HomeMy WebLinkAboutContract 52222-FP1 Invoice No. 52222-20-FP1
Invoice Date 02/17/2022 CSC No.52222-FP1
NN coded 02.28.22
FORTWORTH
PO# FW060-110-11464 64 Line 1
Earned - $3,316.45 -
Retainage - $385,448.74
56017-2060000-CO2328-CR ETA N
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
NOTICE OF PROJECT COMPLETION
56016-CO2328
CS 52222
Regarding contract 02328 for
North Holly Treatment Plant Sedimentation Basin Sludge Removal System Replacement as required by
the Water Department as approved by City Council on 4-9-2019 through IvI&C C-29090 the Director of the Water
Department,upon the recommendation of the Assistant Director, Capital Projects Delivery,Water Department,has
accepted the project as complete.
Original Contract Prices: $7,528,000.00
Amount of Approved Change Orders: $184,290.86 N2 1,2 and 3
Revised Contract Amount: $7,712,290.86
Total Cost Work Completed:
Less Deductions:
Liquidated Damages: 0 Days @$0.00/Day
Other Deductions(see comments):
Total Deduction Amount: $7,712,290.86
Total Cost Work Completed: $7,712,290.86
Less Previous Payments: $7,323,525.69
Final Payment Due $388,765.17
�ln '-7 /2
Recommended for Acceptance Date
Assistant Director, Water Department
CL&" HArd&`'
Christopher 4arder(Marl,20221
Accepted Date
Director, Water Department
Oana Bu( h o
Dana Burghdoff art,202211:3;
City Manager Date
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
n a n BAR CONSTRUCTORS, INC.
U, III
P.O. Box 10 • Lancaster, TX 75146
CONTRACTOR'S APPLICATION FOR PAYMENT
PAY REQUEST NO. 20-FINAL DATE: 02-11-22
PERIOD FROM: 03-26-21 TO: 01-25-22
PROJECT: North Holly WTP Sedimentation Basin ENGINEER: Plummer
Sludge Removal System Replacement 1320 S.University Drive
City Project No.02328 Forth Worth,TX 76107
OWNER: Fort Worth Water CONTRACTOR: BAR Constructors,Inc.
200 Texas St. P.O.Box 10
Fort Worth,TX 76102 Lancaster,Texas 75146
BIDS RECEIVED: 02/14/19 CONTRACT DATE: 04/09/19 NOTICE TO PROCEED: 6/10/2019
CONTRACT AMOUNT: $7,528,000.00 CALENDAR DAYS: 425 SUBSTANTIAL COMPL: 3/512021
ADJUSTMENTS(3): $184,290.86 EXTENSIONS(3): 269 FINAL COMPLETION: 5/4/2021
REVISED AMOUNT: $7,712,290.86 REVISED DAYS: 694 DAYS USED: 960
SUMMARY OF JOB STATUS:
Total Work Completed $6,579,083.29
SUBMITTED BY: BAR CON TRU TORS,INC.
Total Material Stored $1,133,207.57 /
B :
Total Cost To Date Isidro Arrambi e,Jr. President
Less Retainage(5%) $0.00 Date: 02-11-22
Subtotal $7,712,290.86
Less Previous Payments 5? ,z E- 9, VERIFIED BY: Plummer
Uigl4illy signed by Joshua L.Wheeler
an
Amount Due This Period P, C=US,... t el Jr ",Cie=J-hu,L.Wh.
$3ss,7ss.77 By. Joshua L. Wheeler 2M.02.;B`;;:53;�-o600n=h�aL.Wheeler
Name Construction Manager
CONTRACT FUNDED: 100.00% Date: 2/18/2022
TIME EXPENDED: 138.33%
VERIFIED BY: Plummer APPROVED BY: CITY OF FORT WORTH
Ricky Ybarra a Y. Deira V-70hn Jox
By. e.o:�.�„_ .o� B .
Name Project Representative Name Project Manager
Date: Date: 02/16/22
805 Katy Street • Telephone (972) 227-3287 Fax (972) 227-9043
Owner
CONSENT OF Architect
SURETY COMPANY Contractor
TO FINAL,PAYMENT Surety
ALA DOCUMENT G707 Other
PROJECT: North Hotly Water Treatment Plant imentation
(name,address) Basin Sludge Removal System Replacement, Bond# 46BCSIB5710
Project No.02328
TO:(owner) ARCHITECT'S PROJECT NO:
City of Fort Worth
1000 Throckmorton Street CONTRACT FOR: Construction
Fort Worth,TX 76102
CONTRACT DATE:
CONTRACTOR:
BAR Constructors Inc
P.O.Boa 10
Lancaster,TX 75146
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
Hartford Fire Insurance Company
3000 Internet Drive,Suite 600
Frisco,Texas 75034-1991 ,SURETY COMPANY
out bond of(hen:insert nanicand addrecs of Contractor)
BAR Constructors Inc
P.O.Box 10
Lancaster,Texas 75146 ,CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not
relieve the Surety Company of any of its obligations to(hcrc insert name and address of(haver)
City of Fort Worth
1000 Throckmorton Street ,OWNER,
Fort Worth,Texas 76102
as set forth in the said Surety Company's bond.
IN W'I'NESS WHEREOF,
the Surety Company has hereunto set its hand this 21st day of July 2021
Surety C any
Hartfo d Insurance C p•ny
Signatuic of AL'thurizxd Rcprescntafix-c
.Attest: a- ` ttrit}n rrtrr,r Dawn Davis-Attorney-In-Fact ,
,
R
Title n. Z-
I
NOTE:This form is to be usW as a companion document to AIA DOCUMENT G706,CONTRACTOR'S AI l IUAV
en ribF •\ ��,
UEBIS AND CLAIMS,Current Edition
AIA UOCUMF.NT C1707-('ONSEN'I*OF SURFTY COMPANY TO F;NAL PAYMENT•APRII.1970 tSUITION•Al$4, ,
PAGE } ;
01970-TI1F.AMERIC'AN INSTITUTE OF ARCHITECTS,I735 NEW YOM AVE.,NW,WASHINGTON,U.C.2W5. '• -
lY
Direct Inquiries/Claims to:
THE HARTFORD
BOND,T-11
POWER OF ATTORNEY HartfOne Hartrd ord,Connecticut06155
Bond.Claimsf&thehartford.com
call.,$88-2663488 or fax 860-757-6836
KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: MARSH & MCLENNAN AGENCY LLC
Agency Code: 4 6-4 614 9 6
® Hartfbrd Fire insurance Company,a corporation duly organized under the laws ofthe State of Connecticut
Hartford Casualty Insurance Company,a corporation duly organized under the laws of the State of Indiana
Hartford Accident and Indemnity Company,a corporation duly organized under the laws of the State of Connecticut
Hartford Underwriters Insurance Company,a corporation duly organized under the laws of the State of Connecticut
Twin City Fire Insurance Company,a corporation duly organized under the laws of the State of Indiana
O Hartford insurance Company of Illinois,a corporation duly organized under the laws of the State of Illinois
Hartford Insurance Company of the Midwest,a corporation duly organized under the laws of the State of Indiana
Hartford insurance Company of the Southeast,a corporation duly organized under the laws of the State of Florida
having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the'Companies")do hereby make, constitute and appoint,
up to the amountof Unlimited
Edward R. Bowles, Dawn Davis, Walter J. DeLaRosa, DONNIE DOAN, Kristi Meek, Kae
Perdue, Christen Tyner of DALLAS, Texas
their true and lawful Attorney(s)-in-Fact', each in their separate capacity if more than one is named above,to sign its name as surety(ies)only as
delineated above by CK, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the
nature thereof,on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and
executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 23, 2016 the Companies
have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed,duly attested by its Assistant
Secretary. Further,pursuant to Resolution of the Board of Directors of the Companies,the Companies hereby unambiguously affirm that they are
and will be bound by any mechanically applied signatures applied to this Power of Attorney.
s s f
� ®► ;,J�Me�v4�`. fasuW' y,t87® � � pOF� 4F 3 IfT1
Shelby Wiggins,Assistant Secretary Joelle L.LaPierre,Assistant Vice President
STATE OF FLORJDA
ss. Lake Mary
COUNTY OF SEMINOLE
On this 20th day of May,2021,before me personally came Joelle LaPierre,to me known,who being by me duly sworn,did depose and say:that
(s)he resides in Seminole County,State of Florida;that(s)he is the Assistant Vice President of the Companies,the corporations described in and which
executed the above instrument;that(s)he knows the seals of the said corporations;that the seals affixed to the said instrument are such corporate seals;
that they were so affixed by authority of the Boards of Directors of said corporations and that(s)he signed his/her name thereto by like authority.
7essica Ciccone
A4 Commission HH 122280
Expires Tune 20,2025
1,",undersigned,Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct
copy of the'Op e�dbl"At" y executed by said Companies,which is still in full force effective as of July 21"2021
�"d ahti sbal is ake Mary,Florida.
" ♦,,c�us o r '°�,w
'� m Y ,� ! Z�,oacc�e��. Ns�Y► :,,i;16?�� =.�t�9® � a g 41
s Keith D.Dozois,Assistant Vice President
North Holly-Days Reconciliation
1/11/2021 Contractor Submitted Substantial Completion Letter-a little more work needed for substantial completion
3/1/2021 Substantial Completion Walk-through w/City,Design Consultants,and Contractor
3/5/2021 Contractual Substantial Completion Date
4/15/2021 City noted that drainage valves were leaking,City begins basin drainage process
5/4/2021 Contractual Final Completion Date
5/7/2021 Plummer,City,and Contractor perform leakage tests,prepare solution
5/24/2021 Meeting w/City, Plummer,and Contractor to discuss proposed solution and path forward
6/25/2021 Basins 5&6 drain valve repairs complete and basins returned to service prior to final walk-through
6/29/2021 Basin 7 drain valve repairs complete and basin returned to service prior to final walk-through
7/15/2021 Contractor notes completion;however,final walk-through has not occurred
12/13/2021 City has removed basins from service,cleaned them,and ready for final walk-through
12/16/2021 Final Completion Walk-through w/City and Design Consultants
1/25/2022 Final punchlist complete by Contractor
266 days between contractual Final Completion Date and Actual Completion Date
214 days lost due to City needing to place the basins in immediate service
75 days lost between notice of drain valves leaking and repairs complete
AFFIDAVIT OF BILLS PAID
AND WAIVER OF CLAIMS
STATE OF TEXAS
COUNTY OF Dallas
BEFORE ME, the undersigned authority, on this day personally appeared, BAR
Constructors, Inc., CONTRACTOR to that certain Contract entered into on the 23rd day
of July,2021 between City of Ft. Worth and CONTRACTOR for the erection,construction
and completion of the improvements and/or additions upon the following described
premises, to wit:
North Holly WTP Sedimentation Basin Sludge Removal System Replacement
City Project No. 02328
Said Party being by me duly sworn states upon the said improvements have been erected
and functionally completed in full compliance with the above referenced Contract,Project,
Manuals, Plans, and Owner Directives.
Deponent further states that he or she has paid all bills and claims for materials furnished
and labor performed on said Contract and that there are no outstanding unpaid bills and
claims for materials furnished and labor performed or material furnished on said Contract
and that there are no outstanding unpaid bills or legal claims for labor performed or
materials furnished upon said job.
By
President
Title
Subscribed and sworn to before me,the undersigned authority on the 23rd_of July,2021.
Notary:
[NOTARY SEAL] My commission expires:
SHERYL FLOYD CATHEY
NOTARY PUBLIC
* STATE OF TEXAS
"FOFh*�e MY COMM.EXP.06/14/24
NOTARY 10 637376-5
FORT WORTH
February 17,2022
Bar Contractors ,Inc
P.O.Bog 10
Lancaster,Texas 75146
Re:Acceptance Letter
Project Name: North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement
Project Type: Water
Project Ns: 02328
DOE. Ns: N/A
Contract Ns: 52222 Dated: 2/17/2022
Gentleman:
On January 25,2022 a final inspection was made on the subject project. There were punch list items identified
at the time. The punch list items were completed on January 25,2022. The final inspection and the corrected
punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by
the City. The warranty period will start on January 25,2024,which is the date of punch list completion and will
extend for(2)years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance,please feel free to contact me at(817) 392-6054
Yours Truly,
�7� C
y a J 0
Tony Sholola,P.E.,Assistant Director,Water Department
TS /
cc: Chris Harder,P.E.,Director,Water Department
Laura Wilson,P.E.,Deputy Director,Water Department
Captain Michael Skains,Fire Department
Luke Coffman,Sanitary Sewer Systems Superintendent,Water Department
Cesar Zavala, Water Systems Superintendent,Water Department
Dena Johnson,PE,Project Manager,Water Department Capital Projects Delivery
David R Johnson,Inspection Supervisor,Water Department Capital Projects Delivery
Ricky Ybarra Plummer Associates,Inc,Inspector,Water Department Capital Projects Delivery
N/A, Consultant
BAR Contractors,Inc, Contractor
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102
817-392-8240 * Fax 817-392-8195
�^p Printed on recycled paper