Loading...
HomeMy WebLinkAboutContract 56280-A1 CSC No.56280-A1 AMENDMENT No.1 TO CITY SECRETARY CONTRACT No . 56280 WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 56280, (the CONTRACT) which was authorized on the 17t--hday of August, 2020 in the amount of $380,276.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sever Replacements Contract 2020, WSK-K; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $76,100. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $456,376- 00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreem-nt Jrunendment Template Revision Date: November 23, 2021 JIVSS REP?, Contract 2020, WSM—F] Page 1 0. 1014211 APPROVED: City of Fort Worth ENGINEER James a Engineering, Inc. barui 8cu-�r/u7a�f Dana Bu rghdoff(FEb 21,0909:3"LL 5CST) Dana Burghdoff Brian Darby, P.E Assistant City Manager Vice President DATE: Feb 21, 2022 DATE: APPROVAL��nnR,,ECOMMENDED: :L rHard (Feb 14 ��a Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Brenda 1&xopeza Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: Funding NI&C:22-0093 BBP� Date: 02/08/2022 oe[7k(Fe Douglas W. Black Form 1295 : N/A Senior Assistant City Attorney ATTEST: ��O�C*- 71 FORT J ette S.Goodall(Feb 22,2022 08 CST) �V oo=A o ° °Jannette S. Goodall °°off City Secretary ��4.Q EXD►Sapp OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Te_molate Revision Date: November 23, 2021 [1-7/33 REPL Contract 2020, WSM-K) Page 2 of 2 [CPR 1034211 James Civil I Engineering ... .............. DeOtte Land Surveying ........................... ............................... Engineering..........-................... ............ Inc. Hydrologic and Hydraulic Modefing ENGINEERING ................................................... December 28, 2021 Ms. Brenda Oropeza, E.I.T. Project Manager Water Department City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Ref: Amendment No. 1 Water and Sanitary Sewer Replacements Contract 2020, WSM-K City Project No. 103421 Ms. Oropeza, Due to additional services requested by the City as part of the referenced project, James DeOtte Engineering, Inc. will perform the work outlined in the following items: Scope of Work Design: 1 . L-2835 is to be relocated from the back of lots to the surrounding street ROW totaling approximately an additional 2,130 linear feet of sewer design. 2. The 481 LF of water line in Winslow Drive was also part of another project. A replacement 1,446 LF of water in South Hills Avenue between Bellaire Circle and Trail Lake Drive has been substituted. This would be an additional 965 LF of wafer design. ROW/Easement Services: 1. 3 additional easement documents. 2. The relocation of L-2835 will create associated Service Relocation exhibits. Survey: 1. The substituted water line in South Hills Avenue will be an additional 965 LF of design survey. 2. The relocation of L-2835 requires an additional 640 LF of design survey in South Hills Avenue between Trail Lake Drive and Carolyn Road. !.?��17.9 .0445 2201 Dottie Lynn Parkway Ste.119 * Fort Worth TX,76120 phone 817.446.6877 . .....�R........................................................................................................................................................................I..... TBPLS Firm Reg.No.10 10 1400 TSPE Firm Reg.No.8917 December 28, 2021 Amendment No. 1 Water and Sanitary Sewer Replacements Contract 2020, WSM-K Page 2 Fee JDEI anticipates the fees listed above for the project to be a not to exceed amount of $76,100.00. All costs, associated with the identified scope of work, will be lump sum for the scope provided and will be billed as a percentage of completed work as determined by JDEI. Contract Amount: $380,276.00 Amendment #1 Amount: $ 76,100.00 Revised Total Amount: $456,376.00 This scope of work assumes any services not specifically listed as part of this contract will be treated as an additional service.The owner will be notified before any additional services are performed. Sincerely w Brian Darby, P.E. Vice President ..... iox.817.330.0445. .....................................2201.Dottie Lynn Parkway Ste.119 • Fort Worth TX.76120 phone 817.446.6877 ........ .... ................................................................................................................................... TBPLS Firm Reg.No.10101400 TBPE Firm Reg.No.8917 aawmenw j({ |}} i;®�9 � ( ! { } /! ! z #! - � �JJJ );4! !:- I _ &}#�3ox 9 J §;2, eM; ) Jl J 41 �£E] ) 0zM ( : I. I I , . -/ uil'\ ƒi : - - ` ® S J=� �J ! \ k, ƒ k #'# J �J ® { I | !!„!#Jtl.., {_ �!!O ,m ! J 6J -& / !k§ k MUM )(!�/\(`§ )§ )) )) i k 888 8888 8) ;; ;; ¢ \k ,§ 9k a 2 8j) k ,r#,kk# ,# 0-1 61 �; City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, February 8, 2022 REFERENCE NO.: **M&C 22-0093 LOG NAME: 6020WSMKA1 DEOTTEFUNDING SUBJECT: (CD 3)Adopt Attached Appropriation Ordinance in the Amount of$76,100.00 for Increased Project Costs for Water and Sanitary Sewer Replacements Contract 2020, WSM-K Located in the Westcliff and Westcliff West Neighborhood Areas RECOMMENDATION: It is recommended that the City Council adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $76,100.00, transferred from available funds within the Water and Sewer Fund,for the purpose of funding the Water and Sanitary Sewer Replacement Contract 2020, WSM-K project(City Project No. 103421). DISCUSSION: On August 17th, 2020, Mayor and Council Communication (M&C) 21-0587, the City Council authorized an engineering agreement in the amount of$380,276.00 with James DeOtte Engineering (City Secretary Contract No. 56280)for the Water and Sanitary Sewer Replacement Contract 2020, WSM-K. The additional appropriations in this M&C will provide for funding costs associated with proposed Amendment No.1 to the engineering agreement in the amount of$76,100.00, additional design and survey work for the replacement of deteriorated water and sanitary sewer mains in the immediate vicinity of the original project. The Fiscal Year 2022 Water and Sewer Operating Fund budget includes appropriations of $42,633,210.00 within the Water Operating Budget and $34,992,322.00 within the Wastewater Operating Budget for the purpose of providing Pay-As-You-Go funding for Water and Sewer Capital projects respectively.After the transfer of$23,727.00 of Water and $52,372.00 of Wastewater, the balances will be $33,154,186.00 for Water and $24,781,854.00 for Wastewater. Appropriations for Water and Sanitary Sewer Replacements Contract 2020, WSM-K project are as depicted below: Fund Existing Additional Project Appropriations Appropriations Total's W&S Capital Projects — Fund $577,950.00 $76,100.00 $654,050.00 56002 Project Total $577,950.00 $76,100.00 $654,050.00 *Numbers rounded for presentation purposes. This project is located in COUNCIL DISTRICT 3. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water& Sewer Fund and upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, in the W&S Capital Projects Fund for the W/SS REPL Contract 2020 WSM-K project. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs).: TO T and Department ccount Project Program ctivity Budget Reference # mount ID ID Year (Chartfield 2) F qqd Department ccount Project Program Activity Budget Reference# Amount FundD"—Mment Account Pr ' ct 1programActivit BRIWt mount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by_ Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Brenda Oropeza (8271) ATTACHMENTS 1. 602OWSMKAl DEOTTEFUNDING funds availability pdf (CFW Internal) 2. 6020WSMKA1 DEOTTEFUNDING MAP.pdf (Public) 3. 6020WSMKA1 DEOTTEFUNDING SAM.pdf (CFW Internal) 4. 6020WSMKA1DEOTTEFUNDING Updated FID table.XLSX (CFW Internal) 5. 6020WSMKA1 DEOTTEFUN DING 56002 A022(r1).docx (Public) T T T ft ME III C C C • • CL • • • • O_ • • • • aZ (D (D (�D • D D D n n M O O O v v v C - - rn W o c m c (D c a rn rL CL mX (DD - - (DD m rn Trn T ° T � N D 11111111 NOWA C 0 rt O. to CFQ am a M D+ X v au O 3 3 r m D D D 3 3 3 O O O Z m (D • • • • CL • • • • � C C (D (D (D m