HomeMy WebLinkAboutContract 42584 ITY SECRE1'i'%A'%'�'� .O.E. FIL' ' Ci"*v"1'P%ACT0RJ* BORIDINC� FORT V�O�TH CITY SECRETARY�2SB�} /� CON.TRACT NO. Py SPECIFICATIONS AND CONTRACT DOCUMENTS C FOR SOUTH HULEN STREET C CARRIAGE CROSSING DRIVE TO RANCHO VERDE PARKWAY CITY PROJECT No. 01365 AUGUST 2011 t Betsy Price Tom Higgins Mayor Interim City Manager C Douglas W. Wiersig, P.E. Director; Transportation and Public Works S. Frank Crumb, P.E. Director, Water Department PREPARED FOR: The City of Fort Worth GRAHAM ASSOCIATES, INC. TBPE FIRM: F-1191 cr FOC r MARK BURCKHARD TA KY � 65301 #" Iq-0 0 arx JW IS TE CNAL Y/-z 6 BID S F, T M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORT WO RTIf COUNCIL ACTION: Approved on 11/15/2011 - ordinance No. 19982-11-2011 m. REFERENCE 20SOUTH HULEN STREET DATE: 1 1/15/201 NO.. C-25299 LOG NAME: CONSTRUCTION CONATSER CODE: C TYPE: NOW PUBLIC CONSENT HEARING: NO SUBJECT: Authorize Execution of a Contract in the Amount of$1,609,143.35 with Conatser Construction Tx, L.P., for Water, Pavement, Street Lights, and Drainage Improvements for South Hulen Street from Carriage Crossing Drive to Rancho Verde Parkway, Utilize $1,742,000.00 from the Transportation Public Works Gas Well Revenues Fund and $360,000.00 from the Water Capital Projects Funds to Provide for Construction Contract Costs, Contingencies and Construction Services for a Project Total of$2,1 02,000.00 and Adopt Appropriation ordinance (COUNCIL DISTRICT 6) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations by $1,742,000.00 in the Transportation Public Works Gas Well Revenues Fund from available funds to cover the acquisition of rights-of-way and easements and for construction costs related to the South Hulen Street Project; and 2. Authorize execution of a contract with Conatser Construction Tx, L.P., in the amount of $1,609,143.35 for water, pavement, street lights, and drainage improvements for South Hulen Street Improvements from Carriage Crossing Drive to Rancho Verde Parkway. DISCUSSION: On April 22, 2008, (M&C G-16117) City Council established a Special Projects Fund for Street Improvements and authorized the use of Gas Well Revenues in the amount of$15 million for arterial streets. South Hulen Street is included in this Fund, providing construction of half of a Principle Arterial from Carriage Crossing Drive to Rancho Verde Parkway along with bike lanes and sidewalks. The attached appropriation ordinance provides the funds for right-of-way, easements and construction. This construction contract will provide for the construction of water, paving, street lights and drainage 9 improvements on South Hulen Street from Carriage Crossing Drive to Rancho Verde Parkway. Y The project was advertised on August 25, 2011, September 8, 2011 and September 15, 2011 in the Fort Worth Star-Tele ram. The following responsive bids were received on September 22, 2011: Bidder Amount Conatser Construction Tx, L.P. $17609,143.35 McClendon Construction Co., Inc. $176877247.40 JLB Contracting, LLC $1,8017950.46 Ed. A. Wilson, Inc. $2,097,891.00 Time of completion: 300 calendar days. http://apps-cfwnet.org/counc*Il _packet/mc—review.asp?ID=1603 9&councildate=1111512011 11/16/2011 M&C Review Page 2 of 2 The City reserves the right to increase or decrease quantities of individual pay items within the contract, provided that the total contract amount remains within plus or minus 25 percent of the contract award. In addition to the contract cost, funding in the amount of$41,300.00 is included for water construction survey, project management, material testing, field inspection and project close out. The contingency funds to cover change orders totals $9,315.00. In addition to the contract cost, funding in the amount of$239,892.48 is included for Transportation and Public Works associated costs for staff time, survey, project management, material testing, field inspection and project close out. The contingency fund to cover change orders for pavement reconstruction work total $38,1 47.00. Conaster Construction Tx, L.P., is in compliance with the City's MIWBE Ordinance by committing to 18 percent MIWBE participation. The City's goal on this project is 18 percent. This project is located on MAPSCO 103W and 117A in COUNCIL DISTRICT 6. FISCAL INFORMATIONXERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Transportation and Public Works Gas Well Revenues Fund and the Water Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 0223 541200 201„929990200 $1.742,000.00 0223 541200 206230136583 $1,299,758-35 L1,742-000.00 0223 446200 201929990200 P265 541200 606140136583 $303.3 5.00 Submitted for City Mana er's Office b Fernando Costa (6122) Originatina De artment Head: Douglas W. Wiersig (7801) Additional Information Contact: Michael Hasler(2442) Patrick Buckley (2443) ATTACHMENTS 20 SOUTH HULEN STREET CONSTRUCTION CONATSER M,ap.pdf 20SOUTH HULEN STREET CONSTRUCTION CONATSER A02.doc http://apps.cfwnet.org/council_Packet/mc—review.asp?ID=1603 9&councildate=11/15/2011 11/16/2011 CITY OF FORT WORTH,TEXAS s�cR�ra�r CONTRACT cinr �X584 CONTRACT NO. THE STATE OF TEXAS KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT This Contract made and entered into this the day of NOV 15 2011A.D., 2011, by and between the CITY OF FORT WORTH, ahome-rule municipal corporation situated in Tarrant County, Denton, Parker, and Wise Counties, Texas, by an through its duly authorized Assistant City Manager, ("Owner"), and Conatser Construction Tx,LP., ("Contractor"). Owner and Contractor may be referred to herein individually as a"Party"or collectively as the"Parties." WITNESSETH: That said parties have agreed as follows: 1. ' That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: Water,Pavement,Street Lights,and Drainage Improvements for South Hulen Street from Carriage Crossing Drive to Rancho Verde Parkway 2. That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in ' accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are ' hereto attached and made a part of this contract the same as if written herein. 3. The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Department of Engineering of the City of Fort Worth. 4. tThe Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the C�of.�Qri. within a period of 300 calendar days. r.'A If the Contractor should fail to complete the work as set forth in the Plans and Speci4cogtt6 3teCoa"Y Documents within the time so stipulated, plus any additional time allowed as proyid <a etT[j( j Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of$420' Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety a„ shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6 Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, wh eth er or not any such injury, damage or death is caused in whole or in part, bv the ne li ence or alle ed ne li ence of Owner, its officers, servants or em to ees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not anE such inLury or dama a is caused in whole or in part bE the ng li ence or allepred ne li ence of owner, its -officersIt servants or employees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, upon the execution of this Contract, and before beginning work, to make, execute and deliver to City of Fort Worth the following bonds in the name of the City of Fort Worth in a sum equal to the amount of the Contract. All bonds furnish hereunder shall meet the requirements of Chapter 2253 of the Texas Government Code, as amended. A. If the total contract price is $25,000 or less, payment to the contr#etor-sfrm1t-bb-"made in t one lump sum. Payment shall not be made for a period of 45 calendar days from� the v"rk Wit been completed and accepted by the Owner. B. If the contract amount is in excess of$25,000, a Payment Bond shall be executed in the amount of the Contract, solely for the protection of all claimants supplying labor and material in the prosecution of the work. C. If the Contract amount is in excess of$100,000, a Performance Bond shall be executed in the amount of the Contract conditioned on the faithful performance of the work in accordance with the Plans, Specifications, and Contract Documents. Said bond shall solely be for the p rotection of the Owner. D. A Two-year Maintenance Bond in the Name of the Owner is required for all projects to 9 p J insure the prompt, full and faithful performance of the general uarantee contained in the Contract act Documents. S. The Owner agrees and binds itself to pay, and the Contractor agrees to receive for all of the foresail work, and for all additions thereto or deductions therefrom, the rice shown on the Proposal posal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted b the Owner and receipt of y p invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates nla shall be one Million Six Hundred Nine Thousand one Hundred For -three and 351100.....................................................................................................................Dollars $1 609 143.35 . 9. It is further agreed that the performance of this Contract, either in whole or in p art, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Department of Engineering. 10. The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a co py of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. 11. It is mutually agreed and understood that this y agreement is made and entered into b the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract and the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 8 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument throw h duly authorized officers in 8 counterparts with its corporate seal attached. NOV 15 2011 Done in Fort Worth, Texas, this the day of A.D., 2011. i APPROVAL RECOMMENDED: CITY OF FORT WORTH t a Lj-' Dougla W. Wiersig, P.E. -- D' ctor Transportation Public Works ` FERNANDO COSTA,ASST CITY MANAGER ®r ATTEST: Conatser Construction Tx LP. PO Box 15445 Fort Worth TX 75119 CONTRACTOR **rl -�o 000000 4� �h 0 CITY SECRETARY aka p i o 0 (SEAL) w• ,r '0o° 0 dd BY: d4&-1k04Uw X00°0 000 OCP A Brock Huggins,Vice President of �'p'4 Conatser Management Group Inc,G.P. TITLE P.Q. Box 15448 APPROVED AS TO FORM AND Fort Worth,TX 76119 LEGALITY: ADDRESS �f .I Y� -� t '. i A§' T. CITY TORNEY November 1960 Revised May 1986 Revised September 1992 1 f 1