Loading...
HomeMy WebLinkAboutContract 57090 CITY SECHUARY O INTERLOCAL AGREEMENT BETWEEN THE CITY OF FOREST HILL AND THE CITY OF FORT WORTH cny4 K For A License to Perform Roadway Improvements on Seminary Drive at Mansfield Highway Intersection within Forest Hill STATE OF TEXAS § COUNTY OF TARRANT § This Interlocal Agreement ("Agreement") is entered into by and between the City of Forest Hill, a Texas home rule municipality, acting by and through its City Manager ("Forest Hill"), and the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized Assistant City Manager ("Fort Worth"). Forest Hill and Fort Worth are also known collectively as the"Parties". I. RECITALS WHEREAS, Chapter 791 of the Texas Government Code, the Interlocal Cooperation Act, authorizes municipalities to enter into interlocal agreements for the providing of governmental functions and services; and WHEREAS, each governing body, in performing governmental functions or in funding the performance of governmental functions hereunder, shall make that performance or those payments from current revenues legally available to that party; and WHEREAS, each governing body finds that the performance of this Agreement is in the common interest of both parties,that the undertaking will benefit the public and that the division of costs fairly compensates the performing party for the services or functions under this Agreement; and WHEREAS, Fort Worth, in conjunction with the Texas Department of Transportation (TXDOT), desires to install sidewalk and roadway improvements along Seminary Drive and Mansfield Highway ("Project") a portion of which is located in TXDOT right-of-way within the territorial limits of Forest Hill (Mansfield Highway) and within Forest Hill's right-of-way (Seminary Drive) and a portion of which is located within the territorial limits of Fort Worth; and WHEREAS, Fort Worth has agreed to pay for 100 percent of the costs for the engineering design, environmental, temporary construction easements (including within Forest Hill), and construction of the Project, estimated to be $728,260,00 by and through an Advance Funding Agreement with TXDOT, under which TXDOT will let the construction contract; and WHEREAS, Fort Worth has agreed to pay for 100 percent of the costs of the temporary construction easements within City of Forest Hill, the estimated cost of the temporary construction easement is $4,755.00 and construction of the improvement within the City of OIFFICIAL RECORD CITY SECRETARY R.Seminary Rd.&Manslield Hwy Improvements-101590 FT W it otfx Forest Hill, estimated to be $38,000.00 by and through an Advance Funding Agreement with TXDOT, under which TXDOT will let the construction contract; and WHEREAS, Forest Hill grants Fort Worth a license for Fort Worth to perform engineering design, environmental, and construction activities for the Project within Forest Hill city limits. NOW THEREFORE,Forest Hill and Fort Worth agree as follows: II. TERMS AND CONDITIONS A. Project. Fort Worth and Forest Hill agree to perform their respective obligations, as described in the recitals hereto, which are incorporated herein, and as stated in more detail herein below,within Fort Worth and Forest Hill,as indicated on Exhibit A. B. DesigLi of the Project. The Parties acknowledge and agree that Fort Worth will prepare the Project engineering design and that Fort Worth shall be solely responsible for the Project engineering design.Forest Hill shall have review authority of the plans and specifications at 60 and 90% intervals. Major components of the project within Forest Hill city limits include new sidewalk and ramps, curb and gutter, driveways as well as paving and drainage improvements along Seminary Drive and Mansfield Highway; C. Project Obligations. Fort Worth will pay for the project's engineering design, environmental,temporary construction easements, and construction costs, including all necessary utility adjustments so the facilities can be properly installed. D. Procurement,Pre-construction. Fort Worth shall be responsible for: 1. Preparation of Project contract documents; 2. Acquiring all TxDOT approvals for the Project; 3. Completing utility coordination for the Project; 4. Acquiring temporary construction easements for the Project; E. Grant of License. Forest Hill hereby grants to Fort Worth a license to perform or have performed engineering, preliminary construction activities and construction activities within the city limits of Forest Hill within the project limits described in this Agreement. F. Current Revenue. No debt is created by this Agreement. Forest Hill and Fort Worth each hereby warrant that all payments, contributions, fees and disbursements, if any, required under this Agreement shall be made from then-current revenues. G. No Waiver of Immunily or Defenses. Nothing in the performance of this Agreement shall impose any liability for claims against either Fort Worth or Forest Hill, other than claims for which the Texas Tort Claims Act may impose liability.Nothing contained herein E.Seminary Rd.&Mansfield Hwy Improvements-10I590 Page 2 of shall be deemed to waive any immunity or defense or constitute a waiver of governmental immunity by Fort Worth or Forest Hill. H. No Third Party Beneficiaries. It is understood by the Parties that this Agreement is entered into for the mutual convenience and purposes of Forest Hill and Fort Worth and it is the Parties intent that no other person shall be construed as a beneficiary of this Agreement. Further, the Parties do not intend for any third parry to obtain any right by virtue of this Agreement. 1. No Creation of Rights. By entering into this Agreement, the Parties do not intend to create any obligations express or implied other than those stated in the Agreement. Further, this Agreement shall not create any rights in any party not a signatory to the Agreement. J. Force Majeure. If, by reasons of Force Majeure, any party will be rendered wholly or partially unable to carry out its obligations under this Agreement after its effective date,then such party will give written notice of the particulars of such Force Majeure to the other party or parties within a reasonable time after the occurrence of such event. The obligations of the party giving such notice, to the extent affected by such Force Majeure, will be suspended during the continuance of the inability claimed and for no longer period, and any such party will in good faith exercise its best efforts to remove and overcome such inability. K. Severabili. In the event any section, subsection, paragraph, subparagraph, sentence, phrase, or word of this Agreement is held invalid, illegal, or unenforceable by a court of competent jurisdiction, the balance of this Agreement shall be enforceable, and shall be read as if the parties intended at all times to delete said invalid section, subsection, paragraph, subparagraph, sentence, phrase, or word.. In such event there shall be substituted for such deleted provision a provision as similar in terms and in effect to such deleted provision as may be valid, legal and enforceable. L. Amendment. This Agreement may only be amended, altered, or revoked by written instrument duly authorized and signed by the parties to such amendment. M. Notice. Any notice provided for or permitted under this Agreement shall be made in writing and may be given or served by (i) delivering the same in person to the party to be notified, or (ii) depositing the same in the mail, postage prepaid, certified with return receipt requested, and addressed to the party to be notified, or (iii) sending by electronic means, with a copy thereof sent by registered mail on the same day. If notice is deposited in the mail pursuant to (ii) or (iii) of this Article, it will be effective upon receipt or refusal. For the purpose of notice,the addresses of the parties are,until changed as provided below, as follows: City of Fort Worth Transportation and Public Works Department Attn: Iskal Shrestha, PE Sr.Project Manager 200 Texas St. Fort Worth, Texas 76102 E.Seminary Rd.&Mansfield Hwy Improvements-101590 Page 3 of 6 With copy to: Douglas W. Black, Sr.Assistant City Attorney 200 Texas Street Fort Worth, Texas 76102 City of Forest Hill Attn: Venus M. Wehle,PLED Interim City Manager 3219 California Parkway Forest Hill, Texas 76119 With copy ta: Nichols,Jackson,Dillard,Hager and Smith,LLP Attn: Victoria Thomas, City Attorney 500 N. Akard/I800 Ross Tower Dallas, Texas 75201 The parties may from time to time change their respective addresses, and each shall have the right to specify as its address any other address upon at least ten days written notice to the other party. N. Entire Agreement. This Agreement, including any exhibits attached and made a part hereof, is the entire Agreement between the parties and supersedes all prior or contemporaneous understandings or representations, whether oral or written, respecting the subject matter herein. O. Effective Date and Term. This Agreement shall become effective immediately upon its execution by both parties and shall be for a term of one year or until completion of the Project,whichever occurs last. P. Non Discrimination.Neither Fort Worth nor Forest Hill, nor any of their officers, members, agents, employees, program participants, or subcontractors, while engaged in performing this Agreement, shall in connection with the employment, advancement, or discharge of employees., or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age, except on the basis of a bona fide occupational qualification, retirement plan, or statutory requirement. Fort Worth and Forest Hill agree that in the execution, performance, or attempted performance of this Agreement, they will not discriminate against any person or persons because of gender, religion, color, sexual orientation, or national origin, nor will either party permit its respective agents, employees, subcontractors or program participants to engage in such discrimination. ACCORDINGLY, Fort Worth and Forest Hill have each caused this instrument to be executed on each city's respective behalf by its duly authorized representative. E.seminary Rd.&Mansfield Hwy Improvements-101590 Page 4 of 6 EXECUTED and EFFECTIVE as of the date last written by the signatory who's signingmakes this document fully executed,below. CITY OF O ST HILL CITY OF FORT WORTH By: By: Venus We le Dana Burghdoff Interim ity Manager I*erirn Assistant C Manage ^IketR v^ yI�qj2,;-z Date: Date: ATTEST: ATTEST: r " � °y C�1Jl� Amy L. And4 on 6Lrm e4+P- City Secretary City Secretary I, 16 M&C No.NIA r joisc Form and Legality: Date NIA i _ RECOMMENDED FOR APp VAL: �-,Hager and Smith, By:William Johnson,Directos,Asst. City Attorney Transportation and Public Works Department aForm and Legality: C _... Douglas W.Black ' Sr.Assistant City Attorney V CONTRACT COMPLIANCE MANAGER: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting re uirements. Iskal Shrestha,PE - -� Sr.Project Manager 0MCIAL RECORD �9 SECRETARY E.Seminary Rd.&Mansfield Hwy Improvements-101590 F y H,TX. ATTACHMENTS/EXHIBITS. E.Seminary Rd.&Mansfield Hwy Improvements-101590 Page 6 of 6 ATTACHMENT A Project Scope The Project's scope includes traffic signal modification, sidewalk & ADA ramps, pavement marking, and signage installation. Major components of the Project within Forest Hill city limits include a new sidewalk, ADA ramps, curb and gutter, driveway, and paving and drainage improvements along Seminary Drive and Mansfield Highway. Responsible Parties For the Project covered by this Agreement, the parties shall be responsible for the following work as stated in this attachment referenced in the table below. 1. City of Fort Worth Utilities 2. City of Fort Worth Enviromnental Assessment and Mitigation 3. City of Fort Worth Architectural and Engineering Servies 4. City of Forest Hill Review Engineering Plans and Specifications 5. City of Fort Worth Right of Way, Easement, and Real Property 6. 1 State Construction Responsibilities *Z!#, EXHIBIT B OF i 1- I FORT WORTH I ,s � ; ,.._ •?�� � i 1 I � 4 k y,r,: {r • Ir��f-+�-�r� 9� i ;.,� -41 -� s m r T ! Y AIDIL _ � tia• - ff 7 CITY OF F FOREST HILL , i f ecALe:r=1W TRANSPORTATION&PUBLIC WORKS FoRTWoRTH ■ CAPITAL DELIVERY DIVISION 1-021 W6S777H ST su coo E.SEMINARY DRIVE at MANSFkEI.D HIGHWAY FORT WoTE)(ps 76107 e1 67756 1 CfTY PROD.NO.101590 FY 2018 BOND INTERSECTION COUNCIL OFSTRrcT8 IMPROVEMENT PROJECT MAPSCO 92X