HomeMy WebLinkAboutContract 55827-CO2 CSC No. 55827-0O2
FORT WORTH, City of Fort Worth
Change Order Request
Project Name Commander Road-Midfield Stage II City Sec# 55827
Client Project#(s)
Project The scope of the Commander Road-Midfield Stage II project is to construct a proposed roadway for future hangar development at Meacham International Airport.The project
Description includes site utilities,drainage improvements,electrical improvements,relocation of an existing gate,installation of new fence,and the construction of a proposed concrete roadway.
Contractor North Texas Contracting,Inc Change Order# 2 Date 2/4/2022
City Project Mgr. Tyler Dale City Inspector Steven Aguirre
Dept. Aviation Contract Time
Totals (CD)
Original Contract Amount $3,699,645.00 $3,699,645.00 210
Extras to Date $237,646.00 $237,646.00
Credits to Date $146,880.00 $146,880.00
Pending Change Orders(in M&C Process)
Contract Cost to Date $3,790,411.00 $3,790,411.00 210
Amount of Proposed Change Order -$11,163.00 -$11,163.00 62
Revised Contract Amount $3,779,248.00 $3,779,248.00 272
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.15%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $4,624,556.25
JUSTIFICATION(REASONS)FOR CHANGE ORDER
During construction of the proposed 12"waterline,it was determined by the City Inspector&Water Department that the original plan of action for the connection to the
existing 16"Water Main could not be accomplished.After coordination with the City,the Consultant and the Contractor,the use of a 16"x 12"Tapping Sleeve was permitted
to be used for this proposed connection point.Additional contract days are being provided along with this change order in the amount of 62 Calendar Days.31 additional
days were not included within Change Order No.1 and an additional 31 days are associated with Change Order No.2.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractors Company Name Contractor(Name Contract Signature Date
North Texas Contracting,Inc. John Gockley Feb 7,2022
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
o0P �zo8z9� Feb 7,2022
Program Manager Date Senior Capital Project Officer Date
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
0 Farllh I b1212aos.ssc
Feb 7,2022 -+- Feb 7,2022
sistant City Attorney Date Assistant City ManagerIIII Date
Feb 9,2022 Feb 11,2022
« s sn
Council Action if required)
M&C Number N/A M&C Date Approved N/A
ATTEST:
.T..P,'H"P,S 6—a llIFF
p
Jannette Goodall,City Secretary boo oo°�°R�k.
P o° 0o0�
�,�o %0P. OFFICIAL RECORD
Avg =d CITY SECRETARY
°*�d
0
P�'E°°
d °o°0000°°°° a FT. WORTH, TX
�ai1�EXAS,oAp
FORTWORTH City of Fort Worth
Ir- Change Order Additions
Project Name Commander Road-Midfield Stage II City Sec# 55827
Client Project#
Contractor North Texas Contracting,Inc PM Tyler Dale Inspector Steven Aguirre
Change Order Submittal# O2 Date 2/4/2022
AUUI I Mti
Unit Unit Cost Total
x apping Sleeve Aviation I ac
71 Additional Management Costs(Mobilization,Traffic Control, Aviation 1ac
Aviation $44,837.00
Sub I otal Additions
Change Order Additions Page 1 of 1
FORTWORTH City of Fort Worth
11� — Change Order Deletions
Project Name Commander Road-Midfield Stage II City Sec# 55827
Client Project#
Contracto North Texas Contracting,Inc PM Tyler Dale Inspedor Steven Aguirre
Change Order Submittal# O2 Date 2/4/2022
DELI I IUNS
y m m o I oa
01 it) a e ave via ionEach
63 Cast in ace Storm Junction Box via ion Each
Aviation
Sub I otal Deletions
Change Order Deletions Page 1 of 1
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
1 12/16/2021 $90,766.00
Total $90,766.00