HomeMy WebLinkAboutContract 55385-CO1 CSC No.55385-COI FORT WORTH, City of Fort Worth �" — Change Order Request Project Name Westport Parkway-Altavista to Keller Haslet City Sec# 55385 Client Project#(s) FID&56002-0600430-5740010-101019-001780/56002-0700430-5740010-101019-001780/30108-0200431-5740010-101019-002380 Project Description New 4-lane arterial roadway including shared use paths,lighting and storm drainage between roundabouts at Keller Haslet Rd and Altavista Blvd. Contractor Jackson Construction,Ltd. Change Order# 1 Date 1/26/2022 City Project Mgr. Bradley Radovich City Inspector Kevin Jackson Dept. Water 10600430 Sewer 10700430 TPW 1 0200431 Contract Time Totals CD Original Contract Amount $377,881.00 $9,875.00 $2,990,879.75 $3,378,635.75 240 Extras to Date $0.00 $0.00 $0.00 Credits to Date $0.00 $0.00 $0.00 Pending Change Orders(in M&C Process) $0.00 S0.00 S0.00 Contract Cost to Date $377,881.00 $9,875.00 $2,990,879.75 $3,378,635.75 240 Amount of Proposed Change Order $0.00 $0.00 $51,602.05 $51,602.05 Revised Contract Amount $377,881.00 $9,875.00 $3,042,481.80 $3,430,237.80 240 Original Funds Available for Change Orders $18,894.00 $988.00 $464,317.00 $484,199.00 Remaining Funds Available for this CO $18,894.00 $988.00 $464,317.00 $484,199.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.53% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,223,294.69 JUSTIFICATION(REASONS)FOR CHANGE ORDER Material,labor and equipment unit prices have risen at a rate beyond normal expectations between the time of bid opening and the time that the ROW was obtained enabling full access to the construction.Bids were opened in October of 2020 anticipating closing on ROW by the end of 2020.ROW access was not obtained until October 2021,delaying construction.Rebidding the project would delay the project even further and not result in project savings as the increased prices herein compare favorably to recent bids received on other projects.Also included in this change order are revisions to Tree Protection Fencing as a result of the SWPPP review process and the requirements of the land purchase negotiations.Additionally,a redesign of the Traffic Control Plan was undertaken which included a new temporary roadway that will allow citizen access to the subdivision North of the site for as long as possible during construction.lt also includes additional protective barrier required by Oncor as we encroach on their transmission tower with the temporary road.Contingency funds are available to cover the change order.No additional Contract Time is requested. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. ontractor's Company Name Wontractor(Nam ntract Signature Jackson Construction,Ltd. Troy Jackson Jan 28,2022 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date Jan 28,2022 Jan 28,2022 Program Manager Date Senior Capital Project Officer Date Jan 28,2022 atiP Jan 28,2022 Assistant Director Water Dept. / Assistant lJirecT11WPVV Date Director,Contracting Department(Dept) Date Lsta Jan 28,2022 Feb 4,2022 Attorney Date Assistant City Manager Date Feb 9,2022 F. � n Feb 11,2022 Council Action(if required) M&C Number N/A M&C Date Approved N/A ATTEST: s�ooda„ �a�f0 r 1�4 Jannette Goodall,City Secretary p 0°0000000°o�L�� 01. A,o °00��� OFFICIAL RECORD d~S 0 CITY SECRETARY 0vo °=d 0 *I ° FT. WORTH, TX °O000000°00 O a�nexpsaap FORT WORTH City of Fort Worth �IV---- Change Order Additions Project Name I Westport Parkway-Altavista to Keller Haslet City Sec# 55385 Client Project# I FIDs:56002-0600430-5740010-101019-001780/56002-0700430-5740010-101019-001780/30108-0200431-5740010-101019-002380 Contractorl Jackson Construction,Ltd. PM Bradley Radovich Inspector Kevin Jackson Change Order Submittal# O1 Date 1/26/2022 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 12"PVC Water Pie a er 1-5 16"DIP Water(Restraint Joints) Water/0600430 177.00000000 LF F2749.00 1-6 16"PVC C900 Water Pipe Water/0600430 738.00000000 LF $114.7 1-17 Ductile Iron Waterfittings with Restraint Water/0600430 3.30000000 TN 13,000.00 1-18 Fire Hydrant Water/0600430 2.00000000 EA $4,100.7 1-25 6"Gate Valve Water/0600430 2.00000000 EA $1,000.7 1-26 16 Inch Gate Valve w/Vault Water/0600430 1.00000000 EA 25,000.00 1-27 6"Blow-off Valve Water/0600430 2.00000000 EA $21,000.00 42,000.00 111-15 2"Condt PVC Sch 80(T) TPW/0200431 4,268.00000000 LF 13.00 111-24 8"Flex Base,Type A,GR-1 TPW/0200431 789.00000000 SY 29.00 111-25 Hydrated Lime TPW/0200431 305.00000000 TN 222.00 111-27 4"Asphalt Pvmt TPW/0200431 731.00000000 SY $26.05 111-28 8"Asphalt Base Type B TPW/0200431 731.00000000 SY $50.05 111-29 10"Conc Pavement TPW/0200431 11,827.00000000 SY $67.00 $792,409.00 111-30 6"Concrete Driveway TPW/0200431 381.00000000 SF $15.00 111-31 Patterned Concrete median TPW/0200431 2,599.00000000 SF $13.00 33,7 77.00 111-34 4"Concrete Sidewalk TPW/0200431 3,656.00000000 SF 5.75 111-35 5"Conc Sidewalk TPW/0200431 39,937.00000000 SF 6.50 111-36 Barrier Free Ramp,Type P-1 TPW/0200431 4.00000000 EA $1,600.7 111-37 4"SLID Pvmnt Marking HAS(W) TPW/0200431 941.00000000 LF $1.7 111-38 4"SLID Pvmnt Marking HAS(Y) TPW/0200431 1,284.00000000 LF $1.50 111-39 4"BRK Pvmnt Marking HAS(W) TPW/0200431 873.00000000 LF 1.50 111-40 4"DOT Pvmnt Marking HAS(W) TPW/0200431 11.00000000 LF 1.50 111-41 8"SLID Pvmnt Marking HAS(W) TPW/0200431 352.00000000 LF $2.7 111-42 12"SLID Pvmnt Marking HAE(W) TPW/0200431 21.00000000 LF $8.7 111-43 24"SLID Pvmnt Marking HAE(W) TPW/0200431 212.00000000 LF $17.7 111-44 REFL Raised Marker TY II-A-A TPW/0200431 19.00000000 EA $5.55 111-45 REFL Raised Marker TY II-C-R TPW/0200431 86.00000000 EA $5.50 111-46 Lane Legend Arrow TPW/0200431 2.00000000 EA $260.05 111-47 Lane Legend DBL Arrow TPW/0200431 13.00000000 EA $390.05 111-48 Lane Legend Only TPW/0200431 2.00000000 EA $300.05 111-49 Lane Legend Bike TPW/0200431 5.00000000 EA $330.05 111-50 Lane Legend Pedestrian TPW/0200431 4.00000000 EA $380.05 111-51 Type C Barbed Wire Fence,Metal Posts TPW/0200431 2,769.00000000 LF $7.7 111-53 Install 18'Type 1 Gate TPW/0200431 2.00000000 EA $1,088.00 111-54 Topsoil TPW/0200431 2,755.00000000 CY $42.7 111-55 Block Sod Placement TPW/0200431 10,151.00000000 SY 6.00 111-56 Seeding,Hydomulch TPW/0200431 2,687.00000000 SY $1.7 111-57 Seeding,Soil Retention Blanket TPW/0200431 3,692.00000000 SY $1.7 111-60 18"RCP,Class III TPW/0200431 37.00000000 LF $59.7 111-61 21"RCP,Class III TPW/0200431 462.00000000 LF 64.00 111-62 24"RCP,Class III TPW/0200431 830.00000000 LF $88.00 111-63 36"RCP,Class III TPW/0200431 4.00000000 LF $159.7 111-64 42"RCP,Class III TPW/0200431 579.00000000 LF $207.7 111-65 66"RCP,Class III TPW/0200431 222.00000000 LF $451.05 111-66 6'x3'Box Culvert TPW/0200431 101.00000000 LF $47175 47,571.00 111-67 6'x3'Beveled Box Culvert TPW/0200431 67.00000000 LF $471.05 111-68 4'Storm Junction Box TPW/0200431 2.00000000 EA $6,200.05 111-69 5'Storm Junction Box TPW/0200431 1.00000000 EA $6,800.00 111-70 6'Storm Junction Box TPW/0200431 1.00000000 EA $8,800.00 8,800.00 111-71 Station 2+83.69 Storm Junction Box TPW/0200431 1.00000000 EA $23,000.05 111-72 Station 5+13.95 Storm Junction Box TPW/0200431 1.00000000 EA 23,000.00 111-73 18"SET-PD(4:1) TPW/0200431 2.00000000 EA $2,700.05 111-74 10'Curb Inlet TPW/0200431 13.00000000 EA $4,500.05 111-75 5'Drop Inletw/Apron TPW/0200431 2.00000000 EA $8,300.7 111-76 3'Drop Inletw/Apron TPW/0200431 1.00000000 EA $5,200.00 111-77 No 10 Insulated Elec Condr TPW/0200431 8,794.00000000 LF 1.35 111-78 No 10 Bare Elec Condr TPW/0200431 4,397.00000000 LF 1.35 111-79 Ground Box Type B w/Apron TPW/0200431 5.00000000 EA $1,130.05 111-80 Furnish/Install Type 33A Arm TPW/0200431 23.00000000 EA $230.7 111-81 Furnish/Install 120-240 Volt Single Phase Metered Pedestal TPW/0200431 1.00000000 EA $6,565.7 111-82 Rdwy Ilum Assembly TY 18,18A,19 and D-40 TPW/0200431 23.00000000 EA $3,220.7 111-84 LED Lighting Fixture TPW/0200431 23.00000000 EA $366.00 111-85 wy lurn I-oundation I Y J,b,b an ­7T.777M77- 111-86 Furnish/Install Alum Sign Ground Mount City Std. TPW/0200431 15.00000000 EA $443.05 C01 Temp Asphalt Widening TPW/0200431 972.00000000 SY $91.7 CO2 Barrier Wall,Tree Protection TPW/0200431 150.00000000 LF $65.7 CO3 4'Chain Link Tree Protection Fence TPW/0200431 696.00000000 LF $19.7 Water/0600430 $281,588.00 Sewer/0700430 $0.00 TPW/0200431 $2,388,241.80 Sub Total Additions T2 669,82980 Change Order Additions Page 2 of4 FORT WORTH City of Fort Worth Change Order Deletions Project Name Westport Parkway-Altavista to Keller Haslet City Sec# 55385 Client Project# FIDs:56002-0600430-5740010-101019-001780/56002-0700430-5740010-101019-001780/30108-0200431-5740010-101019-002380 Contractor Jackson Constmctan,Ltd. PM Bradley Radovich Inspector Kevin Jackson Change Order Submittal# 0 Date 1/26/2022 DELETIONS y Unit ni os o a 1-4 12"PVC Water Pie W577717711= I- "DIP Water(Restraint Joints) ater LF 1- "PVC C Water Pipe ater LF =— I-TT Ductile Iron Water fittings with Restraint ater TN --7M=- 1-18 Fire Hydrant a er - ate Valve a er 1-26 16 Inchate Valve wNauft Water Blow-offa e a er on t 111- "Flex Base,Type A,GR- TPW/ SY Hydrated Lime TPW/ TN 111- "AsphaltPvmt TPW/ SY - pat Base Type - one Pavement - Concrete Driveway - atteme oncrete median - Concrete Sidewalk 111- "Conc Sidewalk TPW/ SF Barrier Free Ramp,Type P-1 TPW/0200431 EA II- "SLD Pvmnt Marking HAS(W) TPW/ LF vmnt Marking vmnt Marking vmnt Marking vmnt Marking vmnt Marking vmnt Marking Raised Marker I Y II-A-A aise ar er TY II-C-R ane Legend Arrow Lane Legend DEL Arrow Lane Legend Only ane egen i e - Lane Legend Pedestrian - Type C Barbedire Fence,Metal Posts 111-53 Installype 1 Gate opsoi -55---Block SodPlacement - Seeding,Hydomulch - Seeding,Soil Retention Blanket Class Class ass Class Class Class x ox u ert -BT—6'x3'Beveled Box Culvert - Storm Junction Box - Storm Junction Box III- Storm Junction Box TPW/ EA - Station 2,83.69Storm Junction Box - Station 5+13.95 Storm Junction Box u n t rop Inlet w pron 111-76 rop Inlet w pron - o 10 Insulatedc Condr o 10 Bare Elec Condr - Ground Box Type B w pron Furnish/Install Type 33A Arm Furnish/Install - o Single Phase Metered Pedestal wy Ilum Assembly TY 18,18A,19 an 111-134 LED Lighting ature wry lurn oun a on I Y J,O,b an Furnish/Install um Sign Ground Mount City Std. Construction Allowance(Water) ater Construction Allowance among and Drainage) Water/0600430 $281,588.00 Sewer/0700430 $0.00 TPW/0200431 $2,336,639.75 Sub TotalDeletions Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00