AMENDMENT No. 3
TO CITY SECRETARY CONTRACT No. 55475
WHEREAS, the City of Fort Worth (CITY) and Harris Kocher
Engineering Group, Inc. , d/b/a Harris Kocher Smith (ENGINEER) made and
entered into City Secretary Contract No. 55475, (the CONTRACT) which was
authorized by M&C 21-0176 on the 25th day of March, 2021 in the amount
of $426, 469. 00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment
Number 1 in the amount of $3, 498 . 00 which was administratively
authorized on January loth, 2022, Amendment Number 2 in the amount of
$56, 900 . 00 which was administratively authorized on January 26th 2022;
and
WHEREAS, the CONTRACT involves engineering services for
the following project:
Alemeda HROM/MTP Realignment (CPN 103054) ; and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $32, 500 . 00. (See Attached Funding
Breakdown Sheet, Page -4-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for
all work and services shall be an amount of $519, 367 . 00 .
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
City of Fort worth, Texas CITY SECRETARY
Prof Services Agreement Amendment Template Revision Date: November 23, 2021 FT. WORTH, Ty
Page 1 of 4
EXECUTED and EFFECTIVE as of the date subscribed by the City' s
designated Assistant City Manager.
APPROVED:
City of Fort Worth Harris Kocher Engineering
Group, Inc. d/b/a Harris
Kocher Smith
'gana 24L( hdo
Dana Burghdoff eb 21,2022 17:53 CST)
Dana Burghdoff chael oore
Assistant City Manager Principal
DATE: Feb 21,2022 DATE: 2 Illz?-
APPROVAL RECOMMENDED:
G ) Y!L'WilliamWilliam Jo� 2022 14:10 CST)
William Johnson
Director, Transportation & Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
Michael Wellbaum
Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Alemeda HROM/MTP Realignment
Prof Services Agreement Amendment Template CPN: 103054
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
0V Date : N/A
DBlack(Feb 21,2022 09:35 CST)
Douglas W. Black
Senior Assistant City Attorney
ATTEST: apFOFOR0.��"�Ia�
pPA,o0° °O pad
:7�`I`IG��G c1 C7000��GG P~° °040,
Jannette S.Goodall(Feb 22,2022 08:59 CST) O O=
O
Jannette Goodall �� o o*�d
O O °° b
City Secretary �� °000000 °
��nEXAS.oAp
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Alemeda HROM/MTP Realignment
Prof Services Agreement Amendment Template CPN: 103054
Revision Date: November 23, 2021
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 55475
Amendment No . 3
Department Fund-Account-Center Amount
TPW 52007-0200431-5330500-103054-002830-9999 $25, 000 . 00
TPW 52007-0200431-5330500-103054-002830-9999 $7, 500 . 00
Total : $32, 500 . 00
City of Fort Worth, Texas Alemeda HROM/MTP Realignment
Prof Services Agreement Amendment Template CPN: 103054
Revision Date: November 23, 2021
Page 4 of 4
HISRRIS
KOCHER
awSMITH
OALLASIFORT WORTH . DENVER
February 2, 2022
City of Fort Worth
Transportation & Public Works
City Hall—Second Floor
200 Texas Street
Fort Worth,TX 76102
RE: Alemeda HROM/MTP Realignment
Amendment#3
HKS Project No. 200634
Harris Kocher Engineering Group, Inc., d/b/a Harris Kocher Smith (hereinafter referred to as
"Engineer") is pleased to submit Amendment No. 3 in the amount of$32,500.00. The Amendment is
for the following services:
1) SUPPLEMENTAL SUBSURFACE UTILITY ENGINEERING
The Engineer will provide Supplemental Subsurface Utility Engineering ("SUE") at the request of the
City of Fort Worth to locate existing utilities at critical design conflict locations.This scope of services
specifically includes the following based on the attached exhibits:
• Field Layout;
• Nine (9)Test Holes;
• SUE Surveying;
• SUE Project Management; and
• SUE Plans (Quality Level A).
This scope of services specifically excludes collection of data from utility poles/overhead wires/open
channels/irrigation ditches/underground irrigations systems (as applicable),franchise utility
coordination services, project design/engineering, project construction services, permitting fees
LUMP SUM FEE=$25,000.00
2) GAS MAIN CONFLICT PLAN REVISIONS
The Engineer will provide Gas Main Conflict Plan Revisions in accordance with City of Fort Worth
requirements once the above mentioned Supplemental SUE data is obtained. This scope of services
is specifically limited to modifying the proposed storm sewer system layout within Alemeda Street to
account for utility conflicts identified with the above mentioned Supplemental SUE data is obtained
451 S. Main Street, Suite 210, Fort Worth, Texas 76104 P:817.769.6279 F:817.769.6298
TBPE Firm Ns: F-15501 www.harriskochersmith.com TBPLS Firm W: 10194145
Alemeda HROM/MTP Realignment
CPN: 103054
and the modifications to the storm sewer and inlet calculations for said modifications. This scope of
services specifically excludes roadway redesign, legal descriptions/exhibits and revisions to the box
culvert design.
LUMP SUM FEE_$7,500.00
ENGINEER:
Harris Kocher Engineering Group, Inc.
d/b/a Harris Kocher Smith
chael Moor
rincipal
Alemeda HROM/MTP Realignment
CPN: 103054
EXHIBITS
a p..
�G
TH 1 I NUGRMNO AEST)MI 1\ d
� E194804l.9B G'��
E:22B13](1.3! .
`J4,84 LF«IE RCF 1Z79 IF 24' ��JG7. JLi�.:i�-uGi 191t�19
n1 2 Ex cAs XNe
0~�2 2 �14eosoa5
E:2ZBIJ34.54
-1H 5 CAS M 1H 4 WATER 50NO
6ffM27.95 IR69480M82
F-2281332.7i E:7]81337-7{ �'i M 3 Mh1ER x1c
'�' Nt 694&061.SB
Cn E 22613SM 72
l
N�
ALEMEDA STREET
(YAMARE IIg1H REnq
2e9.31 v 24'Raa
-
--
------------------
'g
1
TH F EX UWERCROUNOTEST XING 1
N:644837L41 5
E:228,327.1.3.i
h 19 101�-44
'SN 1-'r U3 19fti- T�--�uCl�ylGi�
y 115 T GT�yI� L. �Li9f1-- off.
b 9
M ML
I
1H 7 EX GAS HOG d
b - � :E94&37396
. E:77dQW5
TH 9 EX U DB'b [MMDTEST MW
N;&MU73.35
E-226133Q69 '��
TH E EX VAIEF Mr 1
H:694&V41 'S 1
L 228135+,34 5
ALEMEDA STREET
'1 (V►AQU WDTH ROM]
+x N
}
Alemeda HROM/MTP Realignment
CPN: 103054