Loading...
HomeMy WebLinkAboutContract 50570-A2 CSC No.50570-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No . 50570 WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 50570, (the CONTRACT) which was authorized by M&C C-28631 on the 20th day of March, 2018 in the amount of $469,270 . 00; and WHEREAS , the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $99,454 . 00 authorized administratively on June 25th, 2019; and WHEREAS, the CONTRACT involves engineering services for the following project: Lake Arlington Lift Station Upstream and Downstream Parallel Relief Sanitary Sewer Gravity Mains; and WHEREAS , it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE , CITY and ENGINEER, acting herein by and through their duly authorized representatives , enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $26,010 . 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $594, 734. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City' s Prof Services Agreement Amendment Template OFFICIAL RECORD Revision Date: November 23, 2021 [Lake Arlington Lift Station Upstream a Parallel Relief Sanitary Sewer CITY SECRETARY Page 1 of 2 FT. WORTH, TX designated Assistant City Manager. APPROVED : City of Fort Worth ENGINEER James DeOtte Engineering, Inc. awa&�427LW Dana Burghdoff(Fe 21,202 0 :36 CST) %A- 17) A Dana Burghdoff Brain Darby, P.E. Assistant City Manager Vice President Feb 21,2022 DATE : DATE : 02/10/22 APPROVAL RECOMMENDED : Christopher Nardor Chnstophe�Ha�de�(Feb 14,202206:58 C5) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Pratima Poudyal, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: 22-0098 0190� Date : 02/08/2022 D Black(Feb 18,2022 13:36 CST) 2021-811936 Douglas W. Black Form 1295 _ Senior Assistant City Attorney ATTEST: ���o-R 0oa�� 0 Jannette S.Goodall(Feb 22,2022 08:51 CST) V 0 ((0 0yy DO T� Jannette Goodall d n City Secretary EXAsaOp OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [Lake Arlington Lift Station Upstream and Downstream Parallel Relief Sanitary Sewer Gravity Mains] Page 2 of 2 [CPN 1013111 ' 'James...................... .............—Civil.E.ndi n.e,.ering. .. ........ . .. .. . .... . ..... .D....eOtte .. .................................. ......................L..a................nd Surveying... Engineering....... ............�,�r!�"5��2�Management .............. ... ................... V. ENGINEERING ..................... ... .Hydrologic.and.Hydraulic..Modeling .. .. . ... . .. ... August 28, 2021 Ms. Pratima Poudyal, P.E. Water Department City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Ref: Amendment No. 2 Lake Arlington Lift Station Gravity Sewer Mains City Secretary No. 50570 City Project No. 10 1311 Ms. Poudyal, Due to additional services requested by the City as part of the referenced project, James DeOtte Engineering, Inc. will perform the work outlined in the following items: Scope of Work Project Management: 1 . The number of required monthly SBE reports included in the original scope of services and Amendment #1 has been exceeded. 2. The City requested we provide lab result reviews. As requested by the City, we will make recommendations as to the acceptability of the work in relation to the project specifications. Subsurface Utility Engineering (SUE): The City requested we pursue additional SUE services for four additional locations in the area of the proposed north alignment. Level A SUE test holes will be performed to locate the existing 10" Williams gas line and 16" Sunoco gas line as they cross existing M-244B and M-503. fax 817,930,0445 2201 Dothe Lynn Porkway Sle.1]9 a Forl Worlh TX.76120 phone 817.446.6877 ............................................................................................................................................................................................. TBPLS Firm Reg,No,10 10 1400 TBPE Firm Reg.No,8917 August 28, 2021 Amendment No. 2 Lake Arlington Lift Station Gravity Sewer Mains Page 2 Survey: The City requested we prepare two temporary access easements for the Midland Manufacturing tract and the Panagopoulos tract. Both locations will also require some additional field topography that is outside the original sewer alignment corridor. Fee JDEI anticipates the fees listed above for the project to be a not to exceed amount of $26,010.00. All costs, associated with the identified scope of work, will be lump sum for the scope provided and will be billed as a percentage of completed work as determined by JDEI. Contract Amount: $469,270.00 Amendment #1 Amount: $ 99,454.00 Amendment #2 Amount: $ 26,010.00 Revised Total Amount: $594,734.00 This scope of work assumes any services not specifically listed as part of this contract will be treated as an additional service. The owner will be notified before any additional services are performed. Sincerely +A Brian Darby, P.E. Vice President fax 817.930.0445 2201 Doflie Lynn Parkway Sfe.119.• Fah Worlh TX,.76120 phone 817.446.6877 ................................................................................................... ...................... .................................................................. MKS Firm Reg,Na.10101400 do TRP Fret Reg.No.8917 "M-MAPNO 00 00 000000 000 00 O 0 0 0 0 0 0. Oo R O Efl Efl Efl O Efl 6969690 O 6969 OO O OO OEflO LO O F 00 W O M LO co CJ S LO LO W O O O 69 ( o LO 69 �69 O O 7 69 N N N Y N R F G) oo O O O O O O O O O O O O O t/`1 a) C W M 69 Efl 69 69 Efl 69 69 69 69 O 69 O 69 O O 9 y6 y6 O p 4) oo Ln Ln o a5 a°i——Y m U X D (n a5 a5 w C C .0 W m U y o U a a F O In In w IL ww m m c U)C9 C U O D Z O Q W K W W C ~ W x X w W p o o Lo C N R 0 7 Z N C a w N N N C ` o o o o o o 0 0 0 0 0 0 0 0 0 0 o mua Eua coua aE ao o a a ao m i a oo o o 00 o Lo R N O 69 LO J O 69 z 'a U » U O fA O L +' M o 0 N °N N � r L N 4 N y NY N L LL 3 a � QW .V a N O 2U m y O E O a' fn a U +r O .O N N W o a) rn rn O .T� E L J y4 o = Jaa J H o r_ m w o o L L O O 00 O a c oo O O o co co 690 o O o N a N N N N N N a p O O J W O o o o 0 O J O'- a) a)o O oo O a a a) COu� o w co Nu� Nu� 00 N °N O O O di T T U O O oo O O R O O O O O O C p Z O >o o o o O° d R O o >uH uH uH uH uH(O (n^oo N fl O O O O v 0 0 m ��� Q cq U t6 d N M r YO (p M M M LO 0. ~ W Q R O N F Q C N ° �� O C C N -Oo C Q O o a) O N Q �.o ° C) U) o o � � T m QEoi LU C Ul O C.0 Q a) (D O p 75 Q a)° w c a m o.(D u, w a5 � .� O �o p E a o° U) u u, o a5 � >,a5 O a) N OJ w a) O U) Q.. o 3: LaL cC > - a) 0 �- C a3 LO F R a) o U.> o o Q to ( ° o w W a) C CD O L a m Y o.� C� a�Y� Z o ° axi ° a�'i (mD U) a5 a5 a5 H a)U) a) Q.� (D 09 y Q L Q Ja .o m oa0 a<C) w o9in o ° a5.� a�C) V)0 U) �m 2w r�>- 0 O N M V LO(OWW O (D Z N N N N N N N N LL E-� Y N N M V O V U R O O co co co co F 00 ()Q City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, February 8, 2022 REFERENCE NO.: **M&C 22-0098 LOG NAME: 60LALSGMSA2-DEOTTE SUBJECT: (CD 5)Authorize Execution of Amendment No. 2 with James DeOtte Engineering, Inc, in the Amount of $26,010.00 for the Lake Arlington Lift Station Upstream and Downstream Parallel Relief Sanitary Sewer Gravity Mains Project, and Adopt Attached Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1.Authorize execution of Amendment No. 2 in the amount of$26,010.00 to City Secretary Contract No. 50570 an Engineering Agreement with James DeOtte Engineering, Inc, for the Lake Arlington Lift Station Upstream and Downstream Parallel Relief Sanitary Sewer Gravity Mains project for a revised contract amount of$594,734.00; and 2.Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water& Sewer Capital Project 2018 Fund in the amount of$46,010.00, by increasing estimated receipts and appropriations in the Lake Arlington Lift Station Upstream and Downstream Parallel Relief Sanitary Sewer Gravity Mains project(City Project No. 101311) and decreasing estimated receipts and appropriations in the Unspecified project(City Project No. UNSPEC) by the same amount. DISCUSSION: On March 20, 2018, Mayor and Council Communication (M&C) C-28631, the City Council authorized an engineering agreement in the amount of$469,270.00 with James DeOtte Engineering, Inc., (City Secretary Contract No. 50570)for the Lake Arlington Lift Station Upstream and Downstream Parallel Relief Sanitary Sewer Gravity Mains, project. The agreement was subsequently revised by Amendment No. 1 in the amount of$99,454.00 administratively authorized on June 25, 2019 that provided for additional archeological services and survey on the project. Amendment No. 2 will provide for the Sub Surface Exploration (SUE) and additional survey for access easements that are necessary on the project. In addition to the amendment amount, $20,000.00 is required for project management. Funding for Lake Arlington Lift Station Upstream and Downstream Parallel Relief Sanitary Sewer Gravity Mains project are as depicted below: Fund Existing Additional project Total* AppropriationsILAppropriations W&S Capital Proj 2018 $1,574,270.00 $46,010.00 $1,620,280.00 Fund - 56014 Project Total $1,574,270.00 $46,010.00 $1,620,280.00 This project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified-All Funds project within the W&S Capital Proj 2018 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Proj 2018 Fund for the VC LS Gravity Sewer Mains project to support the approval of the above recommendations and execution of the amendment to the engineering agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs),: TO Fund Department Accoun Project Program ctivity Budget Reference # Amount ID ID I I Year T 1(Chartfield 2) I FROM Fund Department ccoun Project Program ctivity Budget Reference # Amount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by_ Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Pratima Poudyal (6149) ATTACHMENTS 1. 60LALSGMSA2-DEOTTE FID Table (WCF 12.01.21).xlsx (CFW Internal) 2. 60LALSGMSA2-DEOTTE Form 1295.pdf (CFW Internal) 3. 60LALSGMSA2-DEOTTE funds availability.docx (CFW Internal) 4. 60LALSGMSA2-DEOTTE Map.pdf (Public) 5. 60LALSGMSA2-DEOTTE 56014 A022(r3)r.docx (Public) 6. SAM.gov James DeOtte Engineering, Inc.pdf (CFW Internal) L L L X X X VI VI VI Q Q Q L L L a a a 'a 'a c c c N 0 0 o E E '� E a a = a W J L E E G E G� oc oA Y o0 = a v a a m N a N Z N V 11111111 N V 1111111111 k 111111 Z L� IL W a, ai X a, M M W m cu> m L. m W D Y Z Z Y Q Q LU LU Q a"i a"i C a"i LL a a a c c c 3 3 3 o o o Q Q Q 3t C C C cu 3 3 3 LL LL LL cc ��11111111 cc ��1111