HomeMy WebLinkAboutContract 55381-AR1 CSC No.55381-AR1 FOR, _T WORTH City of Fort Worth Construction Allowance Request Project Name 2021 Concrete Rehabilitation U(Elizabeth Boulevard from 8th Ave to S Adam St) City Sec# 1 55381 Client Project#(s)l 102884-TO#4 Project Concrete Rehabilitation of Sidewalks,ADA Ramps,and Curb&Gutter at Elizabeth Blvd Description Contractor Makou Inc CA#1 1 Date 2/21/2022 City Project Vlgr.1 Iretomiwa Otuyelu City Inspectorl Brian McGill UNIT or DEPT UNIT 1 or Dept UNIT 2 or Dept UNIT 3 or Dept UNIT 4 or Dept Totals Contract Time CD Orginal Contract Amount $467,533.74 $467,533.74 120 Extras to Date $18,700.00 $18,700.00 Credits to Date Current Contract Amount $486,233.74 $486,233.74 120 Amount of Proposed Allocation 4 400.00 0.00 0.00 0.00 4,400.00 Orginal Allowance Available to Allocation $23,153.99 $23,153.99 120 Allowance Funds Previously Allocated $0.00 Revised Allowance Balance $18,753.99 $0.00 $0.00 $0.00 $18,753.99 JUSTIFICATION(REASONS)FOR CONSTRUCTION ALLOWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments):To add Bid Item No 4 Remove ADA Ramps,from the Original Contract Proposal Form to the Task Order Proposal Form.Project has available funds,no additional funds are required. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. WlNam actor Siva Date MAKOU INC Maqsood Khan Mk,F�,,,,�, �M,.,, Feb 22,2022 Inspector/Insp Date Project and Contract Compliance Manager Date `BaMAA.%JdG Feb 22,2022 Feb 22,2022 F� 2�,aze�n d��F�� u3o�m Program Manager Date Senior Capital Project Officer Date RodN" n n Feb 22,2022 Feb 22,2022 i 222.21--' ,�iF =m Assistant Director(Dept) Date Director,Contracting Department(Dept) Date eye Feb 23,2022 �` Feb 23,2022 sP....F 2opoent tyAttorney Date Assi tyManager Date Feb 23,2022 Feb 23,2022 4.d444�n� ATTEST: opt FORA�4a �RIZIZEff2-S.Ci04y i pOs000 000�jOaa Jannette5.600dall(Fe 24,202210:04 CST) �� C Jannette Goodall,City Secretary p#., o %I 0 pVo o=ij o d %. 000�� p 444 ncnAAspoo- OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Construction Allowance SUMMARY Page 1 of 5 FORT WORTH City of Fort Worth Construction Allowance Additions Project Name 2021 Concrete Rehabilitation U Elizabeth Boulevard from 8th Ave to S Adam St City Sec# Client Project# 102884-TO#4 Contractor Makou Inc PM Iretomiwa Otuyelu Inspectorl Brian McGill Construction Allowance Submittal# = Date ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 4 0241.0300 Remove ADA Ramp UNIT 1 or Dept 22.00000000 EA $200.00 $4,400.00 UNIT 1 or Dept $4,400.00 UNIT 2 or Dept UNIT 3 or Dept $0.00 UNIT 4 or Dept $0.00 Total Additions $4,4UU.UU Construction Allowance Additions Page 2 of 5 FORT WORTH., City of Fort Worth —�+ Construction Allowance Value Project Name 1 2021 Concrete Rehabilitation U Elizabeth Boulevard from 8th Ave to S Adam St City Sec# Client Project# I 102884-TO#4 Contractorl Makou Inc PMJ Iretomiwa Otuyelu Inspector Brian McGill Construction Allowance Submittal# © Date CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total Construction Allowance Value 3of5 M/SBE for this Construction Allowance Request M/SBE Sub Type of Service Amount for this CAR Total $0.00 Previous Construction Allowance Requests CAR# DATE AMOUNT Total $0.00 Construction Allowance MSBE Data Page 4 of 5 Construction Allowance MSBE Data Page 5 of 5