HomeMy WebLinkAboutContract 55475-A2 CSC No.55475-A2
AMENDMENT No. 2
TO CITY SECRETARY CONTRACT No. 55475
WHEREAS, the City of Fort Worth (CITY) and Harris Kocher Engineering
Group, Inc. , d/b/a Harris Kocher Smith (ENGINEER) made and entered into
City Secretary Contract No. 55475, (the CONTRACT) which was authorized by
M&C 21-0176 on the 25th day of March, 2021 in the amount of $426, 469. 00;
and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $3, 498 . 00 which was administratively authorized on
January 7th, 2022; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Alemeda HROM/MTP Realignment (CPN 103054) ; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee .
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $56, 900 . 00 . (See Attached Funding
Breakdown Sheet, Page -4-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $486, 867 . 00 .
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City' s
City of Fort worth, Texas Al OFFICIAL RECORD
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 1 of 4 CITY SECRETARY
FT. WORTH, TX
designated Assistant City Manager.
APPROVED:
City of Fort Worth Harris Kocher Engineering
Group, Inc. d/b/a Harris
Kocher Smith
'gana 24L( hdo
Dana Burghdoff(:ran 26,2022 20:24 CST) -
Dana Burghdoff Krcincipa?",
hael re
Assistant City Manager
DATE: Jan 26, 2022 DATE: , /7 Zz
APPROVAL RECOMMENDED:
WJ(J,n 26.20 09:40 CST)
William Johnson
Director, Transportation & Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
Michael Wellbaum
Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Alemeda HROM/MTP Realignment
Prof Services Agreement Amendment Template CPN: 103054
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
WIA Date : N/A
DBlack(Jan 26,2022 19:44 CST)
Douglas W. Black
Sr Assistant City Attorney
ATTEST:
:7�`I`IG��G�GODG��GG
a
aT
Jannette S.Goodall(Jan 27,202207:33 CST) Oi0100000�G
O 1� lY
Jannette Goodall ��°
�P'
City Secretary �vo =d
o°o 1 �p ��
od
°O00000 O
��nEXAS.oAp
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Alemeda HROM/MTP Realignment
Prof Services Agreement Amendment Template CPN: 103054
Revision Date: November 23, 2021
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 55475
Amendment No . 2
Department Fund-Account-Center Amount
TPW 52007-0200431-5330500-103054-002830-9999 $56, 900 . 00
Total : $56, 900 . 00
City of Fort Worth, Texas Alemeda HROM/MTP Realignment
Prof Services Agreement Amendment Template CPN: 103054
Revision Date: November 23, 2021
Page 4 of 4
HISRRIS
KOCHER
awSMITH
OALLASIFORT WORTH . DENVER
January 17, 2022
City of Fort Worth
Transportation & Public Works
City Hall—Second Floor
200 Texas Street
Fort Worth,TX 76102
RE: Alemeda HROM/MTP Realignment
Amendment#2
HKS Project No. 200634
Harris Kocher Engineering Group, Inc., d/b/a Harris Kocher Smith (hereinafter referred to as
"Engineer") is pleased to submit Amendment No. 2 in the amount of$56,900.00. The Amendment is
for the following services:
1) BOX CULVERT REVISIONS
The Engineer will provide Box Culvert Revisions at the request of the City of Fort Worth to modify the
originally approved preliminary design to incorporate a low flow channel as a part of the box culvert
design. This scope of services specifically includes the following:
• Supplemental topographic design survey(via subconsultant),
o Fieldwork,
o Office processing,
• 3D HEC-RAS channel modeling revisions/calculations,
o Revising existing 3D surface models,
o Regrading,
o Storm sewer calculation revisions,
o Plan and profiles (culvert/storm) revisions,
• Floodplain development permit revisions/coordination,
o Tables,
o Narrative,
o Exhibits,
o Application form,
• Roadway grading revisions,
• Utility revisions (water/sewer/storm; as applicable related to this change).
LUMP SUM FEE=$56,900.00
451 S. Main Street, Suite 210, Fort Worth, Texas 76104 P:817.769.6279 F:817.769.6298
TBPE Firm Ns: F-15501 www.harriskochersmith.com TBPLS Firm W: 10194145
r_lemeda rROM/MTP Realignment
CPN: 103054
ENGINEER:
Harris Kocher Engineering Group, Inc.
d/b/a Harris Kocher Smith
Mi ael Moore
P incipal
Alemeda HROM/MTP Realignment
CPN: 103054