¾-inch Service Lines with 1-inch new Service Line, tap, and corporation. 7. Install replaced or relocated services with the service main tap and service line being in line with the service meter, unless otherwise directed by the City. 8. Excavate, embed and backfill trenches in accordance with Section 33 05 10. B. Handling 1. Haul and distribute Service Lines fittings at the project site and handle with care to avoid damage. a. Inspect each segment of Service Line and reject or repair any damaged pipe prior to lowering into the trench. b. Do not handle the pipe in such a way that will damage the pipe. 2. At the close of each operating day: a. Keep the pipe clean and free of debris, dirt, animals and trash – during and after the laying operation. b. Effectively seal the open end of the pipe using a gasketed night cap. C. Service Line Installation 1. Service Taps a. Only ductile iron pipe may be directly tapped. b. Install service taps and/or tap assemblies of the specified size as indicated on the Drawings, or as specified by the Engineer. c. Perform taps on a water system that is either uncharged or under pressure. d. Taps consist of: 1) For Concrete Pressure Pipe or Steel Pipe a) Standard internal pipe threaded holes in the pipe walls (1) Made during pipe fabrication (2) Provide tapered threaded outlet with cc threads for up to 2-inch. (3) Provide flange outlet with flange to thread insulator adaptor kits for 4-inch and larger taps. 2) Other pipe materials a) Bronze service clamp with a sealed, threaded port through which the pipe wall is drilled to complete a service port e. Tap Assemblies 1) Consist of corporation stop with iron to copper connection attached to: a) Copper tubing terminating as shown on the City’s Standard Detail b) May be required adjacent to gate valves c) Install as shown on the Drawings, or as directed by the Engineer. d) When required, shall be included in the unit price bid for installing gate valve. 2) Chlorination and testing purposes 33 12 10 - 14 WATER SERVICES 1-INCH TO 2-INCH Page 14 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 a) No separate payment will be made for taps required for testing and chlorination. 2. Installation of Water Services a. Install tap and Service Line in accordance with City Details. b. Install meter box in accordance with City Details. 1) Adjustment of the Service Line to proper meter placement height shall be considered as part of the Meter Box installation. 3. Trenching a. Provide a trench width sufficiently wide to allow for 2 inches of granular embedment on either side of the Service Line. 4. Bored Services a. Services shall be bored utilizing a pilot hole having a diameter ½ inch to ¾ inches larger than the Service Line. 5. Arrangement a. Arrange corporation stops, branches, curb stops, meter spuds, meter boxes and other associate appurtenances as shown in the City Detail, and to the approval of the Engineer. 6. Service Marker a. When Meter Box is not installed immediately subsequent to service installation: 1) Mark Curb Stop with a strip of blue vinyl tape fastened to the end of the service and extending through the backfill approximately 6 inches above ground at the Meter Box location. b. Installation of service taps only: 1) Attach service marker tape to the corporation stop or plug and extend upward and normal to the main through the backfill at the adjacent trench edge to at least 6 inches above ground to flag the tap location. 7. Corporation stops a. Fully open corporation stop prior to backfill. D. Removal of Existing Water Meters 1. Remove, tag and collect existing Water Service meter for pickup by the City for reconditioning or replacement. 2. After installation of the Water Service in the proposed location and receipt of a meter from the City inspector, install the meter. 3. Reset the meter box as necessary to be flush with existing ground or as otherwise directed by the City. 4. All such work on the outlet side of the service meter shall be performed by a licensed plumber. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Field Tests and Inspections 1. Check each Water Service installation for leaks and full flow through the curb stop at the time the main is tested in accordance with Section 33 04 40. 3.8 SYSTEM STARTUP [NOT USED] 33 12 10 - 15 WATER SERVICES 1-INCH TO 2-INCH Page 15 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION 33 12 10 - 16 WATER SERVICES 1-INCH TO 2-INCH Page 16 of 16 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 14, 2017 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson Added Blue Text for clarification 1.2 A. – Revision to items included in price bid Specification modified to be in accordance with the Reduction of Lead in Drinking Water Act – All materials shall be lead free in accordance with this Act. 1.2.A.3 – Water Meter Service Relocate was renamed Water Meter Service Reconnect 1.6.B. – added certification submittals for compliance with regulatory requirements 2/13/2013 F. Griffin Added the phrase ‘, including grass’ to lines; Part 1, 1.2.A.1.c.14, Part1, 1.2.A.2.c.13, Part 1, 1.2.A.2.c.13, Part 1,1.2.A.3.c.11, Part1, 1.2.A.4.c.11 Added the phrase ‘and replacement’ to line Part 1,1.2.A.4.c.7 4/26/2013 F. Griffin Revised lines with ‘including grass’ replacing with ‘excluding grass (seeding, sodding or hydromulching paid separately)’ Included in Part 1, 1.2, A, 1, c, 14; Part 1, 1.2, A, 2, c, 13; Part 1, 1.2, A, 3, c, 11; Part 1, 1.2, A, 4, 2, 11 6/19/2013 D. Johnson 1.2.A.4.c – Addition of private water service appurtenances relocation to being included in the linear foot price of private water services 11/21/2016 W. Norwood Require meter box suitable for AMI meter. 2.2,C, 11 & 2.2,C,12 11/21/2016 W. Norwood Require service saddle with double straps. 2.2,C,9,b 2/14/17 W. Norwood 2.2, C, 9.a.3 Remove table “Fit Contour of pipe…” 2/14/17 W. Norwood 3.4, C, 1.d.(2) Remove nylon sleeve inserts, require cc threads. 33 12 20 - 1 RESILIENT SEATED (WEDGE) GATE VALVE Page 1 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 33 12 20 1 RESILIENT SEATED (WEDGE) GATE VALVE 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes: 5 1. Resilient Seated (Wedge) Gate Valves 4-inch through 48-inch for use with potable 6 water mains 7 a. 24-inch and larger valves may require an integral bypass 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the 12 Contract 13 2. Division 1 – General Requirements 14 3. Section 33 11 05 – Bolts, Nuts, and Gaskets 15 4. Section 33 11 10 – Ductile Iron Pipe 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Gate Valve 19 a. Measurement 20 1) Measurement for this Item shall be per each. 21 b. Payment 22 1) The work performed and the materials furnished in accordance with this 23 Item shall be paid for at the unit price bid per each “Gate Valve” installed 24 for: 25 a) Various sizes 26 c. The price bid shall include: 27 1) Furnishing and installing Gate Valves with connections as specified in the 28 Drawings 29 2) Valve box 30 3) Extension 31 4) Extensions for valves in vaults 32 5) Valve vault and appurtenances (for 16-inch and larger gate valves) 33 6) Petrolatum tape for connections to steel flanges 34 7) 2-inch risers (for 16-inch and larger gate valves) 35 8) Isolation kits when installed with flanged connections 36 9) Polyethylene encasement 37 10) Pavement removal 38 11) Excavation 39 12) Hauling 40 33 12 20 - 2 RESILIENT SEATED (WEDGE) GATE VALVE Page 2 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 13) Disposal of excess material 1 14) Furnishing, placement and compaction of embedment 2 15) Furnishing, placement and compaction of backfill 3 16) Clean-up 4 17) Cleaning 5 18) Disinfection 6 19) Testing 7 2. Cut-in Gate Valve 8 a. Measurement 9 1) Measurement for this Item shall be per each. 10 b. Payment 11 1) The work performed and the materials furnished in accordance with this 12 Item shall be paid for at the unit price bid per each “Cut-in Gate Valve” 13 installed for: 14 a) Various sizes 15 c. The price bid shall include: 16 1) Furnishing and installing Gate Valves with connections as specified in the 17 Drawings 18 2) System dewatering 19 3) Connections to existing pipe materials 20 4) Valve box 21 5) Extension 22 6) Extensions for valves in vaults 23 7) Valve vault and appurtenances (for 16-inch and larger gate valves) 24 8) Petrolatum tape for connections to steel flanges 25 9) 2-inch risers (for 16-inch and larger gate valves) 26 10) Isolation kits when installed with flanged connections 27 11) Valve vault and appurtenances (for 16-inch and larger gate valves) 28 12) Polyethylene encasement 29 13) Pavement removal 30 14) Excavation 31 15) Hauling 32 16) Disposal of excess material 33 17) Furnishing, placement and compaction of embedment 34 18) Furnishing, placement and compaction of backfill 35 19) Clean-up 36 20) Cleaning 37 21) Disinfection 38 22) Testing 39 1.3 REFERENCES 40 A. Abbreviations and Acronyms 41 1. NRS – Non Rising Stem 42 2. OS&Y – Outside Screw and Yoke 43 B. Reference Standards 44 33 12 20 - 3 RESILIENT SEATED (WEDGE) GATE VALVE Page 3 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1. Reference standards cited in this Specification refer to the current reference 1 standard published at the time of the latest revision date logged at the end of this 2 Specification, unless a date is specifically cited. 3 2. American Association of State Highway and Transportation Officials (AASHTO). 4 3. American Society of Mechanical Engineers (ASME): 5 a. B16.1, Gray Iron Pipe Flanges and Flanged Fittings (Classes 25, 125, and 250). 6 4. American Iron and Steel Institute (AISI). 7 5. ASTM International (ASTM): 8 a. A48, Standard Specification for Gray Iron Castings. 9 b. A242, Standard Specification for High-Strength Low-Alloy Structural Steel. 10 c. A307, Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi 11 Tensile Strength. 12 d. A536, Standard Specification for Ductile Iron Castings. 13 e. B117, Standard Practice for Operating Salt Spray (Fog) Apparatus. 14 f. B633, Standard Specification for Electrodeposited Coatings of Zinc on Iron and 15 Steel. 16 6. American Water Works Association (AWWA): 17 a. C509, Resilient-Seated Gate Valves for Water Supply Service. 18 b. C515, Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service. 19 c. C550, Protective Interior Coatings for Valves and Hydrants. 20 d. C900, Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 IN 21 through 12 IN, for Water Transmission and Distribution. 22 7. American Water Works Association/American National Standards Institute 23 (AWWA/ANSI): 24 a. C105/A21.5, Polyethylene Encasement for Ductile-Iron Pipe Systems. 25 b. C111/A21.11, Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and 26 Fittings. 27 c. C115/A21.15, Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron 28 Threaded Flanges. 29 8. NSF International (NSF): 30 a. 61, Drinking Water System Components - Health Effects. 31 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 32 1.5 SUBMITTALS 33 A. Submittals shall be in accordance with Section 01 33 00. 34 B. All submittals shall be approved by the City prior to delivery. 35 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 36 A. Product Data 37 1. Resilient Seated (Wedge) Gate Valve noting the pressure rating and coating system 38 supplied, including: 39 a. Dimensions, weights, material list, and detailed drawings 40 b. Joint type 41 c. Maximum torque recommended by the manufacturer for the valve size 42 2. Polyethylene encasement and tape 43 33 12 20 - 4 RESILIENT SEATED (WEDGE) GATE VALVE Page 4 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 a. Whether the film is linear low density or high density cross linked polyethylene 1 b. The thickness of the film provided 2 3. Thrust Restraint, if required by contract Documents 3 a. Retainer glands 4 b. Thrust harnesses 5 c. Any other means 6 4. Instructions for field repair of fusion bonded epoxy coating 7 5. Gaskets 8 B. Certificates 9 1. Furnish an affidavit certifying that all Resilient Seated (Wedge) Gate Valves meet 10 the provisions of this Section, each valve meets Specifications, all inspections have 11 been made and that all tests have been performed in accordance with AWWA C509 12 or AWWA C515. 13 2. Furnish a certificate stating that buried bolts and nuts conform to ASTM B117. 14 3. Furnish affidavit that Resilient Seated (Wedge) Gate Valve manufacturer has five 15 years experience manufacturing Resilient Seated Gate Valves of similar service and 16 size with experience record. 17 4. Furnish affidavit that Resilient Seated (Wedge) Gate Valve manufacturer owns or 18 controls any foreign factory/foundry that supplies valve casings and can certify that 19 the Resilient Seated (Wedge) Gate Valve manufacturer is in control of quality 20 control at the foreign factory/foundry. 21 1.7 CLOSEOUT SUBMITTALS [NOT USED] 22 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 23 1.9 QUALITY ASSURANCE 24 A. Qualifications 25 1. Manufacturers 26 a. Valves 16-inch and larger shall be the product of 1 manufacturer for each 27 project. 28 1) Change orders, specials and field changes may be provided by a different 29 manufacturer upon City approval. 30 b. For valves less than 16-inch, valves of each size shall be the product of 1 31 manufacturer, unless approved by the City. 32 1) Change orders, specials and field changes may be provided by a different 33 manufacturer upon City approval. 34 c. Valves shall meet or exceed AWWA C509 or AWWA C515. 35 d. For valves equipped with a bypass, the bypass valve must be of the same 36 manufacturer as the main valve. 37 e. Resilient Seated Gate Valves shall be new. 38 f. Resilient Seated Gate Valve Manufacturer shall not have less than 5 years of 39 successful experience manufacturing of Resilient Seated Gate Valves of similar 40 service and size, and indicated or demonstrate an experience record that is 41 satisfactory to the Engineer and City. This experience record will be thoroughly 42 investigated by the Engineer, and acceptance will be at the sole discretion of the 43 Engineer and City. 44 33 12 20 - 5 RESILIENT SEATED (WEDGE) GATE VALVE Page 5 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 g. Casings for Resilient Seated Gate Valve, such as valve body, wedge, and 1 bypass; that are not manufactured within the United States of America, shall be 2 manufactured by factories/foundries that are owned or controlled (partial 3 ownership) such that the Resilient Seated Gate Valve Manufacturer can control 4 and guarantee quality at the foreign factory/foundry. 5 1.10 DELIVERY, STORAGE, AND HANDLING 6 A. Storage and Handling Requirements 7 1. Protect all parts so that no damage or deterioration will occur during a prolonged 8 delay from the time of shipment until installation is completed and the units and 9 equipment are ready for operation. 10 2. Protect all equipment and parts against any damage during a prolonged period at the 11 site. 12 3. Protect the finished surfaces of all exposed flanges by wooden blank flanges, 13 strongly built and securely bolted thereto. 14 4. Protect finished iron or steel surfaces not painted to prevent rust and corrosion. 15 5. Prevent plastic and similar brittle items from being directly exposed to sunlight or 16 extremes in temperature. 17 6. Secure and maintain a location to store the material in accordance with Section 01 18 66 00. 19 1.11 FIELD [SITE] CONDITIONS [NOT USED] 20 1.12 WARRANTY 21 A. Manufacturer Warranty 22 1. Manufacturer’s Warranty shall be in accordance with Division 1. 23 PART 2 - PRODUCTS 24 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 25 2.2 EQUIPMENT, PRODUCT TYPES AND MATERIALS 26 A. Manufacturers 27 1. Only the manufacturers as listed on the City’s Standard Products List will be 28 considered as shown in Section 01 60 00. 29 a. The manufacturer must comply with this Specification and related Sections. 30 2. Any product that is not listed on the Standard Products List is considered a 31 substitution and shall be submitted in accordance with Section 01 25 00. 32 B. Description 33 1. Regulatory Requirements 34 a. Valves shall be new and meet or exceed AWWA C509 or AWWA C515 and 35 shall meet or exceed the requirements of this Specification. 36 b. All valve components in contact with potable water shall conform to the 37 requirements of NSF 61. 38 C. Materials 39 33 12 20 - 6 RESILIENT SEATED (WEDGE) GATE VALVE Page 6 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1. Valve Body 1 a. Valve body: ductile iron per ASTM A536 2 b. Flanged ends: Furnish in accordance with AWWA/ANSI C115/A21.15. 3 c. Mechanical Joints: Furnish with outlets which conform to AWWA/ANSI 4 C111/A21.11. 5 d. Valve interior and exterior surfaces: fusion bonded epoxy coated, minimum 5 6 mils, meeting AWWA C550 requirements 7 e. Buried valves: Provide with polyethylene encasement in accordance with 8 AWWA/ANSI C105/A21.5. 9 1) Polyethylene encasement: Furnish in accordance with Section 33 11 10. 10 2. Wedge (Gate) 11 a. Resilient wedge: rated at 250 psig cold water working pressure 12 b. The wedge (gate) for all valve sizes shall be 1 piece, fully encapsulated with a 13 permanently bonded EPDM rubber. 14 3. Bypass 15 a. For gate valves using a double roller, track and scrapper system, an integrally 16 cast bypass on the body of the valve is required. 17 1) Orient the bypass on the same side of the gate valve as the spur gear to 18 allow operation of both valves from the manhole opening. 19 2) The bypass shall be a minimum 4-inch in size. 20 4. Gate Valve Bolts and Nuts 21 a. Bonnet, Stuffing Box and Gear Box - Hex head bolt, and hex nut: Steel ASTM 22 A307 Gr. B, Zinc Plate per ASTM B633, SC3 for non-buried service (4-inch 23 through 12-inch valves) or as specified in 2.2.C.4.b. 24 b. Hex head bolt and hex nut: AISI 304 stainless steel for buried service (all 25 sizes) and for valves 16-inch through 36-inch (non-buried service) 26 5. Bolts and Nuts 27 a. Mechanical Joints 28 a) Provide bolts and nuts in accordance with Section 33 11 05. 29 b. Flanged Ends 30 1) Meet requirements of AWWA C115 or AWWA C207 depending on pipe 31 material. 32 2) Provide bolts and nuts in accordance with Section 33 11 05. 33 3) Flanged isolation kits shall be provided when connecting to buried steel or 34 concrete pressure pipe. Kits shall conform to Section 33 04 10. 35 6. Joints 36 a. Valves: flanged, or mechanical-joint or any combination of these as specified 37 on the Drawings or in the project Specifications 38 1) Flanged-joints: AWWA/ANSI C115/A21.15, ASME B16.1, Class 125 39 a) Flange bolt circles and bolt holes shall match those of ASME B16.1, 40 Class 125. 41 b) Field fabricated flanges are prohibited. 42 2) Steel or concrete pressure pipe 43 a) Use flange-joints unless otherwise specified in the Contract 44 Documents. 45 3) Ductile Iron or PVC pressure pipe 46 a) Use mechanical joints with mechanically restrained retainer glands 47 unless otherwise specified in the Contract Documents. 48 33 12 20 - 7 RESILIENT SEATED (WEDGE) GATE VALVE Page 7 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 7. Operating Nuts 1 a. Supply for buried service valves 2 b. 1-15/16-inch square at the top, 2-inch at the base, and 1-3/4-inch high 3 c. Cast an arrow showing the direction of opening with the word “OPEN” on the 4 operating nut base. 5 d. To open, the operating nut shall be turned to the RIGHT (CLOCKWISE) 6 direction. Nut shall be painted red per AWWA specifications 7 e. Connect the operating nut to the shaft with a shear pin that prevents the nut 8 from transferring torque to that shaft or the gear box that exceeds the 9 manufacturer’s recommended torque. 10 f. Furnish handwheel operators for non-buried service, or when shown in the 11 Drawings. 12 8. Gearing 13 a. Gate valves that are 24 inch and larger: Equip with a spur gear. 14 b. Bevel gears for horizontally mounted valves are not allowed. 15 c. The spur gear shall be designed and supplied by the manufacturer of the valve 16 as an integral part of the gate valve. 17 9. Gaskets 18 a. Provide gaskets in accordance with Section 33 11 05. 19 2.3 ACCESSORIES 20 A. All gate valves shall have the following accessories provided as part of the gate valve 21 installation: 22 1. A keyed solid extension stem of sufficient length to bring the operating nut up to 23 within 1 foot of the surface of the ground, when the operating nut on the gate valve 24 is 3 feet or more beneath the surface of the ground. Extension Stems are: 25 a. Not required on City stock orders 26 b. Not to be bolted or attached to the valve-operating nut 27 c. To be of cold rolled steel with a cross-sectional area of 1 square inch, fitting 28 loosely enough to allow deflection 29 2. Furnish joint components such as gaskets, glands, lubricant, bolts, and nuts in 30 sufficient quantity for assembly of each joint. 31 3. Cast Iron Valve Boxes: provide for buried service gate valves, cast iron valve 32 boxes and covers 33 a. Each valve box for 4-inch through 12-inch valves shall be 2-piece, 5 ¼-inch 34 shafts, screw type, consisting of a top section and a bottom section. 35 b. Valve boxes shall be as listed in the City of Fort Worth Standard Products List 36 in attached in Section 01 60 00. 37 c. Valve box covers shall be so designed that they can be easily removed to 38 provide access to valve operating nut. 39 d. Valve box covers must be designed to stay in position and resist damage under 40 AASHTO HS 20 traffic loads. 41 e. Each cover shall be casted with the word “WATER” or “RECLAIMED” in 42 raised letters on the upper surface. 43 f. Cast iron valve boxes and covers shall conform to ASTM A48, Class 35B. 44 1) Valve box covers shall be round for potable water applications and square 45 for reclaimed water applications. 46 33 12 20 - 8 RESILIENT SEATED (WEDGE) GATE VALVE Page 8 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 g. Box extension material shall be AWWA C900 PVC or ductile iron. 1 2.4 SOURCE QUALITY CONTROL [NOT USED] 2 PART 3 - EXECUTION 3 3.1 INSTALLERS [NOT USED] 4 3.2 EXAMINATION [NOT USED] 5 3.3 PREPARATION [NOT USED] 6 3.4 INSTALLATION 7 A. General 8 1. All valves shall be installed in vertical position when utilized in normal pipeline 9 installation. 10 2. Valves shall be placed at line and grade as indicated on the Drawings. 11 3. Polyethylene encasement installation shall be in accordance with Section 33 11 10. 12 3.5 REPAIR/RESTORATION [NOT USED] 13 3.6 RE-INSTALLATION [NOT USED] 14 3.7 FIELD [OR] SITE QUALITY CONTROL 15 A. Field Inspections 16 1. Before acceptance of the installed valve, the City Field Operations Staff shall have 17 the opportunity to operate the valve. 18 2. The City shall be given the opportunity to inspect all buried flanges before they are 19 covered. 20 3. The Operator will be assessing the ease of access to the operating nut within the 21 valve box and ease of operating the valve from a fully closed to fully opened 22 position. 23 4. If access and operation of the valve meet the City’s criteria, then the valve will be 24 accepted as installed. 25 B. Non-Conforming Work 26 1. If access and operation of the valve or its appurtenances does not meet the City’s 27 criteria, the Contractor will remedy the situation until it meets the City’s criteria, at 28 the Contractor’s expense. 29 33 12 20 - 9 RESILIENT SEATED (WEDGE) GATE VALVE Page 9 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3.8 SYSTEM STARTUP [NOT USED] 1 3.9 ADJUSTING [NOT USED] 2 3.10 CLEANING [NOT USED] 3 3.11 CLOSEOUT ACTIVITIES [NOT USED] 4 3.12 PROTECTION [NOT USED] 5 3.13 MAINTENANCE [NOT USED] 6 3.14 ATTACHMENTS [NOT USED] 7 8 33 12 20 - 10 RESILIENT SEATED (WEDGE) GATE VALVE Page 10 of 10 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 END OF SECTION 1 2 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.1.A – Modified acceptable size range and added requirement for bypass in 30-inch gate valves, Blue text added for exceptions 1.2 Measurement and Payment – Added Cut-In Gate Valve 1.2.A.1.c and 1.2.A.2.c – added additional items to be included in price bid 1.6.A – removed requirement for product data for bolts and nuts because it is to be included under Section 33 11 05. 1.9.A.1 – Added requirement for bypass valve manufacturing 2.2.C. – Added requirement for 30-inch gate valves to have a bypass and bypass material requirements; Added reference to Section 33 11 05 and removed material specification for bolts, nuts and gaskets; Added requirement for flanged isolation kits; Added restraint requirements for mechanical joint connections with ductile iron or PVC pressure pipe. 2.3.3 – Modified acceptable cast iron from Class 40 to Class 35B; Added requirements for reclaimed water applications 6/24/2014 D. Townsend 1.1.A.2 Revision - Gate valves larger than 24-inches may be approved by the City on a case-by-case basis 1.6.B.3 Added Section. Requires Affidavit for 5 years of experience in manufacturing RS Gate valves of similar size and type. 1.6.B.4 Added Section – Requires Affidavit on Gate Valve manufacturers ownership in foreign factories/foundries providing components to certify on-site quality control. 1.9.A.1.f Added Section. Requirement for 5 years of experience in manufacturing RS Gate valves of similar size and type. 1.9.A.1.g Added Section. Requirement for Gate Valve manufacturers ownership (or control) in foreign factories/foundries providing components to certify on-site quality control 5/6/2015 D. Townsend 1.1.A.1 Revised maximum allowable Resilient Seated (Wedge) Gate Valve from 30-inch to 48-inch 1.1.A.1.a Revised minimum size gate valve requiring bypass from 30-inch to 24- inch. 2.2.C.3. Changed requirement for an integrally cast bypass from 30-inch and above resilient seated gate valves to all double roller, track and scrapper system resilient seated gate valves 2.2.C.3.2 Added the minimum size bypass shall be 4-inches. 2.2.C.7.d Added that nut shall be painted red per AWWA specifications 3 33 12 25 - 1 CONNECTION TO EXISTING WATER MAINS Page 1 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 6, 2013 SECTION 33 12 25 CONNECTION TO EXISTING WATER MAINS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Connection to existing water mains to include, but not limited to: a. Cutting in a tee for a branch connection b. Extending from an existing water main c. Installing a tapping sleeve and valve B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 33 04 40 – Cleaning and Acceptance Testing of Water Mains 4. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 5. Section 33 05 30 – Location of Existing Utilities 6. Section 33 11 05 – Bolts, Nuts, and Gaskets 7. Section 33 11 10 – Ductile Iron Pipe 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Connection to an existing unpressurized Fort Worth Water Distribution System Main that does not require the City to take part of the water system out of service a. Measurement 1) This Item is considered subsidiary to the water pipe being installed. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the unit price bid per linear foot of water pipe complete in place, and no other compensation will be allowed. 2. Connection to an existing pressurized Fort Worth Water Distribution System Main that requires a shutdown of some part of the water system a. Measurement 1) Measurement for this Item shall be per each connection completed. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the unit price bid per each “Connection to Existing Water Main” installed for: a) Various sizes of existing water distribution main 33 12 25 - 2 CONNECTION TO EXISTING WATER MAINS Page 2 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 6, 2013 c. The price bid shall include all aspects of making the connection including, but not limited to: 1) Preparing submittals 2) Dewatering 3) Exploratory excavation (as needed) 4) Coordination and notification 5) Remobilization 6) Temporary lighting 7) Polyethylene encasement 8) Make-up pieces 9) Linings 10) Pavement removal 11) Excavation 12) Hauling 13) Disposal of excess material 14) Clean-up 15) Cleaning 16) Disinfection 17) Testing 3. Connection to an existing pressurized Fort Worth Water Distribution System Main by Tapping Sleeve and Valve: a. Measurement 1) Measurement for this Item shall be per each connection completed. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the unit price bid per each “Tapping Sleeve and Valve” installed for: a) Various sizes of connecting main b) Various sizes of existing water distribution main c. The price bid shall include all aspects of making the connection including, but not limited to: 1) Preparing submittals 2) Dewatering 3) Exploratory excavation (as needed) 4) Coordination and notification 5) Tapping Sleeve and Tapping Valve 6) Remobilization 7) Temporary lighting 8) Polyethylene encasement 9) Make-up pieces 10) Linings 11) Pavement removal 12) Excavation 13) Hauling 14) Disposal of excess material 15) Clean-up 16) Cleaning 17) Disinfection 18) Testing 33 12 25 - 3 CONNECTION TO EXISTING WATER MAINS Page 3 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 6, 2013 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. American Society of Mechanical Engineers (ASME): a. B16.1, Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125 and 250) 3. ASTM International (ASTM): a. A36, Standard Specification for Carbon Structural Steel. b. A193, Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications c. A194, Specification for Carbon and Alloy Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both d. A242, Standard Specification for High-Strength Low-Alloy Structural Steel. e. A283, Standard Specification for Low and Intermediate Tensile Strength Carbon Steel Plates. f. A285, Standard Specification for Pressure Vessel Plates, Carbon Steel, Low- and Intermediate-Tensile Strength. g. B117, Standard Practice for Operating Salt Spray (Fog) Apparatus. h. D2000, Standard Classification System for Rubber Products in Automotive Applications. 4. American Water Works Association (AWWA): a. C200, Steel Water Pipe - 6 IN and Larger. b. C207, Steel Pipe Flanges for Waterworks Service – Sizes 4 IN through 144 IN. c. C213, Fusion-Bonded Epoxy Coating for the Interior and Exterior of Steel Water Pipelines. d. C223, Fabricated Steel and Stainless Steel Tapping Sleeves. 5. American Water Works Association/American National Standards Institute (AWWA/ANSI): a. C105/A21.5, Polyethylene Encasement for Ductile-Iron Pipe Systems. b. C111/A21.11, Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. c. C115A21/15, Flanged Ductile-Iron Pipe with Ductile Iron or Gray-Iron Threaded Flanges. 6. NSF International (NSF): a. 61, Drinking Water System Components – Health Effects. 7. Manufacturers Standardization Society of the Valve and Fitting Industry Inc. (MSS): a. SP-60, Connecting flange Joint Between Tapping Sleeves and Tapping Valves. 1.4 ADMINISTRATIVE REQUIREMENTS A. Pre-installation Meetings 1. Required for any connections to an existing, pressurized 16-inch or larger City water distribution system main that requires a shutdown of some part of the water system 33 12 25 - 4 CONNECTION TO EXISTING WATER MAINS Page 4 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 6, 2013 2. May also be required for connections that involve shutting water service off t o certain critical businesses 3. Schedule a pre-installation meeting a minimum of 3 weeks prior to proposed time for the work to occur. 4. The meeting shall include the Contractor, City Inspector and City Valve Crew. 5. Review work procedures as submitted and any adjustments made for current field conditions. 6. Verify that all valves and plugs to be used have adequate thrust restraint or blocking. 7. Schedule a test shutdown with the City. 8. Schedule the date for the connection to the existing system. B. Scheduling 1. Schedule work to make all connections to existing 16-inch and larger mains: a. During the period from November through April, unless otherwise approved by the City b. During normal business hours from Monday through Friday, unless otherwise approved by the City 2. Schedule City Valve Crew by 1:00 P.M. a minimum of 1 business day prior to planned disruption to the existing water system. a. In the event that other water system activities do not allow the existing main to be dewatered at the requested time, schedule work to allow the connection at an alternate time acceptable to the City. 1) If water main cannot be taken out of service at the originally requested time, coordination will be required with the City to discuss rescheduling and compensation for mobilization. 2) No additional payment will be provided if the schedule was altered at the Contractor’s request. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery and/or fabrication for specials. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Product Data, if applicable 1. Tapping Sleeve noting the pressure rating and coating system supplied including: a. Dimensions, weights, material list, and detailed drawings b. Maximum torque recommended by the manufacturer for the valve by size B. Submittals 1. Provide a detailed sequence of work for 16-inch, or larger, connections if required by City that includes: a. Results of exploratory excavation b. Dewatering c. Procedure for connecting to the existing water main 33 12 25 - 5 CONNECTION TO EXISTING WATER MAINS Page 5 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 6, 2013 d. Time period for completing work from when the water is shut down to when the main is back in service e. Testing and repressurization procedures 2. Welders that are assigned to work on connection to concrete cylinder or steel pipe must be certified and provide Welding Certificates, upon request, in accordance with AWWA C200. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Protect parts so that no damage or deterioration occurs during a prolonged delay from the time of shipment until installation is completed. 2. Protect all equipment and parts against any damage during a prolonged period at the site. 3. Protect the finished surfaces of all exposed flanges using wooden flanges, strongly built and securely bolted thereto. 4. Protect finished iron or steel surfaces not painted to prevent rust and corrosion. 5. Prevent plastic and similar brittle items from being exposed to direct sunlight and extremes in temperature. 6. Secure and maintain a location to store the material in accordance with Section 01 66 00. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY A. Manufacturer Warranty 1. Manufacturer’s warranty shall be in accordance with Division 1. PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES AND MATERIALS A. Manufacturers 1. Only the manufacturers as listed by the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. B. Description 1. Regulatory Requirements 33 12 25 - 6 CONNECTION TO EXISTING WATER MAINS Page 6 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 6, 2013 a. Tapping Sleeves shall meet or exceed AWWA C223 and the requirements of this Specification. b. All valve components in contact with potable water shall conform to the requirements of NSF 61. C. Tapping Sleeve Materials 1. Body a. Body: Carbon Steel per ASTM A283 Grade C, ASTM A285 Grade C, ASTM A36 Steel or equal b. Finish: fusion bonded epoxy coating to an average 12 mil thickness. Fusion applied per AWWA C213. c. All buried tapping sleeves shall be provided with polyethylene encasement in accordance with AWWA/ANSI C105/A21.5. 1) Polyethylene encasement shall be in accordance with Section 33 11 10. 2. Flange a. Carbon Steel per ASTM A36 in accordance with AWWA C207 and ASME B16.1 Class 125. b. Recessed for tapping valve per MSS SP-60 3. Bolts and Nuts a. Flanged Ends 1) Meet requirements of AWWA C115 or AWWA C207 depending on pipe material. 2) Provide bolts and nuts in accordance with Section 33 11 05. 4. Gaskets a. Provide gaskets in accordance with Section 33 11 05. 5. Test Plug a. ¾-inch NPT carbon steel with square head and fusion bonded epoxy coating 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION A. Verification of Conditions 1. Verify by exploratory excavation, if needed, that existing water main is as depicted in the Drawings and that the location is suitable for a connection to the existing water main. a. Excavate and backfill trench for the exploratory excavation in accordance with 33 05 10. 2. Verify that all equipment and materials are available on–site prior to the shutdown of the existing main. 3. Pipe lines shall be completed, tested and authorized for connection to the existing system in accordance with Section 33 04 40. 33 12 25 - 7 CONNECTION TO EXISTING WATER MAINS Page 7 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 6, 2013 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Upon disruption of the existing water main, continue work until the connection is complete and the existing water main is back in service. B. Procedure 1. Expose the proposed connection point in accordance with Section 33 05 10. 2. Dewater the existing water line so the chlorinated water is not unlawfully discharged. 3. Maintain the water that may bleed by existing valves or plugs during installation within the work area to a reasonable level. a. Control the water in such a way that it does not interfere with the proper installation of the connection or create a discharge of chlorinated water. 4. If any discharge of chlorinated water occurs, discharged water shall be de- chlorinated in accordance with Section 33 04 40 5. Cut and remove existing water main in order to make the connection. 6. Verify that the existing pipe line is suitable for the proposed connection. 7. Place trench foundation and bedding in accordance with 33 05 10. 8. In the event that a tapping sleeve and valve is used, the coupon from the existing water main shall be submitted to the City. 9. Prevent embedment, backfill, soil, water or other debris form entering the pipeline. 10. Establish thrust restraint as provided for in the Drawings. 11. Clean and disinfect the pipeline associated with the connection in accordance with Section 33 04 40. 12. Place embedment to the top of the pipe zone. 13. Request that the City Valve Crew re-pressurize the pipeline. 14. Directionally flush the connection in accordance with Section 33 04 40. 15. Request that City Valve Crew open all remaining valves. 3.5 REPAIR/RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 33 12 25 - 8 CONNECTION TO EXISTING WATER MAINS Page 8 of 8 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised February 6, 2013 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 2.2.C.3 and 4 – Added reference to Section 33 11 05 and removed bolt, nu t and gasket material specification 2/6/2013 D. Townsend 3.4.B.4 Modified to refer to Section 33 04040 33 12 40 - 1 FIRE HYDRANTS Page 1 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised January 3, 2014 SECTION 33 12 40 FIRE HYDRANTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry-barrel fire hydrants with 51/4-inch main valve for use with potable water mains B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 4. Section 33 04 40 – Cleaning and Acceptance Testing of Water Mains 5. Section 33 11 10 – Ductile Iron Pipe 6. Section 33 11 11 – Ductile Iron Fittings 7. Section 33 11 14 – Buried Steel Pipe and Fittings 8. Section 33 12 20 – Resilient Seated (Wedge) Gate Valve 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Fire Hydrant and Extension 1) Measurement for this item shall be by the each hydrant, complete in place. 2. Payment a. The work performed and materials furnished in accordance with this Item and measured under “Measurement” will be paid for at the unit prices bid per each “Fire Hydrant” installed. 3. The price bid shall include: a. Furnishing and installing Fire Hydrants with appurtenances as specified in the Drawings b. Dry-Barrel Fire Hydrant assembly from base to operating nut c. Extension barrel and stem d. Adjusting hydrant to the appropriate height e. Painting f. Pavement Removal g. Excavation h. Freight, loading, unloading and handling i. Disposal of excess material j. Furnish, placement and compaction of embedment k. Furnish, placement and compaction of backfill l. Blocking, Braces and Rest m. Clean up 33 12 40 - 2 FIRE HYDRANTS Page 2 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised January 3, 2014 n. Disinfection o. Testing 1.3 REFERENCES A. Definitions 1. Base: The lateral connection to the fire hydrant lead; also called a shoe B. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. American Water Works Association (AWWA): a. C502, Dry-Barrel Fire Hydrants b. Manual of Water Supply Practices M17 (AWWA Manual M17) – Installation, Field Testing, and Maintenance of Fire Hydrants 3. NSF International a. 61, Drinking Water System Components – Health Effects 4. National Fire Protection Association (NFPA) a. 1963, Standard for Fire Hose Connections 5. Underwriters Laboratories, Inc. (UL) a. 246, Hydrants for Fire-Protection Service 6. Factory Mutual (FM) a. Class Number 1510, Approval Standard for Fire Hydrant (Dry Barrel Type) for Private Fire Service 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to construction. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Product Data 1. Dry-Barrel Fire Hydrant stating: a. Main valve opening size b. Nozzle arrangement and sizes c. Operating nut size d. Operating nut operating direction e. Working pressure rating f. Component assembly and materials g. Coatings and Finishes 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Manufacturers a. Dry-Barrel Fire Hydrants shall be the product of 1 manufacturer. 33 12 40 - 3 FIRE HYDRANTS Page 3 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised January 3, 2014 1) Change orders, specials and field changes may be provided by a different manufacturer upon City approval. 2. Dry-Barrel Fire Hydrants shall be in conformance with AWWA C502, UL 246 and FM 1510. 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store and handle in accordance with the guidelines as stated in AWWA C502 and AWWA Manual M17. 2. Protect all parts so that no damage or deterioration will occur during a prolonged delay from the time of shipment until installation is completed and the units and equipment are ready for operation. 3. Protect all equipment and parts against any damage during a prolonged period at the site. 4. Protect the finished surfaces of all exposed flanges by wooden blank flanges, strongly built and securely bolted thereto. 5. Protect finished iron or steel surfaces not painted to prevent rust and corrosion. 6. Prevent plastic and similar brittle items from being directly exposed to sunlight or extremes in temperature. 7. Secure and maintain a location to store the material in accordance with Section 01 66 00. 1.11 FIELD CONDITIONS [NOT USED] 1.12 WARRANTY A. Manufacturer Warranty 1. Manufacturer’s Warranty shall be in accordance with Division 1. PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Manufacturers 1. Only the manufacturers as listed on the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. 3. The Dry-Barrel Fire Hydrant shall be new and the product of a manufacturer regularly engaged in the manufacturing of Dry-Barrel Fire Hydrants having similar service and size. B. Description 1. Regulatory Requirements a. Dry-Barrel Fire Hydrant shall meet or exceed the latest revisions of AWWA C502 and shall meet or exceed the requirements of this Specification. 33 12 40 - 4 FIRE HYDRANTS Page 4 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised January 3, 2014 b. All Dry-Barrel Fire Hydrant components in contact with potable water shall conform to the requirements of NSF 61. C. Performance / Design Criteria 1. Capacities a. Rated working pressure of 250 psi or greater 2. Design Criteria a. Operating nut 1) Uniformly tapered square nut measuring: a) 1 inch at the base b) 7/8 inch at the top 2) Open by turning the operating nut to the right (clockwise) a) Provide operating direction clearly marked with an arrow and the word “OPEN”. 3) Provide weather shield with operating nut. b. Main Valve 1) Minimum 51/4-inch opening 2) Compression type a) Opening against pressure b) Closing with pressure c. Nozzles 1) ‘T’ shape, 3 nozzle arrangement 2) Nozzle sizes, threads and configuration in accordance with NFPA 1963 a) Hose nozzles (1) 2 x 21/2-inch (nominal size of connection) (a) 180 degrees apart (b) Thread Designation 2.5-7.5 NH (NFPA 1963) b) Pump nozzle (1) 4-inch (nominal size of connection) (a) Thread Designation 4-4 NH (NFPA 1963) d. Hydrant Barrel Configuration 1) Upper barrel 2) Breakable flange and stem a) To be installed above ground at the connection to the upper barrel 3) Extension barrel (if needed) and lower barrel a) Extension barrel and stem (1) Lengthen in 6-inch increments e. Drain Valve 1) Non-corrodible material 2) Spring operated drain valves are not allowed. D. Function 1. Drain Valve a. Drain fire hydrant barrels when main valve is closed. E. Materials 1. Furnish materials in accordance with AWWA C502. 2. Dry-Barrel Fire Hydrant Assembly a. Internal parts 1) Threads 33 12 40 - 5 FIRE HYDRANTS Page 5 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised January 3, 2014 a) Provide operating thread designed to avoid metal such as iron or steel threads against iron or steel parts. 2) Stem a) Stem Nuts (1) Provide bronze stem nuts. (a) Grades per AWWA C502 b) Where needed, stem shall be grooved and sealed with O-rings. 3. Provide crushed rock for placement around base conforming to Section 33 05 10. F. Finishes 1. Primer Materials a. Furnish primer for Dry-Barrel Fire Hydrants in accordance with AWWA C502. 2. Finish Materials a. Dry-Barrel Fire Hydrant 1) Exterior a) Above grade (1) Furnish exterior coating for above grade Dry-Barrel Fire Hydrant assembly components in accordance with AWWA C502. (2) Coating shall be Flynt Aluminum Paint in Silver. b) Below grade (1) Furnish exterior coating for below grade Dry-Barrel Fire Hydrant assembly components in accordance with AWWA C502. 2) Interior a) Interior coating for Dry-Barrel Fire Hydrants assemblies in accordance with AWWA C502 2.3 ACCESSORIES A. Polyethylene Encasement 1. Provide polyethylene encasement in accordance with Section 33 11 10. B. Embedment 1. Provide crushed rock and filter fabric in accordance with Section 33 05 10. 2.4 SOURCE QUALITY CONTROL A. Tests and Inspections 1. Testing and inspection of Dry-Barrel Fire Hydrants in accordance with AWWA C502. B. Markings 1. Provide each Dry-Barrel Fire Hydrant marked in accordance with AWWA C502. PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 33 12 40 - 6 FIRE HYDRANTS Page 6 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised January 3, 2014 1. Install in accordance with AWWA Manual of Water Supply Practice M17, manufacturer’s recommendations and as shown on the Drawings. 2. Provide vertical installation with braces, rest and blocking in accordance with City Standard Details. 3. Excavate and backfill trenches in accordance with 33 05 10. 4. Embed Dry-Barrel Fire Hydrant assemblies in accordance with 33 05 10. a. At the location of the weep holes, wrap barrel with polyethylene encasement and crushed rock with filter fabric to prevent dirt and debris from entering the fire hydrant. 5. Polyethylene encasement installation shall be in accordance with the applicable portion of Section 33 11 10. 6. Install concrete blocking and rest in accordance with Section 03 30 00 as indicated in the Drawings. 7. A minimum 1/3 cubic yard of crushed rock shall be placed around the base, in accordance with AWWA Manual of Water Supply Practice M17, to allow drain outlets to operate. a. The crushed rock should extend 6 inches above the drain outlets and a minimum of 1 foot on all sides of the fire hydrant base. 8. Fire hydrant lead line shall be installed with a maximum cover of 7 feet. a. Cover is measured from the invert at the fire hydrant base, vertical to ground elevation. b. Fittings may be used along fire lead line to ensure minimum and maximum cover requirements are met. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD CONTROL A. Field Inspections 1. The Dry-Barrel Fire Hydrant and assembly shall perform as intended with no deformation, leaking or damage of any kind for the pressure ranges indicated. 2. City inspector will issue final inspection notice to City staff. 3. City Field Operations Staff and Fire Department Staff shall have the opportunity to inspect and operate the hydrant, to ensure that the fire hydrant was installed in accordance with AWWA Manual of Water Supply Practice M17. This includes but is not limited to: a. Operation of Nozzles and operating nut are not obstructed. b. Drain valve is not obstructed or plugged 4. Keep fire hydrant wrapped or covered to identify that it is out of service until the water line it’s connected to is put in service. B. Non-Conforming Work 1. If access and operation of the Dry-Barrel Fire Hydrant or its appurtenances do not meet the criteria of the AWWA Manual of Water Supply Practice M17, the Contractor will remedy the situation criteria, at the Contractor’s expense. 33 12 40 - 7 FIRE HYDRANTS Page 7 of 7 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised January 3, 2014 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE 3.14 ATTACHMENTS END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 2.2.F.2.a.1).a).(2) Added paint manufacturer specification 2.2.C.2.c Revised pumper nozzle nominal diameter and added NFPA 1963 Thread Designations 11/27/2013 D. Townsend Specification Modified to be in accordance with the Reduction of Lead in Drinking Water Act (P.L. 111-380) – All material s to be lead-free in accordance with this act. Sections modified are 1.1.A.1, 1.9.A.2, and 2.2.E.1 Sections added are 1.3.A.2, 1.3.B.7, 1.6.B.1, 2.2.B.1.c, 2.4.B.2 1/3/2014 D. Townsend H.R. 3588 (P.L. 113-64) signed into law 1/2/2014 waived Reduction of Lead in Drinking Water Act (P.L. 111-380) requirement for fire hydrant. All previous revisions related to “lead-free” requirement are now deleted including those revisions made 11/27/2013, those being: Sections modified are 1.1.A.1, 1.9.A.2, and 2.2.E.1 Sections added are 1.3.A.2, 1.3.B.7, 1.6.B.1, 2.2.B.1.c, 2.4.B.2 33 12 50 - 1 WATER SAMPLING STATIONS Page 1 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 SECTION 33 12 50 WATER SAMPLING STATIONS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Water sampling stations for potable water mains B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Products Installed But Not Furnished Under This Section 1. 1-inch water service line a. From water main to curb stop (including tap) D. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 03 30 00 – Cast-In -Place Concrete 4. Section 33 04 40 – Cleaning and Acceptance Testing of Water Mains 5. Section 33 05 10 – Utility Trench Excavation, Embedment and Backfill 6. Section 33 12 10 – Water Services 1-inch to 2-inch 7. Section 33 12 25 – Connections to Existing Water Mains 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Water Sampling Station a. Measurement 1) Measurement for this Item shall be per each. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the unit price bid per each “Water Sampling Station” completed in place. c. The price bid includes: 1) Furnishing and installing Sampling Station with appurtenances as specified in the Drawings 2) Meter box and Lid 3) Concrete support block 4) Curb stop 5) Fittings 6) Incidental 5 feet of service line 7) Pavement Removal 8) Excavation 9) Hauling 33 12 50 - 2 WATER SAMPLING STATIONS Page 2 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 10) Disposal of excess material 11) Clean up 12) Disinfection 13) Testing 2. Water Sampling Station installed per City Standard Details. a. Measurement 1) This Item is considered subsidiary to Water Meter Vault. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the unit price per each Water Meter Vault (with Sampling Station) installed and no other compensation will be allowed. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. NSF International a. 61, Drinking Water System Components – Health Effects 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to construction. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Product Data 1. Product Data submitted in accordance with Section 33 12 10. 2. Sampling Station 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Protect all parts such that no damage or deterioration will occur during a prolonged delay from the time of shipment until installation is completed and the units and equipment are ready for operation. 2. Protect all equipment and parts against any damage during a prolonged period at the site. 3. Prevent plastic and similar brittle items from being directly exposed to sunlight or extremes in temperature. 4. Secure and maintain a location to store the material in accordance with Section 01 66 00. 33 12 50 - 3 WATER SAMPLING STATIONS Page 3 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED PRODUCTS A. Water sampling station 1. Eclipse TM Number 88 Sampling Station, or approved equal, with 12-inch depth of bury 2. Lockable, aluminum weather shield enclosure 3. Brass internal piping and appurtenances 4. Galvanized riser pipe 5. Brass isolation valve with ¾-inch female iron pipe inlet 6. Removable parts that require no excavation 2.2 EQUIPMENT, PRODUCT TYPE, AND MATERIALS A. Manufacturers 1. Only the manufacturers as listed on the City’s Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. 3. The Water Services and appurtenances shall be new and the product of a manufacturer regularly engaged in the manufacturing of Water Services and appurtenances having similar service and size. B. Description 1. Regulatory Requirements a. All Water Sampling Station components in contact with potable water shall conform to the requirements of NSF 61. C. Materials / Design Criteria 1. Water Service a. In accordance with Section 33 12 10 include: 1) 1-inch Water Service 2) ¾-inch Water Service 3) 1-inch Corporation Stop 4) 1-inch Curb Stop 5) Fittings 6) 1-inch standard plastic meter box 2. Concrete Pad a. In accordance with Section 03 30 00 b. Dimensions 1) 2 feet x 2 feet 2) 6 inches thick c. Design 33 12 50 - 4 WATER SAMPLING STATIONS Page 4 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 1) Class ‘B’ Concrete (2500 psi) 2) Reinforced with #4 Rebar 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL A. Tests, Inspections and Markings 1. Conform to Section 33 12 10. PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Install Sampling Station in accordance with City Standard Details and Section 33 12 10 Water to include: a. 1-inch Corporation Stop b. 1-inch Water Service c. 1-inch Curb Stop d. 1-inch 90 Degree Elbow e. 1 inch x ¾ inch Reducer f. ¾-inch Water Service g. Sampling Station h. 1-inch standard plastic meter box i. Concrete Pad 2. Where appropriate, place sampling station adjacent to power pole, elevated tank, street sign, tree or fire hydrant a. Typical installation on short side of street b. When placing adjacent to fire hydrant: 1) Maintain 4-foot offset from fire hydrant and lead. 2) Do not tap fire hydrant lead line. c. For installations adjacent to valves along large water mains, connect to existing large valve copper riser. 1) Do not tap main, unless approved by City. 3. Excavate, embed and backfill trenches in accordance with 33 05 10. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD QUALITY CONTROL A. Field Tests and Inspections 1. See Section 33 12 10. 33 12 50 - 5 WATER SAMPLING STATIONS Page 5 of 5 CITY OF FORT WORTH IH35W GLOBAL LOGISTICS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 102818 Revised December 20, 2012 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.2.A.1.c – 1-inch standard meter box added to price bid 2.2.C.1.a - 1-inch standard meter box added to materials list 3.4.A.1 - 1-inch standard meter box added to installation CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: September 06, 2019 The Fort Worth Water Department’s Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department’s Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department’s Standard Specifications and the Fort Worth Water Department’s Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department’s Standard Specifications or is on the Fort Worth Water Department’s Standard Products List. Table of Content (Click on items to go directly to the page) Items Page A.Water & Sewer 1. Manholes & Bases/Components ........................................................... 1 2.Manholes & Bases/Fiberglass ............................................................... 2 3.Manholes & Bases/Frames & Covers/Rectangular ............................... 3 4.Manholes & Bases/Frames & Covers/Round ....................................... 4 5.Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight .. 5 6.Manholes & Bases/Precast Concrete .................................................... 6 7.Manholes & Bases/Rehab Systems/Cementitious ................................ 7 8.Manholes & Bases/Rehab Systems/NonCementitious ......................... 8 9.Manhole Insert (Field Operations Use Only) ........................................ 9 10. Pipe Casing Spacer ............................................................................... 10 11. Pipes/Ductile Iron ................................................................................. 11 12. Utility Line Marker ............................................................................... 12 B.Sewer 13. Coatings/Epoxy ..................................................................................... 13 14. Coatings/Polyurethane .......................................................................... 14 15. Combination Air Valves ....................................................................... 15 16. Pipes/Concrete ...................................................................................... 16 17. Pipe Enlargement System (Method) ..................................................... 17 18. Pipes/Fiberglass Reinforced Pipe ......................................................... 18 19. Pipes/HDPE .......................................................................................... 19 20. Pipes/PVC (Pressure Sewer) ................................................................. 20 21. Pipes/PVC* ........................................................................................... 21 22. Pipes/Rehab/CIPP ................................................................................. 22 23. Pipes/Rehab/Fold & Form .................................................................... 23 24. Pipes/Open Profile Large Diameter ...................................................... 24 C.Water 25. Appurtenances ....................................................................................... 25 26. Bolts, Nuts, and Gaskets ....................................................................... 26 27. Combination Air Release Valve ........................................................... 27 28. Dry Barrel Fire Hydrants ...................................................................... 28 29. Meters ................................................................................................... 29 30. Pipes/PVC (Pressure Water) ................................................................. 30 31. Pipes/Valves & Fittings/Ductile Iron Fittings ....................................... 31 32. Pipes/Valves & Fittings/Resilient Seated Gate Valve .......................... 32 33. Pipes/Valves & Fittings/Rubber Seated Butterfly Valve ...................... 33 34. Polyethylene Encasement ..................................................................... 34 35. Sampling Stations ................................................................................. 35 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeWater & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16)07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra-Seal P-201 ASTM D2240/D412/D79204/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-00104/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press-Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH1/26/99 33 05 13 HDPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Non-traffic area5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation SystemCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019* From Original Standard Products ListClick to Return to the Table of Content1 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/13)1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowtite ASTM 3753 Non-traffic area08/30/06 33 39 13 Fiberglass Manhole L.F. ManufacturingNon-traffic area* From Original Standard Products ListClick to Return to the Table of Content2 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16)* 33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 1001 24"x40" WD* From Original Standard Products ListClick to Return to the Table of Content3 Approval Spec No. ClasssificationManufacturerModel No.National SpecSizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16)*33 05 13 Manhole Frames and CoversWestern Iron Works, Bass & Hays Foundry3002424" Dia.*33 05 13 Manhole Frames and CoversMcKinley Iron Works Inc.A 24 AM24" Dia.08/24/18 33 05 13 Manhole Frames and CoversNeenah FoundryR-1272ASTM A48 & AASHTO M30624" Dia.08/24/18 33 05 13 Manhole Frames and CoversNeenah FoundryR- 165-LM (Hinged)ASTM A48 & AASHTO M30624" Dia.08/24/18 33 05 13 Manhole Frames and CoversNeenah FoundryNF 1274ASTM A48 & AASHTO M30630" Dia.08/24/18 33 05 13 Manhole Frames and CoversNeenah FoundryR-1743-LM (Hinged)ASTM A48 & AASHTO M30630" dia.33 05 13 Manhole Frames and CoversSigma CorporationMH-144N33 05 13 Manhole Frames and CoversSigma CorporationMH-143N33 05 13 Manhole Frames and CoversPont-A-MoussonGTS-STD24" dia.33 05 13 Manhole Frames and CoversNeenah Casting24" dia.10/31/06 33 05 13 Manhole Frames and Covers (Hinged)PowersealHinged Ductile Iron Manhole ASTM A53624" Dia.7/25/03 33 05 13 Manhole Frames and CoversSaint-Gobain Pipelines (Pamrex/rexus)RE32-R8FS30" Dia.01/31/06 33 05 1330" Dia. MH Ring and CoverEast Jordan Iron WorksV1432-2 and V1483 DesignsAASHTO M306-0430" Dia.11/02/10 33 05 1330" Dia. MH Ring and CoverSigma CorporationMH1651FWN & MH1650230" Dia07/19/11 33 05 1330" Dia. MH Ring and CoverStar Pipe ProductsMH32FTWSS-DC 30" Dia08/10/11 33 05 1330" Dia. MH Ring and CoverAccucast220700 Heavy Duty with Gasket Ring30" Dia10/14/13 33 05 1330" Dia. MH Ring and Cover (Hinged & Lockable)East Jordan Iron Works 30" ERGO XL Assembly with Cam Lock/MPIC/T-Gasket ASSHTO M105 & ASTM A53630" Dia06/01/17 34 05 1330" Dia. MH Ring and Cover (Hinged & Lockable) CISIP Industries2280 (32")ASTM A 4830" Dia.09/16/19 33 05 13.1030" Dia. MH Ring and Cover Composite Access Products, L.P.CAP-ONE-30-FTW, Composite, w/ Lock w/o Hing30" Dia.* From Original Standard Products ListClick to Return to the Table of Content4 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16)* 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia.* 33 05 13 Manhole Frames and Covers Neenah Casting24" Dia.* 33 05 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia.* 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia.03/08/00 33 05 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia.04/20/01 33 05 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia.* From Original Standard Products ListClick to Return to the Table of Content5 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/13)* 33 39 10 Manhole, Precast Concrete Hydro Conduit Corp SPL Item #49 ASTM C 478 48"* 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48"09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60"10/27/06 33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc.48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Diam w 24" Ring06/09/10 33 39 10 Manhole, Precast (Reinforce Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72"09/06/19 33 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72"* From Original Standard Products ListClick to Return to the Table of Content6 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Manholes & Bases/Rehab Systems/Cementitious* E1-14 Manhole Rehab Systems Quadex04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Reliner MSPE1-14 Manhole Rehab Systems AP/M Permaform4/20/01 E1-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System5/12/03 E1-14 Manhole Rehab System (Liner) Poly-triplex Technologies MH repair product to stop infiltration ASTM D581308/30/06 General Concrete Repair FlexKrete Technologies Vinyl Polyester Repair Product Misc. Use* From Original Standard Products ListClick to Return to the Table of Content7 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Manholes & Bases/Rehab Systems/NonCementitious05/20/96 E1-14 Manhole Rehab Systems Sprayroq, Spray Wall Polyurethane Coating ASTM D639/D790* E1-14 Manhole Rehab Systems Sun Coast12/14/01 Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion)For Exterior Coating of Concrete Structures Only01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Sewer Applications8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications08/30/06 Coatings for Corrosion Protection Citadel SLS-30 Solids Epoxy Sewer Applications03/19/1833 05 16, 33 39 10, 33 39 20 Coating for Corrosion protection(Exterior) Sherwin WilliamsRR&C Dampproofing Non-Fibered Spray Grade (Asphatic Emulsion)For Exterior Coating of Concrete Structures Only* From Original Standard Products ListClick to Return to the Table of Content8 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Manhole Inserts - Field Operations Use Only (Rev 2/3/16)* 33 05 13 Manhole Insert Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia.* 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia.* 33 05 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia.09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. LifeSaver - Stainless Steel For 24" dia.09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia* From Original Standard Products ListClick to Return to the Table of Content9 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Pipe Casing Spacers 33-05-24 (07/01/13)11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48"09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casin Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48"03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainless Steel)03/19/18 Casing Spacers BWMFB-12 Casing Spacer (Coated Carbon Steel) for Non_pressure Pipe and Grouted Casing* From Original Standard Products ListClick to Return to the Table of Content10 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Pipes/Ductile Iron 33-11-10(1/8/13)* 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AWWA C150, C1513" thru 24"08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co.American Fastite Pipe (Bell Spigot) AWWA C150, C151 4" thru 30"08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co.American Flex Ring (Restrained Joint) AWWA C150, C151 4" thru 30"* 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AWWA C150, C151* 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AWWA C150, C151* From Original Standard Products ListClick to Return to the Table of Content11 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water & Sewer - Utility Line Marker (08/24/2018)* From Original Standard Products ListClick to Return to the Table of Content12 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Coatings/Epoxy 33-39-60 (01/08/13)02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 210RS LA County #210-1.3312/14/01 Epoxy Lining System Ertech Technical Coatings Ertech 2030 and 2100 Series04/14/05 Interior Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile Iron Pipe Only01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Sewer Applications8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications* From Original Standard Products ListClick to Return to the Table of Content13 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Coatings/Polyurethane* From Original Standard Products ListClick to Return to the Table of Content14 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.R.I. USA, Inc. D025LTP02(Composite Body) 2"* From Original Standard Products ListClick to Return to the Table of Content15 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Pipes/Concrete* E1-04 Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76* E1-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76* E1-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL Item #95-Manhole, #98- PipeASTM C 76* E1-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76* From Original Standard Products ListClick to Return to the Table of Content16 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Pipe Enlargment System (Method)33-31-23 (01/18/13)PIM System PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Approved PreviouslyMcConnell Systems McLat Construction Polyethylene Houston, Texas Approved PreviouslyTRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously* From Original Standard Products ListClick to Return to the Table of Content17 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Pipe/Fiberglass Reinforced Pipe 33-31-13(1/8/13)7/21/97 33 31 13 Cent. Cast Fiberglass Hobas Pipe USA, Inc. Hobas Pipe (Non-Pressure) ASTM D3262/D375403/22/10 33 31 13 Fiberglass Pipe Ameron Bondstrand RPMP Pipe ASTM D3262/D375410/30/03 Glass-Fiber Reinforced Polymer Pipe Thompson Pipe Group Flowtite ASTM D3262/D37544/14/05 Polymer Modified Concrete Pipe Amitech USA Meyer Polycrete Pipe ASTM C33, A276, F477 8" to 102", Class V06/09/10 E1-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76* From Original Standard Products ListClick to Return to the Table of Content18 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Pipes/HDPE 33-31-23(1/8/13)* High-density polyethylene pipe Phillips Driscopipe, Inc. Opticore Ductile Polyethylene Pipe ASTM D 1248 8"* High-density polyethylene pipe Plexco Inc. ASTM D 1248 8"* High-density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8"High-density polyethylene pipe CSR Hydro Conduit/Pipeline Systems McConnell Pipe Enlargement ASTM D 1248* From Original Standard Products ListClick to Return to the Table of Content19 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Pipes/PVC (Pressure Sewer) 33-11-12 (4/1/13)12/02/11 33-11-12 DR-14 PVC Pressure Pipe Pipelife Jetstream PVC Pressure Pipe AWWA C900 4" thru 12"10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AWWA C900 4" thru 12"* From Original Standard Products ListClick to Return to the Table of Content20 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Pipes/PVC* 33-31-20 (7/1/13)* 33-31-20 PVC Sewer Pipe Certain-Teed Products Corp ASTM D 3034 4" thru 15"* 33-31-20 PVC Sewer Pipe Napco Manufacturing CorpASTM D 3034, D 17844" & 8"* 33-31-20 PVC Sewer Pipe J-M Manufacturing Co., Inc. (JM Eagle) ASTM D 3034 4" - 15"12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 and SDR-35 ASTM F 789, ASTM D 30344" thru 15"* 33-31-20 PVC Sewer Pipe Lamson Vylon Pipe ASTM F 789 4" thru 15"33-31-20 PVC Sewer Pipe Royal Building Products Royal Seal Solid Wall Pipe SDR 26 & 35 ASTM 3034 4" thru 15"01/18/18 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe Gravity Sewer ASTM D3034 4" thru 15"11/11/98 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation "S" Gravity Sewer Pipe ASTM F 679 18" to 27"* 33-31-20 PVC Sewer Pipe J-M Manufacturing Co, Inc. (JM Eagle) ASTM F 679 18" - 27"09/11/12 33-31-20 PVC Sewer Pipe Pipelife Jet Stream SDR-26 and SDr-35 ASTM F-679 18"05/06/0533-31-20PVC Solid Wall Pipe Diamond Plastics CorporationPS 46 ASTM F-679 18" to 48"04/27/0633-31-20PVC Sewer Fittings HarcoSDR-26 and SDR-35 Gasket Fittings ASTM D-3034, D-1784, etc 4" - 15"*33-31-20PVC Sewer Fittings Plastic Trends, In.cGasketed PVC Sewer Main Fittings ASTM D 303411/17/99E100-2Closed Profile PVC Pipe Diamond Plastics CorporationASTM 1803/F794 18" to 48"3/19/2018 33 31 20 PVC Sewer Pipe Pipelife Jet Stream SDR 35 ASTM F679 18"- 24"3/19/2018 33 31 20 PVC Sewer Pipe Pipelife Jet Stream SDR 26 ASTM D3034 4"- 15"3/29/2019 33 31 20Gasketed Fittings (PVC)GPK Products, Inc. SDR 26 ASTM D3034/F-679 4"- 15"9/6/2019 33 31 20 PVC Sewer Pipe NAPCO SDR 26, SDR 35 ASTM D3034 4" - 8"9/6/2019 33 31 20 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26, SDR 35 ASTM D3034 8"* From Original Standard Products ListClick to Return to the Table of Content21 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Pipes/Rehab/CIPP 33-31-12 (01/18/13)* Cured in Place Pipe Insituform Texark, Inc ASTM F 121605/03/99 Cured in Place Pipe National Envirotech Group National Liner, (SPL) Item #27 ASTM F-1216/D-581305/29/96 Cured in Place Pipe Reynolds Inc/Inliner Technolgy (Inliner USA) Inliner Technology ASTM F 1216* From Original Standard Products ListClick to Return to the Table of Content22 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Pipes/Rehab/Fold & Form* Fold and Form Pipe Cullum Pipe Systems, Inc.11/03/98 Fold and Form Pipe Insituform Technologies, Inc. Insituform "NuPIpe" ASTM F-1504Fold and Form Pipe American Pipe & Plastics, Inc.Demo. Purpose Only12/04/00 Fold and Form Pipe Ultraliner Ultraliner PVC Alloy Pipeliner ASTM F-1504, 1871, 186706/09/03 Fold and Form Pipe Miller Pipeline Corp. EX Method ASTM F-1504, F-1947 Up to 18" diameter* From Original Standard Products ListClick to Return to the Table of Content23 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Sewer - Pipes/Open Profile Large Diameter09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vylon Pipe Carlon Vylon H.C. Closed Profile Pipe, ASTM F 679 18" to 48"09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extrusion Technologies, Inc. Ultra-Rib Open Profile Sewer Pipe ASTM F 679 18" to 48"E100-2 PVC Sewer Pipe, Ribbed Uponor ETI Company11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) SaniTite HP Double Wall (Corrugated)ASTM F 2736 24"-30"11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) SaniTite HP Triple Wall Pipe ASTM F 2764 30" to 60"05/16/11 Steel Reinforced Polyethylene Pipe ConTech Construction Products Durmaxx ASTM F 2562 24" to 72"* From Original Standard Products ListClick to Return to the Table of Content24 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Appurtenances 33-12-10 (07/01/13)01/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2" SVC, up to 24" Pipe08/28/02 Double Strap Saddle Smith Blair #317 Nylon Coated Double Strap Saddle07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2" SVC, up to 24" Pipe10/27/87 Curb Stops-Ball Meter Valves McDonald 6100M,6100MT & 610MT 3/4" and 1"10/27/87 Curb Stops-Ball Meter Valves McDonald 4603B, 4604B, 6100M, 6100TM and 6101M 1½" and 2"5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc.FB600-7NL, FB1600-7-NL, FV23-777-W-NL, L22-77NL AWWA C800 2"5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc.FB600-6-NL, FB1600-6-NL, FV23-666-W-NL, L22-66NL AWWA C800 1-1/2"5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc.FB600-4-NL, FB1600-4-NL, B11-444-WR-NL, B22444-WR-NL, L28-44NL AWWA C800 1"5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd.B-25000N, B-24277N-3, B-20200N-3, H-15000N, , H-1552N, H142276NAWWA C800, ANSF 61, ANSI/NSF 372 2"5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd.B-25000N, B-20200N-3, B-24277N-3,H-15000N, H-14276N, H-15525NAWWA C800, ANSF 61, ANSI/NSF 372 1-1/2"5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd.B-25000N, B-20200N-3,H-15000N, H-15530NAWWA C800, ANSF 61, ANSI/NSF 372 1"01/26/00 Coated Tapping Saddle with Double SS Straps JCM Industries, Inc. #406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) JCM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16"02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 240 AWWA C-223 U p to 42" w/24" Out02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp4" to 30"Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW37C-12-1EPAF FTWPlastic Meter Box w/Composite Lid DFW Plastics Inc. DFW39C-12-1EPAF FTW08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-1EPAF FTW Class "A"Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9* From Original Standard Products ListClick to Return to the Table of Content25 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/13)* From Original Standard Products ListClick to Return to the Table of Content26 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Combination Air Release 33-31-70 (01/08/13)* E1-11 Combination Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 240 - float, ASTM A 307 - Cover Bolts1" & 2"* E1-11 Combination Air Release Valve Multiplex Manufacturing Co.Crispin Air and Vacuum Valves, Model No. 1/2", 1" & 2"* E1-11 Combination Air Release Valve Valve and Primer Corp. APCO #143C, #145C and #147C 1", 2" & 3"* From Original Standard Products ListClick to Return to the Table of Content27 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Dry Barrel Fire Hydrants 33-12-40 (01/15/14)10/01/87 E-1-12 Dry Barrel Fire Hydrant American-Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-50203/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-50209/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-50201/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-50208/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-50209/24/87 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-50210/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller CompanyShop Drawings No. 6461 A-423 Centurion AWWA C-50201/15/88 E1-12 Dry Barrel Fire Hydrant Mueller CompanyShop Drawing FH-12A-423 Super Centurion 200 AWWA C-50210/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-50209/16/87 E-1-12 Dry Barrel Fire Hydrant Waterous Company Shop Drawing No. SK740803 AWWA C-50208/12/16 33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMaster 5CD250* From Original Standard Products ListClick to Return to the Table of Content28 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Meters02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10"08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6"* From Original Standard Products ListClick to Return to the Table of Content29 Approval Spec No. ClasssificationManufacturerModel No.National SpecSizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Pipes/PVC (Pressure Water) 33-31-70 (01/08/13)01/18/18 33-11-12 PVC Pressure PipeVinyltech PVC PipeAWWA C900, AWWA C605, ASTM D17844"-12"3/19/2018 33 11 12 PVC Pressure PipePipelife Jet StreamDR14AWWA C9004"-12"3/19/2018 33 11 12 PVC Pressure PipePipelife Jet StreamDR18AWWA C90016"-24"5/25/2018 33 11 12 PVC Pressure PipeDiamond Plastics CorporationDR 14AWWA C9004"-12"5/25/2018 33 11 12 PVC Pressure PipeDiamond Plastics CorporationTrans 21, DR 14, DR 18AWWA C90016"-24"12/6/2018 33 11 12 PVC Pressure PipeJ-M Manifacturing Co., Inc d/b/a JM EagleDR 14"Blue Brute"AWWA C900-16UL 1285ANSI/NSF 61FM 16124"-12"12/6/2018 33 11 12 PVC Pressure PipeJ-M Manifacturing Co., Inc d/b/a JM EagleDR 18"Blue Brute"AWWA C900-16UL 1285ANSI/NSF 61FM 161216"-24"9/6/2019 33 11 12 PVC Pressure PipeUnderground Solutions Inc.DR14 Fusible PVCAWWA C9004" - 8"9/6/2019 33 11 12 PVC Pressure PipeNAPCODR18AWWA C90016" - 24"9/6/2019 33 11 12 PVC Pressure PipeNAPCODR14AWWA C9004"- 12"9/6/2019 33 11 12 PVC Pressure PipeSanderson Pipe Corp.DR14AWWA C9004"- 12"* From Original Standard Products ListClick to Return to the Table of Content30 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Pipes/Valves & Fittings/Ductile Iron Fittings 33-11-11 (01/08/13)07/23/92 E1-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Fittings AWWA C153 & C110* E1-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittings AWWA C 110* E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilities DivisionMechanical Joint Fittings, SSB Class 350AWWA C 153, C 110, C 11108/11/98 E1-07 Ductile Iron Fittings Sigma, Co.Mechanical Joint Fittings, SSB Class 351AWWA C 153, C 110, C 11202/26/14 E1-07 MJ Fittings AccucastClass 350 C-153 MJ FittingsAWWA C153 4"-12"05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-FlangeUni-Flange Series 1400 AWWA C111/C153 4" to 36"05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Uni-FlangeUni-Flange Series 1500 Circle-LockAWWA C111/C153 4" to 24" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc.One Bolt Restrained Joint FittingAWWA C111/C116/C153 4" to 12"02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc.Megalug Series 1100 (for DI Pipe)AWWA C111/C116/C153 4" to 42"02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc.Megalug Series 2000 (for PVC Pipe)AWWA C111/C116/C153 4" to 24"08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co.Sigma One-Lok SLC4 - SLC10AWWA C111/C153 4" to 10"03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co.Sigma One-Lok SLCS4 - SLCS12AWWA C111/C153 4" to 12"08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co.Sigma One-Lok SLCEAWWA C111/C153 12" to 24"08/10/98 E1-07 MJ Fittings(DIP) Sigma, Co.Sigma One-Lok SLDEAWWA C153 4" - 24"10/12/10 E1-24 Interior Restrained Joint System S & B Techncial ProductsBulldog System ( Diamond Lok 21 & JM Eagle ASTM F-1624 4" to 12"08/16/06 E1-07 Mechanical Joint Fittings SIP Industries(Serampore)Mechanical Joint FittingsAWWA C153 4" to 24"11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc.PVC Stargrip Series 4000ASTM A536 AWWA C11111/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc.DIP Stargrip Series 3000ASTM A536 AWWA C11103/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore)EZ Grip Joint Restraint (EZD) Black For DIPASTM A536 AWWA C111 3"-48"03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore)EZ Grip Joint Restraint (EZD) Red for C900 DR14 PVC PipeASTM A536 AWWA C111 4"-12"03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore)EZ Grip Joint Restraint (EZD) Red for C900 DR18 PVC PipeASTM A536 AWWA C111 16"-24"* From Original Standard Products ListClick to Return to the Table of Content31 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Pipes/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15)Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16"12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36"08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AWWA C515 20" and 24"05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16"10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12"08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48"05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AWWA C509 4" to 12"01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company20" and smaller* E1-26 Resilient Seated Gate Valve Kennedy4" - 12"* E1-26 Resilient Seated Gate Valve M&H4" - 12"* E1-26 Resilient Seated Gate Valve Mueller Co.4" - 12"11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16"01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AWWA C515 30" and 36"01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AWWA C515 42" and 48"01/28/88 E1-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12"10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AWWA C515 16"11/08/99 E1-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AWWA C515 24" and smaller11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3)11/30/12 Resilient Wedge Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48" (Note 3)05/08/91 E1-26 Resilient Seated Gate Valve Stockham Valves & Fittings AWWA C 509, ANSI 420 - stem, ASTM A 276 Type 304 - Bolts & nuts4" - 12"* E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co.Metroseal 250, requirements SPL #743" to 16"10/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works)EJ FlowMaster Gate Valve & Boxes08/24/18Matco Gate Valve Matco-Norca225 MRAWWA/ANSI C115/An21.15 4" to 16"* From Original Standard Products ListClick to Return to the Table of Content32 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Pipes/Valves & Fittings/Rubber Seated Butterfly Valve 33-12-21 (07/10/14)* E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AWWA C-504 24"* E1-30 Rubber Seated Butterfly Valve Mueller Co. AWWA C-504 24"and smaller1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. AWWA C-504 24" and larger06/12/03 E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Corp. Valmatic American Butterfly Valve. AWWA C-504 Up to 84" diameter04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AWWA C-504 24" to 48"03/19/18 33 12 21 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AWWA C504 Butterfly Valve AWWA C-504 30"-54" * From Original Standard Products ListClick to Return to the Table of Content33 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Polyethylene Encasement 33-11-10 (01/08/13)05/12/05 E1-13 Polyethylene Encasment Flexsol Packaging Fulton Enterprises AWWA C105 8 mil LLD05/12/05 E1-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AWWA C105 8 mil LLD05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AWWA C105 8 mil LLD09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement fro DIP AWWA C105 8 mil LLD* From Original Standard Products ListClick to Return to the Table of Content34 Approval Spec No. Classsification Manufacturer Model No. National Spec SizeCITY OF FORT WORTHWATER DEPARTMENT STANDARD PRODUCT LISTNote: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.Updated: 09/06/2019Water - Sampling Station3/12/96 Water Sampling Station Water Plus B20 Water Sampling Station* From Original Standard Products ListClick to Return to the Table of Content35