HomeMy WebLinkAboutContract 54263-AD5 CSC No. 54263-AD5
FORT WORTH SPINKS AIRPORT
MASTER PROFESSIONAL SERVICES AGREEMENT
ADDENDUM NO. 5
This Addendum No. 05 - Scope of Work (SOW) is made as of Feb 21, 2022
under the terms and conditions established in the MASTER PROFESSIONAL SERVICES
AGREEMENT between the City of Fort Worth ("City") and Garver, LLC. ("Engineer"), the
same being Fort Worth City Secretary Contract (CSC) No. 54263 (the "Master
Agreement" or"MSA").
This Scope of Work is made for the following purposes, consistent with the services
defined in the Master Agreement: professional services for the relocation of the Primary
Airport Control Station (PACS) at Fort Worth Spinks Airport. In particular, Engineer shall
perform those functions identified below in the Scope of Services.
Section I. Scope of Services
1.1 General
Generally, the scope of services includes the following professional services for the
relocation of the Primary Airport Control Station (PACS) at Fort Worth Spinks Airport.
Improvements will consist primarily of the relocation of the existing PACS.
• Project Administration
• Surveying Services
No Pre-Bid Meeting will be held.
1.2 Project Administration & PACS Relocation
Garver will serve as the Owner's representative for the project and furnish consultation
and advice to the Owner during the performance of this service. Garver will attend
conferences alone or with Owner's representatives, local officials, state and federal
agencies, and others regarding the scope of the proposed project, its functions, and
impacts. Garver will coordinate and upload NGIS information into the FAA System.
1.3 Surveying Services
1 .3.1 Primary Airport Control Station Surveys
Garver will relocate and establish a new primary airport control station (PACS) in
accordance with FAA AC 150/5300-16B. This control station will be tied to NSRS. Garver
will coordinate the optional locations for this monument with Airport management and the
survey team once a final location has been determined. There are no known HARN "A" or
"B" stations on airport property that can be converted to the PACS.
Prior to setting the PACS, a subconsultant retained by Garver will perform a field
reconnaissance to determine the location of existing monuments in the vicinity of the
Airport. The PACS will be tied to two First or Second order NAVD benchmark stations.
Addendum No.5 to CSC No.54263 OFFICIAL RECORD
Between the City of Fort Worth and
Garver,LLC Page 1 of 6 CITY SECRETARY
FT. WORTH, TX
Prior to setting the marks, Garver will develop a project survey plan and coordinate the
approval of the new PACS locations with the FAA & NGS. The project survey plan will
include an airport summary report, station table, airport control plot, photographs, station
location drawing and description, GPS observing scheme, project vector diagram,
proposed instrumentation list, data processing plan, and a quality control plan.
Once the PACS location has been approved, the PACS will be set in accordance with the
Blue Book, Volume 1 , Annex P.
1.4 Project Deliverables
The following deliverables will be submitted to the parties identified below. Unless
otherwise noted below, all deliverables shall be electronic:
1 . Quality Control Plan to the Owner and FAA.
• One hard copy to the Owner and FAA.
2. Project Survey Plan to the Owner and FAA.
3. Project Status Reports to the Owner and FAA.
4. Project Sketch (Vector Diagram) to the FAA.
• One hard copy (24" x 32") to the FAA.
5. Field Logs to the FAA
6. Vector Processing Output Data to the FAA.
7. Adjustment and Checking Programs to the FAA.
8. Original Survey Data to the FAA.
9. Finalized Description File to the FAA.
10. Final Project Report to the Owner and FAA.
11 . Other electronic files as requested by the Owner and FAA.
1.5 Schedule
Garver shall begin work under this Agreement within thirty (30) days of execution of this
Agreement and shall complete the work in accordance with the schedule below:
Phase Description Calendar Days
PACS Relocation 90 Days from the Notice to Proceed
Section 3. Compensation, Reimbursable Expenses, and Billing Terms:
Processing and payment of Fees and Reimbursable Expenses, including the structure of
payments and invoicing therefor, shall be in accordance with the Master Professional
Services Agreement.
The total Fee that shall be paid to Engineer for the services within this Addendum shall
be an amount of $53,723.00 and will be paid accordance with Article 2(a) and Article 3 of
the Master Service Agreement. If the City requests additional documentation of expenses,
the Engineer shall provide such information if available.
Addendum No.5 to CSC No.54263
Between the City of Fort Worth and
Garver,LLC
Page 2 of 6
A copy of the fee proposal is attached as Appendix A.
Engineer shall submit invoices for Fees and Reimbursable Expenses to
Tyler Dale in the City's Aviation Department.
On full and final completion of the Services for this Scope of Work, the Engineer shall
submit a final invoice.
Section 4. Counterparts; Electronically Transmitted Signature:
This SOW may be executed in one or more counterparts, each of which when so executed
and delivered shall be considered an original, but such counterparts shall together
constitute one and the same instrument and agreement. Any signature delivered by a
party by facsimile or other electronic transmission (including email transmission of a
portable document file (pdf) or similar image shall be deemed to be an original signature
hereto.
Executed in multiple originals on Feb 21, 2022
[Signature Page Follows]
Addendum No.5 to CSC No.54263
Between the City of Fort Worth and
Garver,LLC
Page 3 of 6
CITY OF FORT WORTH, TEXAS: GARVER, LLC.
Dam whw1oz-
z ()__ (14
By:Dana Burghdoff(Fe 21,202 1 :33 CST) By.
Dana Burghdoff JosKrerawfoird
Assistant City Manager Texas Aviation Director
Date; Feb 21, 2022 Date: 02/17/2022
APPROVAL RECOMMENDED:
By:
Roger Venables
Director, Aviation da��
oA�FORT����
OF000000 " d
ATTEST: ��►o� oO�f�
pro d
0_0 O
Tahhefte S. Goodclll v o 0=
By.Jannette S.Goodall(Feb 22,2022 08:57 CST) 0 0
00
Jannette Goodall ��d 000�`�
City Secretary ���TEXp,Soa�
APPROVED AS TO FORM
AND LEGALITY:
Thomas Royce Hansen
Assistant City Attorney
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
f 9��&
Tyler Dale(Feb 17,2022 14:03 CST)
Tyler Dale
Airport Project Coordinator OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Addendum No.5 to CSC No.54263
Between the City of Fort Worth and
Garver,LLC
Page 4 of 6
Appendix A
Fort Worth Spinks Airport
PACS Relocation
FEE SUMMARY
Title I Service Estimated Fees
Surveys (Subconsultant) $ 37,549.00
Project Administration $ 16,174.00
Subtotal for Title I Service $ 53,723.00
Total All Services $ 53,723.00
Appendix A
Fort Worth Spinks Airport
PACS Relocation
Project Administration
WORK TASK DESCRIPTION E-5 E-2 T-1
hr hr hr
1. Project Administration
Coordination with Client 4 8
External Coordination (FAA, NGS, & Surveyor) 24
Develop Quality Control Program 3 6
Project Kickoff Meeting 4 4
Site Visits 8
Bi-Weekly Teleconference Meetings 7
Review Submittal Documents 2
Schedule Development and Updates 4
Upload Survey Data to NGS 8 16
Review Deliverabels & Submit to FAA& NGS 4 12
u o a -Project minis ra ion 16 83 16
Hours 16 83 16
SUBTOTAL-SALARIES: $16,704.00
DIRECT NON-LABOR EXPENSES
Postage/Freight/Courier $75.00
Office Supplies/Equipment $80.00
Computer Modeling/Software Use $115.00
Travel Costs $200.00
SUBTOTAL -DIRECT NON-LABOR EXPENSES: $470.00
SUBTOTAL: $16,174.00
SUBCONSULTANTS FEE: $0.00
TOTAL FEE: $16,174.00