Loading...
HomeMy WebLinkAboutContract 55475-A2 CSC No.55475-A2 AMENDMENT No. 2 TO CITY SECRETARY CONTRACT No. 55475 WHEREAS, the City of Fort Worth (CITY) and Harris Kocher Engineering Group, Inc. , d/b/a Harris Kocher Smith (ENGINEER) made and entered into City Secretary Contract No. 55475, (the CONTRACT) which was authorized by M&C 21-0176 on the 25th day of March, 2021 in the amount of $426, 469. 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $3, 498 . 00 which was administratively authorized on January 7th, 2022; and WHEREAS, the CONTRACT involves engineering services for the following project: Alemeda HROM/MTP Realignment (CPN 103054) ; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee . NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $56, 900 . 00 . (See Attached Funding Breakdown Sheet, Page -4-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $486, 867 . 00 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City' s City of Fort worth, Texas Al OFFICIAL RECORD Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 1 of 4 CITY SECRETARY FT. WORTH, TX designated Assistant City Manager. APPROVED: City of Fort Worth Harris Kocher Engineering Group, Inc. d/b/a Harris Kocher Smith 'gana 24L( hdo Dana Burghdoff(:ran 26,2022 20:24 CST) - Dana Burghdoff Krcincipa?", hael re Assistant City Manager DATE: Jan 26, 2022 DATE: , /7 Zz APPROVAL RECOMMENDED: WJ(J,n 26.20 09:40 CST) William Johnson Director, Transportation & Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . Michael Wellbaum Project Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Alemeda HROM/MTP Realignment Prof Services Agreement Amendment Template CPN: 103054 Revision Date: November 23, 2021 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: M&C: N/A WIA Date : N/A DBlack(Jan 26,2022 19:44 CST) Douglas W. Black Sr Assistant City Attorney ATTEST: :7�`I`IG��G�GODG��GG a aT Jannette S.Goodall(Jan 27,202207:33 CST) Oi0100000�G O 1� lY Jannette Goodall ��° �P' City Secretary �vo =d o°o 1 �p �� od °O00000 O ��nEXAS.oAp OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Alemeda HROM/MTP Realignment Prof Services Agreement Amendment Template CPN: 103054 Revision Date: November 23, 2021 Page 3 of 4 FUNDING BREAKDOWN SHEET City Secretary No. 55475 Amendment No . 2 Department Fund-Account-Center Amount TPW 52007-0200431-5330500-103054-002830-9999 $56, 900 . 00 Total : $56, 900 . 00 City of Fort Worth, Texas Alemeda HROM/MTP Realignment Prof Services Agreement Amendment Template CPN: 103054 Revision Date: November 23, 2021 Page 4 of 4 HISRRIS KOCHER awSMITH OALLASIFORT WORTH . DENVER January 17, 2022 City of Fort Worth Transportation & Public Works City Hall—Second Floor 200 Texas Street Fort Worth,TX 76102 RE: Alemeda HROM/MTP Realignment Amendment#2 HKS Project No. 200634 Harris Kocher Engineering Group, Inc., d/b/a Harris Kocher Smith (hereinafter referred to as "Engineer") is pleased to submit Amendment No. 2 in the amount of$56,900.00. The Amendment is for the following services: 1) BOX CULVERT REVISIONS The Engineer will provide Box Culvert Revisions at the request of the City of Fort Worth to modify the originally approved preliminary design to incorporate a low flow channel as a part of the box culvert design. This scope of services specifically includes the following: • Supplemental topographic design survey(via subconsultant), o Fieldwork, o Office processing, • 3D HEC-RAS channel modeling revisions/calculations, o Revising existing 3D surface models, o Regrading, o Storm sewer calculation revisions, o Plan and profiles (culvert/storm) revisions, • Floodplain development permit revisions/coordination, o Tables, o Narrative, o Exhibits, o Application form, • Roadway grading revisions, • Utility revisions (water/sewer/storm; as applicable related to this change). LUMP SUM FEE=$56,900.00 451 S. Main Street, Suite 210, Fort Worth, Texas 76104 P:817.769.6279 F:817.769.6298 TBPE Firm Ns: F-15501 www.harriskochersmith.com TBPLS Firm W: 10194145 r_lemeda rROM/MTP Realignment CPN: 103054 ENGINEER: Harris Kocher Engineering Group, Inc. d/b/a Harris Kocher Smith Mi ael Moore P incipal Alemeda HROM/MTP Realignment CPN: 103054