PR�JECT MA1�iJAL
FOR
�� �����° :
�����r ��. '���
�020 ON-CALL PAVEMENT MARKiNGS COIVTRACT #2
Mattie Parker
Mayar
David Coolce
City Manager
Williayn M Johnson
Director, Transportation and Public Works Depai�tment
Prepared for
The Cxty a� Fo�rf 'Wor�h
Transportat�on and Pr�blic Works Degairtment
202Q
� _�
� �
a+ -
;� .
�.�+ �'-
�r� �._, �
� ..i�z�--
�1 a 6 r� I
I
.5&i�� ���.+
- _ . � �����G��. -. �
T '����, ����6;
ao 00 00
STANDARD CONSTRiICTION SP�CIFiCATIQN DOCUMENTS
Page [ oi$
SECTION 00 QO 00
TABLE OF CONTENTS
Division 0� - General Conditians
Last Revised
04 45 10 Ma ar ar�d Council Communicatian 07i01/2011
a0 OS 15 Addenda 07/01/2011
00 l I I3 Invitation ta Bidders D416/202Q*
QO 21 13 Instructions to Sidders QI/34/2017*
n nv�-�rrJ �'� Mmrcrnzviv
nn� fl? M��
00 35 13 Conflict of Interast Affidavit 03127/2012*
00 41 00 Bid Forrn 08/21/2015 *
QQ 42 �3 Pro osal Form Unit Pric� 01/20/2012
00 43 13 Bid Bond 06/27/201 I*
Ob 43 37 Vendor Com liance to State Law Nonresident Bidder 06/27/2011
nn�l. m �n�n�r
OQ 45 l2 Pre ualif�cation Statement 07/0 1120 1 1
nn� n��� nn rnQ, n�4n
00 45 25 Cantractor Com liance with Workers' Com ensation Law 07/01/2011
00 45 40 Business E tii Goal 10/27/2021
00 52 43 A reement 09/01/2025
DO 61 13 1'erfoi�nar�ce Bond 07/0112Q11
00 61 14 Pa ment Bond 07/0 3/2Q I 1
00 bl 19 Maintenance Band 0`7101/2011
00 61 25 Certificate of Insurance 07/0112Q11
00 72 00 General Cand'ttiaqs D8123/2021
00 73 00 Su lementar Conditions 03/09l2020
Division O1- General Re uirements Last lZevised
O] 11 00 Summar of Work I2/20/20I2
01 2S 00 Substitution Procedures 07/01/2011
O1 31 19 Freconstruciion Meetin 08117(2012
nti� mrn�T
01 32 16 Construction Pro ess Schedule 07/0112�1 I
Ql 32 33 Preconstruction Videa 07/DIL2011
O1 33 00 Submittals 12/20/2012
Q1 35 I3 S ecial Pro'ect ProcedUres 12/20/2012
O1 45 23 T�stin and Ins ection Servjces 03/09/2020
n 1��na n� m� zo �-�.,
O1 55 26 Sireet Use Permit and Modifications to Traffic Control Q3122/2021
n i� n� rn�n-
n �� n��no-rr.vi r�rr.v rr
��� _�e���e R2 !n� /"7�
41 66 OQ Product �tora e and Handlin Re u�remant,s 07/01/201 I
O1 70 00 Mobilizatian and Remobi�izatian 11/22/2016
ni� m�y��
01 74 23 Cleaning 0710 S/ZO � l
CITY OP F�I�T WOR"1'H
�` - PREVIOUS SPEG[F'ICATION UTILIZED
2020 pn-Call PavemenC Markings Contract #2
S"T'ANDA�ll CONSTRUCTIOIV SPECIFICATION bOCUl��NTS CPN l �3740
Revised .1uly 2, 2021
00 oa oa
STANDARD CONSTRUCTION SPECLFICATIOI� DpCUMC]V'I'S
Page 2 af S
http://fortwo rt�texas.govltpw/coniraetorsl
or
htt s:lla s.fortworthtexas. ovlPro'ec#Resourcesl
Division 02 - Existiu CnndRtions
02 41 13 5elactive Site Demolitian
02 4l 14 Utilit AemovallAbandonment
02 41 15 Pavin� Remaval
ilivicinn 03 - ["nnr.rete
ilivicinn 2fi - F,lecirical
Division 32 - Exterior
� ��—�� �
� 1�� 1 ,1�.a
17�o-rvn �2�
em ents
_ +
� _ a
• �
� :,::.5...��.:�.r�R - -
�� � .
�.
CITY OP FORT WORTH
5TE1NI]ARD CONSTRUCTIQI�I SPECIFICATION QOCUMEIdTS
Revised duly 2, 2fl21
Last Revised
12/20/20I2
12/20/2012
b2102/2016
. �
. ;
� �
� �
� �
� �
�� �
� �
� o
2020 On-Call Pavement Markiugs Contract #2
CPN 163740
Technical Speci�eatian$ listed below are inciuded for �his Projeci by refere�c� and ean be
viewed/downlaaded from the City'� website at:
iliv�a9nn 31 - F.arthwork
1 � i _i. .
a . — — — " � :�
���v
, , * a n:'.�:.an.�aara rav�
� �:�.�.���.�,;�;�: a =ii�i
. , � ■ - ���
'�
i� �� _ � - �
M� �
� a � � �
�� � _ ��
� � - �
� �
� �� � �___ _-- ��e_e_Z�
r���� `
�
�
� �
�
�
'�
� �
�
i i
�
�
�
�
�
r�i��
� a
��' ��:
_ r r�TS!T!�
�
��a.n�:� � ..a��••
tIT..+..s. C�.,... �:.,.,., 1 ..1. +.. '1 :.,�.li
� ���
� � � i '
k 1
P �
� i
i i
� ! ,
! � _ �
i k
�. � �
� �
iraF�-r:-.�
�• � �
��r�nl�ni �
-r�rz.rvr-�rv--r�
7 7 M,� ll�i
1 �f !'1��
��f��1�'
1')M�z
y � r��,-�� �:o-��
n� r�vor_r��^rcvTs
1 '7 M-�z�'cm�avr.c
�'�A'�'�
7�1M�i
7nr��; �z�
nnt��
71lY� L�
��
, � r���
n� r7o�n f� ��n
i7M�r�c
CITY OF �'ORT W�RT'I-I 2020 On-Call Pa�ement Markings Conhact #2
STANDAItD CON5TREJCTIOIV SPECIF[CAT�ON DOCUIVlENi'S C�N 1037�40
Revised 7u1y 2, 2021
O.D 00 DO
STANDARU CONSTRUC`C'ION 5PECIFICAT[p.N BOCUIv1E�TTS
Page 3 of 8
00 00 00
STAiVDARD CQNSTRUCT{OAI SPBCIF[CAT[ON DOCUME]+tTS
Page 4 nf &
�
ii�
�
�
�
0
0
�
�
�
�
:' ' "
.ny�r«isz.-,.,.a � .
. �: �
1� 1 i
. �; �
� �
� + g
. .
.. . ;
� k
� �
Y� ! o
�_ { �
i��
�
�
�
�
{ �
� �
� 8
� . 1
i _ �
i •Y
�
�
�
� : � :
�
� � i
� • �
� • �
� • � A
� � • ►
�
s _ ie.
R
M
� �
1 /) /']TS.TLVT vTF
� �
� �
�F � �
� �
� �
i �
1 1
N �
�. i
� Y t
1 �
�
{ l
� i
1 1 �
i N �
i 1
� �
��r.���s-.i
CITY OF FORT WORTH 2O24 Ot�-Cal] Pavement IvSarkings Cc�ntracY #2
STANDARD CaNSTRUCTION SPCCiFICATIQN A�CUMENTS CPN 103740
Re�ised J�ly 2, 2d21
00 00 00
STANDf1RD CONSTRUCTI4N SPECIf7CAT[ON DOCUFVIENTS
Pagc 5 of 8
34 71 13 Tr�c Control 03l22f2421
Appendix
� � �_,.
� �� n»�a
CL . _T 1...1.. .oua.] ri....:5:4:....
r+� 7Y,..-_..,..1,...,. T'+�-"' __'_'i_� rz_'"��i[_"' _ n:`_
GG6.O6.D MinQrity and Women Owned Business Enterprise
C'iC-6.07 Wage Rates
n�� pa rr,;.� �a , T.;�c,-��
��. f ,.�__-�'--•-'-_-=---�-_--
a��L�
37 ..4 i} F
END O� SECTION
CtTY OI' �'dKT UVQIZTH 2Q2a On-Call Pevement Markings Cai�ct �2
STANDAI2D CON5TRUCTION SP�CIPCCATIQI� I70Ci)MENTS CFN 10374U
Revis�d July 2, 2D21
�ity �t F�r� Warth,
f��yor a�d
7exas
��l.l�l�l� ���1'1�'I'�LIf11���1C}�1
�AT�: 05f11��1 M�C FIL� NUNI�ER: h+i�� �1-D32b
�.C1�r I�ANk�: ���l��A�.l. ��V�AtE�VT MARI(IN� Ut�IT �R��� C�QhJTi�AC� #2
�UB,�ECT
(AL�.} As�tihor��e Exeouk�on �i � Unl# I��ice �or�ir�c! wHh 7#�P Cansliuckkon Group� Lk.� a��d ��rl�ing "fech��logy, LP each Jn an Amo�anR N�l ko
�xceed $9U0.��0.00 i�r Yaslc �rd�r �an�lructlon ��n+ires f�r ProJ�c�.s �t�laRing io P�v�n3ent Marking
��cor�r��r�o�r�or�{
Ik iS �ecommen�ed tl��k #h� fiily �o�nclC 2�t�li�n�l�� the ex$�utson o� � s��1�1 �ricrf cohlr�C�+�Eth'��� �anstruC4i0n �rau�, i.L� and �krlping
'�ec�rno2ogy, l.P ��cl� in an amo�t�l n�l Io exce��} �9(}�,ORQ,40 �or ra&k OKd�r ��nstr�cRlo� s[�r+l]C�6 f�r k:�e Mnsk�ll�,alOn oi pavemenl m2,►ki�rgs, ��lty
Pro��r� C�o, 1�2�06�, with a�� la twn ronew�!s e�ch.
�i�C#JS91�hJ:
Thls �onk;�ct wlll qrovtida ior cons�ru�kl�n sP�vlc�s ar� an as-n�eded ��asi� arder} b��ls foF pra�acts r���l�d x� pa�rerr�et�k m�rkln� ir�staGlatians,
r�avemant m�rking �roJe�a� �ncru�le long lir�es, s3�ort Ilr�es, an��rse�tl�ns, an� schaal �o�res ko �r»prove o�+eraEl I��f%c �nd pedestrGaR s�fety v�,�hir�
th� ��ky flenlis o! �Ort WOr{Ix. E�ch cont��C� e�rn�unt Is C��pOtl �i ��S�D,�{]0,00, Th�s Initl�l contrack l#�frri IS or�e yeae or Ch� �sspendli�ro oi iUn��,
whYchever occ�irs fifat, and m�iy be renewed up �� kw� adrJlklorraE t�rm� u�der Ihe sa��nr� te#ms, �ondltions. �nd unik ��i�es_ The �rajeck ��s
�Sro�f�d IR a Ir�w t�id Forr�x$� ko dair�rn,Mr�c unll prr�os ta �� p�+id wf�en �ssk or��rs are Fss�o�,
T�oflce �! bids �was �aublls3�ed �n �h� �rf tNa+�h �t�r=Te�eg�rart� on December 14, ��20. ��rcer'nl�er 97, 2020 �n[k �ecemb�� 2�, �Q�O, O�
J�nu�ry 28. ���1, h+�o rc�rrrp�n1es subm�kRed ihr� foll�wi�� h�r�s;
COh}TRAC�OE� ��
TRP �t�nstrucilon �raup, l.�.0 87+��.4�6.45
*�Uipir►g �echrrplogy, �F� $845.�+��,50
The u�a! p��c:es w�re campafad #� s�inklar proaects �n�i wore �o�errninecf lo be fa�r artd e�m�setlts�o, Task C�rd��s wIN �e �7id al #I�e eslablfsh�d
�nfl pr��as, p�o�e�t,� IdentlfGed �niti�tly Ynclude Vlslon Zero �av�marrt markln�s for croas+r:�ln�, �nlersacklonr�, z���cE thoro�glti�arp,s,
T#�is con4fact Is p�RtE wlil� �,vaslab�e ��Ry P�y��� fun�ing,
TRP Cor�siru�t�orr �r�up, f..�.� I5 �n �ompla�n�e wklh E�e CMky'a 4DE OrdinaR�e by �c�r��n�i�t�r�� �� 0��, 5�18� parllclp�tton �n�'E d��ume�nkin� goad
fp�lthG eifart_ 7FiP �on51��plian �roup, LL.� I�er�iified sev�fsl s�,bconlra��i�rg BI��I su��511eP opp��'tunilles, Ftayv���r, k�e ilrms conl��ke�f i� ll�e are�s
ider�tiFad dic9 not r�s�ond oc+�ld r�ot su�mi� E�re lowest blti� Trie �Ity's Mf3� ��al un Ifris projeci �s �°lo,
�irlping Techr�o�a�y, L,P_ IS In c�mpNan�v vui4� t�e ��k.y's BD� Ordlna�tc� by con�mt[#I�� to 7°f'o hd�� p�rtkclpaiion vR 4�i� proJ�cC, T1�e �Ity'� M��
gaa: on kh�s rrro�ecl Is ��'�.
�'hesa �as� o�deFs ere �o��t�d In �LL �C}UN�II� DC�7F���TS,
F��3Cl�L Ih1FORMATI. hi J C�RTI�I�
Yh� Dlr�:�tor �F Fln�nce ce�llFi�s kh�l Funrls sr� �vall�bk� fr� 4he ourrer�l c��311�1 L�udgek, a� pr��,,l�usly �p�ra�sr�pted. fn iha Gen+�r�1 �apl�al
Pfo��cEs Fund far �ho FY �1 PAY� Pav�m�r�� Marking� pro�eck �o s��pork kh� ap�rov�l o[ 117e a��++e recomm�rnd��lp� and execukson Qf R�e
contea�t, Prlor to aRy ��p��1Clk�ure baing Ir�C�rred, th$ 7r�n8par�ation and Pr��i�c Warks �1eP��k�'n��# has ttre r�apon5lblllly k� ual}da#� lhe
a+�ailebl:liy oi f�arisJs.
S�brnft�Ee� �or Cl�y h4ana{��a Offlce b}� �an� �ur�hEd�f[ 8�18
Origln8iln�usir�ess Un�t H�� 1�IIIEerr� JO�t��on 78t11
AtJd�ilo�al.Eitifarmailon Cq�Ta�t, Y2�r�y� B�oaks 78��
naos is-i
ADI7ENDA
Page I of 1
2
3
�E
S
6
7
$
4
1Q
1i
12
13
14
15
16
17
18
19
Za
21
22
23
2�
25
26
27
28
29
30
31
32
33
3�
35
36
37
38
39
4a
41
42
43
SECTION 00 0515
ADDENDUM No. I
2020 On-Call Pavement Markings Contract #2
Ci#y Project I03740
Addendum No. 1 Issue Datia: Jan 19, 202 j
Bid Receipt Date: ,ian 28, 2Q21
This addendum farms part oftke Contract Documents refereneed above and modifes the original Contract
Dac�ments. Acknowledge the receipt of this Addendum by signing in the space beiow and attaching it to
the Contract Documents (inside). Note receipt of this Addendum in t1�e Bid Proposal and on the outer
enveiope ofyorar bid.
Please note, also, that the link far the 202Q On-call Pavement Marking Contract is located at:
C�tt �s:/lciocs.b3G0.rutodesk.coml ro'ects/c51Z�4f39-6$31-478�-�44f-
59u12053f5d7/folders/urz�:ads!{.wi rocl:fs.folder:eo.-N 2�Cei'm DO[�'1<OzFIW S�
The linEc to the City Website for �tandard 5pecifications, Details, and Drawings are located ai:
https://apps.fartworthtexas. �ovlPro i ectReso urces/
I. Summa.ry of Pre-Tiid Meeting
An aptianal pre-Uid n�eeting was he{c[ online on Tl�ursday, Ja�zuary 14, 2021 at I:OU PM. A list of tl�e
iiivitees are attached along witl� the presentation. The City c�eseribed the overall intent af the project and
additional apdates ta tf�e Powej•Point and the contract.
Updates:
Updates.
U�dates:
U pdates:
U��dates:
Ugdates:
Will p��o�ide Powe�•Point Presentation 1s a P�T upon requests
Project Manager Quei�ell dol�nson infroduceci new pavement zn�s•lcings
st:�nd�rds and dr�awings. Will �e ��ploadec� onto Project Resources under
the following linic: https:lla�s.fo�•twoi�ihtexas.gav/ProiectResourcesi
MI3E office number is 817-392-Z643; BUsiness Ec�uiky office number is $17-
392-2C 54
MB� em�il address- DVIN B�Ofiice(�a,fortWorthte�as.eov
City will !ae acquiiting,� re#lectometer fot• Q�[�lity control/�cceptance
I��voices will ��ecd to I�� submitted within 30 ci�ys of complefing � project
44 END OF SECTION
CITY OF I'OKT'WORTH
STANDARD CdNSTRUCTION SPECIFICATION DOCUIvIENTS
Revised July 1, 2011
2020 On-Call 1'avament Markings Contract #2
CPN 103740
oa t i i3
11�VITATIOI� Ta BIDDERS
Page 1 of 3
SECTTON DO 11 13
INVITATION TO BIDDERS
RECEYPT OT+ BIDS
Due to the G�VID19 Emergency deciared by tha City of Fort Worth and until the
etn�rgency declaration, as ainended, is reseinded, sealed bids for the cnnstruction of 2(}20 On-
Cail Pave�'nent Markings Contract #� 2("Project") will be received by the City of Fort WorCh
Purchasing Office untij 1:30 P.M. CST, Thursday, JAN 28, 2021 as fi�rther described below:
City of Fort Woi-�h
Purchasing Division200
Texas Street
Fort Worth, Texas 76Z02
Bids wiIl be accepted hy:
1. US Mail at the address above,
2. By eourier, Fed�x ar hand delivery fi•om $:30-1:30 on Thursdays only at the South �nd Lobby
of City Hall located at 200 Texas Street, Fort Worth, Tex�s '1b1�2. A Purch�sing Department
staff persan wiYl be avaiIabfe to accept the bid and provide a time stamped receipt; or
3. Ifi tha bidder desires to submit the bid on a day or time other than the desigraat�d Thui•sday, the
bidder must oontaet the Purchasing Departmant during normal working haurs ai 817-392-2462
to make an appointment to meet a Purchasing Departrrient emplayee at the 5outh End Lobby of
City Ha11 located at 2fl0 Texas Street, Fort Warth, Texas 761Q2, where the bid(s) will b�
received and time/da#e stamped as abave.
Bids �vill he apened publiciy and read aloud at 2:00 PM C5T in the City Council Chambers and
broadcast through live stream and CFW public television wllich can be accessed at
htt ;//fortworthte�as. nv/fwtv/. The ge�eral p�blic will not be allawed in the City Council
Chambers.
In addition, in lieu of delivering completed MBE forms for the project to the Purchasing Office,
bidders shall e-mail the completed MBE farms to the City Project Manager no Iater than 2:40 p.m.
on the seeond City business day after the bid opening date, exclusi�e af the bid opening date.
GENERAL D�SCRii'TION OF WORK
The inajor work will consist of the (appraximate) following: The Contractor shall furnish all
materials, lahor, equipment, transportatian, insurance, permits and other services necessary for a
coinplete installa�ion of pavement marking for City of �'ort Worth Traz�sportation and Public Works
Department. The coni�'actor shall provide services for City roadways and rigi�t of way per the
attach�d specifications.
Perfonnance for any services described her�in will he initiated upon accegtance by the
Contractor of a wark order having the authorizing signature of the 1'roject Manager prior to
comtnencing wark at the site. Contractors will not perform agair►st this agreement without first
l�a�ing received an official City of Fort Worth work order, except in emergency cases as detailed
helotiv.
CITY OF FORT WORTFI 242D Qn-Call Pauement tvlarkings Contract #2
STANDATiD CONSTItUCT[ON SFECIFICATION DOCT3ME�IT CPN ] 03740
Temporarily Re�ised Apri16,202D due to COVIDi9 �mergency
00 I1 l3
1NVITATION Tp BIDDEiiS
Page 2 of 3
Al1 pavement marking and removaj services except detow� marking iricjude traffic control devices
and related costs. All traffic control methods utilized hy the Contractor shall meet the m�st current
requirements as specified by the FHWA in the "Texas Manual an Uniform Traffic Control Devices
(TMUTCD) for Streets and Highways" andlor subsequent amendments.
PREQUALIFICATION
NIA
DOCUMENT EXAMINATION AND PROCUREMENTS
The Bidding and Cantract Documents may be examined or obtained on-line by visiting the City
of �'ort Worth's Purchasing Division website at IZtt :f/www.fortworthtexas. ov/ urcl�asin and
clicking on t11e link ta the advertised project folders on the City's electroni.c docu�nent
management and collaboration system site. The Contract Documents may 6e downloaded,
viewed, and prinfed by interested cnntractors and/or supp]iers.
Copies of the Bidding and Contraet Documents may be downloaded from
htt s: dacs.b36D.autodesk.com shares dc7c4d9f-af15-�4db0-9bac-fafbcd57bfe8
The cost of Bidding a�d Contract Documents is: NIA
Set of Bidding and Contract Documents with full size drawings: NIA
Set of Bidding and Contract Documents with half size {if available) drawings: NIA
PREBTD CONFERENCE
A prebid conference rnay be held as discussed in Section QO 21 13 - INSTRUC`I'TQNS TO
BIDDERS at the fallowing date, and t�me via a web conf�r�ncing applicatian:
DAT�: Thursday, JAN 1�, 2021
TiME: 1:00 PM
If a prebid conference will be held online via a web conferencing application, invitations will be
distributed direcily to those wllo have submitted Expresslons of Interest in the project to the City
Project Manager andlor the Design Engineer. The presen�ation given at the prebid conference and
any ques#iQns and attswers provided at il�e prebid confer�nc� will be issued as an Addendum to fihe
call for bids.
If a prebid conference is not being held, prospective bidders can e-mail questions or eornrnents in
accordance witl� Section 6 of the Instructions to Bidders referenced abave ta the project manag�r(s}
at the e-mail addresses lisied belo�w. Emailed questions vvill suffice as "questions in writing" and the
req�irement to formally mai.l questions is sus�ended. If necessary, Addenda will b.e issued pursuant
#o the Instructions to Bidders.
CITY'S RIGHT TO ACCEPT OR REJECT BIDS
City reserves th� right to waive irregularities and ta accept ar reject 6ids.
AWARD
Cii.y will awat�d a contract to muliiple Bidders pres�nting the lowest price, qualifications and
campetencies considered.
nvQuuu�s
A�1 inquiries ralative to this procurement should be addressed to the following:
Attn: Quenell Johns�n, P.�,., City af Fort Wnrkh
CITY OF FOitT WORTH 2O26 On-Call Paveinenk Markings Contracf #2
STANDARD CONSTItUCTIQiQ 5P�CTFICATION DOCllNIENT CPiri 103744
Temporarily Aevised Apri16,2020 due lo COV1D19 �tncrgency
OD 11 13
INVITATIpN TO gTDDER5
Page 3 nf 3
Emai[: Quenell.Jallnson@fortworthte�as.go�Phone:
817-392�8618
ANDIQR
Attn: Lawrence Hill, City of Fort WarYh
Email: Lawrence.Hill�a fortwotihtexas,gov
P1�one: 817-392-2b37
EXPRESSION �F INTERSEST
To ensure bidders are kept up ta date of ai�y new information pertinent to this project or the
COVIDI9 emergency declaration, as a�nended, as it may relate to this project, bidders are requested
to email Expr�ssions of Interest in khis procurernent to the City Project Manager and the Design
Engineer. The e�nail should incl.ude the bidder's company name, contact person, that individuals
email adciress and phone number. All Addenda wijS be distributed directly to those who have
expressed an interest in the procurement and will also be pasted in the City of Fort Wor�h's
putchasing website at http:llfortworthtexas.gnv/purchasingl
PIIAN HOLDERS
To �nsure you are kept up to date of any new information pertinent to tlais project such as vwben
an addenda is issued, dor�nload the Plan Holder Registration fomn ta your computer, complete
and email it to the City Project Manager.
The City Project Manager a.t�d desigt� Engineer are responsibie to uplaad the Pla�s Hoider
Registration form to the Plan Holders folder in BIM35Q.
Mail your compietedPlan Holder Registration for�n to thos� Iistedin iNQUIR[�S above.
ADVERTI�EMENT DATES
December 10, 2020
Decemb�r 17, 2020
December 24, 202Q
END �F SECTTON
CITY OF PORT' WORTH 2O2fl On-Call Pavement Markings Contraot 1t2
STAN➢AItD CONS'I'R[ICT30N SPSCIPICATION T]OCUMENT CPN 1037�1U
Ternporarily Revised April &, 2020 due to COVIDI9 Cmergency
D021 13
INSTRUCTIQNS TO BIDDERS
Paga ] of ] 0
SECTION 00 �1 13
1NSTKUCTIONS `i'O BIDDERS
1. De�"ined Terms
1.1. Capitafized f�rms used in these INSTRU�TIONS TO BIDDERS are deiined in Saction
00 72 �0 - GENERAL CONDITIONS.
I.2. Certain additional terms Lised in these [NSTRUCTI�NS TO BIDDERS have the
meanings indicated below which are applicable to both the singtitlar and phiral thereaf.
1.2.1. Bidder: Arty person, firm, parfnership, cor�r�pany, assaciation, or corporation acting
directly through a duly authorized representative, submitting a bid for performin�
the work conte��np�ated under the Contract Documents.
2.2. Nonresiden� Bidder: Any person, firm, partnership, company, association, or
corporation acting directly tU.rough a duly authorized representative, submitting a
bid for perforrr�ing the v,�ork contemplated under the Conti•act Documents vvhose
principal plaee of business is not in the State of Texas.
1.2.3. Succes.sful Bidder: The lowest responsible and responsive Bidder to whorr► City
(on the basis of City's evaluation as hereinafter provided) ma1��s an award.
2. Capies o�' Bidding Docn�nen�s
2.1. Neither City nor Engineer shaLl a�sume any responsibiliiy for errors or misinterpretations
resulting from the Bidders use of incomplete sets of Bidding Documents.
2.2. City and Enginee�' in making copies of Bidding Documents at+ailabie do so only for the
purpose of obtaining Sids far the Work and do not au�orize or confer a license ar grant
for any other us�.
3. Prequalitication of Bkdders {Prirt�e Contractors and Snbcontractors)
3.1. Bidders or their designated subcontractors are required to be prequalified for the wark
types requiring prequalification as per SeetiQns 00 45 11 BIDDER"�
PREQUALI�`ICATIONS and 00 45 12 PREQUALIFICATION STAT�MENT. Firms
seeking pre-qualification, must submit the documentation identified in Sectian 00 45 11
on Section 00 45 13 PREQUALIFICATION APPLICATION at Seast sev�en (7)
ealendar days prior to Bid opening for review and, if qual�fied, aecaptance. The
subcontractors listed by a Bidder on 00 45 12 must be prequaliiied �or the appropriate
work iy�es. Subcontractors must %llow the same timelines as Bidders for obtaaning
prequalification review. Bidders or Subcontractors who are not prequalified at �he time
bids are apened and reviewed may cause the bid ta be rejected.
Prequalification requirement work ty}aes and documentation are available by accessing a!1
required files through the City's website at:
h�tps;//apps fortworthtexas. ovlProjectResourcesl
3,1.1. Paving— Requirements document locaterl at:
CITY OI' FORT WOR�H 2Q20 On-Call PavementMarkings Contract #2
STANDARD CONSTRUCT[Oi`f SPECIFICAT101� DOCUlYiENT CPiJ 1fl3740
RevisedlUpdated November 2, 2021
QO Z i l3
[i�fSTRUCT[ONS TO BIDDERS
Page 2 of 10
htt s:lla . s.fortworYhtexas. ovlPro'ectResourceslResourcesP/02°1020-
%2QConstruction°,�o20DocumentslContractor%2QPre ualifieation/TPW%24Pavin
%20Contractor°/o2QPre ualification%20Pro �'atnIPRE UALI�'ICATION°/a20RE
UIREMSNTS%a2QFOR%20FAV1NG%2000NTRACTORS. df
3.1.2. Roadway and Pedestrian Lighting — Requirements dacument located at:
https:l/a�ps.fortworthl:exas �ovl�rojectResauroeslReso�►rcesPl02%2Q-
°/a24Construction%20DocumentsfContractor%20Pre LtalificationfTPW%20Roadwa
%20and%20Pedestrian%20Li tin %20Pre ualification%20Pro i�n/STREET%
2�LIGHT%20PRE UAL%20RE NINTS. df
3.13. Water and Sanitary Sewer — Requirernents docLunent located ai:
ht�ps•/lapps fortwor��texas. o� vlProLctResourceslResourcesPl02%20-
%24Const�•uction%20Docum�nts/Contra.ctor%2Q1'z'e ualiiicationlWater%20and%2
OSanifa %20Sawer%20Coniractor°/a20Pre li.alification%20Pra ramlWSS%2Q re
qua!°/o20require� ner�ts.pdf
3.2. Each Bidder, unless currently prequalified, must sub.mit to City at least seven {7}
calendar days priqr to Bid opening, the documentation identified in Seciion 04 45 11.,
BIDDERS PREQUALIFICATIONS.
3.2.I .Submission of and/or questions related ta prequalificatian sllould be addressed to
the City contact as provided in Paragraph 6.1.
3.3. The City re.serves the righi to require any pre-qualified contractor who is the apparent iow
bidder for a project to suhmit sueh additional infQrmation as t11e City, in its sole
d�scretion may require, including but �ot lunited to manpower and equipment reeords,
information about key personnel to be assigned to the project, and consiruction schedule
to assist the City in evaIuating and assessing the ability af the apparent 1ow hidder to
deliver a quality product and successfully complete proj eets for the amount bid wi�hin
the siipulated time frame. Based upon tl�e City's assess�nent of the submitted
informafion,. a recommendation regarding the award of a contract will be made to the
City Gouncil. Failure to submit the additional informatian, if requested, may be grounds
for rej ecting the apparent iaw bidder as non-responsive. Affected cnntractors wi.11 be
notified in writin� of a recammandation to the City Council.
3.4.. In addition to prequalification, additianal requirements for quaIi�cation may be required
�iihin various sections of the Cantract Documents.
4. Examination of Bidding and Contract Dacuments, Other Related Data, and �ite
4.1. Before subrnitting a Bid, each Bidder:
CITY OF FORT WORTH 2O20 On-Calf Pavement Markings Contract i�2
STA�lDA1tD CONSTRIICTION SPECIFiCATTON DOCl1MENT CPN 103740
RevisedJ[Jpdated Nnvem6er 2, 2D2 f
0021 13
INSTRUCT[ON3 T� SIBD�TLS
Page 3 of 10
4.1.1. 5hajj exam�r►e and carefully study the Contract Documents and oiher rela#ed data
identifed in the Bidding Documents (incltlding °technica] data" z'sferred to in
Paragrap.h 4.2. below). No infojmation given by City or any representative of the
City other than that contained in tk�e Coniract Documents and off`icially
promulgated addenda thereto, slaall be binding upon the City.
4.1.2. Should visit th� �ite to become familiar with and satisfy Bidder as #o the general,
iocal and site conditions tl�at may affec� cosY, progress, performance or furnishing
of the Work.
4.i,3. Shall consider federaj, state and local Laws and Regulations ti�at may a�fect cost,
progress, performance or furnishing ofthe Work.
... � ,
,
. , . . . ,
, , , ,
,
�
�
� •� .
4.I .S. Shali study all: (i) reports of expiorations and tests of subsurface conditions at or
contiguaus to the Site and ail drawings af physical eonditions relating ta e�isting
surface or subsurface structures at the Site (except Underground Facilities) that
have been identified in the Contract Documents as containing reliahle "technical
data" and (ii} reports and drawings of Hazardous Environmental Conditions, if any,
at the 5ite that have been identified in ihe Contract Doculnents as containing
reliable °technical data,"
4.1.6. Is advised that the Contract Documents on file with the Gity shall constitute al� af
the information which the City will furnish. AIl additional information and data
which the City will supply after pro.mulgatian of the formal Coniract Documents
shall be issued in fi�e form of written addenda and shall become pat't of the Contract
Documents just as though such addenda were actua�lly written into the priginal
Contract Documents. No infarmation given by the City ot�er• than �at contained in
the Contract Docttments and officially promulgated addenda tk�ereto, shall be
binding upon the City.
4.I.7. S1lould perform independent researck, investigations, tests, barings, and such other
means as may be necessary to gain a complete knowledge of the conditions which
will be encountered during the construction of the project. For projects witl�
restricted ace�ss, upan request, City may pz'o�ide each Bidder access ta the sita to
conduct such examinations, investigations, explorations, tests and stuctiEs as each
Bidder deems necessary for submissiora of a Bid. Bidder mus# fll ail holes and
cIean up and restore the site to its forsner conditions upon compfetion af such
explorations, inuesiigations, tests and studies.
CITY OF FORT WORTH 2O2p On-Call 1'avement Madcings Contract #F2
STANDARD CQ1+I5TAUCT[ON BPECIrICATION DDCUNfiENT CPN 1D374D
itevisedlUpdated Navember 2, 2021
oazt �3
IIVSTRUGTIONS `CO BIDD�RS
Page 4 nf 10
4.I.8. Snall determine the diff culties Qf the Work and a11 attending circ�mstances
afFecting the cost of doing the Wark, ti�ne required %r its completian, and obtain all
infarmation reauired to make a proposal. Bidders shail rely exclusiv�ly and so�ely
upon their own estimaies, investigation, rasearch, tests, explorations, and other dafa
which ara necessary for full and complete informaiion upon which �he proposal is
to be based. It is understood that the submission of a proposal or bid is prima-facie
evidence that the Bidder has made tl�e investigations, examinatinns and tests harein
requirad.
4.1.9. Shail promptly notify City of all conflicts, errors, ambiguities or cliserepancies in ar
t�etween the Contz'act Docuinents and such other related dacuments. Tha Contzactor
shall not take advantage of any gross error or omission in the Contract Documents,
and the City shail be permitted to make such corrections or interpretail.ons as inay
be deemed necessary for fulfillment �f the intent of tlie Can#.�act Documents.
4.2. Reference is made ta Section DO 73 00 — Sugpleinentary Conditions for identification of:
4.2.1. those reparts of explarations and tests of subsurface conditions at or canfiguous to
the site which ha�e been utitized by City in preparation of the Contract Documents.
The logs of Soil Borings, if any, on the plans are for general information only.
Neither the City nor the Engineer guarantee that the data shown is representative of
conditior�s which actually exist.
4.2.2. those draw�ings of physical conditE�ns in or relating to existing surface and
subsurface structures (except iJnderground Faciiities) which are at or contiguous to
the site that have been utilized by City in prepaxation of th� Coniract Documents.
4.23. capies of such reports and drawings will t�e made available by City to any Bidder
on request. Those reports and drawings may not be part of the Contract
Documents, but the "technical data" eontained therein upon which Bidder is entitled
to rely as provided in Paxagraph 4.02. of the General Conditions has b�en identified
and established in Paragraph SC 4.02 ofthe Supplementary Conditions. Bidder is
responsible for any interpretation or conclusion drawn frnm any "techni�al data" or
any othar data, inte�•pretations, opinions or inforrnation.
4.2.4.Standard insurance requirements, coverages and linr�iYs.
4.3.The submission of a Bid witl const�tute an incontrovertible representation by B'tdder: (i)
that Bidder has etimplied vwith every requirement of this Paragraph 4, (ii) that witho�:tt
exception the Bid is premised upon performing and furnishing the Wark regLlired by the
Contract Dacuments anc� applying the specific means, methads, techniques, seq�ences ar
pracedUres af construction {if any) that inay be shown or indicated or expressly required
by the Contract Docutrzents, (iii) tliat Biddar has given City writt�n notice of all
conflicts, errars, a�nbiguities and discrepancies in the Contract Documents and the
written resolutfans thereof by City are acceptable fo Bidder, and when said conflicts,
etc., �ave not been resolved through the inteipretations by City as described in
Paragraph 6., and (iv) that tha Cantract Documents are ger►erally sufficient to indicate
aztd convey understanding of a11 terms and candjtions %t' performing and furnislling �he
Wnrk.
C1TY QF FORT WOIiTH 2O20 dn-Call naveittent Markings Contraet #2
STANDA1tD CONSTRUCTIQN SP�CTFICATIQN DOCUMENT CPN 103740
Revised/Updated Na�ember 2, 2021
o.a z� ta
�ST'RUCTIONS TD BIDDERS
PageSaflQ
4.4. The provisians of this Paragraph 4, incIusive, do nat appIy ta Asbestas, Polychlorinated
biphenyls (PCBs), Petroleti�m, Hazardous Waste or Radioactive iVlaterial covered by
Paragraph 4.06. of the General Conditions, unless specifcally identified in ihe Contract
Documents.
5. AvaifAbility af Lands for Work, Etc.
I. The lands upon which the VJork is to be performed, rights-af-way and easeznents for
access thereto and other Iands designated for use by Contrac#or in perfor�ning the Work
are identified in the Cantract Docum.ents. Al� additional lands and access Yk�ereto
rec�uired for temporary construction facilities, constr�.tetion equipment or storage of
materiafs and equipment fa be incarporated in the Work are to be ob�ained and paid far
by Contractor. �asemen�s for permanent structt�res ar permanent changes in existing
facili�ies are to be obtained and paid for by City unless otherwise pro�vided in the
Coniract Documents.
5.2. Outstanding right-of-way, easements, andlor permits to be acquir�d by the City are L'a5ted
in Paragraph SC 4.01 of the Supplementary Conditians. In ihe event the necessai�y right-
af-way, easements, and/or permits are not nbtained, the City reserves the right ta cancel
ihe award of contract at any time before the Bidder begins any consfruction �uark an the
proj ect.
5.3. The Sidder shall be prepared to cammence construction without al� executed ri.ght-of-
way, easements, and/or permits, and shaIl subinit a schedule to the City of how
construetion will proceed in the other areas of the proj act that do no� require permits
andlor easemenis.
6. Int�rpretations and Addenda
6,1. AIl questions about the meaning or intent of the �idding Documents az'e to be directed to
City in writi�g on or before 2 p.m., the Monday pz'iar to the Bid opening. Questions
received af�er Y.his day may not be responded to. Interpretations or clarifications
considered necessary by City in response to such questions will be issued by Addenda
delivered to all parties recorded by City as having received the Bidding Documents.
Only questions answered by formal writt�n Addenda will be binding. Oral and other
interpretations or clarifications wi116e without �egal effeu-�.
Address questions to:
City of Fort Worth
20Q Texas Street
�'ort Wor�h, TX 7�102
Attn: Trans�ortation and Public Works Department, Quenell Johnson
�mail: guenell.iohnson(a�{'ortvvorthiexas._gav
Phone: 817-392-8618
6.2. Addenda may also be issu�d to modify the Bidding Documents as deemed advisa6le by
City.
C1TY D!� FQRT WOR'TH 2O2U Qn-Call Pavement Markings Contract #2
STANDARD CON$T[2UC'TION SPECIFICATIflN DOCi3MHNT CPN ]03740
Revised/[Jpdated TiovemUer 2, 2U21
aaz� i3
Ii�IS'TRUCT[ONS TO [31DDERS
Page 6 of 10
5.3. Addenda or cl�rifications may be posted via tlze City's electronic document management
and collaboration systern at https:llapps.for�wo��hiexas.go�IProiectReso�rces.
6.4. A prebicf eonference may be held at the tizne and place indicated in the Advertisement or
INVITATION TO BIDD�RS. Repi•esentatives of City will be present to discuss the
Projeet. Bidders are encouraged to attend and participate in the conference. City will
tz'ansmit to a1� prospeetive Bidders Qf record such Addenda as City considers necessary
in response to questinns arising at the conference. Oral statements may nnt be relied
upon and will not be binding or legally effective.
7. I3id Secur�t�
7.1. Each Bid must be acco�npanied by a Bid Bond made payable to City in an amount oifive
(5) percent of Bidder'S m�imurn Bid price, on the form attached or equivalent, issued
by a surety meeting the requirements of Paragraph 5.01 of the General Conditions.
7.2. The Bid B�nds provided by a Bidder will be retained until the oonditions of the Notice of
Awaxd l�ave been satisfed. If the 5uccessful Bidder fails to execute and return the
Contract Documents within 14 days aft�r the Nofice of Award conveying sarne, City
may consider Bidder tn be in default, rescind. the Notice of Award and act on the Bid
Boncf. Such actian shall be City's e�ciusive remedy in ihe event Bidder is deemed to
have defaulted.
8. Cantraet Tiines
The number of days vwithin whicll, or the dates by which, Milestones are fio be achieved in
accordance with the General Requirements and the Work is to be completed and ready for
Final Acceptance is set forth in the Agreement or i.ncnrporated therein by reference to tIie
attached Bid Form. The City may renew this agreement for up ta two (2j additional time
periods under the saine terms, conditions and unit pz'ices, TMe City shall provide at least sixty
(60) days' notice to tl�e Contractor af the City's intent to renew.
9. L�quidated Da�anages
Provisions far liquidated dainages are set forth in tha Agreemeni.
10. Sabstitute and "Or-Equal" Items
'i'he Cor►traet, if awarded, will be on the basis of mat�riais and equipr�-ient described in the
Bidding Documents without consideration of possible sLtbstiiut� or "or-equal" items.
Whenever it is indicated or specified in the Bidding Documenis that a"substi�ute" or "ar-
equal" item of material or equipment may be furnis�ed or used by Contractor if acceptable to
City, applicatian for such acceptance rvill not be considered by City until after the Eff�ctive
Date af the Agreem�nt. The procedure for submission af any such application by Contractar
and consideration by City is set forth in Paragraphs 6.45A., 6.Q5B. and 6.05C. of tihe General
Condition� and is suppjemented in Seetion OI 25 00 of the General Requirelnents.
11. Sabcontractors, Su�a�aliers and Otl�ers
CITY OF FORT WORTH 2O2D On-Call Par+emeirt Markings Contract #2
STANDARD Ca1VSTRUCTION SPECIFICATION L70CUMENT Cl'N 103744
RevisedlUpdated hIn�ember 2, 2021
QD 21 13
INSTRUCTIONS "I'O BIDI]BR5
Page 7 of 10
11.1. In accordance with the City's Business Equity Ordinance No.25.165-1 �-2Q21 the City
k�as goals for tite participation of minarity business and/or women bEisiness
enterprises in City contracts $100,000 or greater. See Sectian 00 45 40 fnr the
MIWSE Proj�ct Goals and add�iional �•equirements. Failure to comply shal� render
the Bidder as �on-responsive. '
Business Equity Ordinance No.25165-14-2021, as amended {replacing Ordinance
No. 24534-ll-2020}, codi�ed at:
htt s:l/codelibrar .amle al.comlcodes/ftwnrtIallatestlftworth t�c/0-0-0-22593
1 l.2, No Contractor shall be required to employ ariy Subcontractor, Supplier, other person
or organization agai�st whom Contractor az' City has reasonable obje�tion.
12. Sid Form
I2.1. The Bid Forrn is included with the Bidding Documents; additional copi�s nzay be
obtained from the City.
12.2. All blanlcs on the Bid Form must be compieted and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by th� person signing the Bid Form. A
Bid price sl�all be indicated for each Bid item, alt�z'native, and unit price item lisied
tllerein. In the case of optional alternatives, the words "Na Bid," "Na C�ange," or
"Not Applicable" may be entared. Bidder shali state the prices for which the Bidder
proposes to do the work cantemplated or furnish materjals i•equired. Al l entries shall
be legible.
123. Bids by carporations shall be executed in the corporate name by the president or a
vice-president or other carporate afficer accnmpanied by e�id�nce of authority to
sign. The cor}�orate seal sha[i be affixed. The corpor�te address and sta�e of
incorporation shall be shown helow the signature.
12.4. Bids by partnerships sha�l Ue executed in ti�e �artnership naine and signed by a
partner, whose title must appear under the signature accompanied by evid�nce of
authority to sign. The official address of the partnersll[p sha11 be shown belaw the
signatui•e.
I2.5. Sids by limited liability companies shali be executed in #l�e name oi the firm by a
member and accompanied by evidence of autharity to sign. The stat� of formation Qf
the iirm and tf�e official address ofthe firm shal! be shown.
12.5. Bids 6y individuals shall shnw the Bidder's name and offtcial address.
I2.7. Bsds by joint ventures shall be executed by each joint venture in the manner Endicated
on the Bid Form. The of�cial address of the joint venture shall be shown.
12.8. All names shall be typed ar p.rinted 'ua ink helow the signaiure.
12.9. The Hid shaI3 contain an acknowledgement of receipt of all Addenda, th� numbers of
which shall be filled in on ii7e Bid Foi-�n.
C{TY QF FORT WORTH 2O20 On-Ca11 Pavemenf Markittgs ContracL #2
5TAN1]ARD C�NST1tUCTION SPECIFICATEON DOCUMENT CPN 1037�0
Kevised/llpdated Novetnber 2, 2Q2]
002] 13
INSTRUCTIqN5 TQ BIDDERS
Page 8 of l0
12.10. Postal and e-mail addresses and telephone number fnr eommunications regarding the
Bid shall he shown.
] 2.11, Evidence of authorify to condltct business as a Nonresident Bidder in the state of
Texas shall be provided in �ccoa-danee v�ith Sectian 00 43 37 — Vendor Compiiance
to 5tate Law Non Resident Bidder.
f3. Submission af Bids
Bids shall be submitted on the grescribed Bid Form, provided with the Bidd�ng. Documents,
at tl�e time and place indicated in the Advertisement or INVITATION TO BIDDERS,
adciressed ta Purchasing Manager of the Ci�y, and sha�l be enc1osed in an opaque s.ealed
envelope, marked with the City Project Number, Praject title, the name and address of
Bidder, and aecompanied by �he Bid securiry and other required documents. If the Bid is sent
through the maii or o.thar delivery system, the sealed envelop� shall be enclosed in a separate
env�lope with the notation "BID ENCLOSED" on the face of it.
14. Withdrawal of Bids
14.1. Bids addressed to the Purchasing Manager and �jed with the Purcl�asing Off ce may
be withdrawn prior to the tim� set for bid opening. A request far wiYhdrawaI must be
made in writ�ng and deiivered to the Purchasing Office to receive a time stamp prior
to the opening of Bids. A timely withdrav,�n bid will be returned to the Bidder ar, i�
the request is within on� hour of bid opening, wi11 not be read aloud and will
tllereafter be returned unopened.
14.2. In the event any Bid far which a withdrawal request has been timely iiled has been
inadvertently opened, said Bid and any record thet•eof wiil subsequently be mar�Ced
"Withdrawn" and wi116e gi�en no further consideration for the award of cnntract.
i5. OQening of Bids
Bids t�vill be apened and read aloud publicly. An abstract of the amounts of the base Bids and
maj or alternates (if any) will be made avaiIable to Bidders after the opening of Bids.
16. Bids to Remain Subject to Aeceptance
All Bids wi11 remain subject to acceptance for a minimuin of 9Q days or t�e time periad
specified for Notice of Award and exeeuCion and delivery of a completa Agreement by
5uccessful Bidder. City may, at City's sole discr�tion, release any Bid and nuSlify the Bid
security prior to that date.
17, Evaluation of Bids and Award af ConEract
I7.1. City reser�es the right ta reject any or all Bids, inclttding without limitation the rights
to reject any or all nonconforming, nonresponsive, unbalanced or conditionai Bids
and to reject the Bid of any Bidder if C.ity believes that it would not be in ihe best
interest of the Project to make an award ta that Bidder. City reserves the right to
waive infarmaliti�s not involving price, contract time or changes in the Wo�'k and
award a contract to such Bidder. Discrepanoies between the multiplication of units of
Work and unif priees will6e reso�ved in favor of tlte unit prices. Discrepancies
between the indieated sum of any coluinn of figures and ti�e correct sum tl�ereof wiii
be resolved in favar oftile correct sum. Discrepa�cies between words and figures
will be resolved in favor of tha words.
CITY QF P'OR'f WORTH 2O20 On-Call Pavetnent Markings Contract #2
STAI�lI7ARD CpNSTRUCTIaN SPECIF'CCATION DOCUMGNT CPN 1fl3740
ItevisedlLTpdaled Noveinber 2, 2021
002i l3
IiY5'I'1Zi3CTfDNS TO BII)T]ER5
Page 9 of 10
1'7.1.1. Any or all bids wiii be rejected if City has reason to believe that collusion exists
arnang the Biciders, Bidder is an intet'ested party to any litigation against City,
City ar �idder may have a claim against the other or be engaged in litigation,
Bidder is in arrears an any existing contract or has defaulted on a previnus
cantract, Bidder has performed a prior contract in an unsatisfactory manner, or
Sidder has uncompleted work w[�icl1 in the judgment of the City will prevent or
hinder the prompt carnpletion of additional work if awarded.
17.2. In additir�n to Bidder's relevant prequalificaiion requirements, City may consider the
qualifications and axperience of Suhcontractars, Suppliers, and oth�r per�ons and
organizations praposed for thase portions of the Work where the idenfity of such
Su6contractors, Suppliers, and ntk�ar persons and organizations must 6e submitted as
provided in the Contract Docutnents or upon the request of the City. City aiso may
consider the operating costs,. maintenance requirements., perforrraance data and
guarant�es of major items of materials and equipment proposed far incorporatian 'rn
the Work when suc1� data is required to be submittad prior to t�e Notice �f Avrard.
17.3. City may conduct such investigations as City deams necessary to assist in the
e�aluation of any Bid and ko establish the respons:ibility, qua�ifications, and financial
abilit�+ of Bidders, proposed Suhcontractors, Suppliers and other persons and
orgarjizations to perfarm and furnish the Work in accordance with the Con�t•act
Doeuments to City's satisfaction wzthin the preseribed time.
17.4. Contractor shall perform with his owm arganization, work of a va1L�e not less than
35% of the vaIue em6raced on tl�e Contract, unless atl�erwise appro�ed by the City.
I7.S. If the Contract is to be awarded, it wiIlloe awarded to lowest responsible at�d
responsive aidder whose evaivation by City indieates that the award r�vili be in the
best interests of the City.
17.6. Pursuant to Texas Government Code Ghapter 2252.001, the City will not award
eontract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than
the lowest bid submit,ted by a responsible T�xas Bidder by the same arnount that a
Texas t'esident bidder �wauld be required to underbid a Notu'esident Bidder tn obtain a
comparable contract in the state in which the nonresident's principal place of
business is located.
17.7. A cantraet is not a�arded until formal City Council authoxizatian. If tl�e Contract is
to be awarded, Ciiy wi11 awa.rd the Cantract within 90 days after the day of ihe Bid
opening unless extended in writing. No other act of City or others will constitute
acceptance of a Bid. Upon the contraet award, a Notice of Award will be iss�ed by
the City.
17.7.1.The contractor is reguired to fill out and sign the Certiiicate of Interested
�'arfees Fnrm 1295 and the farm must be submitted ta the Praject Manager
before t�e contract will be presented to the City Council. The form caa be
obtainecf at htt s:1lw�wvv.ethics.state.tx.usldatalforms1l295f1295. df
17,$. Failure or refusal to comply with the requirements may result [n rejection of B1d.
I$. Signing of Agreement
CITY OF PORT WQRTFI 2020 On-Call Pavement [vlarkings Contract 1i2
STANDARD CONSTRUCTIOI�[ SPECIFICATION DOCUMENT CPN 1U3740
RevisedlUpdated November 2, 2421
00 21 13
INS'T'RilCTIONS TO BlDDERS
Page 10 of 10
18.1. When City issues a Notice of Award to the Succsssful Bidder, it wi11 be accompanied
by the required number of unsigned ec�unterparts af the P�aject Manual. Within 14
days thereafter, Contractor shall sign and cfeliver the required number of caunterparts
of the Proj ect Manual io City vwith the required Bonds, Certificates of lnsurance, and
all other required documentatian.
18.2. City shall thereafter deliver ona fully signed counterpart to Contractor.
END OF SECTION
C1TY 4F FOft7' WORTH 2O20 On-Call Pavement Markings Contract #2
ST,4I�DARD COAIS`('ItITC'CI�N SPSCIFICATIQN DOCUMBAi1' CPN 103740
RavisedlLlpdated Novemher 2, 2021
003513
BID FORM
Page 9 of 9
SEC�ION 04 3� 13
CONFLIGT OF INTEREST AFFIDAVIT
Each bidder, offeror, or respondent (hereinafter a�so referred to as "you") to a City of Fort Wor�h {also
referred to as "City"} procurement are rsquired to complete Conflict ofi fnterest Questionnaire (the
a�tached CIQ Fnrm) and Local Government Officer Conflicts Disclosure Statement (the attached CIS
Form} below pursuant to state 1aw. This affidavit will certify that the Bidder 1�as on file with the Cifiy
Secretary the required documentation and is efigible to �id on City Work. The referenced forms may
also be downloaded from the vuefasite links provid�d below.
�------
�:rrrrwvr.ccflli.a.a[aic.iii.i:` cJ�i.
I-��-' �
❑
P�
❑
❑
�1����:
CIQ Form is on file with Ci�y Secretary
CIQ Farm is being provided to the City Secretary
CIS �orm is on File with City Secretary
C1S Form is �eing pro�ided to tf�e City Secretary
TRP Construcfiion Group, LLC
TRP Gonstruetion Group, LL�C
2�13 Moneda Street
Fort Worth, TX 76917
�N� O� S�C710N
By: Rod P�urne�C �
t -- �
Signature: � � � ,
Tit�e: President & CEO
C1TY OF FORT WORTH
STAidDARD GON5TRUCTI01� SPEC{FICATION DOCUMENTS
�orm Reuised 20120327 d0 41 00_00 43 13_0� 42 A3_00 43 37_44 45 12 00 35 13_8id 2020 On-Cali Pavement Markings Contract 2.xls
an a� o0
BI{J FORM
Page 1 of 9
s�cTiow oo a� ao
B1D FORM
Tp: 7he Purchasing Manager
cla: �'he Purchasing Divisinn
1 Q00 Tl�rockmorton Street
City of Fort Worth, 7exas 76102
�OR: 2020 On-Call Pavement Markings Contract #2
Cify Project No.: NIA
UnitslSections: Pavement Markings Striping
1. Enter fnto Agreement
The undersigned Bidder praposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form
included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and
canditians of the Contract Documents.
2, BIDDER Acknowrfedgements and Certificat'son
2,1. In submitting this Bid, �idcker accepts all of the terms and candi#ions of the INVITATION 70 BIDDERS and
INS7RUCTlONS TO BIDR�RS, including withaut limifation those dealing with the disposition of Bic) Bond.
2,2. Bidder is aware af all costs to provide the required insurance, wili do so pending �ontract award, and will
provide a valid insurance certificate meeting all requirements within 14 days of noti�cation of award,
2.3. Bidder certifies that this Bid is genuine and not made in the inierest of or on behalfi of any undiscfosed
indiv9dual or entity and is not submikted in conformity with any callusive agreement or rules of any group,
assaciation, organizat9on, or corporation.
2.4. 8idder has not diractly ar ir�directly induced or solic9ked any other Bidder to submit a false or sham Bid,
2,5. Biddar has not solicited or induced any individual ar ent9#y to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusi�e, or coarcive practices in competing for the Contract.
�or the purposes of khis I'aragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to
influence the action of a pubVic official in the bidding process.
b. "fraudulent practi�e" means an intentional misrepresentation ofi fa�ts made (a) to influence the
bidding process ta the defriment of City (b) to establish Sid prices at artificial non-competifive
levels, or (c) io depri�e City of the benefits af free and open competition.
c. "collusive pra�tice" maans a scheme or arrangemenk between two or more Bidders,. with ar
without the knowledge of City, a purpose of which is ia establish Bid pr9ces at artificial, non-
competitive ievels.
CiTY OF FORT WORTH
STANQARq CONSTRUCTION SPECIFICATION DOCUMENTS
Farm Revised 26150821 tl0 41 00_00 a3 43�QU 42 43_00 43 37_00 45 12_04 35 19_Bid 2p20 On-Call Pavement Mafkings Contract 2.xls
00 91 00
BEQ FORM
Page 2 of s
d. "coerc9ve practice" means harming or threatening to fi�arm, directly or indirectly, persons or their
p�operty to influence their parkicipation in the bidding proeess or a#fect the execution of the
Contract,
3. Prequalifrcation
The Bidder scknowledges that the following work types must be performed only by prequalifisd contractors and
subcantractors:
a. NIA
b.
c,
d.
a. 7ime of Completian
4.1. Time of completian w+ll be determined an a per work arder basis.
4.2. Bidder accepts the provisions af the Agreement as to liquidated damages in the event of failure #o �omplete
the Work �andlor achie�ement of Milestanes} within the times specified in the Agreement,
5. Attaehed ta fhis Bid
�'he following documents are attached to ar�d made a part of this Bid:
a. This Bid Form, Section 00 41 00
b. Required �id Band, Section 00 43 13 issued by a su.rety meeting the requirements af Paragraph
5.0'I of the General Conditions.
c. Proposal Form, �ection 00 A�2 �43
d. Vendor Compliance to 5tafe Law Non Resident Bidder, Sectian OQ 43 37
e. MWBE Forms {optionel at time of bid)
f, Prequalification Statement, Section 00 45 12
g, Canflict of Interest Affidavit, 5ection 0� 35 13
*If necessary, CIQ or Cl5 forms are to be provided directly to Gity 5ecretary
h. Any additional documents that may be required by Section �2 of th� Instructions to Bidders
6. Total Bid Amaunt
6.1. Bidder will complete t1�e Work in accordance with the Contract Qocuments for the fallowing bid amount. ln
the space provided below, please enter the total bid amo�nt far this project. Only this figure will be read
pubficly by the City at ihe bid opening.
C1TY OF FORT WOR7H
STANDAR� CONSTRUCTION SPECIFICATION pOCUMENTS
Form Ftevised 20150821 00 41 60_00 h3 13_�0 42 43_b0 43 37_OU 45 12_Otl 35 13_Bid 2020 On-Call Pavement hharkings Contract 2.xls
va a� o0
BID FORM
Page 3 of 9
6.2. 1t is understood and agreed by the 8idder in signing this proposal that the total bid amount enfered below is
subject to verification andlor modification by multiplying the unit bid pricas for each pay item by the respective
eskimated quantities shown in this proposal and then toialing all of the extended amaunts.
6,3. m ar Alkemate 3ia ltems <��e this �f app�iaG�- �--- - '
, � - � �i � ti �:_ :F $ppf �Di � �r�:,.ur-�. aalp�- $7�4D,426.45
To�al Bid
�. Bid Submittal
$i'�40,4�6.45
This Bid is su�mitted on January 28, 2Q21 by the entity named below.
,
.�
Respectf�itte� �� ` _
By, � -�,
(Signature
Rod Pekurr�e
(Pr�nted Name)
TitEe: President & CEO
Company: TRP Cansiructian Grou , LLC Corporate Seal:
Address: iRP Constructian Group, LLC
2213 Moneda 5treet
Fort Worth, TX i6117
State of Incorporation: Texas
Email: �..= .����,��,Y.V�1��
Phone; 817 8D8-1466
EMD OF SECT[ON
CITY OF FORT WORTH
STANDAR4 CONSTRUCTIDN SPECIFICATION DOCUMENTS
Form Revised 20150827 00 47 00_00 43 13_DO 42 43_00 A3 37_40 45 12_tl0 35 13_Sid 202Q On-Cal1 Paverr[ent Markings Cantract 2.xls
SF.CT[ON 00 42 43
PROPO5ALPqRM
00 J741
�FJ PIt01!Q4.\I.
r�� n otv
Bidder's Appliculion
UNPI' PR[C �G &ID
Projectltem information
➢escriplion
!17AOOt �'�»ish/[nsfall 4" Solid W�ite, Sprny 16ermapl9sCsc (90 mi1:)
� �� qp0z Fvmish4nstall 4" Solid Yel[ow, Spray Thcrmaplaslic (90 mil_)
217,0003 T'umisiJlnstal] h" Dash VJhi1e, Sprey Thcrmopleslic (90 mil.}
217.p004 rurnishllns1p11 4" Dash Yellow, Sprfty Thermapla5tic (90 mil.}
257.0904 �u�3g�T��staU 4" dD'C W hite, Spray Tharmoplaslic (90mi1)
217.00Q5 �uraishl[ns4a11 4" ➢OT Yepow, Spray Thcrmoplastic (90mi1)
2I7.�007 `v��$wlnstnll4" Whiie, 3iv3, f+380I @5, 5tamark 6rend Sape
ai�.000s Fumishl[natall 4" YeSlow, lM. A3801 ES, Sinmark hrand tape
4217.D102 �urnishllnsial{ 6" Salid White, Spr�y Thermoplastic (9� miJ.)
1217.�iD2 F��%��Install G" Solid Ye41ow, Spray Thcrmoplastio (9D mil.)
S2I7.OS�3 Fumishl[ostaq 6" Dash W3ute , Spray TherniopinsSic.(90 mil.)
3217,0103 �urnisldlnstall6" Dash Yellow, Spray'fhesmoplastio-(90 miLJ
32I7.�10�A �umislrAnsleli 6" DOT Wkiife, Spray7lsecmaplastie (90 mif.)
72i7A1�4 Furni3h![nstall8" l)OT Whice, Sp�ny'Chermoplastic�90 nsil.)
n
}217.m10A �uYnishll¢sfall 12" DQT Wl�ite, Spray Thermoplestic (9� mil,)
3217.O1b5 Fumishllnstail6"White, 3Iv1,A386IE5,Stamerk6rendtape
3217A1Ob �w'^�s�n"�� 5� Yellow, 3M, A3$01 E5, S[amark brand tape
3257�.02i12 F«��shl[sistaSl�B"SalidWhitc,SprayThar�opl3stic(90mi1.)
3217.0202 ���rnishAnsSell S" 5olid Yellow, 5pray Thermoplastic (90 mil.j
9949.4999 Fumishllnstal] l8° Salid �Vbite, Sp[eY Thermoplastic {9� mii.)
�99y_��gg �'urnishllnstsll S8" S91id YelloW, Sp[ay�"Chermoplasiic (90 miL)
3217.0203 F��g�TMstall 8" White, 3M, A3.SqI ES, Stamark brand tape
3237A204 rumishl�nstall S" Yellnw, 3M, A380I �5, Stamark hrand tage
3217 �303 FumisSJln5lflll 12" Wh�1e, 3M, A386! E5, SlamArk hraod tape
3217.6304 Fumishlinstall l2" Ye4low, 3M, A3SOI ES, Sfamark Urand Eape
3217.10�5 �emove�thermoplastic conirast or preformed ARR�W
3217.1004 Rcmove thennoplastia contrasS or preformed ONLY
3217.i006 �emovathermapla6liceonlcsstorpreformedBike
32t7.4�06 Remove thesmoplas[iacontrasSorpieformed Yield
3217.2101 rurnislallnstell 4" Aeflective Marker, 'I�pe I- A
3217.2k02 FurnishQnstatl A" Reflecfive Marker, Type I- C
3217.2101 �umislsllnstall A" Reilective Marker, Type ll- AIA
32I7.2104 Cumishllnstall 4" Reflective ivlarker, Type �I -C-R
gZ�pq2q� Remvve 4" WhsteorYellow Thermnplastic-PreEomied,Cantrast,5pray
3217.430] ��ove G' White vr Yellow Thermup3astia Areformed, Contrast, Spray
3257.43p2 Remove S" White or Yollaw TfiermopLes[ic -Prcformed, Cantcask Spray
3217.4A01 ��ovc therntoplasiic Raflroad Legend, Including� X, RR, and three�.24" stop bars
3217 4408 K�m�ve thermoplestic Lane Legend -Pccfarmed, CnnVast, Spray
7217.4704 �e1C1°� 12� �'�'re.ar Thermaplasiie P[eformed, Contrasl, Spraq
9217.4305� �emovc 16" Wfute i'hertnoplasti�P�formed, Coniresf, Spray
3217.4306 �move 34" White Thermoplxstic-Prefo�med, Conkrast, Spca4
3345.01 l Furnish AnstalS TG3DO Interstate Grade Cucb SectionslFG 33�i LFX I'OSTwith 2-3" yallow or white
949� �gg Fumishllnstall4" Themsoplt�stle-Contrast Markings (125 mil) Wl�ite or Yellow, Solid or Skip Lina
Fun3islJlnslall 6" Therma lastio-Contmst Marki�s ( l25 mi!) White nr Yeqow, Sofid or S3tip Lfne
9999,999�J P
yc�gggggg C�in11SSi11rts181C8"Therntvp��estic-ConteastMarkings (12S-m�l)WhitearYellow, SolidorSkipLiae
4999.9999 1'i�mishll�stall-4" Mt�lti-palqmer VdhiEe a� Yellnw, Solld or Skip Line, ➢DT
yg99 gggg FurnislJ[nstall 6" NlulFi-polyrter Wl�ite ar Yellow, Solid or Skip �ine, bOi
999g gggg Furnishllostaq $" Malti-potqtner WhiEe ar Yellaw, Solid Linc
9999.4999 Furnisl�insFell 12" Multi-Nolymer Whitq Solid Line
g��9 �ygg �urnisldlnstal3 24° Multi-pokymer White , Sofid Line
gggq gggg Remove 4" ot 6" White or YellnW Molt'spnSymer
99�y� �gyg Reniove 8" White ar Yellow Multipolymer
9999,9994 Ren3ava l2" White or Yellow MulGpoly�uer
9999.9999 Remuve 16" White M�dtipolysner
99yy gggg Remove 24" White TJfultipolymer
9999.9999 Remove 4", G" or 8" Whife or Yellow ThermoplasGc-Contrast (S 25 milj
9994.9999 �i�misl�llnstelk Acxeel Whita Chlorinated Zone Marking.PTint 12W-IJ1I0
9gggqggg Remove Aexcel WfiiteChlonna4edZonaMarking Paint 12 W-Dll(3
��yx� �ggg FurnishlSiul�11 Pr'e£armed "i'IiermopSastin(]25 mil) Misnallaoeous Word
,,,...,...�,.��_ F'��rni�l�l(wstall4" Preformed Thermoplaslic (l25 n�il.) Wk�ite, Solid or Skip Line
6idder's Proposal
Specificatian Unit of Bid Quantify l]nit Price H'td Velue
Section No. Measate
32 l7 23 LF [SDOD gp.�g $ ttl,2Q0_00
32 17 23 LF 1500D $p 58 $ k0 2A0.90
321723 LF 1�a0� $0.79 $ 11,850.U0
32172� LF 15900 $O,T4 $ ll,850.00
321723 LF SOD $l,gp $ 754.00
52 S7 23 LF 1�00 $1.50 $ i SOP.00
32 1'i 23 ]�f 35a0 $280� S 7,OO�Ap
32 l7 23 LF 25.00 $2:Bq $ 7,OtI0.00
32 ] 7 2� LF 25�0 $p.80 $ 2 U00.00
32 l7 23 LC 25�0 gp,gp $ 2,000.06
32 17 23 LF 25�� $0.85 $ 2,125AP
3217�3 LE+ Zg0i1 �p,g5 $ 2,12500
32 17 23 LP 2500 $1.70 $ 4,250.00
}Z 17 23 LF 2500 $Z.90 R 5,0�6.OU
32 17 25 LF 25W $3.00 � 7 509.D0
32 l7 23 L� 59a $4-50 $ 2,25�,04
32 17 23 LF SO4 $4.50 � 2,250,60
321723 LF 75Q0 g�,qp $ 10,506.0{l
32 17 23 LF 30110 $1 40 S 4,200.00-
32 17 23 LP 340D gq,55 $ 33,650.00
32 l7 23 I.F 7000 $4.55 $ 13,650,06
32 17 23 L1' 25� $5.63 $ 44,125.00
32IT23 LF 2500 $S.GS $ 1h}25.00
32 17 27 LF SOQ $B.S� $ 4,250.fl�
92 17�23 LP 50➢ $$ 50 � 4 258A0
32 37 23 EA 125 $35.00 $ h,37S O�D
32 l7 23 k:A �ZS $35,00 $ 4,375.00
321723 �� �ZS $35.00 $ 4,375,09
32 17 23 EA IZ� S35:Q6 $ 4,375.00
12 l7 23 EA Z6�0 gq.,SQ $ 9,aaa.ac
321723 EA 200D $4.SQ $ 9000A[
321723 EA Z�p� $4.SQ $ 9,Op0Of
32 17 23 CA 2000 $4.i0 � 9,000.01
321723 LF ZS00 $Q.S7 $ 1425:01
g2 �7 yg LF 2504 $p,(p $ {,5�0:(ti
32 17 23 Lr 3060 $p,g3 $ 2,550,0�
32 ST 23 EA z5� �I79.p0 $ 4,256.0
32 17 23 EA 25 $50.06 $ 1,250.0
321723 Lr 540 �9,qp $ 1,70D.0
32 17 23 LT S00 $4.D0 $ 2,000�.0
32 17 23 LF SflP $4.a0 $ 2,000 L
72 37 23 LF' 75 $ISQ.Q4 $ t l 250.t
92 f723 LP S00 $�,�q $ 570�.(
321723 LF 500 $S.10 � $�Q.�
3z � 7 y3 Lr S00 $z.27 $ i 135 �
32t723 LF 25170 $1.14 $ 2&SO:i
32 17 23 LF 500 $1.70 $ 85�:
32 17 23 LF S00 $2.64 $ 1 43D.
32 l7 23 LF ZSQ $4_54 $ I,135.
321T23 LP �n $9.06 � 2,270,
32 l7 23 LP 325 $0.27 $ 67,
32 17 23 LP 25a $4.27 $ G7
32I723 LC 2� $Q.i9 �$ 147
32 i7 �3 [-F 250 $o.6s $ 170
32 17 23 LP 250 $0.77 � l92
}2 �7 23 LF 250 s�.00 S 25C
3z �2 �g Lr 2500 $1,00 $ 2,50C
321216 L,F 250 $p,SD $ �z=
32 S2 l6 LF I50 $2BS.(10 S 42,75(
3�21723 LF 250 $2,25 5 SG
oo�i � po aa i3 aaax en oaasr_oass ix on as �a_oui mzoa�.c.u.ra.�n��<aj��co,����.�.t�9
tu��pq�4ed20i1o12o
Projecf lfem Informetian
Bid list Descrip9ion
Iten� No.
G3 2499.9941 �'��ishllnstall G' Prefarmed Thermoplastic (125 mil.) Wlii�e or Yellow, Solid or S�kip Liiie
G2 9999.4949 FurnishlCnstall 8" P�cformed ThermaptasUc (125 nuL) White vr Yellow, 3olid Line
G3 9999.9999 Cumishllnstall l2" Preformed Thermapla9tin (12S mil.) Whit�, Solid ]..ina
64 9499.9999 �urnishllostal3 24" �Pcefqrmed Thermopiastic (125 mil.) Wliite or Yellow, 561id Line
GS 99949949- Furnishllnstail TUermoy4astic Preformed (l25 mil,) (3ingle Head Curve Arrows ar OIVLY's)
65 9999.9499 FiirniskJlnstall Thermopinstic Prefonned (S2S mil.) (Single head Streight Arrows)
67 9994.999�J Ftimishl]nstall The�moplastic Preformed {1?5 m'sl.) (Gane I�eduction Arrows, ] 2' long}
GS 9499-9999 �'urnish/lnsta117hermoplaslic Preforrned�(125 mil.) (llouble Iicad Combo Arrows)
69 9999.9949 Purnishlinstail'fharmoplestic Preformed (I25 mii.) (Tripke Head Com6p Armws)
70 9949,9.999 Fur:�iahlFnsFall'Thenuoplastic Preformed {125 mi1J (Rail Rond (X &RR), Including thrae 24" stop bars)
71 g�qg qqg� Bumish/lnstal! Thermopinstic PsePotmed (125 miL) (3G x 24, Yield Sym4aol)
72 9999.99`39 �urnishllnstall Tltermoplestic Preformed (90 mil J(Bike, Shared, IncSudas liike symbul and 2 Shattow Merkings) ]nstalled
73 9999,9999 Pi=mislilBistnll Thermoplaslic Preformed (90 nifl.) (Bike, lncludes Bike�symho] only)
74 9999.9499 Furnishllnslall Themioplastic Prefomied (125 mil.) (8ike, Arrow, Includes I Slraight Arsow only, 6')
75 yggg gggg Tumishllnstall Thennoplastic Pre£ormed (90. m'rl.} (5 faet wide, Bike C,raea, Premark Urand) EncWding Sealer, MiFsl use 2 part
76 9999:9949 Remave fhermoplasSic 36 x 24 Yscld Symbal
77 �g�g�g�g FsirnisSJlnstall 4" Type [T Whitc C1C oe Yellow NA round Ceraniic Hatton
7$ 9999.9999 �umisl�llnstall b" T�pe 11 While CTC or Yepo�v AIA raund Ceramic.Quqon
79 9999 �999 Pur¢ishllnstaSl 8" Type Il White CIC or Ye1Low� NA Ceramic Bul1o«
�Q yggg ggg9 Install S" Type 11 Whife CIC as Yallow A/A Geramic Bulton
B I 9444.9999 �B�O°� Temp TAB
82 99999999 Fu[nishflns[all Bu[toniypeFlexStake
83 4999.9999 Remove 4" refl 1'�affic Du€tan
gq 9�99.9999 �move G" ref] Trnffic�Snttan
85 ggg� �ggy Remoxa 8" refl Traitic Bultan
$6 99`J9.9999 1'�ep and Scal Pavcaient S�u-Face €ar 4" Markings
87 qc�gq gggg Prap a�d 5ca1 Pavement 5urface far 6" LVfaskings
$8 9999.9949 Prep end 3ea1 Pavemcnt Susfaee for 8" Merkiu�s
Bg 9994.9�99 p�A end�Seal Prtvemenl Surfeae for 12" Markings
9� 9949,9999 p�ep and SeaS Favement Surface-for l8" \4arkings
�� gg�g 9994 Prep and Seal Pay.ement Sur€ace for 29" Marki�isgs
g2 99�99.9999 P�P �d Sea�l Aeve�nent Surface�for Rail Ro�d Iv3�rking5,.lncluding?C, ]iR & ihrea 24" stop bars
93 9�999.9994 prep �and SePI Pavamcnt SurFaee foc 3G x 24 Yield Symbol
94 9999.9999 Prep and Seal Pavement SurFaca for ONLY
95 9949.9999 �'re� and Seal Pavement Surfece for iCield
�6. gggq gggg Arep and Seal Pavement Surfece Cor Arrow
9� y94g gggg prep nnd Sea1 �Paucmenl Surfttce for Bike, Shnred, Includes Bike symbol end 2 Shavow
98 gq�q ggqg Pra� a��d Seal Pevement 5urFaec for pike, Includes Bike symbol only
99 9999.9459 P�Y �� Seal Pavement Surface far IIike, Arrnw, lncludes 1 Sheig[�t Arrow only, 6
100 9499.9999 rrep and Seak Pavemen[� Svrface Far 5 feel veidc, Bike Greeif, Pre�ntvk brend Inalucking Sealer
l01 9999.9994 PumislilGiatallYellaw36"Delineators
jnz ygg�gggg Cumis��nstall White35"Daliqeatars
103 4949.9999 Remave Yellow, White 3fi" DclinetHors
1DA 9999.R999 RemovePG300InterslateGrndeCurbSections/FG33GEFXl'OST�vitlt2-3"yellowarWhifeWrspsIPG300
105 9�J99.4999 Fumish/Inatxll 4" Exlr�de Thecmopkastic [I2S mi4.) W hife ar Yellow, 3olid arBnsh Lme
IO.G 9999.9999 F��miskilinstell 8" Cxtcude Thermoplas4ic (125 mi] J WNite or Yellow, Solid Line
]07 99999999 Famish/lnstall l2" Exirude Thermoplastic (l25 mif.] Whife w Yelidw, Solid Line
1�$ 9999.9999� 1'urnish9lnstnll 24" &xlrude Thermaplaslic (l25 nv3.) White So1id Line
� p� yqg�.ggqg Fumishllnsta114" Spray Thermaplestie- Contrast Merkiogs Q25 mil.) Whiie or Yella�v, SoGd or Skip Lin�
�]4 9999.9999 Fumfs6l[nstall G" Sgray Thermoples4c - Conlrast Markings (125 mil.) White or Ye31ow; Salid a; Skip Lina
1 I I 9999.999;J ���inishllrtstall B" Spray'Chcrmoplastic-Co��hast Maricings (l25 mil,) Whitc�or Yellow, Solid l.ine
� 12 �x}gg gggg Furn'sshlInsl�11 12" SprayThenndplastio- Conlrasf Markings {125 niil.) Wlvte ar Y.ellaw, Solid Line
I S3 9999.9999 FurnisGllnstall 18"�5prny Tharmpplastio- Contrast Merkings (125 mil.} White or Yellow, 5olid Line
y �q ggqg gggg I�urnishllnsfall 24" Spray Thermop3estio- Conhast I�9erkiE�gs ( I25 mil.) White ar Yellow, Solid Liae
� �5 q�gg ggq9 EurnishpnstalS Thermoplastio Preformed-Canvast {I25 ini1.] {Single Ilead Curve Arcows or ONLY's)
l l6 99999999 Fum�sldlnstall Thermoplastic Prefarmed- CoMrest (125 mil.) (Singlc Head Curve Arrmvs or ONLY's)
� y� yggq �jggq Furnisldlnstall Thcrtnoplastic Preformed- Conhasf (125 mil.J (Lnne Reductiau Arrnw i2' lang)
11 B 49999999 C�rnishfinstnll Thennopls�tsc Preformed- Contr�st (125 mil,) (DoubSe I�lead Comhu Artows)
1 l9 9999.9999 Fumishllustall Thermoplastic Prefprmed- C.antrast (I25 mil.} (Triple HOad Com6o Arrows)
12n gqgq gggg Furnishlinetstll Thormoplasiic Preformed- Conhast {125 mil J(Kailroed (X & IZR), I�ic3uding th[ee 24" stop 6ars)
1z� gggggp�� Fun�ishllnstdll Tlierniapkastie Prefonned- Contrast (125 rt�il.) (36 XL4, Y'seld Sym�ol)
l22 9999,9499 Furnisiilinstall "Fhermapinstic Preformed- Contrast (90 mil.) (E3ike, Sltaad, locludas Bike symhol and 2 Sl�xrrow Mnrking
123 9999.9999 Fumis]Ulnsiall Thermoplestic Preformed- Eo��lrast (90 mil,) (Bike, includes 8ike sym6al only)
124 99999999 �umishllh9[aq 'Phemtoplgstic PrsPormed- Contwnst {9D mil.) (Bi%e, Shared, Includes 2 5hnrraw M�rkings only)
� 25 cy R ti i�h1in gal�l Tharnwpl�sl :c AFeformed - Canl€nst (90 mil.)�(fiiko, Arrow, Hicltldes 1 St[niglN tL'rows only, G')
s
Foim rsm+�a latw�:o
Specification Unitof B.�
Sectson A'o. Mexsure
321723 1.F
33 l7 23 LF
32 S7 23 LF
32 17 23 LF
32 17 23 BA
32 l7 23 8A
32 17 25 �A
32 17 29 �
32 17 23 EA
32 37 23 EA
32 17 23 EA
32 l7 23 1=�
32 l7 23 EA
32 37 23 EA
321723 LF
32 17 23 eA
32 ] 7 23 EA
32 l7 23 EA
32 l7 23 ER
32 47 23 EA
32 17 23 EA
321729 �A
32 l7 23 8A
32 17 23 EA
321723 EA
32 17 23 LP
72 l7 23 �
32 1 T 23 LF
32 1? 23 LF
3Z1723 LP
32 37 23 LF
321723 EA
32 17 23 EA
}2 {723 EA
32 17 23 EA
3217 23 EA
32 l7 23 LA
4z 1123 EA
3� 17 23 EA
32 l7 23 LF
32 l7 23 CA
32 17 23 EA
32 17 23 EA
32IT23 �A
sa s� xa LF
32 ]123 LF
3i l7 23 id'
32 l7 23 LF
32i725 LF
321723 LP
32 17 23 LP
32 17 23 LF
$2 17 23 �-H
32 L7 Z3 L�
32IT23 F,A
32 [7 23 EA
32 17 23 �.A
32 17 23 EA
321723 EA
32 S7 25 HA
321723 L•A
32 17 23 EA
32 17 23 EA
32 l7 2} EA
32 17 23 EA
SOfl
500
500
500
45
45
S
20
5
20
25
75
iao
22
IQO
ioa
AO
40
40
25
40
40
IO
2009
�p00
2060
2D00
SOU
500
70
l6
TD
250
259
250
nN enai�ns�u.
6idt#W�i§'oposal
Uail Price Bid Valuc
$3 40 $ 1,700.0
54_SQ $ 2,25D,C
$6.60 $ 3,400.0
$13.50 $ G.750_(
$355.fJ0 $ ] l,
$450.00 $ 2,
�aoo,00 � s,
$550,00 $ 3;
$150.Q0 $ 15,
$iao.00 � z
S340AQ $ l7
225.00 $ iG,675{f0
45.00 $ 4,500:00
iz ao $ 26a.ao
S.SD $ 550.00
6:80 $ 6$0.�0
45.OD $ 1,800.00
45.00 $ L,800.00
S ff6 $ 0.0:0�
rao.00 �. 2 soo.ao
3.aa s izo.00
S.d�O $ 200 00
I0.Q0 $ 100.60
0.57 $ 1,k4Q,00
6_G8� S 680.��
2.25 $ 4,500,[]V
2,83 $ 1,425.Of1
3.40 $ 1,7Q0.00
115.00 $ A,60D_Ol7
tz.an $ aao.ao
30.00 $ 2,100.00
35.00 $ 2 450.00
Z5,D0 $ 1,75Q.00
30.00 $ 7,SOO.00
25,00 $ 6,2SO,flC
25.00 $ 6,250.0C
Sa 100.00 $ 5 000.00
50 55:0� $ 2,750,00
50 F06.00 S S,WD.00
t450 �.y5 $ I,812_59
60 1.20 $ 102,00
25P 2�.85 $ 712.50
I000 G.80 $ G SOD.OQ
62 1.70 $ 145.40
�2 2.25 $ 139.50
6� 3�.40 � 250.80
�2 10A0 $ G2p9C
G2 t5�oo � 93a_OC
bZ 2Q,Op �
l0 30(3.00 $
�� �on.00 �
l� �5�.00 $
10 $q5000 $
ltl $686_OQ $
10 $725.60 $
�0 $55.00 $
�p $340,00 $
��� $34�.00 $
�� $450.00 $
lb ���5 on �
Projact Item ]nfarma3ian
g�� ��5� Dessription
Ftem No.
I ZG 9999.9499 Funzishllnatall 12" White or Yellow- Confrast, 3M, rL360I ES, Slamark 6rand tape
12q ggqq gc�g Furnish/Enstall 4" Multipolymer Wl�ite nr YeSlaw, Solid nr Skip Linc, Dot
��g gggg c�g�g Furnish!]nslall S" Mullipalymer Wf�ite pr Yellow,.Solid 4ina
129 9999.9999 Furnishllnshal] [2" Mullipolymer White or Yellow, Salid L'sne
130 9999.9999 �wnishlfns[all i8" h1ulCspalymer Wtiise Solid
13l 9999.9999 Fuinishllnstall 24" Multipolymer Whife 5olid
�32 g9g9.9g99 I�umishllnstall Multipoiymer (Single Head Ct�rve Arrows or �NGY's)
1�3 9999.9999 Furnishllnskall Multipolymer (Singlc head SlraighE Arrows )
l34 99�99999 Furnishllnslall Mul[ipolymer (I,nne Aeduelion Anows, 12' long)
!35 9999.9999 ��'nish/lnslall Mvltipolymer (1]oubleP3eadComboAirosv8)
136 9999�9.999 rumish11ns1aIS l�Fulfipolymer {Trfple I�Icad Combo Arrows)
137 9999,9.999 Fumishllnetal] Mu[tipulymer (Rai] Road (X & RR), Includiag three 24" slo� bars}
138 ggq�.�ggg FumishlInatall ivl�dlipofyinef (96 x 24, Yiald Symb01)
l39 9�199.9999 Fumishflnstn3l Muliipo3ymce (Yield, Bikq Shared, includes 6ike symbol and 2 Sharrow Mnrkings)
14Q qggq_gg�g Pumislilinstall Multipolymer (Sike, Includes Hike symbol nnly)
�q� gc�gggggg Furnisl�llnstallMullipolymex(Bike,Arraw,Includesl5traightArrowo�dy,G')
142 9949.9999 Hv�'nishllnstall Multipalymer (Singte Head Cairve Arrows or ONLY's)
143 4959�99J9 Furnish![nsLall dvlultipolymer(SingleheadSfraightArrovrs}
L44 9999.4999 Fumsshllnsta3l Multspolyfncr (LaneRealucti9nAnpus,k2'la�s�
145� 9999.9999 Fw'i�ishllnstall Mullipolymer (�aubie Head Com6a ARaws}
Ihb �9J9�.9999 ���g�nstnll Multipnlymer (TripleNendCambaAreows)
S47 999�9_4999 Fumishllnsiall ]v[ultipolymar (Railroad {X &RR), Including Ihsee 24" stap bars)
198 99999499 Cumisl�lIisstell Pviultipolymer (5 Feel widq Hike Green, Premark brand) Including Sealer, A9usfi use2 paA sealer
lA9 9999.9999 �e»�ove MultipalymeracrocvsincludinglsnereduetianerrowsarOMLYorBikasym6ol PavementLegend
150 9949.999� Remave MultipolymerRaLlraadLngend,]ncludiogX,Rlt,.endlhree24"stop6rus,
1$1 9499,9994 Remove8"WhiteorYello�vMvltipolymer
152 9999.9999 �mpvc l2" WhiteorYcllaw Multipolymer
153 9999..9999 Remave 24" Wl�ita NFultipolymer
lS-0 9�594.49�39 Remove Multipalymer 36 x 24 Sym6ol (YIEL�)
155 9999_99.94 Furnish4i�stall Maltipolymer Wl�ita �WPItD ]
15.6 49999999 Remove Multipolyiner White (WORD)
157 9999.9494 �emove Aaxcel White Chiarinated Z.one Markii�g Psin[ 12 W-17110
158 3471.4001 Trafl3c Control�
159 3471.0002 parla6kc Message Sigu
Ifi0 9999_9999 Full Higlkway C4osure perday -(Nigf�UWeekenQ)- 7'tafi'sc Coniro]•
lGl 9999.9999 FurnishSlreetPemiit
1G2 170A102 VWorkOrderMabilixation
S�ecifica[ion Unitof
Sectipn Na. Measure
32E721 I.F
321723 LF
32 17 23 LF
321T23 LF
32 17 23 4F
32 17 23 LF
32 l7 23 EA
32 17 23 LA
32 17 23 EA
32 17 23 EA
321723 �A
32 l7 23 �A
32 l7 23 EA
32 S7 23 EA
321727 EA
32 I7 23 EA
32 I7 23 F.A
32 l7 23 GA
32 l7 23 EA
32 17 23 £A
32 17 23 EA
32 17 23 EA
32 l7 23 L�
3�1723 6A
32 l7 23 �A
32 37 23 LF
�2 17 23 I,F
32 ] 7 23 E.T
32 17 23 EA
321723 LF
321723 1�F
32 l2 TG LF
34 71 13 MD
347t E3 �A
34 7l ]3 EA
01 70 0p EA
Ot 700� EA
i ao
3750
4SaD
250Q
saoo
12S
25
25
25
25
25
59
fi2
50
5�
35
in
IS
IS
15
]5
25
25
25
25
25
25
IS
25
i25
12
I
S
1
L
Grand
�
� � \ '
� � ..... � � ��
�•� P�����j r �kc� I �au(- .r Gr-�
I�@nRaFCASAI..
Bld[����'O�lose�
Unit Prica Qid Valuc
$15,Q0 $ 1,500.00
'$Ll4 $ 4,275.00
$1.70 $ 16,S5a.00
$2:84 S 7,IOO.OQ
55,D0 $ 25090
$G,SD $ 32540.00
$170,Q0 $ 21,250.fl0
$170.00 $ 4,250.00
$]68.00 $
$21�,06 $
$454:00 $ 1
$50.00 $
$140.00 $
$1G5.00 $
$17�.OD $
$�7n,ao �
$227.00 $ 3,AOS.QO
$188.�0 $ Z826A0
$21.6.00 $ 3,I54.OQ
$454.Oa $ 4,540An
$SS:pa � 825.00
$2A.D� $� 540.00
$75,00 $ 1,875.00
�0.27 � 6,75
$0.59 $ 14.75
$0.77 $- ]9.25
517.00 $. 425.00
$28.Ofl� � 42D.Q0
$33,00 $ 575,�f3
$OST $ 7I.2S
$600.W $ 7.200:Q�
$SQO.QO $ SOD.00
$500.OQ $ 50:O.OQ
ssoa:au � r�a.�o
C771' ON FONTR'OIiYFi
SfAlv'AARi1 Cottil'RVC77fiN SPkC:I}7CATI0.� �CUA4c�Ts
00 JI 9a_06 i] I3 0� 43�43_-00 �} J] -P� 45 12_W 35 43_I7[1 2U200roCd1 PnvnNn<hlvl'n�g} Cnnheet 2.�It
F kG�leodYtl1�64f0
aa �a �3
s�o sa�❑
Page 7 of 4
����o�� �� �� � �
��� �o���
�t��� ��� �v �o-���� ��������:
That �rve, (�idder I�ame} TRP Conatruction Gxaup, LLC �ereinafi4e�
called the Principal, and (Surety Name) Arch Insurance Company
a corpor�tion or fir�n duly authorized to fransact surety business in the Stafe of Texas, hereina�ter called the 5urefy,
are held and firmly aound un4o the Cifiy, hereinafter cal3ed ths Obligee, in the
sum o# Five Pe�'cent of Amaun� sid and fVo11�0 Dolla�s
($ 5 a of amt . bzd .00), the payment of rrlrhich sum jiv[II be well and truly made an� 4hs
said Principal and the said Sure4y, binc� otirseE�es, our heirs, e}cecutors, adminisfrators, successors and assigns, jointly
anc! severally, firm by these pres��tts.
WHERE45, �he 1'rincipal has submifi4ed 2� proposal ta perform uvor� for 4he fiollowing projec� of i�e Obligee,
iden4ified as ao2o oz�-c�v F�v�M�r��r mARxr�r�s ca�a'z'�c�r #z
�IQW, "CH�REFORE, i� ti�� �bligee shall award 4he Contract �or the iaregoing praject #a
the f'rincipal, and the Principal shall satisfy all requirements and conditions requireci for t�e execution of the
Congract and shall �nier into the Contrac� in writing with the Obl�gee in accordance with ihe terms of such proposal,
then this bond sh�l] be nulf and void. If fihe Principal fails to execute such Contract in accordance wiih the terrns of
sueh proposal or faii.s 4o satis�y all requiremen4s and conditions required for ihe e�:ecutia� of the Coniract in
accordance uvith the proposal or fails to satisfy all requirements and conditions requited far the e3cecution of the
Coniract in accordance wifh fhe proposal, ii�is bond shaU 6e�ome fhe property of the Qbligee, withouf reco�rse of the
Principal andlor Surety, not to exceed t�e per�aliy hereof, and sha[I be used fo compensafe Ohliges far the difference
between Principal's Total Bid Amount and tF�e nexi select�d BEdder's Total Bid Amount.
51GfVEQ this 25�h day of 5anuary , 2�Z�.
By: Cam�any Nam� "-,,. TRF constru�tion Graup, LLC
���`,�r �,���-� j/� (Signature and Title of Principa
�'By�: SU.Pety NalTle I-9efe : Arch Insurance Company
Eli a.: :h x. s�erling t�igna#ure of Attorney-� ;-Fact}
�Attach Power of Aftomey (Surety) for Attarney-in-Facf Impressed
Surety Seal
On1y
��8� OF ���i9D�9
C3TY OF FORT WdRTH
S7ANDARD CONSTRUCTiON SPECIFICATION ��CUM�NTS
Form Revised 261 i0627 00 41 0o_DO 43 43 90 42 43 00 A3 37_00 45 12_�d 35 13_Bid 2020 an-Call Pavernent Markings Contract 2.xls
Mi� UVCl1J0�.�.��
p ha� �esw�a� c�� �44��a��y �s�gcs �P�e ��f� �f ��a��� �a�a�a��f da�k �aa, ��a� �h�yp 6��v� �r+� �a�a�d�a�r6�� a� d���a�I �&�� ��aa�ga��s�r c�soc��d i�a ��e
�'��e�ra�r ��a�1 �as ��a� ���ea8 ���l�a ���fr��1. ��� ya�r�1 f�� �l��e, L.��aa, ����� �� �s���"ba, Cuvv���� ��&�, �����e�� ��k� �� {�e�i�l�e��6�d
�/a9�ae �ra�rara����.
����� �� ��������
Knov�r All Persons By ihese Presents:
Tha# the Arch Insurance Company, a corporation organized and euisting under the lav4rs afi the S#ate of Missouri, havir�g its princip�l
admi�isirative office �n Jcrsey City, �4ew Jersey (hereinafter referred to as the "Company"} does hereby appoint:
Benjamin A. Stahl, �lizabeth �C. 8terling, Ma�ia Signoril� and Wesley P. Williams vf Atlanta, GA (EACH)
i4s true ancJ IawEul Attorn�y(s)in-Fact, to make, execute, saal, and cfeli�er from the date of issuance of this power for and on its behalf as
surefy, and as its act and de�d:
Any and all bonds, underkakings, recognizances and other surety obligations, in the penal sum no# �xceeding
i�inetV Million Dollars (9D,a00A00.00L
This authority does nat perrnit the sam� obligation to be split int4 two or more 6onds !n ordar to bring each such band wiihin fhe dollar
lirnit of aufhority as set forth herein.
The execution of such bonds, undertakings, recognizances and other surety obligatians in pursuance of these presents shall be as binding
upon the said Company as fuliy and amply to a11 inten#s and purposes, as if the same t�ad been duly executed and acknowledged by its
regufarly elected o�icers at its principal adminisirative ofFce in Jersey City, Ne�r .iersey.
This Power of Attorney is executed by authorify of resolutions adopfed by unanimous consent of the Board of Directors of the Campany
on September 15, 2Q11, tr�e and accufat� copies of which are hereinafter se# forth and are hereby certifed to by tF+e undersigned
S�cre#ary as being in full force and effect:
"VOTED, That the Chairman of the Board, ti�e Presiclent, or the Executive Vice Pr�sident, or any Senior Vice President, of the Surety
Business DiviSion, or their appointees designated in writir�g and filed with ihe Sec€etary, or the Secretary shall ha�e the power and
autharity to appoint agents and attorneys-in-fact, and to authorize them subject to the fimitations set forth i� their respective powers of
at�orney, to execute on behalf of the Company, anc� stiach the seal of the Company thereto, bonds, undertakings, recognizances ancf
oiher surety ob[igations obligatory in the nature thereof, and any such officers af th�; Campany may appoirtt agents for acceptance ofi
process."
Ti�is Po+uer of Attomey is signed, sealed and certified by facsimile �nder and by autharity of the following resolution adopted 6y the
unanimous consent of the Board of Directors of �he Company on Septemb.er 15, 2091:
VOTE�, That the signature af the Chairman of the Board, the President, or the Executive Vice President, or any Senior Vice President,
of the Sur�ty Busin�ss D�vision, or their appaintees designated in writing anci filed with the Secretary, and the signature of the 5ecretary,
the seal of the Company, and cerEificaiians by the S�cretary, may be affixed t�y facsimile on any power of atforney or bond exec.uted
pursuant to the rasolution adopted by the Board of Directors on September 15, 2411, and any s�ch power so e�cecuted, sealed and
eertifed with respecf to any band or under�aking to which it is attached, sl�all continue to be �alid and binding upon ihe Company.
OOML0013 00 03 03 Page 1 of 2 Printed in U.S.A.
!-1!'� DOGa30$'�.p?
ln �estimony Wl�ereo�, t€�a Cnmpany has c�used #his ins�rumenf to be signecl anc� i4s corporate seal to be a�xed by Yheir au�hor�zccl
officers, ti�is 26'�' day a� March, 2Q2Q
At4es#ec� and Ceriified
��5 .�? f ' % !
'j�y''�`.,�'���'.J�t�° 4-�,g"1�'.t��1{� ��.�1
l�
Patrick K. Naiks, Secretary
S�A I� OF P�IVNSYLVANIA SS
COfJNTY OF PMILADELPHIA SS
��,���l� GEI���•,
�'� ,r' i�
i � ,{ _ _ „_..,,�r
t�y- i� c £«T f43�.3:2i: �
U � rs,c �
�� � f
k h�r
�� +`�.� _4 � �
V�'a.,_ � .1���F��� Jr
Arch Insurance Company
���4. -` `, t- } I�; .
`` �� �� _,_ _. .
f `'��� �'y -- � ��;� � -t_����,.l�
-:.--�f J
David M. F'inlcels4ein, E;cecuti�e Vice President
I, Michele Tripodi, a�lotar}r Public, do hereby certify that Patrick K. �laiis and David �I. Finkelsfein persanally known to me to be the same
persans whose names are respecfiively as Secretary and E�€ecutiue Vice Prasident of the Arch Insurance Campany, a Cnrporation
organized and e�cisting under the laws of the Skate of Missouri, subseribed tv the #oregoing instrument, appeared 6efore me this day in
person and severally acicnowledged thaf #hey being thereunfio duly au#horizec] sEgned, sealed witl� the corpora�e seal and delivered the
said instrum�nt as the free and vofunfiary act of saicl corparation and as their own free and voluntary acts for the uses and purposes
there9n set forth. � . _.
�fSt�E1d��H�1F'$� Trti fiF L"3F %th'S YG �Aht4�1
�� -" "' i�C�IAA_A l!. l V-.�� I
� �,t+�+�l.k i�CiFt��� ri�, � � r='st �
:�![� [i+� i�'1i�F-SSr h�r._ f f� � i iar`,k'I
� ,.�y�:�y�n[ts&Ki E�,�.� (_r�� }r 5 �, _1!�t
�� - —
CERTIFIGAT[ON
_ ,•
� •� ,: ; `,
. , ' + �� �'sf�� '�� ,� � L-�;� ��(. 5,. ,
� .�,.� -
t` � _
:•` r,
Michele Tripodi, fVotary Public
My cornmission expires 07/3112021
!, Patrick K. Nails , S�cretary of �e Arch Insuranc� Campany, do hereby certify that the attached Power of Attorney dated March 26,
202D on bai�alf af the person(s) as listed abo�e is a true and correct eopy and that the sarne has been in full force and effect since the
date thereof and is in fup force and effect on t�e date of fhis certificate; and I do further ce�ify that the said David M. Finkefstein, who
executed the Power of Attorney as Ex�cLiti�e Vice President, was on #he date of execution of the aitached Pawer ofi Attorney the duly
eleeted �xecutive Vice President of the Arch lnsurance Company.
iN T�STIM�NY VVHEREOF, I ha�e hereunto subscribed my name and affixed the corporate seal nf the Arch lnsurance Gompany on
this day of , 20 '
��� �d� l�` � �/
� � ��.L��#��'� 4� t%��r'"�.�•�= �
.`.,.�_,��
Patrick K. iVails, Secretary
T�is Porrver nf Altorney lirr�its the acts of those named therein to the bonds and undertakings specificalfy named tYterein and they ha��
no autharity �o bind the Company except in the manner and to the extent herein ataied.
PLE,4S� ��i�� ALL CL�AIM �P�Ql11F�E�S R.�LATl�9G i°� iF�9S �46��'f�?'H� �OLLOVVIf�� Ai]�RESS:
Arch �nsurance � Starety Y3R�isiae�
3 P�r�nnr�y, �ui4e 15�4D
Ri�iladelph��� �A 39�Ya2
QQML0013 00 Q3 fl3
��y� � F �.r�._� qx-�iI'
T'
�� ��
t.� (};7k_tS.MiSIf `�
� SCId. E
� � �:� � �
�� ���a�t� �_�
' �'a�e 2 of �
Printed in U.S.A.
0o as a�
V�NnOR CONlPLIANCE TO STATE LAW
Page 7 of 8
SECi'ION OQ 43 37
V��VDQR COMPLIANCE 70 STATE LAW NON RES![JEiV7 BIDDER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This
law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-af-state conkractors
whose corporate offices or principal place of business are outside the State of Texas) b3d prajects far
construction, impravernenfs, supplies or services in Texas at an amouni lower than the lowest Texas resident
f�idder by th� same amount that a Texas resident bidder woufd be required to underbid a nonresident bidder in
order to obtain a cnmparable contract in the State which the nonresident's principal placa of business is located.
The appropriate blanks in 5ection A must be filled aut by all nonresidenf bidders in order for your bid ta meet
specifications. The failure o'f nonresident bidders to do so wi11 automatically disqualify that bidder. Resident
bidders must check the box �n Seckion B.
A. Nonresidenk bidders in the State of , our principal pEace of business,
are required to be percent lower than resident bidders 6y 5tate Law, A copy of the
stakute is attached.
Nonresident bidders in the S�ate of ,. aur principal place of business,
are not required to underbid resident bidders.
B. The principal place of business f our company or our parent company or rr�ajority owner is
in fhe Siate of Texas. �
BID��R:
TRP Construction Group, LLC
TRP Gonstruction Group, LLC
22� 3 Moneda Streek
Fort Worth, TX 78917
By: Rod P�� _
. � .
l �- � �• _ ��� - �
__� ,4�.
�
(Signature)
Tit1e; Presid�nt & C�O
Date: 1 ZS z�z-!
END OF SECTIOI�i
CITY DF FORT WO�tTH
STANRAR� CONSTRUCTION SP�CIFICATION �OCllMENTS
Form Revised 201 i4627 60 41 OQ 00 43 13_Op 42 43_60 43 37_DO 45 i 2_00 3.5 13_Btd 2Q24 On-Caf! Pavement Markings Contract 2.xls
00 45 12
BiD FORM
PageSaf9
SECTION QO �� 12
PREQUALIFICATION STATEMENT
Each Bid�er for a City procurement is required ta complefe the information below by identifying the prequalified
confractors and/or subcontractors whom they intend to utilize for the major work type(s) listed.
Major Work Type ConfractorlSubcontractor Campany Name preaualification
Expiration Date
NIA . � � . : . � ��,,}e f E�:,�t. t�i
��:� i� rx
!' �Ir, �;,, .
� ,�, ... . .,�. . , .. ' '
{�j}�:li:i'.
� .� ��� . , i•P��k��l�. I���� �}f . � � �, � � �
O� . � �� :"I�.11�� asi
, �r3��
The undersigned hereby certifies that the contraciors andlor subcontractors described in the table abo�e are
currently prequalified for fhe wor[c types �isted.
�I�D�R:
TRP Constrt�ction Grou�, LLC
TRP Canstruction Group, LLC
2Z13 Moneda Street
F'ort Wor�h, 7X 76117
By: Rod P� -
— , ,
�t`� �• �`�� .
(Signature}
Title: President & CEO
Date: ��zg�zort
�Rl� OF' SEC�ION
CITY OF FORT WORTH
STAN�AR� CONSTRUCTIOiV SPECIFICATION DOCUMEl4TS
Form Revised 20120120 OU 41 00_DO 43 13_DO 42 43_00 43 37_OD 45 12_00 35 13_8id 2020 On-Call Pavement Markings Contraci 2.xls
9@4526- i
CONTRACTOR COMPLIANCE WITFT Vi'ORK�R'S COdvIP�NSATION LtAW
Page 1 of 1
1
SECTION �0 45 26
2 CON'1'RACTOR COMPLIA,NCE WITH WORI�ER'S COMPENSATION LAW
3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractar cei�ifies that it
4 provides worker's compensation insurance co�erage for aIi of its employees employed on City
5 Project No. N/A. Cantractar furthez• certifies ihat, pursuant to Texas Labor Code, Section
� 406.496{b), as amended, it will pravide to City its subcontractoz''s certificates of compliance with
7 warker's compensation coverage.
CONTRACTOR:
10
ll
12
13
i�
I5
16
17
18
19
20
2I
22
23
24
25
26
27
28
29
�a
31
32
33
34
3S
35
37
II�P �rlZlJl%i0Y! 0:��. �C _ BY: E�C!%��N
Gompany {Flease PC�'rxj `
2�%II /p'I//+�NI s ¢ r v� SignaturQ: ''
. �- :` :
Address _ �' � �"
X �f Title: fZ�J'I/J e �' �' �'�
CitylStatelZip (Please Print}
THE STATE OF TEXAS
COUNTY OF TARRANT
BE�'ORE ME, t�i� undersigned autharity, on this day p�rsonaIly appeared
�(� � r�tt� , knovvn to �ne to be the person vrhose naine is
subscribed to ihe foreg�oin i.nstrument, and acknovaledged to me that ha/she executed the same as
ihe act and deed of �+�L•SS L�Y �s G� for the purposes and
cansideration therein expressed and in the capacity therein stated.
��
GIVEN TINDER MY HAND AND SEAL OP O�'FICE this � day of
�u�U�iCJ� , 2��-
�
Notary Public in and far the State o Texas
38 END OF SECTION - - - - - -_- - _ - _ _
�I�R��t
_ ' �at--'• ' te nf Texas
39 _ . .-• --- •
CITY OF r0[ZT WORTI� 2020 On-Call Pavemeni Markings Cot�tract#2
STANDARD COi�fSTRUC'i'ION SP�CIFICATION DOCUMENTS CPN ] 03740
Revised duly l, 2011
00 45 4U - 1
Susiness Equity Goal
Page 1 of2
SECTION 00 45 40
Business Equity Goal
APPLICATION OF POLICY
if the total dollar value of t11e con�ract is $1 Q0,000 or more, then a Business �quity goal is applicable.
A Business Equity �irm refers to cert[�icd MinorEty-, andlor Women�, awned Business Enterprises
(M/WBEs).
8 P4LICY STATEMENT
9 Zt is the policy of tl�re Gity of Fort Worth to ensure the fiill and equitable paxticipation of Business Equity
10 Firms wlren applicabla, in the pracurement of a1i goods and services. All requirements and. regulations
I1 stated in the City's Business Equit}% Ordinance No.2S165-10-2021, (replacing Ordinance No. 24534-11-
12 2024 {codified at: https•//codelibrary.arnle�:al.coln/codes/ftworthllaiestlftwai�h tx10-0-0-22593) apply to
13 this bid.
14
IS BUSINESS E UITY PROJECT GOAL
16 The City's Btzsiness Equity goal on this project is
17 applies to Pa�ks a�ad Community Services).
18
5% of the totai bid valUe of the contraci (Base bid
19 METHODS TO COMPLY WITH THE G4AL
20 On City contracts where a Business Equity Gaal is appiied, offerors are required ta cornply with the C�ty's
23 Btiisiness Equsty Ordinance by �neetin� or ez�ceeding the ahova stated goal or otherwise comply with the
22 ordinance through one of the following methods: 1. Commercialiy useful services perforimed by a
23 Business EquiLy prime eontractor, 2. Busin�ss Equi�y subcontracting partic�pation, 3. Comibination
2�4 oi Business �quily �arime ser�ices and Business Equity subeontracti�� participation, �. Susi�ess
25 Equity �oint Venture/Mentor-Protege �articipation, 5. Good Faith Effart documentatio�, or 6.
26 Prime coniractor Wai�er documen,tation.
27
2S SUSMITTAL O�' REQUIRED DOCi1MENTATI�N
29 Applicable documents (listed beiow) must he recaived by the Purchasing DivisiQn, OR the offeror sha[1
30 EMAIL the Business Equity docurnentation to tl�e assigned City of �'ort Worth Project Manager or
31 Department Designee. Documents are to be received no later than 2:00 p.m., on the third City
32 business da� after th� bid opez�ing date, excSusi�ve of the bid opening date.
33
34
3S
36
37
38
39
40
41
42
43
44
45
�F6
�47
�48
49
The Offeror must submit one or more of the follov,+ing documents:
1. Utilization �'orm and Letter(s) of Intent, if the goaI is met or axceeded;
2. Good F�aith Effori Form and Utilization Form, incl�ding supporting documentation, if
participation is ]ess thart stated gpal, or nn Bt�siness Equity pa��icipation is accnmplished;
3. P�rime Contractor Waivcr Form, including supporting docLunentation, i� the Offeror �vill pe:rform
all subcontracting/sup�Ii�r apportunities; nr
4. Joint VenturelMentor-Prot�ge Form, if goal is met or exceeded vwith a Joint Venture or Mentor-
Protege participation.
These forms can be found af:
Business Equity Utilization Form and Letter of Intent
htt:ps•I/a�ps fortworthtexas.govlProjectReso.urceslResottrcesP150%20-
%20MWBE/NEW%20Business%2QEquitv°/n200rdinanceB usiness%20Equity%20Utilization%20Forin.
�
Letter of Tntenf
CITY OF i�017T WORTH
3TAAiQARD CbNSTT2UCTION SPECIFICATTON i)DCl3MENT5
Re� ised Octn6er 27, 2021
2D20 Qn-Call Pavement Ivlarkings �onhact �2
CPN 103740
004540-2
Business Equiry Goa1
Page 2 of 2
1 htt s:lla s.fortworthtexas. ov{Pro'ectResourceslResourcesP/60 - MWBEINEW Business E ui
2 Ordinance/Letter of Intent-2021_pdf
3
4 Business Equity Good Faith Effort Forin
5 https:/lapps_fortworthtexas.�ovlProjectRes.ources/ResourcesP/60°/a2Q-
6 °/o20MWBEMEW°Io2OBLlS1f1E55a/o2OE uit %2QOrdinance/Business%2d� uit %20Good%20N�aiti�%20Ef
7 fort%o20Form�df
8
9 Business EqUity Prirne Contractar Wai'ver Form
10 https�l/a�ps %x'tworthtexas. o�v/ProjectResourceslResourcesP/60°fo20-
ll °/a20MWBE/NEW%20Business%2,OE �.iit %200rdinancE/Susiness%20E ui %20Priine%2OCnntractor
12 °/a20Waiver.pdf
13
14
15
1G
17
18
19
2D
21
22
23
24
25
26
27
28
29
3Q
31
32
Busin.ess Equity .Toint Venture Form
f�ttps'l/a�ps.fortworthtexas.gov/Proj ectResourc�s/ResourcesP/60%20-
%20MWBE/NEVJ%20Business%20E uii:: %200rdinancelBusiness%2QE uit %24Joint%2QVenture. df
FAILURE 'TO ACHIEV� THE GOAL, OR OTHERWI�E COMPLY WITH TfIE QRIDNINACE V4'ILL
RESULT IN THE BI]]DERIOFFERDR B�ING DECLARED NON�R�SUNSIVE A1�ID THE SID
REJECT�D.
FAILURE TO SU�3MIT THE R� C7IRED BUSINESS � U'1'Y DOCUMENTATION OR OTFIERWIS�
COMPLY WITH TH� �RDINANCE Wll,L R�SULT TN TH� BID BEING DECLAR�D NON-
RESPONSIV� THE BID RE.IEC"I'�D AND MAY SUSJECT THE BIDD�RJOF+`�'EROR TO SANC'�'IONS
AS DESCRIB�D IN S�C. ZO-373 OF TH� DRDINAi�CE.
For Questions, Please Contact The Business Eq�itp Division of the Department of DiversiLy and
Inclusion at {817) 392-2674.
END OF S�CT�OI�
C1TY OF Fa�T WORTT-I
STANDAItD CON3TR[3CTION �PECIFICATION DQCUMCNTS
Ravised Oclober 27, 2021
2D20 On-Call Pavemenf Markings Contract #2
CPN 103740
005243-1
Agreement
Page l of7
$ECTION DO 52 43
AG1jEEMENT
THIS AGREEMENT, authoi•ized on �� II v".�'! , is made by and between the City of Fort
�orth, a 7'exas home rule rnunicipality, acting by and through its duly authorized City Manager,
("City"), and TRP Construction Group, LLC, authorized to do business in Texas, aciing by and
through its ciuly authorized representative, ("Cont��actor"}. City and Contractflr may jointly he
referred to as Parties.
City and Coniractar, in cansideration of the mLrtual covenants hareinafter set foi�h, agree as
follnws:
Arf�cle 1. WORK
Contractor shall camplete all Work as specifed or indicated in the Contract Documents for the
Project identified herein,
Artiele 2. PR03ECT
Tlae project for which the Work under the Contract Documents may be the whnle or only a part rs
generally described as follnws:
2020 On-Call Pa�e�nent Markin s Conri•act #2
CPN 1Q3740
Artiele 3. CONTRACT PRICE
City agrees �o pay Contractor for performance of the Work in accordance with t�e Contract
Doeumen1:s an am�unt not to exceed, in current funds, of Eight Hllndred Thousand and 001140
Dojlars ($804,000.00). Contract price may he adjustad by change ordet•s duly authorized by the
Parties.
Article 4. CONTRACT TIME
�.1 Final Acceptance.
The Work will be issued on a tas.k order basis and Final Aeceptance of each task order will
be determined as that v�ork is completed. Time far the overall contract shall not ba more
than fi�e (5} years or until the amount up ta $840,000.00, unless amended, has been
exhausted.
„
. ,
�� - � � -
1 6 �
C[TY OI' I'012'F WORTH 2O20 On-Call Pavement Markiiigs ConEract #2
STANI7ARD CONSTRUCT[QN SP�CIFICAT1pN DOCUNfENTS CP1�F 1a3740
Re�ised 9141I2U2I
Od 52 43 - 2
Agreement
Page 2 oF7
4.3 Renewal
The City may renew this Agreement for up ta two (2} addiiional tirne periods under the
same terms, conditions, and unit prices. The Cit� sliall provide at least sixty (60) days'
notice to tl�e contractor of tl�e City's intent to renew
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A. The Contra�t Doctiments which comprise the entire agreeinent between CiYy and
Cantractor concerning the Work consist of the following:
1. This Agreement.
2. Attachments to this Agreeinent:
a. Bid Form
1} 1'roposa[ Form
2} Vendor Compliance to State Lavw Nan-Resident Bidder
3) 1'requalification Statement
4) State and Federal doculnents (praject specafic)
b. Current Prevailing Wage Rate Tahle
c. Insurance ACQRD Form(s)
d. Payment Bond
e. Performance Bond
f. Maintenance Bond
g. Power of Attorney %r the Bands
h. Workar's Coinpensation Affidavi�
i. MBE and/or SBE Utllization Foxm
3. General Canditions.
4. Supplementary Conditions.
5. Speci�catinns speeiiically made a part of the Contract Docu�nents by attachment
or, if not attached, as incorporated by reference and described in the Table of
Cantents af the Project's Contract Dncuments.
6. Drawings.
'�. Addenda_
8. Docum�ntation submitted by Contractor prior to Notice of Award.
9. The %]louving which inay be delivexed or issued after the Effective Date of the
Agreement and, if issued, become an incflrporated part of the Contract Documen�s:
a. Notice to Proc�ed,
b. Field Orders.
c. Change Orders.
d. Letter of Finai Acceptance.
Article 6. INDEMNIFICATION
C1TY OF FORT WOCtTH 202[i On-Call Paventent Markings Contraet #2
STATiDARD CO[�fSTRUCTIdN SPBCIFICATION DQCUIviENTS C�N 103740
Revised 91D 112021
OD52A3-3
Agreement
Page 3 Qf 7
6.1 Contracior cavenants and agrees to i�demnify, hold S►armless an.d d�fend, at its own
expense, the eity, its officers, servants and employees, from �nd against any and all
claims arising out of, or alleged to arise out of, Ehe vvoek and services to be performed
by the contractor, its of�'icers, agents, employees, subcontractors, licenses or invitees
under this contraet. Th�s indemni�'teation rovisinn is s ecif"icall intended tfl o erate
and be effective even if it is alle ed or ra�en that all or some of the da�na es bein
sou ht were caused in w�ole ar in art b an act omission ar �e li ence of the ci .
Tt�is indemnity provision is i�ntended to include, without limitation, indemnity for
costs, expenses and legal fees incurred by the city in defending againsf such claims and
causea of actions.
6.2 Contractor covenax�ts and agrees �o indemqify and hold harmless, at its own expense,
the ciLy, its officers, servants and employees, from and against any and all loss, damage
or destruction of property of the city, arising out of, or al�eged to arise put of, the work
and services to be performed by the contractor, its ofiicers, agents, entployees,
subcontractors, license.es or invitees under this contract. Thi� indemnifcation
rovisian is s eci�call intended to o erate and be effective even if it is alle ed or
ro�en that all or some of th� dama es bein son ht were caused in whole or in art
bv anv aci. omissian or ne�li�ence of the city.
Art�cic 7. MISC�LLANEOUS
7.1 Terms.
Terms used in this Agteement uvhich are defned in Article 1 of the General Canditions wiil
hau� the meanings indicated in tha General Contiitions.
'i.2 ASsignment of Contract.
Tlus Agreement, including all oi Yhe Con#ract Documents may not be assigned by the
Contractar without the advaneed express written consent of the City.
7.3 Successots and Assigns.
City and Cantracta�' eaeh binds itself, iis partners, successors, assigns and iegal
representat�ves to �he otiler parky hereto, in respect to all cQvenants, agreements and
obligatians contained in the Contract DQci.unents.
7.4 Se�erability/Non-Waiver of Claims.
Any provision or part of fhe Cnntract Documents held to be unconstitutional,. void or
unenforceable by a conrt of competent jurisdiction shall be deemed stricken, and a.ii
remaining Qravisions sha11 continue to be valid and binciing upan City amd Contractor.
`The failure of City or Contr�ctor to insist upon the perfannance of any term or pro��sion of
this Agreement or to exercise any right geanted herein shall not constitute a waiver of City's
or Contractor's respective right to insist upnn appropriate performance or to assert any such
right on any future occasion.
7.5 Gaverning Law and Venue.
This Agreement, includit►g all of the Cantract Documents is performable in the 5tate of
`Texas. V�nue sha1S be Tarrant County, Texas, or the United States District Court for the
North�rn Disirict of Texas, Fort Worth Division.
CIT'Y OF FORT WORTH 2U20 Dn-Cap Pavement d+rlarkin�s Contract #2
STAI�[DARD CONSTRUCTIdN SPECli'ICATIQAi I�OCiiMENTS CPN 103'740
Revised 9/01/2021
0o sz a� - �
Agreement
Page 4 of 7
7.6 Authority to Sign.
Cant�actor shall aitach evidenca of authority to sign Agreement if signed hy someone other
than the dwly authorized s.ignatory of the Contractor.
7.7
Non-appropriation ofFunds.
In t11e event no funds or insufFtcient funds are appropriated by City in any f scal periad for
any payments due hereunder, City vti+ill natlfy Vendor of such accurrenee and this
Agre�.ment sha11 terininate on the last day of the fisca� period for wh�ch appropriations �vere
received wit]iout penalty or expense to City of any kind whatsflever, except as ta the
portians of the payments hera�n agreed upon for whicll funds have been appropriated.
7.$
7.9
Prohibition On Contracts With Campanies Boycatting Israel.
Contractor, unIess a st�le proprietor, acknowledges th�t in aceordance with Chapter 227i of
the Texas Government Cade, if Contractor lias 10 or more full time-emplayees and the
contract value is $100,a00 or mare, the �ity is prol�ibited fram entering into a contract with
a company for goods or services unless the contract contains a written verification from the
company that it: (i) daes not boycott Is�ael; and {2) �wvill not boycott Israel during the term
of the contract. The terms "boycott Israel" and "company" shall have tl�e meanings
ascribed to those terms in �ection 8d8.001 of the Texas Government Code. By signing this
contrac�, Contractor certifies that Contractor's sig�nature provides written
verification to the City t�at if Chapter 2271, Texas Government Code applies,
Cantractar: (�} does not �oycott Israel; and (2) will not �Ooycatt Israel during the term
of t�e contract.
Prohibifion an BoycotCing Energy Companies.
Contractor acknowledges that in accordance with Chapter 2274 of tlle Texas Government
Code-(as added by Acts 2021, 87th Leg., IZ.S., S.B. I3, § 2), the City is prahibited frnm
entering into a contract for goods or services fhat has a valtie of $140,D00 or mora, which
will be paid �holly ar partly frorn puk�lic funds of the City, with a company (with 10 or
more full-time emgloyees) unTess th� contracf contains a written verification from the
eompany Yhat it: (1) daes not boycot� energy companies; and {2) will not boycott energy
companies during the term of the contract. The terms "boyco�t energy company" and
"company" have #he meaning ascribad to those terms by Chapter 2274 of ihe Texas
Government Code (as added by Acfs 2421, 87th Leg., R.S., S.B. 13, § 2). To tf�e extent
that Chapter 2274 of the Governmestt Code is applicable to this Agreement, Y�y
signing this Agreement, Cont�racfor cerEi�es thaE Contra�tor's signature provides
written verification tc� t�►e City that Con�tractor: (1) does uot boycott energy
companies; and (2) wil[ not l�oyeott energy campanEes dnring Ehe ferm of this
Agreement.
7.10 Prohibition an T.�iscrimination Against Fit•earm and Ammunition Tndustries.
CiTY OF FQRT WORTH 2O20 On-Cal[ Pavement Mar[zit�gs Cantract #2
STANDARD CONST1ZiTCTIDi�I SPECIFTCATION dOCUiv1ENTS CP%I lQ3?4�
Revised 9/011202]
005243-5
Agreement
Page 5 of 7
Contractor acknowledges ihat except as atllerwise provided hy Chapter 227� of the Texas
Government Code (as addeci by Acts 2021, 87th Leg., R.S., B.B. i9, § 1}, the City is
prohibited from entering into a contrac� for goods ox' services that has a value of $1QD,000
or more which will be paid wholly or paxtly from public funds of ihe �ity, with a campany
(with 14 or more full-time ernployees) unless the cantract contains a written verificaiior�
from th� cornpany that it: {1) does not have a practice, policy, guidance, or directive that
discriminates against a firearm entity or fir�ann trade assaciatian; and (2) will not
discriminate during the term nF the confract against a�rearm entity or firearm trade
a550C11�1D17. Tii� ��TCE1S "discriininate," "fireartn 017t1�" and "�11'OaCIT1 trade association"
have the meaning aseribed to those terms 6y Chapter 2274 of the Texas Government Code
(as added by Acts 2021, 87th I.eg., R.S., S.B. 19, § 1). To fhe extent thaY C�apter 2274
of the Governm�nt Code is applicable to ihis Agreem�ent, by signing this Agreeznent,
Contractor c�rtifies that Contractos�'s signature provides written verificaiian to the
City that ConEractor: (1) does not have a practice, policy, guidance, or direttive that
discrimi�nat�s against a firearm eniaty or firearm� trade association; and (2) will not
discriminate a.gainst a frearm en�ity or iYrearm trade associafinz� during the Eerm of
this Agreement.
7.11 Immigratipn Nationality Act.
Contractar shall �erify the identity and emplayment eligihility of its employees who
perform work under this Agreeincnf, inciuding campleting the Employment �ligibility
Verification Form {T�9). Upon requ�st by City, Cantractor shall provide City with copies of
all I-R forms and supporting eligibiIity documentation for each employee who performs
work under this. Agreement. Cantractor shall adhere to all Federaf and Siate laws as well as
establish appropriate procedur�s and controls so that no services will be pet�armed by an.y
Cot�tractor employee who is not legally eligible to perform suci� services.
CONTRACTOR SIiALL TNDEMNI�'Y CITY AND HOLD CITY HARMLESS
�+'ROM ANY PENALTIES, LLABILITIES, OR LOSSES DUE TO VXOLATIONS ��+
THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYE�S,
SUBC�NTRACTORS, AG�NTS, �R LICENSEES. City, upon written natice tQ
Gontractor, shali have the right to immediately terminxte this Agreement foi• violations of
Yhis provision by Contractor.
7.12 No Third-Party Benefciaries.
This Agreement gi�es no rights or benefits to anyane other than the City and the Contractor
and there are no third-party beneficiaries.
7.13 No Cause of Action Against Engineer.
CITY OF PORT WORTH 2O�0 On-Call Pavement Markings Contract #2
STAi�I�ARD CONSTRUCTION SPECIF[CATIOiV DOCUMCIVTS CAN 10374fl
Revised 9/01/2021
aosza3-�
Agreemant
Page fi of7
Contractor, its subcontractars and equipment and materials suppliers on the PRO.TECT or their
sureties, shall maintain no direct action against the Engine�r, its o.fficers, employees, and
subcontractars, for any clai�n arising out of, in connection with, or resuit�ng from the
engineering services perfo��ned. OnIy the City will be the bene�ciary of any undertaking by
the �ngineer, The presence or duties of the Engineer's personnel at a construetion site,
whether as an-site representatives or otherwise, do not �nalce fhe Engineer or its personnel
in any way responsible for those duties thaY belong to the City and/or the City's construGtion
contractors or ather entities, and do not relieve the construction contraetors ar any other
entity of their obligati�ns, duties, and responsibilities, including, but no� limited to, all
constractian methods, means, teahnic�ues, sequences, and procedures necessary fo�•
coordinating and completing all portions o.f the construction work in accordance with the
Contract Documents and any health or safety precautions required by such construetion
work. The Engineer and its personnel ha�e no authority to exercise any control over any
construction contractor or other entity or their employees in connection with their work or
any health nr safety precautions.
C1TY QF FORT WORTCi 2020 �r�-Cal] Pavement Markings C4ntract #2
STA]tiiDARD CpNSTRUCTION SI'�CIFICATION DOCUME�VTS CPN 1(13740
Revised 9/0 1120 2 1
oosza�-�
Agrcoincnl
�age 7 oF7
TN WITNESS WHEREOF, City ���d Cotftractor have each execut�d t11is Agreernent fo l�e
effective as oi tlie date subscribed by the City's desi�natecl Assistatit City Manager {"Ef%c#ive
Date").
Contc•actor; �� c�j��-R,{�°���
� �, �-� �
. • - _
� �_
Sig re
q�'DI��City of Fort Worth
� N
(Pr3.nted Na�ne)
.,���JJ titr �t' ,� G� c5
Titla �. '. �"-'
// yNi.s �z iv�e
Add�•ess
I�.� Wma���`X' __�° //�
City/StatelZip '
� '/ Z2
Da
C1'CY QI' FORT WOIt1'H
37iLTIDARb CON37'IiUCTION BPfiCIP1CA7'ION DpCUMGN7'S
Reviscd 9�01/2021
�y� � � + 1 A ' r
�
D�na Burglydo
AssistanC Ciky'�lanag� �
r j- -
% • ,' _
Date
Attest;
J�nnette Gaodall, City Sect�etAcy �
��
(8ea1} �
��
M&C: M&C 21-0326 �
Date: May l l, 2021
Form 1295 No,; 202i-711442
Contract Cflmpliance Manager;
By signing, I scknowledge H�at T am tEie person
��esponsible foa• tha monitoring and
adtninist��atian ofthis contract, including
ensut�Ing a�l perfoiina�ice �nc� repartir�g
reqitii•a�nents.
C1int Hoovei; P.E,
Engrneei°ing Manager
Ap�roved as to Fnr�n and Legality;
�I
Dot�glas W, Bl�elc
Sr. Assistant City Atiorney
APPRQVAL REGOMMEND�b:
-�.�� �_
WilIiam Jolrtnson, Direatar �"
Teansporta#ion & P�iblia Works Depa2tment
� ��� �.���''�.
�,•, ..<. _;.���i
:�
_ . t �
2020 pn-Cnll Pnvein�n:=�aFkii,� tu,�u�ca rli
, �� ��a����
I
2
3
�
5
G
7
8
9
10
ll
i2
l3
i4
l5
lb
17
18
l9
zo
'I'�I� STAT'E OI� T�XAS
COUNTY OT+` TARRANT
S�CTION OU 61 1�#
PAYMENT BOND
oo�� ��- �
i�AYM�NT lipNv
Page ! of 2
Bond No. SUl 176316
§ . KNOW ALL BY TH�SE PRESENTS:
§
§
That we, TRP Construction Gro�tp, LLC, ICl10Wk1 as "Pri.nc�pa!" l�ei•eir�, and Arcf�
InsEu•�nce Con�pany; a corparate sureYy, du{y authorized to do b��siness in the Staie af Texas,
known as "Surety" hereir� (wh�ther one a�' �na►'e), ai•e h�ld and firi�lly bound uuto tl�� City of Foi�t
Wort1�, a intu�icipal corpot•ation created putsuai�t to th� iar�vs of tlle State of Texas, kE�own as
"City" herei��, in tlle penal strin of E9ght Hundred Thousand Dollars ancf OO/1Q0 ($800,004.00),
lawful inaney of the Uriited States, to b� paid in Fort Warth, Tarra��t County, Texas, for tl�e
payir�ent of whicll sunz well and truly be made, we bind oursefves, our heirs, exect�tox•s, �
adinin[strafors, successors and assigns, jointly and se�eraify, frmly by these presents:
. WH�R�AS, Frincipai l�as ente�•ed into a ce��Eain written Contract with City, awai°ded tl�e
�� day of ___ , 20 __', which Contract is hereby referred to and
n�ade a�ai�t hereof fo�• al[ p«i�pases as if fully set farth herein, to furnisli aU materials, eq«ip�nant,
labor ant� otkier accessories as definec� l�y law, in tlle prosec�►tion of the Wo�•k as provided far in
said Cantract and designated as 2Q2Q On-Call Pa�ement Markings Cantract #2, City Prnject
Nu�nber l Q3740.
2i NOW, THEREFOR�, THE CDNDi"CION OF TH15 OT3LIGATION is such tl�at if
22 1'rincipal sliall pay all monies owing to any (and a3!} payment 6on� beneficiary (as defiE�ed i��
23 Gl�apter 2253 of the Texas Gavernme�t Cod.e, as amended} in the prasecutinn of tl�e Wark t�nder
24 the Cpnt►•act, then this ob]igatio�i sl�all he and became null and vnid; otl�erwise to remain in full
25 fio�'ce a�d effect.
26
27
28
29
Tl�is bn�id is made and exec�ted in coinpliance with t1t� pt•ovisions of Ch�pter 2253 of the
Texas Go�erninent Code, as amended, and all l'[abiEities on this bond sfialJ be detct•mi��ed in
accordance with the pro�isioiis of said statute,
C[TY QF f`ORT WUItTI{
5'I'ANQARl7 CQ�[STRUL'TION 5PL'•CIriCAT[ON i)dCUMEN�'S
Revised July 1,201[
2R20 (]n-Call Pavemen[ INarkings Cantract �2
City Project �Imn�er 103740
OQ Gl 1�-2
PAYiv1CN'C BOND
Page 2 o f 2
� iN WITNESS WHER�OF, the Frii�ci�al and Surety l�ave each S�GN�D and SEAL�D
2 ti�is instrument by duly a��thorized agents a��d officeE•s on this the Sth day of
3 _ ]�nuRry , �� Z2
4
ATTEST;
,C� ���
{ rincipa!) Secretary
� ����� . ' � = z- .
�e
W n s a to Princi�a]
i j
PRINCIPAL;
TR�' Construction��LC
` Y r �
BY: '`
Signature
rl� �v�v �r .�� f Cd�o
Na�ne and Title
/�ddress: 2213 Maneda Street
Fort Worth, TX 75117
SURETY:
Arcl� Insu���nce Co`inpa[ _
�,f �'"�'r ! t�� �.
A'I'T�ST: �Y� �/k �
Signat
n/a
(Sttr�ety) Secratary
.��- . :
�. - ,_
VJit�iess � to Surety MeganDouaire
5
G
7
8
9
in
�
tz
Elizabeth R, Sterlin A -In-Fact -
Name and Title
Address: 3 1'arkway, SiEite ! 5�0
f'hiladelphia, P� 19102
Telephone Ntnnber: 2i S-60G-i 600
Nd��: If signed by an atfic�r of t13e Surety, there inust be aj� iile a cirtifec� extraet f�•o�n tl�e
bylaws sl�owitlg th�t t1�is person l�as authnrity to si�n sucli o�li�ation. If 5«rety's }�hysical
lddress is different from its �nailing adc�ress, both ►nust be pro�icled. �
T11e date o�Fthe bond shall t�ot be prior to the da#e the Contract is awarded.
�ND OF SECTION
Cl'TY OP I�QRT' WAl2'I'H
S`i'ANDAtZD CUNSTIiIIC'CION SPL'CIFlCATIOI�1 nOCIlIv1ENTS
Revised Juiy 1, 201 l
2020 On-Call Pavemenf A+farkings Co�ztrani #2
City Proyect Number 10374D
QDGI 13-I
P�fLC'Ol2MRNCL 130%I�3
f��ge i ol'2
�
2
3
�
5
G
7
8
�
10
tl
12
l3
f4
sECT�orr ao �1 i3
PERFdRMANCE BOND
Band No, SU1176316
THE STATE OF TEXA� §
� KNOW A.LL BY THES� PR�SENTS:
COUNTY aI` TARRANT §
Tl�at we, TRA Cnnstruction Group, LLC, known as "Principaf" herein a��d Arci1 �nstu•a�1ce
�ompaa�y, a corporate s�treky dtity a�Etl�orized to do business in the State nf Texas, lcn�wn as
"S�trety" lle�'ein (wliether one ar more), are held and firinly l�ou�ld tintn the City of F`ort Wot�th, a
mu�aicipat carpnratia�i created pElrsuant to the taws of Texas, lcnawn as °`City" i�e�•ein, it� the �ena]
SUIll Oi, �1gI7i I'i�fildl'�f� TIlOL15711C1 DQI�aI�s and 00/100 ($$46,O�OAO},lawfi�l money of t1�e Untted
�tates, ta b� �aid in Fort Worth, Tacrant County, Texas �or t�he pay�e►it of which sut�l well a�id
t�•uly to be made, W0 �113EL Ql1E•selves, our l�eirs, executors, acfministratoj•s, successni's a�ld assi�ns,
joi�3tly and severally, f rtnly by these prese»ts.
ig WH�REAS, the Principal has entered into a e�ctaiil written contrack with tlle City
!G awarded the ?� _ day of _� , 2Q i, which Contract is l�ei•eby re%rred ta aE�d
t7 3nade a pai�t l�ereof for a[l purpnses as if ful�y se� fal�tll l�erein, to f�irnish alf �naterials, eq��ipmer��:
! 8 fabflr anc� other accessQries cfefi�z�d �Sy law, in the proseaution of the Worlc, iuc�uding any Cl�ange
19 Orcters, as provided for iii said Cnnt.ract designated as 2Q20 On-Call Pavement Markings Co�att�act
20
21
22
23
24
25
2G
27
28
29
30
31
32
#2, City !'rojeet Niit�ber 103740.
NOW, T���R�FOR�, the canditinn of tllis obli�ation is such tl�at if the said �'eincipa!
si�aIl faiti�fully perfo�•m it obligations under the Contract and sha[I in a1[ res}�ects duly ant!
faitl�.fully �ei�for�n #he Work, ii�cltEdii�g Change Or�iers, u��der the Cont��act, accarding to the plans,
sQeci�cations, and contract docu3n��tts therein referred ta, and as well during any pEi°iQd a€
extension nf tl�►e Co3�tract that �nay be granted oi� ti�e pa�•t of tl�e City, then kl�is obligaiion shall be
and become null and void, ot�3�rwise to reinain in fiill forc� and efFect.
PROVID�D FURTHER, that if any lega] action be filec[ on this i3and, venue sha[I lie in
Tarra»t County, Texas or tk�e United States Disti•ict Cnurf �For tlfe Nortjiern District of Texas, Fart
Worth Division.
This bond is �nade a��d execirted in campfiar�ce with the provisions of. ChapYe�• 2253 oftl7�
Tex�s Goverrnne��t Code, as emended, and all {ia�ilities on tkiis bond shail be determined ii�
accordance with the p�•ovisions of said statt�e.
CCPY OF CpRT WORTH
S'I'ANDAR� COAi51'RUCT[ON Sl�ECCflCATIDN I70CUMENTS
Itevised July l, 20i 1
242U Qai-Ca11 !'�vement Marki3�gs Canlract 7J2
Citp �rajeci Number 1D3740
1
2
3
4
5
6
7
8
9
f�
!l
j2
i3
]4
15
1G
17
18
I4
20
2]
22
23
24
25
2&
27
28
29
30
31
32
33
34
35
3G
37
38
39
4D
4l
ao6i i3-z
P�RF�dItMANCI� QONll
Ps�gc 2 of2
�N WITN�SS WH�R�OF, the Principa! and khe Surety i�ave SIGNED a��d Sl�A�.�D
EIll5 Ii15ffL11T18Cl� I]y C�LtIy �UCi]01'iZ�CV 8g2i1i5 �ill(i fl�C�PS ail iI115 t11C 5 h day o�' 7annary __
, 20�.
Ai"i"�ST:
6����
(Principal) Secrekary
. ��
. q'� 4--
� itn�ss �s to Pr'tttci�aal
� 1`� `, �` , _ � _�
W itness as � Sm�ety Megan Douairs
PRiNCI PA L:
'1'RP Canstruct�An'GeuLrp;-�'- �'
� ' � �
�.
BY: ' `� � �, _ � '
5ig�iafure
,�IE�L��, ��e�ia��af Y L°�v
Narne aud 'fitle
Address: 2213 Maneda Street
E'o��t Worth, Texas 76 [ 17
SURE'I'Y:
Archfnsurance Co pa
BY: "` '
Si ture ,
Elizabeth K. Sterlin A -In ��ct �
' Nanze and °Citle �
Address: 3 Parlcway, 5t�it� 1506 �
Philadel}�hia, l'A 19102
'Telephone Ntunber: 215-606-i 60�
*Nate: Ef signed by an afficer af t1�e Su�•ety Company, th�re iaiust be on file a certified ex��'ack
fro�n the by-l�ws showing that this person has autliority to sigr� such ol��igation. �f
Surety°s physical �ddi•ess is different from its mailing address, botli mt�s� ba provided.
The date of the bo�ld shall not be prior to the date the Con�ract is awarded.
C'fl'Y Of' �QRT WOEt'fl�l
STANDAFtD CONS'1'RUCTIaN SPI:CI�ICAT[DN DOC[IMEI�i�'S
Re�ised July l, 201 l
202p On-Call I'avement Markings Contrace i{2
City ProjecE NumUet 10374Q
� ' nn�i t�-�
�vlA1N'I'ENANCE DOND
f�nge 1 of3
Bo�d No. SU1176316
i
2
3
4
5
6
7
8
9
i0
11
f2
l3
i4
15
ld
i7
18
19
�a
2l
22
23
24
25
26
27
2$
29
30
3i
32
33
TH� STATE OF T�XAS
COUI+iTY OF TARRANT
s�cTzax ao �i i�
MA�NTENANCI� BOND
�
§ I�N�W ALC. BY THES� PR�SENTS:
§
That we TRP Cottstruction Graup, LLC, know�i as "Principal" herei�t and Arch insurance
Ca�np���y, a cor�orate surety duly autftorized to do f�usiness in the State of T�xas, fcnown as
"Su��ety" herein (wllether ona or tnore), a�•e l��id anct fiE•mly baund unto tl�e City of Foi�t Wort11, a
tnunicipa{ ca��poralian createcf puC•suant �o tkre laws of tlze Stat� ai Te1as, k�lown as "City" her�in,
in the s�t�n of Eight HE�ndi•ed Tiio��saf�ci �ollat•s ancl 0011 p0 ($800,Q00.00), .lawful man�y of tl�e
United States, to be paid in Fort Workh, Tai�rant Cnunty, Texas, for paymenC of wllich sum well
and tru�y l�e made unto the City and its successors, we bind oE�rselves, our heirs, execuCors,
admi�istrators, successors a��d assigns, jointfy and severally, f��•mly bp th�se presenis.
'VVHEREAS, the Pri�cipal has entered into a certain w►�itten cont��act w�th t1�e City awarded
the�� day of 4 , 20.;, �_, which Contract is hereby
refei•red to �nd a inade part 1�ereof for all ptrrposes as if fu11y set foi�tf} hei•ein, Co 1'u�•nish aff
materials, eq�iipment labQr and other accesso►•ies as ciefitted by faw, in tl�e prosecutian ofthe
Wo��it, incl��ding a��y Wark resE�lti�rg f�•om a duly authorized Change Order (callectively he�•ein,
the "WorEc") as provided iar in said co��tract and desi�nated as 2�2� �n»Call Favement Markings
Cantract #2, City Proj�ct Ntii�lber 103740; and
WHEREAS, Principal binds itself ta use si�cll materials and to so const�'uct t�te Work in
accordance witl� the plans, speciiications and Contract Dacumetlts that tf�e Wot•k is and will
eemain fi•ee from dafecYs in inaieriafs o�• workanansl�ip for and durin� tlle period af �r�va (2) years
after the dale_ of Fina] Acceptance of the Work by the City ("Maintenanc� Period"); and
WIiEH,EAS, Principal binds itself to re�aii� or reco�ystruct tlie Work i» whol� oi� in �art
upoEi receiving notice fi�om the City ofithe need tl�erefor at �ny tiu�e with[n tlle M�Entenance
Period, �
C{�"Y nC rORT WORTH
S`f'ANl]ARD CQNSTAUCTiQ�f SPEG1l�1CATlOk pOCUNfEN'i'S
ltevisedJ�dy l,2Q11
302U pn-Call Pavcinenl M�rkings Coittrnct ��2
City l�roject Number 1037�1U
f
2
3
4
5
G
7
8
9
!0
]I
l2
!3
14
�S
�6
17
1$
19
0061 19-2
MAMTGNANCE [30ND
f'age 2 of 3
NOW TH�REFOIt�, the conditian of this ob93gati:on is sti�ch fhat if PrincipaE shaEl
re��neciy any defective Work, for wl�icii timely nokice was provic�ed by City, to a completion
satisf�ctory to tf�e City, t!�►et� this obligation shafl becoine null and void; otltierwis� to reiilain in
f«ll ib�•ce ai7d �f%at.
PROVIDED, H�WEVER, if k���i��cipal sl�all fail so to repair or reconstt•uct any timely
noticeci de�ective Work, it is agreed tila# the City may cause any and al1 suc� defectit�e Woi'k to
be repaired anci/or �•econstructed witl� all associated costs kh�reof being bort�� hy the Pr�naipal and
the Surety under this Maintenailce boncf; �rtd
PR�VIDED FUItTH�R, that iia17y fe�al action be filed on this aand� vanue �hall lie in
�rarra��t Co��nry, 'i'e�cas or the United States District Cnurt for the Nortisern District of T�xas, Fort
Wart�t D��isic�n; and
j�RQ�7�DED �ZjjZTH��S k�1af �E115 Oh�l�atl0i7 Sjl�ll i7� COt1�i111i0ii5 Ill i1d�LIYE allC�
successiye reeaveries may be 11ad hereor► fo�• s�xccessive braac�les.
C{�'Y O!� FpAT WOR'I't}
STANRAlZD GONSTRUC�7d1V SI'I:CIl�1CAT10N i]OCUMi:NTS
Revised July 1, 2011 �
202U On-Call ['�vement Markin�,s Cantrpctli2
Cily Project Number 103740
�
3
4
5
6
7
8
9
]0
ll
�2
��
14
IS
16
17
18
19
za
21
22
za
��
25
2G
27
28
29
30
3!
32
33
34
35
3G
37
38
39
4D
�1
QQGf E9-}
s�7A1NTf�N11NGf: [i�Nl]
Pnga 3 aF3
IN WITPIE�S WHEREOF, tlie Pf•incipal and the Surety have eacl� SIGNED and SEALED t1�is
inst�•um�nt by duly autl�orized agents anci of�ee�•s on this the 5� day c�f Tan��aCy
, 2022.
AT"!"CST:
�� ���� �
{pr9ncipaij Sea•etary
.�
C '��— �
W� ss a� to Privcipaf
� �r
ATTLST:
N/A
(5ure#y) Seceeta�y
�—` ' `,� y�_ S--'
Wit ess as to rety MeganDouaire
PR1NCiPAL:
TRP Consh�uc�Cnn Ciroup�,LC
6�;` � '� - �� -
Signa#ure
��a�� F�'�i1� ,� �� o
Name and Title
Address; 22[3 Moneda Sireet
Fo��t Wort�i, TX 7G1 17
SURET�':
Arcl� [nsurance Compan�
;� �� �.,��_ -
��: � . �_____u__ �
Si i ture
RlizabeN3 K. Sterling AtE�v-Tn-Faot _
Name and Titie ��
Address: 3 Parkway, 5uite i50�
Philadelphit�, PA �9102�
Tele�llane Nun�Uer: 215-GOG-1 Gfl0
'�Nate: If signecl by a�t officer of tl�e 5urety Ca�z�pany, tliei•e must be on flle a certified ext.ract
f'ro�n tl�e by-laws showing that this person has atttlinrity to sign suah oUtigation_ If
Surety's physical add�•ess is dEf�erent fi•om its �nailing address, bot�� tnusk Ue p►'ovided.
Tl�e date of the �ond shall not be �i•iar to tl�e date tlle Contract is awarded.
C['CY O� f�ORT WOkt'C[d
STANDA[tD CONSTl2UC'I'[()N SPGCi�[CATIAN DOCUMEN`CS
lieuiscd July 1, 201 l
2U20 On-Call Pnvemenl Markings Con[ruct #2
City Projecl�IumUer 1U3740
AIC 0000332572
Tfds Isower ofAtforney Ii�r+irs fhe ac1� of thase nnneed herePn, arrd they 8uve na asfharJty 10 bind !he Con�pm+y exce�t !r� the nrun»er and ta lhe wcfenf herefn staPed.
Nat valid fo� Nofe, Lr oan, Le[!er of Credii, Currexcy Rate, tr�teresf Rate or Residelrfia! Value Guornnfees.
PpWER OF AT1'QRNEY
Rnow A!! Persap� By 3'heae Presents:
Thst the Arch Insurance Company, a cqrporstion n�anized and existingunde� the laws nf the State of Missauri, having its principal adminietrative office in 7ersay City,
New Jersey (hereinafter rafer�red to as the "Gumpany") doea herehy appaint:
Senjamin 1�. Stehl, Ellzaheth K. Sterllug, Megap K. Doixalre and Wealcy P. Williams of Atlauta, GA (EAG`Fi�
its true apd iawful Attorney[e)in-Pact, to make, cxecutc, seal, and delivcr from the d�te of issuatice of tFiis power £or and on its behalf as surety, aud as its act and deed:
Any and a!1 bonde, undertakings, recogaizances and other surety vbligatians, in tiie penal sum not exceeding 1Vine Million Dollars ($90.DOQ.00O.dOi.
This autliority dnes not permit the seme obGgation to ba spliC into kwo or more bonds In order to. hring each such bnnd witiun the doilar limit of authority as. sat farth
heeein. '
Tha sxecution of snch bonds, undertakiugs, recognizances snd other surety obligatinna ip pursuance af thase presents shall he as binding upon the said Company as
fully and amply to ail intents and purpoaes, as if the. same ha� bsen duly executed and acknowledged by its regularly eiected afficeCs at its principal adminisirative
ufYice in lersay Ciry, New lersey.
Tlvs PowCr of Attarney is executed by audtority of �esnlutions adopfed hy unanimous oonsent of lhe Board of 17irectors af the Compnny on Deeemher 14, 202Q, true
and eccurate copies of which are hereinafter set forth and are here6y certi5ed to by the underaigned Secretary as being in full force aud effect;
"VO'fED, That the Chairman oi the Board, the President, or the Lxeautive Vice President, or any Senior Vicc Presidetrt, of the Surety Businesa 17ivisian, ar their
appaintees designated in writing �nd filed with lhe 5ecretary, or tite Secretary shall fiave the power and authority to appoint agents and attvrneysan-faet, and to
authorize them subject to the limita�ions set forth in their respeetive powera of attorney, tn execute on behalf of the Cqmpany, and attach the seal of the Compa�
thereto, bonds, undettaltings, recogQizzances and other surety obligations obligatnry in the natuee thereo� and any snch officers of Che Company may appoint sgents for
atceptance of process."
This Power of Attorney is signed, aealed and ceetified hy facsimile under and bq autharity of the following resolucivn adopted by the unenimans oonsenE of the Baard of
Directom of Ehe Company on Decem6er 1 Q, 2020;
YOTED, Tl�at the signatnre of fhe Chairman nF the �oatd, the Preside�t, nr the Executave Viee President, Or �ny Seninr Vice Preside►it, af ihc Sureiy �usiness
pivision, nr theix appaintees designated in writing and filad with the 5ecretary, aad the signature af the Secretary, the seal oi the Compaay, end certifications by the
Secretary, rnuy be affuced by facsimiia on any power nf atkorney ar bond executed [rursuant ta the resointion adopted by the Board of Directors on Uecember 3 0, 202U,
and �ny such power sv executed, saaled and certifted with resj�ect tn any bond or undertaking to which iY is attached, shali continua to be valid attd bindiag upon the
Company. ln Tesf��tnnny Whsreof, the Compaay has caused tivs instnunent to ba aigned and its corporata seal Yo 6e affixed by their authoriaed off'icers, this lZ'" day
of Febraarv. 2921. _..t����
Atiested and Cerfifsed
/� Y L r U' � k� —
r
Reg�n . Shuiman, Secretary
BTATE QF I'ENi�'SYLVANIA SS
COUNT'Y OF �'HILADELPHTA 55
;�'� ��
E'Yl�b�+TliidiTE
S�/Vo
w4Fl
�������
Arc!► Insurance Camgany
����� "�'r�,.,�,.�'
Stephen C. Ruschak, Bxecutive Vice President
I,1ti13chele Tripadi, a Notary Public, do herehy eertify that Regan A. Shnlman and Stephan C. Ruschak personaqy known to me to be the �ame persons whose names
are respectively as Secretary and Executive Vice President ai the Arch Insurance Company, a Corparation organized and existing under the laws of tha 5taie of
Missauri, subscribed to the foregoing instrument, appeared before me this day in person and scve�atly acknowledged that Ehey bcing thereunto duly autl�orized signed,
sealed with the corporate seal and delivered the said instrument es the free and vnluntary act of said cozporation and as theiz awn free and vol�cts fnr the uses and
purposes therain se[ Fnrth. ��p ��y6��.
— � ` �.�. ,�.� �
r�►�u �� ���� �'
�t��e�,iriiw E Mich le 'padi,No blic
� f�+ �"R �Y �� �� My commission expires 07/31/202�
CE�iTIFICA.TION
1, Regan A. Shulman, 5ecretaty of the Arch Insurance Compaery, da hereby cerkiiy ttiat the attxched I'awer of A€torney datcd Fe!►ruar� 12. '2D21 on behalf of the
person(s) as listed above is a true and cArrect copy and that the same has heen in full force end effect since t�e date tltereof and is in ftiA forob and effeot on the date of
this certificate; �nd I do further certify that the said Stephen C. Auachak, who executed the Power nf Attorney as Executive Vice President, was an the date nf axecut�an
of tl�e attached Power nf Attotney the duly elected Executive Vice President of the Arch Insuzance Company.
IN TESTI1140NY WIiE��lF, I hava hercunto subsorihed.my name and affixed the corporate seal of the Arch Insurance Comparty on this 5t ay of .1a��y ,
20�. , Yt s L1��
Re A. 5hulman, 5ecretary
Thia PowCr of ACtnrney iimits tha acts nf those named therein tv the bonds and audertakinge specificaYiy named therein and they 6ave no authority to bind the Campany
except in the manner and tv the extent h�rein stated. ���il��
PLEASL 5EI�IA ALL CT.AIM INQiIIHIES RELATING TQ THIS BON[1 TO THE FOLLUWIN� AAD�SS: ,�' "�
Arch Insw'ance—Surety Division � . ����IlfeYE
3 Parkr�ay, Su4te 1500 y� '
Ph3ladelplua, PA I910Z t4�
������...�r,.
To verljy tf�e aut�ienticfty of thts Power vf Attomey, plecse cantactArcf� �►rsurtynce Company at 5uretyAutherttic�gt�hins�
Plsase refier t�o the above named Attarney-lr�-F�ct urid tf�e detc�ils of tiie lwnd to whicJ� the pmwer Is �ttacired•
AICPOAU4012.Q Printed in U.S.A.
i�������� wo�i�� �°o ��� ��� �o���vb������
���v���N� �e��c� �v�so i����Y�.�Y�
�'o abtain ir�formation or make a complaint:
Para obtener informacion a para someter una
q�a�ja:
You may call Arch Insurance Graup's toll-free
telephone numher for infarmation or to make a
cvmplaint at:
1 �$6�e413-���0
You may also write to Arch Insurance Group at:
Aech Insuranae �roup
Harho�sic�e 3
210 budson S#reefi, Suite 300
Jersey City� IVJ 07319 -'f 1 Di
You may contact the Texas D�partment af
Insurance to obtain infarmation on companies,
co�erages, rights or complaints at:
1-�00-2�2�343�
You may write the Texas nepartrnent ai
Insurance:
P,O. Box 149091
Austin, TX 78714-9�91
Fax: (512) 49Q-100T
Web: http:llvwvw.tdi.texas.gov
E-�nail: ConsumerPratection@tdi.texas.gov
�REiwlUl�fl OR CL�IM pl��Ui�S:
Should you fi�ave a dispufe concerning yaur
prEmi�am or about a claim you should contact
the ArGh Insurance Group first. If the dispuie is
not reso[Wed, you may contaci t�e Texas
Departrnent of Irtsurance.
,4iiACH THIS NOi1C� i� Y�UR POl�ICY:
This notice is 'for information only and ddes not
become a part ar condition nf the aitached
document.
Usted puEde Ilamar a� numero de teisfono gratis
de Arch Insurance Grou� para informacion o
para someter una c�ueja a1:
9 �866�13-f 550
Usted tambien puede escripir a Arch Insurance
Gro�p:
Arch Insu�ance (�roup
aarbor�ide 3
290 Hudson S��eef, Suite 30D
Jeesey Ciiyr R�J Oi�'i 1-17 D7
Puede cornunicarse con el Departamento de
S�guros de Texas para obtener ir�formacion
acerca de companias, caberturas, derechos o
quejas a!: •
1 ��00-ti�2�3439
Puede �scribir al Departamento de S�guros de
Texas:
P.O.Box149D91
Austin, TX 78714-5091
�ax: (512) 490-1 Q07
Web; http:llwww.tdi.texas.gav
E-mail: ConsumerProtection@tdi.texas.go�
�1���1�,�� S��RE PR[l�➢AS d ��C�AIwOS:
Si tiene una disPuta concerniente a su prim� o a
un reclamo, debe comunicarse con el Arch
Ensurance 6raup primero. Si no se resueive la
disputa, puede entonces comunicarse con el
departamento (i'DI).
UNA �5�� A111S0 A SU POl�I�A: Este a�iso es
soio para propasito de ir�formacian y no se
conWierte en parte o condicion del documento
adjunto.
OQ ML0042 �4 0�416 Page 1 af 1
STAl�DARID GEllTERAL C011II)I'T'IO�T�
OF THE COl�STRUCTIOl�f CONTRA�T
C1TYOi' FORT WOf2TH 2O20 On-Call PavementMarkings Contract#2
STANDARBC013STRUC.TION SPECIF[CA7']ON DOCLIMENT5 Ciry PrajeetNumber 103740
Revisian: $113C�021
STAND�RD GENERAL CONDTT�ONS OF THE
CONSTRUCTION CONTRACT
TABLE �F CONTENTS
Page
Article 1 —Definitions and Ter�ology ..........................................................................................................1
1.01 DeFir►ed Terrns ............................................................................................................................... I
1.02 Tern�inalogy ..................................................................................................................................�
Article2— Preliminary Mattet's ......................................................................................................................... 7
2.01 Copies of Docurnents ....................................................................................................................7
2A2 Cornmencemeni of Contract Time; Notice to Proceed ................................................................ 7
2.03 Starting the Work .......................................................................................................................... 8
2.04 Before Startrng Cons�ruction ........................................................................................................ S
2.05 Preconstruction Cor�erence .......................................................................................................... 8
2.06 Public Meeting .............................................................................................................................8
2.a7 Initial Acceptance of Schedules .................................................................................................... 8
Article 3— Contraet Doeuments: Intent, Amending, E�euse ............................................................................ 8
3.fl1 Intent .............................................................................................................................................. 8
3.02 Reference Standards ...................................................................................................................... 9
3.Q3 Reporting and Resolving Discrepancies .......................................................................................9
3.04 Arnendir�g and Supplementing CantractDocuments .................................................................10
3.05 Reuse of Documents ...................................................................................................................10
3.06 Eleatronic Data ............................................................................................................................ l I
Artic1� 4-- A�ailability of Lands; Subsurface anti Physical Conditions; HazardoUs Environmental
Canditions; Reference Points ...........................................................................................................11
4.41 Availability of Lands ..................................................................................................................11
4.Q2 �ubsuriac� and Physical Condi�ians ..........................................................................................12
4.03 D�fering Subsurface or Physical Conditions .............................................................................12
�.04 Underground Facilities ...............................................................................................................13
4.05 Re%rence Points .........................................................................................................................14
4.06 Hazardaus Envir�nmental Condi�ion at Srte ..............................................................................14
Article5— Bands and Insurance ,... .................................................................................................................16
5.01 Licensed �ureties anci Insurers ...................................................................................................16
S.Q2 PerFormance, Payment, and Maintenanee Bonds .......................................................................16
5.03 Cet-�ifica�es nf Insurance .............................................................................................................16
S.Q4 Contractor's Insurance ................................................................................................................18
5.05 Acceptance ofBonds and Insurance; Option to Replace ...........................................................19
Article 6 — Cantractar's Responsib�liti�s ........................................................................................................19
6.01 Supervision and Superintendence ...............................................................................................19
GITY OF' FORT WOI�TH ZQ20 On-Call PavemeEit Markings Contract #2
STANnARDCD?JS1'BUCT[ON SPECIRICAT[ON DOClIMBAlTS City PrajectNtunber ]0374D
Aevision: �21
6.02
6.03
6.a4
6.05
6.06
6.07
6.Q8
6.09
6.Ia
6.11
6.12
6.13
b.14
6.15
6.16
6.17
6.18
6.19
6.20
6.2I
b.22
6.23
6.24
Labor; Working Hours ................................................................................................................20
Servicas, Materials, and Equipmeni ...........................................................................................20
PrajectSchedule ..........................................................................................................................21
Substi�utes and "Or�Egua�s" .......................................................................................................21
Cancerning Subcontractors, Suppliers, and Others ........................................
WageRates .................................................................................................................................. 25
PatentFeesandRoyalties ...........................................................................................................2�
Permitsand Utilities ....................................................................................................................27
Lawsand Regulations .................................................................................................................27
T�X�� . ..... ... . ....... .... .......... ..... ... ........ ..... ........ ........ ........ ..... . ... .... ......... ............. ........ ........ ........ ... . 2s
Use of Site and Other Areas .......................................................................................................28
RecordDocuments ......................................................................................................................29
Safetyand Protection ..................................................................................................................29
SafetyRepresenta.tive .................................................................................................................. 30
Hazard Comrnunication Programs .............................................................................................30
Emergencies and/or Rect�f'icatian ...............................................................................................3Q
Submittals.................................................................................................................................... 31
Continujngthe Work ...................................................................................................................32
Contractor's General Warranty and Guarantee ..........................................................................32
Indernnification.........................................................................................................................33
Delegatian of �rofessional Design Ser�ices ..............................................................................34
Rightto Audif ..............................................................................................................................34
Nondiscrimination....................................................................................................................... 35
Article 7- Other Work atthe Site ...................................................................................................................35
7.01 Related War�t at Si�e ...................................................................................................................35
7.02 Coardination ................................................................................................................................36
Article$ - City's Respansibilities ...................................................................................................................36
8.01 Comtnunica�ions to Contractor ...................................................................................................36
8.02 Furnish Data ................................................................................................................................ 36
8.03 Pay WhenDue ............................................................................................................................36
$.04 Lands and Easements; Reparts and Tests ...................................................................................36
8.05 Change Orders .............................................................................................................................36
8.06 Inspections, Tests, and Appravals .............................................................................................. 36
8.Q7 L�mitations on Giry's Res�onsibilities .......................................................................................37
8.Q8 Undisclosed Hazardous Environrnental Conditian .................................................................... 37
8.09 Compliance wiih Safety Progrann ...............................................................................................37
Article 9- C�ty's Observation Status During Construction ........................................................................... 37
9.01 City's Project Manager ............................................................................................................37
9.Q2 Visits to Site ................................................................................................................................37
9.03 Authorized Variations in Wo�k ..................................................................................................38
9.04 Rejecting Defective Work ..........................................................................................................38
9.05 Determinations for Work Performed ..........................................................................................38
9.06 Deci�ions on Requirements af ContractDocuments and Accepta.bility of Worl� .....................3$
CITY OP FOn'T WORTH 2D20 On-Call Pavement Markings Cantract #2
STAI�DARDCONSTR[1CTION SI'BCIFICATION DOCETMENTS CityProjecYNumber1037�10
Revisian: Sfl"�11.(�1
Article 10 - Changes in the Worlc; Claims; Extra Work ................................................................................38
10.01 Authorized Changes in the Wark ............................................................................................... 38
10.02 Unau�hnrized Changes in the Work ...........................................................................................39
10.03 Execution of Change Orders .......................................................................................................39
10.0� Extra Work ..................................................................................................................................39
10.05 Notrfcation to Surety ..................................................................................................................39
10.06 Contract Clair�as Process .............................................................................................................Ad
Article 11 - Cost af the Work; Allowances; Unit Price Worlc; Plans Quantity Measurement ......................41
11.01 Cost of the Wnrk ......................................................................................................................... 4i
11.a2 Allowances ..................................................................................................................................A�3
11.03 Unit Price Work ..........................................................................................................................44
i 1.04 Plans Quantity Measurement ......................................................................................................45
Article 12 -- Change of Contract Price; Change of Contract Tune ................................................................. 46
12.01 Change of ContractPrice ............................................................................................................46
12.02 Change of Contract Time ............................................................................................................ 47
12.03 De�ays ..........................................................................................................................................47
Article 13 - Tests and Inspections; Carrection, Remo�al or Acce�tance nf Defective Work...................... 48
13.01 Notice of De�ects ........................................................................................................................�5
13.02 Access to Work ...........................................................................................................................48
13.03 Tests and Inspections ..................................................................................................................48
13.04 Uneoverinig Work ........................................................................................................................49
13A5City M�y Stop the Work .............................................................................................................49
13.06 Correction or Removal af ➢efective Wor1� ................................................................................50
13.07 Correction Period ........................................................................................................................50
13.08 Acceptanae oiDefeciive Warlc ...................................................................................................51
13.09 City May Correct Defecti�e Work ............................................................................................. S 1
Articie 14 - Payment;� to Contractor and Completion ....................................................................................52
14.01 Schedule afValues ......................................................................................................................52
19�.02 Qrograss Payments ...................................................................................................................... 52
14.03 Cantractor's Warranty of Ti�le ...................................................................................................54
14.(}4 Par�ial Utilization ........................................................................................................................55
14.05 Fit�al Ir►spection ...........................................................................................................................55
14.06 F�al Acceptance ......................................................................................................................... 55
14.0'1 Final Payment .............................................................................................................................. 56
14.08 Final Completion Delayed and Partial Retainage Release ........................................................ Sb
14.09 Waiver af Claims ........................................................................................................................ 57
Article 1S - Suspension of Work and Termunation ........................................................................................5'1
15.41 Ci�y May Suspand Work .............................................................................................................57
15.02 City May Terminaie far Cause ................................................................................................... S 8
15.Q3 City May Terminate For Cor�venience ...............................,.......................................................6�
Article16 -Dispute Resolution ......................................................................................................................61
16.01 Methods and Procedures .............................................................................................................6I
C1TY OF FdRT WdIiTH 2O20 fln-Ca[[ Pavement Markiogs Contraci #2
STANDARDC4N5TR[lCT!(3N SPEC[FICATION DOCiIMENTS CityPtnjecll+Fumber103740
Revision: 823J2F711
ArticIe17 — Miscellaneous ..............................................................................................................................62
I7.01 Giving Notice .............................................................................................................................. b2
17.02 Computation ofTimes ................................................................................................................b2
17.03 Cumulative Remedies ................................................................................................................. 62
17.04 Survival of Obligations ...............................................................................................................63
17.05 Headings ..................................................................................................... .................................63
C1TY OF FORT WORTH 2O20 On-Call Pavement Marl€ings Cvntract #2
STA3�TDART�COI�STRUCTION SPECIF[CATION DOCUMBNTS CityProjectNum6er 1fl3740
Revision: R23/1D21
oo�zoo-i
GEf�ERAI.CONDIT10N5
Page 1 of 63
ARTICLE 1— DEFINITI�NS AND TERMINOLOGY
1,01 Defined Terms
A. Wherever used in these GeneraI Conditions ar in othar Contract Documents, the ierrns listed below
have tlle meanings inciicated which are applicable to both the singular and plural thereof, and
words denoting gender shali include the inasculine, feminine and neuter. Said terrns are genera�y
capitalized or written in i�alics, but not always. When used in a eontext consistent with the
definition af a listed-de#"ined term, the term shall have a m�aning as deim�d below whether
capitalized or italicized or otherwise. rn addrtion to teri�ns specifically deiu�ed, terms with initial
capital letters ic� the Con�ract Docwnents incjude refer�nces to identified articles and paragraphs,
and the trtles of other documents or forms.
1. Addenda—Writtenor graphic instrurrients issued prior ta the opening of Bids which clarify,
correct, or change the B�dd�ng Requirements ar the proposed Contraet Docum�nts.
2. Agree�nent—The written mstrument which is evicience af the agreement between Ciry and
Contractar co�ering �he ViWork.
3. Application for Payment—The fortn acceptable ta City which is to be us�d by Cont�'actor
during the course of the Wark in requesting progress or final payments and which �s ta be
accornpanied by such su�pr�rting documentation as is required by the Contract Document�.
4. Asbestos Any xnaterial that contains mare that� one percent asbestos and is ft'iable or is
releasing asbestos.iibers into the a�r above current action levels estab3ished by the United Sta.tes
Occupational Safety and Health Adrnrnistration.
5. Award -- Authoxization by the Ci�y Council far the City to enter into an Agr�ement.
6. Bid=The offer or proposal of a Bidder submitted on the prescribed form setting forth �e
prices for the Work to be performed.
7. Bidder—The incii�idual or entity who submits a Bid directly to Ci�ty.
8. Bidding Documents The Bidding Requirements and the proposed Contract Documents
(including aI1 Addenda).
9. �iddingRequirerraents The advertisement or Invitation to Bid, Instructions t4 Bidders, Bid
security of acceptable form, if any, and the Bid �'arm with any supp�ements.
10. Bus�ines� Da�— A business day is defined as a day that the City conducts noi•rnal business,
generally Monday thraugh Friday, except far federal or staie holidays obser�ed by the City.
I1. Calendat�Day—Aday consisting pf 24 hours measuredfrom midnighi to the ne�t r�icinigh�.
C1TY OF FORT WCJRTH 2O20 On-Call Pavement Markings Contract #2
STANDAI2DCQNSTAUCTION 5P�CIFICA7'30N DOCIJMEIVTS City ProjecCNutnber 10374fl
Aevision: SIl_3/1(12l
oo�zoo-�
GENERALC�KDl710N 5
Page 2 of 63
12. Change Ot�a'er A document, whieh is prepared and approved by the Gity, which is si�ned
by Cor�tractor and City and auihorizes an addiiion, deletion, ar x•ev�sion in the V�ork nr an
adjustment in the Contract Price or the Coniract Time, issued on or after the E£fective Da�
of tha Agree�nent.
13. City— The City of For� Worth, Texas, a hame-rule �nunicipal corparation, authorized and
chartered under the Texas State Siatutes, aeting by its governing body through its City
Manager, his designee, or agents authorized under �is behalf, each of vvhick is reqeaired by
Charter to perform specific duties with responsibility for firial enforcement af the contracts
involving ihe Ciiy of Fort Warth is by Charter vested in the Gity Mana��r and is the enfiity
with whom Cor�tractor has entared into the Agre�ement and for wholn the Warl� is to be
per�armed.
1�. City Atto�ney — The of-�'�c�ally appointeci City Attorney of the City of Fart Worth, Texas, or
his dul�r authoriz.ed representative.
15. City Council - The dUly elected and qUalified go�erning body of the City of Fort Worth,
Texa.s.
16. Ciry Manager — The of�"icially appointed and auihor�zed City 1WIanager of the City of Fart
Worth, Texas, ar his duly authorized representative.
17. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment af
Cantract Price or Contract Ti�ne, or both, or otkzer rel�ef �ith respect to the terms of the
Cantract. A dejnand for money or services by a third party �s nnt a Contract Clairn.
18. ContYact—The enfire and irtiegrated written document beiween the City and Contractor
concerning the Work. The Cantract coniains the Agreement and aIl Contract Doeuments and
supersedes prior negotia�ions, representatio�s, or agreements, vvhetker written or ora�.
19. Contract Documents—Those items so desigr►ated in the Agreement. All items �Sted in the
Agreement are Contract Documents. Approved Submitta.�s, othei• Contractor submi�ttals, and
the reports and drawirigs of subsurface and physical conditions ar� not Contract Documents.
20. Contract Price The moneys payable by City to Contractar for comp�etian af the Work in
accordance r�vith the Contract Documents as stated in the Ag7-eement (subject to the provis�ons
of Paragraph 11.03 in the case of LTnit Price Work).
21. Cant�act Time—The number of days or the dates stated �n the l�.greement to: {i) achieve
Mi�estones, if any and (u) complete the Work so that it is ready for Final Aeceptance.
22. Cont�acto� The indi�idual or entity vvith whom City has entereci into the Agreement.
23. Cost of ihe Wark—See Paragraph 11.01 of these General Conditions for defini�ion.
CITY OP FORT WOR'I'EI 2020 On-Call Pavemerrt Mar[cings Con�act #2
STANDARDCONSTR[1CT10N SPECIFICATIDN DOCUME]ZTS CityProjectl�urnber103740
Ttevision: &23fd721
OQ7200-1
GENERALCQI�DITION 5
Page 3 vf 63
24. Damage Clairrrs — A demand for money or services arising from the Projact or Sil-e from a
thi�'d parly, City or Contractar exelusive of a Contract Claitn.
25. Day ar day— A day, unless otherwise defined, shall mean a Calendar Day.
26. Directo� of Aviation — The offcially appointed Director af tl3e A�iation Department of the
City of Fart Worth, Texas, or his du�y appointed representative, assisfian�, or agents.
27. Director of Parks and Comrrtunity S�rvices — The officially appo.inted Directar of the Parics
and Co�nmunity Services Department oithe Ciry of Forl Wor�h, Tex�s, or his duly appainted
representati�e, assistan�, or agents.
28. DiYectar of Planning and Development — The afficially appointed Director of the PI�nning
and Developrnent Department of the Ciry of Fort Worth, Texas, or hi� duly appointed
representatrve, assistan�, ar agents.
�,4. Directo� of �ransportation Public Works — The offcially appointed Directar of tlie
Transpor�ation Public VVorks D�par�tnent of the City of Fort Worth, Texas, ar his duly
appointe� reprasentative, assistan�, or agents.
30. Di�ectar^ of Water Department — The ofiici�lly appointed Directnr of the Water Department
of the City of Fort WQrth, Texas, or his duly appointed representative, assistant, ox agents.
31. Drawings—That part of the Coniract Documents prepared or appraved by Gngirieer which
graphicaliy shovvs the scope, e�ent, and character af t41e Workto be performed by Contractor.
Submittals are x�ot Drawings as so defined.
32. Effective Date of ihe Ag�eer�ent—The daie indicated in the Agteement on vvhich it becames
effective, but if no such date is indicat�d, it means the date on �vhicla the Agreement is signed
and deli�ered by the last of ihe two parties to sign and deliver.
33. Engineer The licensed professianal engineer or engmeering firm registered in the State of
Texas performing professional services for the City.
34. �xtt•a WoNk — Addi�innal work made necessary by changes or alterations of the Contrxct
Documents or of quantities or for other reasons for whieh no prices are provided in the Contra�t
Documents. Extra wark shaIl b� part of the Wark.
35. Field Order—A vvritten order issued by City which requires changes in the Work but vwhich
does not invoi�e a change in the Cantract Pri�e, Coniract Time, or the intent of t11e Engineer.
Field Ortiers axe paid from Field Order Allowances incorparated int� the Contract by funded
work type at the tune o£ awarti.
36. Final Aeceptanee — The written notice given by the City to the Cantractor tha� the Worlc
specif'ied in the Cantract Documents has been completed to the sat�faction of the Ciiy.
CITY dF FO1�T WQRTH 2�20 On-Call Pavernent Ivl�rkings Contract #2
STANDA2DCON5TRUCTION SPGCICICATION DQCUMEN'f5 CityProjectNumber[Q374�
Revisioii: 8r131�1
007200-I
GENERALCONDITIONS
Page 4 of 63
37. Final 1'nspectiorr. — Inspection carried out by the City to veriiy that the Contractor has
coinpleted fhe Work, and each and every part or appurtenance thereof, fully, entirely, and in
canformance with the Cantract Dacum�nts.
38. Ge.ne�al Requirernents— Sectians of Division 1 of the ContractDacuments.
39. Haza�dous Envi�anmental Cona`ition The presenee at the Site of Asbestos, PCBs,
Petroleurr�, Hazardous Waste, Radioactive Ma�eriaj, or ather mat�rials in such quantities or
circumstances that may present a substantial danger to persons ar praperty exposed thereto.
40. Hazardous YYaste Hazardous waste is d�fined as any solid waste listed as hazardous or
passesses one or more hazardous characteri�tics as defined in the %deral waste regu�.tions,
as amencied fram titne to time.
41. Laws and Regulations—Any and aII applicable laws, rules, regulations, ordinances, cades,
and orders of any and all go�vernmental bodies, agencies, authorities, and courts having
jurisdi�ti�n.
42. Liens--Charges, security interests, or encumbran�es upon Project funds, real property, or
personal praperty.
43. Maj or �tem — An Iterr� of woric mclucied ir� the Caniract Docuznents that has a total cost equal
to or grea�er than 5% of ihe ariginal Contract Price or $25,�00 whichever is Iess.
44. Milestone A principal event speeifed in the Can.tractDocutnet�i� re�atit�g to an intertnediate
Contract Time prior to Final Acceptance of the Worlc.
45. Notice of Awa�d—The written no�ice by City to the Suecessful Bidder stat�ng that upnn
iimely compliance by ihe SuceessfulBidder with the c�nditians precedentlisted therein, City
will sign and deliver t�ie Agreetnent.
46. 1Votice to Proceed—A wri�tennotice grven by City to Contractor f�ing the date an vvhich the
Contract Time wi11 commence to rvn and on which Contractor shall start to perforna the Worlc
specif'ied in Contract Documents.
47. PCBs—Polychlorinated biphenyls.
48. Petroleurtx—Petroleum, iricluding crude ail or any fraction thereof which is liquzd at standard
conditians of temperature and pressure (6Q degrees Fahrenileit and 14.7 pounds per square
inch absolute), such as oil, peiroleum, fuel oil, oil sludge, oil ref'use, gasal�e, keroaene, and
oil m�ed with oiher non�Hazardous Waste and crude oi�ls.
49. Plans — See definit�on of Drawings.
CITY OF FORT WORTH 2D20 On-CaI[ Pavement Markings Contract �F2
STANQARDCONSTRUCT[DN SPECIFICAT[ON DQCUMENTS CityProjectl�um6er1037�4Q
Revision: 8r1312021
on72oo-�
GENERALC:OND1710N S
Page 5 of 63
50. Project Schedule—A schedule, prepared and maintained hy Contractor, in accordance with
the General Requit•ements, dascribing the sequence and duratian of the activities carnprising
the Contraclor's pl�n to accomplish the Warlc within the Contract Time.
51. PNoject—The Virorkto be performed under the Cantract Docu��nents.
52. Project Nlanager The auihorized representative of the Ciiy who will be assigned to the
5ite.
53. Public Meeting — An annaunced meeting conducted by the City to facilikate public
partici�ation a��d to assist the pubfie in gau�ing an informed view of the Project.
54. Radioactive Material—Source, speeial nuaIear, or bypraduct material as defined by the
Atomic Energy Aci of 1954 (42 USC Section 2011 et sec�.) as amended from iime to time.
55. Rega�lar Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday
thru Friday {exciuding ]egal holidays}.
56. Samples—Physical examples of �naterials, equigment, ar worlananship thai are
representative of some portian of fihe Work and which establish th� standards by which suck�
portic�n of the Work rr�ill 6e judged.
57. Scheduie of Submittals—A schedule, preparad and maintained by Contractar, of required
subraittals and the time requirements to support scheduled per%rmance of related construction
acti�ities.
58. Schedule of Values—A schedule, prepared and �naintained by Cont�actor, a�locat�ng portions
of the Contract Price to various portians of the Woxk and used as the basis for reviewing
Contractor's Applications for Payment.
S9. S'ite—Lands or areas indicated in the Contract Docvrnsnis as being furnis.hed by City Upon
which the Wor�C is ta be performed, including rights-flf-way, permits, and easements for access
thereto, a�d such other lands �urnished by City v�hich are designated far the ase of Contractor.
60, 5`peczficat�ons—Thai part of tlie Cont�act Docum�nts consistirig of writtan requirements for
tn�aterials, equjpment, systems, sta.ndards and worlrn�anship as applied fio the Work, and certain
adtninistrative reRuiremen�s and procedural matters applieable thereto. Speciftcations may be
specifical�y made a part of the Contract Documents by attachment or, if nat attached, may� be
incorporated by reference as indica�ted in the Tab1e of Contents {Division 00 QO 00} of each
Pro�ect.
51. Subcontractor An individual or entity having a direct cantract with Contractor or wzth any
otlzer Subconiractor for the perfori�nance of a part of th.e Work at the Site.
C1TY QF I'OItT WORTH 2O2U On-Call Pavement Mar[cings Contract #2
STANDATi17CON5TRUCTIQN SI�CIFlC.AT10N DOCUNfENi'S CifyProjectNumberl03740
Revisian: B(i3/L�1
ao 7z oU - i
GEN�F2AL CON�ITION S
P�ge 6 af 63
b2. Submittals All drawings, diagrams, illustratrpns, schedules, and other data or infarmation
whic�► are sp�cif'ically prepared or assembled by or for Contraetnr and sularr�tted by Contractor
to iliustrafe some portion. of the �orlc.
53. Substantial Completion — The stage in the progress of the Prolect rvhen il�e Work is
sufficiently complete in accordance with the Contract Docurnents for Final Insp�ction.
6�. Successful Bidde� The Sidder subtnilting the lowest and most resp�nsive Bid to whom Crty
rnakes an Award.
65. Su�erintendent— The represeniative of the Contractor who is available at all times and a51e
to receive instructions from the City and to act for the Can�ractor.
66. Supplementary Canditions—That part of the Contract Documents which amends or
supplemenis these General Conditions.
67. Suppdier A manufacturer, fabricator, supplier, distributar, materialman, or �rendor having a
direct contract with Contcactor or wi�h any Subcontractar to furni�h �naterials or equipment
to be incorporated in the Work by Contractor or Subcont�actor.
6$. Unde�ground Facilities All underground pipel+nes, conduits, ducts, cables, w�res,
manhales, vauits, tanks, tunnels, or other such facilities or attachments, and any encasemerrt�
containing such facilities, iricluding but n�t limited to, those that convey electricity, gases,
steam, liquid petrnleum praducts, telephone or othar communicati�ns, cable te�evisior�,
water, vvastewater, storrn water, other liquids or chemica�s, ar traffic or other control systerris.
69 Ut�itPYice Work—See Paragraph 11.03 of th�se Genera� Conditi�ns for definition.
74. Weekend Warking Hou�s — Hours beginning at 9:00 a.m. and ending at 5:00 p.zn., Satui•�ay,
Sunday ar legal holiday, as approv�d iri advance by the City.
71. Wo�^k The entire cons�ruction or the various separately identifiable parts thereof required to
be pro�ided under the �ontract Documents. Work includes and is the result of perfotming or
providir�g all labor, services, and documentation necessary to produce such canstrucfion
includ�g any Change Order or Field Order, and fi�rnishing, installing, and incarporatirig a11
materia�s and equipment mto such construction, all as required by the Contrac� Documents.
'72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal
halidays authorized by the City for contract purposes, in which weather or other conditions
not under the control of the Contractor wili parinit the pe�-farmance of the pri�cipal un.it oi
work undervva� �or a contit►uou� period of not lass than 7 kours betvs+een 7 a.rn. and 6 p.m.
1.02 TeNminology
A. The vvords and terms discus�ed in Paragraph 1.02.B through E are not deFined but, when used in
the Bidding Requirements or Cantract Dacuments, have tk�e indicated mean�ng.
B. Infent of Certain Terms or Adjectives:
CITY OF FORT WORTH 2O20 Dn-Call Pavement Markings Contract #2
3TAiVDAR�CflNSTRUCTION SPECIFICATIaN DQCUMENTS CityPmjeatNumber]U3740
Rer+ision: 8r23�Za21
OD7200-I
GENERALCANDITION S
Pa�a 7 of b3
j. The Contr'act Documenis inc�ude the terms "as allowed," "as approved," ``as ardered," "as
d�rected" ar terms of like effeet or itnport to authorize an exercise of judg�nent by City. In
addition, the ad�ectiv�s "reasonable," "suitable," "acceptable," "p�'aper," "satisfactory," or
adjeeti�+es of like effect or itnport are �sed to describe an action nr determination pf City as to
the Worlc. It is intended that such e.xercise af professionaj judgment, action, or determination
r�vill be solely tn evaluate, i�► general, ihe Work for compliance with the inforrr�ation �n the
Contract Documents and with the design coneept of the Project as a functinning whole as
shown or indicated in the ContractDocuments (unless there is a specif'ic statement indicating
o�herwise).
C. Defective:
1. The word "defective," when z�odifying the w�rd "Wnrk," refers to Woric thai is
unsat�sfaetory, £aulty, or de�cient i� that i�:
a. does not conform io the Con�ract Docurr�ents; or
b. does not meet the requirennents of any applicable inspection, reference standard, test, or
approval referred to �n the Cont�act Documents; or
c. has be�n damaged prior to City's written acceptance.
D. FuNraish, Install, Pe�-farrn, Provide:
1. Th� vv�rd "Furnish" or �t11e word "Install" ar the ward "Perform" or the word "Provzde" or
the v�rord "Supply," or any combination or similar diz�ective or usage thereaf, shaIl mean
furnishing and ineorporating � the Work inclucfmg al� necessary Iabor, materials, equiprnent,
and everything necessary to perform the VVork iridicated, unless specifically limited in the
contex� used.
E, Unless stated oth�rr�vise in the Cantract Documen�s, words or phrases that have a well known
technical or canstruction industry or trade meaning ar� used in. the Cor�tract Documents in
aecordance with such recagn�zed m.eanmg.
ARTICLE � — PRELYNIINARY 1VMATTERS
2.01
�,.02
Copies of Documents
City shall furttish to Contractor one (1) original executed copy and one (I) electronic copy of the
Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be
furnished upon request at the cost o� rEproduction.
Cot�rtencerprent of Cont�aci Tinze; Notice to Pt�oceed
The Cantrac� Time will commence ta run on ti�e day indicated in the Notice to Proc�ed. A Notice fa
Proceed ix►ay be given no earlier than 14 days after the Effective Dafie of Yhe Agreeznent, uriless agreed
to by both parties �n vvriting.
C17'Y OI' �'ORT WORTH 2O2� On-Call Pave�nent Ivlarkings Contract #2
ST.ANDARBCONS'fRUCT]�N SPECIP[CAT10N DOCCIIVIENTS CityProjectNumber10374fl
Revisian: 8�13CL:121
oo�zao-t
GE�kERALCONDITIDN 5
Page $ of 63
2.03
Z. (}4
2.OS
2.06
2.07
sfL7YtIYlg' t�2B WOYk
Contractoz- shaIl start to perfarm the Work on the date when the Contract Time commances to run.
No Wnrk shall be done at the Site prior to the date on which the Contract Time comrnenees to run.
�efo�e Sta�ting Const�ucCion
Baselzne Sche�ules: Submit in accordance with t�e Contraci Documents, and prior ta starting the
Work.
I'reconsit�uctaon Conference
Before any Wark at the S�e is started, the Contraetor sha31 attend a Preconstruction Conference as
specified in tl�e Coniract bocurnents.
Publae Meeting
Contractor may not nnobilize any equipment, materia�s or resources to the Site prior ta Cor�tractor
attenditig the Public Meeting as scheduled by the City.
Initial Acce�tance of Schedules
No progress payment shalI be made ta Gontractor untii accepta.ble sehedules are submi�ted to City in
accordance with the ScheduIe Specif"ication as grovided in the Con�ract Documents.
ARTICLE 3— CONTRACT DOCUN�NTS: INTENT, AMENDING, REUSE
3.O1 Intent
A. The Contract Documents are coinplementary;. what is required by ane is as bindirig as if requ�red
by ail.
B. It is the intent af the Coniraet Documents to describe a functionaily complete project (or gart
thereof) to be constructed in a�cordance withthe Contract Documents. Any labor, docutnentation,
services, materials, or equipment that reasonably may be inferred from the Contract Documents
or from pre�ailing custom or frade usage as being requir�d to produce the icidicated result will be
provided whet�ier or not specifically called for, at no additional C05t t0 GIiy.
C. Clarifications and interpretations of the Contraet Documents shall be i�sued by City.
D. The �pe�if'�cations may vary in form, for�nat and style. Some Speeification sections may be written
in varying degrees af streamlined or declarative style and some sectiions may be relatively
narrative by comparison. Omission of suc.h words and phrases as "the Cantractor shall," "in
COi1fOTl11iCY WIt�i," "d5 5ilOWl�," Or "�S spec�'ied" are �nten�ional in streamlin�d sections.
Otxait�ed worcis and phrases shall be supplied by infcrence. Similar typcs Qfpro�isions may appear
in various parts of a section ar artic�es wi�hin a part depending on the format of the
CTTY dF PORT WORTH 2p2p Qn-Call Pavernent Markings Gantraci #2
STAN�ARDCONS'CRUCT[6N SPECIFICATIQN DOCUMENTS City ProjecYNumber 1Q37d0
Revisian: 8r7.3/102I
oo�Zoo-�
GENERAL CpNDITIQN 5
Page 9 of 63
3.02
3.03
section. The Contractor shalf not tafce advantage of any variation of fbrm, format or style iri
inaking Coniract Claims.
E. The cross referencing of specificatian sections under the subparagraph heading "Related
Sections i�clUde but are not necessarily limited to:" and elsewhere within each Specif�catian
s�ction �s pravided as an aid and canvenience to the Contractor. The Cantractor shall not rely on
the cross referencing provided and shaU be responsible to coordin.ate the en�ire Work under the
Contract Documents and pro�ide a complete Projeet wheiher or nat the cross referencin� is
provided in �ach section or whether or not the cross refexencing is �omplete.
Reference Standc�ds
A. Standards, Specificati�ns, Codes, Laws, and Regu}ations
1. Reference to standards, sp�eifications, manuals, or codes of any technical society, organizatian,
ar association, or ta Laws or Regulations, wheiher such reference ba specifie or by implication,
shall mean the standard, specificaiian, inanual, code, or Laws or Regulatians in effect at the
titne of opening of Bids (ar on tl�e Effective Date of the Agreement if there were no Bids),
excepi as may be otherwise specifically staied in the Contraci Documents.
2. No pro�vision of any such standarci, specification, man.ual, or code, or any instruction o� a
Supplier, shall be effective to change the duties or responsibilities af City, Contractor, or any
of their subcon�ractors, eonsujtants, agents, ar employees, fram thase set forth in the Contract
Documents. No such provisian or instruction shaII be ei�ective to assigr� to City, or any of rts
officers, directors, members, partners, employees, agents, consultants, or subcontractors, any
duty or author�ty to supervise or direct the performance of the Work or any duty or authoriiy
ta undertake responsibility incons�stent with the provisions of �he Contract Documents.
Reporting and ResolvingDiscrepancaes
A. Repo�ting Discrepa�cies:
1. Contract�r's Revieiv of ContractDacuments Before Sta�ling T�ork: Beiare undertaking each
part of th� Work, Conhacior sha�l carefu�ly study and compare the Contract Docurr�ents and
cllecl� and verify pertinant fi�ut'es therein against all appficable field rneasurements and
canditions. Coniractnr shall promptly report in wriiing to City any conflict, error, ambiguity,
or d�screpancy which Contractor disc�vers, or has actual lc�owledge o�', and shaIl obta.in a
written interpreiation or clarif'ication iram City before praceeding with any ViTark affected
thereby.
2. Cnrat�actor's Revaet� of Contract Documents During Perfo�nc�nce of Wo�k: Zf, during the
performance of �he Work, Contractor discovers any canflict, error, ambiguity, or discrepancy
within the Contract Dacuments, or between the Contz�act Docutr�ants and (a) any a�plicable
Lav�+ or Re�ulation ,(b) any stan�ard, specification, manual, or cade, ar{c) any instruction of
any Supplier, then Cantx•actflr shali promptly repart it to City in writing. Contractor shall nat
proceed with the Wnrlc affected thereby {except �n an emergency as required by Paragraph
C1TY OF I'aRT WORTEI 2020 On-�all Pavement Markings Contraet #2
STANBARDCONSTRpCT[ON SPECIFICATION DOGiJME�YTS CityProjectllumber1�3740
Revision: 82312021
007200-1
GENERAL.CONDITION S
Page 10 ai 63
6.17.A) until an. amendment or supplement to the Cnn�act Documents has been issued by
one of ihe methods �ndicated in Paragraph 3A4.
3.04
3.05
3. Contractar shall not be liable to City for failvre to report any conflict, error, ambiguity, or
discr�pancy ir► the Contract Documents �nless Contractar had actual knowledge thereaf.
B. ResalvingDisc�epancies:
1. Exc�pt as may be otherwise specifically stated in the Contract Documents, the prov�sions of
the Contract DocUments �hall take precedence �n reso�ving any conflict, error, ambiguity, or
discrepancy between the provision5 of t�ae Contraet Documents and the provi�ions of any
standard, speci�'ication, manual, or the instruction of any SuppIier (whetrier or not specifically
incorporated by reference in the Contract Documents).
2. In case o�� discrepancies, figured ciimensions shalI govern over scaled dim.er�ians, P�a.ns shall
go�ern over Specifications, Supplementary Conditians shall govern over General Conditions
and Specifications, and quantities shown an the P�ans shall govern over t�ose shown in the
praposal.
Arrzending and Suppdementirtg Cont�aetDoc�rt3ents
A. The Contract Doeuments rnay be ainended ta pravide far addit�ons, deletions, and r�visions in
the '�Vork nr to modify the terms and cond�tions thexeof by a Change Order.
B. The requirements of the Contract Documents rriay be supplemented, and minar variaiions and
de�iations in the Vdork not involving a change in Con�ract Pric� or Contract Time, rnay be
authorized, by one or mor� of t11e follawing ways:
l . A Field Orcier;
2. City's review of a Submiktal (s�abject to the provisions Qf Paragraph 6.18.C); or
3. Csty's r�vri�ten interprcetation or clarification.
Reuse of Documer�ts
A. Coniractor and any �ubcontractor or Supplier shall not:
1. have or acqui�e any tit�e to or a�vnership rights in any of fhe Drawings, SpecificatiQns, or
ather document� (or copies of any iher�o� prepared by or bearing the seal of Engi��e�r,
including elecironic tnedia editions; ar
2, reuse any such Dra�vings, Speci�ications, other doc�,unents, or copies thereof on extensions of
the Project or any otl�er pr��ect without vwritten consent af City and specif'�c written verification
or adaptatian by Engineer.
Cl1'Y qF �'�TZT WO[ZTL� 2020 On-C.all Pavement Mar[cings Cantract #2
STANDA.T2DCOIVSTR[]CTI6N SPECICICArION DOCUMEI�TS Gity ProjectNumber 103740
Revi s i on: 8�23fi.(il1
Ofl72DD-1
CENtRAI. CANDITION S
Page ] l of G3
B. The prohibitions of this Paragraph 3.05 wil� sur�ive final payment, or ter�x►ination of the
Contrac�. Nothir�g herein shall prec�ude Contraetor from retaining copies of the Contract
Documenirs %r record purposes.
3.Q6 Elect�anrc Data
A. Unless otherwise stated in �he 5upplementary Conditions, the data furn�shed by Ciky or Engineer
to Contractor, or by Contractor to City or Engineer, that may he relied upon are limited ta the
printed copies included in the Contract Documents (also lcnn�vn as hard cnpies) and ather
Specifications referenceci and located on the City's on-line electronic document managemen.t and
col�baraiion system site. Fi�es in electronic media format of te�t, data, graphics, or ather types
are furnished only for the convenience of the receiving party. Any conclusion ar in%rmation
obtained or derive�l from such eIectronic files will be atthe user's sole risk. Ifthete is a discrepancy
hetween ihe electronic ��es and ihe hard copies, the hard copies govern.
B. �+Vhen transferring documents in electronic media format, the transferring party makes no
representations as to long term compatibiliiy, usability, or readability of documents resulting from
the use of soitware applicat�on packages, operating systezns, or cornputer hardware differing frorn
those used by the data' � creator.
ARTICLE 4— AVAILABII.ITY OF LANDS; SUBSURFACE AND PHYSXCAL CONDITZONS;
HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS
4.01 Availab ality of �ancls
A. City sl�all furnish the �ite. City shafl notify Conb°actar of any encumbrances or restrictians not of
general application but specifically relat�d to use of the Sit� with which Contractor must comply
in performing the Work. City will obtain: ir� a timeiy mant�er �nd pay far easements for permanent
structures oc permanent ehanges �n �xisting facilities.
The CiLy has obtained or anticipates acquisition af andlar access to right-of way, andlor
easements. An.y autstanding right-af-way andlar ease�nents ar� anticipated to be acauired in
aecordanne with the schedule setforth in the Stapplerr�entary Conditions. The Project Scheciule
submitted by the Contraetar iti accordance with the Contract Documents t�ust consider any
outstanding right-of-vvay, an.d/or easeinents.
2. The City has or anticipates removing andlor relocating utili�ies, and obstructions to the Si�e.
Any outsianding removal or relocation of utilities ar obstructions is anticipated in accordance
with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted
by tne Contxaetar in accordance vvith the Co��tract Documents must consider any outstand'mg
utilikies or abstcuctions to be removed, adjusted, andlor relacated by others.
B. Upon reasonable written request, City shaIl furnish Contractor with a current statement nf record
legal tiile and legal description of the lands upan which fhe Wark i� to be perforrned.
C1TY OF FORT WORTH 2O20 On-Ca[[ Pavement NTarkings Conisaat #2
sTANDARDCRNSTRUCTION 5PECIFICATION DOCUMF.NT5 CityPrajectNum6er103740
Ttevision: 82�/2021
ao��:oo-�
GENERALCRi�D{TION S
Page l2af63
4.02
C. Contractar shall provide for aII addrtional lands and access thereta that may be required for
construction faciliCies ar storage of material� and equipment.
SubsuYface andPhys�cal Conditi�rts
A. Reparts and�ra�vings: The Supplementary Candi�ions ider�tify:
l. those reports known to City of explorations and tests of subsUrface canditions at or
conti�,tous to the Srte; and
2, thflse drawings known to City of physical conditions relating to eXisting surface ot
subsutface structures at the Site (e�cept Underground �'acilities).
B. Limited Rediance by Contr�actor on Technacal Dz�taAutha�ized.• Contractor may rely upnn the
accuraey of the "technical data" contained in such xeports and drawings, bui such reports and
drawings are not Cantract Documents. Such "technical data" is identif'ied in the Supplementa ry
Conditions. Contractor may not malce any Cantract Claim against City, or any of their officers,
direciors, mernbers, partners, ernploy�es, agents, cnnsu�tants, ar subcontractors with respect to:
1. the completeness of such r�ports and drawings far Contractor's purposes, including, but nat
lim�ed to, any aspects of the means, methods, techniques, sequences, and procedures of
construction to be employeci by Contractor, and safe� precautions and programs incident
thereto; or
2, o#her data, interpretatians, opinians, and informatian cnntained in such reports or shown or
indicated in such drawings; or
3. any Contractor int�rpretation of or conclusion drawn from any "technical data" or any such
ather data, inferpretations, opinions, or inform:ation.
�4.03
DiffeNingSub�ur,face o� Physical Condifians
A. Natice: If Contractor believes that any subsurface or physical condition that is uncovered or
revealed ertherr:
S, is of such a nature as to establish that any "�echtZical data" on which Contractor is entitled to
rely as provided in Paragraph 4.02 is rn�terially inaccurate; or
2. is of such a nature as to reQui�e a change in the Contract Docuz�ents; or
3. differs materialIy fi�oln that showj� or indicat�d in the ContractDocuzxaents; or
4. is of an unusual nature, anci differs materially from conditions ordinarily eneountered and
generally recognized as inherent in woric oi the character provided for ita the Contract
Documents;
C1TY OF FORT �012TH 2O20 4n-Call Pavement Markings Contract #2
STAI�lI?ARDCONSTRUC�lQN SPECIPiCATIDM DQCf.IMGNTS CityProjectNum6er103740
Revisi on: 8�13/2113,1
oo�aao-i
G�NERALCON�ITION S
Page 13 of 63
then Contracior shali, promptly after becoming aware thereof and before �urther distucbing the
subsurface or physical conditions or performmg any Work in connection t.herew�t4� (except in an
emergency as required by Paragraph 6.17.A), noti� City in writing about such condition.
B. Possable Price and Time Ad� ustments
Contractor shali not be entitled to any adjustment in the Contract Price nr Coniract Time if:
L Contractor 1cr�evv of the eXistence af such conditiians ai t�e tirrie Cont�ractor �na�e a f�al
comrnitment to Ci�y with respectto ContractPrice and Contract Time by the submission of a
Bid or becoming bound under a negotiaied contract, or
2. ths existenc� of such condition could reasonably have been ciiscovered or reveal�d as a xesult
of the exairlination of the Contract Documents or the 5ite; ar
3. Contractar failed to give the vwritten notiee as reqt�ired by P aragraph 4.03.A.
4.04 Undergro�nd Facilities
A. Shown or Indicated.• The information and data. shown or indicated iri the Contract Documents
with respactto exisiing Underground Facilities at or contiguous to the Site �s based on inEormaiion
and data furn�shed to City or Er�gineer by the owners of such Underground FaciIities,
incjuding City, or by others. Unless it is othez-wi�e expressly provided in t�e Supplementary
Conclitions:
1. City and Engineer s�all not l� responsible for the accuracy or coznpleteness of any such
ir�ormaiion or data pro�vided by others; and
2. the cost of a�l of the foIlowing wiJl be included in the Contract Price, and Contractor shal�
har�e full responsbiliry for:
a. r�vie�wing and checking all such information and data;
b. lacating all Underground Faciiities show� or indicated in the Cnntract Dacumen�s;
c. coordination and adjust7ment ot the WorIc with the owners of such Undergt'ounci
Faci�ties, ir�clud�ng City, during constructian; and
d. the safety and proteotian af all such Underg-�ound Facilities and repau�g any damage
theretfl resulting firam the Work.
B. 1VatShovvn oNZndicated.•
I. If ar� Underground Facility w�►ich conflicts with the Work is unca�ered or revealed at or
cQntiguaus to tl�e Site which was not shawn or indicated, or no� shown or indicated with
reasonable accuracy in the Contract Docui�nents, Contractor shaU,. promptly after becoming
aware thereof and before further disturbing conditions aff�ecied thereby or perfarining any
C1TY OF FORT WQRTH 2O20 On-Call Pavement Markiilgs Contract #2
STANDAR➢CQNSTRUCTIpN SPECIFICA'f1al� DOCLiMENTS CityProjectNumber103740
Revisian: 8?3f�1
00 72 ao - �
GEN�.FtAL CON�ITION S
Yage 14oPG3
Work in connection therewith (except in an emergency as required by Paragraph 6.17.A),
identify the owner of such Undergraund Facility and give notice to that owner and to City.
City will review the discovered Underground Facility and determine the extent, if any, to
vtrhich a change inay be required in the Contract Documents to reflect and documeni the
consequences of the existence or location of the Undergrovnd Faciiity. Contractor shall be
responsib�e for the safety and pratection of such discovered Underground �acility.
4.05
� �:
2. If City cor�cludes that a change in the Contraci Documents is required, a Change Order n�ay
be issued to raflect and document such consequences.
3. Verificatian af existing utilities, struct�ares, and service lines shall include notificaiion af aIl
utilrty companies a minimu�m of 48 hours in advance of construciion inciuding exploratary
exca�ation if necessary.
Refer�ence Points
A. Ciiy shall provide engineering surveys to establish reference poin�s for construction, which in
City's judgment are necessary to enable Contractor to proceed wi�th the �Vork. City will provide
construcfion staIces or other customary method of marking to astablish line anc3 grades for roadvvay
and utility constructior�, centexlines and benchmarks for bridgeworlc. Contractor shall protect and
preser�e the estabIished reference points and property monuments, and shall make no changes or
relocations. Contractor shail repor�t to City vahenever any reference point ar property manument is
lost or destroyed or requ�res relocation because of neGessary changes in grades or locations. The
City shall be responsible for the replacement or relocatian flf reference points or property
m�numents not carelessly or vuillfully destrayed by the Contractor. The Contractar shaIl notify
City in advance and with sufficient time to avaid dela.ys.
S. Whenever; in the opirzion of the City, any reference point or monument has been carelessly or
willfuily destrayed, disturbed, or removed by the Contractor or any of his employ�ees, the ful� cast
for replacin� such poir�t� plus �.5% will be charged against the Cantractor, and the full amount w ill
be deducted from payment due the Contractnr.
Hazardaus Environanental Condition at Site
1�. ReportsandDt�awings: TheSuppleinentary Conditians identify �ose repartsanddrawings l�nown
to City relating to Hazardn�� Environmental Cond�tions that have been identified at tl�e S�te.
B. Lirxaited Relia�ce by Contracto� an Technical Data Authorized: Cantractor may rely upon Yhe
accuracy of the "techriical data" contained iun such reporis and drawings, but such reports and
dra�ings are not Contract Documents. Such "�echnical data" is ident�ied in the Supplementary
Conditians. Contractor may not malce any Contxact C�aim a�ainst City, or any of their off'icers,
directors, members, partners, ernployees, agents, consultants, or subcontractors wiYh respect to:
1. the completeness of such reports and drawings for Contractor's purposes, inclUding, but not
limited to, any aspects of the means, methocis, techniques, sequences and procedures af
CITY OF FORT WQRTf-I 202p Qn-Call Pavameni Markings Contract #2
STANI]ARDCDNSTRIICTION SPFsGIFICATiQN D(]CUMIIVT5 CiYyPrnjectNu�nUerlQ374Q
Revision: 8�3/'�21
oo7�oa-�
GENERALC013DITIONS
Page l5 of 63
canstruction to be employed by Cont7ractor and safety precautians and programs incident
thereto;or
2. other c#ata, interpretations, opinians and inf'ormation contained in such reports or shown or
indicated in such drawings; or
3. any Contraciar inierprel-ation of or conclusion drawn from any "�echnical data" or any such
other data, interpretations, opmions or information.
C. Contractor shall not be respon.sible For any Hazardous Environmental Candi�ion uncovered or
revealed atthe Site which was not shown or indicated in Drawi�gs or Specifications ar identified
in th.e Contract Documents to be wi�hin the scape of the Work. Confractor shali be respansible for
a Hazardous Enviro�unental Condition created with any materials brought to the Site by
Coniractar, Subcontractors, Suppliers, or anyone e�se for whom Contractar �s responsible.
D. If Contractor encounters a Hazardo�as Env�ronmental Condition or if Contracior or anyone for
whom Contractar is respansible nreates a Hazardaus Env�ronmental Condition, Contractar shall
itnmediately: (i) secure oz otherwis� isolate such condrtian; {u� stop all Work in conneation w�h
such condition and � any area affected thereby (except in an emergency as reguired by Pa�•agraph
6.17.A}; ar�d (iiij natiiy City {and promptly thereafter conf'�rm such notice in writing}. City may
consider Yhe necessity to retain a quaIified expert io evaluate such condition or take corractive
action:, if any.
E. Cantract�r shall not be required to resume Work ir� cont�ection wit1�. such condition or in any
affected area uniil after City has obtained any r�quired permits related thereto and del�vered wriiten
notice �o Cantractar: (i} specify�ng that such condition and any affected area is or f�as been
rencfered suitable for the resumption of Work; or (ii) specifying any special conditians under which
such Work may be resumed.
F. If after receipt of such vdritfien notice Cantractor daea not agree to resume such Work based on a
eeasonable beli�f it is unsafe, ar does not agreeto resume sueh Vi�ork urider sueh special conditiflns,
then City may order the portion of th� Woric that is in the area affectedby such cond�tion ta be
deleted frorn the Work. Cily tnay have sucl� deleted portion of the Work pez�£ormed by Ciiy's owr�
forees or �thers.
G. To the fullest extent permitted by �aws and Regulations, Contractor shali in�emn� and hold
harmless City, frorra and against all claims, costs, losses, and damages (includtng but not limited
to alI fees and eharges af engineers, archi�ects, attor^neys, and atherprofessionals and all court
or arbitration or other dis�pute resolution costs) a�ising out af or relating ta a HazaNdous
Environmental Condztion creatcd by Cont�actoroN by anyonefarwha� Cantracto� i.s respanstble.
Nothirag i�r this Paragraph 4. 06.G shall obligate Contractor ta rndertan� any individual o� entity
frorrr and against the cansequences of that individual's o�' entity's own �aegligence.
H. The provisions of Paragraphs 4.02, 4.03, and 4A4 do not apply to a Hazardous Enviror►menta�
Condition uncovered or eevealed ati the Si�e.
CITY QP FORT WORTH 2O20 On-Call Pevement Markings Contract #2
STANT��RDCONSTRUCI'IdN SPECIFICATi6N DQCUNfENTS City Pro{ecCNum6sr 103740
Revision: 823I1-0,2!
QD7200-!
GENERALCON�ITION 5
Page l6. of 63
ARTrCLE 5— B ONDS �ND IN�UR�NCE
5.01 Licensed Su�eties andlnsurers
5.02
5.03
Ali l�onds and insurance reguired by the Contract Docurr�er�ts ta be pu�•chased and maintained by
Contractor shall be obtained from surety or insurance co�panies that are duly licensed or autharized
ir� the State af Texas to issue bonds ar insurance polieies far the limrts and coverages so required.
�uch surety and insurance companies shall a�so meet such additional requirements and quaI�cations
as rnay be pravided in the Suppiementary Conditions.
Performcznce, �ayment, andNfaintenance Bonds
A. Contractar shall iurnish perfQrmance and payment bonds, in accordance with Texas Govarnment
Code Chapter 2253 or successar stattzte, each in an amount eyual �o the Cont�ract Prica as
seGurity far t4ie faithful performance and payment of all oi Cnntractor's obligations under ��
Con�ract Documents.
B. Cantractor shafl fuenish maintenance honds in an amaunt equal to the Contract Pr�ce as security
fio protect the City against any defects in any portion o� t�e Work descrbed in the Contract
Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final
Acceptance by Yhe City.
C. All bonds shall be in 1:he form prescr�bed by the ContractDocuments except as pravided atherwise
by Laws or Regulations, and shall be e�ecuted by such szareties as are named in the list of
"Companies Halding Certif'icates of Authnrity as Acceptab�e Sureties on Federal Bonds and as
Acceptable Reinsuring Ca�npanies" as published in Cucu�ar 570 {amer�ded) by the F�anciai
Managerz�er�t Serviee, Surety Bond Branch, U.S. Department of t�e Treasury. Ali bonds signed by
an agent or attorney-in-fact must be accompanied by a sealed and dated power o� attorney which
shaIl show that it is effective on the date the agant ar attorney-in-faet signed each bond.
D. Ifthe surety an any bond furnished by Contractor is declared b�nl�upt or becar�-ses insolvent or its
right to do business is terminated in the State of Te�s nr it ceases to meet �e requiremenfis of
Paragraph 5.02.C, Cantractor sha1� prompt�y notify City and shall, within 30 days after the event
giving rise to such not��ication, provide another bond and surety, both of which shall comply with
the rec�uirements oFParagraphs S.Oi and 5.02.C.
Certifica�es oflnsurance
Contractar shall deliver to City, wii-h copies to each additionaj �sured anef foss payee identiffed in the
Supplemeniary Condi�ions, certificates of insurance (othar evidence of insurance requested by Crty or
any other additional insured) in at least ihe mi�imum amount as specified ut �e Supplementary
Conditin�� r�vhich Contractor is reguired to purchase and ma�tain.
I. The certi�icate of insurance shall docu�nent the City, and ail identif'ied entities named 'm ihe
�uppiementary Conditians as "Additior�al Insured" on all liability policie�.
C1TY OF FORT WORTH 2O20 On-Cal l Pavement Ivlarkings Contract �!2
STAAlDARDCONSTRUCTi�N SPEC[FICATIOM DOCUM�I'1'S CityPro�ectNumher10374�
Revision: 8��3(l(121
QO7200-1
G�.NERAL CON41TlON S
Page 17oP63
2. The Contractor's genera� liability insuran�e shall include a, "per project" or "per location",
endorsement, which shall be identified in th� certifzcate of utisurance provided to the City.
3. The certiiicate shaIl be signed by an agent authorized to bind coverage an 4�ehalf afthe insUred,
be complete in its entirety, and. shaw coinp�ete i�surance carrier names as listed in the current
A.M. Best Property & Cas.ualty Guide
4. The insurers far all po�icies musi be lieensed and/ar approved to do busi�ess in the �tate of
Texas. Except for workers' compensati�n, alI insurers must ha�e a minimum rating of A-:
VII in the curreni A. M. Best Key R�ting Guide or have reasonably equivalent financial
strength and sol�ency to the satisiaction of Risk Management If the rating �s below �hat
required, writt�n approval of City �s required.
S. A!1 appfieable palicies shall include a Waiver nf Subrogation (Righ.ts of Recovery) in fa�ar
of th� City. In add�ian, ihe Cont�actor agrees to vvaive all rights of subrogation against the
Engineer (if applicable), and each additional ir�sur�d ider�tified in ihe Supplementary
Concirtians
b. FaiIure of the City to demand suc� eertificates or o�er evid�nce of full compliance �ith the
�surance requirements or failure �f the Ciry to identify a deficiency fram e�ridence that is
provided shall not be construed as a wai�er of Contraetor's obligation to maintain such line s
of rnsurance coverage.
7. If insurance palicies are not written for specif'ied coverage jimits, an Umbrelia or Excess
Liab�lity �ns�ance for any differences is required. E�cess Liabil� shaIl £o�low form of the
prii�nary enverage.
$, Un1es� otherwise stated, all required insurance sl�all be written on the "occurrence bas�s". jf
coverage is underwr�tten on a claims-made basis, the retz�oacti�e date shall be enincident with
ar prior to the date of the effective daie of the agreerr�ent and the certifcate of insurance shall
state that the coverage is cla.�tns-made and the retraactive date. The msurance coverage shall
be ma.inta�ned for the duration af ihe Contract and for three (3) years following Final
Acceptance provided under the Contract Dacuments or for the warranty period, whichever is
longer. An annual certifrcate of insurance submitted to the City shall evidence such
insurance coverage.
9. Po�icias shall have no exclusions by endorsements, which, neither nullify or arnend, the
required lines of caverage, nor decrease t�e limits o� said co�erage unless such endorsements
are approv�d in writing by the City. In the event a Gont�act has been bid or executed and the
excZusions are deterinined to be unacceptable or the City desires addztional insurance caverage,
and the City das�res the conti•actorlengineer to obtain suc� coverage, the contract price shall
be adjusted by the cost of fhe pre�nium far such addi�ianal coverage plus 10%a.
10. Any self-insured retention (SIR}, iri excess of $25,040A0, affecting required insurance
cnverage shall be approved by the Csty in regarefs �o as�et value and stocicholders' equity. In
CTT'Y OP FQRT W012TH 2O20 On-Call 1'avement Markings Contract #2
STANDAStDCON57'RUCTION SPECTFlCATI03J DpCUMENTS CityProjectNumber1037�30
Revision; 823�2021
oo7aoo-i
G�NERALCOiJQITION 5
Qage I 8 af 63
lieu oi traditional ins�ance, alternative coverage maintaineci through uisurance poo�s or risk
retention graups, must also be approved by Ci�y.
11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first-doli�r basis, must be acceptable to and approved by t4�e Ciry.
12. City, at its sole ciiscretion, reserves the right ta review the insurance requirements and ta
make reasonable adjustm�nts to msurance coverage's and their limits when d�emed necessary
and prudent by t11e City hased upon changes in statutory law, court decision or the c�.ims
history af the industry as well �s of fhe coniractir►g pariy to the City. The City shal� be required
to gravide prior notice of 90 days, and the ins�rance adjusi�nents shall be incorporated 'mto the
Work by Change Order.
I3. City shalj be entitleci, upon wrrt.ten request and wiEhout expense, ta receive copies af policies
and endorseznents thereto and may malce any reasonabia requests for deletion ar t•e�isinn or
inodifica�ions of par�icu]ar policy #erms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements ta the requirements of the Contract. Deletions, revisions,
or modifications shall not l�e required where pol�cy pra�isions are established by law or
regulations binding upon either party or the underwriter on any such policies.
14. City sha�l not be responsible far the direct paymen� of insurance prerruum casts for
Contractnr's insurance.
5.04 Coratractor's Insurance
A. Wopkers Compensation and Ernployers' Liability. Contractor shall purchase and maintain such
insurance coverage with limits eonsistent wiih statutory benefrts outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers'
Liability as is appropriate far the Work b�ing perfrormed and as will provide protection. fro�n claims
set for�h below which may ari�e out oi or result from Contractor's performance of tlae Work and
Contractor's ather obligations under the Contract Documents, whether rt�s to be performed by
Contractor, any Subcontractar or Supplier, or by anyane directly or indi�ectly ennplayed by any of
thern to perform any of the VG'ork, or by anyone for whose acts any of them may be iia6le:
1. clam�s under warkers' co�npensation, disability l�ene£'rts, and other similar employee benef�t
acts;
2. claims for dama.ges because of bodi�y injury, occupational sickness or disease, ar death of
Contractor's employees.
B. Commercial Gener�al Liability. Coverage shall include but not be �united to covering liability
(bodily injury ar property damage) arising £roin: premisesloperations, independent contractors,
products/coxnpleted operations, personai in�iry, and liabili�y under an insured contract. Insurance
shall be provided on an occurrence basis, and as compreh�nsive as the current Insurance Services
Office {ISO) pokcy. This �surance shalI apply as primary insurance with respect to any other
C1TY Or FORT W02TH 2O24 4n-Call Pavement Markings CoRtract #2
STAIVDARDCONS'fRUCTCON SPECIFIl:ATI43d DOC[JMENTS CityFrojantNLunber1Q3740
Revision: 8113/iA2f
oo7zoo-t
GEN�RALCON�ITION 5
Page l9 of 63
insurance or self-insurance programs affot�ded to the City. The Commercial General Liability
poiicy, shall have no exclusions by endorsements that would alter of null'�fy premises/operations,
productslcompleted operations, contracival, personal injury, or adver�ising inj�ary, which are
narmafly contained with tl�e poiicy, unless the City ap�roves sUch exclusions in vvriting.
For construction projects fhat present a substan�ial compfeted operation expasure, the Ci4y may
r�qui�e the cantractar to inaintairi co�npleted operatians coverage ior a minimum of no iess than
t,�ree (3) years foflowing the completion of the project (if identifed in the Suppletnentary
Conditions).
C. Aa�to�nobile Liability. A commercial business auta policy shall provide eoverage on "any auto",
defined as autos awned, hieed and non-o�ned and provide indeznnity for cla.itns for damages
because bodily injury or death of a,ny person and ar praperty dam:age arising out of the work,
maintenance or use of any motior vehicle by tY►e Contractor, any Subcontxactor or Supplier, or by
anyone directly or indirectly empioyed by any of them to perform any of the w'ork, or by anyone
for whase acts any of them may be liable.
D. Railroad Protective Liability. If any oi tY►e work or any warranty work �s vvithin the limits of
railroad right-of-way, the Contractor shai� comply with tl�� requireznents identif'ied in t1�e
Supplementary C�nditions.
E. Notification of Policy Cancellatian: Contractox shall itnmediaiely notify Ciry upon cance�Iation
or other loss of insurance coverage. Gon�actor shall stop work unti! rep�ac�ment insuran�e has
been procured. There shall be no time credif for days not worked pursuant to tivs section.
5.05 Accepiance ofBondsandlnsurance; Qption to 12eplace
If City has any ob�ection to the coverage af%rded by or other provisions of the bonds or �nsurance
required to be purchased and maintained by the Contractor � accordance with Artiele 5 on the basi�
af non-conformance rv�iih the Contract Dacuments, the C�ty shali so natify the Contractor in writing
within 1Q Business Days afterreceipt of the certificates {or oiher evidence requested). Cantractor shall
pro�ide ta the City such addiiional information in respeet of insurance provided as the City rnay
reasonably re�uest. If Contractar does not purchase or mainiain al� a� the bonds and insurance required
by the Gontract Documents, the C�ty shall notify the Contractor in wri�ing of such failure prior to the
start of the Worlc, or of such failure to rnaintain prior to any change in tl�e required coverage.
ARTICLE 6 — CONTRACTOR'S RESPONSIB�LITIE�
6.Q1 Supervision and�'uperir�tendence
A. Contrac�or slaall supervise, inspect, and d�rect the Work competently and efficiently, devoting
such attention thereto and applying such slciUs and expertise as may be necessary to perfarm the
Wark in accordance with the Contract Documents. Contractor shall be solely re�ponsible for the
means, methods, te�chniques, sequences, and procedures of canstruction.
CITY OP FQAT WORTH 2O20 On-Call I'avement Markings Contract #2
STANDARDCONSTRIICTION SPECIfiCATION DOCUM6NTS CiiyPrnjectNumberl.p3740
Revision: 823f1021
007200-�
GENERALCONDITION S
Page 20 of 63
B. At all times during the pro�ress of the Work, Conieactor shall assign a compet�nt, English-
speaking, Superintendent wl�o shall nnt l�e replaced wrthout written notice ta City. The
�uper�ntendent �vill be Contractor's representat'rve at the Site and shall have authority to act on
behalf of Contractor. All commurucation given to or recei�ed from the Superintendent shall be
binding an Contractor.
C. Contractor shaU notify the City 2�4 haurs priar to moving areas during the sequen.ce of construction.
6.02 Labor; WarkingHou�^s
A. Coniractar sha11 provide campetent, suitably qualif"ied personnel to perform consiruction as
required by the Con�•act Doeuments. Contractor shafl ai ail times inaintain good discipline and
order ai the �ite.
B. Except as otherwise reyuued for the safety or pratecfiioza of persons or the Work or prope�ty at
the Si�a ar adjac�nt thereto, and except as otherw�se stated in t�e Contract Documents, all Wark
at the Site shall be performed during Regular WorkYng HoUrs. Contractor will not permit the
performance of Work beyond Regular Working Haurs or far Weekenc� Working Haurs wi�hout
City's written consent (which �vill not be unreasonably withheld). Written request {by letter or
electronic communicaiion) to perform Worlc:
1. fnr beyand Regul�r Working Haurs request rr�ust be made by noon at least two (2) Business
Days prior
2. for Weekenci Warkar�g Hours requestmust be made by noon af t1�e preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
6.03 Services, Mat��ictls, a�ad Equipment
A. Ur�less otherwise spacif"ied iun the Contract Documents, Contractor shall provide and assume full
respons.ibility for all services, materials, equipment, labnr, transportation, construction equipment
and machinery, tools, appliances, fuel, povver, light, heat, telep�►one, water, sanitary faciiities,
temparary facili�ies, and all other facilities and incidenta�s necessary �ar th� performance,
Contracior rec�uued testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specif'ied,
shall be of good quality anci new, except as other�wise pro�ided in the Contract Documents, AlI
special warrantias and �uarante�s reqUired by the Specifications shall expressly run to tihe benefi�
of City. If required by City, Cont�actor shall furnish satisfactoiy evidence (including reports of
requued tests) as to the source, lcand, and quality of materials and equi�ir��nt.
CiTY OF FORT WORTH 2O20 On-Call Pavement Markings Contract #2
STANDARDCONSTRUC'CIOM SPECIFICATION DOCUMFN�I'S City Project Nutnber 1p3740
Revision: Sr2:�IZ(i21
oo�zoo-�
GEN�F�ALCON�ITION S
I'age 21 of 63
6.04
5.05
C. All material� and equipment ta be incorporated into the Work shall be stored, applied, installed,
connected, erected, protect�d, used, cleaned, anci canditioned in aecordance with instruciions of
the applicable SLtppl�er, except as otherwise may be provided in the Cantract Docurnents.
D. All items ai standard equiprnent ta be incorporated inio the Wark shall be the latest model a# the
time of bid, unless atherwise speciftad.
Proj ect Schedule
A. Contractor shall adhere to the Project Schedule establ�shed in accordance v,�ith Paragraph 2.Q7
and the General R�quirerr►ents as it may be adjusted from time to time as provided be�ow.
1. Cantractor shall submit to City for accepta�ce (to th� extent indicated in Paragraph 2.Q7 and
tl�e General Requ�ements) propased adjustments in the Projeci Schedule that witl not result
in changing the Contract Time. Such adjustments will comply with any provisions of the
General Requirements applicab�e thereto.
2. Cantractor shall submit to City a month�y Project Schedule witli a manthly progress payment
for the duration of the Coniract in accordance wikh the schedule specif�cat'rQn O1 32 16.
3. Propased adjustments in the Praject Schedule that will change the Contract Tirrie shall be
su�mitted in accordance with the requirements of Article 12. 14dju5tments iri Cantract Time
may only be rr�ade by a Change Order.
Substitute,s and "Or-Equals"
A, Whanever an item of material or equipment is specif"�ed or described in the Cantrae� Docuznents
by using the name ai a proprieta.ry item ar the name of a particular Suppiier, ihe spee�cation orr
descriptian is intended to cstablish tk►e iype, functiorn, appearance, and quality rec�uired. Unless the
specification nr description contains or is f�llowed by words reading that no jilce, equi�alent, or
"ar-equai" item or no sUbstitution is per�nitted, other i�ezns oi maierial or equiprr►ent of ather
Suppliers may be submitted to City for re�view under the c�rcurrastances describeci below.
1. "Or-Equal" Ite�tn,s: If in Ciiy's soie discretion an itetn of material or equipment proposeci by
Cont7ractor is functionally equal ta that named and sufficiently similar so that no change in
related Work will be required, rt may be considered by City as an "or-equaP' �tem, in which
case review and approval of the propo5ed item may, in City's sole discration, be accomplishe d
withoui compliance with some or all nf tt�e requirements for approval of propased substitute
items. Far the purposes of th�s Paxagraph 6.05.A. I, a proposed iterri of material or equiprnent
will be considered functionafly equai to an rtem so named if:
a. the City determ�nes that:
1) i� is at least equal in mafierials of canstruction, quali�y, durability, appearance,
strength, and design ch�.racteristics;
CITY OF FORT WORTH 2O�D On-Call Pavement Markinga Contract �2
5TANDARDCONSTRUCTION SPECIrICATION DOCUNIENTS Ciry k'rajeetltiIwnber 1p3740
Itevisi on: 8I131Z(7Ll
aa�zoa-i
GEi�ERAL CON4ITION 8
Page 22 of 63
2) it will reliably perform at least equally welI the iunction and achieve the results
imposed by the design concept of ihe completed Praject as a f�nctioning who.ie; and
3) it has a proven record of performance and availah�liiy of responsi�e ser�ice; and
b. Contraetor certifes thai, � approved and incorporaied into the Worlc
1) there will be no ir�cr�ase in cost ta the City or ir►crease in Contract Time; and
2) it will conform substaniially to the detailed requirements af' the item named in fihe
Contract Doeurnents.
2. Substitute IPern,s:
a. If in City's sole discretion an item of material or equipment propased by Cantractar does
no�t quali�y as an "or�equal" item under Paragrap�► 6.OS.A.1, it may ba subtx�.itted as a
proposed substitute i�em.
k�. Contractor shail submi� sufficient information as pro�ided belary to allow C;ity to deterinirie
�' the i�em of material or equipment propo�ed i� essentially equivalent to that nam�d and
an acceptable substitute therefor. Requests for review of propos�d su�stitute items of
material ar equipment wiU not be accepted by Crty from anyane other than Contractor.
c. Cnntractor shall make written application to City for review of a proposed substrtute item
of material or equiprnent thai Contractor seeks to furnish or use. The application sha11
comply with Section Ql 25 00 and:
1) shall ceztify tl�a�tY�e proposed substrtuie item will:
a) perfortn adequately the functions and achie�e t�e results called for by the general
design;
h) be sirnilar in substance to that specified;
c} be suited to the same use as that specifi�d; and
2) will stat�:
a) the extent, � any, to whieh the use of f,he prapased subst�tute zte�n w�I prejudice
Contractor's achievement of final cntnpletion on ti�ne;
b) whether use af the prt�posed substitute rtem in the Work will require a change ir�
any of the Contract Documenfi� {or in the provisions of any other direct contract
with City for ather work on the Projecf) to adapt tl�e design to �he proposed
substikute item;
C1TY 4F CORT WOfiTH 2Q2p Qn-Call Pauement Markings Coiitract #2
STANDARDCONSTRUCT[ON SPECIFiCAT[ON DOCllME1�IT5 Ciiy Projectl�Iumber IU374Q
Revision: 8rI.3/L121
oa �z na - i
G�NERAL CON�ITION S
Page 23 of 63
c) whether �ncorporation or use of the proposed substitute item in connecti�n with
the Work is suhject to payment of any license fee or royalty; and
3) will identify:
a) all variations of the prapnsed substi�ute item from thai specifizd;
b) available engineering, sales, maintenance, repair, and replacement services; and
4) s�all contain an rtemized estimate of al� costs or credits tl�at wil� re�ult directly or
indirectly from use of such suhstitute �tem, including costs of redesign and Darnage
Claims nf other cantractors afFected by any result�g ehange.
B. ,5uhsti.iute Constr�uciionMethods or Proceduf°es: If a. specific means, �nethod, technique, seguence,
or procedure of construction is expressly required by the Confxact Documents, Con:iractor rnay
furnish or utilize a substi�tute mean�, mefhod, technique, sequence, or procedure of constructian
approved by City. Contractor shall submit suffcient information ta allow Ciry, in Ciry's sole
discr�tion, to determir3e that th.e substi�ute proposed i� equi�alent to that expressly cal�ed for by
the Contract Documents, Gnn�ractor shall malce written appjica�ion to City far review in the same
manner as those provided in Paragraph 6.QS.A.2.
C. City's Eualuation.� City wi11 be allowed a reasonabl� time within which to evaluate each
praposal or submittal mad� pursuant to Paragraphs 6.OS.A and 6.OS.B. City rriay require Contractar
to furnish additional data abaui the pz•oposed substiiute. City will be the sole judge of acceptab�it�y.
Na "or�equa�" or substitute wiU be ordered, �stalled or utilized until City's reviery is Go�x►plete,
which r�ill �e evidencad by a Change Qrder it� the case of a substrtute a�d an accepted Submittal
for an "or-eqUal." City will advise Contractor in writing of its determinatian.
D. Special Guarantee: City may require Cantractor to furnish ai Con�ractor's ex�ense a special
perForman.ce guarantee, warranty, or oiher si.�rety with respect to any substitute. Contractor shall
inderranify and hold ha�nless City and an,�one di�ectly or indirectly errtployed by thenxfrom and
againstar�yandallclrxams, danurges, lossesandexpenses(includingattorneysfee.s}ari,singoutof
the use af substituted materials or equipment.
�,. City's CostReilnbu�sement: City vtiriil reco�d City's costs in evaluating a substitute proposed or
submitted by Contractar p�arsuant to Para�aphs 6.OS.A.2 and 6.�S.B. Whether ar nat City
appro�es a substitute s� proposed or submitted by Contractar, Contractor may be required to
reimburse City for e�aluating each such propo�ed �ubstitute. Contractar ��nay alsn be required ta
reim�urse City for ihe charges for malcing changes iri the Contract Dacuments (or in the provisions
af any other direct cnntract with Cityj resultitag from the accep�nce pf each prop�sed subsiitute.
F. Cont�-actor's Expense: Contractor shall provide ali data in support of any proposeci substitute or
"or-equal" at Contractor's expense.
C1TY OF FORT WORTI� 2Q20 fln-Call Pavement Markings Contr�ct#2
STANDARDCONSTRUCTEQN SP�C[AICATION DOCUM�iT5 CityPrajectMumhar1037�10
Revision: 8�L:i20z1
oo�aoa-�
GENERAL CONDITIQN S
Page 24 of 63
. i:
G. City Substitute Reirnbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be iricorparated to the Contract by Change Order.
H. 7'ime Exten�ions:No addi�ionai time will be granted for substitutions.
Conce�ningSubcont�actors, Suppliers, andOthe�s
A. Contractor sha11 perfat�m with his awn organizatian, wark af a value nat less than 3S°/p of �he
value e�nbracad on the Contraci, uniess otherwise appraved by the City.
B. Contractor shall not emplay any Subcontracior, Supplier, or other individual or entity, whether
�ni�ially or as a repl�cement, against whozn City may have reasonable objec�ian. Cont�actor shall
not be required to empIoy any Subcantractor, Suppfier, ar other individual or entity to furnish or
perform any of t�e Wark against wham Co�►tractar has reasonable objection (excludin.g those
acceptab�e to City as indicated �n Paragraph 6A6.C).
C. The Crty tnay fram time to time raquire the use of certain Subcon�ractors, Suppliers, or ather
indi�iduals or entities on the project, and will provide sLich requiraments in the Suppl�mentary
Cond'hions.
D. Minorily Business EnieYpYase Com�ltance: jt is City �oIicy 1:o ensure the full and equitable
participaiion by Mmornty Business �nterprises (MBE) in ihe procurement af goocis and sei�vices
on a contractual basis. If the Contract Documents provide for a MBE goai, Cantractor is requ�e d
to camply with the intent of trie Czty's MBE Ordinance (as amended) by the fol3awing:
1. Contractor shall, upon request by City, provide coznplete and accurate information regarding
actual vvork perforrried by a MBE on the Contract and payment therefor.
2. Contractor will not make addiitians, deietions, or substitutians of accepted MBE wiChout
rvritten consent of the City. Any unjustified change or deletion shall be a material breach of
Contract a�d may result in debarmen.t in accordance with the procedures outlined in the
Ordinance.
3. Coniractar shall, upan requeatby City, allow an audit and/ar examination of any books, records,
or files iri the possession of the Contz�actorthat vvill substantiate the actual �work perfarmed by
an 1VIBE. Material misrepresentation of any nat�re will be groun�s for terinination of the
Contract in accordance vvithParagraph 15.02.A. Any such rxaisrepresentation ma}� be grounds
for dasqualification of Contractor to bid on future contraets with the City for a period of
not iess than three years.
E. Contractor shall 'be iully r�sponsibie to Crty for al1 acts and omissions of the �ubcontractors,
Suppliers, and other individuals or enti�ies performing or furnishing any of the Work just as
Contractar is responsibie far Cantractor's awn acts and omissions. Noihing irt the Contract
D ocumants :
CITY OF FORT WORTF3 2420 On-Call Pavcment Markings Contract #2
STANDARDCONSTRUCTIDN SPEC[FICAT[ON DOCUMF�TS CityProjectNum6er103740
]Zevision: 8�13/1021
oonoo-i
G�NERALCONDITIQN 5
Page 25 of 63
6.07
1. shall create for the benefit of any sUch Subcontractor, Supplier, or other individual or entity
any contractual relatianship 6etween City and any such Subcontractor, Supplier or other
individual or en�ity; nor
2, shall create any obligation on the part af C'ity to pay or to see to the payment of any inoneys
due any such Subcontractor, Supplier, or other i�dividual or entity except as may atherwrs� be
requued by Laws and Regulations.
F. Contraetor shall be solely respansible for scheduling ancf caoxdinating the Work of �ubcontractars,
Suppliers, a�d other individuals or entities perfarming or furnishir�g any of the Worlc under a direct
or indirect contract with Contractor.
G. A11 �uhcontractors, Suppliers, and such ather individuals ar entities performing or furnishing a�y
oi the Worl� shall cniYurnanicate wrth City through Contraetor.
H. All Work performed for Contcactor by a Subcantractar ar Supplier will be pursuant to an.
appropriate agreernent betiv�en Contractor and the SubcontractQr or Supplier which specif�cally
l�inds the Subcontractor or Supplier to the applicable terms and conditions of the Cantraci
Document,s for the benefit of Ciry.
Wage Rates
A. Duty to pay Prevailing Wage Rate,s. The Contrac�or shall comply with alI rec�uireznents af
Chapter 2258, Te�cas Go�er�meni Code (as amended), inclucting the payment oi not less tI�an the
rates determined by tha City Cauncil of the City Qf Fnrt Worth ta be ihe pre�ailing wage raies in
accardance vvith Ghapter 2258. Such prevailing wage rates are included in these Contract
Document�.
B. Penalty foY Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand inade by the Gity, pay io ihe City $60 for each waricer employed far each
calendar day or part of the day �hat the warker is paid less than ihe prevailing wage rates stipulated
in these contract doeuments. Thi� penalty shall be retained by the City to offset its administrativ�
costs, pursuant to Texas Go�ernment Code 2258.023.
C. Complaints of Violations and City Determrnataon. of Goad Cause. On recejpt of information,
including a complaint by a worker, concerning an alIeged vioiation of 2258.023, T�xas
Croverrnnent Code, by a Cor�fracior or Subcontractor, the City shall malce an initial
detet'mination, be�ore the 3l st ciay after the date the City recei�es the infortnation, as to whether
good cause exicts to believe that ti�e rriolation accurred. Th.e City shall notify in writing the
Coni-�actor or 5ubcantractar and any affected wQrl�er of rts iniCial determination. Upan the City's
determiriatian that there is good cause to believe the �ontractor or Subcontractnr has violated
Chapter 2258, the City sha�l retain the full arnounis claimed by the c�aitraant or clai�nants as the
difference hetweenwages paid and vvages due under the prevaiJing vvage rate�, such amnunts being
subtracted �rom successive pro�ress payrnents pending a final determi�atiQn of the violation.
CITY OF PORT WORTH 20?0 On-Call Pa�ement Markings Confract #2
STANDAIZDCOIV3TRUCTIQN SPEC1PiCAT1QN DOCUML�NTS GityProjectNtunber1037Ap
Revisian: 62�1
Ofl7200-1
GENERALC(I�IdIj10N 5
P age 2b of fi3
6.as
D. AYbitrc�tion Requi�ed if Violatio�a Not Resoivea'. An issue relating to an alleged vivlation of Section
225$.023, Texas Government Code, ineluding a penalty owed to the City nr an affected worker,
shail be submitted to bincfi�g arbitration in accordance with the Texas Gen�ral Arbitration Act
(Article Z24 et seq., Rev�sed Stat�xtes) if the Contractor or Subcontractor and any a�Fected worker
does not resolve the issue by agreementbefore the 15th day afterthe date the Czty makes its initial
determinatian pursuant to Paragraph C abcjve. If the persons required to arbitrate under this
�ection do not agree on an arhitrator be�ore the i lih day aiter the date that arbitration is requir�d,
a disirict court shall appoint an arbitrator on the peti�ion of any of the persons. The Ciry is nat a
party in the arbitra�ion. The deeisifln and award of the arb�trator is iv�al and binding on all parties
and may be enforced in any court of competent jurisdiction.
E. Records to be 1Vlaintaaned. The Contractor and each Subcontracior shall, for a period of �hree (3)
years fallowing the date of acceptance of the worlc, maintain records that show (� the name and
occupati�n of eachworker employed by the Cantractor in ti�e construction of the Wnrk provided
far in t�is Coniract; and (ii) t11e actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by ii�:e City. Tha provisior� of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
�`. I't�ag�es.s Payments. Wrth each progres� payment or payroll period, whichever is less, the
Contractar shall submit an affidavit stating thattl�e Gantractor has complied with the requirer�ent�
of Cha�ter 2258, Texas Goverrunent Code.
G. Posting of Wage �aies. The Confiraetor sk�all post prevailir�.g wage rates ir� a conspicuous place at
all tirnes.
H. Subcont�acto�'Compliance. The Contractor shall include in its subcon�'acts and/or shall
otherw�se require all of �ts Subcontra�tors fio comply with Paragraphs A thraugh G above.
Patentl'�es at�d Royalties
A. Contractor shall pay all license fees and royalties and assume al� casts ineider�t to the use in the
perfarmance of the Work or the incorporation in ihe Work nf any invent�on, dasign, process,
praduct, o.r device which i,s the subject of patent rights or copyrights held by others. If a particu�ar
inventian, de�ign, process, product, or device is speciiied in the Contract Documents for use in the
performance of the Work and if, to the actuallrnowledge flf Ci�y, its use is subject to patent rights
or copyrights calling for the payment of any license fee or royalty to oth.ers, the existence of such
rights s�aIl i�e disclosed by City in the Contract Doc�.u�nents. Failure of the Ciry to disclose such
in%rma�ion daes not relie�e the Contractor firam its ol�ligations to pay for the use of said fees or
royalties to others.
B. To the fullest exfent permitt�d by Laws and Regulations, Contracior shald indemn� and hold
har�nless City, fNom a�ad againstall claims, costs, losses, and darnages (incl�rding but not lirnited
to all fees and charges of engineers, architeets, attorneys, and othe� p�ofe,s�ionals and all court
oY arbit�atio�a or othe� dispute resolution costs} arising out of o� relating to any znfi�ingement of
patentrights or copy�ights incident io the use in the perfortnance of the WoNk or resultingfrom
CITY OF FO[�T �JORTH 2420 On�Call Pavement Markings Contcact #2
STANDARDCOIVSTRlICT]ON 5PECIF[CAT10N DOCUMENTS City Pro}ectNarnbez' ]03740
Revision: &jL3i1(12]
oo��oo-�
GEN�RAL CQN� ITION 5
Page 27 of f 3
the incorporcrtion in ihe Work af any inverrtion, design, process, product, or device notspecifed
in the Cortt�^act�7acuments.
6.09 Permrts and Utilities
A. Cont�actor obtaxn�d permiis and licenses. Contractor sha�l obtain and pay fnr all c4nstruction
permits and licenses except those provided far in tlte Supplementary Conditions or Contract
Docum�nts. City shall assist Contractor, �when necessary, in abtaining such pe�•mits and licenses.
Contraetor sl�all pay all governmental eharges and inspection fees necessary for the prosecuiion of
the Warlc which are applicable at the tune oi apening af Bids, or, �f there are no Bids, on the
Effective Date of the Agreement, e�cept for permits provicied by the City as specif'ied in 6.Q9.B,
City shall pay all charges of ut�lity owners far connectians far providing permanent service to the
WorIt.
B. Cafy obtainedper�nitsand licen.s�s. C�ty will obia�n and pay far all permits and Iicenses asprovic�ed
far iri the Supplemeniazy Canditions or Contract Documents. It will be the Contractor's
responsibiliry to carry out the provisions of the permit. If the Contractor init�ates changes to the
Contract and the Ciiy approves the changes, the Contractor is responsible for obtaining clearances
and coorcimatin� with the appropriate regula�ory agency. The City will not reimburse the
Contractor for any cost associated �vith these requirements of any City acquired permit. The
following are permits f.he City will obtain if required:
1. Texas Departinent ofTransportation Perrnits
2. U.S. ArmyCorps of Engineers Permits
3. Texas Commission on Environmental Quality Permits
4. Railroad Company �'ermits
C. Outstanding pe�^mits and licenses The City anticipates acquisition of and/ar access to permits
and licenses. A�y autsfianding permits and licenses are anticipated to be acq�ired in accordance
vvith the schedule set forth in the Supplem�ntary Conditions. The Project Schedule submitted by
the Contractor m accQrdance witl� tlle Contract Documents must consider any outstanding permits
anci licenses.
b.10 La�s and Regulatians
A. Contraetor shall give all notices rec�uired by and shall cornply wrth aIl Laws and Regulations
applicable fo the perfoi°rr►ance nf the Work. �xcept where niherwise expressly required by
applicable Laws ar�d ReguIations, th�e City shajl not be responsib�e f�r monitoring Contractor's
compliance vcrith any Laws ar Regulations.
B. If Contractar performs any Work knowing or having reason tn Icnow that it is contraiy to Laws or
R�gulations,. Coniraetor shaIl bear al! clainas, costs, �osses, and damages (�cluding but not limited
to all fees and cl�arges of engineers, architects, attorneys, and ati�er pro�essiona�s and all
CiTY OF FORT WQRTH 2O20 On-Call YavemenY Markings Conlraet #2
STANI7ARDC01VSTAUCTION 5P&CIFICAT]ON DOCi1MENT5 City PmjecYNumber 103740
Revisinn: 8fi311i121
O.D 72 OU - i
GENERALCON�{T10�35
Page 28 0€ 63
court or arbitratton ar other dispute resolution costs) ari�ing out of nr re�ting to such Work.
However, �t shall not be Contractor's responsibility tn malce certain that the Speci£'icatians and
Drawings are in accordanoe vvith Laws and Regu�ations, but �his shall not reIieva Contaractar of
Contractor°s obiigations under Paragraph 3.02.
C. Change.s in Lavvs or Regulations not lcnown at the tirne of opening of Bids having an �ffect on
the cost or tnne of performance of the Wnrk may be the subject of an adjustrnent in Cantract Price
or Contract Time.
6.11 Taxes
A. On a contract awarded by the City, an or�anrzation which qualifes iar exemption pursuant to
Texas Tax Code, Subchapter H, Sections 151.301�335 {as amended), the Contractor may purchase,
rent or lease all materials, supplies and egu�pmant used or consumed m the performance of this
cantxact by issuing to his supplier an e�emption certificate in lieu of the ta�, said exemQtion
certificate to comply witla State Comp�'aller's Ruling .007. Any such exemption certiiicate issued
to the Contractor in IieU of the tax shall be subject ia and shail comply with the provision of State
Comptroiler's Ruling .011, and any other applicab.le rulings pertaining to the Texas Tax Cade,
Subchapter H.
B. Texas Taz�pei-rnits and information may be obtain�d from:
l. Comptrol�er af Public Accaunts
Sales TaxDivision
Capitol Staiion
Austin, TX 78711; or
2. k�ttpJ/wr�vw.window.state.tx.us/taxinfa/ta,�'orms/93-farms.html
G.I2 Use of Site and Oth�rAreas
A. Limitation on Use of Site and OtherAYeas:
1. Contractor shall cor►f'�ne constructian ec��aipment, the storage of materials and equipm�nt, and
the operations of workers to the Site and other areas permitted by La.ws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equi�rnent or other
materials or equipment. Contracfor shall assurne ft�ll responsibility for any damage to any such
�and or area, or to the owner ar occupant �hereof, or of any adjacent land ar areas resultirig
from the performance of the Wnrk.
2. At any ticne when, in the judgment of the City, tI�e Contractor has obstructed or closed or is
carrying on operations in a portion
necessary for proper execution of ih
section on which operatians are iin
area of the Site.
C1TY �F FORT' WORTH
STANDARDCt7tVSTRIiCTiON SPECIrICAT]ON DOCLTMENTS
Revision: 8�L'i�21
of a street, right-of way, ar easement greater than is
e WarIc, the Ciry �nay rec�uire the Cantractar to fmish the
progress before work is commenced on any addil:ional
202U On-Cal1 Pavement Markings Contract #2
City Project Number 1U374U
00 72 0p -1
GENERALCONDITION 5
Psge 29 of 63
3. S�ould any Damage Claim Y�� made by any such ownei° or occupant because of the perform.ance
of the Work, Con�ractor sha11 pramptly attempt to resolve the Damage Claim.
4. Pursuantto Paragt�aph 6. Z.l, Contracto� shall indemnify and hold harmless Ciiy, from and
againstall claims, costs, losses, and dama�es arisingout of o� relating to any clairrz or action,
legal oN equatcrble, bpought by any such owne� or� occupant against City.
B. Renaoval of Debris Du�ing PeNfo�rrcanee of tk�e Work.• During the progress of ihe Wark
Contractor shall Iceep �e Site and otl�er areas free from accuml�latzons of waste materials, rubbis h,
and other debri�. Remova! and disposal of such waste materials, rubbish, and other debris shall
conform io applicable Laws ar�d Regulations.
C. Stte 1V�'ainte.nance Cleaning: 24 hour� after written notice is gi��n to the Contractor that ihe
eIean-up an the Job sita is proceeding in a manner unsatisfactory to the City, if the Contractar fails
ta aorrect i:he unsati�factory procedure, the City may take such direct action as the City deems
appropriate to correct the cl�an-up deiiciencies cited to the Contractor in the written n.atice
(6y �etter or eIactronic co�nmunication), and the cost�s of such direct action, plus 25 % of such
costs, shall be deduci�d from fhe monies due or to become due to the Cantrac�ar.
D. Final Site Cleaning: Prior to Final Acceptance of th.e Work Conf,ractor shall clean the Site and
the VVork and rnake i� ready for utilization by City or adjacent property owner. At the completion
of the W�rk Cont�actor shaIl remave froin the Site all tools, appliances, construction ec�uipment
and machir�ery, and surplus materials and si�all restore to originaj condition ar better all property
disturbed by the Wor�t.
E. Laading Structures: Contractor shall not laad nar permit any part of a�y structure to be loaded
in any manner �at will endanger the structure, nor shall Contraciar subject any part oi the Wark
ar adjacent praperty to stresses or pressures that will endanger it.
6.13 Record Documents
A. Contractor shall maintain in a safe place atik�e Siee or in a place designated hy the Contractar and
approved by the Ciry, one (1) record copy af a11 Drawings, Specifications, Addenda, Change
Orders, Fie1d Orderrs, and written interpretations and clarificaiions in good order and annotated to
show changes made dur�r�g eonstruction. Thes� record dacuments together with alI approved
Samples and a eo�nterpart of aIl accepted Subinitta�s will be available tn City for reference. Upon
completion of the Wark, these record documents, any operation and maintenance manuals, and
Submittals will be delivered to City priar ta Final Inspection. Contractor shall include accurate
locatians for buried and nnbedded items.
b.14 Safety and P�otection
A. Contractor shall be sakly responsible for initia.ting, rnaintai�tiing and supervising all safety
precautions and programs in connectian with t.he Work. Suc� responsibility daes not relieve
Subconfractors of their responsibility for the safety of persans or property in the performance of
their worlc, nor for complia�ce with applicable safety Laws and Regu�.tions. Cont�actor shall
CiTY OF FORT WORTH 2D20 On-Call Pavement Markings Contraci #2
STANDARI]CONSTRUCTION SPLCIFICAT[ON DOCI7MENTS CityProjeefNumber103740
Revision: SI23l1021
oonoo-i
G�NERALCONDITION S
Page 34 of 63
6.15
b.1b
6.17
take all necessary precautions for the safety of, and shall provide the nece�sary proteetion to
�revent darnage, injury or loss to:
1. all persons on the Site or wna may be affected by the Work;
2. all the VVork and materials and equipment to be incarporated therein, whether in storage an
or off t�e Site; and
3. other property at ihe Site or adjacent thereto, including t��e�s, shrubs, lavvns, walks,
pa�ements, roadways, structures, utilities, and Underground Facili�ies not designated for
reinoval, relona�ion, or repl�cement in the course of construction.
B. Contracior sha11 comply with all applicable Laws and Regulatians relating to the safety af
persons or properly, or to the proiection of persans or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protaction. Cantractor s�.all
notify owners of adjacent property anci of Underground FaciIities and �ther utility awners vvhen
prasecution of the Work rnay afFeet t11em, and shall cooperaie with them �n the protection,
remowal, relocation, and r�placement di their property.
�. Contractor shall coinply witli �he a.pplicable requirennents af City's safety programs, ii any.
D. Contractor shall inform City of the spec�c requiraments af Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Srte.
E. All damage, injury, or loss to any property referred to in Parag�raph 6.14.A.2 ar 6.14.A.3 caused,
directly ar indirectly, in whole or in part, i�y Contractar, any Subcontractor, Supplier, flr any other
individual or ent�ty directly or indirectjy emplayed by any af them to perform any of th:e Worlc,
or anyane for whose acts any of them may be liable, shall be remedied by Contractor.
�. Cont�actor's duti�� and responsbilities for safety and for protection af the Work shall continue
un�i1 such tsme as all the �Vorl� is completed and Ciry has accepted ihe Work.
Safety .Representativ�
Contractor shall inform City in writing of Can�ractor's designatad safety representative at �he Site.
Haza�d Co�tmunicationP�ograms
Contractar shall be responsible for aaordinating any exchange of material safety data sheets ar other
hazarci communication information required to be made available to or excY�a.nged between or among
employers in accordance with Laws or Regulations.
Emergencies and/oN Rectif cation
A. In emergencies affectu�g the safety or protection of persons or the Wnrk or property at the Site or
adjacent tl�ereto, Contraetar is obligated to act ta prevent threatened damage, injury, or Ioss.
Contractor shall give City prompt written notice if Contractor believes tihat a�y significant
CITY DF FORT WOItTH 2O2U dn-Call Pavement Markings Contract #2
STANDARDCONSTRUCTCQN 5PE[:LFICAT[OM DOCUMENTS City ProjectNumber 103740
Revision: 8�'�21
0072D0-]
GEFlEF2ALCONDITION S
1'age 31 of 63
changes in the Worlc or variations from the Cont�•actDocuments have been caUsadthereby or are
required as a resUlt thereof. If City determines t4�at a change in t�e Can�ract Dacumenls �s �•enuire d
becayse af the action taken by Cantractor in response to such an emergeney, a Change Order �rx�ay
be issued.
B. Should the Contractar iail to respond to a request fram the City to rectify any discrepancies,
om�ssions, or correction necessaryta confnrm with the requiremen� af the Contraet Documents,
the Ciry shali give the Contractor writ�en: notice that such worlc or changes are ta be perfarmed.
The written natice shall direct attention to the discrepant conditinn and request the Coni��actor to
talce remedial action to correet the cQndi�ion. In the �vent the Caniractor does not take pc�srtive
steps to fulf'� tivs written re�uest, or does not show just cause fot not iaking the proper action,
within 24 hours, ihe City may take such remedial action v�ith City forc�s or by contraci. The City
shall deduct an amount equal to the ent�re cosis for such remedial act�an, plus 25%, from any
funds due or becorne du� tl�e Contractor on the Projeci.
6.18 Submittals
A. Contractor shall submit reQuired Submittais to City far review and acceptance in accardarice
with t�e �ccepted Schedule of Submittals (as requirecf by Paragraph 2.07). EacY� submittal will be
identified as City may require.
l. Submi� number of copies spec�ied in khe Genera�Requuements.
2. Data shown on the Submitta� wiil be complete with respectto quanti�ies, dimensions, spec�'ied
performance and design criteria, maierials, and si�nilar data to shaw City ihe services,
rnateria�s, and equiprnent Contractor proposes tn provide and to enable City to review the
information for the linnited purposes required by Paragra�h 6.1$.C,
3. Submit�als subrnitted as herein provided by Contractor and reviewed by City for
confarmance with the design concept shall be executed in conformity with the Cantract
Docum.en�s unless otherwise requ�red 4�y City.
4. When Suhrz�ittals are sUbmitted f�r ihe purpose of showing the installation ica greater deiail,
their re�iew shall not excuse Contractor from requirernents shown on the D�•aw�gs and
Specifcations.
5. For-Info�nation-Only submittals upon whieh the City is nQt expected io conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit requued number of Samples specified in the Specifications.
7. Clearly identify each Sample a� to material, Suppfier; pertiu�ent data suoh as cataing nurzi.beis,
t�e use for which intended and other data as City may require ta enable City to review the
submittal for the limited purposes required by Paragraph 6.18.C.
CITY OF FORT WORTFI. 2020 Dn-Cal] Pavernent Markings Contract #2
STANDARDCONSTRUCTIpN SPECIFICATIOP DOCUMENT5 CityQrojeetNumberl0374Q
Revision: 8�131�021
aa�zoo-i
C�ENERALCONDITION 5
Page 32 of 63
B. Vtilhere a Submittal is requued by the Contract Documents or the Schedule of Submittals, any
related Work performed priar to City's review and acceptance of the periineni submittal will be
at the sole expense and responsibility of Contractor.
C. City's Revrew:
l. City wiU pro�ide tunely review of required Subrnittals in accnrdance with tl�e Schedule of
Submittals acceptable to City. City's review and acceptance will be anly to determine if the
rtems covered by the submittaL� w�ll, after installation or incorporation in the Wor�, eonforin
to the information given in the CantractDacuments and be comp�tible wil-h the design co�cept
d�the completed Project as a functioning whole as indicated by the Cantract Documents.
2. Ciry's re�ievv and acceptance will noi extend to means, methads, techniqLies, sequences, or
procedures of cnnstructian (except where a particular means, n�ethod, technique, sequence,
or procedure of cdnstru�tian is specrf'ically and expressiy calIed for by the Confrract
Donuments) or to safety precautians ar programs incident thereta. The review and acceptance
of a separa�e item as such will not indicate appro�val of the assemb�y in which the item
functions.
3. City's review and aeceptance shall noi r�lieve Cantractor from responsibilit� for any
variaiian from the requiremen�s of the Conf�act Documents unlcss Contractor has comp�ied
with the requ�rements of Section O1 33 00 and City has given writ�en accep�ance of each
such variation by �pecif'zc written ncrtation thereof incorporated in or accorripanying the
Submittal. Ci�y's review and acceptance shall not relieve Con�ractor from responsibility for
complying with the requirements of t%e Contraet Documents.
6.19 Continurng the Work
Except as atherwise provided, Contractor sl�all carry on the Work and adhere to the Project Schedule
during a11 disputes or disagreertlents with Ciky. Na Work sk�all be delayed or pastponed pending
resolutiion of any disputes or di�agreements, except �.s City and Contractor may othez�wise agr�e in
writing.
6.20 Cont�acto�'s Gene�al Wa�ranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance wi�h �e Contract
Documents and will not be defective. City and i�s o�'�cers, direc�ors, members, partner�,
employees, agents, consultants, and subcontractors shall be entitled ta rely on represeniation of
Cvntraciar's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
l. ab�ase, modif'tcation, or improper maintenance or operation by persons oth�r than Contractor,
Subcontractors, �uppliers, or any other individual or entiity for whom Contractar is
cesponsible; or
CITY OF P'ORT W�RTii 2020 On-Call Pavement Markings Contract #2
STAIVDAR.DCONSTRUCTION SPL'CIFICATION DOCLTMEI�TS CityPrajectNumber1D374�
Kevision: $�1.(TLl
OD 72 U0 - I
G�NERAL CONDITION S
Fage 33 of 63
2, normal vvear and tear under normal usage.
C. Contractor's obligation to perfnrm and compl�te the Work in accardance with the Cantract
Documents shal� be absolute. None nf the fallowing will constitute an acceptance of Work that is
not in aceordance with the Contract Documents or a release af Contractor's obligation ta perform
the Work in accordance with the Contract Documents:
1. observations by Czly;
2. recommendation or payment by City of any progress ar final payment;
�. the issuance af a certif'icate of Final Acceptance by City or any payment related t��reto by
��Y�
4. use or oceupancy of the Work or any partthereof by City;
5. any review and acceptance of a Submittal by Crty;
6. any inspectian, test, or approval by others; or
7. any oarrection of defe.�tive Work by City.
D. TY�a Contractar s�all remedy any defects or damages in the Work and pay for any damage to
other work ar property r�su�ting therefrom vwhich shall appear with�n a periad of two (2) years
from �he date of Final Acceptance of the Work unless a langer period is s�eeifted and sha�l furnish
a good and sufficient rnaintenance bond, complying wit�► the requiremenfis of ArticlE
5.02.B. The City wi� give notice aiobserved defects wrtl� reasonable prnmptness.
6.21 Indem�►rfication
A. Contractar eovenants anci agrees ta indemnify, hold �armless and defend, at its awn
expense,the City, its officers, servants anc� ean�loyees,from and against any and a11 claims
arising out of, or al�eged to arise out of, �he work and services to 1�e �erforimed by the
Contractor, its o�ce�, agents, employees, subcontractors, licenses or inviiees under th9s
Confiract. THI� TNDF.MNiFT ATION PRO'V�SION � SPEC'IFICAI.LY TNTFNDED T()
OPFRAT D BF EFF+'FC'_TNF EVE7�T_ D+_IT IS Ai I�F[7ED OR P OV�,N THAT Ai.i,
(�R SOMF OF THF I?AMAC'YFS BElNfT SQi1GHT WF,RF CAUSED. IN WH[IT.F, !OR 1N
P RT RY ANY ACT OMISSI[lN (lR_ EGLiGENG�_ THF C."iTY. Thi� indemnity
provision is intended to include, �rr�ithout limitation, indemnity for costs, expenses and legal
fees incurred �y tE►e City in defending against such claims and causes of actians.
B. Cantractorcovenants and a�rees to indemmify and hold harmless, at its ownex�ense, the Ci�,
its officers, servants and employees, from and agairist a�ny and all loss, damage or destructiz►n
of property ofthe City, a�-ising out of, or alleged io arise out af, the vvork and services to l�
performed by the Contractor, its offieers, agenfs, employees, subcontraetors, liceasees or
invitees uuder t�is Contract. THIS INDEMNIFICATION PROVI�SI.OlY _I�.
C1TY OF FORT WORTH 2O2D On-Call Pavemant Markings Contract #2
STA�TDARDCONSTRi1CTI0N SPECIflCATION T�C?CUMENTS CityPiojectNumber1Q3740
Revision: 8r?.3l�021
o.a �z ao - i
GENERALC013dkTI0N S
Page 34 of 63
6.22
6.23
' : \ \1_1 1 �' �:--- `�1 i_ 1 _/ � 1 -
� - - - � � _► � ► 1 / \ ._ -_ _ _I_ : . � U- - 1 -' - - f :_ IL =- -'- - 1 _ 1 . fl _
.� � r .�. i _ _ � � ► '_,_ : _ : � � _ =- - - � ►i _ _ � ► � ;,
►__ _ � �_ --�-
Delegation of Professional Design Services
A. Contractor wiJ] not be required to pro�ride professional design services unless such services are
specificaily required by th� Contract Document� fox a portion of the Work ar uriless such ser�ices
arerequired to carryout Cantractor's responsibilities for const�uction means,methods, techniques,
sequences and pracedures.
B. If professianal design services ar certif'ications by a design p�o�essionaI related ta systems,
materials ar equiprr�ent are specifically required of Coniractor by the Contract Dacuinents, City
will specify au perforrnance and design criteria that such services must satisfy. Car►tractor shall
cause such services or certificatians to be pravided by a properly l�censed prafessional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Wor� designed ar certif'ted by
such professional, i£ prepared hy others, shaU bear such professianal's written approval when
subm�ed to City.
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or appro�als performed by such ciesign professionals, provided City ha5 specified
io Cont�aetor perfarmance and design criteria that such seraices must satisfy.
D. Pursuantto this Paragraph 6.22, City's review and acceptance af design calculaiions and d�sign
drawings will be oniy for the limited purpase of checking %r canforrnance with performance and
design criteria. given and the design cancept expressed 'ua the Contract Documents. City's review
and acceptanc� of Submittals (exaept design calculaiions and design drarvings) wi� be only for
tiha purpose stated in Paragraph 6.18.C.
�ight ta Audit
A. The Contracinr a�rees that the City shall, uniil the expiration of three (3) years after final
paysnent under this Contraet, have access to and the right to examine and photocopy any directly
pertinent boolcs, c�ocuments, papers, and records o� the Contractox in�alving transactions rel�ting
to this Cantract. Cantractar agrees that tlze City shall have acc�ss dur�ng Regular Working Hours
to all necessary Contractor facilities and shall be provideci adequate and appropriate worlc space
in order to conduct audits in cornpliance with the prov�sions of this Paragraph. The City shall
give Contractor reasanahle advance notice of intended audits,
B. Contractor further agrees to include in alf its subcantracts hereunder a provision to the effect that
the subconiractor agrees that the Ciry shall, until the expiratinn of three (3) years after fmal
payment ►ander this Coniract, have access to and the right to examine and photocopy any directly
p�rtinent boaks, documents, papers, and records of such Subcontractor, involving transactions to
the s�bcantracf, and fiicther, that City shall ha�ve access during Re.guIar W�rking Hours to all
C1T�' OF FORT W�RTH 2O20 On-Call Pavement Markings Conlract #2
STANDARDCONSTRUCTIpN SPCCIFICATIflN �QCUMENTS CityProjectNumberiD374D
Revision: �+23/1021
00720D-I
GENERAL CONDI7{ON 5
Pag� 35 of 63
Subeontractor faciiities, and shall be provided adequata and appropriate worlc space in order to
conduct audits iti cornp�iance with t�►e provisions of ihis Paragraph. The City sha1� give
Subcontractar reasonable advance natice of intended audits.
C. Contractor and Subeontractor agreeto pnotocapy such documents as may be requested by the City.
The City agrees to r�imburse Confiractor far the cost of the capies as follovvs at the rate p�ablished
in the Texas Adr�mistrative Code i� effect as of the time copying is performed.
b.24 Nondiscrimination
A. Ti�e City is responsible for operating Pubjic Transportation Programs and implementing transrt-
related projects, which are fu�ded in part w�ih �'ederaI �'inancial assistance awarded by the U.S.
Department of Transpartation and the Federal Transit Adm.if�istraiion (FTA), wiihout
discrimiriating against any person in the United Staies on the basis af race,color, or national origin.
B. Title VI, Civil Rights Act of 196� ces anaended.� Contractor shal� comply with the reauiraments of
the Act and the Regulations as further dafined in the Supp�ementary Condi�ions for any project
receivirig Federal as,sistance.
ARTYCLE 7-- OTHER WORi� AT THE SIT�
7AI Related Wo�k atSite
A. City may perfnrm other work related to the Project at the Site with City's einp�oyees, or nther
City contractnrs, or thraugh other direct cantractstherefor, or have other worlcperfarmed by utility
owners. If such other work is no� noted �n the Con�ract Documen�s, tI►en written notice thereof
will be gi�en to Contractor prior to star�ing any such other r�ork; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, ir� City is performing other work wii}� City's employees or oth�r City contractors,
proper �.nd safe access tothe Site, grn�ide areasonable opportuniiy for th� introduction and starage
of materials and eq►aipment and the execution of such other worl�, and properly coordinate the
Work with theirs. Contracior shall do all cutting, fit�iu�g, and patchuag of the Work that may be
required to praperly connect or atherwi�e mak� its se�eral parts corne tagether and proper�y
integrate with su�h other work. Contra�tor shall not endanger any woric Qf others by cut�ing,
exca�atin�, or atherwis� alteritig such vsrork; pro�ided, however, that Contractor may cut or alter
others' worlc vvith tne written consent af Ciry and the others whose warIc will be affected.
C. Ifthe proper execution or results of any part oF Cnntr�.ctor's Work depends upon work perf'o�ned
by others urider this Ar�icle 7, Cantractor shall inspect such other work and prornptly report ta
Ci�y in vvriting any delays, defects, or de�ciencies in such other worl� �laat render it unava�lable
or unsuitable for the proper execution and results of Contraciar's Worlc. Contractor's failure to so
report will canstitute an acceptance of such other vvorlf as fit and proper for integration wi�h
Coniractor's Work except far latent defects in the work provided by n�hers.
C1TY OF FORT WQRTH 2O20 On-Call Pavement lVlarkings Contract #2
STANDARDCaTISTRUCTIOM 5PECIFICATION DOCUMEPITS CityProjcetNumberi03740
Itevision: 823/2(i21
oo�zoa-�
GENERALCONDITIDN S
Page 36 of 63
7.02 Coordination
A. �f City intends to contract with others for the perfoxmance of other worlc on tt�e Project at the
Site, the followtng wiU be set farth m Supplementary Conditions:
1. the indi�idual or entity who will have autlzoriLy and responsbility for coardination of the
aeti�ities arnong the various contractors wil� be identified;
2, the specif'ic matters to be cover�d by such authority and responsibility will be itemized; and
3. the e�ent of such authorif.y and re�ponsibilities will be provided.
B. i7nless otherwise provided in the Supplementary Conditions, Cit� shall have authority for such
coordination.
ARTICL� 8 — CITY'S RESP4NSIBILITIES
8.01 Co�amunications to Confra�tor
Except as otherwise provided in the Supplementary Conditians, Ciry sl�all iss►ae a�l communicat�ons
to Contractor.
$.02 Fu�nish Data
City sY�a11 timely fumish ttie data requaed under the Contract Documents.
8,03 Pay When Due
8.04
S.OS
8.Q6
City sha�l make payments ta Cantractor m accordance vvith Art�cle 14.
Lands and �aserrtents; Repa�ts and Tesis
City's duties wi�h respect to �roviding fands and easements and providing engineering surveys to
establish reference pofnts are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02. refers to Ciky's
identifying and malcing available to Cantractor capies of rep�rts of explaratio�s and tests of subsurface
conditians and drawings of �hysical conditions relating io existing surface or subsurface s�ructures at
or contiguo�as to the Site that have been u�ilized by City in preparing the Confixact Documents.
Chc�nge OYdeYs
City sha11 execute Change Orders in accordance �uith Paragraph 10.03.
Inspections, Tests, andApprovals
City's responsibility vvith respect ta certain inspections, tests, and appro�als is set forth in Paragraph
13.03.
C1TY OF FOAT VJQRTIi 302U On-Call Pavement [v�arkings Contraat #2
STANDARDCONSTRUCT[ON SPE[;1FICAT[ON BOCUMFIVTS CityPrajectNumber1037A0
Rcvision: 823/�021
00 '72 OU - �
C�NERALCANpITION 5
P.age 37 of 63
8, 07
, .
. �.
8.Q9
Limitations on City's IZesporrsibflrties
A. The City shall not supervise, direct, or ha�e con�rol or autl�ority av�r, nor be responsibie for,
Contractar's means, methods, technis�ues, sequences, or procedures af const�uction, or the safety
precautions and programs ic�cident Yhereto, or for any failure of Contractor to comply with Laws
and Regula.tions a�plicable to the performance of the Work. City will not be responsibl� for
Contractor's faiiure to perform the Work in accardance •with the Contract Document�.
B. City will notify the Contractn.r of applicabla safety plans pursuant to Paragraph b.14.
Undisclosed Hazardaus Environ�nental Condition
Ciry's responsibility with respectto an undisclosed Hazardous Env�ranmental Condition i� set forth
i� P aragraph 4.06.
Campliance wtih Safety Pr�ogrart�a
Whiie at the Site, City's emp�oyees and representatives shall comply vwitk► the spec�'ic applicable
raquirements of Cantractor's safety programs of which City has been in#�ormed pulrsuant to
P aragraph 6.14.
ARTICLE 9— CITY'S OSSERVATION STATUS DURING CONSTRUGTION
9.6I Cfty'sProjecPManager�
City will provida one or mora Project Manager{s) during the constructian period. The duties and
responsihilities and the limrtations of authority of City's Project Mana.ger during, constt'uction are set
forth in the Contract Doc�aments. The Ciry's Praject Manager for this Contract is identified in the
Suppiementary Condrtions.
9.Q2 Visits to Srte
A. City's Projeci Manager will make visits to the �iie at sntervals appropriate to the variqus sta.ges
of consi:ruction as City deems necessar�r in orcler to observe the progress that 4�as been made and
the quali�y af ihe �arious as�ects of Cont�actor's executed Work. Based on informa.tion
obtained during such visi�s and obser�ations, Gity's Pro�ectManager will determine, � general, i�
the Work is proceeding in accordance with the Contract Documents. City's Project Manager will
not be required to nnalce exhaustive or cnntuluous �spections on the S�te to check the qualiry or
quantity of the Work. City's Pro3ect Manager's ef£orts will be duected toward providing City a
greater degree of confidence that the cornpletecf Woric will conform generally ta the Contract
Dacuinents.
B. City's Project Manager's visits and observatians are sub�ect to au the limitations Qn authority and
responsibility in the Contrac� Documents including th�se set farth in Paragraph
8.07.
CITYOP TORT WORTH 2Q20 Qn-Ca1l Pavement Markings Contract#2
ST'ANDARDCONSTRIICTION 5P6C]FICATIQN DOCUMI:IV"I'S City ProjeetNu�nber ]03744
Revision: 823�i21
OD7200-1
G�NERALC41��iTION 5
Page 38 of 63
r•1
9,44
9.05
` 1�
Authorized Variatiotzs tn Work
City's Project Macnager may authori�e minar variatinr�s in th.e Work fi•oin the �°equirements of the
Contract Documents vwhich do not involve an adjustment in tka Contract Price or the Contract Time
and are compatible with the design coneept of the completed Project as a functianing whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City and aiso on Contractar, who shall perform the Work involved pro�nptIy.
RejectingDefective Work
City will ha�e authority to reject Wor�c which C�ty'� 1'roject Managerbeiie�es to be defec.tive, or vvill
nat produce a connpleted Project that conforms to fihe Contract Documen�.s or that will prejudice the
mtegrity of the design concept o� the camgleted Project as a functioning whale as indicated by the
Contract Docum�nts. City will have authorrty to conduct special inspection or testing of the Wark as
provided in Artic�e l3, whether or not the Work i� fabricated, instal�ed, or cnmpleted.
Determinations for Work Perfarmed
Contractar will determine the actual quantities and classriications of Work performed. City's Projec�
Manager will review with Contractor the preliminary determinations on such matiers before rendering.
a written recommendxtior�. City's writien decision wi�l be final (except as modified to xeflect changed
factual cnnditions or more accurate data}.
Decisians on Requi�ements of Contract Documents ancl Aceeptability af Wo�k
A. City wili be the initial interpreter of the requiremenfis of the Cor�t7ract Documents and judge of ihe
acceptability of the Work thereunder.
B. City will render a written decision on any issue r�ferred.
C. Cit�'s written decision on the issue referredwill be final and bit�ding on the Contractor, subject
ta the provisions of Paragraph I0.06.
ARTICLE ] 0— CHANGES XN THE WORK; CLAIMS; EXTRA WORK
10,p1 Authorized Changes in the Work
A. Wrthout in�alidating the Contract and �viihout notice �o any surety, City may, at any time or froin
ti►ne to time, order E�xa Wark. Upon notice of �uch E�a Worlc, Cant�actor shall pronaptly
proceed with the Worl{ involved which wi� be perforrned under the applicable condi�ions of the
Contract D4cuinents (exoept as otherwise specif�ica�ly provided). E�ra Work shall be
memoriaiized by a Change Order which may or may not precede an order of Extra worlc.
B. For inmor changes of Work nat requiring changes to Conhact Time or Contract Price, a Field
O�•der may be issued �ay the Crty.
CI"f'Y OF PORT WOR�'I-I 2�2D On-Call Pavemenk Markings Conuact #2
6"CAI�iDARDCONSTRilC'CION SPfiCIF[CATION DOCUINENTS Cify PrajectNu�nber 103740
Revisian: 82i/�021
aa72oo-�
G�NERALC011plTIDN 5
Page 39 of 63
10.02 Unauthorized Changes an ihe Work
Contractar shall not be entitiad to an increase in the Contract Price or an exiension of the Contract
Time with respectto any work �erformed t%at is not required by the Contract Documents as amended,
mod�ed, or suppleirented as provided in Paragraph 3.Q4, except in the case of an emergeney as
provided in P aragraph 6.17.
I0.03 Executio� of Change Orders
A. City anci Contracior shall execute apprapriate Change Orders covering:
changes in �he Work which are: (i) ordered by City pursuantto Paragraph 10.O1.A, ��j reyuired
because of acceptance of defective Work under Paragraph 13.08 or City's correctian af
defective Worlc under Paragraph 13.09, or (ii� agreed to by the par�ies;
2. changes in th� Contrac� Price or Contract Time which ai•e agreed ta by the parties, including
any undi5pu�ed st�m or amouni of time for Work acii,tally performed.
10.04 Extra Wo�k
A. Should a difference arise as to what daes or does n�t consiitufe E�ra Work, ar as to the payment
thereaf, and the City insi�ts upan its perfarmance, the Contractor shall proc�ed vvi�h the wark after
making written request for written orders and shall keep accurat� account of the actual reasonable
cost fih�reof. Contract Claims regard�ng Extra Work shall be made pursuant to Paragraph 10.06.
B. The Cor�tractnr shaU. furnish ihe City such instaUation records of aIl deviations from fihe arjginaI
Cantract Docum�nis as may be necessary to enable ihe City to prepare for permanent recnrd a
correeted set of glans showing the actual insta.l�ation.
C. The campensation a�•eed upor� far Extra Work whether or not initiated by a Change Order shall
be a fu�l, comp�ete and final pay��nent for ali costs Coniractar mcurs as a res��t or relating �o the
chang� or Extra Work, whether said cosis are lrnown, unknawn, foreseen or unforeseen at that
tur�e, including wit4�out Iimitatian, any costs for del�y, �xtended o�erhead, ripple or impact cost,
or any other effect on changad or unchanged work as a res�lt af th.e change or Extra Work.
10.05 Notification to Surety
If the provi�ions of any bond requi�e notice to be given io a surety of any change af£ecting the general
scope af the �Nar�c or the grovisions of the Confract Documents (including, but not limited to,
Contract Price or Contracf Time), �e giving of any suc� notice will be Contractor's responsibility.
The .amount of each applicable bond will be adjusted by the Contractar to reflect the effect of any
such change.
CI'I'Y OF FOIiT WORT�I 2D20 an-Cal1 Pavement N(arkings Contract #2
STANDARDCQN5TRIICTIQN SF�CiFICATION I30CUMENTS Ciry PrajectNumber 1fl3740
Revision: 8CL3l1021
oo�zap-t
GENERALP,QiJDIT16N S
Page 40 of 63
10.06 Contr^act Clair�as Process
A. City's Decision Required: All Contract Clauns, exeept those wa�ved pursuant ta Paragraph
14.09, shall be ref�rred io t�e City for deci�ion. A decision by City shaIl be requirad as a condition
pi•ecedent to any exercise by ConSractor of any rights or remedies he may otherwise l�a�e under
the Contract Docutn�nts ar by Laws and Regulations in respect of such Cont�act Claims.
B. Natice:
1. Written notice stating the general natur� of each Contract Claiix� shall �e dejivered by the
Contractor tn City no la.ter fihan 15 days after the start of the event giving rise thereta The
responsibility to substantiate a Contraet Ciaim shail rest with the party malang tha Contract
Claim.
2. Notice af the amount or extani of the Conixact Claim, wiih supparting ciata shall be delivered
to the City on or befora 4S days frr�m the start of the e�ent giving r'rse thereto (unless the City
ajlovvs addztional time for Co�tractor to subt�it aciditional ox more accurate data iri support o.f
such Contract Cla'un).
3. A Contract Claim for an adjusiment in Contract Price shall be prepared in aecordance with
the provisions of Paragraph I2.01.
4. A Contract Claim for an adjustment in Contra�ct Time shall be pi•�pared in accordance �+ith
the provisions of Paragraph 12.02.
5. Each Contract Claiin shall be accoinpanied by Cantractor's v�rf[ten statement that the
adjustrrient cla.imed is the entire adjustment ta which the Contractor believes ik is entitled as a
result of said event.
6. The City shall subnnit any respor�e to the Contractor within 30 days after reeeipt of the
c�.imant's last submitia[ (unless Contract aIlows additional time).
C. Caty'sAction: Czry will review each Contract Claim and, wvithin 3Q days after receipt of the last
subnniital of the Contractor, if any, take ane of the fallow�g actions in writing:
1. deny the Coniract Claim in whole or in par�,
2. approve the Contract Claitx�, ar
3. notify the Cont�actor that the City is unable to resalve the Contract Claim if, ir� tkie City's
sole discret�on, it would be inappropriate #'ar the City ta do so. �or purposes of further
resalution of the Contract Claim, su�h notice shall be deemed a denial.
C1TY OP �'ORT WQRTI-1 2026 On-Cell Pavemeni Markings Contract #�
STAi�TDARDC6AISTRUCTION SPECIFICATION DOCUMENT5 CityProjectNutnbcr143740
Re�isimi: &?.3IX121
00 �z oo- �
GEN�RAL CONDITION 5
Page 41 nf 63
D. City's written action under 1'aragraph 10.06.0 will be £'inal and binding, unless City or
Cnntractor ir�vake the dispute resal��tion procedure set forth in Article 16 �within 30 days of such
ac�ion or denial.
E. No Contract C�im for an adjustment in Contract Price or Contract Time will be valid if not
submitted in accordance with this Paragraph 10.06.
ARTICLE ll— COST OF THE WORK; ALLOWANCES; �TNIT PRICE WQRK; PLANS
QUANTITY MEASU f:�EMENT
11.OI Cost of the Work
A. Casts Included: The terrri Cast �f �he Work means the sum of ali co�ts, except those �xcluded in
Paragraph 11.Q1.B, nacessarily incurred and paid by Contractor in the proper performance ofthe
Wark. When the value oi any Wark covered b� a Change Order, the costs to be reimbursed to
Cantrac�or wiil be oniy those additianal or incremental cosfs required because of ti�� change in the
Work. Sueh costs shall not include any of the cnsts itemized in Paragraph l I.O1.B, and shall
inclvde but nat be limited io the fo�lawing iterns:
1. Payrall costs for employees irz the direct employ of Cantractor in the performa�ce of the
Work under schedules of job classifications agreed upon by City and Conl:ractor. Such
employees shall include, without ]inaitation, superir�tendents, foremen, and othee persanne�
employeci full time an the Work. Payroll casts for employees r�o� employed ful� time on the
Wark shall be appartioned on the basis of their time spent or� the Work. Payroll costs shall
include;
a. salaries with a 55% markup, or
b, sa�.ries and wages plus the cost of fringe benefts, which shall �nciude socia] security
contributions, unemployment, e�cise, and payroil taxes, workers' compensation, health
and retirement benefits, bonuses, sick lea�e, r�acation and holiday pay applicable thereto.
The expenses of performing Vdark outside of Regular Worlcing Hours, Weelcend
Working Hours, nr Iegal holidays, shall be included in the abowe to the extent autl�orized
by City.
�. Cost of all materials and equiprn�nt furnished and incorporated in the Work, including costs
of transportation and storage thereaf, and Suppliers' field services required in connection
therewith.
3. Rentals of all constructiQn equipment and machinery, and the parts thereof whether rented
from Cantractnr ar others in accordance witl► rental agreements approved by City, and the
costs of transportation, loading, unloadi�g, assembly, disrnantlit�g, and removaI thereo£ AIl
such costs shall he in accordance with tlze terrzis af said rental ag7reements. The rental of any
such equiprnent, machinery, or parts shalI cease when �he use thereof i� no longer necessary
for the W orlc.
CITY OF FQRT WORTH 2O20 On-Cal] Pavement Markings Gontract #2
STANDARDCONSTR[]CTIDiJ SP�CIT'ICATI�N DQCUNf�NTS City ProjectNumher 103740
Revision: $/23J2021
OU7240-1
GEIVERALCANDITIQN S
Ppge 42 of G3
4. Payments made by Contractor to Subcontractors for Work perfarmed by Subcontractors. If
required by City, Contractor shall obtaxn compatitive bids fram suhcontractors acceptable to
City and Contractar and sha�l delsver such bids to City, who will then determine, which f�ids,
� any, w�11 be acceptable. If any s�abeoniract pra�id�s that the Subcantractor is io be paid on
the basis of Cost af the Worlc plus a fee, the Subconiractar's Cost gf the Work and fee shall
be determined in the same maruier as Cont�'actor's Cost of the Warlc and fee as provided in
t�is Paragraph I1.01.
5. Casts af special consultants {�r�c�uding but nat ]imited to engineers, archit�cts, iesting
laboratories, surveyors, attorneys, anc� accountants) employed for servi�es specifical�y related
to tl�e W ork.
6. Supplementaj costs including the followirag:
a. The proportion of necessary transportation, travel, and subsistence expenses of
Contractor's employees irzcurred in d�scharge oi duties cannected wiih the Work.
b. Cost, includmg transportation and maintenance, of aIl rnaterials, supplies, equipment,
machi�ery, applia�ces, office, and temparary facilities at the Site, and hand tools nat
owned by the workers,.which are consumed �n the perforrraance of the Worl�, and cost, less
market value, of such items used but not consumed �k�ich rema�n tl�e property of
Contractt�r.
c. Sales, consumer, use, and ather similar ta�ces related to the Work, and for which
Contractor is Iiable not cover�d under 1'aragraph 6.11, as imposed by Laws and
Regulations.
d. Deposits losi for causes other than negligence of Cantractor, any Subcontractor, or
anyone direetly or indirectly employed by any af them or for whase acts any of them inay
�e lial�le, and royalty payments and fees for perr�its and licenses.
e. Losses and damages (and related expenses) caused by damage to the Work, not
compensated by it�surance or otharw�se, sustained by Cantractor in conneeiion with the
perfarmance of the Work, provided such lasses and damages have resulted from causes
ather tizan the negfig�nce of Contractor, any Subcontractor, or anyane diract�y or indirectly
employed by any of them or for whase acts any of them may be liable. Such losses shall
inelude set�lements made with the written consent and approval of City. No such losses,
damages, and expenses shall be included in the Cost of the Wark for the pLupose of
determining Contractor's fee.
f The cost of utilities, fuel, and sanitary facilities at the Site.
g. Minor expenses such as telegrams, long distance telephone calls, telephona and
communicat�an services at the �ite, e�press and courier sezvices, attd similar petty cash
iterns �n connection with the Work.
CITY OF FORT WORTH 2O20 On-Call Pavement Maricings Contract #2
STANDARDCONSTRl1CTI0N SPECiFICATIUN DpCUMENTS Citypro�ectNumberlfl3740
Revision: &23/LD21
007200-I
GENtRAl.CONDITION 5
Page 43 of G3
h. The costs nf premiums for aU boncis and insurance Contractor is required by the Contract
Documents to purchase and maintain.
B. Costs Excla�ded: The term Cast of ihe Wark shall not izaclude any of the foll�wirig items:
Payroll costs and ather compensation of Con�ractor's offcers, executives, priricipals (af
partnerships and sole proprietorships), general managers, safety managers, engirieers,
architects, estima�ors, attorneys, auditors, accauntants, purchasing and contracting agents,
e�editers, tinnekeepers, clerks, and other persannel emQloyed by Contracior, whether at ihe
�zte or in Contractor's principal or branch affice for general adininistratian of the Work and
not specifically included in tI�e agreed upon scheduIe of �ab classiiications referred to in
Paragraph 11.O1.A.1 or specifically covered by Paragraph 11.O1.A.4, all of which are to be
considered adxninisttative costs covered hy the Contractor's fee.
2. Ez�penses ai Contractar's priticipal and branch offices ofher than Contractor's nffiee at the
Site.
3. Any part of Contractar's capital expenses, ir�cluding interest on Contractor's capital
employed for the Work and charges against Contractor For delinquent payments.
4. Costs due to the negligence of Contractar, any Subcontcactar, or anyone directly or indirect�y
empIoyeci by any of them or %r whose acts any of them �nay be liable, includirig but not
lirnited to, the correction o� defective Work, disposal of materia.ls or equipnnent wrongly
supplied, and malsing gaod any damage to property.
5. Other o�exhead or general e�ensa costs of any kind.
C. Con.tractor's Fee: '�hen a1l the Work is performed on the basis af cost-p1us, Cont�•actar's %e
si�ali be determined as set farth in the Agre�ment, When the vaiue of any Worlc covered by a
Change Order for an adjust�nent in Contract Price is determined on the basis of Cost of the
Warlc, Contractor's fee shall be de�ermined as set forth in Paragraph 12.O1.C.
D. Dacumentation: Whenever the Cost of the Worlc far any purpose is io be deterinined pursuant to
Paragraphs 11.O1.A and 11.O1.B, Contractor will establ�s�► and maintain records thereaf in
accordance with generaIly acceptecE aceoun�ing practices and submi� in a forna accepiabl�e to City
an i�emized cost breakdown together with suppo�ting data.
1 L02 Allowances
A. SpecifaedAllowance: It is understoad that Cont�actor has iricluded in �kie Contract Price all
alIowances so nam�ci in the Con�ract Documents a�d shall cause the Warlc so covei•ed to be
performed for such s�ams and by such persons or entities as may be acceptal�Ie to City.
B. Pre-bid Allawvances:
l . Contractor agrees that:
C1TY OF POitT WORTH 2O20 On-�all Pavement Markings Con[racE #2
STANDATtDCONSTRUCTION SPECIF[CATION DOCUMEiVTS Ci{yProjcctNumUerl03740
Revision: 823f�21
oonaa-i
GENERAL GOND171DN 3
Page 44 oi 63
a. the pre-bid allowances incIude the cost to Cantractor of materials and equipment req�ired
by the al�owances ta be delivered at the Site, and all applicable taxes; and
b. Contractor's costs %r unloading and handling on t�� Si�e, Iabar, installation, averheaci,
profit, and other expenses contemplated for the pre-bid allowances have been included in
the allowances, and no demand for additional payment on account of any of fhe
foregoing will be valid.
C. ContingencyAllawance: Contractar agrees that a contingency aliowance, � any, is for the sole use
of City.
D. Prior to final payment, an appropriate Change Order will be issued to reflect actuaI amounts due
Con�ractor on account of Work covered by allowances, and the Contraet Price shall be
corrasponc�ingly adjusted.
11.Q3 UnitPrice Work
A. Where the Cantract Documents pror�ide that all or part of the Worlc is ta be Unit Price Work,
initially ihe Con�i•act Price will be deemad to i�c�ude for all Llnit �rice Work an amount equal to
the sum of the unit priee for eaehseparately identif'ied itein o�Unit Price Worktimes the estimated
quantity of each item as �ndicated in tiae Agreement.
B. The estimated quantities of items of Unit Price W�rk are not guaranteed and dre solely for the
purpose af corriparison of Bids and determ�ning an in�ial Gontract Price. Determinations aF the
actual quantiCies and classif'ications of Unit Price �orlc performed by Con�actor vcrill be made by
City subject to the provisians af Para�raph 9.Q5.
C. Each unit price will be deem.ed to iticjude an amaunt considered by Contractor ta be adequate ta
cover Contractor's overHead and profit %r each separately identif"ied item. Work described in the
Cantract Docun�ents, or reasonably inferred as required for a iunctionally complete installatzon,
but not identi�ed in the listing �f unit price items shail be considered incidental to unit price worlc
lis�ed and th� cos� nf incidental work u�cluded �s part of the unit price.
D. City may make an adjust��nent in the Con�ract Price in accordance with Paragraph 12.01 if:
1. th:e quantity of any item of Unit Pz-ice Work performed by Contractor differs materially and
sign.ificantly from the estimated quantity af such item iridicafed in fh� A�reement; and
2. there is no correspanding adjustment with respect ta any other ite�rrz of Work.
E. I�ac�eased or^ Decreased Quantities.• The City reserves the right to order Ez�tra Work in
accordance with Paragraph 10.01.
1. If the changes in quant�ties or the alteratians do not sigriifcantly change the character nf
work under the Contraci Dacumenis, ihe altered worIc vvill be paid for ai the Contract unit
price.
CITY QF FC)12T WORT[-I 2D20 On-Cai{ pavement Markings Contract #2
STANDAR]7CDN5TRlICTION 5P8CIFICATIOhf DOCIIIvIEAlTS CityPraject]+Iumher103744
Revision: 82320'Ll
oo�zao-i
GEN�RAL G4NDITIDiJ 5
Page 45 nf 63
2. If �he changes in �uantities or alterations significantly change #he character nf worl�, the
Contract will be amended by a Change Order.
If no unit prices exist, this will l�e considered Extra Work and the Contract wili be am�nded
by a Change Order � accordance with Articje 12.
4. A sign'rf"icant change in the character of wark occurs vvhen:
a. the character af work for any item as altered differs material�y ul lcind or na.ture from that
in the C.ontract or
b. a Major Item of work �aries by mare than 25°fo fram the original Contract quantity.
5. Wh:en tlie quantity of work to be done under any Major Item of the Contract is more than
125% of the original quan�ity stated in the Contrac�, then either party to the Contract may
requ�st an adjustrnent to the unit price on the portion of the work that is above 125%.
6. When the quantity of work to be done under any Ma3or Item of the Contract is less than '75°/fl
of the origina� quantity sta.ted in the Cantract, then either party to the Contraot may request
an ad�ustm�nt to the uni� price.
11.Q4 Plans Quantity Measurement
A. P lans quantit�es rnay or may not representtl�e exac� quantity of woxk performed or ma.terial rnoved,
handled, or placed during the execuiion of the Contract. The estimat�d bid quantities a�•e
designated as firial payment quantities, unless revi�ed by the gaverning Sectian or this Article.
B. If the quantiry measured as outlined under "Price and Payment Procedures" varies by more tl�an
25% (or as stipulated under "Price and Payment Procedures" for specific Items) from tlZe total
�stimated quantity for an indiv'idual Ttem ariginally shown in the Contract Dacuments, an
adjustment rr�ay be made to the quantity of authorized work done for payment p�arposes. Tk►e party
to the Contract requesting t�.e adjiastmant will provide field measurements and calculations
s�owing the final quantity for vvhich payment wiU be made. Payment for ravi�ed quantity �tvil� be
made at the unit priee bid for that Item, except as pravided for in Article 10.
G When quant�ties are revised by a change in design approved by the City, by Change Order, or to
coz-rect an error, or to corract an error on the plans, the plans quantity will be increased�r dacreased
by the amoL�nt involved in the change, and the 25% variance wil� apply �o the new plans quaniiry.
D. If ihe total Cont�act quanti�ty mu�tiplied by the uni� price bid foi• an individuaj Ite�n is less than
$250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans
quantity Item if the City and Contractor agree in writing �o frx ihe f�nal quantiry as a plans quantity.
CITY pF PORT WORTH 2420 On-GaIE Pavement Ivlarkings Contract #2
STANDaRT]C�NSTRUCTIOiJ 5PEC1FiCATION DOCUMEI+ITS City ProjectNwnber 103"740
Revision: 823I1A2f
007200-I
G�NERALCON4�IT10N S
Page 4G af 63
E. I'or callout work ar nor�-site specific Contracts, the pIans quaniity measurement requirements are
not app]icable.
ARTICL� 12 — CHANGE OF CONTRACT PR�CE; CHANGE OF CONTRACT T�ME
12.41 ChangeofContractPrice
A, The Contract Price may only be changed by a C�ange �rder.
B. The value af an� Work covered by a Change Order wilI be determined as follows:
1. where the Work involved is cnvered by unit prices contained in the Contract Documents, by
application af such unit prices to the quaniities of the it�ms involved (sub{ect to the provi�ions
oiParagraph 1.1.03); or
2. where the Work i�nvol�ed is not covered by uni� prices contained in the Contract Docui�nents,
by a tnutuaIly agreed lurnp sutn or uni� price (wl�ich may ineiude an allowance for overhead
and proftt not necessarily in aceordance with Paragraph I2.Ol.C2), and shall mcIude the eost
of any secontiary impacts that are foreseaable at the time of pricing the cos� of Extra Work;
ar
3. where the Work mvolved is �ot covered by unit prices eontained in the Contract Documents
and agreement to a lump sum ar uni� price is not reached under Paragraph 12.41.B.2, on the
basis of the Cosi of the Work (determined as provicied in Paragraph i 1.01) plus a Cantractar's
fee for overhead and prof�t (determined as provided in Paragraph 12.O1.C).
C. Conlractor's �ee: The Contractor's �dditiional fee for overhead and profit sha31 be determined as
follows:
1. a mutually acceptable f�ed fee; or
2. if a fi�eci fee is not agreed u}�on, �Yien a fee based ar� the follow�ng percentages of the various
portions of the Cost of the Wark:
a. for costs incurred under Paragraphs lI.OI.A.1, 11.01.A.2. and ll.Ol.A.3, the
Contractor°s addrtianal f�e shal� be 15 percent excepi for:
1) rental fees for Contractor's own equip�nent using sfiandard rental rates;
2) bonds and insuranca;
b. for costs incurred under Paragraph 11.O1.A.4 and 11.OI.A,5, the Contractox's fee shall be
five percent {5%);
1) where one ar more tiers oi subcontracts are on the basis of Cast of the Work plus a
fea and no f�ed fee is agreed upon, ihe intent of Paragraphs I2.01.C.2.a and
I2.O1.G2.b is tnat the ,Subconfractor who actualIy per%rms the Work, at vvhatever
CITY OF F�RT WORTii 202D On-Call Pavetneitt Markings Contraet #2
STANBAE2DCONSTRqC'CION 5PECIFICATION DOCiJMENTS CityProjcetAltunher103740
Revision: b73i11i1V
00 72 00 -1
GENERALCONDITION S
Page 47 af 63
tier, will be paid a fee of 15 percent of the costs �ncUrred by such Subcontractor un.der
Paragx'aphs 11.O1.A.1 and 11.01.A.2 and that any higher tier Subcontractor and
Conteactor wsfl each be paid a fee of five percent (5%} of the amaunt paid to the ne�t
lower tier Subcontractar, however in no case shall the cumulative totaI of fees paid be
in exoess af 25°/a;
c. no fee si�all be payable on the basis of costs itemizad under Paragraphs 11.O1.A.b, and
1 I.O1.B;
d. the amount of credit to be allawed by Cnntractor to City for any change which results in
a net decrease in cost will be the amount af the actuai net decrease iri eost plus a deduction
in Contractor's fee by an amount equal to five percent (5%) of s�ach net decrease.
12.02 Change of Co�air�act Tirrte
A. The Contract Time may only be changed by a Change Order.
B. No ea�tension of the ContractTirrte will be allowed far Extra Work or for cla.imed delay unless the
Extca Work eontemplated or claimed delay is shown to be on the cri�ical path of the Pro�ect
Schedule or Cantracior can show �y Critical P ath Method analysis how tbe Extra �rti orlc or claime d
delay adversely affects t�e critical path.
12.03 Delays
A. Where Contractior is reasonabl� delayed in the perfarmance or completian of any part of the
Work wi�hin the Contraet Tune due to delay beyond the cantrol of Cont�actor, the Con�ract Tirne
rnay be e�tended in an amount equal to the time lost due to such delay if a Cnn�ract Clau�n is made
therefor. De�ays beyond the conirol of Cantractor shall include, but not b� lunited ta, acts or
neglect by City, acts or neglect of utility awners or ofher contractors perfarming other work as
cantemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God.
Such an adjusfiment sha�l be Coniractor's sole and exclusive remedy fnr the delays described in
ih�s P aragraph.
B. I� Contractor is de�ayed, City sha11 not be liabie to Contractor for any claims, costs, Iosses, or
damages (including buti not lirnited to a➢ fees and charge5 af engineers, archi�ects, attorneys, and
ather professionals and all court or arb.itration ar ather dispute resolution casfs} sustained by
Cont�•actor on nr in connection wiih any other project or ar�ticipaied project.
C. Contractor sha�l nnt be entitled to an adjusiment in Contract Yrice or Contract Time for delays
within the conttol of Contractor. Delays attributable to and within. the contro.l of a Subcontractor
or Supp�ier sha11 be deemed to be delays within the control of Contractar.
D. The Contractor shall receive no compensation for delays ar hindrances ta the Worlc, except vvhen
direct and unavoidable e�t.ra cost to the Con�actor is caused by the failure of the City to provide
information or material, if atry, which �s to be fiu�tished by the City.
C1TY OF F�RT WQRTH 2O2a On-Call PavemenE Markings Contract #2
STAIdDARl7CQNSTRUCT]ON SP�C]FICATION DDCiJMEtdTS CityProjectNumber143740
Rev'tsitln: 8n3F�b21
o-a�zoo-i
GENERAL COND ITlON 5
Page 48 nt 63
ARTTCLE �3 — TESTS AND INSPEC'TI�NS; CORRECTiON, REMOVAL OR ACCEPTANCE OF
DEFECTTVE WORK
13.01 Notice of Defects
Notice of all defective Work of whieh City has actual knawledge wi�l be given to Contractor.
Defective Worlc may be re3ected, correctad, or accepted as provzded in this Article 13.
13.02 14ccess io YYnrk
City, independent testing iaboratories, and governmental agencies with �Urisdictional in#erests will
have access to the Site and the Warlc at reasonable tnnes for their observation, inspection, and testing.
Contractar shall provide the�n proper and safe condiiions for such access and advise them of
Contractor's safety procedures and pragrams so that �hey may comply iherewith as applicable.
13.03 Tests and Xn.s�ecCions
A. Contraciar shall give City timely notice of readines� of the Work fc�r all required inspections,
tests, or appra�aIs and shall eooperate with inspection and testing personnel to facilitaie required
inspections or te5ts.
B. If Coniract Documen�s, Laws ar Regulations of any pu�iie body having juri�diction requare any
of the Worlc {ar part thereo� to be inspeeted, tested, or appraved, Contractox shaU assume fi�ll
responsibility for arranging and obtaining such independent inspeetions, tests, retests ar approvals,
pay all costs in connecl:ion therewith, and f�arnish City the requirad certiFicates of inspection or
approvaI; exceptiing, however, #hose fees specifically ident�ed in ihe Supplementary Conditions
or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as
described in the Supp�ementary Candi�ions.
C. Contractar sha11 ba responsible for arranging and obtaining anti sha11 pay aIl costs in connection
with any inspections, tests, re-tests, or approvals required for City's acceptance nf materials or
equipment to be incorporated in the Work; or acceptance ofmaterials, tnix designs, ar equipment
submit�ed for approval prior ta Contract�r's purchase thereof for incorporation in the Work.
Sueh inspeetions, iests, re-tests, or approvals shall be perforined by organizatiot�s acceptable to
City.
D. City may arrange for the servi�es of an independent testing laboratory (`"I'esting Lab"} to
perform any inspectians or tests ("Testing") far any �art of the Worlc, as determined solely by
City.
1. City vviU coardinate such. Testing to the extent possible, with Contractor;
2, Should any Testing under this Section 13.03 D result in a"fail", "did, r�ot pass" or� ather
s�imi�ar negative result, the Contz•actar shall be responsible for paying far any and a!1 retesis.
Contractar's cancel�ation without cause oi City initiated Testir►g s�a�l be deemed a negative
r�sult and require a retest.
CITY OF FORT WdRTH 2O20 On-Call Pavement Markings Contract #2
5TANDARDCONSTRUC"�lON SYECIFICA�'10N DDCUMENTS C'tly �rojectNtfmber 1Q3740
Revision: &23(1i111
00 �a ao - i
GENERALCQNQITION S
Pa�e �49 of 63
Any amaunts owed for an.y ietest under th3,s Seetion 13.fl3 D shal� be paici directly� tn I:he
T�sting Lab by Cantractar. City wiil forward all in�oices for retests to Contracfar.
4. If Contractor fails to pay the Testing Lab, Cit� will not issue Final Payment until the Testing
Lab is paid.
E. If any Wark (or the worl� of others) that is to be irispected, �estea, or approved is covered by
Cantractar vvithout written concurrence of City, Contractor shall, � requested by Crty, uncover
such Work for observation.
F. Uncovering WorIc as provided ir► Paragraph 13.03.E shall be at Cantracior's expense.
G. Contractor shall have the right to make a Contract Claun regarcling any retest or invoice issued
under ��ction 13.03 D.
13.0� Uncav�ritag Wark
A. Ii any Work is covered cont�airy to the Contract Documents or specific instructions by the City, it
must, if requested by City, he uncavered for City's abservation and replaced at Cantractor's
expense.
B. I�' City considers ii necessary or advisable that covered Work be observed by Czty or inspected or
tested by athers, Contractar, at City's request, shall uncover, expase, or otherr�vise make avaiia.ble
for oi�servation, inspectian, or testing as �ity may require, that partior� of t.�ie Work in question,
furnishing all necessary labor, material, and equipment.
1. Lf it is faund that t�e uncovered Work is defective, Con.tractor shall pay all c�a.ims, costs,
losses, and damages (including but not limited to al� f�es and charges of eng�neers, architects,
attarneys, and other professionals and alI coYu�t or other disp�te rasolution casts) arisi�g out of
or relating to such uncoaering, exposure, observation, �pection, and testmg, and of
satisfacto�:y replacement or reconstruetion (ineluding but not limited to all costs af repair or
rep�acement of work o�' others); ar City shall be en�it�ed to accapt defec�ive Work in accordance
with Paragraph 13.08 in which case Cantractor shall still be r�sponsible for all casts associated
with exposing, obser�i�g, and testing ihe defective Wark.
2. If ihe uncovered Wark is not fau�d to be defective, Con�ractor shall be allowed an increase
in tl�e Cont�act Price or an extension af th� ContractTime, ar both, dire�tly attributable to such
uncovering, exposure, observa�ion, inspection, testing, replacement, and reconstr�ction.
13.05 City May.�top the Wo�k
If the Work is defective, or Contractor fails to supply sufficient skilled warkers or suitable mafierials
or equipment, or �'ails to perform the Wark in such a way that the completed Work will conform to
the Contract Dacuments, Czty rr�ay order Contractor io stop the Wark, or any portion ther�of, until tlae
cause inr such order �as been eliininated; however, this right of City to stop the Work shall not give
rise ta a�y duty on the part of City ta exercise this right for the benefit of Contractor, any
CITY O�' FORT WORTH 2O20 On-Call Pavement Markings Contract #2
STANDARDCONSTRUCTTON 5PECIFICATION f70CiTN[�.7VTS CityProjectl�Iumber1fl374Q
Revisinn: �.021
60720D-1
G�NERAL. CON�ITION S
Page 50 of 63
Subcontractor, any Supplier, any other individual ar entity, or any sureLy �or, or employee or agent of
any of ihem.
13.06 Cort-ection o�Removal ofDefective Worl�
A. Praraptjy aft�r receipt oi written natice, Gontractor shall carrect all defective Worlc pursuant ta
an acceptable schedule, whether or not fabricated, installed, or comp��ted, or, i.f the Work has been
rejected by City, remove it fram the Praject and replace it with �Iork that i� not defective.
Contractor shall pay all clairns, casts, additional testing, losses, and damages {including but not
limited to aIl fees and charges of engineers, architects, attorneys, and oiher professiona�s and all
coUrt or arbi�ration or ather dispute resolutian costs) arising out of or relating ta such correction
or remova] (including but not lim�ted to all costs of repair or xeplacei�nent of work of others).
Failure to require the removal of an.y defeciive Work shall not canstitute acceptance of such Worl�.
B. When correcting defective Wark under the terms of tl�is Paragraph 13.06 ar Paragraph 13.07,
Contractor shall take no action that wo�tld void or otherw�se unpair City's special warranry and
g�aarantee, if any, on said Worlc.
13A7 Carreetion Period
A. If within two (2) years after the date of Final Accepfanee (or such Ionger period af tnne as may be
prescribed by th� terms of any applicable special guarantee required by the Contract Documents),
any Work is found to be defective, or if the repair af any damages to the land or areas made
available for Contracfior's use by City ar permitted by Laws and Regulations as contemplated in
Parageaph6.ifl.A is found to be defective, Contracior shall pramptly, r�vithout costto Gi�y and in
accordance with City's written i�sirucl:ions:
1. repa�r such defective land or areas; or
2. carrect such defective Worlc; or
if the defeetitre Work has been rejected by City, ret�nove i� fram tha Project and replace rt
wit1� Worl� that is nnt defective, and
4. satisiactarily correct �r repair or remove and replace any damage to other Wo�k, to the work
of oihers or other land ar areas resultvng therefrnrn.
B. If Cantractor does not promptly comply witlt the terms nf City's wrikten instructions, or in an
emergency wnere delay would cause seriovs ris1L of lo5s or damage, City rnay have the defective
Work corrected or repaired or may have the rejecied Warlc removed and replaced. All clairras,
costs, �osses, and damages (incictd�ng but not limited to all fees and charges af engineers,
architects, aftorneys, and other professionals and all court or other dispute resolution cos�s) arising
out of or relating ta such carrection or r�pair or such removal and repiacement (including but not
limifed to alI costs of repair or replaceineni of work of others) will be paid by Contractor.
CTI'Y OF FORT W�RTI� 2Q20 On-Call Pavement MarKings Contract #2
STANDARDCONSTRi�CT[ON SPCC[CICATION DOCUMBN'TS CityProjectNumber103740
Revision: 82'i/�121
ao�zaa-�
GENERALCONCIITION 5
Page 51 of 63
C. In special circumstances where a particular item of equipment is placed in continuous ser�ice
before Final Acceptance ofall the Work, �he correction period for that item may start to run from
an earlier date if so provided in the Contract Documents.
D. Where def�ctive Worlc (and damage to other Work resulting thar�from) has b�en corrected or
rernoved and replaced under this Paragraph 13.07, the correction period herew�der with respeet
to such Worlc may ba required ta be extended for an addrtional period of ane year after the end of
the miti�l correction period. Cily shall provide 30 days written notiee to Contractor shouid such
addi�iona.l warranty caverage be required. Contractar m.ay dispute this requirem�nt by filing a
Contract Claim, pursuant to Paragraph 1Q.06.
E. Contractor's cibligations under fhis Paragraph 13.Q7 are in addition to any other obligation or
warxanty. The pro�isions af this Paragraph 13.47 shall not be construed as a substitute for, Qr a
waiver of, the provisions of any appficable statute of W'z�i�aiion or repose.
13.0$ Accepta�aee ofDefective Wo�k
If, instead of requiring correetion or removal and replacement of defective Work, City prefers to
accept it, City inay do sa. Con�ractor shall pay all claims, costs, Iosses, and damages {including but
not iimited to all fees and cl�arges of engineers, archi�ects, attorneys, and other pro%�sionals and all
court or other dispufie reso�ution costs) attributable to City's evaivation of and determination to accept
such def�ctive Worlc and for ihe dim�nished value of the �ork to th.e a�ent not otherwise paid by
Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issueci
incorporating the r��ces.sary rev�zons in the Contract Docurrients wit�► respect to the Work, and City
shall be entitled to an appropriate decrease in the Con�ract Price, reflecting �he dimini�hed value of
Wark so accepted.
13.09 CttyMay CarrectDefective Wo�k
A. If Coniractar fails vv�hm a reasonable time after writCen noiice fram City to correct defeetrve
'G�ar�c, or ta remove and replace rejected Wark as z�equired by City in accordance tivith �'aragraph
13.06.A, ar if Con�iractor fai� to perform the Work ua accordance with the Contract Documents,
or if Contractor fails to comply with any Qther provision of the Contract Documents, Crty may,
aficr se�en {7) days wril.ten notice tn Contractor, correct, or rennedy any such de�ciency.
B, In exercis�g ihe rights and cemedies under this Paragr�ph 13.09, City shall proceed
e�€peditiously. In connec�ion vvith such corrective or remedial action, City may exclude Contractar
fram all or par� of the Site, take possession af ali or part of the Work and suspend Contractor's
set^uices related thereta, and �ncorporate in t�e Work ail materials and equipment incorporated in
the Work, stored at the Site or far which City has paid Cnntractor but which are stored ei�ewhere.
Cantractar shall allow Ciry, City's representatives, agents, consultants, ernployees, and City's
ather cantractors, access to tY►e Site to enab�e City to exercise the rights and rexnedies under this
Paragraph.
C. All clairns, casts, losses, and damages {including but not litnited to all �ees and charges of
engineers, architects, attorneys, and ather profassionals and all court or other dispute resolution
CI'1"Y OF' FORT WOR I'H 2U20 dn-Cal[ Pave3nent Mazkings Contract #2
STANDARDCONSTRUCTION 5PECIFICATION DOCUMEAITS CityProjectAlumber1�3.740
Revision: 82.�1
ao �z oo - i
GE�[ERAL CON� ITl4N S
Page 52 of 63
costs) incurred ar sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Cantractor, and a Change Order will be issued i�ncorporatir�g the
necessary rer�isions in the �ontract Docwnents with respect io the Worl<; and City sl�ail be enti�led
1:a an appropriate decrease in the �ontract 1'rice.
D. Contractar shall not be allowed an extension of the Cont�act Time because of any delay in the
performance o� the Wark attributable to ihe exercise of City's righfis and remedies under ihis
P aragraph 13.09.
ARTICLE 1� -- PAYMENTS TO CONTRACTOR AND COMPLETION
14.OI Schedule of Yalues
The Schedule of Values for lump sur�a contracts established as provided in Paragraph �..d7 will serve
as the basis far progress payments and will be iricarporated in�o a forrn of Application for Paynner�
acceptable fo City. Progress payments on account af Uni� Price Warlc will be based on t�ie nurnber of
units campleted.
14.02 Progress Payme�ats
A. Applieations for Payrrrents:
1. Contractor is responsible far providing all informatian as required #o become a vendor of ihe
City.
2. At least 2Q days before th� date established in the General Requirements for each progress
paytnent, Contractor shall submit to Czty for revievv an Application for Payment fill�d out and
signed by Contractor cover�ng the Wor�C cornpleted as of the date of the Application and
accotnpanied by s�ch supporting dacumentation as is requii'ed by ihe Contract Documents.
If payinent is requested on the basis of materials and ec�uipment not incorparated in t�e Wark
but delivere�i and suitably stored at the Site or at another iocation agreed to in writing, the
Application for Payment shall also be accomparued by a bill of sale, invoice, or otl��r
documentation waz�ranting that Ciry has rec�ived the ax�aferials and equipment free and clear of
all Liens and evidence that the rnaterials and equipment are covered by appropriate insurance
or other arrangements to protect City's intezest therein, all of which must be satisfactoty to
City.
4. Begin��ing �uith the second Applicatian far Payment, eack� Applicatiar� shall include an affidavit
af Contractar stating that previous progress payments recei�ed on account of the Work have
been applied on account to discharge Cont�actor's legitimate obligations associatedwith prior
Applications for Payment.
5. The amount of retainage with respect to progre�s paymenis will be as described in
subseetion C. unless otherw ise stipulated in the Contracf Docum�nts.
CI'i"Y QF �'ORT WOATH 2O20 On-Call Pavement Nfarkings Contract �2
STANDARI?CONSTRUCTION 5PECIFICATtDN �OCUMENT5 CityProjecENumher1U3740
Revision: 8/731�(?21
aonoo-t
GEN�f2ALC(}NDITION S
Page 53 of 63
B. Revievv ofAppiications:
1. City wili, after receipt of each Application for Payment, either indicate in writing a
recnmrnendation of paytxtenfi or return the Application ta Contrac�or indicaiing reasans for
refusie►g payment. In the latter case, Contractor may mait� f.he necessary carrections and
resubmit the Application.
2. Ci�y's processing of any payme�t requested iti an Application for Payment �vill be based on
City's obser�ations of the executed Work, and on City's review of the Application for Payment
and th� acco�npanying data and schedules, ihat to the best of Crty's knowl�dge:
a. the Work has progressed to the poini indicatec�;
b. the quality of the Work is generally in accordance with the Contract Docurnents {s�ibject
ta an evaluatian of the Work as a func�ioning whoie prior ta or upon Final A.cceptance, the
resuits of any subs�quent tesfis called for in th� �ontraet Dncuments, a firtal deter�ninaiion
of quantities and classif'ications �or Work performed under Paragraph 9.05, and any other
qualificatians stated in the rec�rrunendation).
3. Processing any such paymenti w�ll not thereby be deetned to have represented that:
a. inspections made �n cneck the quality or the qua�tity of the VVork as it has been performed
have been exhaustive, extended to avery aspect nf the Work in progress, or invoived
detailed inspections of the Work beyand the responsibilitie� spea�icaliy assigneti to City
in the Contract I]ocum�nts; or
b. there may not be otl�er matters or issues between�ie part�es tnat might entitle Contractor
to be paid additionally by City or entitle City to withhold p�ymeni to Con�ractor; or
c. Cantractor has complied with La�vs and Regulations applicable to Cantractor's performance
of the Work.
A. Crty rnay refuse to process the whole or any part oi any payrnent because af subsequently
discovered evidence or the results of subsequent inspeetions or fesfs, and revise or revoke
any such payment previously made, to suoh ea�tant as may be necessary to protect City from
loss becausa:
a. the Work is defective or cornpleted Work has been damaged by the Contractor or
subcontrac�ors requiri�g carreetion or replacei�en.t;
b. discrepancies in quantities contained in previous applications for payment;
c. the Contract Price has been reduced by Change Orders;
d.. City has been reqUired to correct defective VVorlc or complete Work in accardance with
Paragraph 13.09; o�•
CIT tii OP FpRT WOl2TH 2O20 Dn-Cali Pareinent Mar�eings Conlract 1t2
$'iAI�I1lAl2DCONS7'RifCT10N 5PfiCiFICAT[ON DOCUMEIV'I'S CityPrajectNutnber103740
Revision: 81L"�JJ�021
007206-]
GENERAL CONDITION 5
Page 54 af 63
e. Ciry �as actual Icnowl�dge of the occurrence of any of tl�e events enumerated in
Paragraph 15.02.A.
C. Retainage:
1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent
(1Q%).
2. For contracts greater than $400,000 at the tirne of ex�cution, retair�age shall 6e f�ve percent
(5%.).
D. LiquidatedDamages. For each calendar day that any work shall remain uncompleted airter ihe
time spec�ed in the Contract Documents, tha sum per day specifed in the Agreetnent will be
assessed against the manies due the Contractor, not as a penahy, but as damages suffered by the
City.
�. Payrneni: Contractor will be paid pursuant to the requirements of this Article 14 and payment
vvill become due in accordance with the Contract Documents.
F. Reduclion in Paysneni:
1, City may refuse to make payment of the amount requested because:
a. Liens have been fled in cannection with the Worls, exceptwh�re Contractor has delivered
a spec�c bond satisfactory ta Ciry ta secL�re the satisfaction and diseharge of such Liens;
b. there are other items entit�in.g City ta a set-off aga�nst the amount recommended; or
c. City has actual lcnowledge of the occurrence of any af the events enuinerated in
Paragraphs 14.02.B.4.a tl�ough 14.02.B.4.e or Paragraph 15.Q2.A.
2. If City refuses ta inal�e payrr►ent of the amount requested, City wiil g�re Contractor written
notice stating the reasons for su�h action and pay Cantractar any amount remaining a�er
deduction of the amount so withlielcf. City shall pay Contractor the amount so withheld, or any
adjustment thereto agreed ta by City and Contracfor, when Cantractor remedies the r�asons
for sucn actian.
14.03 Cant�acto�'s Warranty of Title
Contractar warrants and guarantees that title to all Work, materials, and ec�uipment covered by any
Application far Payment, whether incoiporated in the Project or not, will pass to Ciry na laterihan the
time af payment free and clear af alI Liens.
CITY OP FORT WOCZ'TH 2D2D On-Cal1 Pavemeirt Maricings Contract �E2
S'{'ANIJARDC6NSTRUC7'i0N SPSC[�ICATI(lN DOCUMENTS CityPmjectNum6cr1Q3740
Revisian: 8fl3f�121
00 �z oo - �
GElVERAL CON4ITIDN S
Page 55 af 63
14.Q4 Pa�tial Utilizatao�r
A. Prior to FinaI Acceptance of all tl�e Work, City may use or occupy any pari of the Warlc wh�ch
has spec�ca[�y been identif'ied in the Cantract Documents, or which City determines canstitutes
a separately func�ioning and usable part of the Work that can be used for its intended purpose
withouf significant interference with Contractor's per�ormance afthe remainder ofthe Worlc, City
at any time may notify Contractor in writing to permi� City to use ar acc�.ipy any such part of the
Work which City determines to be ready for rts intended use, subject to the following cnndi�ions:
Contxactor at any time may natify City in writing that Contractor cansiders any such part of
th� Work ready iar i�s intended use.
2. Wit�in a reasonable tnne af�er notzfication as enutnerated in Paragraph 14.OS.A.1, City and
Contractor shall tnake an insp�ction of thai part of the VL�ork ta deterrnine its staius of
completion. If Ciry does not consider that part of the Work to be substantialiy complete, City
will notify Contractor ira vvriting giving the reasons therefor.
3. PartialUtilization wi� noi constitute Final Aeceptance by City.
14.05 Finallnspection
A. Upon r�vritten notice from Cantraetor tiiat fhe entire Work is S u b s t a nt i a 11y Complete in
accordanc� with the Contract Docurrients:
1. Within 10 days, Ciry will schedule a�'inal Inspection with Coniractor.
2. City will nqtify Contracfar in wrjting af al� particulars iri whicl� tl�is inspection reveals that
the Work is incamplete or defecti�e ("Punch List Iterns"). Contractor shall irrunediately take
such measures as are necessary to camplete �uch Work or rexnedy such de�ciencies.
B. No time charge wi�l be made agains�t the Contractor between said date of natifcation to tk►e City
of Substantiia.l Complefiion and the date of Final insp�ction.
1. Should the CiLy determine that the Work �s not ready %r Final Inspection, City wiil notify the
Contractor in �vriting of the reasons and Contra�t Tuxie will resume.
2, Snould the City concur that Substantial Completion has been achieved with the exceptian af
any �'unci� List Items, Contract Time will resume for the duration ii takes for Contractor to
achieve Final Acceptance.
1�.06 FinalAcceptance
Upon compleiion by CanCractor to Gity's sati�faction, of any addi[ional Work identifed in the Fiina�
Inspection, City will issue to Contractor a letter af Final Aeceptance.
CITY QP F'ORT WORTH 2O2U pn-Cal] Pavement Markings Contract #2
STANDAILDCDNSTRi]CTLON SPEC[FICATLON DOCUMENTS City nrojacCNum�er 103740
Revision: 823f1421
0072D0-S
GEN�RAL CONDITIQP� S
Page 56 of 63
5�.07 Final Paymerat
A. ApplzcationforPayment:
1. Upon Final Acceptance, and in the opinian of City, Contractor may make an application for
imal payment £allawing the pracedure for pragress payments in accordance with the
Contract Documents.
2. The final Application for Paymeni shall be accompanied (except as previously del'tvered} by:
a. all documentation ealled for in the Contract Documents, including but not lirniteci to t.he
evidence of insurance required by Paragrapia 5.03;
h. cansent of the surety, if any, to �"u�al payment;
c. a list of all pending or released Damage Claims against City ti�at Contractor believes ar�
unsettled; and
d. af�da�its of payments and co�nplete and iegally effecti�e releases or waiveis
(satisfaetory to City) of all Lien righ�s arising out of or Liens filed in connee#ian rvith the
Worl�.
B. PayrnentBecQmes D�e.•
1. After City's acceptance of the App.lication for Payment and accompanying doc�.tmentation,
requested by Contractor, less previous payments made and any surn City is entrtled,
incSuding but not lunrteci ta 1iQuidated damage5, will become due and payable.
2. After all Dama:ge Claims have been resalved:
a. directly by the Contractar ar;
b. Contractor pro�ides evidence �hai the Damage Claim 4�as been reparted to Contractor's
insurance p�o�ider for resolution.
3. The malQng of the final payment by the City shall �at relieve ihe Cantractor of any
guarantees ar other rec�uirements of the Contraci Docliments WI11CI1 specifcally continue
thereafter.
14.a8 Final Completian Delayerl and Partial Retainage Release
A. If finai campletion ofthe Work is signif'icantly de�aycd, and if City so confiri�ns, City may, upon
receipt of Contractor's final Applicatio� for Paymenfi, and without terminating the Contract, make
payrr�ent of the balance due for that �aortion of the Worl� fuliy campleted and accepted. If ihe
remaining balance to be held by City for Work not fully compleied or corrected is less than the
retainage stip�alaied �n Paragraph 14.02.C, and if bonds have been furnished as required in
Paragraph 5.02, the r�vrittan consent of the surety to the paynt�ent of ihe balance due far tl�at
CITY OF' FO1tT WORTH 2Q20 On-Call Pavement Markings Contract #2
STAI�li]Al2DCON3TRUCTION SYECIF[CAT[ON DOCUMEIV"I'S CityProj�ctMumber1D3740
I�evision: �1131�621
007200-!
GENERALCONDITIONS
Page 57 nF 63
portion of t.he Warli fully cor�apleted and accepted shail be submitted by Contractnr to City with
the Application for such payment. Such payment shall be made und�r the terms and condition.s
go�erning fnal payment, except that it shaU not consti�ute a waiver of Contract Claims.
B. Pariial Retainage Release. For a Contract thafi provides for a separate vegetative establishment
and mai�tenance, and test and perFormance periods following the carx►pletion of all other
construction sn the Contract Doc�ments for al1 Worlc locations, the Ci�y may retease a partion of
the atnount retained provided that all �ther work is completed as determin�d by the City. Befare
th� release, all submittals and fr�al q�antities must be cornpleted and acceptedfor all other worIc.
An amount sufficient to ensure Contract compliance will be retained.
14.09 Waiver of Claitns
The aceeptance offinal paymcnt will constitute a refease of thc City fram ali claitras or liabilities
under the Contract for anything dane oc iurnished or relating to the work under the Contract
Documents or any act or neglect of City related to or connected with the Conixact.
ARTICLE 1� — SUSPENSION OF WORK AND TERMINATION
1�.01 City Nlay Suspend Wor�k
A. At any tim� and without cause, Ci�y may suspend the Worlc or any portion thereof by written
natice to Coniractor and which may fix the date an which �Vork will be resumed. Contractor shal]
resume the Work on the date so f�ed. During temporaxy sUspensian of the Worlc covered by these
Contract Documents, for any reason, the City will make no �xtra payment %r stand-by time nf
construction equipment and/ar construction crews.
B. Shauld ti�e Contractor not be able to complete a portion of the Project due to causes beyond the
eontroi of and without the faul� or negligence of the Contracfor, and shou�d i� be determ�ed by
rn�iival consent of the Coniractor and City that a solution to allow construction to proceed is not
a�ailable r�vithin a reasonable period of ti�ne, Contracinr inay request an exiensian in Contract
Time, directly attributable tn any sueh suspension.
C. If it should becotne necessary to suspend the Worlc for an iridefrriiie periad, t�e Cantractor shall
store a� materia� in such a mannex that they w�ll noi obstruct or itnpede the pub�ic unnecessari�y
nor became damaged in any way, and he shall talce every precaution to prevent damage or
deterioration of t�e work p�r�armeci; he shall provide suitable drait�age about the work, and ereci
temporary structures where necessary.
D. Contractor may be reimloursed for the cost of rr�oving his equip�nent off the job and returning the
necessary equipment to the job when it is defermined by fhe Ciiy that construction may be
resutr�ed. Such reimburseinent shall be b�sed on actual cost to the Gontrantor of moving tha
equipment and no prof�t w�ll be allawed. Reunbursement may not be allowed if the equipment i�
mnved to anat.�er construction project for the City.
C1TY OF FORT WORTH 2O20 On-Call Pavement Markings Conh-act #2
STANDARDCOIVSTRUC710N SPECIF?CAT[01� DOCUMENTS CityProjectNumbcrl0374a
Kevision: &?3I�D21
0072fl0-1
GENERAL CONd{71Q N S
Pflge S8 af 63
1 S.Q2 City May Terminate f�r Cause
A. The occurrence of any one nr more of the following events by way of example, but not of l'unitation,
rnay justi�y termination for cays�:
I. Contractor's persistent failure to perfnrin the Warlc iri accordance with the Contract Documents
{including, but not li�nited to, failure to supply sufficient slcilled �uorkers or suitable materials
or equi}ament, failure to adhere to the Project Schedule esiablished under Paragraph 2.07 as
adjusted from ti�aae to time pursuant to Paragrap� 6.OA�, or failure to adhere to the Ciry's
Business Di�ersity Enterprise Orciinance #20020-12-2011establ�sheci under Paragraph
6.06.D);
2. Contraetor's disregard of Laws or Regulations af any public body having jurisdiction.;
3. Contractor's repeated disregard of the authority of Ciry; or
4. Contractor's violation in any substar�tial way af any provisians of the Contract Dacwnents;
or
5. Cantractar's failure to promptly make goad any defect in materials or workmanship, or
defects of any nature, the conectian af which has been d�rected in writing by the City; or
6. 5ul�stantial indication that the Cantractor has mad� an un.authorized assignux�ent of the
Contraet or any funds due therefrom for tihe benefit of any creditor or for any ot�er purpose;
or
7. Subsiantia.l er�idence that the Contractor has b�coine insolvent or bankrupt, or otherwise
financially t�nable to earry on the Work satisfaciorily; ar
8. Contractor corrune�ces legal action in a court of competent jur�sdiction against the City.
B. I�nne or mare af the events identified in Paragraph 15.02A. oecux, City wiU pravide written nntice
fo Contractor and Sur�ty to arrange a conference with Cantractor and Surety to address
Contraetor's failure to perform the Worlc. Conference shall be held not later than IS days, after
receipt o� notic�.
L If the City, the Contractar; and the Surety da not agrae to allow t�ie Contractar to prace�d to
per�arm the constrUction Contract, the City may, to the extent permitted by Laws and
Regulations, declare a Contractor default and farrnally terminate t�e Contractor's righf to
complete the Contract. Contractor default shall not be declared earlier tihan 20 days after the
Contractor and Surety have recaivad notice ot' c�nference to adcl�ess Contractor's failure to
perform ti7e Worlc.
2. If Con�ractor's services are terminated, Sur�ty shall be obligated to take over and perform tlae
Work. if Surety does r�ot commence performance thereof within 15 consecutive calendar ciays
af�er date oi an addi�ional writ�en notice demanding Surety's performance of its
CITI' OF I'ORT WQRTN 2020 On-Cal] Pavement Marlcings Conhact #2
STANDARD C6N5TRIlCTION SPCsC[FICATiON DOCUNi$NTS City ProjectNumber 103740
Revision: &�131�21
oo7zao-i
�EN��a,�c;or�niTlaN s
Page 59 of 63
obligations, then City, without process or action at law, inay take over any portian of the
Work and complete �t as described below.
a. If City completes the Woric, Czty may e�ciude Cnn�ractor and Surety from th� si�e and
talce possession of the Work, and ail materials and equi�ment incarporated inio f.�e Work
stored at the Site or for which City has paid Contractor nr Surety but which are stored
eL�ewhere, and finish the Wark as City may deem expedient.
VL�heiher City or Surety completes the Vijnrk, Contractor shall nat be entitied to receive any
further pa.yment unfil the Work is finished. If the unpaid balance af the Cantract Price exceeds
alI claims, costs, losses and damages susta�ed by City arising out of or resulting frorn
completing the Work, such excess w�ll be paid to Contractor. If such claims, costs, losses and
damag�s e�ceedsuch unpaid balance, Contractor shall pay the d�%rence to City. S�ch claims,
costs, losses and da�nages incurred by City will be incorp�raied in a Change Oider, provided
that when exercising any rights or remedies und�e t�is 1'aragraph, City shall not be required to
abtain the lowest price for tk►e Wark perforrned.
4. Neither City, nor any oi its respective cnnsultants, agents, of�cers, directors or employees
shall be in any way liable or accauntab�e to Cantractar or Surety for the method by which the
completion af the said Work, or any portion ther�of, rnay be accomplished or for the price paid
therefar.
City, notwithstanding the metl�od used 'm completing the Contract, shall �ot for%rt the right
to recover damages fro�n Contractor or Surety for Contrac�or's failure to timely compleie the
entire Con�ract. Contractor shall not be entitled to any c�.itn nn account of th� rnathod used
by City in completing t�ie Contract.
6. Maintenance of the Wark shalf continue io be Contractor's and Suret�r's responsibilities as
pror�ided for in the bond xequirements of the Contract Doeumerits or any speciai guarantees
provided for under the ContraGt Dacuments or any other obligations otherwise pr�scribed by
law.
C. Notwrthsianding Paragraphs 15.02.B, Con#ractor's services wi� not be terminated if Coniractor
begins within seven days of receipt of notice of intent to t�rrninate ta correct its failure to perfarm
and proceeds diligently to cure such failure within no rnare than 30 days of receipl- of saic� notice.
D. Where Caniractor's services have been so terminated by City, the termination vvill not affect any
rights or rem�edies of City against Contract�r thet� existing or �hich may thereafter accxue, Any
retention ar payment of moneys due Confractor by City w�ill nat release Contractor from liability.
E, If and to the extent that Contractar k►as pravided a perfor�r,ance bond under the pra�isians of
Paragraph S.b2, the termination procedures of that bond shall nat supersede rhe provisions of this
Ariicle.
CITY OF C'012T WORTH 2O20 On-Call Paveinent Markings Con#ract #2
STANDARDCOI�STRUCTIO?J SP1iCIF[CATIOtJ DOCU[vlENT3 CityProjectNLimber10374U
Ravisian: 8�Z3l�121
oo�zaa-i
GEMERAL CDND IT 16tJ 6
Pagc 60 of 63
15.03 City May Terminate For Convenience
A. City may, wiihout caUse and �vithout prejudice to any of.her right or remedy of City, terminate tha
Contract. Any termination shall be effectedby mailing a notice oithe terminatian to the Contractor
specifying the extent to which performance of VL�ork under the contract is termu�ated, and tl�e date
upnn which such terrnination becomes effecti�e. Receipt of the i�atice shall be deemed
conclusively presumed and established when the letter is placed in ihe United StatesPostal Service
Majl by the Gity. Further, it sha�l be deemed conclusively presumed and established that such
terminatian �s made with just cause as therein stated; and no p�•oof in aany claim, demand ar suit
shall be required of the City regarding such discretionary action.
B. After receipt af a notice of termir►ation, anc� ex.cept as otherwise directeci by the City, the
Contractor shall:
1. Stop work under the Contract on the date and to the extent speciiied in the notice af t�rmination;
2. phce no further orders or subcontracts for materials, services or facilities exeept as may be
necessary for cotnpletion af such poriion of the Work ur►der the Contract as is noi ternvr►ated;.
3. tercninat� alI orc[ers and subcantracts ta �he extent t4�at they relate to the performance of the
Work terrrlinated by natice oF termination;
4. transfer title ta the City and defiver in ihe manner, at �he times, and to the extent, if any,
direcfied by the City:
a. the fabricated or unfahricateci parts, Work �n progress, completed Work, suppl�es and
other material produced as a part of, or acquired in connection with the performance pf,
the Worlc terminated by the notice of the termination, and
b. the eompleted, or par�ially completed plans, drawings, information and other property
which, if the Contract had been campleted, would have been required to be ftarnished to
the City.
5. complete perform.ance of such Worlc as shall not have been terminated bq the notice of
termina�ion; anci
6, take such action as may be necessary, or as the City rnay direct, for t�e pxatection anci
pres�rr+ation of the praperty related to its cant�act which is in the possession of the
Cantractor a�td in which the owner �as or may acquire the rest.
C. At a time not later than 30 days afterthe termination date specified in the notice of termination,
�he Contractor may submrt to the City a list, certiffed as to quantity and quality, tif any or ali items
of termination in�entory nat previously cLisposed of, e�cclusive nf itiems the d�sposi�ion of which
has been directed or authorized by City.
CITY OF FORT WORI`I-I 2020 On-Call Pavement Markings ContracC #2
�TANBATLDCDNSTRUCT[ON SPEC[FICATTON DOCLJtv1ENTS CityPrajectNum6er 1Q3740
Revision: &2�/2021
007200-1
GENERALCO�l�IT16N S
Page G I of 63
D. Not ]ater than 15 days thereafter, the City shall accept title to such items provided, �hat the list
submitted sh.aI1 be subject to verif'�cation by the City upon removal of the items or, if the items are
stored, within 45 days iram the date of submission of the list, and any necessary� adjustments to
correct the list as submitted, shall be made prior io final settlement.
E. Not la.ter than 60 days afterthe natice of fiermination, the Contractor shal� submi� his termination
claim to the City in tk�a form and with the certification prescribed by the City. Unless an extension
i� made in writing within such 60 day period by the Con�ractor, and granted by the Gity, any and
all such clauns shall be cancjusi�rely deemed waived.
F. In such ease, Contractor• shal] be paid for (without duplication of any items):
l. cornpleted and acceptable Woxk execu�ed in accordance with the Contract Documents prior
ta the effective date of termination, including fair and reasonable sums for o�erhead anci profit on
such Work;
2. expenses sustained prior to the effective date af termination in performing services and
furnishing labor, materials, ar equipment as required by the Contract Docutnents in connection.
with uncompleted Wor�, pl�as fair and reasonable sut�ns for overhead and profik on such expenses;
and
3. reasonable e�pensas clirectly atkributable to termina�ion.
G. In the event of the failure o� the Contractor and City to agree upon the whole amount to be paid
ta the Contractar by reason af the t�rmination af the Wark, th� Ciry si�all determir�e, on the basis
of informatian available to it, the anaaunt, � any, due to t�e Con�ractor by reasan of the terminatian
and sha3l pay ta the Contractor the amaunts determined. Coniractor shafl not be paic[ on account
of loss of anticipated prafits or revenue or other economic lass arising out of or resulting from
such term�ation.
ARTICLE 16 -- DISPt1TE RESOLIITION
16.01 Methods and Procedu�es
A.. Ezther City or Contractor rzaay request mediation of any Cantract Claim submitied far a decision
under Paragraph 10.06 before such decision beco�nes final and binding. The request for mediation
shail be submitted to the other p�rty to the Contract. Timely submission of the request shalI stay
the effect of Paragraph 10.06.E.
B. Ciry and Contractor shall participa.te in the mediation process � goad fait�. The process shalI be
commenced wrthin 60 days of filing of the request.
G If the Cnntract Clau-n is nat resoIvad by mediation, City's action under Paragraph 10.06.0 or a
den.ial pursuant to Paragraphs 10.Ob.C.3 or 10.06.D shall become final and binding 30 days after
iermination of th� media.tion unless, within that tirne period, City or Contractor:
CITY OF FORT WORTH 2a20 On-Call Pavement Markings Cantract #2
STFINDAR➢CONSTRUC7'ION SPECIFICATION 1]OCUM�7�fT5 CityProjectNumber103740
Revision: $23l1A21
ao�aoo-i
GENERALCONOITION 5
Page 62 of 63
1. elects in wri�ing to invoke any other dispute r�solution process provided for in the
Supplementary Condi�ions; or
2. agrees with the other party to submii the Cor�tract C�im to another dispute resolu�ian
process; or
3. gives written notice ta the other party of the inter�t to sul�mit the Contract Claim to a court of
competent juri�dictian.
ARTICLE I�—MISCELLANEOIIS
17.01 GivingNotice
A. Whenever any prov�sian oi the Contract Documents req�a�res ihe giving of writien notice, it will
b� deemed to have been �alidly given if:
1. de�ivered in person io t�e uadividual or to a rr�ember of the firm or to an officer of the
coxporation for whQ1n i� is intended; or
2. delivered at or sent by regist�red ar certif'ied mail, postage prepaid, to the ]ast business
address lrnown to the giver of the notice.
B. Business address changes ��nust be promptly made in writing io the other party.
C. Whenever the Con�ract Documents spec�'ies gNirig notice by electronic means such electronic
notic� shall be deerned suff'�cient upor� confirmation of reeeipt by the receivin� party.
I7.02 Computation ofTirrres
Wh�n any periad of time is referred ta in til�e Cont�ac� Documents by days, it will be camputed to
e�clude the �rst and inc�ude the last day of such period. If the Iast day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day
of the period.
17.03 Cumulative Rerriedies
The duties and obligations imposed by these Ganeral Conciitioa,a and the rights and remedies available
hereunder to the parties hereto are in addition to, at�d are not to be c�nstruad in any wayas a limitation
of, any rights and ret�aedies ava�abla to any or all of them which ar�e otherw�se i�posed or avxilable
by Laws ar Regulations, by special warranty or guarantee, or by other prov�sians oF the Contract
Documents. Tl�e provisions of this Paragraph will be as effective as if repeated specif"ically iri the
Conteact Documents in connection with each particular duty, obligation, right, and remedy to ��ich
they apply.
C1TY OF FpRT WpRTH 2O20 On-Call Pa�ement 11�iarkings Coi�traat �€2
5TA?�fDARDCONSTRUCTION SP�CIFI.CATION DOCLIM�NTS City ProjectNumber 103740
Rev[sian: 8lL�/'A21
OD 720Q- I
GENERAL CQNDITION S
Page G3 of 63
I7.fl4 Su�vival ofObligatio�s
All representations, indemni�eations, warranties, and guarantees made in, required by, ar given in
aecordance with the Contract Documents, as well as all cantinuing o�ligations indicated in the
Cantract Documenis, wilI surviva final payment, completion, and acceptance of the �Vorl� or
terrrzination or completion of �he Contract or termination of the services of Contractor.
17.05 Headings
Article and paragraph headings are inserted for convenience only and do not aonstitute pat-�s of these
Genera� Canditians.
C1TY Or FQRT WORTIi 2020 �n-Call Pavement Markings Corttract #2
STANDACtDCDNSTRUCT[�N SPECIFICATION DOCi7MENCS CityProjcctNumber1U3740
Revision: 8113/]A21
00 �� ao
surPLEn��nrTAx� corrn�Troxs
Page 1 of b
SECTION 00 73 00
SUPPLEMENTAR�' C�NDTTIONS
TO
GENERAL CONDITIONS
Supplementa�y Cond�tians
'1"hese Supplementary Conditions modify and supplement 5ect�on QO 72 QO - General ConditiQns, and other
pmvisions of the Contract Documents as indicated 6elaw. All provisions of the General Conditinns that are
modified or supplemented remain in full force and efFect as so modifed or supplemented. Ali praVisians
of the General Canditions which are noi so mQdif ed or supplemented remain in fu11 farce and effect.
De�ued Terms
The kerms used in these Supplementary Conditions which are defined in the Ganeral Conditions have the
meaning asskgned to th�m in the General Conditions, unless speci�ically noted herein.
Modificatio�s snd 5�pplements
The fallowing ara instruations that modify or supplement sgecific pasagraphs in the General Conditions and
ather Contract Documents.
SC-3.03B.2, "Resolving Discrepancies"
Plans govem over 5pecifications.
SC-4.01 A
Easement limits shown an the Drawing are approximate and were provided to astabiish a basis for bidding.
Upon receiving the finai easements descriptions, Contractor shall compare them to the lines shown on the
Contract Drawings.
SC-4.U1A.1., f°Avs�ilabilrty of Lands"
`I'he followic�g is a list of knnwn outstanding rig�f-af-way, and/or easements to be acquired, if any as of
Decem6er 10, 20�a:
Oatstanding Right-Of-Wa�, and/or Easements ta Be Acquired
PARCEL OWNER TARG�T DA'I`�
1V[]MBER �F POSSESSION
None
The Contractor undersiands and agrees that the dates listed above are estimates only, are not guaxant��d,
anc[ do not bind the City.
If C�ntractar considers the final easements provided to differ maYerially from tha representations on the
Cantract Drawings, Cantractor shall within five (5) Business Days and before proceeding with the Work,
notify City in writing assaciated with the differing easament line Iocatians.
SC-4.a1A.2, "Avail�bility af Lands"
CITY OF PORT GVORTH 2O20 On-Ca11 Pavement Markings Contract #2
STANDARD CONSTRUCTION SPECIFIGAT[ON DqCUMBN'1'S CPN 143740
Revised Mar¢h 9, 2D2Q
00 �3 ao
SUPPLEIvIENTARY CQNI1�{T[ONS
Page2 ofG
Ut7itzes ar abstructions to be remo�veci, adjusted, andlor relocated
The following is list of utilities andlor obstructions that have noi been removed, adjusied, andlor relocated
as of December 10, 2020:
EXPECTED UTILITY AND LOCATION
OWIVER
None
TARGET DAT� O�'
ADJUSTMENT
The Contracfor understands and agrees that the dates listed above are estimates only, are not guaranteed,
and do nnt bind the City.
SC-4.02A., "Subsurface and Pi�ysical Conditrans"
The following are reports o� exploratinns and tests of subsurface canditions at it►e site of the Work:
Non�
SC-4.QGA., "Hazardous Environmental Conditions at Site"
The followutg are repo��ts and drawings of existing hazardous environmental conditions known io the City:
None
SC-S.03A., ��Certificates vf Insurance"
The entities listed below are "additionaf insureds as their interest may appear" including their respective
officers, direciars, agents and employees.
(1.} City
(2) Consultant: No�ne
(3} Other: None
SC-S.D4A., "Coniractar's Insux�nce"
T`he limits of liability far the insurance cequired by Paragrapkt GC-SA4 shalI provide the following
coverages for noi less ihan the follow'tag amounts o� greaterwhere required by laws and regulations:
5.04A. Workers' Compensation, under Paragraph GC-5.04A.
5tatuEory Limits
Employer's liability
$10.�,00(} each accident/occurrence
$100,040 Disease - each emplayee
$504,600 Disease - policy limit
SG5.04B., "Contraetor's Insurance"
5.04R. Commercial Generai. Liability, under Faragraph GC-5.04B. Con#ractor's Liabiiity� Insurance
under Paragraph GC-5.04B., which sha1l be on a per project basis cavering the Contractor with
minimum limits of:
$1,OOO,DOQ eack occurrence
CITX OF FQRT WOATFI 2020 On-Call Pavement Markings Contra�# �k2
S�'t11dDARD CQNSTRUGTIOIY 5PECITICATIOI�F DOCUM�NTS CPN ]03740
Revised March 9, 2020
aa �3 ao
SUPPLB3vfE1�TTARY COIVDITEQN3
Page 3 of 6
$2,DDQ,OQO aggregaie limit
The pniicy must have an endo►•sement {Amendment — Aggre�ate Limits of Insurance) malcing the
Generai Aggregate Limits apply separaiely to each job site.
The Commercial General Liabil�ty Insurance policies shall provide "X", "C", and "U" coverage.'s.
Veriiication of such coverage must be shown in the Remarks ,+�rticle of fihe Certif cate of Insurarice.
SC 5.Q4C., "Ca�trflctor's Insurance"
5.04C. Automabile Liability, under Paragraph GC-5.04G. Contractor's Liability Insurance under
Paragraph GGSA4C., which shall be in an amount not iess than the %flowing amounts:
(1) Automobile I.iabiliky - a commercial business policy shall provide eoverage on "Any Auto",
defined as autos owned, hired and no�-owned.
$1,000,000 each accident on a combined single limit hasis. Split limits are acceptable if lnnits are at
least:
$250, ODO Bodidy Irrjury per persorr /
$500,000 Bodilylnjuryperaccid�nt/
$1 QO> 000 Property Daratage
5C-5.04D., "Contractnr's Insurance"
T`he Cantractor's canstruction activitiies will require its employees, agents, subcon�ractors, eqUipment, and
�natarial deliveries to nross railroad praperties and tracks: none.
The Contractor shall conduct its operarions on railroad properties in such a manner as not to iniarfere with,
hinder, or okistruct the railroad con�pany in any manner whatsoever in the use or operation of itsCtheir trains
or othar property. Such aperat�ons on raiiraad properties may require that Contractor to execute a"Right of
Entty Agr�ement" with the particular xailroad co�npany or companies involved, and to this end the
Contractor shQulci satisfy itself as to the requirements of each railroad company and be prepared ta execute
the right-of-entry (if any) required by a railroad aompany. The rec�uirements specified herein i�kewise relate
to the Contractar's use of privaie and/ar construction access roads crnssing said railroad compan.y's
properties.
The Contractual Liability coverags required by Paragr•aph 5.04D of the Genera] Condiiions shall provide
coverage for not less than the foll�wing amounts, issued by companies satisiactory to the City and to the
Railroad Company for � term that continues for so long as the Contractor's operations and work cross,
ocaupy, nr tnuch railroad properky:
(1} General Aggregate:
(2) Each Occurrence:
_ Required for tFtis CQntract
$Corrfirm La»rits with Railraad
$Con arm Limits �ith Railroad
X Not req�sired for this Contract
Witl� respect to the abave outlined �nsurance requirements, the following shall go�ern:
1. Where a single railroad campany is involved, the Contractor shall p�•ovide nne insurance policy in
the name of the raifroad company. However, if more than one �rade separation or at-grade
crossing is affected by the Project at entirely separate bcatians on the line or lines of the same
railroad cnmpany, separate covarage may be rec�uired, eaeh in the a.mount stated abnve.
CITY OF PORT WORTH 2O2� On-Call Pavement Markings Contract #2
STANDARD CONSTRUCTION SPEC.TFICATION DOCUMENTS CPN 10374�
Revised March 9, 2020
00 73 40
SUPPLEMEiVTARY CONDITIONS
Page 4 of 6
2. Wl�ere more than one railroad company is operating on the same right-o€-way nr where several
railroad compan.ies are invalved and operated on their own sepa�•ate rights-of way,. the Contractor
may b� required ia provid8 separate insurance policies in thc name of each railroad company.
3. Tf, in addition to a grade separation or an at-grade crossing, other wori� or aetivity is proposed on a
railroad company's right�of-way ak a location entirely separate from the grade sepa�•ation or at-
grade crossing, insuranca coverage for #his work must be included in ihe policy cavering the grade
separation.
4. If no grade separaE�an is involved 6ut other work is proposed an a railroad company's right-af
way, ail such other work may be covered 'm a single poiicy far that railroad, even though the vrork
may be a# two or rr►ore sep�'ate loeations.
No work or activiiies on a railroad company's property tn be performed by the Contractor shall be
commenced until the Contraetor has furnished the City with an ariginal policy or policies of the insurance
for each railrnad company named, as required above. All such insurance m�st be approved by the City and
each affected Railroad Company prior to the Coniractor's beginning wr�ric.
"fhe insurance specifiad above must he ca.rried until all Work tn be perfonned an the �•silraad right-of way
has been campfeted and the grade crossing, iFan�, is no longar used hy the Contractor. Tn addition,
insurance must be ca�•ried during all maintenance and/or repair work p�rfar�ned in the railroad right-of way.
Such insurance must name the railroad cotnpany as the insured, tagether �vith any tenant or lessee of the
railraad company operating over trasks involved in the Pi�jeet.
SC-6.4�4., "Project Schedule"
Project schedule shalf be tier 2 For the project.
SC-6.07., "Wage Rates"
The following is the prevailin� wage rate tabla(s} applicable to this project and is provided in the
Appendixes:
2� 13 PREVAILING WAGE RAT�B (Heavy and Highway Construction I'rajects}
2013 PKEVAILTNG WAGE RATES (Commereial Canstructio.n Projeets)
A copy of the tab[e is also available by accessing the City's website at:
httqs: II �pp5. fo rt worthte�as.�ov/P roi ectReso urcesl
You can aceess the iile by following the directory paih:
02-Construction Documents/Specifications/DivD� — General Conditions
SC-6.09., "Permits and Ut'rlities"
SC-6.09A., °LContractor ok�tRined pe�•mits And licenses"
The following are known permits and/or licenses requirad by the Cantract to be acquired by the Contractor:
None
SC-6.09B. "City ai�tained permits anc[ licenses"
The following are known permits andlor licenses rec�uired by the Contrac# #0 6e acquired by the City:
Nc�ne
C1TY OF I'ORT WQRTH 2�20 Qn-Call Pavement Mazkings Contract #2
STANDARD COAi5Tl2U�CT10N SPECIF1CATlON DDCUMENTS CPN 103740
I2evised Marc[� 4, 2Q20
00 93 00
SUPPL�MBNTARY CONT3ITIONS
Page 5 of 6
SC-6.09C. "Outstanding permits and lrcenses"
The following is a]ist of known outstanding permits andlor licens�es to be acquired, if any as of Deeember
xo, Zo2o:
Outs#anding Permits and/or Licenses to Be Acquired
OWNER PERMIT OR LICENSE AND LOCATION
None
er� G ��u ccm•a� �c�Y r�;�.:i n:,�1,+�_,�,.}..�70GA .,...,.,,.....��.r»
. .� � ��.,-. �.0 «..........,..
TARG�'T' DATE
OF P055ESSION
� _ -
�
_ �- - _
■• �� _ . .
4 �
I �
� _ _
� \ � �
' •
i' 'a +' 'aE. l. o�:f.. o l.:.aa:.. ��..ci ..]io l. . +L,e ..r,��F,. F ..,.1. +.. ho
ava. iaiu v ..j ..... ................ �.., ...�__. .... .._
v �
i
e e
.,+:,. ..1
��
� _
!
#'- �
- ■' -
■._ - _
'�. ,:F1.4. l�i � 4 + kL.o ('.�e.4r.�n4� .,.ln�ui'v vv:ir...,n+ V.,F�1 +l,e !_��n+,-.,..+-....
f
..-v:�-c+r�roz f.. + ..,I,r.lo n �
��-vm.ri.�-.i-�nxirviriarxnxxrircivzr-vr��crescv - �..� ..uv�� :.. .. .. .. ... .:: i....
CITY OF FORT WORTH 2O20 On-Call Pavement Markings Contract #2
STANDARD CONSTRUCTIQN SPECTFTCA'E'IO1V DOCUMENTB CPN 10374fl
Revised Marcl� 9, 2020
00 73 OD
SUPPLE�vIEI+ITARY CpNDITiQNS
Page 6 of 6
� ■.
_ - — `
SC-7.02., "Ca6Cdinati0n"
The individuals or entities listed below have contracts with the C.ity fnr the performance of other woi•k at
fhe 5ite:
Vendor
None
of VWork
Coordinaiion A:utho
SG9.01., `°City's ProjecY Manager"
The City's Project Manager for tf�is Cont��act is Quenell ]ohnson, ar hislher successor pursu�nt to written
noti�cation from the Diractor of Transportation artd Public Works.
SC-13.D3C., "Tests and xnspectians"
Nane
SGI4.02G "Retaina�e"
Due to the nature of this contract, no retaanage will be held.
SG16.OIC.1, "Met!'tods and Procedures"
None
END OF SECTION
Re�ision Log
DA�E NAME SUMMARY OF CHANG�
112212fl16 F. Gri�in 5C-9.01., "City's Project Representafive" wording changed to City's Prajec#
Manager.
319I2Q20 D.V. Magana S�-6.07, Updated tMe linlc such that files can be accessecf via the City's
website.
C1TY QF FORT WORTH 2D20 On-Call Psvement Markings Contract t!2
STANDARD CDNSTRUCT70N SPECIFICATION D�CUM�ASTS CPN 1U374D
Revised March 9, 2020
o� �� aa- i
stFn��a.av oF wox�
Page 1 of3
SECTION Ol 11 00
SUMMAIZY OF WORK
PARTI- GENERAL
1.1 SiTMMARY
A. Section Includes:
1. Surr�mary of Work to be perfarmed in accordance with ihe Contract Dqcuments
B. Deviations from this City of Fort Worth Standard Speci%cation
1. None.
C. Relafed Specitication Sections include, but are not necessarily limited to:
1. Di�ision 0- Bidding Reguirements, Contract Forms, and Conditions of the Contraoi
2. Division 1� General Requirements
1.2 PRrCE AND PAYMENT PROCEDYTR�S
A. Measurement and Payment
1. Work associated r�vith this Item is considered subsidiary to the various items bid.
No separate payrnent wi116e ailowed for this Ttem.
1.3 REFERENCES [NOT TJSED]
1.4 ADMINISTRATIVE REQUXREMENTS
A. Work Covered by Contract Dacuments
1. Work is fo include furnishing all labar, cnaterials, and equipment, and per%rming
all Work t�ecessary for this construction project as detailed in the Drativ�ngs and
Speci�ications.
B. Subsidiary Work
1. Any and all W'ork specifically go�erned by documentary requu•ements for the
pro}ect, such as conditions imposed by the Drawings or Contract Documents in
which no specific item for bid has b�en provided for in the Proposal and the item is
not a typical unit bid itein included on the s#andard bid item lisi, th�n ihe item shall
be considered as a subsidiary item of Work, the cost of whicl� shall be included in
the price bid in the Proposal far various b.id items.
C. Use of Fremises
1. Caordinate uses of premises under direction af �he Cii}r.
2. Asstltne full resgonsibility far pratection and safekeeping of materials and
equip�nent stored on the Site.
Use and occupy only portions of the public streets and alleys, or other public places
or other rights�of-way as provided for in the ordinances af the City, as shown in the
Contract Doctitments, or as may be specifically �.utllorized in writing by the City.
a. A reasonable amaunt of tools, inatexials, and equipment for construction
purposes may be stored in such space, but no more than is n�cessary to avoid
delay in the construction ape�'atians.
CITY QF FORT WORTH 2O2D On-CaILPavement IVlarkings Contract #2
STAirIT]ARp CQNSTRUCTI03d SPECIFICx1TION UQCUMEIYTS CPN 103740
Tievised Decein6er 20, 2012
oi itoo-z
SUNfMATtY OF V10RK
Page 2 nf 3
b. Excavated and �waste inaterials shall be stored in such a way as not to interfere
with the use of spaces that may be t[esignaYed to be left free and unnbstz'ucted
and so as not to incon�enience occupants of adjacent properiy.
c. If the sYreet is occupied by railroad tracics, the Work shall be carri�d on in such
rnanner as not to interfere with the operation of the railroad.
1} All Work shall be in accordance with railroad require�nents set forth in
Division 0 as well as the railroad permit.
D. Work within Easements
1. Do not enter upon private property for any purpose without ha�ing previously
ob#ained permission from the owner of such property.
2. Do not store equipmenti or material on private property unless and until the
speeified approva] of the property owner has been secured �n writing by the
Contractor and a copy furnished to the City.
3. Unless specifically pravided otherwise, clear �ll rights�af-way or easem�nts of
abstxuctions which inust be removed to make �nssible proper prosecution of tl7e
Work as a park of the project const��uction operations.
4. Preserve and use every precaution to pre�ent damage to, all trees, shrubbery, plants,
lawns, fences, culverts, curbing, anci all other types of structures or improvements,
to al] water, sewer, and gas lines, to a11 conduits, overhead pole lines, ar
appurtenances thereof, including the cflnstruction of teinporary fenc.es and to all
other public or private property adjacent to the Work.
S. Notify the proper representatives of the owners or oceupanis of the public or private
lands of interest in lands which rnight be affected by the Work.
a. 5uch notice shall be made at least 48 haurs in advance of fhe beginning of the
Work.
b. Notices shall be appIicable to both publie and private utility companies and any
eorporation, eompany, individual, or otk�er, either as owners or occupants,
whose land or interest in land might be af%cted by Yhe Work.
c. Be responsibla for ail damage or injury to pz'operty of ar�y character resulting
from any act, omission, negiect, or misconduct in the manner ai• rnethad or
ex�cution of the Work, or at any time due to defective wark, rnaterial, or
equiprnent.
6. Fence
a. Resfore a13 fences encountered and removed during consiruction of �e Froject
to ti�e original or a�etter than ori.gina.l c�rndition.
b, Er�et temporary fencing in piace of the fencing removed whenever the Work is
not in progress and when the site is vacated a�ernight, and/or at all times to
provide site security.
c. The cQst for all fence work within easements, including :removal, temporary
closures and replacement, shall be sul�sidiary to the variaus items bid in the
project proposal, unless a 6id item is specificaliy provided in the proposal.
CITY �F PORT WQRTI� 2020 On-CaEI PavemenY Markings Contracti #2
STANDARD COIVSTRUC'l'IQN SPHCII'[CATION DOCLIM�HTS CPN 1Q3740
Revised December 20, 20 i2
Dl 110D-3
SUMMARY OF VJORK
Yage 3 nf 3
1.5 SUBMXTTALS [NOT USED]
1.6 ACTXON SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT iTSED]
1.7 CL4S�OUT SiTBMITTALS [NOT USED]
1.8 MAYNTENANCE MAT�RIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSUItANCE [NOT U�EDI
1.1� DELNERY, STORAGE, AND �TANDLING �NOT USED]
i.11 ��ELD [SITE] CDNDITIONS [NOT USED]
1.12 WARRANTY [NOT US�D�
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OI' F'ORT WOATH 2620 On-Call Pavement Markings Contract #2
STAi�lDARD CONS`1'RUCTION SPECIFICATION DOCUMENTS CPN ]03740
Revised l7ecemher 20, 2012
O 1 25 43U - 3
SUBSTITUTIQhI PROC�DilJRES
Page l of 4
SECTION QI 25 00
SUBSTITUTION PROCEDt.TRES
PART1� GENERAL
1.1 SUMMARY
A. 5ection Includes:
1. The procedure for requesting the approval of substitution of a prpduct that is not
equivalent #o a product which is specified by descriptive or perfarrnance criteria or
defined by reference to 1 or more af the following:
a. Name of manufacturer
h. Narne of vendar
c. T�•ade name
d. Catalog numb.er
2. Substitutions are not 'br�equals".
B. Deviations fro�n this City of �`ort Worth Standard Specification
1. None.
C. Related Speciiication Seetions include, but are n�t necessarily lirnited to:
i. Division D— Bidding Requirements, Cantract Farms and Conditions of the Contract
2. Division 1— G�neral Req�irements
1.2 PRICE AND PAI'MENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considez'ed subsidiary to ihe various items bid.
No separata payment will be allowed �or this Item.
1.3 REFERENC�S [NOT USED]
1.4 ADMINXSTRATIVE REQUIREMENTS
A. Request for Substitution - General
1. Within 30 days after award of Con�ract (unless noted otherwise), the City will
consider %rznal requests from Contractor for suhstitution of pz'aducts in p.lace of
tY�ose speci�'ied.
2, Certain types of equipment and kinds of material are described in 5peeif cations by
means of references to names af manufacturers and vendors, trade names, or
catalog nLimbers.
a. When this method of specifying is used, it is not intended to exclude from
consideratian other products bearing other manLYfacturer's or vendor's names,
trade names, or eatalog numbers, provided said produets are "or-equals," as
determined by City.
3. Other iypes of eqLtipment and kinds of material may be acceptable substitutions
under the following conditions:
a. Or-equals are unavailable due to strika, discontinued producfion of products
meeting specified requirernents, or other factors beyo.nd eontrol of Contractor;
or,
CITY OF FORT WORTH 2O20 On Call Pavement Markings Contract#2
STANDARD CONSTRUCTION SPECIFICATION DOCUNfENT� GPN 1p3740
Revised July 1, 2Qi 1
012500-2
3UB3TIT[3TI�N PROCEDURBS
Page 2 of 4
b. Contractor proposes a cast and/or time reduction incentiva ta the C'ity.
1.S SUBIVIITTALS
A. See Request for 5ubstitution Form {attached)
B. Procadure for Requesting Substitutin.n
1. Substitution shaI1 be c�nsidered only:
a, After auvard of Contract
b. Under the conditions statad herein
2. Submit 3 copies of each written request for substitutian, including:
a. Doeumentaiian
1) Complete data substantiating compliance of prapased substitution with
Contract Documents
2) Data relating to changes in const�'uctian schedule, when a r�duction is
proposed
3) Data relafing to changes in cost
b. For products
1) Product identification
a} Manufact�ver's name
b) Telephone number and represer�tative contact name
c) Specification Section or Drawir�g reference af ariginally speeifed
product, including discrete name or tag number assigned to original
prodLrct in th� Cantract Dacumenis
2) Manufacturer's literature clearly inarked to show compliance of proposed
produci with Contract Documents
3) Itemized comparisan of ariginal and proposed product addressing product
characteristics including, but not necessarily limited �o:
a) Size
b} Compositian oi• materials of constructian
c) Weight
d} Electrical or mechanical requirements
4) Praduet experience
a) Lacation of past projects t�tilizing product
b) Name and telephone number af persons assaciated vvith referenced
projects knowledgeable concarning proposed product
c) Available field data and r�pnrts associated with propos�d product
5) 5amplas
a) Pro�ide at request of City.
b) Sarnples become ihe property of the City.
c. �`ar construction �nethods:
1} Detailed description ofproposed method
2) Iilustration drat�ings
C. Approval or Rejection
1. Written appraval or rejection of s.ubstiiutton given by the City
2. City reserWes the right to require proposed prnduct to coinply with colo.z' and pattern
of specified product if necessary ta secure design intent.
3. In the event the substitution is approved, the r�sulting cost and/or tilne reduction
will be doeumented by Change Order in accordance with the General Conditions.
Cl"1'Y OF FORT WORTFI 2020 On-Call Pavement Markings Contract #2
STANDARb COI+iSTRUCTIOAi SPBCIFICATION DOCLIM�iVTS CPN 10374D
Revisad ,luly 1, 2011
012500-3
5UB5TITU'fION PROCBDURES
Page 3 of 4
4. No addit�onal contract time �aill be given far substitution.
5. Substitation will 6e rejected if:
a. Submittal is not thraugh the Contractor with his stamp of approval
b. Request is not made in accordance wiih this Specification Seetion
c. [n the City°s opinion, acceptance will raquire substantial revision of tl�e original
design
d. In the City's opinion, substitution will not perfo��rn adequately the function
consistent wiYh the design intent
1.6 ACTION SUBNIITTALSIINFORMATIONAL SUBIVIITTALS [NOT USED�
1.'� CLOSEOUT SUBNIITTALS [NOT USED]
I..8 MAINT�NANCE MATERL4L SUBNIITTALS [NOT USED]
]..9 QUALITY ASSURANCE
A. In making request for subst�tution ar in using an approved produci, the Contractor
represenis ttiat the Contractor:
1, Has investigated propasad product, and has deterrnined that it is adequate or
superior in aIl respects to that specified, and that it will perform functiQn for which
it is intended
2. Will pro�ide satne guarantee for substitute i1:em as for pt'oduct specified
3. Will coardinate installation of accepted substitution inta Work, to include building
modifications if e�ecessary, mai�ing sueh changes as may be required for Worl� to be
complete in all respeets
4. Waives all clairns far additional costs reiatad to substitution which subsequent�y
arise
1.10 DELIVERY, STORAGE, AND HANDLING [NOT 1TSEDj
1.11 T�XELD [SITE] CONDITIONS [NOT USED]
1.12, �'VARRANTY [NOT USED]
PART � - PRObiTCTS [NDT USED]
PART 3 - EXECUTION [NOT U�ED]
END O�' SECTION
Revision Log
DATE NAME SUMMARY �F CHANGE
CITY pF FORT WORTH 2�.20 On-Ca[[ Yavement Markings Cantraet #2.
STANDARD CON3TRUCTTON SPECIFICATION DOCUMGNTS CPN 10334D
Revised Ju{y 1, 20] 1
Oi2504-h
SUBST[TUTiON PROCEDTJIZES
Page 4 of 4
�XHISIT A
REQUE�T T� �R SUBSTITUTION TORM:
TO:
PROJECT: DATE:
We hereby subrnit for yaur consideration the following prodttct instead of t11e specified ifem for
the above project:
SECTION PARAGRAPH SPECIFIED ITEM
Proposed Substitution:
Reasan for Substitution:
inelude complete in�ormation on changes ta Drawings and/or Specificat�ons which proposed
substitution wiil require. f�r its proper installatian.
Fiil in Blanlcs Below:
A. Will the undersigned contractor pay for changes to the building design, including engineering
and detailing costs caused by the requested su�stitution7
B, V�hat effect does substitution have on other trades7
C. Differences between proposed subsiitution and specified item?
D, Di�ferences in product cast or product delivery time7
E. Manufa�turer's guaraniees of th� proposed and specified items a.ra:
�qual Bettez' (explain on attachment)
The undersigned siates that the function, app�axance and quality are equivalent or superior to the
specified item.
Submitted By: For Use by City
Signature
as noted
Firrn
Address
Date
'Telephone
For LTse by City:
Appro�ed
City
CITY OF FORT WORTH
57'ANDARD CONSTRUCT[ON SPECIFICATION DqCUM�NTS
Revised ]uly 1, 20l 1
� Recommended
_ Not recommended
By
Date
Remarks
Date
Rej ected
Recommended
Received late
202D On-Call Pavenient Markings Contract #!2
GPN 10374D
D13119-i
PR�CONSTRUCTiON M��TING
Page 1 of 3
SECTION Q131 19
PRECONSTRLTCTION MEETING
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Frovisions for the preconstruction meeting to be held prior to the stai�t oi Work to
clarify construction contract administration procedures
B. Deviations from this City of FQrt Worth Standard Specification
l. None.
C. Related Specificaiion Sections include, but are not necessarily Iim�ted to:
1. Di�ision 0— Bicfding Req�airements, Gontracf �'orms and Canditions of the Contract
2. Divisian I— General Requiremenis
l.2 PRICE AND PAYMENT PR[)CEDiTRES
A. Measurement and I'ayment
1. Work associated with this Item is cansidared subsidiary ta the various items bid,
No separate payment will be a.11owed for this Itern.
1.3 REFERENCES �1VOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coa.rdination
1. At�and preconstruction meeting.
2. Representati�es of Contractor, subcontractors and suppliers attending meetings
shall be quali�ed and authorized to act on b.ehalf of the entity each represents.
3. Meeting administered by City may be tape recorded.
a, If recorded, fapes wiIj �e used to prepare minutes and retained by City far
future reference.
B. Prec�onstruction Meeting
I. A preconstrLtction meeting; wi116e held within 14 days after the execution of the
Agreement and be%re Work is started.
a. The meeting will be scheduled and administered by the City,
2. T11e Praject Representative will preside at the m�eting, prepare the notes of the
meeting �nd distribute copies of same to all participants who so request by fully
compieting the attencfance form to be circulafed af the beginning of the meeting.
3. Attendance shall include:
a. Project Repz•esentative
b. Contractor's projec# manager
a Contractor's superintendent
d. Any subcontractor or supplier representatives whom the Contracto� may desire
to invite or #he City may request
CITY OF' FOItT WdRTH 2O20 On-Call Pavement Markings Contracl #2
STANDAI2D COI+ISTRUCTION SPECII'ICFITION DdCUMBNTS CPN 103740
Revised August 17, 2012
O1 31 l9 -2
PRECONSTRUCT[QN ME�TTI<1G
Page 2 of 3
�.
5.
e. Other City representatives
f. Others as apprapriate
Construction Schadule
a. Prepare baseline construction sc�edule in accordance with �ection �1 32 lb and
provide at Preconstruction Meeting.
b. Cify vvill notify Contractor of any scl�erlule changes upon Notic� nf
Preconsiructian Meeting.
Pr�liminaay Agenda may include:
a. TnTa'oduction of Project Personnel
b. General Description of Pr�jaet
c, Status of right-of-way, utility clearances, easements or other pertinent permits
d. Cantractor's work plan and scheduie
e. Contract Time
f. Notice to Prnceed
g. Construction Stalcing
h. Frogress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Materia]
L Insurance Renewals
m. Payroll Certification
n. Material Certifications and Quality Contral Testing
o. P�tblic Safety and Canvenience
p. Dacumentatian of Pre-Construction Conditions
q. Weekend Work Notification
r. �.egal H�lidays
s. TrencI� Safety Plar�s
t. Confined Space Entry Standards
u, Coordinati.on with the C{ty's representative for operations of existing water
systems
v. 5torm Water Pollutinn Prevention P1ari
w. Coordination with other Contractors
x. Early Warning Syst�m
y. Contractor Eva�uaiion
z. Special Conditinns applicabie to tlze projeci
aa. Damages Claims
bb. Suhmittal Procedures
cc. Substitutinn Pracedures
dd. Correspondence Routing
ee. Record Drawings
ff. Temporary const�•uction facilities
gg. M/WBE or MBE/SBE procedures
hh. Fina! Acceptance
ii. Final Pa�ment
jj, Questions or Comrnents
C1TY OF F�RT WORTH 2O20 On-Call Pavement Marfcings Contract #2
STANDARD CONS'1'RUCTIDN SP�CIFICATION DOCUMENTS CFN 103740
IZevised August 17, 20[2
Ol 3l 19 - 3
PRECONSTRUCTION MHETING
Page 3 af 3
L5 SiTBMITTALS [NOT US�D]
i.6 ACTION �UBMITTALSIINRORMATIONAL SUSMITTALS [NOT USED]
1.7 CLOSEOUT SUBNiITTALS [NOT U�ED]
1.$ MAINTENANCE MATERIAL Si7B1VIITTA�S [NOT USEDj
I.9 QiTALITY ASSU�tANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLXNG [NOT USEDj
1.11 I'IELD [SITEI CONDXTION� �NOT USEDj
f.12 WARRANTY [NOT U�ED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - �XECUTION [NOT USEDj
END OF SECTIDN
Revision Log
DAT� NAME SL]MMAR'Y �F CHANGE
CiTY OF PQRT WDRTH 2�20 Un-Call Yavetnent Maricings Contract #2
STANDAEtll CQNSTRUCT[ON SPECTFICATION DOCUMENTS CPN 103740
Revised August l7, 2fl12
653216•1
CONSTRLTCTION PRQGRE55 SCHEDULE
Page 1 of 5
SECTION U132 16
CON�TRUCTTON PROGRESS �CHEDULE
PART1- GENERAL
I.I SUMiVIA.RY
A. �ection [ncludes;
1. General requirements for the preparation, submit�al, Llpdating, status reporting arid
management of th� Construction Progress 5cheduIe
2. Specific requireinents are presented in the City of Fort Worth 5chedule Guidance
Document
B. DevEations from this Cify of Fart Worth Standard Specification
1. Nane.
C. Related Specification Sections include, but are not n�cessariIy limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of tY�e Contract
2. Division l— General Requirements
L2. PRICE AND PAYMENT PROCEDURES
A. Measurement and 1'ayment
1. Work assaciated with this Item is consi�iered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REF�RENCES
A. Deimitions
1. Schedule Tiers
a. Tier 1- No schedule suhmiital required by contract. Small, brief duration
projects
b. Tier 2- No schedule submittal required l�y contract, hu� wil] rec�uire some
mii�stone dates. Small, 6rief duratian projects
c. Tier 3- Schedule submii�al required by contract as described in the
Specification and herein. Majority af Ciiy proje�ts, including all bond prograrn
proj ects
d. Tier 4- Schadule submittal required by contract as described in the
Specifcation and herein. Large andlor complex projects with long durations
1) Examples: iarge water pump station project and associated pipeline rvith
intercor�nection to another goveramental entity
e. Tier 5- Schedule submittal required by cnntract as described in the
Specificatian and herein. Large andlor very camplex projects with long
durations, lugh public visibiliiy
1) Examples might include a water or wastewater treatmen� plant
2. Baseline Schedule - IniYial schedule submitted before work begins that will serve
as the 6aseline for �neasuring progress and departures from the schedule.
3. Progress Schedufe - Monihly sUbm.ittal of a progress sclledule docllm�nting
progress nn the project and any changes anticipated.
CITY OF FORT VirORTH 2D20 On-Cal] Pat+ernent Marking. s Contrect #2
STANDARD CONSTRUCTTdN SPECIFICATION �OCUMC]+1TS CP1V 103740
Revised duly 1, 201 I
oi 3z ts-�
CONSTRUCTTON PROGRESS SCHEDULE
Page 2 of 5
4. S�hedule Narrative - Concise narrative of the schedule including schedule
char�ges, expecl:ed delays, key schedule issues, critical patli items, etc
B. Reference 5tandards
1. City of Fort Worth Schedttle Guiclanee Document
1.4 ADMINISTRATIVE REQUIREMENTS
A. �aseline 5chedule
1, General
a.
b.
c.
Prepare a cast-loaded haseline Schedule using approved saftware and the
Critical Path Method {CPM) as required in Yhe City of Fort Worth Schedule
Guidance Docum�nt.
Revi�w the draft eost-loaded baseline Sehedule with the City Yo demonst�•ate
und�rstanding of the worl� to be performed and lcr�own issues anci constraints
telated to ihe schedule.
Designate a� authorized reptesentative (Pra�ect Schedul�r) responsible far
developing and updating the sehedule and preparing reports.
B. Progress Schedule
1. Updaf� the progress Schedule monthly as i•equired in the City of Fort Worth
Schedule Guidance Docu3nent.
2. Pr�pare the Scheditle Narrative to aceompany the �nonthly progress 5chedule.
3. Change Orders
a. Incorporate approved change orders, resulting in a change of contract time, in
the baseline �ch�dule in accordance with City of �'ort Worth Scheduj�
Guidance Document.
C. Responsibiliiy for Schedule Compliance
l.
2.
W1lenever it becomes apparant from the current progress ScheduIe and CPM StaYus
Report that delays to the cxitical path have result�d and the Contraci eomple%ian
date wi11 not be met, ar when sa directed by the City, make some or all of tl�e
foljowing actions at no additional cost to the City
a. 5ubmit a Recavery 1'lan to the City for approval revised base�ine Schedule
outS�ning:
1) A writien state�nent of fhe steps intended to take to remove or arrest the
delay to the critica] pa#h in the appro�ved schedule
2) I�cr�ase consn•uction manpowe�' in such quantities and crafYs as will
substantially e�iminate the backlog of wark and return current Schedule to
meet projected baseline completion dates
3) Increase the number of working hours per shift, shifts per day, working
days per week, the amaunt of construction equipment, or any combination
of the faregoing, suf�ciently to substantially �lianinate the backlog of work
4) Reschedule activitles to achieve maximum praetical concurrancy of
accomplishment of activities, and camply with the revised schedu]e
I�' na written statement of the steps intended ta take i.s submitted when so rec�uested
by the Ciiy, the Ciiy may direct the Cont�•aetor to increase the level af effort in
manpower (trades), e�uiprnent and work schedule (overtime, weekend and holiday
work, e#c.) to be �mpEoyed by the Contractnt in order to remove or arrest t�ae delay
to the critical path in #he approved seheduie.
a. No additional cost for such work will be considei•ed.
CITY OP FaRl' WQRT�-I 2020 On-Call Pave�nent Markings Contract #2
STt1NDARll CONSTIZUCTIQN SPECIFICATION DOCUMEiYTS CPN 103740
Revised .Tuly {, 2011
O] 3216-3
CONSTRUCTIQN PROGRESS SCHEDULE
Page 3 of 5
D. The Contract cQmpl�iion time will he adjusted only for causes specified in this
Contract.
a. Requests for an e�ctension of any Contract completion date must be
suppleinented with the follaw�ing:
I} Furnish justiiieation and supporting evidence as the City may deem
necessary to determine whether the requested extension of ti�ne is entitled
under the provisions o�this Contract.
a) Tl1e City will, after receipt of such justification and sup�arting
e�idence, inak� �ndings of fact and will advisa the Contractar, in
writing thereof.
2) If the Ci�y fnds that the requested exiensian of time is entitled, the City's
determination as to t11e total number of days allowed far the extensions
shali be based upon ihe approved total baseline scheduie and on all data
relevant to the extension.
a) Such data shal] be included in the next updating of the Progress
schedule.
b) Actual delays in aativities w�ich, according ta the Baseline schedule,
da not affact any Contz'act completion daie show� by the eritical path in
the network will not be the basis for a. change therein.
2. Submit eachrequest for change in Contraet completlon data to the City wit�in 30
days after the beginning of the delay for which a time extension is requested but
hefore the date of final payment under this Contract.
a. No time extension will be granted for requests which are not submitted witl�in
tha foregoing time limit.
b. From time to time, it tn.ay be necessary for the Contract schedule or completion
time to be adjusted by Yhe City to reflect the effects of job conditions, weather,
technical difiicuities, strilces, unavoidable delays on tl�e part of the City or its
representatives, and ather unforeseeable conditions which may indicate
schedule adjustmants or completion tim� extensions.
1) Under such conditions, the City wzll direct the Contractor to rescheduIe the
woz•k or Cantract completion time to reflect the changed conditions and the
Contractor shall revise his schedule accordingly.
a) No addifional compensation will be made to the Contractor for such
schedule changes except far unavaidable overall eontract time
extensions beyond the actual completion of unaffected work, in which
case the Contractor shali #ake aIl possible action to minimize any time
axtension and any additi�onal co�t to the Gity.
b) Available float time in the BaseIine schedule may be used by the Ciiy
as well as by the Contractor.
3. Float or slack time is defined as t�e amount af time between the earliest start date
and th� latest start date or between the earliest finisl� date and the latest finish date
of a chain of activities an the �aseline Schedule.
a. Float ai• slack time is not fpr the exclusive use or benefit of either the
Contractor or the City.
b. Proceed with work aceording to early start dates, and the City shall have the
right #o reserve and a�portion float t�me accarding to the needs of the proj ect.
CITY OF FORT WQRTH 2O20 On-Call Pavemant MarkiRgs Conh•act #2
STANDARD COI+ISTRUCT1pN SP�CIPTCATIOl�i D�CUIVIENT5 CPN 103740
Revised July 1, 2011
ai3ai�-a
CONSTfLLJCTION F1tOGRES� SCHEDUi.E
Page 4 of 5
c. Ackr�owledge and agree that actual delays, af%cting paths of activities
containing float time, wi11 not have any effect upon coniracf completion times,
providing that the actual delay does not exceed the float tizne assQciated with
those activities.
E. Coordinating Schedule with Other Contract Schedules
1. Where work is to be performed under this Cantract concurrently with or contin�ent
upon work perfartned on the same facilities or area under othez' contracts, the
Baseline Schedule shall be coordinat�d with the schedules of the other contracts.
a. Obtain the schedules of the other ap�ropriate contracts fra.zn the City for th�
preparation and updating of �aseline sched�le and malce the required changes
in his schedule when inciicated by changes in corr�sponding scheciules.
2. In case of interference between the operations of diff�rent contractors, the City will
det�rmine the work priarity csf each contractor and Yt�e sequence of work necessary
to expedite the compl�tion of the entire Proj ect.
a. In such cases, the decision ofthe City shall be accepte.d as �inal.
b. The temporary� deiay of any work due to such circumstancas shail nnt be
considered as justification for ciaims for additional eompensation.
1.5 SUBMTTTAL�
A. Basaline ScheduIe
1. Submit Schedule in native file forma� and pdf format as required in t11e City of Fort
'Worth Schedule G�iidance Document.
a. Native iile f�rmat includes:
i) Primavera (P6 or Primavera Cantractor)
2. Submit draft baseline 5chedule to City prior to the pre-construction meeting and
bring in hard cnpy to the meeting fot review and discussion.
B. Yrogress Scheduie
1. 5ubmit progxess Sehedule in na#ive file format and pdf fortnat as required in the
City of Fort Worth Schedule Guidance Document.
2. Submit progress ScheduSe monthly no later than the last day of the month.
C. Schedule Narrati�ve
1. Subtnit the schedule narrative in pdf for�nat as required in. the C.ity of Fort Worth
5chedule Guidance Document.
2. Submit schedule narrative montl�iy no later than the last day of the month.
D. 5ubinittal Prncess
1. The City administers and �na�ages schedules through �uzzsaw.
2. Contractor shall suhmit documents as required in the City of Fori Wort11 Schedule
Guidance Document.
3. Once the project has been completed and Final Acceptance has been issued by the
City, no fiirther prQgress schedules are reqtiEired.
CITY OF FQRT W�RTH 2O20 On-Call Pavement Markings Contract #2
STANDARI? CQNSTRUC`I'ION SP�CIPICATIdN bOCL1CvIENTS CPN 1Q3740
Revised July 1, 201 l
4132E&-5
CO1�fSTRiICT[ON P�tOGRESS SCHED[1LE
PageS oF5
1.6 ACTION Si7BMITTALSIINFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOS�OUT SUBMITTALS [NOT US�D]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT T7SED�
1,9 QUALITY ASSURA.NCE
A. T1�e person preparing and revising the constructlan Progress Schedule sha11 be
experienced in the preparation of schedules of similar complexity.
B. Schedule and supporting documents addressed in this Speciiicatian shall he prepared,
u}�dated and re�ised to accutately re#lect the performance of the construction.
C. Contraetor is responsible for th� quality of all suhmittais in this section meeting the
standard of care fflr flie canstruction industry for sirni�ar projects.
1.10 D�LIVERY, STORAGE, AND HANDLIIVG [NOT USED]
f.I]. FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USEDI
PART 2 - PRODUCTS [NQT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTI�N
Revision Log
DATE NAME SL3MMAItY OF CHANG�
CITY OP FOItT WORTH 2Q20 On-C�ll Pavement Marfcings Contract #2
STANBARD C�NS'CRUCTEON SPECIFICAT101d DOCUMENTS CPN 103740
Revised 7u[y 1, 201 l
013233-1
PRECONSTRUC`CIO1�I VIREO
Page l of 2
SECTION 01 32 33
PREC�NSTRUCTION VIDEO
PART1- GENERAL
1.1 SiT11'IMARY
A. 8ection Includes:
1. Administrative and p�'ocedura! requirements for:
a. Preconstruation Vidaos
B. Deviations from this Cify of Fort Wor�h Standard 5peciiicatian
1. No�e.
C. Reiated Specification Sections include, buf are not necessarily limited to:
1. Division D-- B idding Requiremenfs, Contract Forms and Conditions of t11e Contract
2, Division 1-- General ReqUirev�ents
i.2 PRICE AND PAY'MENT PROCEDURES
A. Measuremenl and Paymer�t
1. Work associated with this Item is considered subsitfiary ta the various items bid.
No 5�parate payment will be allowed for fihis Item.
1.3 REFERENCES [NOT USED]
1.4 A.DMTNLSTRATIVE REQUIREMENTS
A. Preconstruction Video
1. Produc.e a preconstruction videa of the sitelalignment, including ali areas in the
vicinity of and to be aft'ected by construction.
a. Provide digitai copy af video upon request by the City.
2. Retain a copy of the preconstruction videa u�til the end of tl�e maintenance surety
period.
1.5 SUBMITTALS [NOT USED]
1.G ACTXON �LTBMITTALS/IlVFDRMATI4NAL SUBNIITTALS [NOT USED]
1.7 CLOSEOUT SUBNIITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBNIITTALS �NUT USEDj
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT [7SED]
1.11 �'I�LD [SITE7 CONDITI�N� [NOT iTSED]
1.12 WARRANTY [NOT iTSED]
PART 2 - PRODUCTS [NOT USED]
CI"fY OF FaRT W�RTH 2O20 On-Ca�! Pavement Markings Contract #2
5TANDAt2D CONSTRi3CT[ON SPEC�ICATIbN DOCU1VfENTS CPAi i03740
Revised 3�dy l, 201 i
013233-2
PREC.�IVSTRUCTION VIDGQ
Page 2 of 2
PART 3 - EXECUTiON [NOT USEDj
END OF SECTYDN
Revision Log
DATE NAME SUMMARY OF CHANGE
C1TY OF PORT'U1dRTH 2O2b On-Call Pavement Markings Contract #2
STANDARD CONSTl2UCTION 5PBCiFICATIO]V DOCU11h�NT5 CPN 1037h0
Revised 7uEy 1, 2011
ot 3soo-i
SUBMTT'I'ALS
Page l nf 8.
SECTION 01 33 00
SUBMITTALS
PARTI- GENERAL
1.1 SiTMMARY
A. Section Inclu�ies:
C�eneral methods and requirements of sub�nissians applic�bla to the following
Wnrk-related submiitals:
a. Shop Drawings
b. Product Data (including Standaa'd Product List submitta3s)
c, Samples
d. Mock Ups
B. Deviations from ti�is City of Fort Worth Standard Speci�rcation
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Farms and Canditions of the Con.tract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measuj•ement and Payment
1. Work assaciated with this liem is considered subsidiasy to the various items bid.
No separate payment wi]] be allowed for this Item.
1.3 REFERENCES [NOT iTSED]
1.4 ADMINISTRATZVE REQUIREMENTS
A. Coordination
3. Notify the City in w.riiing, at the time of submittal, of any deviations in the
subtt�ittals fram the r�quirements ofthe Contract Documents.
2. Conrdination of Submittal Times
a. Prepare, prioritize and transmit each submittal sufficiently in advance of
performing the relatec3 Work ar ather applicable activities, or within the time
specifted in the individual Work Sections, of the Speeif cations.
b. Contractar is responsible such that �e installation wil� not be delayed by
pi•ocessing tiznes including, bui not limited to:
a) Disapproval ar�d resubznittal (if required)
b) Coordina�ion with other subinittals
c} `['esting
d) Purchasing
�) Fahrication
fl Deli�ery
g) Similar sequenced activities
c. No extension of time will be authorized because of the Conh'actor's failure to
ttansinit submittals sufficiently in advance of tile Work.
C1TY OF FpRT WORTH 2a2D On-Call Pavement Markings Gantract # 2
STANDAItD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 1037�10
Rer+ised Deeemher 20, 2012
o�3soo-z
SUI3MITTALS
Pege 2 of 8
d. Maka submittals promptly in accordance with approved schedule, and in such
sequence as to cause no delay in the Work or in the wark af any other
contractar.
B. Submitkal Numbering
1. When submittin�; shop drawings ar satnples, utilize a 9-cl�aracter submittal cross-
refer�;nce identifcation nuinbering systern in #he fallowing manner:
a. Use the first b digits of the applicab�e Specificat�on Section Number.
b. For the next 2 digits number use nuinbers D1-99 to sequentially number each
initial se}aarata item or drawin.g submitted undez' each specific S�ction number.
c. LaSt use a leiter, A-Z, indicating the resubrrmission of tne s�me drawing {i.e.
A=2nd submission, B=3rd submission, C=4tl'i submission, etc.). A typical
subrnittal number would be as follows:
03 30 00-08-B
1} D3 3Q 00 is tl�e Specification Section iar Conerete
2} OS is the eighth initzal submittal under this Speeification Section
3) B is the third submission (second resubmission) af that partzcular shop
drawing
C. Contractor Certification
l. Re�iew shop drawi�gs, product data and samples, including t[�ose by
subcontractors, prior to st�bmission to detet'tnine and verify the fallowing:
a. Field measurements
b. Field consiruction criieria
c. Catalog nurr►bexs and similar daia
d. Conformance with the Contract Documents
2. Pro�ide each shop drawing, sample and product data subtnitted hy the Contractor
with a Certification Statement affixed including:
a The Contz'actor's Compan}� nanae
b. Signature of submittal reviewer
c. Certification State�nent
1) `By tkus submittal, I l�ereby repr�sent that I l�ave determined and �erified
field ineasurements, field construction crit�ria, materials, dimensions,
eatalog numbers and similar data and I hava checked and coordinated each
item with ofher applicable approved shop drawings."
D. 5ubmittai Foxmat
1. Fold sl�op drawings iargez' than 8%2 inches x 11 inches to S%z inclzes x I 1 inches.
2. Bind shop drawings and ptaduct data slieets together.
3. Order
a. Caver Sheet
1) Desc�iption af Packet
2) Cantractor Certiiicatian
b, List of items 1 Table of Contents
c. Product Data /Shop Drawings/5atnples /Calculatians
E. Submittal Content
I. The date of sul�mission and the daies of any previol�s submissions
C1TY OF FORT WORTFI 2020 On-Cal l Pavement Markings Contraet # 2
ST;4NBAiiD COI�STRUCTIO�T SPECIFICAT701� DOC.UM�NTS CPN 103740
Revised ]]ecamber 20, 2012
O13300-3
SUBNfIT"CALS
PAge 3 of 8
2. The Projeel: title and nurnber
3. Contractor identifica�ion
4. Ti�e names of:
a. Contractor
b. �uppli�r
c. Manuiacturer
S. Identification of fhe product, with the Specif�cation Sectian number, page and
paragraph(s)
6. Field dimensions, clear�y identified as such
7. Relation to adjacent or critical features of the Wark or materials
8. Appltcable standards, such as ASTM ar Federal Specifi�ation numbers
9. Identification by higi�lighting of deviations from Contract Documents
10. Identification by highlighting af re�isions o� resubmittals
I l. Att 8-i�ch x 3-inch blank space far Ct�ntractor and City stamps
F. Shop Drawings
1. As specifed in individual Wark Sections includes, but is not necessarily limited to:
a. Custom-prepared data such as fabricatian and erectlanlinstallation (warking)
drawings
b. 5cheduled inftorination
c. Seiting diagrams
d. Aotual shnpvS+a�'k manufacturing instructions
e. Custom templates
f. Speezal wiring diagrams
g. Coordinatian drawings
h. Individual systein ar equipment inspection and test reports ineiuding:
1) Performance curves and certifications
i. As applica6le to the Work
2. Details
a. Relation of the variaus garts ta the main inembers and iines af the st��Lictu�'�
h. Where correct fabrication of the Work depencis upon field measurements
1) 1'rovide such measurements and nate on �he drawings priar to submitt�ng
for approval.
G. Aroduct Data
1. For subinitta]s of praduct data for products included on the City's Standard Product
I.,ist, clearly identify �ach item selected for use on the Project.
2. For submittals of product data for praducis noi included on the City's Standat'd
Product List, submittal data may include, bLtt I.S not necessarily jimited to:
a. Standard pr�pared data for manufactured products (sometimes referred to as
catalog data)
1) �uch as the manufacturer's praduet speci�cation and installation
instruct�ons
2) Availa6ility oi colors and pat�erns
3) Manufacturer's printed statements of compiiances and applicability
4) Roughing-in diagrarns and femplates
5) Catalog cuis
6) Praduct phatagrapF►s
CITY OF FORT WOIZTH 2O2D On-CAII Pavement Markings Conlract #E 2
STAN�ARD CONSTRUCTION SPECIFI�ATCOI�T DQCU1vIENTS CPN 103740
Revised December 20, Zal2
oi3sao-a
SiTBMITTALS
Page 4 of &
7) Standard wiring diagra�ns
8} Printed performance curves and operational-range diagrams
9) Production or quality control inspectzon a�d test reports and certiiicatians
10} Mill reports
11) Product operating and maintenance instructlons and recammanded
spare-parts jisting and printed product warranties
12) As applicable to the Wark
H. Sampies
1. As specified in individual Sections, include, b�t are not necessariiy limited to:
a. Physical exampl�s ofthe Work such as:
1) Sections af manufaettared or fabricated Wark
2) Small cuts ar containers of inaterials
3) Campl�te units of re�etitivaiy used products color/texturelpattern swatches
and range sets
4) Specimens for coordination of visual effecf
5) Graphic symbois and units of Work to be used by the City for indapendent
inspection and testing, as applicable to the Work
Do not start Work requiring a shop drawing, satnple ar product data nor any rnaterial to
be fabricated or installed prior io tha approval or qualified appi�oval of stiYch itam.
1. Fabrication performed, materials purchased ar on-site constructinn accomplished
which does not canform to approved shop drawings and data is at the Contractor's
risk.
2. The City wi11 not be liable for any expense or delay due to carreetions or remedies
requiz'ed to accomplisl� conformity.
3. Cnmplete project Warl�, materials, Fabrication, and installations in conformance
with approved shop cira�wings, applicable samples, and product data.
3. Submittal Distribution
1. Electronic Distribution
a. Confirm de�elapinent of Fraject d�rectory for ejectronic su6mittals to be
upioaded to City's Buzzsaw site, ar another exiernal rTP sjte approved f�y the
City.
b. Shop Drawings
1} LTpload subrnittal to designated project directory and notify appropriafe
City represen#atives via email of submittai posting.
2) Hard Copies
a) 3 copies for all submittals
b) If Contractor requires more than 1 hard copy of Shop Dra�rings
returned, Contt'actor shail subinit znore t3�an the numbar of copies listed
above.
c. Froduct Data
1) Upload suhmitfal to designated project directory and notify appropriatie
City representatives via email of subrnittai pnsting.
2) Hard Copies
a) 3 copies for a11 submit�als
d. Samples
1) Distributed to the Project Representative
2. Hard Copy Distribution (if required in lieu af electroruc distribution)
CITY OF FORT WORTIi 2020 On-Call Pavement Markings Contract �l 2
STANDARD CONSTRUCTtON SP�.CIFICATiON DOCUMEhI'I'S CPN 1 �374D
Ravised pecember 20, 2012
01330ti-5
5UB1vI1TTALS
Page 5 nf 8
a, Shop Drawings
I) Distributed to the City
2) Capies
a) $ copies for mechanical submittals
b) 7 capies for all nther s�bmittals
c) If Contractor requires rnore tha� 3 eopies of S.hop Drawings r�turned,
Contractor shall submit more than the nuznb�r of copies list�d above.
b. Praduct Data
1) Distributed to the City
2) Copies
a) 4 copies
c. S�mples
S) Distriblited to the Project Representative
2) Copies
a) Submit t1�e number stated in the respective Speciiicatian 5ections.
Distribute reprodt�ctions of agp��o�ed shop drawings and copies of appro�ed
product data and samples, where required, to the job site iile and elsewhere as
direated by the City.
a. Provide nunnber of copies as directed by the City but not exceeding the number
previausly speciiied.
K. Su63-nittal Review
1. The review af shop drawings, data and sarnples wili be for generai conformance
with the design concept and Cantract Doc�.tments. This is not to. be construed as:
a. Permitting any depar��zre fi'om the Contract requirements
b. Relieving the Contracfnr of responsibility far any errors, incIuding details,
dimensions, and materials
c. Ap.prnving departur�s from details furnished hy the City, except as atherwise
provided herein
2. The review and approval of shop drawings, samples or product data by the City
does not relie�e the Contractor from hislher responsibility with regard to the
iulfillment of the terins of the Contract.
a. A�1 risks of error and omission az'e assumed by the Contractor, and the City wilI
have no respansibility therefore.
3. The Contractar rernains responslble for details and accuracy, for caordinating ii��
Work with all oth.er assaciated worl� and trades, for selecting fabrication processes,
for techniques of assembly and for perfarming Work in a safe manner.
4. If the shop drawings, data or satnples as submitted describe variaiions and show a
departure from fhe Contract requireinents wh�ch City finds to be in the interest af
tile City and to be so minor as not to inv�lve a cl�ange in Gontract T'rice or tima for
perfor�nance, the City. may return the reviewed drawings without noting an
exception.
5. Submitta�� will be returned ta the Contractor under 1 of the faljowing codes:
a. Code 1
1) "NO EXCEPTIONS TAKBN° is assigned when there are no nntations or
comments on the submittal.
a) When r�turned under this code the Contractor may release the
equipment andlor material for manElfaciuz'e.
b. Code 2
Cl'TY OP P'ORT WOItTH 2D20 On-Cal I l�svement Markings Cantract # 2
STANDARD CONSTRUCTIQN SP�CIFICATTON DOCUMEIV'T5 CP1�I 103'I40
Revised Becember 2Q, 20I2
D13300-6
SUBMIT'i'ALS
Page b nf 8.
1) "EXCEQTIONS NOTED". This cod� is assigned when a canfirmatinn of
the notations and comments IS NOT requirad Uy the Contractor.
a) The Conh•actor may relea,se the equipment or material for manufacture;
hnwever, all notations a.nd cam�nents must be incarporated in�o the
�nal product.
c. Code 3
1) "�XCEPTIaNS NOTEDIRESUBMIT". This combination of codes is
assigned wheri notations and comments are �xtensive enougl�. to require a
resubmittaf of the pacicage.
a) The Contractor may release the equipment or material for manufacture;
however, ail notations and comments must be ineorporated into the
ftnal product.
b) This resubrnittal is to adtfress all comments, omissions and
nan-conforming items that were noted.
c) Resubmittal is to be received by the City within 15 Calendar Days af
the date of the City's transmi#tal requiring the resuhmittal.
d. Code 4
1) "NOT AP�'ROVED" is assigned when the su6mittal does not meet the
intent of the Cont��act Documents.
a) The Contractor must resubmit the entire packa�e revised to bring the
submjtta[ in�o conformance.
b.) It may be necessary to resubmit using a di.ff�r�nt manufactLirerf�endor
ta meet the Contract Documents.
Resubmittals
a. Handled in the same manner as �'irst sUbmittals
1) Corrections oiher than requested by the Gity
2} Marlted with xevision Eriangle or other similar method
a) At Contractor's risk if nat marked
b. Submittals far each item will be reviewed no more than twice at the City's
�xpense.
1} All su6sequant reuiews wi13 be performed at times convenient to the City
and at. the Coniractor's expense, based on the City's or City
Representative's then pr�vailing rates.
2) Provide Contractor reimbursement. to t�.e City within 30 Calendar Days for
all such fees invoiced by the City.
c, The need far tnore than 1 r�subrnissian or any other delay in csbtaining City's
revaew oisubmittals, will ttot entitle the Contractor to an extension af Cantract
Tiine.
7. Pai�tial Submittals
a. City reserves the right to not review submittals deerned Qarti�.i, at the City's
discretion.
b. Subrnittals deemed by the City to be not complete will be returned to the
C.ontractor, and will be considej•ed "Not Approved" Until resubmitted.
a The City inay at its opiion provide a list ar mark the submittal directing the
Contractor ta the at�as that are incomplete.
8. If the Contractor cansiders any correction indicated nn the shop drawings to
constit�tte a change to the Contract Docurnents, then written natiee must be
pr�vided thereof to the Ciiy at least 7 Calenciar Days prior to release for
manufact�re.
CI I'Y OI' rORT WOATH 2O2U On-Call Pavement Mazkings Contract # 2
STANDAItD CONSTI�iTCTIDN SPL�CIFICATIOAI DOCUMEN�3 CPN 103740
Revised DecemUer 20, 2D12
oi 33 00 - �
SLTBMITi�ALS
Page 7 vf S
9. When the shap drawmgs have been completed to the satisfaction of the City, the
Contractor may carry out the construction in accordance therewith and tto fiu-ther
chatages therein except upon written instructions from the Cit�.
10. Eac11 submittal, apprapriately coderl, wijl l�e returned within 30 Calendar Days
�ollowing receipt of submittal by the City.
L. Mocit ups
I. Mock Up units as specified in individual �ections, include, bui are nat necessarily
limited to, coa�plete ur�its of the standard of acceptance fa�� that type of Work to be
used on the Proj ect. Remove at the completion of the 'ViWork or when directed.
M. Qualifications
1. If speciiically r�quired in other Sectinns of these Specifications, submit a P.E.
Certification foi• each item required.
N. Req�est fQr Information (RFT)
1. Contractor Request for additional in%rmation
a. Clarification or interpretation of the contract docume�ts
b. When the Contractor believes there is a conflict between Contract DocL�inents
c. When the Contractor beliet�es there is a conflict between the Drawings and
Specifications
1) Identify the conflict and request clariiication
2. i7se the Request for Informaiion (KFI) forrn presvided hy Che City.
3. Numbering of RF'x
a. Pre�x with "1tFI" follaw�d by series number, "-x�", beginning with "01" and
increasing sequentially with each additional tra�smittal.
4. Sufficient infnrmation shall ba attached to permit a v�ritten response without fur�her
information.
5. The City will lag each reqliest and vvill re�iew the requ�st.
a. If review 4f the projeet information request indicatas khat a changa to the
Contract Documenis is required, the City will issue a Field Order or Change
Order, as appropriate.
1.5 SUBNiITTAInS [NOT LTSED]
1.G ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT U�EDj
L7 CLOSEOUT SUSMTTTALS [N4T USEDj
1.8 MAINTENANC� MATERIAL SUBMITTAL,� [NQT USED]
l.9 QtiALITY ASSURANCE [NOT USED]
�..10 DELIVERY,. STORAGE, AND HANDLING [NOT USED]
1.Zi FIELD [SYTE] CONDITIONS �NOT USED]
112 WAARANTY [NQT USED]
CITY OF FORT W�RTH 2O20 O�-Call Pavement Markings Contract # 2
STANDARD CONSTRUCTIOH SPECIPICATTOI�T DOCUMEHTS CPN 143740
Revised Qece�nber 20, 2U12
0133�0-5
SUBtv1ITTALS
Page 8 oi 8
PART 2 - PRODUCTS [NOT IISED]
PART 3 - EXECUTXON [NOT USEDj
END OF SECTION
Revision Lag
DAT� NAivIE
12C2012D12 D.Jdhuson
SUMMARY OF CHANGE
1.�I.IS.8. Warking Days modified fo Calendar Days
C17'Y O�' FORT WORTH 2U20 O�-Ca{l Pavement Markings Contra�t# 2
STANl7ARD C.ONSTRUCTION SPEGIFICATI01� DOCIIMENTS CPN 1037�0
Revised Decamber 20, 2012
p13513-1
SP�CIAL PRO.TEC'j' PROCEDURES
Page 1 of 8
�
SECTION Ol 35 13
SPECIAI� PRO�ECT PROCEDURES
3 PART 1- GENERAi.
4 1.1 SUMMARY
5
6
7
8
9
1�
11
12
13
14
15
16
17
18
19
A. Seciion Includes:
1. The procedures for speciai project circLtmstances that inciudes, but is not lirnited #o:
a. Coardination with Yhe Texas Department of Transportation
b. Work near High Voltage Lines
c. Confined Space Entry Program
d. Air Pollution Watch Days
e. Use of Explasives, Drop Weight, Etc.
f. Water Department Noti�cation
g. Public Notification Prior to Beginning Construction
h. Coordination with [lnited States Army Corps of Engineers
i. Coordination within Railraad permits areas
j. Dust Control
k. Empiayee Parking
B. Deviations from this City of F`ork Worth Standat d Specification
1. None.
2fl C. Related Specif'ication Sections inelude, but are nat necessarily Iiznited to:
2I 1. Divisian Q— Bidding Requiremenis, Cantract Forms and Conditions of the C.o�t�'act
22 2. Division 1— General Requirements
23 3. Sectipn 33 12 25 -- Connection to Existing Water Mains
24 1.2 PRICE AND PAYlVI�NT PR�CEDI7RES
25
26
27
28
29
3D
31
32
33
34
35
36
37
38
39
40
41
42
A. Measuz'ement and Payment
�. Coordination within Railroad permit areas
a. Measureme�t
1) Meastitr�ment for this Item wi11 be by lump sum.
b. Payment
1) The work performed and �naterials furnisl�eri in accordance with this Item
will be paid for at the lump sum price bid far Railrpad C.00rdination.
c. The price bid sha11 includ�:
i) Mabilization
2} Inspection
3) Safety training
4) AdditionalInsurance
5) Insuranee Certificates
6j Other requirements assoeiated with generai eoo.rdination vvith Railroad,
incIuding addiYional employees required to pratect the right-of-way and
property of the Railroad from damage arising ouY af and/or from the
canstruction of the Project.
2. Railroad Flagmen
CITY OF FORT WORT�[
STANDARD CONSTRLFCTIOIV SPECIPIC�TION T30CUMEIVTS
Revised Deeember 20, 2D l2
2020 dn-Call Pavement Markings Contract #2
CPN 103740
01 35 13 - 2
SP�CIAL PROJBCT PRdCEDUItES
page 2 af 8
1
2
3
�
5
6
7
8
9
la
li
12
13
a. Measurement
1) Measurement for this Item wil] be per working day.
b. Payment
1) The work performed aad maferials fi�rnished in aceordance with this It�m
wilj be paid for each worlcing day that Railroad Flagmen are present at the
Site.
c. The price bid shal� include:
1) C.00rdination for scheduling flagm�n
2) Fla�rnen
3) Qther requirements associated with Railroad
3. All other iterris
a. Work associated with these Items is considered subsidiary to the various Items
bid. No separat� payment wiil be allawed for this Item.
14 1.3 R.EFERENCES
15 A. Reference Standards
i6 1.
l7
18
19 2.
26
21 3.
22
f►�ej
2�4
25
26
27
28
29
30
31
Reference standatds cited in this Specification refer to the current refarence
standard published at the time of t�►e latest revision date lagged at the end of this
Specification, unless a date is specifically cited.
Health and Safety Cade, Title 9. Safety, Subtitle A. Pubiic Safety, Chapter 752.
High VoItage Overhead Lines.
North Cen#raI Texas Council of Governments (NCTCOG) — Clean Canstruction
Specification
1,4 ADMINISTRATNE REQUIREMENTS
A. Coordinatian with th� `I'ez�as Departmstat af Transportation
1. When work in the right-of way which is under Y.he jurisdi.ciion of the Texas
Dep.artment of Transportation (T�OT):
a. Notify the Texas Department of Transportation prior to commencing any work
therein in accordance with the provisions of the permit
b. All work perf�rmed in the TxDOT right-of-way shall be perforrned in
compliance with and subject to approval fram t�e Texas Department of
Transpartation
32 B. Work near High Valtage Lines
33 1. Regulatary Requirements
34 a. All Work near Hi�h Voltage Lines {more thari 600 vaits measured between
35 conductors or between a conductar and fhe ground) shall be in accordance with
36 Health and Safety Code, Title 9, SubtitZe A, Chapter'752.
37
38
39
40
�l1
42
�3
44
45
2. Warning sign
a. Provide sign of sufFicient size meeting all OSHA requireinents.
3. Equipinent aperating within 1 D feet of high voltage lines will requiz'e the following
safety features
a. Insulating cage-type of guard about the boom or arm
b. Insuiator links on the lift hoolc connectlans for baek hoes or dippers
c. Equipment must eneet the safety requiraments as set forth by OSHA arad the
safety requirements of the owner of the high voltage lines
4, Work within 6 feet of high voltage electz'ic Iines
C1TY OF FORT WORTH
STANDAKE7 CONSTItUCTION SPECIFICA'�ION ]70CUMEAITS
Revised I]ecember 20, 2Q 12
2D20 �n-Cal] Pavement Markings Contract #2
CPN 103740
Q] 35 13 - 3
SPECIAL I'RO.FECT PROC�DURES
Page 3 of 8
1
2
3
4
5
6
7
8
9
i0
11
12
13
14
15
lb
l7
18
19
2Q
21
22
z3
24
2S
26
27
28
29
�a
31
32
3.3
34
35
36
37
38
39
40
41
42
43
�44
�5
a.
b.
c
Notification shall be given to:
I) The power coinpany (example: ONCOR)
a) Maintain an ac.curate log of all such calls to power company and reeord
aciion iaken in eac11 case.
Coordinatian wiih power company
1) After notification coordinate with the power company to:
a) Erect temporary mechanica� barriers, de-energize the lines, or raise or
jower the lines
No personnal may work wi�hin 6 feet of a high vo1#age line before tlle above
requireinents ha�e been mat.
C. Confined Space Entry Program
1, Provide and follow appro�ed Canfined Space �ntry Program in accordance with
OSHA reqLii�'ements.
2. Coniined Spaces include:
a. Manl�oles
b. AlI other confined spaces in accordance with OSHA's Permit Required for
Canfined 5paces
D. Air Pollut�on Watch Days
1
2.
General
a. 4b��rve the follovving guidelines relating to working an City cr�nstxuction sites
on days desigr�ated as "AIRPOLLUTION WATCH DAYS".
b. Typical Ozone Season
1} May 1 throtzgh OctQber 31.
c. Critical Emission Time
1) 6:00 a.m. to lO:OQ a.m.
Watch Days
a. The Texas Commission on Environmentaj Quality (TCEQ), in coordination
with the Nationa! Weather Service, will issue the Air Pollution Watch by 3:0�
p.m. on the afternoon prior to the VJATCH day.
b. Requirements
I) Begin work after l D:OD a.m. whenever construction phasing requires the
use of motarized eq�.ipment for periods in excess of 1 hour.
2) However, the Cantractor may begin work prior to 10:Q0 a.m. if:
a} Use of motorized equipment is less �lian 1 haur, or
b} If equipment is new and cez`tif ed by EPA a;s "Low Emitting", or
equipment burns U1tra.Law Sulfur D�esel (ULSD), diesel ernulsions, or
alternative fuels such as CNG.
E. TCEQ Aiz' Pet�tnit
1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ.
F. Use of Explasives, Drop Vl�eight, Etc.
1. When Contract Dacu2nents permit an the project tl�e foIlowing wiil apply:
a. Public Notification
1) Subznit notice ta City and proof of adequate insuranc� caverage, 24 hours
prior ta commencing.
2) Minitnum 24 hour pu6lic notification in accordance with Section O1 3l 13
46 G. Water Depart�nent Coordination
C[TY bF I'ORT WORTH
5TANDARD COMSTRUGTf03�T SPECIFICATlQN D.DCUNiBNTS
Revised DeceinUar 2U, 2012
2020 On-Call Pavement Markings Contract #2
CPN 103740
O 1 35 13 - 4
SPECIAL YR0IECT PROCEDURES
Page 4 of 8
1 1. During i.iie construction of this project, it will ba necessary to deaetivate, for a
2 period of time, existing lines. The Contractar shall be required to coordinate with
3 the Water Departmer�t to determine the best t�zr�es for deactivating and activating
4 those ]ines.
5 2. Coardinate any event that will require connecting to or the operation o.f an existing
6 City water line system w.ith the City's representative.
7 a. Coordination shall be in accordance with SectiQn 33 12 25.
8 b. If needed, obtain a hydrant water meter from the Wafer Department for use
9 during the life of named project.
I 0 c. In the event that a wa�er valWe on an existing live system be turned off atid an
11 to aceoi�madate the constructian of the project is required, coorcfinate this
1 Z activity through the appra.priate City represeniative.
13 1) Do not operate water line valves of existirtg r�v�.ter sy�tem.
14 a) Faiiure to comply will render the Contractor in violation of Texas Penal
15 Code Title 7, Chapter 28.03 (Criminal Mischie� and the Contractar
16 will be prosecuted to the full extent of the law.
I7 b} In addition, the Contractor will assume all liabilities and
1S responsibilities as a resuIt of these activns.
19
Za
21
22
23
24
25
26
27
28
29
3Q
31
32
33
34
35
36
37
38
34
�a
41
�2
43
44
45
46
47
48
H. Fublic Notification Prior to Beginning Constauction
1. Prior to beg�nning constructian on any block in the project, on a block by block
basis, prepare and deliver a notice or flyer of the pending construction to the frant
door of each residence or business that will be impacted by �canstt'uction. The notic�
shall be pr�pared as fallows:
a. Post notice or flyer 7 days prior to beginning any construction activity on each
black in the project area.
1) Prepare flyer on the Conh•aetar's lstterhead and include the following.
information:
a) Naine of Project
b) City Project No {CPN}
c) 5eope of Project (i.e. type of constr�Yction acti�ity)
d) Actual construction dLlration within the block
e) Name of the contractor's foreman and phone number
� Name of the City's inspector az�d phone number
g) City's after-hours phone t�uz�ber
2) A sample of the `pre-constructian natification' f[yer is atY�ched as Exhibit
A.
3) 5ubmit sche�ule shawing the constr�action start and fnish time for each
block of the project io the inspector.
4) Deliver f3yer to the City Inspectar for re�iew priaz' ta distribution.
b. No canstruction will be allov�r�ed to begin on any block until the flyer is
delivered to all residents of the blocl�.
Fublic Notification of Tempor�'y Water Ser�ice Interruption during Construction
1. In the avent it becomes neeessary fo temporarily shut dowr� water service to
residents or businesses d�rring constr�ction, prepare and deIiver �. notice or �lyer of
the pending interr�ptian to ihe front door of each affected resident.
2. Prepared notice as fallows;
a. The notification or flyer shall be posted 24 hours prior tn the temparary
interruption.
C1TY Or FORT WOR'T'�i
ST.�NDARD CONSTRiICTION SPECIPIC?.TIO1�F BOCUMBNTS
Revised Decemhar 2Q, 2012
2020 Ou-Call Pavement 114arkings Coniract #2
CPN 143740
013513-5
SPECIAL PAd7�CT PKOCEDURES
Pa$e 5 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
36
b.
c.
d.
e.
f.
17 �. Coordination with United �tates Army Corps of Engineers (USACE)
18 1. At locations in the Pro3ect where construction activities occur in areas where
19 USACE perm�ts are required, meet all requirements set forth in each desigr�ated
20 pextnit.
21
Zz
23
24
25
26
27
28
29
30
31
3z
33
34
35
36
37
38
39
4q
41
42
43
44
45
46
K. Coordination witt�in Railroad Permit Areas
1
2.
�
Prepare #lyer on the contractor's letterhead and include the following
information:
1) Name of the project
2) City ProjectNumber
3) Date of the interruption of ser�ice
�) Period the interf•uption will take place
5} Name of the cantractor's foreman and phone number
6) Name af tlZe City's inspectQr and phone �umber
A sample of the temporary water service interruption notification is attached as
Exhibit I3.
Deliver a copy of the ternporary interri,iptian notification to tY�e City inspector
fax review priar to being distributed.
Na interruption of watei• ser�ice can occur untiI tlie flyer has been delivered to
all affected residents and businesses.
Elecironic t+ersions of tl�e �ainple flyers can be obtained from the Project
Construction Inspector.
At locations in tY�e project where constructian aciivities occur in areas where
railroad permits are required, meet a11 requirements set forth in each designated
railroad perrnit. This includas, but is not funited to, provisions for:
a. Flagt�ten
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certi%cates
£ �ther employees raquired to pratect ihe right-of-way and prppea�ty of the
Railroad Campany from damage arising out of and/or frorn the construction af
the project, Proper uti3ity clearance procedures shall be used in accordance
with the permit guidelines.
Obtain any suppl�t�aental information needed ta comply with the railroad's
req��irements.
Railroad Flagmen
a. Submit receipts to City fQr verificafian of working days that railroad fla�rnen
were present on Site.
L. Dust Contrql
1. Use accegtable measures tia cnntrol dust at the Site.
a. If water is used io control dust, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispflse of slurry.
M. Employee Parking
1. Provide pat'king for employees at locations approved by ihe City.
N. £Coordination with Nortl� Centx'al Texas Council oF Governments (NCTCOG) Clean
�qnstruction Specification [if required for tlle p�'oject — verify witll City]
CITY OF FORT WQRTH
STANDA12ll CO3V5TRLiCTION 51'ECIFiCATiQ�I DOCU1VfENT3
Revised Becern6er 20, 20.12
2020 On-Call 1'avement Markings Contraek #2
CPN 10374�
p13513-6
SPECIAL PROJEC'T' PRQCEI]URES
Page 6 of 8
1 I. Com�ly witl� equipment, aperaiional, reporting a�1d enforcement req�rirements set
2 foith in NCTCOG's Clean Construction Specifccation.}
3 1.S SUBNIITTALS [NOT USED]
4 1.6 ACT�ON SUBMITTALS71Nk'ORIVIATIONAL SUBMITTALS [N�T USED]
5 1.7 CLOSEOUT SUBMITTAL� [NOT USED]
6 i.8 MAYNTENANCE MATER�AL SUBIVIITTALS �NOT U�ED]
7 1.9 QiTA.LITY ASSURANCE [NOT USED]
8 1.14 DELNERY, STORAGE, AND HANDLING [N�T USED]
9 1.11 �ELD [�ITEj CONDIT�iONS [NOT iTSED]
10 1.12 WARRANTY [NOT USED]
ll PART 2- PRODUCTS [NOT USED]
12 PART 3- EXECUTIOIN [NOT USEDj
13
l4
END OF SECTION
Revision Lag
DATE NAME SUMMARY OF CHANGE
1.4.B — Added requirement af cnmpliance with Healtli and Safet}+ Code, Title 9.
$131/2D12 D. 7oluason Safety, S�btitle A. Pub�ic Safety, Chap#er 752. High VoLtage Overhead Lines.
I.4.� —Added Coatractor responsibilify for obtai�ling a TCEQ Au Permit
l5
CITY OF FQRT Vi+OR'TH 2O20 On-Call Pavement Markings Contract #2
S`CA1�iDARD CQNSTRUCTIOld SPECIFiCATION DOCCIMENTS CPN 1D3740
Revised Decemher 20, 2012
p13513-7
SP�CIAL PR�IECT PRQCEDURES
Page 7 of8
2
3
4
5
6
7
8
9
t0
11
12
13
14
15
16
17
18
19
20
21
zz
23
24
25
26
27
28
29
3a
3l
32
33
34
35
3G
37
EXHXBIT A
{To be printed on Contrac�or's Letterhead)
Date:
CPN No.:
Praject Name:
Mapsco Locaiion:
Limits of Construction:
� � I '�
`� �
�' � ' I i i � i
I I I I
�
I
I
II
�
I
, i
THfS IS TO INFOR�ii YOU THAY UNDE� A CONTRACi WIT�i THE C1TY OF F�RT
WORTH, OUR COMPANY WILL WORK ON UT1LIiY L1NES �N OR AROUND YOUR
PROP�RTY.
GONSTRUCTION WILL BEG1N APPRDXIIV1I�T�LY SEVEN �AYS FROM THE DA7E
O� TH[5 N��ICE.
1F YOU HAVE QU�STIONS A80UT ACC�SS, SECURITY, SAF�TY OR ANY OiH�R
ISSUE, F'L��ASE CALL:
Mr. <CONTRACTOR'S 5llP�FtWTEt�DENT� AT CTELEPHON� NO.�
OR
MC. <CI7Y INSPECTOR� RT � TELEQHOIVE NQ.>
AFTER 4:30 PiVI OR ON WEEKENDS, PI�EASE CALL �81'�] 39� 83a6
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITY OP T'ORT WQRTH
STANPARD CONSTRUCTIqAI SPECIFTCATION DpCUMENT5
Re�ised December 20, 2012
2D20 On-Call Yavemsnt Markiugs Coniract #2
CPN 103740
013513-8
SPECIAL PROlECT PRQCEDURES
Paga 8 of 8
1
2
EXHIBIT B
FoR� �o�TH
oaw;
�a� �o. x�x
�rofece �i�:
�����5 �S ��S���R�i�� �L%Y 8� ��0����
��`��R���'�°I�1NI
DUE TO UTLLiTX IMPROVEMENTS YN YOLTR 1�iEIGHBQRFI00D, YOUR
WATER S�RVIC�'WII.L BE I1V'fERRUPT�D ON
BETWE�:iV 'i`HE HOiJ�B OF Al�[D
IF 7(pTJ HA,VE QIIEST'IONS ABO'[1T TH1S S�UT-OUT, PI.EASE CALL:
MR. AT
(COIVTRAC'�OR5 SY7PERI�iTE1V�ENT) (TELEPHQTTCt 1V�JMBER)
OR
�� � AT
(CIT'Y IiVSPECTUR) ('I'ELEPHO1tiFE 1�Ti31�'IBER}
TH75 II�iCONVENIEI�TCE WiLL BE AS SH012T A$ POSSIBLE.
THA.NK YOU,
CONTI�.4CTOR
�
4
CITY OP POR'T WORTH 2O2D On-Call Yevement Niarkings Conlract #2
STANDARD CONSTAUCTIQN SPECC�'ICATiON DOCUM�NTS CPN 1U3740
Cte�ised DecemUer 2U, 20 ] 2
O.l 45 23
THST[iwlG AND INSPEGTION S�ItVICES
Page 1 of 2
SECTX4N Ol 4S 23
TESTING AND INSPECTION SERViCES
PART1- GEN�RAL
11 �UMMARY
A. Sectian Includes:
1. Testing and inspecfion services procedures and coordination
B. Deviations from tllis City ofFort Worth Standard Specification
1. None.
C. Related Specification Sections includ�, but are nat necessarily li�nited to:
1. Division Q-- �idding Requiremen�s, Gontract Forms and Conditions of the Contz•act
2. Divisian 1— General Requirernents
1.2 PR.IC� �iND PAYMENT PROCEDUR�S
A. Meas�.u•ement and Payment
1. Work associafed wit� this Iiem is considered subsidiary to tha various Itea�s bid.
No separate payment wi11 be allowed for this Item.
a. Con#ractor is responsible for perfarming, coordinating, and paymanf af aIl
Quality Cont��ol iesting.
b. Gity is responsible for performing and paytnent for first set of Quality
Assurance testing.
1} If the first Quality Assurance test pet'formed by the City iails, the
Contractor is respansible for payment af subsequent Qualify Assurance
testing until a passing test occurs.
a) Fina1 acceptance wili not be issued by Cit� until all required payments
foi• testing by Contractor have been pai.d in ful1.
1.3 REFEAENCES [NOT USED]
1.4 ADNIII�ISTRATIVE ItEQUIREMENTS
A. Testing.
1. Complete testing in accorciance with t17e Contract Dacum�nts.
2. Coardination
a, When testing is required ta be performed by the City, noiify City, suff'iciently
in advance, when testing is neaded.
b. When testing is required to be completed by the Contractor, notify City,
slifficientily in advance, that iesting. will be performed.
3. Distributian af Testing Reports
a. Electranic Distribution
1) Conf rm develop��tnent of Proj ect directoz'y far electronic subtnittals to be
uploaded ia the City's document managernent system, or anather external
I'TP site appraved by the City.
CiTY OF FORT WORTH 2p20 On-Ca]] Pavemeni Markings Contract # 2
STANDARI] CQI�FSTRUCT[ON SPECIFICATIOhI DOCUMENTS CPT3 10374D
Revised Mareh 9, 2Q2p
O1 45 23
TESTING AND INSPECTION SBRViC�3
Pagc 2 af 2
2j Upload test reports io designated project directory and natify appropriate
Cify representaiives via email of submittal posting.
3) Hard Copies
a) 1 copy for all submittais submitt�d ta the i'roj ect Representative
b. Hard Copy Distribution (ifrequired in lieu of elect�•onic distribution)
lj Tests performed by City
a) Distribute 1 Mard copy to the Contractar
2) Tests performed by the Contractor
a} Dist�ibute 3 hard capies to City's Project Representati�e
4. Provide City's Project Represeniative vvith trip tickets fnr each deiivered load of
Cancrete or Lime material including the following ininrm�tion:
a. Name of pit
b. Date of delivery
c. Materiai delivered
B. Inspectinn
1. �nspaction or lack of inspection does not relieve the Contractor from obligation to
gerform r�vork in accoedance with Lhe Contract Docurr►ents.
1.5 SUBMITTALS [NOT USEDj
1.6 ACTIOIV SUBMITTALSiTNFO1ZMATION�L SUBMITTALS [NOT U�ED]
1.7 Ci.,�SEOUT SUSMITTAL� [NOT USED]
I.$ MAINTENANCE MATERiAL SUBMITTALS jNOT USED}
1.9 QUALITY ASSURANCE [NOT USED�
1.1Q DELNERY, �T4RAGE, AND HANDLYNG [NOT USED�
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECiTTION [N�T USED]
END OF SECTXON
C17'Y Or �'OIiT WORTH 2O20 On-Call Pavement Markings Cnntraot # 2
STANDARD CdN5TRUCTTOI+I SPECIF[CATION llOCUMENTS CPN 103740
Tievised I�farch 9, 202Q
41 5526-1
STRCEI' LlSE PEAMI"I' AND MO{�TFlCATIONS TO TP�AFI'1C CONTTZOL
Page [ of 3
i
2
sFCTTON o� ss �6
STREET' USE PERMI'I' AND MODIFICATIONS TO TRA�FIC CONTROL
3 PART1- GENER�L
4 1.I SUMMARY
S
6
7
8
9
1�
11
12
13
14
15
A. Sectionlncludes:
1. Administrative procedures for:
a Street Use Permit
b. Modificatian ofapprovedtra�fic control
c. Removal of Street Signs
B. Deviatinils fromtk�s City af�'ort Warth �tandard Speci�cation
l. None.
C. Related Specification �eciions include, but aj•e not necessarily limited to:
1, Division 0— Bidding RequiE•ements, Contract Forms and Conditions of the Contract
2. Division 1—General Requirements
3. S.ection 34 71 13 — Traffic Control
16 1.2 PRICE AND PAYMI:NT PROCED[IRT�.�
17 A. Measurement and Paymeni
l8 1. Work assnciated with this Item �s considered subsidiary to the va�•ious Items bid.
19 No separate payment will be ailowed for this Item.
2p �,3 RF.FF.RFNCES
21 A.Reference Standards
22 l. Reference standards cited in this spec�cation refer to tl�e cuerentreference standand
23 published at the time of'the iatest revision date logged at the end of this
24 specification, unless a.date is specifically cited.
25 2. Texas Manuai on L3niform Traf�'ic C:ontrol Devices (TMUTCD).
26 1,4 ADMINrSTRATiVE ItEQ�REMIIVTS
27
28
29
30
31
32
33
3�}
35
36
A. Traff'ic Cantrol
1. General
a. Contractor s11ai1 �ninimize lan� closures and impact tn vehicular/pedestrian
teaffic.
b. Vi�hen �raf�c cQntrol plans are included in the Drawirigs, provide Traffic
Cantroi i� accordance with Drawin�s and Section 34 71 13.
c. When traffic control plans are not included in the Dravw�gs, prepare traffic
controlplans in accordance wrt� �ection 34 71 I3 and submit to Gity for
Y�V i�W .
1) Allow minimum 10 worlc�ng days far review of proposed Traif�c C.ontrol.
C1TY OF FQRT W O1tTH 2�20 On-Call Pave�nentMar!cings Contraet # 2
STANDARD CONSTRUCT[OlV SPECIFiC.4TION UUCUNfENTS CYI�F �437`IO
Revisad Mareh 22, 2021
Dl 55 26 - 2
STItEET USEPGRMIT ANDNf017IFICATIONS TOTRAFPiC COIVTRdL
Page 2 of 3
1 2} A traf�c control "Typical" publisl�ed by City of Foi•t Worth, the Texas
2 Manual Unified Traffic Contrt�l Devices (TMUTCD) or Texas Department
3 af Transportation (T�OT} cat� be used as an alternative to prepar�ng
4 projectlsiie specific traffic control plan if the typical is applicable to the
5 specific project/site.
B. Street Use Permit
10
ir
12
13
I4
IS
16
17
is
19
20
21
22
23
24
1. Prior to installation of Traf�c Control, a City Sireet Use Permit is required.
a. Ta obtain Street Use I'ermi�, submit TraFfic Gontrol Plans to City
Transportatio.n and Public Warks Department.
1) Allow aminimum af 5 working days for permit review.
2) It is the Cantractor's respo�sbiiity to coordinate review af Traffc Contro.l
plans for Street Use Permit, such that constnaciian is not delayed.
C. Modifica�ian to Approved Traffic Control
1. Prior to installation traffic cantrol:
a. Submit rev�sedtraffie control plans to City Department Transpo.riation and
Pubiic Works Department.
1} Revise Ti•affic Control plans in accardanca with 5ection 34'71 13.
2) Allow minimum 5 working days for review of �•evised Traffic Control.
3) It is the Contractor's respansibility to coordinate review of Traffic Control
plans for Street Use Permit, such that eonstruciian is nqt delayed.
D. Removal of Sta•eet Sjgn
If it is determined thai a street sign must be rerno�ed for construction, then contact
City Transportation and PubIic Works Department, Signs and Markings Division to
rernove the sign,
25 E. Temporary Signage
26 1. In the case of regulatory signs, replace permanent sign w ith temporary sign meeting
27 requirements of the jatest ecfition of the Texas Manual on Uniform Traf�'ic Control
28 Devices (A�IUT`CD}.
29 2. InsEail temporary sign. before the removal flf permanent sign.
30 3. When construction is complete, to the extent that the permanent sign can be
31 reinstalled, contactthe City Transportation andPublic Warlts Departm�nt, Signs
32 and Markings Division, to reinstall the permanent sign.
33
34
F. Traffic Controi Standards
1. Traffic Control Standards ean be faund an the City's wehsite.
3t 1.� SUBMITTALS [NOTUSID]
36 A Submit ali required documeniation ta City's Project Representa#ive.
C1TY OF rORT W ORTH 2O2� On-Call Pave�nent Markings ConUract # 2
STANDARD CONSCRUCTION SPECICIC,41'10N DOCUMENTS CPN 143740
I2evised dvlarch 22, 2d21
p] 5526-3
STREET U3�I'ERM1T ANDMODII'ICATIOIVS TOTRAFFiC CONTTtOL
Page 3 of 3
1 1.G ACTTQN SUBMITTALSIINFORM�iTIONAL SUBMITTAL5 [NOT i[TSED]
2 I.q CLOSEOUT SiTB1VIITTALS [NOT USEQ]
3 1.S MAINTENANCE MAT�RIAL SUBMITTALS �NOT USID]
4 1.9 QUALITY ASSUR.ANCE [NOT IISID]
5 1.10 DELIVERY, S'T70RAGE, AND HANDLING [NOT USID�
6 1..11 FIFLD jSTTE] CONDITIONS [NOT U5ID]
7 1.12 WARItANI'Y [NOT USID]
S PART � - 1'R�DUCTS [NOT i1SED]
9 PART 3- EXECUTTON [NOT II5�1]]
10
11
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
l.+� A. Ac[ded language ho emph.asize minimizing of lane closures and i�npact to
traffc.
1.4 A. 1. c. Addad language to allow For use af published traffic confrol "Typicals" i
3l22/2U21 IvI Owen applicable to specific projeet/site.
i.4 F. j} Removed re%zenee to Buzzsaw
1,5 Added language re: submittai of permit
12
CIT Y OF FOAT W aRTH 2O20 0n-Cal] Pavement Markings Cvnhact# 2
STANDARD CQNSTRUCCTON SPECICICATI4N DOCUMEI�TS CPN 10374�
Revised March22, 2021
01660b-!
�'RODUCT STORAGE ANID HANDLiNG 12EQF71R�MENTS
Page l of 4
S�CTION Ol 66 OQ
PRODUCT STORAGE �ND HANDLING R�QLTIREMENTS
PART1- G�NERAL
I.I SUMMAIZY
A. Sect�on Includes:
1. Scheduling of product delive�y
2. Packaging of prodLicts for delivery
3. Protectio� o�products against damage fram:
a. Handling
b. Bxposuz`e to elements or harsi� environments
B. Deviations from this City of Fort Worth Standard Specification
i . None.
C. Related Specification 5ections include, but are not necessariiy lir�nifed to:
1. Division 0— Bidding Requir.ements, Cantract Forr►is and Conditions af the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYIV�NT PROCEDiJRES
A. Measuz'ement and Payment
1. Wark associated with this Tfem is considered subsidiaxy to the variaus Items bid.
No separate payment will be allowed for t�is Itea�.
L3 REPERENCE.S [NOT USED]
�,4 ADMINISTRATNE R�QiTIRE1VIENTS [NOT USED]
L5 SUSMITTALS [NOT USED]
1.6 ACTICIN 5UBlYIITTALS/rNFORMATIONAL SUBNIITTALS [NOT USED]
I.'1 CLOSEOUT 5USM�TTALS [NOT US�D]
1.8 MAINTENANCE M ATERIAL SUSMITTALS [NOT USED]
1.9 QUALTTY AS�URA.NCE [NOT USED]
I.10 DELIVERY AND HANDLING
A. Delivery Requirements
1. Schedule delivery of products ar equipment as required iQ allow timely inskallation
and to avoid prolongad storage.
2. Provide appropriate personnel and equipment to receive daliveries.
3. Deli�ery trucks will not be permiited to wait extended periods of time on the Site
far• personnel or equipment to receive the delivery.
CITY OF FORT WORTH 2O20 On-Call Pave�uent Markings Cnntract # 2
STA1�iDARD CONSTRi1CTION SPECI�iGATION DQCUMENTS GPN I03740
Aevised duly l, 201 I
Ql b6d0-2
PRODUCT STORAG� ANU IIANDLING REQLTIREMEIYTS
Page 2 af 4
4. Deiiver products or equipsnent in manufacture�•'s original unbroken cartons or other
containers desigtted and consiructed to protect tine contents fro�n physi�al or
environmental damage.
5. Clearly and fully mark and icientify as to manufacturer, item and installation
location.
6. Pro�ide manufacturer's instructions for starage and handling.
B. Handling Requirements
1. Handle products or equipment in accordance with these Contract Documents and
maz�ufaeturer's recoinmendations and ins�'uctians.
C. Storage Requi�'ements
1. Stare inaterials in accordar�ce with manufacturer's reeommendations and
xequirements ofthese Specificatians.
2. Make necessary pravisions for safe storage of inaterials and equipment.
a. Place Ioose soil inaterials and materials to be incorporated into Wark to prevent
damage to any part af Wor[� or existing facilities and ta rnaintain free access at
all times to all parts of Work and to utility service company instaiiations in
vicinity of WQrk.
3. Keep materials and equipment neatly and compactly stored in lneations that will
cause minimum inconvenience ta other contractors, puhlic travel, adjoining owners,
tenants and occupants.
a. Arrange storage to provide easy access far inspection.
4. Restrict storage to areas avaiIable on construction site for storage of material and
equipment as shown on Drawings, or approved by City's Project Representative.
5. Provide oi%site storage and protection when on-site storage is not atlequate.
a. Provide addresses of and access to off site storage 1pcatians for inspection by
Ciiy's Prnject Representative.
6. Do noi use lawns, grass plots oi• other private property for skorage purposes wiihout
written perrnissian of owner or other person in possessian or control of pretnises.
7. 5tore in rnanufaeturers' unopened containers.
8. Ne�tly, safely and compact�y stack materials delivered and stored along lin�: of
Worlc ta at�oid inconvenience and damage ta property owners a.nd general public
and maintain at least 3 feet fram fre hydrant.
9. I�eep pubiic and private driveways and str�et crossings open.
10. Repair or repiace damaged lawns, sidewalks, streets ar other improvemer�ts to
satisfaction of City's Froject Representati�e.
a. Total lengfh which materials may be dist�•ibuted along route of con�truction at
one time is 1,OD0 linear feet, unless atherwise approved in writing by City's
Project Representative.
CITY OP �'OTtT WORTH 2U2q On-Call Pavemant Markings ConCract# 2
STANDARD CDIVSTRUCTI�N SPECIFiCATIOi�I DQCUMEIVTS CPN ]0374fl
Revised July I, 20l 1
o��6ao-3
PRODUCT STO.RAG� AI+ID HANDLING REQUIREMENi'S
Page 3 df4
1.11 FIELD [SITE] CONi7I'I'�(3NS [NOT USED]
1.�2 WAI�RANTY iNOT U�ED]
PART 2- PRODZTCTS �NOT USED]
PART 3 - EXECUTION
3.1 INSTALLER5 jNOT USED]
3.� EXAMINATION [NOT USED]
3.3 PREPARATIQN [NOT LTSED]
3.4 ERECTION [NOT USED]
3.5 REPAIIt / RESTORATI�N [N�T USEDj
3.6 RE-YNSTALLATION �NOT USED]
3.7 �'XELD [oR] SITE QUALXTY CONTROL
A. Tests and Insgectfons
1. lnspec� al1 products or equipment delivered to the site prior to unloading.
B. Nan-Conforining Wark
1. Rejeot a�l products or equipment t11at are damaged, used or in any other way
unsatisiaetory for use on the project.
3,8 SYSTEM STARTUP [NOT USED]
3.9 AD�TUSTING [NOT USED]
3.X0 CLEANING (NOT USED]
3.11 CLOSEOUT ACTIVIT�ES [NOT USED]
3.1� PR�TECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products ar equipment in �ocation to avoid physical damage to items while in
storage.
C. Protect equipmenY from exposure to eie�nents and keep thorougl�jy dry if required by
the manufacturer.
3.13 1VIAINTENANC� [NOT U�ED]
3.1� ATTACHMENTS [N4T i7�ED]
END OF SECTION
CI'I`Y OI' FORT WORTH 2O2D On-Call Pa�vement ivlarkings Contract # 2
STAAlDt1ItD CONSTRUCTION �PECI�ICATTON DOCUMENTS CP7V ID3740
Re�ised 7uly 1, 3011
ni 66aa-a
PRODUCT STOiiAGE AND ]iANDi,IlVG REQUTABMENiTS
Page 4 of 4
Revision Log
DATE NAIVIE SUMMARY LlF CHANGE
C[TY QF FORT WORTH 2O20 On-Call Pavement Markings ConYract � 2
STAI+FDARD CON57'C�UCTION SPECII'ECATIqN bOCUME1+1T5 CPN 10374D
Revised luly l, 2011
oi�oaa-i
MOBILIZA`I'ION A�ID REMQ�IL,IZAT[QN
Page 1 of 4
1
2
3 PARTl- GENERAL
SECTION 4170 00
MOBILIZATTON AND REMOBILIZATION
�4 l.l SCTMMARY
S A. Section Includes:
6
7
8
9
10
11
I2
13
14
15
16
I7
18
I9
20
2I
22
23
24
25
26
27
28
29
3U
31
32
33
34
35
36
37
38
39
4�
41
42
43
44
45
I
2.
�
Mobilizatian and Deinobiliza�ion
a. Mobilization
1} Transpartation of Contractar's personn�l, equipment, and operating supplies
to the Site
2) Establisk�ment of necessary general faciliiies far the Contra�tor's operation
at the Site
3) Pre�niums paid fnr performance and payment bonds
4) Trat3sportation ai Cnntracfor°s personnel, equipment, and opez'ating supplies
to another location within the designated Site
5} Relocation o.f necessa�-y general facilities for ihe Contractor°s operation
from 1 locatinn tn anothea� iocation on the Site.
b. Demobilization
1) Transportation of Contraetor's pei•sonnel, equiprnent, and operating supplies
away from the Site including disassembly
2) Site Clean-up
3} Removal af all b�ildings andlor other facilities assembled atthe 5ite �or this
Contract
e. Mobilization and Demobilization do not include activities for specific iterns of
work that are for which paymen� is provided elsewhere in the contract.
Remob�lization
a. Remobilization for Susger�sion of Work specifically required in the Contract
Documents or as reqLtired by City includes:
1) DeYnob�lization
a} Transportation of Contt�ctor's personnel, equipment, and operatizag
s�jpplies fi•om the Site i�cluding disassembly or temporarily securing
equipment, supplies, and other facilities as designated by tl�e Contract
Documents necessary to suspend the Work.
b) Site Clean-up as designated in the Contract Documents
2) R�mobilization
a} Transportation of Contractor's personnel, equipi�ent, and operating
supplies to the 5ite necessary to resurne the Work.
b) �sYablishYnent of necessary general facilifies for the Contractor's
operation at the Site necessary to resume the Wark.
3} No Payments will be macEe for:
a) Mobilizatian and Demohilization from one location to another on the
Site in the normal progress o� perfarrning the Work.
b) Stand-by oi• idle time
c) Lost profits
Mobilizations and Demobilizatiion far l�iliscellaneous Projects
a. Mobilization and Demobilizatian
CCT't' OF FDRT WDRTH
sTANDARD CONSTRUCTION SP�CIFICA'TjON bOCUMENI'S
Revised Noveml�er 22, 2016
202D On-Call PaveEnen[ Markin�s Contraet �2
CPN 143740
017000-2
ivIOB1LIZAT'ION A1VD REIvIOBILIZATION
Paga 2 of 4
1
2
3
4
5
b
7
8
9
10
ri
I2
13
14
15
16
17
18
� I} Mobilization shall cansist of the activities and cost on a Work Order basis
necessary for:
a) Transpoi�ation of Contractor's personnel, equipment, and operating
supplies to the Site fbr the issued WorK Order.
b} �stablislarnent af necessary g.eneral facilities fnr the Contractor's
aperation at tha Site for the issued Wa:rk 4rder
2} Demobiiization shall consist of the activiti�s and cost necessary for:
a} Transportation of Contractor's personnel, equipment, and operating
supplies from the Sita inclt�ding disassem.bly fo�• each issuad Work
Order
b) Site C1ean-Lip %r eacl� issued Work Order
c) Removal of all huildings or other facilities assembled at th� Site for
each Work Od�r
b. Mobi�ization and Demobilization do n�t rnclude activities for spacific itetns of
work for which pay�nent is provided elsewhere in t11e confract.
4. Emergency Mobiliz�tions and Demobilization for Miscellaneaus Pro�ects
a. A Mohilizatinn far Miscellaneaus Frojects when directed by the City and the
mobilization occurs within 24 haurs of the issuance o�Yhe Work Order.
19 B. Deviations from this City of Fort Worth Standard Speeificatian
20 I. None.
21 C. Related Specifi�atipn Sectiqns lnclude, but are not necessarily limited to:
22 1. Division Q— Bidding Rec�uirements, Contract �'orms and Conditions of the Cont�act
23 2. Division 1— GeneraI Requlrements
24 1.� PRICE AND PAYMENT PROCEDiJRE�
25
26
27
28
29
30
3I
32
33
34
35
36
37
38
39
40
41
42
43
4Q-
45
46
A. M�asurement and Payment [Consult Ciiy Dapat�tment/Division for direction on if
Mohilization pay item ta be included or the item should be subsidiat�+. Include the
appropriate Section 1.2 A. 1.]
1, Mobilization and Demobilization
a. Measure
1) This Item is considered subsidiary to the various Items bid.
b. Payment
T} The vaork performed and materials furnished in accordance with this Item
are subsidiary to the various Items bid and no o#her compensation v;ti116e
allowed.
2. RemQbilization far suspension of Work as specifcally tequired in the Contract
Documents
a. Measurerr�ent
1) Measurement for this Item sha11 be per each remobilization performed.
b. I'ayment
i) The work perfortned and materials fiixnisF►ed in acco�•dance with this [te�n
and measured as pi•ovided under "Measurement" will be paid for at the urut
price per each "Speciiied Remobilization" in accordance with Contract
Documents.
c. The price shall incIude:
1) Demobilization as described in Section 1.1.A.2.a.1)
2) Remo.bilization as ciescribed in Section 1.1.A.2.a.2)
CLTY OF FORT WDRTH
STAiYDAlZd CONSTiiL3CTIOIV SPECIFICATIDN DOCiIM�NTS
Revised Navember 22, 20 ! G
202b On-Call Yaveme��t Ivlarkings Coutract �F2
CPI� 103740
O17Q00-3
MOBILIZATION tAND RBMOBiLIZAT1aN
Page 3 a.f 4
l
2
3
4
5
6
7
S
9
10
11
12
l3
l�
IS
16
17
18
19
20
21
22
23
24
2S
26
27
28
29
30
31
32
33
34
35
36
37
38
d. No payments wi1l he made for star�dby, idle time, or fosi prafits associated this
Item.
3. Remobilization for suspensian af Wark as required by Ciiy
a. Measureineni and Payment
1) This shall be submitted as a Contract Claim in accordanee with Article 10
of Sectian 00 72 Op.
2} No payments will be inade far standby, idle time, o�' lost profits associated
wiih �his Item.
4. Ma.bilizations and Dernobilizations for Miscellaneous Projects
a. Measurement
1) Maasuz'�ment for this Item shall ve for each Mobilization and
Demobilizatian required by the Cantract Documents
b. 1'ayment
1) The Work performed and matez'ials furnished in accordanca with this Item
and measured as provided under "Measurement" will be paid far at the unit
price per each "Worl� Orde�• Mobilization" in accardance with Contract
Documents. Deinobijization shall be considered subsidiary to mobilization
and shall not be paid for separately.
c. The price �hall include:
i) Mobilization as described in Section I.1.A.3.a.1} .
2) Demobilization as described in S.ection 1.I.A.3.a.2)
d. No paytments will be made for standby, idl� time, or lost profits assoeiated this
Item.
5. Em.ergency Mabilizations and Deinobilizatians for Miscellaneous Frojects
a. Me�surement
I} Measurement far this Item shall be for each Mobilization and
DeariobiSization required by the ConYract Documents
b. Payment
1) The Work performed and materials �urnished in aceordance with this Item
and measured as provided under "Measurement" wil] be paid for at the unit
priee pei• each "Work �rder Emergency Mabilization" in accardance with
Contract Documents. D��nobilization shaIl be considered subsidiary� to
mobiIization and sha11 not be paid for separately.
c. 'i'he price shall include
i) Mobilization as described in Section 1.1.A.4.a)
2) Demobilization as described in Section 1.I.A.3.a.2j
d. No paylnents vtrill be made for standby, idle tiine, or lost pro�its associated this
Item.
39 1.3 RE�'ERENCES [NOT II�ED]
40 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
41 1..5 SUBMITTALS [NOT USED]
42 1.6 INFORMATIONAL SUBMITTALS [NOT tiSED]
43 1.7 CLOSEOi1T �UBMITTALS [NOT USED]
�4 1,8 MAINTENANC� MATERTAL SUBMITTALS [NOT U�ED]
CITY QF FdRT WdRTH 2O20 Qn-CaI[ Pavement Markings Cantract #2
STANDARI] COIVSTRUCTIOi`I SPECIPICATIOI+1 DOCUMENTS CPN 103740
Revised l�Iovember 22, 201 G
017000-4
MOBILIZATION AND REMOBIL3ZATIQN
i'age 4 of4
1 1.9 QUALITY ASSi7RANCE [NOT USED]
2 I.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
3 1.11 �xELD [SITE] CaNDITIONS [NOT USED]
4 1.1� WARRANTY [NOT i7SED]
5 P.A.RT 2- PRODUCTS [NOT USED]
6 PART 3- EXECUTION [NOT USED]
7
8
END OF SECTION
Revis.ion Log
DATE NANIE SUNIMARY O�' CHANGE
1 i/2211G Michael Qwen I.2 Priee and Paymcnt.Procedures - R�vis.ed sPecifacation, including blue text, to
make specif cation flexible for eithcr suhsidiery or paid bid item for Mobilization.
9
C1TY OF POItT WOf2TH 2O20 On-Call Pavement ivlarkings Contraet#2
BTANDA[tD CON5TRUCTION SP�CIFICATIOI�i DOCiJMENTS CPIV Ifl3740
Revised November 22, 2016
oi�az.3-i
CLHANING
Page l of 4
SECTION 01 74 23
CLEANING
PART1- GENERAL
f��.YiJ►'�'i I�:�'/
A. Section [ncludes:
1. Intermediate and final cleaning.for Work not including special cleaning of closed
systems specified elsewhere
B. Deviations From this City of Fn:r� Wnrth Sfandard Specification
1. None.
C. Related Specification Sectians znclude, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of ihe Contract
2. Division 1— General Requirements
3. Sectian 32 92 13 — Hydro-Mulching, Seeding and Sadding
i.2 PRICE AND PAYMENT PROCEDURES
A. M�asurement azad Payment
l. 'V4'�ark associaYed with this Item 1s considered subsidiary to the various Items bid.
Na separate payment will be allawed for t1�is Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUXREN�NTS
A. Scheduling
1. Schedule ckeat�sng operations so that dust and other cantatninants disturbed by
cleaning process r�ill not fa11 on newly painted surfaces.
2. Scl�edule final cleaning upon compietion of Work and �mmediately grior �o fnal
inspection.
1.5 SUBIVIITTALS [NOT USED]
1.6 ACTION SIIBMITTALS/INF4RMATIONAL SUBMITTALS [NOT USED]
I.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAl1VTENANCE MATERT�L Si7BMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 STORAGE, AND HANDLING
A. Storage and Handling Requirements
1. Store cleaning products and cleaning wastes in cantainers specifically designed for
those inaterials.
CITY OF FORT WORTH 2�020 On-Call Pave�nent Mar[cings Cnntract � 2
STAIIDARD CONSTRUC`1"ION SPECIFICATION DOCiTMENTS CPhi 103740
Itavised Ju[y 1, 2D11
017423-2
CLEANITIC�
Page 2 of 4
111 FTELD [SITE] CONDITIONS [NOT [TSED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS
2.1 OWNER-FURNISHED [oa] OWNER�SUPPLIEDPRODUCTS [NOT USED]
2.2 MATERIALS
A. Cleaning A�ents
1. Compatibl� with su��face being cleaned
2, New alad uncontaminated
3. For manufactured surfaces
a. Material reeommended by manufacturer
2.3 ACC�SSORIES [NOT USED�
2.4 SOURCE QIIALITY CONTROL [NOT T3�ED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT LTSED]
3.2 EXAMINATION [NOT US�D]
3.3 PREPARATION 11VOT USED]
3.4 A�'PLICATION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.7 RIELD [on] SIT� QUALITY CONTROL [NOT USED]
3,8 SYSTEM �TARTUP [NOT USED]
3.9 ADJiTSTING [NOT USEDj
3.10 CLEANiNG
A. General
1. Prevent accuinulatian of t�astes that create hazardous conditions.
2. Conduct cleaning and dispos.al operations to comply with laws and safety orders of
gaverning authorities.
3. Do not dispose of valatile wastes such as mineral spirits, oil ar paint thinnei• in
storm or sanitary drains or sewers.
4. Dispose of degradable dabris at an app.roved solid waste disposal site.
5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
alternate manner approved b�+ City and regt�latory agencies.
CITY Or F�RT 1�QRTH 2O24 On-Ca]] Pavement Markings Canlract # 2
STANDARD CONSTRLTCTION SPECIFICATION DOCUNEENTS CPN 103740
Revised .Tuly f, 201 I
01 74 23 - 3
CLEANIIVG
Page 3 of 4
6. Handle materials in a eontrolled manner with as few handlings as possible.
7. Thoroughly clean, sweep, wash and polish ai1 Work and equipment associated with
thia project.
S. Remave all signs of temporary eonstructian and activities incidental to construction
of required permanent Work.
9. [f project is not cleaned to the satisfaction ofthe City, tha City reserves the right io
have the cleaning completed at the expense of the Contractor.
] 0. Do not burn on-site.
B. Intermediate Cleanin� during Consteuction
1. Keep Work areas clean so as not to Y►inder health, safety or conver�ience of
personnel in �xi.sting faciiify aperations.
2. At ma�Lnum weekly in.tervals, dispose of waste materials, debris and rubbish.
3. Confin� construction debris daily in strategically Iocated eontainer{s):
a. Gaver to prevent blowing by wind
b. Stora c3ebris away from construction ar operational activities
c. Haul from site at a rninimum of once per week
4. Vacuuin clean interior areas when ready to reaeive finish painting.
a, Continue vacuum cleaning on an as-needed basis, �intil Final Acceptance.
S. Prior to storm ever�ts, thoroughly clean site of all loose or unsecured items, which
may became airborne or transported by #lowing watei• during the storm.
C. Interior Final CIeaning
i. Reinove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other
foreign materials from sight-exposed surfaces.
2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean.
3. Wash and shine glazing and mirrors.
4. Polish glassy surfaces to a clear shine.
5. Ventilating systems
a. Clean permanent filters and replace disposable filters if units were operated
during construction.
b. Clean ducts, blowers and coils if units were operated withnut fli�rs dt�ring
construction.
6. Replace ail burned out lamgs.
7. Braorn clean process area floors.
8. Mop ofFice and control room flo�rs.
D. E�eriQr (Site or Right of Way) Final Cleaning
1. Remove trasli and debris contafners from s[te.
a, Re-seed areas disturbed by location of trash and debris cpntainers in accardance
with Section 3� 92 13.
2. Sweep roadway to remove alI racks, pieces of asphalt, aoncf•ete ar any other object
tliat may hinder or disrupt the flaw of traffic along the roadway.
3. Clean any interior areas including, but not limited to, vaults, manhoies, structures,
jEinctiora boxes and inlets.
CI7'Y QF FQRT W6RTH 2O2� On-Call Pavement Markings Contracf � 2
STANflARD CDNSTRUCTION 5PEC1hICATI4N DOCiTMENT5 CPN 103740
R��;sea rU�y �, aoi i
p17423-�4
CLEANINCr
Page 4 of 4
4. If no longer r�c�uir�d for tnaintenar�ce of erosion facilities, and upon approval by
City, remove erosion control fz'om site.
5. Clean signs, lights, signals, etc.
3.11 CL4SE�UT ACTIVITIES [NOT USED]
3.�.2 �ROTECTYON [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS �NOT USED]
END OF SECTIDN
Revision Log.
DAT`B NAME SiJMMARY OF CHANGE
C1TY OF FORT WORTH 2O2Q Qn-Ca[[ Pavement Markings Gonfrae[ # 2
STANDARL7 COI�STRUCTIOiV SPECIT'ICATIOI+� DOCLTMENTS CPN 10374D
Revised J�tly l, 20i 3
APPENDTX
G C� . n �r-vr�i�iz�iun��rau[iQ�J
GC-6A6.D Minority and Women Owned Business Entarprise Compliance
GC-6.07 Wage Rates
r_r• � nn n,,,,..,,:+.. .,,,a rr+;i;�;.��
CrTY �F PORT WORTH 2p20 Qn-Call Pavement Markings Con#ract #2
STANDARD C�NSTRUCT701V SI�ECIFICATION D4CUMENTS CPTf 103740
Revised July l, 2U11
GC-6.06.D Minority and Women Owned Business
Enterprise Compliance
THIS PAGE LEFT INTENTIONALLY BLANK
C ITY OF FORT WORTH
STANDARD CONSTRUCTION SPEC IFICATION DOCUMENTS
Revised Jul y I , 2011
2020 On-Call Pavement Markings Contrfct #2
CPN 103740
3/16/202 1 B2Gnow
CITY OF FORT WORTH
CONTRACT COMPLIANCE MEMORANDUM
THIS FORM MUST BE ATTACHED TO THE ROUTING "M & C" BEFO J E LAW
DEPARTMENT AND CITY MANAGER APPROVAL I
To: Department Project Manage r
From: Office of Business Equity
Date: March 16 , 2021
In the Amount of: $800 ,000.00 102906
DOE/Project No .
ProjecUBid: On-Call Pavement Markings , Unit Price Contract 2
1. Compliance with the City's Business Diversity Enterprise (BDE) Ordina ~ce has
I
been achieved by the following method:
TRP CONSTRUCTION GROUP, LLC is in compliance with the City's BOE
Ordinance by committing to 0% MBE participation and documenting good faith effort.
TRP CONSTRUCTION GROUP, LLC identified several subcontracting and supplier
opportunities. However, the firms contacted in the areas identified did not respond or
did not submit the lowest bids. The City's MBE goal on this project is 5%. [
2020 On -Call Pavement Marking s Contract #2
I CPN 1037 40
htt ps ://fortwort h.di versitycomp liance .com /FrontPage/Divers ityMain .asp ?X ID=304 1/1
Page 1 of 4
FORT WORTH City of Fort Worth ~ Minority Business Enterprise
MBE Subcontractors/Su1212liers Utilization Form
OFFEROR COMPANY NAME : Check applicable block to d lSCribe
?J!!:r a:J,A/5"Tf2.V C i7o A/ 6"2oup, Lt. C Offeror 1 MIWID BE fill NON-Ml NIOBE PROJECT NAME:
u;io ()}.I -t*L J;rven;lf/ltr ~N9f i?zo1~~r ,/., BID DATE
/,p Y /-uzo
City's MBE Project Goal: I Offeror's MBE Project Commitment: PROJECT NUMBER
5% .,lJ % NjA
Identify all subcontractors/suppliers you will use on this project
Failure to complete this form , in its entirety with requested documentation, and received by the ~urchasing
Division no later than 2:00 p.m. on the second City busiiess day alter bid opening. exdusive of bid o1 ning date,
will result in the bid being considered non-responsive to bid specifications.
The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in thi · utilization
schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/r knowing
misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being
considered non-responsive to bid specifications.
MBEs listed toward meeting the project goal must be located In the six (6) county marketplace at t J time of
bid or the business has a Significant Business Presence in the Marketplace. Marketplace is the gE 1ographic
area of Tarrant, Dallas, Denton, Johnson, Parker, and Wise counties.
Prime contractors must identify by tier level of all subcontractors/suppliers. Tier: means thH level of
subcontracting below the prime contractor/consultant i.e. a direct payment from the prime contr:1ctor to a
subcontractor is considered 1st tier, a payment by a subcontractor to its supplier is considered 2nd tier. The prime
contractor is responsible to provide proof of payment of all tiered subcontractors identified as a MBE and
counting those dollars towards meeting the contract committed goal.
ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. I
Certification means those firms . located within the Marketplace, that have been determined to be a bondafide minority
business enterprise by the North Central Texas Regional Certification Agency (NCTRCA) or other certifying agenc ies that
the City may deem appropriate and accepted by the City of Fort Worth . I
If hauling services are utilized, the Offeror will be given credit as long as the MBE listed owns and
operates at least one fully licensed and operational truck to be used on the contract. The MBE '!1P.Y lease
trucks from another MBE firm, including MBE owner-operated , and receive full MBE credit. The "1BE may
lease trucks from non-MBEs, including owner-operated, but will only receive credit for the Jr s and
commissions earned bv the MBE as outlined in the lease agreement.
Rev . 2/10/15
FoRTWoRTH
~
ATTACHMENT 1A
Page2 of 4
Offerors are required to identify ALL subcontractors/suppliers , regardless of status ; i .e ., Minority and non-MBEs. MBE firms are to be
listed first, use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal .
NCTRCA N
SUBCONTRACTOR/SUPPLIER 0
Company Name n Detail Detail T
Address I M w Subcontracting Supplies Dollar Amount Telephone/Fax e B B M Work Purchased
Email r E E B
Contact Person E
(1/oJ) 11'1 -II t, t-
6JP1S /rt-lJVr-D D 7 17ft:""Yl.M.o /MST11.-t?01 OD() ·
tt-4 -
/('bti S. M11F"Yl,a,.i Sr
eJ/AII{', TY-t:/j7/Cj
(l/Jft,) t,,q=, -~o 1-B
5w.trtu--o /l€~ D D 7 ltt.ff~ $6HJr IZ$"io-"~.
1110
-f/t!IO N. Denm,, .f T
/,1ey_/lf I f)C. lf/t')!p/p ,:/-
7Pi' ~D'11Srfl \KQdJ\ Mcof 4t1-'14frA'tlA71DAI -w,ttt:. /tJD, o s-eu:: D D i7 JN fllt1.uf17IN
"fe~p,n.~i:'/,;). 1-/0 M!Je/ -otz M,t,t.bMIJJ
p//1~ dpfnt-'hl/Jl'T1£S
lh!At Urff U::
D D --
D D -.....
D D -
-
Rev. 2/10/15
FORTWORTH
~ ATTAi CHMENT 1A
Page 3 of4
Offerors are required to identify ALL subcontractors/suppliers, regardless of status ; i.e ., Minority and non-MBEs. MBE firms are to be
listed first , use additional sheets if necessary . Please note that only certified MBEs will be counted to meet an MBE goal.
NCTRCA N
SUBCONTRACTOR/SUPPLIER 0
Company Name n Detail Detail T
Address I M w Subcontracting Supplies Dollar Amount
Telephone/Fax e B B M Work Purchased
Email r E E B
Contact Person E
D D '--....
D D -....
D D ......
....
D D -....
I
D D ...... -
D D 1--
......
Rev. 2/10/15
fORTWORTH
T otal Dollar Amount of MBE Subcontractors/Suppliers $
Total Dollar Amount of Non-MBE Subcontractors/Suppliers $
ff
ATIACHME NT 1A
Pag e 4 of 4
,rs;t9-00 .~0
TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ 35Jt IJ-O(/.
~
The Offeror will not make additions, deletions or substitutions to this certified list without the prior approval of the
Minority and Women Business Enterprise Office through the submittal of a Request for Approval of
Change/Addition form . Any unjustified change or deletion shall be a material breach of contract and may result
in debarment in accord with the procedures outlined in the ordinance. The Offeror shall submit a detailed
explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the detail
explanation is not submitted , it will affect the final compliance determination.
By affixing a signature to this form , the Offeror further agrees to provide, directly to the City upon request,
complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and
any special arrangements with MBEs. The Offerer also agrees to allow an audit and/or examination of any
books , records and files held by their company. The Offeror agrees to allow the transmission of inteNiews with
owners , principals, officers, employees and applicable subcontractors/suppliers participating on the contract that
will substantiate the actual wo rk performed by the MBE(s) on this contract, by an authorized offi cer or employee
of the City . Any intentional and/or knowing misrepresentat ion of facts will be grounds for terminating the contract
or debarment from City work for a period of not less than three (3) years and for initiating action under Federal ,
State or Local laws concerning false statements . Any failure to comply with this ordinance creates a material
breach of the contract and may result in a determination of an irresponsible Offerer and debarment from
participating in City work for a period of time not less than one (1) year.
Printed Signature
Title Contact NamefTitle (if different)
G61v) 8oB -/'/(P(p
Company Name Tolophone and/or Fax
f' ()be e 'ff' /J CO>, Jf!t.t/C f7 tme/ ,t/14(. C.t7>*1
E-mail Address ~ ,./ ' Address
IP/8/ztrzo
Dato
Rev . 2/10/1 5
FORT WORTH
' .~ a
OFFEROR COMPANY NAME:
-r/l/J (thtff1lJICn~
PROJECT NAME:
City of Fort Worth
Small Business Enterprise
SBE Good Faith Effort Form
6~e1v~, tLC.
ATIACH,MENT 1C
Page 1 of4
Chock appllcablo b!oclc to doscrlbe
Offeror
I S/0/BE lt1I I
N?N-S/0/BE
7"U> t)N -Oft-L /"1'111=,-1e;,. f-/J11f'f'l,,f1-V, J I'"' J°.u. ,-BID DATE j
t>(p/ () '1/~ou
City's SSE Project Goal: I Offeror's SBE Project Commitment: PROJECTNUM BER
5 % -8 % N/A
I" the Offeror did not meet or exceed the SBE subcontracting goal for this project, the Offeror must co,
fonn .
nplete this I
If the Offeror's method of com llance with the SBE oal is based u on demonstra p Q p I Ion of a
"good faith effort", the Offeror will have the burden of correctly and accurately preparing and
submitting the documentation required by the City. Compliance with each Item, 1 thru 11 below,
shall satisfy the Good Faith Effort requirement absent proof of fraud, Intentional and/orjknowlng
misrepresentation of the facts or intentional discrimination by the Offeror.
Failure to complete this fonn, In Its entirety with supporting documentation, and received by the
Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening , exclusive
of bid opening date, will result In the bid being considered non-responsive to bid specifications.
I
1.) Please 11st each and every subcontracting and/or supplier opportunity for the completldn of this
project, regardless of whether it is to be provided by a SBE or non-SBE. (DO NOT LIST N~MES OF
FIRMS) On all projects, the Offeror must 11st each subcontracting and or supplier opportunity
regardless of tier.
(Use additional sheets, if necessary)
List of Subcontracting Opportunities List of Supplier Opportunities
/tt>NE" -/" o ?~ .,$8.P f'~ ~ ~PUU ne lrmt /H,4-llk,-v,'!1'
61AJI 8Ql/fJs /tnt-/>v,.,.I /11,tlt./P. ,,f
I
I
Rev . 2/10/15
ATTACHMENT 1C
Page 2 of4
2.) Obtain a current (not more than two (2) months old from the bid open date) list of SBE subcontractors
and/or suppliers from the City's M/WBE Office.
_f__Yes
__ No
Date of Listing O(p I OB I Zot.(')
3.) Did you solicit bids from SBE firms, within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior to bid opening by mall, exclusive of the day the bids are opened?
Yes
J No
(If yes , attach SBE mall llstlng to include name of finn and address and a g!l!s! copy of letter malled.)
4.) Did you solicit bids from SBE firms, wit hin the subcontracting and/or supplier areas previously listed ,
at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are
opened?
(If yos. attach list to Include .!!!.!!l! of SBE firm, person contactod, phone number and date and time of contact.)
5.) Did you solicit bids from SBE firms, within the subcontracting and/or supplier areas previously listed ,
at least ten calendar days prior to bid opening by facsimile (fax), exclusive of the day the bids are
opened?
__ Yes (If yes , attach list to Include name of SBE flnn, fax number and !!!m and time of contacl In addition, If the fax is
returned as undeliverable, then that "undeliverable conflnnatlon" recolvod must be printed directly from the
facsimile for proper documentation. Failure to submit confinnatlon and/or "undeliverable confinnatlon"
documentation may render the GFE non-responsive.)
6.) Did you solicit bids from SBE firms, within the subcontracting and/or supplier areas previously listed,
at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened?
__ Yes
~No
(If yes, attach email conflnnatlon to Include .!!!.!!l! of SSE flnn, date and time. In addition, If an email Is returned
as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for
proper documentation. Failure to submit confinnatlon and/or "undeliverable message" documentation may
render the GFE non-responsive.)
NOTE: The four methods Identified above are acceptable for soliciting bids, and each selected method
must be applied to the applicable contract The Offeror must document that either at least two attempts
were made using two of the four methods 2! that at least 2!!!. successful contact was made using one of
the four methods In order to be deemed responsive to the Good Faith Effort requirement.
NOTE: The Offeror must contact the entire SBE list specific to each subcontracting and supplier
opportunity to be In compliance with questions 3 through 6.
7 .) Did you provide plans and specifications to potential SBEs?
Yes
~No
8.) Did you provide the Information regarding the location of plans and specifications In order to assist
the SBEs?
__ Yes
__ ./_No
Rev. 2/10/15
ATTACH
1
MENT 1C
Page 3 of4
9.) Did you prepare a quotation for the SBEs to bid on goods/services specific to their skill set?
__ Yes (If yes, attach all copies of quotations.)
_LNo
1 O.) Was the contact lnfonnatlon on any of the listings not valid?
Yes (If yes, attach the Information that was not valid In order for the MiWBE Office to address the corrections
--needed.)
~No
11.)Submit documentation if SBE quotes were rejected. The documentation submitted should be in the
forms of an affidavit, include a detailed explanation of why the SBE was rejected and any s pportlng
documentation the Offeror wishes to be considered by the City. In the event of a bona fldf dispute
concerning quotes, the Offeror will provide for confidential In-camera access to an Inspect! n of any
relevant documentation by City personnel.
{Please use additional sheets, If necessarv. and attach.)
Company Name Telephone Contact Person Scope of Work Reason for Rejection
/vCNE -/40 '/" S £1..~ ~
I
I
I
I
ADDITIONAL INFORMATION:
.. Please provide additional 1nfonnatlon you feel will further explain your good and honest efforts to obtain
SBE participation on this project.
IS '"' % ..>Qr
The Offeror further agrees to provide, directly to the City upon request, com J lete and
accurate information regarding actual work performed on this contract, the ~ayment
thereof and any proposed changes to the original arrangements submitted with ithis bid.
The Offeror also agrees to allow an audit and/or examination of any books, recc,rds and
files held by their company that will substantiate the actual work performe1 on this
contract, by an authorized officer or employee of the City.
Any intentional and/or knowing misrepresentation of facts will be gro4nds for
terminating the contract or debarment from City work for a period of not less ttlan three
(3) years and for initiating action under Federal, State or Local laws concern f ng false
statements. Any failure to comply with this ordinance and creates a material breach of
contract and may result in a determination of an irresponsible Offeror and dJbannent
from participating in City work for a period of time not less than one (1) year.
Rev. 2/10115
ATTACHMENT 1C
Page 4 of 4
The undersigned certifies that the information provided and the SBE(s) listed was/were
contacted in good faith. It is understood that any SBE(s) listed in Attachment 1 C will be
contacted and the reasons for not using them will be verified by the City's M/WBE
Office.
Printed Signature
Title Contact Name and Title (if different)
-rgp 6:nrntvcTZov> 6t2CfU,,?1 LL c. (erv 80&-/'((?(t
Company Name Phone Number Fax Number
Address
robe@., ft: p Cr.41~frlflq!C?Jj{0:fl· "41
Email Address
~rJog/'Mzo
City/State/Zip Date
Rev . 2/10/15
GC-6.07 Wage Rates
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPEC!FlCA TJON DOCUMENTS
Revised Jul y 1, 201 1
2020 On-Call Pavement Markings C ntract #2
CP 103740
2013 PREVAILING WAGE RATES
(Heavy and Highway Construction Projects)
CLASSIFICATION DESCRIPTION Wage Rate
Asphalt Distributor Operator $ 15 .32
Asphalt Paving Machine Ope rator $ 13 .99
Asphalt Raker $ 12 .69
Broom or Sweeper Operator $ 11.74
Concrete Fini sher, Pav i ng and Structures $ 14 .12
Concrete Pavement Finishing Machine Operator $ 16.05
Concrete Saw Operator $ 14.48
Crane Operator, Hydraulic 80 tons or less $ 18.12
Crane Operator, Lattice Boom 80 Tons or Less $ 17 .27
Crane Operator, Lattice Boom Over 80 Ton s $ 20.52
Crawler T ract o r Operator $ 14.07
Electrician $ 19 .80
Excavator Operator, 50,000 pounds or less $ 17.19
Excavator Operator, Over 50,000 pounds $ 16 .99
Flagger $ 10.06
Form Builder/Setter, Structures $ 13 .84
Form Setter, Pav ing & Curb $ 13.16
Foundation Dr ill Operator, Crawler Mounted $ 17.99
Foundation Drill Operator, Truck Mounted $ 21 .07
Front End Loader Operato r, 3 CY or Less $ 13.69
Front End Loade r Operator, Over 3 CY $ 14 .72
Laborer, Common $ 10 .72
Laborer, Utility $ 12.32
Loader /Backhoe Operator $ 15 .18
M echanic $ 17 .68
Milling Machine Operator $ 14.32
Motor Grader Operator, Fine Grade $ 17.19
Motor Grade r Operator, Rough $ 16 .02
Off Road Hauler $ 12.25
Pavement Marking Machine Operator $ 13.63
Pipelayer $ 13 .24
Recla imer/Pulver izer Operator $ 11.01
Re inforcing Steel Worker $ 16.18
Roller Operator, Asphalt $ 13.08
Rolle r Operato r, Other $ 11 .51
Scraper Operator $ 12 .96
Servicer $ 14 .58
Small Slipform Machine Operator $ 15.96
Spreader Bo x Operator $ 14.73
Truck Driver Lowboy-Float $ 16.24
Truck Driver Transit -Mix $ 14 .14
Truck Dr iver, Single Axle $ 12 .31
Truck Driver, Single or Tandem Axle Dump Truck $ 12.62
Truck Driver, Tandem Axle Tracto r with Semi Trailer $ 12.86
Welder $ 14.84
Work Zone Barricade Servicer $ 11.68
The Davis -Bacon Act prevailing wage rate s shown for Heavy and Highway construction proj ec t s were determined y
the United States Department of Labor and current as of September 2013 . The titles and descriptions for the
classifica tion s listed are detailed in the AGC of Te xas ' Standard Job Classifications and Descriptions for High way,
Heavy, Utilities, and Industrial Construction in Te xas .
Page 1 of 1 2020 On-Call Pavement arkin gs Contract #2
CPN 103740
2013 PREVAILING WAGE RATES
(Commercial Construction Projects)
CLASSIFICATION DESCRIPTION
AC Mechanic
AC Mechanic Helper
Acoustical Ceiling Installer
Acoustical Ceiling Installer He lpe r
Bricklayer/Stone Mason
Bricklayer/Stone Mason Trainee
Bricklayer/Stone Mason Helper
Carpenter
Carpenter Helper
Concrete Cutter/Sawer
Concrete Cutter/Sawer Helper
Conc r ete Finisher
Concrete Finisher Helper
Concrete Form Bu ilder
Concrete Form Builder Helper
Drywall Mechanic
Drywall Helper
Drywall Taper
Drywall Taper Helper
Electrician (Journeyman)
Electrician Apprentice (Helper)
Electronic Technician
Floor Layer
Floor Layer Helper
Glazier
Glazier Helper
Insulato r
Insulator Helper
Laborer Common
Laborer Skilled
Lather
Metal Building Assembler
Metal Building Assembler Helper
Metal Installer (Miscellaneous)
Metal Insta l le r Helper (M is cel laneou s)
Metal Stud Framer
Metal Stud Fr am er Helper
Painter
Painter Helper
Pi pefitter
Pipefitter Helper
Plasterer
Plasterer Helper
Plumber
Plumber Helpe r
Reinforcing Steel Setter
Page 1 of 2
Wage Rate
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
25.24
13.67
16 .83
12.70
19.45
13.31
10 .91
17 .75
14 .32
17 .00
11.00
15 .77
11 .00
15.27
11 .00
15.36
12 .54
15.00
11 .50
19 .63
15 .64
20.00
18 .00
10.00
21.03
12.81
16 .59
11.21
10.89
14 .15
12 .99
16 .00
12 .00
13.00
11 .00
16 .12
12 .54
16.44
9.98
21.22
15 .39
16 .17
12 .85
21.98
15 .85
12 .87
2020 On-Call Pavement Marki ngs Contract #2
CPN 103740
Reinforcing Stee l Setter Helper $ 11.08
Roofer $ 16.90
Roofer Helper $ 11.15
Sheet Metal Worker $ 16.35
Sheet Metal Worker Helper $ 13 .11
Spri nkler System Installer $ 19.17
Sprinkler System Installer Helper $ 14.15
Steel Worker Structural $ 17.00
Steel Worker Structural Helper $ 13.74
Waterproofer $ 15 .00
Equipment Operators
Concrete Pump $ 18.50
Crane, Clamsheel, Backhoe, Derrick, D'Line Shovel $ 19 .31
Forklift $ 16.45
Foundation Drill Operator $ 22.50
Front End Loader $ 16 .97
Truck Driver $ 16 .77
Welder $ 19.96
Welder Helper $ 13.00
The prevailing wage rates shown for Commercial construction projects were based on a sa lary survey conducted
and published by the North Te xas Construction Industry (Fall 2012} Independently compiled by the Lane Gorman
Trubitt, PLLC Construction Group. The descriptions for the classifications listed are provided on the TE XO's (The
Construction Association} website . www.texoassociation.org/Chapter/wagerates.asp
Page 2 of 2 2020 On-Call Pa ement Markings Contract #2
CPN 103740