Loading...
HomeMy WebLinkAboutContract 55217-CO2 CSC No.55217-CO2 FORT WORTH. City of Fort Worth Change Order Request Project Name West 7th Street City Sec# 55217 Client Project#(s) 101555 Project Description West 7th Street from University Drive to Trinity River Bridge Street Improvements Contracto Reyes Group,LTD Change Order# 2 Date 2/3/2022 City Project Mgr. Leon Wilson City Inspector Ozzie Ouimette Dept. TPW Contract Time Totals (CD) Original Contract Amount $4,937,193.00 $4,937,193.00 300 Extras to Date $712,861.52 $712,861.52 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $5,650,054.52 $5,650,054.52 300 Amount of Proposed Change Order $8,765.00 $8,765.00 114 Revised Contract Amount $5,658,819.52 $5,658,819.52 414 Original Funds Available for Change Orders $1,006,271.87 $1,006,271.87 Remaining Funds Available for this CO $293,410.35 $293,410.35 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 14.62% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $6,171,491.25 JUSTIFICATION(REASONS)FOR CHANGE ORDER 70 calendardays are necessary because during the pre-construction meeting the City requested that the contractor modify the traffic control to minimize the lengths of the lane closures. The intent was to minimize impact to the businesses within the project corridor. This resulted in additional phases far the traffic control. 20 calendar days are necessary because 10inches of unforeseen concrete road base were discovered which had to be removed to construct the bicycle lanes at an appropriate cross slope. 24 calendar days are necessary because the City requested that the contract demobilize during the Fort Worth Stock Show&Rodeo. The cost for contractor demobilization is $8,765.00 which includes costs to demobilize/remobilie equipment to the site and costs to remove and re-install traffic control. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name .ntractor IN Contract Signature Dat Reyes Group,LTD Jaison Cherian Feb 4,2022 Inspector/Inspection Supervisor 17 DatW Project and Contract Compliance Manager Date Feb 7,2022 _111—, Feb 4,2022 Program Manager Date Senior Capital Project Officer Date 6L. Feb 8,2022 Feb 81 2022 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date [aa en your .Feb 8,2022 8 � Feb 8,2022 rife Assistant City Attorney Date Assistant City Manager Date Feb 9,2022 T, Feb 10,2022 IIIIIIIIIIIIIIIIIII[Council Action(if required) ATTEST: M&C Number N/A M&C Date Approved N/A �/./�.'e%!;'�yQ� � �BBG'a'"� 4a iette S.Goodall(Feb 10,2022 16(XCST) q'd C OR �T a °`pOOpOO OFFICIAL RECORD lannette Goodall,City Secretary ,cy Qo° °�Oa� OO..o ° 0.o °o��� CITY SECRETARY 0 �p o° °o*'d FT. WORTH, TX as �° 0000000 q' � rEXASo�p FORTWORTH City of Fort Worth I---- Change Order Additions Project Name West 7th Street City Sec# 55217 Client Project# 101555 Contractor Reyes Group,LTD PM Leon Wilson Inspector Ozzie Ouimette Change Order Submittal# O2 Date 2/3/2022 ADDITIONS ITEM DESCRIPTION DEPT City Unit Unit Cost Total 166 Demobilize/Remobilize for TPW S8,765.00 Sub Total Additions S Change Order Additions Page 2 of 5 FORT WORTH City of Fort Worth Change Order Deletions Project Name West 7th Street City Sec# 55217 Client Project# 101555 Contractor Reyes Group,LTD PM Leon Wilson Inspector Ozzie Ouimette Change Order Submittal# O Date 2/3/2022 DELETIONS ty Unit Unit Cost Total TPW S0.00 Sub Total Deletions S . Change Order Deletions Page 3 of 5 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00